REQUEST FOR QUOTATION (RFQ) (Pre-Delivery Inspection of ...

24
1 July 02, 2013 REQUEST FOR QUOTATION (RFQ) (Pre-Delivery Inspection of Rice Husk Gasified Power Generation Equipment) United Nations Development Programme United Nations Development Programme, DPRK Country Office. Procurement Unit PO BOX 27. 21 Munsudong Daedonggang, Pyongyang. Democratic People’s Republic of Korea. 80807 +850-2-381-7772 Ext: 213 [email protected] DATE: July 02, 2013 REFERENCE: RFQ-2013-12-DPRK Dear Sir / Madam: We kindly request you to submit your quotation for Pre-Delivery Inspection of Rice Husk Gasified Power Generation Equipment, as detailed in Annex 1 of this RFQ. When preparing your quotation, please be guided by the form attached hereto as Annex 2. Quotations may be submitted on or before 12:00PM, July 16, 2013 and via e-mail, courier mail or facsimile to the address below: United Nations Development Programme United Nations Development Programme, DPRK Country Office. Procurement Unit PO BOX 27. 21 Munsudong Daedonggang, Pyongyang. Democratic People’s Republic of Korea. 80807. +850-2-381-7772 Ext: 204 [email protected] Any question or comments regarding this Request for Quotation shall be sent to the address above or to the e- mail address [email protected] not later than July 9, 2013. The answers to the questions or any modification to this RFQ will be published in UNDP and UNGM websites, or sent to you directly before July 11, 2013. Quotations submitted by email must be limited to a maximum of 5MB, virus-free and no more than 5 email transmissions. They must be free from any form of virus or corrupted contents, or the quotations shall be rejected. It shall remain your responsibility to ensure that your quotation will reach the address above on or before the deadline. Quotations that are received by UNDP after the deadline indicated above, for whatever reason, shall

Transcript of REQUEST FOR QUOTATION (RFQ) (Pre-Delivery Inspection of ...

1

July 02, 2013

REQUEST FOR QUOTATION (RFQ) (Pre-Delivery Inspection of Rice Husk Gasified Power Generation Equipment)

United Nations Development Programme

United Nations Development Programme, DPRK Country

Office. Procurement Unit

PO BOX 27. 21 Munsudong Daedonggang, Pyongyang.

Democratic People’s Republic of Korea. 80807

+850-2-381-7772 Ext: 213 [email protected]

DATE: July 02, 2013

REFERENCE: RFQ-2013-12-DPRK

Dear Sir / Madam:

We kindly request you to submit your quotation for Pre-Delivery Inspection of Rice Husk Gasified

Power Generation Equipment, as detailed in Annex 1 of this RFQ. When preparing your quotation, please be guided by the form attached hereto as Annex 2.

Quotations may be submitted on or before 12:00PM, July 16, 2013 and via ☒e-mail, ☒courier mail or ☒facsimile to the address below:

United Nations Development Programme United Nations Development Programme, DPRK Country Office. Procurement Unit

PO BOX 27. 21 Munsudong Daedonggang, Pyongyang.

Democratic People’s Republic of Korea. 80807.

+850-2-381-7772 Ext: 204 [email protected]

Any question or comments regarding this Request for Quotation shall be sent to the address above or to the e-mail address [email protected] not later than July 9, 2013. The answers to the questions or any modification to this RFQ will be published in UNDP and UNGM websites, or sent to you directly before July 11, 2013. Quotations submitted by email must be limited to a maximum of 5MB, virus-free and no more than 5 email transmissions. They must be free from any form of virus or corrupted contents, or the quotations shall be rejected. It shall remain your responsibility to ensure that your quotation will reach the address above on or before the deadline. Quotations that are received by UNDP after the deadline indicated above, for whatever reason, shall

2

not be considered for evaluation. If you are submitting your quotation by email, kindly ensure that they are signed and in the PDF format, and free from any virus or corrupted files. Please take note of the following requirements and conditions pertaining to the supply of the abovementioned good/s:

Customs clearance, if needed, shall be done by:

☒UNDP

☐Supplier/Offeror

☐Freight Forwarder

Latest Expected Delivery Date, Place and Time (if delivery time exceeds this, quote may be rejected by UNDP)

☐ 1 week from the contract signed

☒ As per Delivery Schedule The pre-delivery inspection is tentatively scheduled to be conducted for 8 days from August 5 to August 12, 2013. Tentative major inspection points of the project’s cargo are:

Lot 1 Gasifier system – Yangon, Myanmar; Lot 2 Gasifier peripheral & auxiliary equipment and steel structure –

Guangzhou China Lot 3 Gas, diesel generation sets, transformer, electrical switch-gears &

equipment – Qingdao, China Actual address and timing for inspection in three places (in 2 countries) will be re-confirmed about 10 days before the actual inspection date.

Delivery Schedule

☒Required

☐Not Required

Preferred Currency of Quotation

☒Euro

☒Local Currency

Value Added Tax on Price Quotation

☒ Must be inclusive of VAT and other applicable indirect taxes

☐ Must be exclusive of VAT and other applicable indirect taxes

Deadline for the Submission of Quotation

Tuesday, 12:00PM (NOON) July 16, 2013

All documentations, including catalogs, instructions and operating manuals, shall be in this language

☒ English

☐ French

☐ Spanish

☐ Others

Documents to be submitted

☒ Duly Accomplished Form as provided in Annex 2, and in accordance with the list of requirements in Annex 1;

☒ Latest Business Registration Certificate ;

☒ Company Profile

☒ Complete documentation and information for key personnel involved in the provision of the requested services

☒ Working proposal

☒ Written Self-Declaration of not being included in the UN Security Council 1267/1989 list, UN Procurement Division List or other UN Ineligibility List;

☐ Others

☐ 60 days

3

Period of Validity of Quotes starting the Submission Date

☒ 90 days

☐ 120 days In exceptional circumstances, UNDP may request the Vendor to extend the validity of the Quotation beyond what has been initially indicated in this RFQ. The Proposal shall then confirm the extension in writing, without any modification whatsoever on the Quotation.

Partial Quotes ☐ Not permitted

☒ Permitted [The offeror can quote for all three lots specified in Appendix 1 or some of them.]

Payment Terms

☐ 100% upon complete delivery of goods

☒ Others % Milestone

70%

Following the submission final inspection report to UNDP-DPRK. To do this task, draft report will be prepared by a contractor and commented by Project Manager, and then revised/finalized version will be submitted within 1 (one) week after conclusion of the pre-inspection

30% Following the inspection and clearance by project manager’s upon equipment arrival and installation in DPRK

Evaluation Criteria Annex 4

UNDP will award to:

☐ One and only one supplier

☒ One or more Supplier, depending on the following factors: [The offeror can quote for all three lots specified in Appendix 1 or some of them.]

Special conditions of Contract

☒ Cancellation of PO/Contract by UNDP if the delivery/completion is delayed more than 2 weeks after site inspection finished.

☐ Others

Annexes to this RFQ1

☒ Terms of Reference for the Services Required (Annex 1)

☒ Form for Submission of Quotation (Annex 2)

☒ General Terms and Conditions / Special Conditions (Annex 3).

☒ Evaluation Criteria (Annex 4) Non-acceptance of the terms of the General Terms and Conditions (GTC) shall be grounds for disqualification from this procurement process.

Services offered shall be reviewed based on completeness and compliance of the quotation with the minimum specifications described above and any other annexes providing details of UNDP requirements. The quotation that complies with all of the specifications, requirements and offers the lowest price, as well as all other evaluation criteria indicated, shall be selected. Any offer that does not meet the requirements shall be rejected. Any discrepancy between the unit price and the total price (obtained by multiplying the unit price and quantity) shall be re-computed by UNDP. The unit price shall prevail and the total price shall be corrected. If

1 Where the information is available in the web, a URL for the information may simply be provided.

4

5

Annex 1

TERMS OF REFERENCE for

Pre-Delivery Inspection of Rice Husk Gasified Power Generation Equipment

TASKS AND RESPONSIBILITIES

1) Acquisition and understanding of documents related to the procurement procedure

The feasibility study report is the basis to implement the demonstration projects in DPRK rural areas. The

first document of Invitation to Bid with reference of ITB-2012-03-DPRK and its Amendments were prepared

and advertised in January 2012, but the technical specifications of the Rice Husk Gasified Power Generation

system were revised by local experts in close consultation with UNDP-DPRK and Feasibility Study team. It

followed to re-preparation and re-advertisement of Invitation to Bid with reference of ITB-2012-06-DPRK.

Therefore the documents for acquisition and understanding are:

Invitation to Bid ITB-2012-06-DPRK and its Amendment 1 with subject “Procurement of complete

equipment and materials, for the installation of a 100 kW Rice Husk Gasification Power Plant in Yaksu

Cooperative Farm, in the DPR of Korea”; and

Offer submitted by SPM COGEN SDN BHD focused on the technical specifications of the system.

2) Pre-delivery inspection of the whole system of equipment as per the Appendix I

Based on the acquisition and understanding of documents described above, a contractor will be responsible

to carry out the inspection of the equipment through site visit to the manufacturing company and/or factory

with the following tasks.

To confirm the completion of the manufacturing of equipment and check thoroughly the quantity of the

system one by one compared to the documents;

To conduct the qualitative evaluation of the equipment based on the expertise interpretation and

operational experiences with measuring dimensions and calculating technical parameters;

To discuss some issues with manufacturers to be clear in qualitative and quantitative evaluation;

To check the label of equipment focused on the technical specifications, and if it is not clear, set in test

operation of equipment; and

To take pictures of inspected equipment to attach in the inspection report.

3) Preparing and submission the pre-delivery inspection report

After completion of pre-delivery inspection, a contractor is responsible to prepare the inspection report to

submit to UNDP-DPRK. To do this task, draft report will be prepared by a contractor and commented by

Project Manager, and then revised/finalized version will be submitted within a week after conclusion of

inspection.

6

EXPECTED DELIVERABLES

The contractor is expected to have the following deliverables:

1) The Inspection Report for manufacturing of whole system of RHGPG equipment.

2) Technical evaluation sheet to prove the qualitative and quantitative evaluation of the equipment.

3) Pictures of inspected equipment.

The contractor will be required to submit draft of the report to UNDP-DPRK for comments and approval. The

above mentioned deliverables will be submitted to UNDP-DPRK in signed hard copy and in electronic format.

All reports and pictures should be provided in electronic format.

DATES AND PLACES

The pre-delivery inspection is tentatively scheduled for 8 days from August 5 to August 12, 2013.

Tentative major inspection points of the project’s cargo are:

Gasifier system – Yangon, Myanmar;

Gasifier peripheral & auxiliary equipment and steel structure – Guangzhou China

Gas, diesel generation sets, transformer, electrical switch-gears & equipment – Qingdao, China

Actual address and timing for inspection in three places (in 2 countries) will be re-confirmed about 10 days

before the actual inspection date.

EXPERIENCE AND QUALITY OF THE CONTRACTOR

Contractor should have:

Postgraduate degrees in relevant science or engineering field;

Extensive experience over ten years in design and quality evaluation of RHGPG devices or systems;

Excellent track record in actual inspection of equipment of such kind. Proof of such track record is to be

substantiated by references of clients;

Good English written skills and spoken ability.

Contractor shall :

Elaborate clearly in the technical proposal their understanding of the assignment and the tasks;

Indicate clearly the credentials of the personnel to work on the assignment and by no means substitute

those in the proposal by other personnel after the bid is submitted;

Provide a detailed and clear plan of how work will be conducted and work including man days, required

durations, time needed for home based work if necessary;

Provide a detailed financial plan/proposal in line with the template provided in Annex 2.

7

Appendix I

The technical specifications for Pre-Delivery Inspections of Rice Husk Gasified Power Generation System

Lot 1: Yangon, Myanmar - the following items:

a. 1.1 Rice Husk Gasifier b. 2.1 Ash & Char Remover

Item. Description Technical Specifications

required Offered by the Bidder

1.1. Rice Husk Gasifier

Manufacture standards

ASME, ASTM or approved equivalent standards for materials of construction. The bidders are requested to provide the name of the technical standards used for manufacturing of the gasifier offered

Compiled

Type Fixed bed with downdraft Compiled

Quantity 1 (one) 1 (one)

Fuel Rice husk (LHV = 13 MJ/kg, Moisture content ≤ 14%, Ash content 18-22%)

Compiled

Rated gas flow at gasifier outlet (Nm3/h)

300-350 350 – 400

Gas calorific value (MJ/Nm3) > 4.5 > 5.5

Gasification temperature (oC) 900-950 900 – 1400

Gasifier efficiency (%) > 65% (hot gas) 65% - 70%

Gas composition (CO, H2, CO2, CH4, N2)

As per design of the Equipment Supplier

Refer to Appendix A

Gas impurities at gasifier outlet

Tar content (mg/Nm3 of

gas) < 1000 < 500

Particulate matters

(mg/Nm3 of gas) < 1000 < 500

Gasifier start-up time (min) < 45 30 – 60

Turn down ratio 50% 40% - 100%

Load fluctuation (% of full load) ≥ 20% Max. of 20%

Rice husk consumption (kg/h) ≤ 200 (or 2.0 kg/kWh of gross power output)

Approx. 185

Air consumption (Nm3/h) As per design of the Equipment Supplier

300 – 400

Char/Ash discharge (kg/h) ≤ 45 max 40 – 45

Materials of construction

Gasifier body Carbon steel Compiled

Critical components of the Carbon steel/Cast Iron Compiled

8

Item. Description Technical Specifications

required Offered by the Bidder

gasifier (combustion cone, nozzle, etc.)

2.1. Ash/Char Remover

Type Single or double arm type Single arm

Quantity 1 (one) 1 (one)

Working temperature (oC) 150 – 400C Compiled

Rotational speed (rpm) < 2 1 – 2 rpm

Materials of construction

- Bearing: cast iron bushing - Blade: high chromium cast

iron - Shaft: carbon steel

- Compiled - Compiled

- Compiled

Type of drive Electric motor (3 phases, 380 V, 60 Hz)

Compiled

Motor rated power (kW) 0.5 Compiled Appendix - A Composition and Properties of SynGas Carbon Monoxide 31% Carbon Dioxide 3% Hydrogen 15% Methane 1% Water vapor 1% Nitrogen and Oxide 49% Density of Gas 1.1 kg/m

3

Specific Heat Capacity of Gas 1.1865 KJ/m3-K

Calorific Value of the Gas 5.5 – 6.5 MJ/Nm3

Lot 2: Guangzhou, China – the following items:

c. 1.2 Rice Husk Feeding System d. 2.2 Ash Discharging System e. 4.1 Gas Cleaner & Cooler f. 4.2 Gas filters g. 5.0 Gas Blower h. 8.1 Control system i. 8.2 Field Instrumentation j. 9.1 Cooling Tower k. 9.2 Cooling Water Circulating Pumps l. 10.1 Water Treatment Plant m. 10.2 Raw water pumps

Item. Description Technical Specifications

required Offered by the Bidder

1.2. Rice Husk Feeding System

Type Screw or Pneumatic Screw

Rice husk receiving hopper

Type Metallic Compiled

Quantity 1 (one) 1 (one)

9

Item. Description Technical Specifications

required Offered by the Bidder

Capacity 500 kg of rice husk Compiled

Rice husk conveyor

Type Screw Conveyor or Bucket Elevator

Screw Conveyor

Quantity 1 (one) 1 (one)

Conveying capacity 150% of rice husk consumption at full load of the gasifier

Compiled

Type of drive Electric motor (3 phases, 380 V, 60 Hz)

Compiled

2.2. Ash Discharging System

Type Water-cooled screw or chain conveyor

Screw Conveyor

Quantity 1 (one) 1 (one)

Capacity (kg/h) 100 100 – 200

Type of drive Electric motor (3 phases, 380 V, 60 Hz)

Compiled

Motor rated power (kW) 0.25 Compiled

4.1 Gas Cleaner and Cooler

Type Scrubber + Tar Condenser Wet scrubber, gas

conditioner & cleaning system

Outlet gas impurities

Tar content (mg/Nm3 of

gas) < 30 Compiled

Particulate matters

(mg/Nm3 of gas) < 30 Compiled

Moisture content (%) < 1 0.5

Outlet gas temperature (oC) < 40 35 – 40

Gas calorific value (MJ/Nm3) > 5.5 5.5 – 6.5

Water demand for Scrubber

(m3/h) < 6 m3/h, Recyclable 5 - 6 m3/h

Cooling water flow rate (for

Cooler) (m3/h) < 20 m3/hr (from Cooling Tower)

15 - 20 m3/h

Materials of Construction - Scrubber: Carbon steel - Gas Cooler: Carbon

steel/Stainless steel tube

- Compiled - Compiled - Compiled

4.2 Gas Filters

Type On-line, cylinder tanks Compiled

Quantity 2 (1 working + 1 standby) 3 (2 working + 1 standby)

Filter media Dried rice husk or “Activated”

Saw dust Compiled

Gas impurities at filter outlet

Tar content (mg/Nm3 of

gas) < 10 5 – 10

Particulate matters

(mg/Nm3 of gas) < 10 < 5

10

Item. Description Technical Specifications

required Offered by the Bidder

Moisture content (%) < 0.5 0.1 – 0.5

Filter media life (hours) 330 – 3300 Compiled

Outlet gas temperature (oC) < 35 35 – 40

Materials of construction

Body Carbon steel Compiled

Critical components Carbon steel Compiled

5. GAS BLOWER/FAN

Type Centrifugal, induced draft Compiled

Quantity 1 (one) 1 (one)

Rated gas flow (Nm3/h) > 150 350 – 400

Static pressure (mm WG) 150 100 – 200

Type of drive Electric motor (3 phases, 380 V, 60 Hz)

Compiled

Motor rated power (kW) 3 0.5 kW

Materials of construction Carbon steel Compiled

8.1. Control system

Type of control To be proposed by the bidders PID Controller

Power supply for control system

220 V / 60 Hz Compiled

Operators Interface Local Control Panel(s) Motor Control Center

w/Interlock

8.2. Field instrumentation

Analog signal (mA) 4-20 Compiled

Digital signal 24 VDC (dry contacts) Compiled

Local indicators Analog and/or digital type Analog

Transmitters (If applicable) Intelligent type of instruments enabling the easy integration with the PLC system

Compiled

Temperature measurements Thermo-couples and/or resistance temperature detectors (RTDs)

Compiled

Flow measurements (If applicable)

Pitot-type devices Compiled

Level measurements Infrared level sensor and/or level gauges

Level Gauge

Pressure measurements Pitot-type pressure gauges Analog type

Control valves

- Valves shall be sized to carry maximum nominal flow at the specified pressure drop with 80% of valve maximum lift;

- Control valves and control dampers shall be equipped with pneumatic actuators and electro-pneumatic positioners;

- Provide with accessories

Compiled

Compiled

Compiled

11

Item. Description Technical Specifications

required Offered by the Bidder

such as handwheels, filter regulators, solenoid pilot valves, and limit switches as applicable.

9.1. Cooling tower

Type Induced draft Compiled

Quantity 1 cooling tower with its accessories

Compiled

No. of cells As per design of the Equipment Supplier

1 (one)

Fans per cell 1

Maximum circulating water flow (m3/h)

As per design of the Equipment Supplier

25 m3/h

Hot water temperature (oC in) 44 max Compiled

Cold water temperature (oC out)

32 max Compiled

Tower pump head (m) 20 Compiled

Design drift loss (%) 0.1 Compiled

Design evaporation loss (%) 1.9 Compiled

Water basin

Volume (m3) 32 3.24

Dimensions (L x W x H m) 4.0 x 4.0 x 2.0 1.8 x 1.8 x 1.0

Materials of construction

Cooling tower Fiberglass Reinforced Plastics (FRP)

Compiled

Water basin

Steel Reinforced concrete foundation and brick walls (to be designed by the bidder and constructed by the Purchaser)

Compiled

9.2 Cooling water circulating pumps

Type Centrifugal, horizontal, end-suction

Compiled

Quantity 2 (1 working + 1 standby) Compiled

Capacity per pump (m3/h) 20 25

Water head (m) 20 20

Type of motor 380 V / 3 phases / 60 Hz Compiled

Motor speed (rpm) 1800 Compiled

Protection IP 55 Compiled

Insulation class F Compiled

Materials of construction

Casing Cast Iron Compiled

Impeller Cast Iron Compiled

Shaft Stainless Steel Compiled

10.1. Water treatment plant

Type Skid-mounted Compiled

12

Item. Description Technical Specifications

required Offered by the Bidder

Treatment technology As per design of the Equipment Supplier

Mechanical Filtration

Quantity (trains) 2 (1 working + 1 standby) Compiled

Rated capacity (m3/h) per train 1.0 Compiled

Quality of treated water To meet the requirements of the cooling water

Compiled

10.2. Raw water pumps

Type Single stage, horizontal Compiled

Quantity 2 (1 working + 1 standby) Compiled

Rated capacity per pump (m3/h)

1.0 Compiled

Head (m) As per design of the Equipment Supplier

15 – 20 meters

Type of motor 220 V / 60 Hz Compiled

Motor speed (rpm) 1800 Compiled

Protection IP 55 Compiled

Insulation class F Compiled

Materials of construction

Casing Cast Iron Compiled

Impeller Cast Iron Compiled

Shaft Stainless Steel Compiled

Lot 3 Qingdao, China – the following items:

n. 6.1 Gas Engine o. 6.2 Electric Generator p. 7.1 Step-up transformer q. 7.2 0.4 kV Switchgear r. 11.0 Standby-by Diesel Engine Generator

Item. Description Technical Specifications

required Offered by the Bidder

6. GAS ENGINE-GENERATOR SYSTEM

6.1. Gas engine

Type Sparks internal combustion engine

Compiled (refer Appendix B)

Quantity 1 (one) 1 (one)

Gas consumption in full load (Nm3/h)

As per design of the Equipment Supplier

220 – 250

Engine efficiency ≥ 30% 30 %

Starting system Battery power starter Compiled

Lubrication method Lube oil Compiled

Cooling method Closed circuit oil-water cooling Compiled

Materials of construction ASME, ASTM or approved equivalent standards

Compiled

6.2. Electric generator

13

Item. Description Technical Specifications

required Offered by the Bidder

Type

Brushless, self-regulated, digital voltage regulation (AVR), horizontal mounted, single shaft with single or double bearing

Compiled (single – bearing)

(refer Appendix B)

Quantity 1 (one) 1 (one)

Gross power output (kW) 100 Compiled

Efficiency (%) ≥ 90% Compiled

Rated voltage (Volt) 400 400

Frequency (Hz) 60 60

Cos 0.8 lag. Compiled

Phase & Connection 3 phases / 4 wires Compiled

Mode of excitation Brushless Compiled

Insulation class F (both rotor, stator and exiter) H

Mounting Horizontal Compiled

Temperature rise Class B (both rotor and stator) F

Terminal box To suit HT cable connection 400 V cable connection

Cooling method IP 23 Compiled

Materials of construction Carbon steel Compiled

7. ELECTRICAL SYSTEM

7.1. Step up transformer

Type Out-door installed Compiled

Manufacture standards IEC or approved equivalent standards

Compiled

Quantity 1 (one) 1 (one)

Rated capacity (kVA) 150 150

Cooling method ONAN Compiled

Rated voltage

HV side (kV) 3.3 Compiled

LV side (kV) 0.4 Compiled

Tap voltage on HV side + 2 x 2.5% Compiled

No. of taps 5 Compiled

Tap changing method OCTC (off circuit tap charger) Compiled

Connection Delta-Wye Compiled

Connection method

HV side Bushing Compiled

LV side Bushing Compiled

LV neutral Bushing Compiled

7.2. 0.4 kV Switchgear

Type Vacuum or Air, Indoor Air Circuit Breaker

Manufacture standards IEC or approved equivalent standards

IEC

Rated voltage (kV) 0.4 0.4

11. STAND-BY DIESEL OR GASOLINE ENGINE GENERATOR

Function To be used for starting up the rice husk gasification power

8.0 kW 3-phase black-start genset (1-unit)

14

Item. Description Technical Specifications

required Offered by the Bidder

system during the period when the electricity supply from the local grid is not available

Type Offered by bidder Refer Appendix C

Capacity Offered by bidder but not less than 5 kW

8.0 kW

Other technical specifications Offered by bidder Refer Appendix C

Appendix – B Gas Engine Specification

Make: Deutz – German Technology Country of origin: China Design capacity: 100 kW (base-load) Rated speed: 1800 rpm Idling speed: 700 – 800rpm Type: Vee type 8-cylinders, 4-stroke, electronic-control spark plug ignition, water-cooling,

wet cylinder jacket, premix proper ratio of air and gas before combustion Cooling system: Radiator, fan cooling. Compression ratio: 11.5 : 1 Fuel: Synthetic gas (syn-gas) Oil recommended: SAE 15W/40CD Oil consumption: Approx. 1.0 g/kWh Noise level: 80 Decibel (max)

Alternator Specification Make: Stamford – United Kingdom Technology Country of origin: China Voltage: 400V, 60Hz, 3phase, 0.8pf. Number of bearing: Single Excitation: Brushless by Automatic Voltage Regulation (AVR) Protection: IP 23

Appendix – C Black-start Diesel Generator Specification

Make: Deutz – German Technology Country of origin: China Design capacity: 10 kW (Prime rating) Rated speed: 1800 rpm Idling speed: 700 – 800 rpm Type: Inline 2-cylinders, 4-stroke, standard fuel injection Cooling system: Air-cooled Compression ratio: 16 : 1 Fuel: High speed diesel Oil recommended: SAE 15W/40CD Oil consumption: Approx. 1.5 g/kWh Noise level: 80 Decibel (with canopy)

Alternator Specification Make: Stamford – United Kingdom Technology LEROY SOMER Country of origin: China Voltage: 400V, 60Hz, 3phase, 0.8pf. Number of bearing: Single

15

Excitation: Brushless by Automatic Voltage Regulation (AVR) Protection: IP 23

16

Annex 2

FORM FOR SUBMITTING SUPPLIER’S QUOTATION2 (This Form must be submitted only using the Supplier’s Official Letterhead/Stationery3)

We, the undersigned, hereby accept in full the UNDP General Terms and Conditions, and hereby offer to supply the items listed below in conformity with the specification and requirements of UNDP as per RFQ Reference No. _______: TABLE 1 : Offer to Supply Goods Compliant with Technical Specifications and Requirements

Price Schedule: Request for Quotation of Services

Description of Activity/Item Quantity Unit of measure

Estimated Amount

1. Remuneration

1.1 Fee for Services in Home office

(please breakdown activities)

1.2 Fee for Services in Field

(please breakdown activities)

2. Out of Pocket Expenses

2.1 Travel

2.2 Per Diem Allowances (not exceeding allowable UN Daily Subsistence Allowance, rate for Myanmar and Prof China are attached in Appendix 2)

2.3 Communications

2.4 Reproduction and Reports

2.5

2 This serves as a guide to the Supplier in preparing the quotation and price schedule.

3 Official Letterhead/Stationery must indicate contact details – addresses, email, phone and fax numbers – for verification

purposes

17

TABLE 2 : Offer to Comply with Other Conditions and Related Requirements

Other Information pertaining to our Quotation are as follows :

Your Responses

Yes, we will comply

No, we cannot comply

Delivery of Report

Validity of Quotation

All Provisions of the UNDP General Terms and Conditions

Written Self-Declaration of not being included in the UN Security Council 1267/1989 list, UN Procurement Division List or other UN Ineligibility List;

All other information that we have not provided automatically implies our full compliance with the

requirements, terms and conditions of the RFQ.

[Name and Signature of the Supplier’s Authorized Person] [Designation] [Date]

18

Appendix 2

Daily Subsistence Allowance Rate

for Myanmar and People’s Republic of China

Area DSA rate (USD)

Yangon, Myanmar 179

Guangzhou, PR of China 257

Qingdao, PR of China 269

19

Annex 3

General Terms and Conditions

1. ACCEPTANCE OF THE PURCHASE ORDER

This Purchase Order may only be accepted by the Supplier's signing and returning an acknowledgement copy of it or

by timely delivery of the goods in accordance with the terms of this Purchase Order, as herein specified. Acceptance of

this Purchase Order shall effect a contract between the Parties under which the rights and obligations of the Parties shall

be governed solely by the terms and conditions of this Purchase Order, including these General Conditions. No

additional or inconsistent provisions proposed by the Supplier shall bind UNDP unless agreed to in writing by a duly

authorized official of UNDP.

2. PAYMENT

2.1 UNDP shall, on fulfillment of the Delivery Terms, unless otherwise provided in this Purchase Order, make

payment within 30 days of receipt of the Supplier's invoice for the goods and copies of the shipping documents

specified in this Purchase Order.

2.2 Payment against the invoice referred to above will reflect any discount shown under the payment terms of this

Purchase Order, provided payment is made within the period required by such payment terms.

2.3 Unless authorized by UNDP, the Supplier shall submit one invoice in respect of this Purchase Order, and such

invoice must indicate the Purchase Order's identification number.

2.4 The prices shown in this Purchase Order may not be increased except by express written agreement of UNDP.

3. TAX EXEMPTION

3.1 Section 7 of the Convention on the Privileges and Immunities of the United Nations provides, inter alia, that

the United Nations, including its subsidiary organs, is exempt from all direct taxes, except charges for

utilities services, and is exempt from customs duties and charges of a similar nature in respect of articles

imported or exported for its official use. In the event any governmental authority refuses to recognize

UNDP's exemption from such taxes, duties or charges, the Supplier shall immediately consult with UNDP to

determine a mutually acceptable procedure.

3.2 Accordingly, the Supplier authorizes UNDP to deduct from the Supplier's invoice any amount representing

such taxes, duties or charges, unless the Supplier has consulted with UNDP before the payment thereof and

UNDP has, in each instance, specifically authorized the Supplier to pay such taxes, duties or charges under

protest. In that event, the Supplier shall provide UNDP with written evidence that payment of such taxes,

duties or charges has been made and appropriately authorized.

4. RISK OF LOSS

Risk of loss, damage to or destruction of the goods shall be governed in accordance with Incoterms 2010, unless

otherwise agreed upon by the Parties on the front side of this Purchase Order.

5. EXPORT LICENCES

Notwithstanding any INCOTERM 2010 used in this Purchase Order, the Supplier shall obtain any export licences

required for the goods.

6. FITNESS OF GOODS/PACKAGING

The Supplier warrants that the goods, including packaging, conform to the specifications for the goods ordered under

this Purchase Order and are fit for the purposes for which such goods are ordinarily used and for purposes expressly

20

made known to the Supplier by UNDP, and are free from defects in workmanship and materials. The Supplier also

warrants that the goods are contained or packaged adequately to protect the goods.

7. INSPECTION

7.1 UNDP shall have a reasonable time after delivery of the goods to inspect them and to reject and refuse

acceptance of goods not conforming to this Purchase Order; payment for goods pursuant to this Purchase

Order shall not be deemed an acceptance of the goods.

7.2 Inspection prior to shipment does not relieve the Supplier from any of its contractual obligations.

8. INTELLECTUAL PROPERTY INFRINGEMENT

The Supplier warrants that the use or supply by UNDP of the goods sold under this Purchase Order does not infringe

any patent, design, trade-name or trade-mark. In addition, the Supplier shall, pursuant to this warranty, indemnify,

defend and hold UNDP and the United Nations harmless from any actions or claims brought against UNDP or the

United Nations pertaining to the alleged infringement of a patent, design, trade-name or trade-mark arising in

connection with the goods sold under this Purchase Order.

9. RIGHTS OF UNDP

In case of failure by the Supplier to fulfil its obligations under the terms and conditions of this Purchase Order,

including but not limited to failure to obtain necessary export licences, or to make delivery of all or part of the goods by

the agreed delivery date or dates, UNDP may, after giving the Supplier reasonable notice to perform and without

prejudice to any other rights or remedies, exercise one or more of the following rights:

9.1 Procure all or part of the goods from other sources, in which event UNDP may hold the Supplier responsible

for any excess cost occasioned thereby.

9.2 Refuse to accept delivery of all or part of the goods.

9.3 Cancel this Purchase Order without any liability for termination charges or any other liability of any kind of

UNDP.

10. LATE DELIVERY

Without limiting any other rights or obligations of the parties hereunder, if the Supplier will be unable to deliver the

goods by the delivery date(s) stipulated in this Purchase Order, the Supplier shall (i) immediately consult with UNDP to

determine the most expeditious means for delivering the goods and (ii) use an expedited means of delivery, at the

Supplier's cost (unless the delay is due to Force Majeure), if reasonably so requested by UNDP.

11. ASSIGNMENT AND INSOLVENCY

11.1. The Supplier shall not, except after obtaining the written consent of UNDP, assign, transfer, pledge or make

other disposition of this Purchase Order, or any part thereof, or any of the Supplier's rights or obligations

under this Purchase Order.

11.2. Should the Supplier become insolvent or should control of the Supplier change by virtue of insolvency,

UNDP may, without prejudice to any other rights or remedies, immediately terminate this Purchase Order

by giving the Supplier written notice of termination.

12. USE OF UNDP OR UNITED NATIONS NAME OR EMBLEM

The Supplier shall not use the name, emblem or official seal of UNDP or the United Nations for any purpose.

13. PROHIBITION ON ADVERTISING

The Supplier shall not advertise or otherwise make public that it is furnishing goods or services to UNDP without

specific permission of UNDP in each instance.

14. CHILD LABOUR

21

The Supplier represents and warrants that neither it nor any of its affiliates is engaged in any practice inconsistent with

the rights set forth in the Convention on the Rights of the Child, including Article 32 thereof, which, inter alia, requires

that a child shall be protected from performing any work that is likely to be hazardous or to interfere with the child's

education, or to be harmful to the child's health or physical, mental, spiritual, moral or social development.

Any breach of this representation and warranty shall entitle UNDP to terminate this Purchase Order immediately upon

notice to the Supplier, without any liability for termination charges or any other liability of any kind of UNDP.

15. MINES

The Supplier represents and warrants that neither it nor any of its affiliates is actively and directly engaged in patent

activities, development, assembly, production, trade or manufacture of mines or in such activities in respect of

components primarily utilized in the manufacture of Mines. The term "Mines" means those devices defined in Article

2, Paragraphs 1, 4 and 5 of Protocol II annexed to the Convention on Prohibitions and Restrictions on the Use of

Certain Conventional Weapons Which May Be Deemed to Be Excessively Injurious or to Have Indiscriminate Effects

of 1980.

Any breach of this representation and warranty shall entitle UNDP to terminate this Purchase Order immediately upon

notice to the Supplier, without any liability for termination charges or any other liability of any kind of UNDP.

16. SETTLEMENT OF DISPUTES

16.1 Amicable Settlement. The Parties shall use their best efforts to settle amicably any dispute, controversy or

claim arising out of, or relating to this Purchase Order or the breach, termination or invalidity thereof. Where

the Parties wish to seek such an amicable settlement through conciliation, the conciliation shall take place in

accordance with the UNCITRAL Conciliation Rules then obtaining, or according to such other procedure as

may be agreed between the Parties.

16.2 Arbitration. Unless, any such dispute, controversy or claim between the Parties arising out of or relating

to this Purchase Order or the breach, termination or invalidity thereof is settled amicably under the preceding

paragraph of this Section within sixty (60) days after receipt by one Party of the other Party's request for such

amicable settlement, such dispute, controversy or claim shall be referred by either Party to arbitration in

accordance with the UNCITRAL Arbitration Rules then obtaining, including its provisions on applicable law.

The arbitral tribunal shall have no authority to award punitive damages. The Parties shall be bound by any

arbitration award rendered as a result of such arbitration as the final adjudication of any such controversy,

claim or dispute.

17. PRIVILEGES AND IMMUNITIES

Nothing in or related to these General Terms and Conditions or this Purchase Order shall be deemed a waiver of any of

the privileges and immunities of the United Nations, including its subsidiary organs.

18. SEXUAL EXPLOITATION:

18.1 The Contractor shall take all appropriate measures to prevent sexual exploitation or abuse of anyone by it or

by any of its employees or any other persons who may be engaged by the Contractor to perform any services

under the Contract. For these purposes, sexual activity with any person less than eighteen years of age,

regardless of any laws relating to consent, shall constitute the sexual exploitation and abuse of such person.

In addition, the Contractor shall refrain from, and shall take all appropriate measures to prohibit its

employees or other persons engaged by it from, exchanging any money, goods, services, offers of

employment or other things of value, for sexual favors or activities, or from engaging in any sexual

activities that are exploitive or degrading to any person. The Contractor acknowledges and agrees that the

provisions hereof constitute an essential term of the Contract and that any breach of this representation and

warranty shall entitle UNDP to terminate the Contract immediately upon notice to the Contractor, without

any liability for termination charges or any other liability of any kind.

22

18.2 UNDP shall not apply the foregoing standard relating to age in any case in which the Contractor’s personnel

or any other person who may be engaged by the Contractor to perform any services under the Contract is

married to the person less than the age of eighteen years with whom sexual activity has occurred and in

which such marriage is recognized as valid under the laws of the country of citizenship of such Contractor’s

personnel or such other person who may be engaged by the Contractor to perform any services under the

Contract.

19.0 OFFICIALS NOT TO BENEFIT:

The Contractor warrants that no official of UNDP or the United Nations has received or will be offered by the

Contractor any direct or indirect benefit arising from this Contract or the award thereof. The Contractor agrees that

breach of this provision is a breach of an essential term of this Contract.

20. AUTHORITY TO MODIFY:

Pursuant to the Financial Regulations and Rules of UNDP, only the UNDP Authorized Official possess the

authority to agree on behalf of UNDP to any modification of or change in this Agreement, to a waiver of any of its

provisions or to any additional contractual relationship of any kind with the Contractor. Accordingly, no

modification or change in this Contract shall be valid and enforceable against UNDP unless provided by an

amendment to this Agreement signed by the Contractor and jointly by the UNDP Authorized Official.

23

Annex 4

EVALUATION AND SELECTION OF OFFERS

UNDP will award contract to the consultant that guarantees the best value for money. Thus, award will be made to the

lowest priced technically acceptable offer. The technical criteria are described in the following table:

Technical criteria Max points A B C D E

1 Proposed Work Plan and Proposed Methodology (Form 1) 300

2 Experience (Form 2) 300

Total 600

Evaluation forms for technical proposals follow on the below. The obtainable number of points specified for each

evaluation criterion indicates the relative significance or weight of the item in the overall evaluation process. The Technical

Proposal Evaluation Forms are:

Form 1: Proposed Work Plan and Proposed Methodology

Form 2: Experience

Note: The score weights and points obtainable in the evaluation sheet are tentative and should be changed depending on the

need or major attributes of technical proposal.

Technical Proposal Evaluation

Table 1

Points

Obtainable

Company / Other Entity

A B C D E

Proposed Work Plan & Methodology

1.1 To what degree does the Offeror understand the task and

deadlines? 80

1.2 Did the proposal address all required aspects of the ToR in

sufficient detail? 80

1.3 Is the proposal based on well-defined description of work

requirements? 70

1.4 Does the proposal fully correspond to the description of work? 70

Total 300

Technical Proposal Evaluation

Table 2

Points

Obtainable

Company

A B C D E

Experience

2.1 Level of experience for the consultant in design and quality

evaluation of RHGPG devices or systems (evidence is required) 80

2.2 Qualifications in terms of education, consultancy, specializations

and other relevant requirements (proof is required) 50

2.3 Experience in inspection of equipment, in particular, in

gasification devices and systems (proof reference is required) 80

2.4 Experience with UNDP or other UN or donor agencies (proof

reference is required) 40

2.5 Language skills 50

Total 300

24

UNDP reserves the right to accept or reject any quotation, and to annul the solicitation process and reject all quotations at

any time prior to award of contract, without thereby incurring any liability to the affected Bidder(s) or any obligation to

inform the affected Bidder(s) of the grounds for the Purchaser's action.