REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ......

199
Appendix 4: Business Requirements Response Guide _____________________ __ Request for Proposals RFP-2016-1201 Washington State Good To Go! Back Office System Offered by Washington State

Transcript of REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ......

Page 1: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

Appendix 4: Business Requirements Response Guide

_______________________

Request for Proposals

RFP-2016-1201

Washington State Good To Go!

Back Office System

Offered by

Washington State Department of Transportation

Page 2: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

Table of Contents0.0 Business Requirements Response Guidelines............................................................1

0.1 General Instructions...............................................................................................10.2 Response Instructions...........................................................................................10.3 Examples Demonstrating Format of Required Responses....................................4

0.3.1 Example A: Compliance........................................................................40.3.2 Example B: Compliance With Modification............................................50.3.3 Example C: Non-Compliance................................................................6

1.0 Overview of Scope of Work............................................................................................71.1 Current WSDOT Tolling Business Environment....................................................71.2 Solution Overview..................................................................................................71.3 Scope of Services..................................................................................................81.4 Development Methodology....................................................................................81.5 Implementation Approach and Phasing.................................................................81.6 Configuration Definition..........................................................................................9

2.0 Operational Back Office..................................................................................................92.1 Concept Overview..................................................................................................92.2 Transaction Processing and Trip Building...........................................................102.3 Trip Transaction Types and Exceptions...............................................................102.4 Static, Variable and Dynamic Pricing...................................................................112.5 Suspension or Change of Toll Rate.....................................................................112.6 Transaction and Image Transfer..........................................................................112.7 Transmission Error Identification.........................................................................122.8 License Plate Character Extraction with OCR.....................................................122.9 Manual Image Review.........................................................................................132.10 Trip Re-processing from Image Review...............................................................132.11 Operational Reporting..........................................................................................14

3.0 Commercial Back Office...............................................................................................144.0 Account Management...................................................................................................15

4.1 Good To Go! Customer Accounts........................................................................154.2 Single Customer Account....................................................................................15

4.2.1 Unregistered Customer........................................................................164.2.2 Prepaid Customer................................................................................164.2.3 Zero Balance Customer.......................................................................164.2.4 Postpaid Customer (Pay By Mail)........................................................174.2.5 Non-revenue Customers......................................................................174.2.6 Government Customers.......................................................................18

4.3 Customer Defined Account Validity Period..........................................................184.4 Negative Account Balance Grace Period.............................................................18

Page i of 139

Page 3: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

4.5 Commercial Account Interface.............................................................................194.6 Merging Customer Accounts................................................................................194.7 Customer Account Establishment........................................................................204.8 Customer Account Closing..................................................................................204.9 Good To Go! Pay Card........................................................................................204.10 Customer Account Search Capabilities...............................................................21

4.10.1 Comment Search Capabilities.............................................................214.10.2 General Search Capabilities................................................................214.10.3 License Plate Search Capabilities.......................................................224.10.4 Account Notification Search.................................................................224.10.5 Customer Case Management and Case Search.................................22

4.11 Account Statement and Pay By Mail Notification Process...................................234.11.1 Account Statements.............................................................................234.11.2 Pay By Mail Notification (Toll Bill)........................................................23

4.12 Other Customer Account Notifications.................................................................244.12.1 Email or Text Notification Option.........................................................24

4.13 Barcodes for Letters, Envelopes and Mailing Labels to Identify Accounts..........254.14 Toll Dispute Resolution........................................................................................254.15 Advocate for the Customer Program (A4C).........................................................264.16 Enhanced CSR Tools..........................................................................................264.17 Marketing Support................................................................................................27

5.0 Civil Penalty Program....................................................................................................275.1 Pre-Civil Penalty Customer Notification...............................................................285.2 Certification for Eligibility of Civil Penalty.............................................................285.3 Notice of Civil Penalty..........................................................................................285.4 Customer Program for Resolution (CPR)............................................................295.5 Adjudication Program...........................................................................................29

5.5.1 Interface with OAH Case Management System..................................305.5.2 Administrative Hearings Functionality (WSDOT Option).....................30

5.6 DOL Registration Hold Program..........................................................................306.0 Collections......................................................................................................................31

6.1 Integration with Third Party Collections Systems.................................................316.2 Collections Functionality (WSDOT Option)..........................................................32

7.0 Settlements.....................................................................................................................327.1 Payment Plans.....................................................................................................33

8.0 Customer Website.........................................................................................................338.1 General Requirements.........................................................................................338.2 Open a Good To Go! Account.............................................................................348.3 Manage Good To Go! Account............................................................................348.4 View and Pay or Dispute Toll Bills and Notice of Civil Penalty............................348.5 Customer Viewing of Images Associated with a Transaction..............................35

Page ii of 139

Page 4: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

8.6 Special Promotions..............................................................................................358.7 Fulfill Transponder Inventory Request.................................................................358.8 Live Chat..............................................................................................................368.9 Social Media Communication Channels..............................................................368.10 Multilingual Access..............................................................................................368.11 Web Metrics.........................................................................................................378.12 Allow Customers with Negative Balance to Make Payment Online.....................378.13 Experience with User Centered Design...............................................................38

9.0 Inventory Management..................................................................................................3810.0 Washington State Ferries Integration..........................................................................3911.0 Additional CSC Support Tools.....................................................................................39

11.1 Computer Telephony/IVR System Integration.....................................................3911.1.1 Interface with CSC Operator Provided IVR System............................3911.1.2 Vendor Provided Telephony and IVR System (WSDOT Option).........40

11.2 Document Scanning and Management System...................................................4011.3 Email Support.......................................................................................................4111.4 CSC Dashboard...................................................................................................4111.5 Photo Recognition Application for Plate Registration..........................................42

12.0 Accounting and Financial Requirements....................................................................4312.1 General Requirements.........................................................................................4312.2 Payment Processing............................................................................................4312.3 Receivables Collectability....................................................................................4412.4 Write-Off...............................................................................................................4412.5 Bankruptcy Management.....................................................................................4512.6 Refund Issuance..................................................................................................4512.7 Interest Calculation..............................................................................................4612.8 Discount/Incentive Programs...............................................................................4612.9 Non-Revenue Transactions.................................................................................4712.10 Auditability............................................................................................................47

13.0 Management Reporting Requirements........................................................................4713.1 General Requirements.........................................................................................4713.2 General Ledger (GL) Activity Summary Report...................................................4813.3 Subsidiary Ledger (SL) Activity Detail Report......................................................4813.4 Trial Balance Report............................................................................................4813.5 Bank Reconciliation Report..................................................................................4913.6 Customer Deposit Summary Report....................................................................4913.7 Refund Tracking Report.......................................................................................4913.8 Toll Transaction Processing Summary Report....................................................5013.9 Toll Transaction Disposition Summary Report.....................................................5013.10 Inventory Management Report............................................................................5013.11 Receivables Aging Report...................................................................................51

Page iii of 139

Page 5: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

13.12 Write-Off Activity Report......................................................................................5113.13 Operations Production Reports............................................................................5113.14 System and CSR Activity Report.........................................................................5213.15 Monthly Operations Report..................................................................................5213.16 Allowance for Additional Reports.........................................................................52

14.0 Data Warehouse and Business Intelligence Requirements (WSDOT Option).......5314.1 General Requirements.........................................................................................5314.2 Bill of Materials.....................................................................................................5414.3 Anticipated User Count........................................................................................5414.4 Data Warehouse Deployment and Configuration................................................5414.5 Data Warehouse Hardware Requirements..........................................................55

14.5.1 Traditional Server Option.....................................................................5514.5.2 Server Instance Option........................................................................5614.5.3 Cloud Server Option............................................................................56

14.6 Data Warehouse Software Requirements...........................................................5614.6.1 Utility Software.....................................................................................5714.6.2 Database Development Software........................................................5714.6.3 Business Intelligence Software............................................................58

14.7 Data Warehouse Availability................................................................................5814.8 Data Warehouse Administration and Maintenance..............................................5814.9 Data Dictionary.....................................................................................................59

14.9.1 Coded Value Crosswalk Section.........................................................5914.9.2 Database Objects Map........................................................................5914.9.3 Frequency of Data Dictionary Update.................................................60

15.0 Regional and National Interoperability........................................................................6015.1 Regional Interoperability Definitions....................................................................6015.2 Regional Interoperability General Requirements.................................................6115.3 Scalability for Regional Interoperability................................................................6115.4 Regional Interoperability File Definitions..............................................................6115.5 Regional Interoperability Transaction Processing................................................6215.6 Customer Service Functionality for Regional Interoperability..............................6215.7 Regional Interoperability Settlement and Reports...............................................6215.8 Regional Interoperability Testing.........................................................................6315.9 National Interoperability.......................................................................................63

16.0 Integration with WSDOT and Partner Systems...........................................................6316.1 General Requirements.........................................................................................6316.2 Interface Architecture Requirements...................................................................6416.3 Interface Architecture Responsibilities.................................................................6416.4 Interface Design, Development, Documentation and Testing..............................6416.5 Interface Implementation.....................................................................................6516.6 Interface Operations and Maintenance................................................................65

Page iv of 139

Page 6: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

16.7 Interface Sizing and Estimating Requirements....................................................6516.8 Interface Monitoring.............................................................................................66

16.8.1 Interface Dashboard............................................................................6616.8.2 RTS/BOS Integration Dashboard........................................................66

17.0 Security and Access Control........................................................................................6717.1 Confidentiality of Information...............................................................................6717.2 Controlled Access at Vendor Facilities................................................................6717.3 On and Off-Boarding of Vendor Staff...................................................................6817.4 Off-Boarding of WSDOT and CSC Operator Staff...............................................6817.5 Access Control for BOS System – Vendor Staff..................................................6817.6 General BOS Access Control Requirements.......................................................6917.7 Role Based Security............................................................................................6917.8 Managing Multiple Roles within BOS...................................................................7017.9 Temporary Expanded Access..............................................................................7017.10 Password Reset...................................................................................................7017.11 Attempted Access Violations...............................................................................7117.12 User Log-off for Inactivity.....................................................................................7117.13 System Access Control Matrix.............................................................................7117.14 Data Transmission Security.................................................................................7217.15 Hosting and Disaster Recovery Facility Controls.................................................7217.16 Access Control for Reporting and Business intelligence.....................................7217.17 Security Plan........................................................................................................7317.18 PCI and PA-DSS Compliance..............................................................................73

18.0 Hardware and Software Requirements........................................................................7318.1 General Requirements.........................................................................................7318.2 Hardware Requirements......................................................................................7418.3 Hardware Mean Time between Failure (MTBF) Requirements...........................7418.4 Diagnostics...........................................................................................................7418.5 Customized Hardware.........................................................................................7518.6 Bill of Materials (BOM).........................................................................................7518.7 Software Requirements.......................................................................................75

18.7.1 Software - User Interface.....................................................................7618.7.2 Software - Expansion Capability..........................................................7618.7.3 Software – Maintainability....................................................................7618.7.4 HOT Updates - Code Updates Loading While System is Running......7718.7.5 API for Third Party Application Developers.........................................7718.7.6 Software – License..............................................................................7718.7.7 Software – Technical Documentation..................................................78

18.8 Back Office Hardware..........................................................................................7818.8.1 Hardware – Components.....................................................................7818.8.2 Hardware - Disaster Recovery Site.....................................................79

Page v of 139

Page 7: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

18.8.3 Hardware – Backup Power (UPS / Generator)....................................7918.9 Operating System................................................................................................7918.10 Database Management System...........................................................................8018.11 Backup and Archive Capability............................................................................8018.12 Performance Requirements.................................................................................8018.13 Systems and Database Technical Support..........................................................81

19.0 Back Office Hosting.......................................................................................................8119.1 General Requirements.........................................................................................8119.2 Back-up or Disaster Recovery Hosting Site.........................................................8119.3 Hosting Site Capabilities......................................................................................8219.4 Communications..................................................................................................8219.5 Security................................................................................................................82

20.0 Project Management......................................................................................................8320.1 Overview..............................................................................................................8320.2 Project Schedule..................................................................................................83

20.2.1 Initial Project Schedule........................................................................8420.2.2 Approved Baseline Project Schedule..................................................8420.2.3 Revised Project Schedule....................................................................84

20.3 Issue Management..............................................................................................8520.4 Risk Management................................................................................................8520.5 Project Kick-off.....................................................................................................8520.6 Workshops and Working Sessions......................................................................8620.7 Weekly Status Meetings......................................................................................8620.8 Agendas and Meeting Notes................................................................................8620.9 Monthly Progress Reports...................................................................................8720.10 Deliverable Reviews............................................................................................87

21.0 Quality Management......................................................................................................8721.1 Quality Management Program.............................................................................8721.2 Partnering Program..............................................................................................88

21.2.1 General Requirements.........................................................................8821.2.2 Partnering Between Vendor and WSDOT...........................................8821.2.3 Partnering Between Vendor and CSC Operator..................................89

22.0 Organizational Change Management...........................................................................8922.1 Organizational Change Management Overview..................................................8922.2 OCM Requirements.............................................................................................8922.3 Change Management Team................................................................................9022.4 OCM Sizing Considerations.................................................................................9022.5 Change Management Planning Requirements....................................................9022.6 Change Management Communications Requirements.......................................9122.7 Readiness for Change Assessment Requirements.............................................9122.8 Change Gap Analysis Requirements...................................................................91

Page vi of 139

Page 8: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

22.9 WSDOT Project Staff Change Requirements......................................................9222.10 External Stakeholder Readiness for Change Requirements...............................9222.11 Training Design, Delivery and Support Requirements.........................................9222.12 Initial WSDOT Core Team Training on BOS Components..................................9322.13 System Demonstration for CSC Operator............................................................9322.14 Establish Training Development Needs...............................................................9422.15 Support Training Delivery....................................................................................9422.16 Design, Implement and Manage Training Environments.....................................9422.17 Establish and Manage Training Data Sets Requirements...................................9522.18 Post-Training – Vendor Responsibilities..............................................................9522.19 User Post Go-Live Support Requirements...........................................................95

23.0 Data Migration from RITE System................................................................................9623.1 Overview..............................................................................................................9623.2 Data Migration Plan.............................................................................................9623.3 Data Migration Team...........................................................................................9623.4 Data Migration Approach.....................................................................................9723.5 Data Migration Required Deliverables.................................................................9723.6 Data Migration Tasks...........................................................................................98

23.6.1 Requirements Analysis........................................................................9823.6.2 Specifications Development................................................................9823.6.3 Development and Unit Testing............................................................9923.6.4 Migration Testing and Validation.........................................................9923.6.5 Actual Production Data Migration........................................................99

23.7 Other System Migration Considerations............................................................10024.0 Testing Program..........................................................................................................100

24.1 Introduction........................................................................................................10024.2 General Requirements.......................................................................................10024.3 Master Test Plan................................................................................................10124.4 Test Procedures.................................................................................................10124.5 Test Reports.......................................................................................................10124.6 Deficiencies........................................................................................................10224.7 Unit Testing........................................................................................................10224.8 Factory Acceptance Testing..............................................................................10224.9 Integration and Commissioning Testing.............................................................10324.10 Security Testing.................................................................................................10324.11 Performance Testing..........................................................................................10424.12 Regression Testing............................................................................................10424.13 User Acceptance Testing...................................................................................10424.14 Operations Testing.............................................................................................105

25.0 Operations and Maintenance Services......................................................................10525.1 General Requirements.......................................................................................105

Page vii of 139

Page 9: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

25.2 Back Office Equipment Maintenance.................................................................10625.3 Network Systems Maintenance.........................................................................10625.4 Maintenance Online Management System (MOMS).........................................10625.5 Key Performance Indicator Dashboard..............................................................10725.6 Maintenance Requirements...............................................................................10725.7 Notification and Recording of Maintenance Activities........................................10825.8 Routine Maintenance.........................................................................................10825.9 Incident Management........................................................................................108

25.9.1 Severity Level 1 – High......................................................................10925.9.2 Severity Level 2 – Medium................................................................10925.9.3 Severity Level 3 – Low.......................................................................10925.9.4 Release Management for System Incidents......................................110

25.10 Equipment and Spares Inventory Management.................................................11025.11 Software Maintenance Services........................................................................11025.12 Test Environment...............................................................................................11125.13 Maintenance Staffing.........................................................................................11125.14 Maintenance Training........................................................................................11125.15 Annual Audit Requirements...............................................................................112

25.15.1 PCI, SOC1, SOC2 and OCIO Audits.................................................11225.15.2 System Performance Audit................................................................11225.15.3 Other Required Audit Support...........................................................113

25.16 Incident and Revenue Loss Management.........................................................11325.17 Cooperation with Others....................................................................................11325.18 Emergency Response Management..................................................................11425.19 System Maintenance and Version Tracking......................................................114

26.0 Project Organization and Staffing..............................................................................11526.1 Project Organization Chart.................................................................................11526.2 Vendor Key Personnel – Implementation Phases 1 and 2................................11526.3 Vendor Key Personnel – Operations and Maintenance Phase..........................11526.4 Substitution of Vendor Key Project Personnel...................................................116

27.0 Go-Live and Acceptance of the System and Services.............................................11627.1 Approval for System Go-Live.............................................................................11627.2 Phase 1 Acceptance..........................................................................................11727.3 Phase 2 Acceptance..........................................................................................11727.4 Final System Acceptance..................................................................................11727.5 Acceptance of Modifications..............................................................................118

28.0 Project Office Space....................................................................................................11829.0 Potential Future Contract Modifications...................................................................118

29.1 Enhancements to State Route 167 Toll Facility.................................................11829.2 Interstate 405 Express Toll Lanes Bellevue to Renton......................................11929.3 Onboarding of Unidentified Future Toll Facility – Fixed or Variable Pricing.......119

Page viii of 139

Page 10: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

29.4 Onboarding of Unidentified Future Toll Facility – Multiple Toll Points and Dynamic Pricing 119

30.0 Deliverables..................................................................................................................12030.1 General Requirements.......................................................................................12030.2 Project Initiation Phase......................................................................................120

30.2.1 WSDOT Partnering Plan....................................................................12130.2.2 Initial Project Schedule......................................................................12130.2.3 Project Management Plan.................................................................12130.2.4 Web-based Collaboration Environment.............................................12230.2.5 Quality Management Plan.................................................................12230.2.6 Security Plan......................................................................................12230.2.7 Subcontractor Management Plan......................................................12330.2.8 Master Test Plan................................................................................12330.2.9 Work Place Safety Plan.....................................................................12330.2.10 Project Office Space..........................................................................12430.2.11 CSC Operator Partnering Plan..........................................................124

30.3 Preliminary Design Phase..................................................................................12430.3.1 Software Development Plan (SDP)...................................................12530.3.2 Installation Plan.................................................................................12530.3.3 Requirements Traceability Matrix (RTM)...........................................12530.3.4 Initial Core Team Training.................................................................12630.3.5 Configuration Management Plan.......................................................12630.3.6 System Architecture...........................................................................12630.3.7 Organizational Change Management Plan........................................12730.3.8 Communications Plan........................................................................12730.3.9 System Requirements Document (SRD)...........................................12730.3.10 Training Plan......................................................................................12830.3.11 Data Migration Plan...........................................................................128

30.4 Final Design Phase............................................................................................12830.4.1 Disaster Recovery Plan.....................................................................12930.4.2 Interface Control Documents (ICD)...................................................12930.4.3 Test Procedures................................................................................12930.4.4 Data Migration Specifications............................................................13030.4.5 System Detail Design Document (SDDD).........................................130

30.5 Procurement Phase...........................................................................................13030.5.1 Procurement Plan..............................................................................13130.5.2 Hardware and Software Installed and Accepted...............................13130.5.3 Third Party Hardware Manuals..........................................................13130.5.4 Third Party Software Manuals...........................................................132

30.6 Installation and Testing Phase...........................................................................13230.6.1 Customer Website.............................................................................132

Page ix of 139

Page 11: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

30.6.2 Test Reports......................................................................................13430.6.3 Data Migration...................................................................................13430.6.4 Transition Plan...................................................................................13630.6.5 Successful Completion of PCI Audit..................................................13630.6.6 Successful Completion of OCIO Audit...............................................13630.6.7 Successful Completion of SOC1 and SOC2 Audit............................13730.6.8 System Administration Manual..........................................................13730.6.9 Post Go-Live Support Plan................................................................13730.6.10 Maintenance Plan..............................................................................13830.6.11 Maintenance and Service Manuals...................................................13830.6.12 Maintenance Online Management System (MOMS).........................13830.6.13 KPI Dashboard..................................................................................13930.6.14 Annual Audit Plan..............................................................................13930.6.15 Data Dictionary (WSDOT Option for Data Warehouse)....................139

30.7 Training Phase...................................................................................................14030.7.1 Training Courseware and Training Materials.....................................14030.7.2 Training Pilot Walkthrough.................................................................14030.7.3 User Acceptance Test Training.........................................................14130.7.4 Train the Trainers Course(s) Completed...........................................14130.7.5 End User Training Completed...........................................................14130.7.6 Readiness Plan..................................................................................14130.7.7 Updated Training Materials Post Go-Live..........................................142

30.8 Production Cut-Over Phase...............................................................................14230.8.1 System Go-Live.................................................................................14230.8.2 Go-Live Report..................................................................................14330.8.3 System Release Notes......................................................................14330.8.4 Hardware and Software Inventory.....................................................143

30.9 Acceptance........................................................................................................14430.9.1 Phase Acceptance Letter...................................................................14430.9.2 Final Acceptance Letter.....................................................................144

Page x of 139

Page 12: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

0.0 Business Requirements Response Guidelines

0.1 General InstructionsThis Attachment to the RFP (hereafter “Business Requirements Response Guide”) contains instructions and a template for each Vendor to use when submitting their proposal to WSDOT in response to the business requirements contained in WSDOT’s Back Office System Replacement Request for Proposal (hereafter “RFP”). Vendors should follow the prescribed format included in this Business Requirements Response Guide.

The Vendors response to Appendix 2 Scope of Work of the RFP should closely follow the prescribed format as outlined here. Failure of a Vendor to follow the prescribed format may result in that Vendor’s score being negatively impacted.

DO NOT INCLUDE ANY PRICING INFORMATION IN THIS Business Requirements Response Guide. Inclusion of any pricing information in the Business Requirements Response Guide may result in the immediate disqualification of the Vendor without evaluation of the Vendor’s proposal.The Vendor should provide clear, concise, and reasonable responses that specifically address the requirements stated in the RFP. Vendors should not in any way “postpone” a response to RFP requirements (e.g. “Vendor ABC would be happy to discuss how we will meet this requirement at a later time” is an example of a postponed response).

1. The Vendor should use the electronic version of this Attachment provided with the RFP to respond to RFP requirements. The Vendor should not make any changes to formatting or text styles in the overall document. It is important that the Vendor not merge any table cells in the document.

2. The Vendor should save their response file as the original filename prefixed with a Vendor Identifier designating the Vendor submitting the proposal (e.g., “Company ABC Business Requirements Response Guide FINAL.doc”) where “Company ABC” is replaced with the name of the Vendor (abbreviations are acceptable – a full legal name is not required). All files submitted by the Vendor should use the same Vendor Identifier.

3. IMPORTANT: All electronic files must be provided in Microsoft Office-compatible formats.

4. The Vendor shall return the completed Business Requirements Response Guide, with the new file name, as part of its overall written proposal.

0.2 Response InstructionsThe Vendor shall respond to requirements contained in the RFP according to the following three-part procedure. In some instances, the Vendor shall complete all three parts for each section of requirements. In other instances, only the first (Part A) or the first and second parts (Part A and Part B) should be completed for the individual sections. Examples of how to complete the Business Requirements Response Guide are provided following the response instructions below.

1. Part A: Compliance

Page 1

Page 13: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

The requirements in the RFP contain the expected products and / or services to be provided by the Vendor during the project. It is essential that the Vendor indicate their concurrence with the requirements and that the Vendor will meet the requirement as written. If the Vendor has read, understood, and will comply with a requirement exactly as written, the Vendor should:

A. Check the “Yes, as stated” box in Part A of the respective section. Checking “Yes, as stated” indicates that the Vendor will comply with the requirements as stated in the RFP.

B. If the Vendor proposes to fully comply with the requirement as written in the RFP, the Vendor should not enter any additional information in Part A or Part B of the template.

C. See “Example A” in “Format of Required Responses” below for an example of this type of response.

2. Part B: Compliance with ModificationIf the Vendor does not agree to comply with a requirement as stated in a particular section, and / or has one or more proposed modifications to requirement language, and / or has an alternative approach to meeting the requirement as stated, the Vendor should:

A. Check the “Yes, with modification” box in Part A of the respective section. Checking “Yes, with modification” indicates that the Vendor will comply with the requirements in the RFP with modifications to the requirement or through an alternative approach.

B. Copy and paste the relevant requirement(s) from the body of the RFP into the cell in Part B of the template.

C. The Vendor should then make its proposed revision to the requirement language by striking out word(s) and / or inserting new proposed language into the cell in Part B of the template.

IMPORTANT: Vendors should ensure that the text of the relevant original requirement is contained in the cell and that strike-throughs and / or additional language inserted by the Vendor is clearly visible in order for the Evaluation Committee to see the original text along with the Vendor’s proposed changes.

IMPORTANT: In the event that the Vendor proposes changes to a sub-set of requirements in a respective section of the RFP, the Vendor may copy only that portion of the RFP that is relevant to the proposed change (e.g. a paragraph or series of sentences). It is the Vendor’s responsibility to ensure that there is sufficient context regarding their proposed changes. One way of ensuring sufficient context is to include in Part B the original language in the RFP for the sentences immediately before and immediately after the language that the Vendor proposes to change.

IMPORTANT: If the Evaluation Committee is unable to obtain a clear understanding of the nature and / or impact of Vendor’s proposed changes, the Vendor’s score for that section may be impacted.

IMPORTANT: If, in the opinion of the Evaluation Committee, the Vendor’s proposed modifications to requirement language and/or alternative approach to meeting the requirement as stated introduce a material deficiency in the Vendor’s proposed solution, the Vendor’s score for that section will be negatively impacted. WSDOT is under no obligation to accept the Vendor’s proposed changes.

Page 2

Page 14: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

D. AFTER completing the proposed revision, the Vendor may add a concise explanation concerning the reason(s) for the proposed revision within the cell in Part B. The explanation should be separate and distinct from the marked-up text and be preceded by the Vendor’s proposed changes.

E. The Vendor should not view the possibility of requesting changes to RFP requirements as an opportunity to re-write major portions of the RFP. WSDOT expects the Vendor to comply with the requirements as written, with changes made only for minor clarifications or if a Vendor will not comply with the requirement as written.

3. Part C: Describe What or How Many sections of the Business Requirements Response Guide require that the Vendor describe how it will meet the stated requirement(s) by either providing a specific product or performing a specific service. For requirements that require this type of response, the Vendor should do the following:

A. Complete the Part A Compliance section according to the instructions provided above.

B. Complete the Part B Compliance with Modification section according to the instructions provided above if the Vendor is proposing changes to the requirement language.

C. Review the instructions provided in Part C regarding the information sought by the WSDOT concerning the solution or services proposed by the Vendor.

D. Below the table cells and in the space indicated, provide a concise but complete description of how the Vendor will meet the requirement(s) for the respective sections as stated in the RFP. The description provided by the Vendor should be completely contained within the respective sections with minimal cross-referencing of sections. If additional information is needed to fully explain the Vendor’s approach and description, and this information cannot be provided in the body of the Business Requirements Response Guide, the Vendor may provide an appendix to its response and clearly indicate where the additional information is located in the appendix. The Vendor should strive to minimize cross-references and/or referring to appendices whenever possible for readability and conciseness of the overall RFP response.

Page 3

Page 15: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

0.3 Examples Demonstrating Format of Required Responses

0.3.1 Example A: Compliance

1.4.2.2 Prepaid CustomerPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C What level of configurability are you proposing (User Configurable, Configurable or Fixed)? Explain below.

Will the Vendor solution utilize a COTS product(s)? Choose one and explain below.

Solution will utilize a COTS product(s)

Solution will NOT utilize a COTS product(s)

Vendor Explanation to Part C:[If the Vendor is required to provide additional detail as described in Part C, the Vendor shall provide a response here below the table.]

Page 4

By Checking “Yes, as stated” the Vendor indicates that they will comply with RFP requirement as written for this section of the RFP.

Cross-reference to the section in the RFP describing WSDOT requirements. DO NOT MODIFY.

No response is required for Part B based on the Vendor’s response to Part A.

Response is required for Part C for this section.

Page 16: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

0.3.2 Example B: Compliance With Modification

1.6 CollectionsPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

[Copy original requirement here and show proposed revision to the requirement language.]

1. Provide a rules-based point system that establishes collection probabilities to help prioritize accounts for collection;

2. Provide a work flow to route accounts for review and approval prior to turnover to collections;

3. Provide transaction/account flag to indicate collection activities (internal or external) and provide ability to enter comments on customer account;

4. Provide a work queue to manage assignments of collections cases;5. Automate generation of standard letters;6. Provide document management capabilities to store documents

received from a customer and link the documents to the collections case and customer account;

7. Provide skip tracing functionality through integration with one or more skip tracing vendors;

8. Integrate with the accounts receivable function to support receipt of customer payment and the application of this payment to the amount owed following WSDOT business rules (generally first-in, first-out);

9. Integrate with a credit reporting service to request credit reports and post information received to the collections case and customer account;

10. Generate data files and integrate automatically with credit reporting service(s) to file credit reports; and

11. Charge simple interest on accounts in collection.

Explanation: Additional authroizations are needed to engage credit reporting services.

Part C No response required.

Page 5No response is required for Part C for this requirement.

By Checking “Yes, with modification” the Vendor indicates that they will comply with the requirement as modified in Part B

Cross-reference to the section in the RFP describing WSDOT requirements. DO NOT MODIFY.

Note explanation for the proposed change in requirements language.

Page 17: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

0.3.3 Example C: Non-Compliance

1.12.7 Interest CalculationPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:[If the Vendor will not meet this requirement, describe why it is not necessary for the Vendor’s overall solution.]

Part C What level of configurability are you proposing (User Configurable, Configurable or Fixed)? Explain below.

Vendor Explanation to Part C:[If the Vendor is required to provide additional detail as described in Part C, the Vendor shall provide a response here below the table.]

Page 6

By Checking “No, will not meet” the Vendor indicates that they will not comply in any way with requirement of this section of the RFP.

Cross-reference to the section in the RFP describing WSDOT requirements. DO NOT MODIFY.

Response is required for Part B based on the Vendor’s response to Part A.

Response is required for Part C for this section.

Page 18: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

1.0 Overview of Scope of Work

1.1 Current WSDOT Tolling Business EnvironmentPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One:

Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

1.2 Solution OverviewPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Provide an overview of the major components of the Vendor’s proposed solution.

Describe how the proposed solution will incorporate the operational back office (OBOS) and the commercial back office (CBOS) components.

What elements of the proposed solution will be COTS or custom and how will these elements be integrated?

Describe how information will flow (data integration, etc.) between the OBOS and CBOS components.

Provide an overview of the proposed data warehouse solution.

Describe the Vendor’s prior experience implementing the proposed

Page 7

Page 19: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

solution set.

Describe the proposed hosting strategy and the location of the primary hosting site and the disaster recovery site.

1.3 Scope of ServicesPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Provide an overview of the Vendor’s proposed approach to performing the requested Scope of Services.

1.4 Development MethodologyPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Provide an overview of the Vendor’s proposed development methodology.

1.5 Implementation Approach and PhasingPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Page 8

Page 20: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Provide an overview of the Vendor’s recommended implementation approach, phasing and overall project schedule.

Define the Vendor’s proposed scope for Phase 1 and Phase.

Provide a high-level project schedule in a Gantt chart format which shows the timelines and sequencing of the phases and Milestones for the Implementation (Phase 1 and Phase 2).

Discuss the benefits of the Vendor’s proposed approach and the associated risks of the proposed approach along with recommended mitigation strategies for these risks.

1.6 Configuration DefinitionPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One:

Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

2.0 Operational Back Office

2.1 Concept OverviewPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Page 9

Page 21: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

Part C Provide an overview of the Vendor’s proposed Operational Back Office (OBOS) solution. Indicate which components are COTS or custom and describe the Vendor’s prior implementation experience with each major element.

Describe at a high level how the primary OBOS business functions will be performed in the Vendor’s OBOS solution.

2.2 Transaction Processing and Trip BuildingPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C What level of configurability are you proposing (User Configurable, Configurable or Fixed)? Explain below.

Will the Vendor solution utilize a COTS product(s)? Choose one and explain below.

Solution will utilize a COTS product(s)

Solution will NOT utilize a COTS product(s)

Describe Vendor’s proposed toll point transaction handling and trip building process with configuration details on rules used for trip building in the proposed solution.

2.3 Trip Transaction Types and ExceptionsPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Page 10

Page 22: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

Part C No response required

2.4 Static, Variable and Dynamic PricingPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C What level of configurability are you proposing (User Configurable, Configurable or Fixed)? Explain below.

Will the Vendor solution utilize a COTS product(s)? Choose one and explain below.

Solution will utilize a COTS product(s)

Solution will NOT utilize a COTS product(s)

Describe how the Vendor’s proposed BOS solution will be Configurable to support different rate plan schedule types, including a failover toll rate schedule based on historical information in case of communications loss.

Describe approach for supporting different pricing models, including WSDOT-defined segment-based pricing as well as trip-based and per-mile pricing.

2.5 Suspension or Change of Toll Rate

Part A Will the Vendor meet requirements in the referenced section of the RFP as stated or with modification? Check One:

Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required

Page 11

Page 23: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

2.6 Transaction and Image Transfer

Part A Will the Vendor meet requirements in the referenced section of the RFP as stated or with modification? Check One:

Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

2.7 Transmission Error Identification

Part A Will the Vendor meet requirements in the referenced section of the RFP as stated or with modification? Check One:

Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

2.8 License Plate Character Extraction with OCR

Part A Will the Vendor meet requirements in the referenced section of the RFP as stated or with modification? Check One:

Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Page 12

Page 24: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

Part C What level of configurability are you proposing (User Configurable, Configurable or Fixed)? Explain below.

Will the Vendor solution utilize a COTS product(s)? Choose one and explain below.

Solution will utilize a COTS product(s)

Solution will NOT utilize a COTS product(s)

Describe details on the OCR application used with OBOS for proposed solution.

Provide lessons learned on OCR from prior projects and how these lessons are applied to Vendor’s proposed BOS solution.

2.9 Manual Image Review

Part A Will the Vendor meet requirements in the referenced section of the RFP as stated or with modification? Check One:

Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C What level of configurability are you proposing (User Configurable, Configurable or Fixed)? Explain below.

Will the Vendor solution utilize a COTS product(s)? Choose one and explain below.

Solution will utilize a COTS product(s)

Solution will NOT utilize a COTS product(s)

Describe image review dashboard solution and how KPIs related to image review will be handled in proposed solution

2.10 Trip Re-processing from Image Review

Part A Will the Vendor meet requirements in the referenced section of the RFP as stated or with modification? Check One:

Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Page 13

Page 25: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required

2.11 Operational Reporting

Part A Will the Vendor meet requirements in the referenced section of the RFP as stated or with modification? Check One:

Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required

3.0 Commercial Back OfficePart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One:

Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Provide an overview of the Vendor’s proposed CBOS solution. Indicate which elements are COTS or custom.

Describe the Vendor’s prior implementation experience with each proposed CBOS component.

Page 14

Page 26: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

4.0 Account ManagementPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

4.1 Good To Go! Customer AccountsPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One:

Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Provide an overview of Vendor’s proposed customer account architecture.

4.2 Single Customer AccountPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C What level of configurability are you proposing (User Configurable, Configurable or Fixed)? within the Vendor’s proposed single customer account approach. Please explain below.

Page 15

Page 27: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

4.2.1 Unregistered CustomerPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C What level of configurability are you proposing (User Configurable, Configurable or Fixed)? Explain below.

Describe details on the requirement/business rule configuration related to unregistered customer.

4.2.2 Prepaid Customer Part A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C What level of configurability are you proposing (User Configurable, Configurable or Fixed)? Explain below.

Describe details on the requirement/business rule configuration related to the prepaid customer.

4.2.3 Zero Balance Customer Part A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Page 16

Page 28: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C What level of configurability are you proposing (User Configurable, Configurable or Fixed)? Explain below.

Describe details on the requirement/business rule configuration related to the zero balance customer.

4.2.4 Postpaid Customer (Pay By Mail)Part A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C What level of configurability are you proposing (User Configurable, Configurable or Fixed)? Explain below.

Describe details on the requirement/business rule configuration related to the postpaid customer.

4.2.5 Non-revenue CustomersPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C What level of configurability are you proposing (User Configurable, Configurable or Fixed)? Explain below.

Describe details on the requirement/business rule configuration related to the non-revenue customer.

Page 17

Page 29: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

4.2.6 Government CustomersPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C What level of configurability are you proposing (User Configurable, Configurable or Fixed)? Explain below.

Describe details on the requirement/business rule configuration related to the government customer.

4.3 Customer Defined Account Validity PeriodPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C What level of configurability are you proposing (User Configurable, Configurable or Fixed)? Explain below.

Describe details on the requirement/business rule configuration related to the customer defined validity period.

4.4 Negative Account Balance Grace PeriodPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Page 18

Page 30: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

Part C What level of configurability are you proposing (User Configurable, Configurable or Fixed)? Explain below.

Describe details on the requirement/business rule configuration related to the negative account balance grace period.

4.5 Commercial Account InterfacePart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Describe details on the features and application available for Commercial Business User to review and update license plates details once it’s uploaded via the customer account interface.

4.6 Merging Customer AccountsPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C What level of configurability are you proposing (User Configurable, Configurable or Fixed)? Explain below.

Describe details on the requirement/business rule configuration related to merging customer accounts.

4.7 Customer Account EstablishmentPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One:

Page 19

Page 31: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C What level of configurability are you proposing (User Configurable, Configurable or Fixed)? Explain below.

Describe details on the requirement/business rule configuration related to customer account establishment.

4.8 Customer Account ClosingPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C What level of configurability are you proposing (User Configurable, Configurable or Fixed)? Explain below.

Describe details on the requirement/business rule configuration related to customer account closing.

4.9 Good To Go! Pay CardPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Provide an overview of the Vendor’s proposed Good to Go! pay card

Page 20

Page 32: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

functionality

What risks or issues does the Vendor foresee in terms of implementing this functionality and what are potential mitigation strategies?

4.10 Customer Account Search CapabilitiesPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Provide an overview of the customer account search capabilities included within the Vendor’s proposed BOS solution..

4.10.1 Comment Search CapabilitiesPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response needed.

4.10.2 General Search CapabilitiesPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Page 21

Page 33: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response needed.

4.10.3 License Plate Search CapabilitiesPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response needed.

4.10.4 Account Notification SearchPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response needed.

4.10.5 Customer Case Management and Case SearchPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Page 22

Page 34: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Describe the case management/case search functionality available in the Vendor’s proposed solution.

4.11 Account Statement and Pay By Mail Notification Process

Part A Will the Vendor meet requirements in the referenced section of the RFP as stated or with modification? Check One:

Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response needed.

4.11.1 Account StatementsPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C What level of configurability are you proposing (User Configurable, Configurable or Fixed)? Explain below.

Describe details on the requirement/business rule configuration related to account statements.

4.11.2 Pay By Mail Notification (Toll Bill)

Part A Will the Vendor meet requirements in the referenced section of the RFP as stated or with modification? Check One:

Yes, as stated

Page 23

Page 35: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C What level of configurability are you proposing (User Configurable, Configurable or Fixed)? Explain below.

Describe details on the requirement/business rule configuration related to pay by mail notification.

4.12 Other Customer Account Notifications

Part A Will the Vendor meet requirements in the referenced section of the RFP as stated or with modification? Check One:

Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C What level of configurability are you proposing (User Configurable, Configurable or Fixed)? Explain below.

Describe details on the requirement/business rule configuration related to other customer account notifications.

4.12.1 Email or Text Notification Option

Part A Will the Vendor meet requirements in the referenced section of the RFP as stated or with modification? Check One:

Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C What level of configurability are you proposing (User Configurable,

Page 24

Page 36: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

Configurable or Fixed)? Explain below.

Describe details on the requirement/business rule configuration related to email or text notification on customer accounts.

4.13 Barcodes for Letters, Envelopes and Mailing Labels to Identify Accounts

Part A Will the Vendor meet requirements in the referenced section of the RFP as stated or with modification? Check One:

Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C What level of configurability are you proposing (User Configurable, Configurable or Fixed)? Explain below.

Will the Vendor solution utilize a COTS product(s)? Choose one and explain below.

Solution will utilize a COTS product(s)

Solution will NOT utilize a COTS product(s)

Describe different barcode types handled by the proposed barcode solution.

4.14 Toll Dispute ResolutionPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C What level of configurability are you proposing (User Configurable, Configurable or Fixed)? Explain below.

Will the Vendor solution utilize a COTS product(s)? Choose one and

Page 25

Page 37: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

explain below.

Solution will utilize a COTS product(s)

Solution will NOT utilize a COTS product(s)

Describe details on dispute management tool dashboard to be used by CSR and reporting capabilities for the management.

4.15 Advocate for the Customer Program (A4C)Part A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C What level of configurability are you proposing (User Configurable, Configurable or Fixed)? Explain below.

Will the Vendor solution utilize a COTS product(s)? Choose one and explain below.

Solution will utilize a COTS product(s)

Solution will NOT utilize a COTS product(s)

Describe details on the tool used for A4C program in the proposed solution

4.16 Enhanced CSR ToolsPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Describe details on the CSR tools and features used in the proposed solution to improve CSRs productivity and performance with better customer service.

Page 26

Page 38: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

4.17 Marketing SupportPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Describe details on the Vendor’s proposed solution set to provide marketing support.

5.0 Civil Penalty ProgramPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C What level of configurability are you proposing (User Configurable, Configurable or Fixed)? Explain below.

Will the Vendor solution utilize a COTS product(s)? Choose one and explain below.

Solution will utilize a COTS product(s)

Solution will NOT utilize a COTS product(s)

Provide an overview of the civil penalty program functionality within the Vendor’s proposed BOS solution.

Describe level of flexibility in instituting various relief programs for customer under civil penalty program via configuration changes.

5.1 Pre-Civil Penalty Customer NotificationPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated

Page 27

Page 39: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C What level of configurability are you proposing (User Configurable, Configurable or Fixed)? Explain below.

Describe details on the business rule configuration related to pre-civil penalty customer notifications.

5.2 Certification for Eligibility of Civil PenaltyPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C What level of configurability are you proposing (User Configurable, Configurable or Fixed)? Explain below.

Describe in detail the tools that will be used by TEO (Toll Enforcement Officer) in certifying eligibility of civil penalty.

5.3 Notice of Civil PenaltyPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C What level of configurability are you proposing (User Configurable, Configurable or Fixed)? Explain below.

Page 28

Page 40: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

Describe the flexibility in adapting NOCP changes in the proposed solution.

5.4 Customer Program for Resolution (CPR)Part A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C What level of configurability are you proposing (User Configurable, Configurable or Fixed)? Explain below.

Will the Vendor solution utilize a COTS product(s)? Choose one and explain below.

Solution will utilize a COTS product(s)

Solution will NOT utilize a COTS product(s)

Describe details on the tool used for CPR program in the proposed solution.

5.5 Adjudication ProgramPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

5.5.1 Interface with OAH Case Management SystemPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

Page 29

Page 41: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Describe approach for implementing interface.

Discuss potential challenges in terms of designing and implementing interface.

5.5.2 Administrative Hearings Functionality (WSDOT Option)Part A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C What level of configurability are you proposing (User Configurable, Configurable or Fixed)? Explain below.

Will the Vendor solution utilize a COTS product(s)? Choose one and explain below.

Solution will utilize a COTS product(s)

Solution will NOT utilize a COTS product(s)

Describe in detail the tools that will be used by adjudication hearing officers in reviewing and hearing cases of civil penalty.

5.6 DOL Registration Hold ProgramPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C What level of configurability are you proposing (User Configurable, Configurable or Fixed)? Explain below.

Will the Vendor solution utilize a COTS product(s)? Choose one and

Page 30

Page 42: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

explain below.

Solution will utilize a COTS product(s)

Solution will NOT utilize a COTS product(s)

Describe details on how DOL registration hold program will be configured and incorporated in the proposed solution.

6.0 CollectionsPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

6.1 Integration with Third Party Collections SystemsPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Describe interface details with third party collections systems including the approach for integrating back to the customer receivable in the proposed solution.

How will items sent to collections be placed on hold to prevent customer payments from being posted against that item while still allowing other payments for non-collections items to be posted to customer accounts?

6.2 Collections Functionality (WSDOT Option)

Page 31

Page 43: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

Part A Will the Vendor meet requirements in the referenced section of the RFP as stated or with modification? Check One:

Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Provide an overview of the functionality of your collections solution.

What level of configurability are you proposing (User Configurable, Configurable or Fixed)? Explain below.

Will the Vendor solution utilize a COTS product(s)? Choose one and explain below.

Solution will utilize a COTS product(s)

Solution will NOT utilize a COTS product(s)

Describe how account receivable will be integrated to the customer accounts from collections.

Describe how tools like skip tracing will be used to increase the collection efforts.

7.0 SettlementsPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C What level of configurability are you proposing (User Configurable, Configurable or Fixed)? Explain below.

Will the Vendor solution utilize a COTS product(s)? Choose one and explain below.

Solution will utilize a COTS product(s)

Solution will NOT utilize a COTS product(s)

Describe how settlement programs will be incorporated and integrated in the proposed solution including financial adjustments and posting to the

Page 32

Page 44: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

customer accounts.

7.1 Payment PlansPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C What level of configurability are you proposing (User Configurable, Configurable or Fixed)? Explain below.

Describe the configuration details and features used to manage different payment plans under the proposed solution.

8.0 Customer Website

8.1 General RequirementsPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Provide an overview of the Vendor’s proposed approach and methodology for website design and development.

Describe how content changes will be managed with minimum downtime for the website.

8.2 Open a Good To Go! AccountPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One:

Page 33

Page 45: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

8.3 Manage Good To Go! AccountPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

8.4 View and Pay or Dispute Toll Bills and Notice of Civil PenaltyPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

8.5 Customer Viewing of Images Associated with a TransactionPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated

Page 34

Page 46: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Will the Vendor solution utilize a COTS product(s)? Choose one and explain below.

Solution will utilize a COTS product(s)

Solution will NOT utilize a COTS product(s)

Will image download be allowed by the application and what will be the security implications for allowing it?

8.6 Special PromotionsPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C What level of configurability are you proposing (User Configurable, Configurable or Fixed)? Explain below.

Describe how web based promotions can be added, implemented and removed in the proposed solution.

8.7 Fulfill Transponder Inventory RequestPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Page 35

Page 47: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

Part C No response required.

8.8 Live Chat Part A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Provide an overview of proposed Live Chat capabilities.

8.9 Social Media Communication ChannelsPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

8.10 Multilingual AccessPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Page 36

Page 48: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

Part C Describe the Vendor’s proposed solution capabilities and approach for supporting the various languages as required in this section.

8.11 Web MetricsPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Describe the web analytics tools that will be used to measure the web performance.

What types of metrics will be tracked and provided to WSDOT? How would the Vendor recommend these metrics be utilized to help improve website design and influence future website enhancements?

8.12 Allow Customers with Negative Balance to Make Payment Online

Part A Will the Vendor meet requirements in the referenced section of the RFP as stated or with modification? Check One:

Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

8.13 Experience with User Centered DesignPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

Page 37

Page 49: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Describe the Vendor’s experience with user centered design and the design and development of web site’s similar in scope to the Good To Go! customer website.

Provide a summary of the experience of the Vendor’s Lead Web Developer and other proposed resources for web development in terms of the requirements in this section.

9.0 Inventory ManagementPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Provide an overview of the capabilities of your proposed inventory management solution.

What level of configurability are you proposing (User Configurable, Configurable or Fixed)? Explain below.

Will the Vendor solution utilize a COTS product(s)? Choose one and explain below.

Solution will utilize a COTS product(s)

Solution will NOT utilize a COTS product(s)

Describe how transponder returns will be handled in the proposed solution.

Describe how third party retailers will be handled in the proposed solution for transponders, kits and pay cards.

Describe how inventory valuation and accounting will be handled and integrated with the WSDOT financial system.

Describe inventory management dashboard for inventory projections.

Page 38

Page 50: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

10.0 Washington State Ferries IntegrationPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Describe how WSF integration be will incorporated into the Vendor’s proposed BOS solution.

Based on the Vendor’s experience, describe potential risks and/or issues in terms of implementing WSF integration and recommend strategies to mitigate these risks or issues.

11.0 Additional CSC Support Tools

11.1 Computer Telephony/IVR System IntegrationPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

11.1.1 Interface with CSC Operator Provided IVR SystemPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Page 39

Page 51: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Describe the Vendor’s proposed approach for integrating with an IVR system provided by the CSC Operator.

Describe examples of the Vendor’s past experience integrating its proposed BOS solution with an IVR system provided by a third party.

Describe any risks or challenges the Vendor sees with this approach and recommend mitigation strategies.

11.1.2 Vendor Provided Telephony and IVR System (WSDOT Option)Part A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Identify Vendor’s proposed telephony and IVR solution and describe the capabilities of the proposed telephony and IVR solution in detail.

What level of configurability are you proposing (User Configurable, Configurable or Fixed)? Explain below.

Describe the metrics that will measure the performance and effectiveness of IVR system and how it will be used to improve the user’s IVR experience in the proposed solution.

11.2 Document Scanning and Management SystemPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Describe in detail the capabilities of the Vendor’s proposed document scanning and management system.

What level of configurability are you proposing (User Configurable,

Page 40

Page 52: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

Configurable or Fixed)? Explain below.

Will the Vendor solution utilize a COTS product(s)? Choose one and explain below.

Solution will utilize a COTS product(s)

Solution will NOT utilize a COTS product(s)

Describe how document scanning and management system will be integrated with other elements of the Vendor’s proposed BOS solution.

11.3 Email SupportPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Describe the capabilities of the Vendor’s proposed email solution.

What level of configurability are you proposing (User Configurable, Configurable or Fixed)? Explain below.

Will the Vendor solution utilize a COTS product(s)? Choose one and explain below.

Solution will utilize a COTS product(s)

Solution will NOT utilize a COTS product(s)

Describe how the email system will be integrated with other components of the Vendor’s proposed BOS solution.

Describe how migration of existing email system will be handled.

11.4 CSC DashboardPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Page 41

Page 53: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

Part C What level of configurability are you proposing (User Configurable, Configurable or Fixed)? Explain below.

Will the Vendor solution utilize a COTS product(s)? Choose one and explain below.

Solution will utilize a COTS product(s)

Solution will NOT utilize a COTS product(s)

Describe how the CSC dashboard will be incorporated in the propose solution.

11.5 Photo Recognition Application for Plate RegistrationPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C What level of configurability are you proposing (User Configurable, Configurable or Fixed)? Explain below.

Will the Vendor solution utilize a COTS product(s)? Choose one and explain below.

Solution will utilize a COTS product(s)

Solution will NOT utilize a COTS product(s)

Describe how the proposed solution will incorporate the photo recognition application with the CBOS via both the website and mobile device (Vendor option).

12.0 Accounting and Financial Requirements

12.1 General RequirementsPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Page 42

Page 54: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Provide a detailed description of the Vendor’s proposed accounting and financial management solution and describe how this solution integrates with other BOS components.

What level of configurability are you proposing (User Configurable, Configurable or Fixed)? Explain below.

Will the Vendor solution utilize a COTS product(s)? Choose one and explain below.

Solution will utilize a COTS product(s)

Solution will NOT utilize a COTS product(s)

Describe how the proposed solution will integrate with WSDOT accounting system.

Describe the Vendor’s prior experience implementing its proposed financial management solution; provide two (2) client references with contact information where the Vendor has previously implemented its proposed accounting and financial management solution.

12.2 Payment Processing Part A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C What level of configurability are you proposing (User Configurable, Configurable or Fixed)? Explain below.

Will the Vendor solution utilize a COTS product(s)? Choose one and explain below.

Solution will utilize a COTS product(s)

Solution will NOT utilize a COTS product(s)

Describe how the different payment types will be handled by the proposed solution.

Describe how PCI compliance will be handled and maintained by the proposed solution.

Page 43

Page 55: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

Describe how incomplete payment transactions and reversals will be handled in the proposed solution.

12.3 Receivables CollectabilityPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C What level of configurability are you proposing (User Configurable, Configurable or Fixed)? Explain below.

Will the Vendor solution utilize a COTS product(s)? Choose one and explain below.

Solution will utilize a COTS product(s)

Solution will NOT utilize a COTS product(s)

Describe how receivable collectivity analysis will be performed in the proposed solution.

Describe how the historical dataset will be incorporated to perform the receivable collectivity analysis.

12.4 Write-OffPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C What level of configurability are you proposing (User Configurable, Configurable or Fixed)? Explain below.

Describe how the write off process will be managed and incorporated

Page 44

Page 56: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

with the CBOS in the Vendor’s proposed solution.

12.5 Bankruptcy ManagementPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C What level of configurability are you proposing (User Configurable, Configurable or Fixed)? Explain below.

Describe how bankruptcy notification will be managed and handled for the customer account in the proposed solution.

12.6 Refund Issuance Part A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C What level of configurability are you proposing (User Configurable, Configurable or Fixed)? Explain below.

Describe how the refunds will be interfaced with the WSDOT TRAINS financial system to issue payment vouchers? Describe how refunds will be recorded in the proposed CBOS solution.

Describe how anomalies related to refunds like interface connectivity issues or return payment vouchers will be handled and tracked in the proposed solution.

12.7 Interest Calculation Part A Will the Vendor meet requirements in the referenced section of the RFP as

Page 45

Page 57: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

12.8 Discount/Incentive Programs Part A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Provide an overview of the discount functionality available in the proposed BOS solution.

What level of configurability are you proposing (User Configurable, Configurable or Fixed)? Explain below.

Describe how discount/incentives programs can be added/updated/ removed in the proposed solution.

12.9 Non-Revenue Transactions Part A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C What level of configurability are you proposing (User Configurable,

Page 46

Page 58: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

Configurable or Fixed)? Explain below.

Describe how non-revenue transactions will be handled at account level/vehicle level/transponder level in the proposed solution.

Describe how the financials will be handled and reported for non-revenue transactions in the proposed solution.

12.10 AuditabilityPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

13.0 Management Reporting Requirements

13.1 General Requirements Part A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Describe how the Vendor’s proposed reporting solution will address the requirements and requested capabilities outlined in section 13.1.

Will reports have drill down capability to view the transaction details in the CBOS?

Describe how acceptable system performance will be achieved for all reports.

Page 47

Page 59: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

13.2 General Ledger (GL) Activity Summary ReportPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

13.3 Subsidiary Ledger (SL) Activity Detail Report Part A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

13.4 Trial Balance Report Part A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

13.5 Bank Reconciliation Report Part A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One:

Page 48

Page 60: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

13.6 Customer Deposit Summary Report Part A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

13.7 Refund Tracking ReportPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

13.8 Toll Transaction Processing Summary Report Part A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One:

Page 49

Page 61: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

13.9 Toll Transaction Disposition Summary Report Part A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

13.10 Inventory Management Report Part A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

13.11 Receivables Aging ReportPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated

Page 50

Page 62: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

13.12 Write-Off Activity ReportPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

13.13 Operations Production ReportsPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

13.14 System and CSR Activity ReportPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Page 51

Page 63: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

13.15 Monthly Operations ReportPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

13.16 Allowance for Additional ReportsPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

14.0 Data Warehouse and Business Intelligence Requirements (WSDOT Option)

Part A Will the Vendor meet requirements in the referenced section of the RFP as stated or with modification? Check One:

Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Page 52

Page 64: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Provide an overview of the Vendor’s proposed data warehouse solution including all proposed hardware and software elements.

Describe how the vendor’s data warehouse solution will integrate with other components of the BOS application.

Describe how legacy dataset will be used to build the Data Warehouse and Business Intelligence requirements in the proposed solution.

Describe the Vendor’s prior experience designing, developing, implementing and operating data warehouses similar in size and scope to WSDOT’s requirements.

Provide a brief overview of the proposed resources who will be assigned to design and develop the Tolling data warehouse.

14.1 General RequirementsPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Describe how the Vendor’s proposed solution will meet each of the requirements identified in this section.

Describe how the Tolling data warehouse will be interfaced and kept in sync with the CBOS, OBOS and other WSDOT systems in the proposed solution.

14.2 Bill of MaterialsPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Page 53

Page 65: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

14.3 Anticipated User CountPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

14.4 Data Warehouse Deployment and ConfigurationPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Describe in detail the Vendor’s proposed approach and methodology for performing data warehouse deployment and configuration.

14.5 Data Warehouse Hardware RequirementsPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Page 54

Page 66: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Describe the Vendor’s proposed data warehouse hardware details and how its security and access will be managed in the proposed solution.

Provide rationale for hardware option selected.

If Vendor has selected a Cloud Server option:

o Describe the hosting and disaster recovery sites/locations for a proposed cloud based solution.

o Describe the cost saving on using the cloud based solution.

o Describe how security and access will be managed in the proposed solution.

o Describe how data will be available to WSDOT and transitioned in case cloud based solution provider ceases to provide services.

14.5.1 Traditional Server OptionPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

14.5.2 Server Instance OptionPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

Page 55

Page 67: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

14.5.3 Cloud Server OptionPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

14.6 Data Warehouse Software RequirementsPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Describe in detail the proposed data warehouse software elements and how the proposed solution addresses the requirements in this section.

Describe how licensing and user access will be handled and managed in the proposed solution.

14.6.1 Utility SoftwarePart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Describe the capabilities of the Vendor’s proposed utility software.

Page 56

Page 68: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

Will the Vendor solution utilize a COTS product(s)? Choose one and explain below.

Solution will utilize a COTS product(s)

Solution will NOT utilize a COTS product(s)

Describe how licensing and user access will be handled and managed in the proposed solution.

14.6.2 Database Development SoftwarePart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Provide a brief overview of capabilities of the Vendor’s proposed database development software and how it addresses requirements in this section.

Provide the rationale for the Vendor’s selection of the proposed database development software.

Describe how licensing and user access will be handled and managed in the proposed solution.

14.6.3 Business Intelligence SoftwarePart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Provide a brief overview of the capabilities of the Vendor’s proposed business intelligence software and how it addresses requirements in this section.

Provide the rationale for the Vendor’s selection of the proposed business intelligence software.

Page 57

Page 69: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

Describe how licensing and user access will be handled and managed in the proposed solution.

14.7 Data Warehouse AvailabilityPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Describe the availability of the data warehouse system in the proposed solution.

14.8 Data Warehouse Administration and MaintenancePart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Describe how data warehouse administration and management will be handled in the Vendor’s proposed solution.

14.9 Data DictionaryPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Page 58

Page 70: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Describe the capabilities/functionality of the Vendor’s proposed data dictionary solution.

14.9.1 Coded Value Crosswalk SectionPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

14.9.2 Database Objects MapPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

14.9.3 Frequency of Data Dictionary UpdatePart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Page 59

Page 71: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

Part C Describe the process for maintaining and updating the data dictionary in the Vendor’s proposed solution.

15.0 Regional and National InteroperabilityPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response is required.

15.1 Regional Interoperability DefinitionsPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response is required.

15.2 Regional Interoperability General RequirementsPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Page 60

Page 72: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

Part C Provide a brief overview of the Vendor’s proposed solution to meeting the CTOC interoperability requirements as outlined in this section.

15.3 Scalability for Regional InteroperabilityPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Describe how the Vendor’s proposed solution will scale to support the requirements for interoperability with additional toll facilities.

15.4 Regional Interoperability File DefinitionsPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

15.5 Regional Interoperability Transaction ProcessingPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

Page 61

Page 73: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

15.6 Customer Service Functionality for Regional InteroperabilityPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Describe how the Vendor’s proposed CBOS solution will support the customer service requirements outlined in this section.

15.7 Regional Interoperability Settlement and Reports Part A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

15.8 Regional Interoperability TestingPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

15.9 National Interoperability Part A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One:

Page 62

Page 74: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Identify any risks or challenges in designing the BOS solution to facilitate and support future national interoperability and identify recommended mitigation strategies to address the risks or challenges.

16.0 Integration with WSDOT and Partner Systems

16.1 General RequirementsPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

16.2 Interface Architecture Requirements Part A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Describe in detail the Vendor’s proposed integration/interface architecture and its enterprise application integration (EAI) toolset(s).

Describe the rationale for the selection of the Vendor’s proposed toolset(s).

Page 63

Page 75: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

Identify potential challenges or risks in terms of implementing the proposed integration/interface architecture and strategies to mitigate these challenges or risks.

16.3 Interface Architecture ResponsibilitiesPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

16.4 Interface Design, Development, Documentation and TestingPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Describe the Vendor’s interface development methodology/approach.

16.5 Interface ImplementationPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Page 64

Page 76: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

Part C Describe how the Vendor will manage and communicate with stakeholders and third party interface providers to ensure timely interface implementation.

16.6 Interface Operations and MaintenancePart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

16.7 Interface Sizing and Estimating RequirementsPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

16.8 Interface MonitoringPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Page 65

Page 77: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

Part C No response required.

16.8.1 Interface DashboardPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C What level of configurability are you proposing (User Configurable, Configurable or Fixed)? Explain below.

Describe interface dashboard features and reporting capabilities in the proposed solution.

16.8.2 RTS/BOS Integration DashboardPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C What level of configurability are you proposing (User Configurable, Configurable or Fixed)? Explain below.

Describe RTS/BOS integration dashboard features and reporting capabilities in the proposed solution.

17.0 Security and Access ControlPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Page 66

Page 78: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

17.1 Confidentiality of InformationPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

17.2 Controlled Access at Vendor FacilitiesPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Describe the Vendor’s proposed security access policy for its facilities to be utilized in performance of the BOS project.

17.3 On and Off-Boarding of Vendor StaffPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Page 67

Page 79: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

17.4 Off-Boarding of WSDOT and CSC Operator Staff Part A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

17.5 Access Control for BOS System – Vendor StaffPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

17.6 General BOS Access Control RequirementsPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Page 68

Page 80: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Describe in detail the access control features and capabilities of the Vendor’s proposed BOS solution.

17.7 Role Based SecurityPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Describe how role based security is implemented within the Vendor’s proposed BOS solution.

17.8 Managing Multiple Roles within BOSPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

17.9 Temporary Expanded AccessPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

Page 69

Page 81: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

17.10 Password ResetPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

17.11 Attempted Access ViolationsPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

17.12 User Log-off for InactivityPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Page 70

Page 82: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

17.13 System Access Control Matrix Part A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Describe the capabilities of the system access control dashboard utility within the Vendor’s proposed BOS solution.

17.14 Data Transmission SecurityPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Describe the secure transmission protocols and method used for the data transmission within and outside interfaces in the proposed solution.

17.15 Hosting and Disaster Recovery Facility ControlsPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Page 71

Page 83: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

17.16 Access Control for Reporting and Business intelligencePart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Describe the access control capabilities for the data warehouse solution. Explain how the database and the data will be secured from unauthorized access for the Vendor’s proposed solution.

17.17 Security PlanPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

17.18 PCI and PA-DSS CompliancePart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Page 72

Page 84: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Describe how PCI and PA-DSS compliance will be followed, managed and maintained for the proposed solution.

18.0 Hardware and Software Requirements

18.1 General RequirementsPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

18.2 Hardware RequirementsPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

18.3 Hardware Mean Time between Failure (MTBF) RequirementsPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated

Page 73

Page 85: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

18.4 DiagnosticsPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

18.5 Customized HardwarePart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Describe any proposed customized hardware the Vendor plans to utilize for its proposed BOS application.

Provide the rationale for any proposed customized hardware.

18.6 Bill of Materials (BOM)Part A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One:

Page 74

Page 86: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

18.7 Software RequirementsPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

18.7.1 Software - User Interface

Part A Will the Vendor meet requirements in the referenced section of the RFP as stated or with modification? Check One:

Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Describe key features and capabilities of the user interface of the proposed BOS solution (both OBOS and CBOS) and demonstrate compliance with the requirements in this subsection.

18.7.2 Software - Expansion CapabilityPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One:

Page 75

Page 87: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Describe the expansion capability of the Vendor’s proposed BOS software solution.

18.7.3 Software – MaintainabilityPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Describe the software updates/upgrades and release cycle for various software elements of the Vendor’s proposed BOS solution.

18.7.4 HOT Updates - Code Updates Loading While System is Running Part A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Describe the Vendor’s proposed approach for performing HOT updates.

18.7.5 API for Third Party Application Developers

Part A Will the Vendor meet requirements in the referenced section of the RFP as stated or with modification? Check One:

Page 76

Page 88: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Describe the Vendor’s proposed approach for providing the third party APIs outlined in this section.

What challenges and risks does the Vendor see with these requirements and what recommended strategies does the Vendor propose for mitigating these challenges/risks?

18.7.6 Software – LicensePart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

18.7.7 Software – Technical DocumentationPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

Page 77

Page 89: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

18.8 Back Office HardwarePart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Provide an overview of the Back Office hardware architecture for the Vendor’s proposed solution.

18.8.1 Hardware – ComponentsPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

18.8.2 Hardware - Disaster Recovery SitePart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Describe how disaster recovery site will be setup and configured to handle the disaster recovery requirements for the BOS solution.

Page 78

Page 90: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

18.8.3 Hardware – Backup Power (UPS / Generator)Part A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

18.9 Operating SystemPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Provide an inventory of the operating system software and its licensing and configuration setup details for the proposed solution.

18.10 Database Management SystemPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Describe the database configuration setup details including schemas and data dictionary for the proposed solution.

Provide Vendor’s rationale for its selection of database management

Page 79

Page 91: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

system.

18.11 Backup and Archive CapabilityPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Describe the backup, archive and restore capabilities included within the Vendor’s proposed BOS solution.

18.12 Performance RequirementsPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Describe how the performance requirements will be met and maintained for the Vendor’s proposed BOS solution.

18.13 Systems and Database Technical SupportPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Page 80

Page 92: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

Part C No response required.

19.0 Back Office Hosting

19.1 General RequirementsPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Describe the Vendor’s proposed hosting site setup, configuration and performance capabilities to address the Back Office hosting requirements for the BOS project.

19.2 Back-up or Disaster Recovery Hosting SitePart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Describe the Vendor’s backup hosting site setup, configuration and performance capabilities to address the back-up and disaster recovery requirements for the BOS project.

19.3 Hosting Site CapabilitiesPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

Page 81

Page 93: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

19.4 CommunicationsPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Describe the Vendor’s proposed network setup, configuration and performance capabilities to address communications requirements for the BOS project.

19.5 SecurityPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

Page 82

Page 94: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

20.0 Project Management

20.1 OverviewPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Describe the Vendor’s overall project management approach for the BOS project.

20.2 Project SchedulePart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Provide an initial draft of the Vendor’s proposed project schedule prepared in Microsoft Project as a hardcopy attachment to the Technical Proposal. Provide a softcopy of the draft project schedule in Microsoft Project 2010 or greater. The project schedule attachment is not included in the page limit for the Technical Proposal.

20.2.1 Initial Project SchedulePart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Page 83

Page 95: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

20.2.2 Approved Baseline Project SchedulePart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

20.2.3 Revised Project SchedulePart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

20.3 Issue ManagementPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Page 84

Page 96: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

Part C Describe how issue management will be structured and managed for the BOS project.

20.4 Risk ManagementPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Describe how risk management will be structured and managed for the BOS project.

20.5 Project Kick-offPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

20.6 Workshops and Working SessionsPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Page 85

Page 97: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

Part C No response required.

20.7 Weekly Status MeetingsPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

20.8 Agendas and Meeting NotesPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

20.9 Monthly Progress ReportsPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

Page 86

Page 98: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

20.10 Deliverable ReviewsPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

21.0 Quality Management

21.1 Quality Management ProgramPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Provide an overview of the Vendor’s proposed quality management approach.

Identify the Vendor’s proposed Quality Assurance Executive and Quality Assurance Manager and provide a summary of the relevant experience of each of the proposed team members.

Describe the Vendor’s planned peer review process.

Describe the Vendor’s planned formal quality assurance review process and identify potential points in the project schedule for the conduct of these reviews.

Page 87

Page 99: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

21.2 Partnering Program

21.2.1 General RequirementsPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response needed.

21.2.2 Partnering Between Vendor and WSDOTPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Provide an overview of the Vendor’s proposed partnering approach with WSDOT for the BOS project including both the Implementation phase and the Operations and Maintenance phase. Highlight any differences in the partnering approach between the Implementation phase and the Maintenance and Operations phase.

21.2.3 Partnering Between Vendor and CSC OperatorPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Page 88

Page 100: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

Part C Provide an overview of the Vendor’s proposed approach for partnering with the CSC Operator.

22.0 Organizational Change Management

22.1 Organizational Change Management OverviewPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

22.2 OCM RequirementsPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Provide an overview of the Vendor’s proposed organizational change management methodology and approach.

22.3 Change Management TeamPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Page 89

Page 101: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Provide a summary of the experience and qualifications of the Vendor’s proposed Change Management Lead and other Change Management Team members.

22.4 OCM Sizing ConsiderationsPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

22.5 Change Management Planning RequirementsPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

22.6 Change Management Communications RequirementsPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Page 90

Page 102: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Provide an overview of the Vendor’s proposed approach for meeting the change management communications requirements.

22.7 Readiness for Change Assessment RequirementsPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Describe the Vendor’s proposed approach for conducting an enterprise readiness assessment.

Based on the Vendor’s prior experience, what are some of the key risks from an enterprise readiness approach and what are potential mitigation strategies to address the identified risks?

22.8 Change Gap Analysis RequirementsPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

22.9 WSDOT Project Staff Change RequirementsPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One:

Page 91

Page 103: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

22.10 External Stakeholder Readiness for Change RequirementsPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

22.11 Training Design, Delivery and Support RequirementsPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Provide an overview of the Vendor’s proposed training approach including a proposed training timeline/schedule for both the Phase 1 and Phase 2 Go-Live.

22.12 Initial WSDOT Core Team Training on BOS ComponentsPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One:

Page 92

Page 104: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Provide an overview of the Vendor’s proposed approach for conducting core team training, including an outline of proposed courses and course content.

22.13 System Demonstration for CSC OperatorPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Provide an overview of the Vendor’s proposed approach for providing an initial system demonstration for the CSC Operator, including an outline of proposed content for the demonstration.

22.14 Establish Training Development Needs Part A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Describe the Vendor’s approach for design and development of training materials.

Page 93

Page 105: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

22.15 Support Training Delivery Part A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Describe the detailed steps the Vendor will perform to support training delivery by WSDOT and the CSC Operator for the BOS project.

22.16 Design, Implement and Manage Training Environments Part A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Provide a description of the planned training environments for the BOS project.

22.17 Establish and Manage Training Data Sets RequirementsPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Provide details on the training datasets that will be available for the BOS project, and the steps the Vendor will take to manage and maintain these data sets, including required refreshes.

Page 94

Page 106: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

22.18 Post-Training – Vendor ResponsibilitiesPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

22.19 User Post Go-Live Support RequirementsPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Provide an overview of the Vendor’s approach for providing post Go-Live support.

23.0 Data Migration from RITE System

23.1 OverviewPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Page 95

Page 107: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

Part C Provide lessons learned based on prior experience and suggest how these lessons learn will inform your proposed approach for performing data migration on the BOS project.

23.2 Data Migration PlanPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Provide an overview of the Vendor’s proposed approach for migrating data from the RITE system.

23.3 Data Migration TeamPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Describe roles and identify the team for data migration from the RITE system to the Vendor’s proposed BOS solution.

Provide a summary of the relevant experience of each proposed Data Migration team member in terms of their planned responsibilities on the BOS project.

23.4 Data Migration ApproachPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

Page 96

Page 108: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Describe in detail the approach to data migration for the proposed solution.

Describe the financial migration approach for the proposed solution.

Describe Vendor’s approach to establishing and maintaining internal controls during the migration process.

23.5 Data Migration Required DeliverablesPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

23.6 Data Migration TasksPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

23.6.1 Requirements AnalysisPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One:

Page 97

Page 109: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

23.6.2 Specifications DevelopmentPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Describe the specification mapping steps the Vendor will perform during the data migration process.

23.6.3 Development and Unit TestingPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Describe ETL development steps and details for the data migration process.

23.6.4 Migration Testing and ValidationPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated

Page 98

Page 110: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Describe migration testing and validation steps for the proposed solution.

Describe the Vendor’s approach for engaging WSDOT in data validation and verification activities during testing.

Describe the Vendor’s approach for verifying internal controls and the financial integrity of the data migration process during testing.

23.6.5 Actual Production Data Migration Part A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

23.7 Other System Migration ConsiderationsPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Identify and discuss the Vendor’s approach for migrating any other systems that will require migration as part of transitioning the new BOS solution to production.

Page 99

Page 111: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

24.0 Testing Program

24.1 IntroductionPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

24.2 General RequirementsPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Provide an overview of the Vendor’s proposed testing approach to address the requirements in this section.

24.3 Master Test Plan Part A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

Page 100

Page 112: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

24.4 Test ProceduresPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

24.5 Test ReportsPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Provide an outline of the contents of a test report for one of the required testing phases/stages.

24.6 DeficienciesPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Page 101

Page 113: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

Part C Describe the Vendor’s proposed approach for managing, tracking and maintaining the deficiency log.

24.7 Unit TestingPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Provide an overview of the Vendor’s unit testing methodology and approach.

Provide an outline of the typical contents of a Vendor unit test package.

24.8 Factory Acceptance TestingPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Describe the Vendor’s proposed entry and exit criteria for FAT testing for the BOS project.

24.9 Integration and Commissioning TestingPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Page 102

Page 114: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Describe the Vendor’s proposed entry and exit criteria for ICT testing for the BOS project.

24.10 Security TestingPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Describe the Vendor’s proposed approach for Security Testing including recommended entry and exit criteria.

Describe the remediation steps the Vendor will follow in case of any critical security breach found during testing.

24.11 Performance TestingPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Provide an overview of the Vendor’s proposed approach for Performance Testing.

24.12 Regression TestingPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated

Page 103

Page 115: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Describe the Vendor’s proposed approach for Regression Testing including all automated tools.

Describe the dataset that will be used for Regression Testing.

24.13 User Acceptance TestingPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Describe the Vendor’s proposed approach for assisting WSDOT to plan and execute the User Acceptance Testing.

Describe the dataset that will be used for User Acceptance Testing.

24.14 Operations TestingPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Provide an overview of the Vendor’s proposed approach for conducting Operations Testing.

Describe the dataset that will be used for Operations Testing and the process for synchronizing this with the customer information in the

Page 104

Page 116: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

existing RITE production system.

25.0 Operations and Maintenance Services

25.1 General RequirementsPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Provide an overview of the Vendor’s proposed approach to providing Operations and Maintenances services, including the anticipated location of staff.

25.2 Back Office Equipment MaintenancePart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Describe the Vendor’s planned steps for performing hardware maintenance to meet required service levels.

25.3 Network Systems MaintenancePart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

Page 105

Page 117: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Describe the Vendor’s planned steps for performing network maintenance to meet required service levels, without impacting users of the BOS.

25.4 Maintenance Online Management System (MOMS) Part A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Provide an overview of the Vendor’s proposed MOMS solution including key functionality/capabilities.

What level of configurability are you proposing (User Configurable, Configurable or Fixed)? Explain below.

Will the Vendor solution utilize a COTS product(s)? Choose one and explain below.

Solution will utilize a COTS product(s)

Solution will NOT utilize a COTS product(s)

25.5 Key Performance Indicator Dashboard Part A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Provide an overview of the Vendor’s proposed Key Performance

Page 106

Page 118: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

Indicator Dashboard solution including key functionality/capabilities.

Describe the data sources for KPI information and the data integration that will be implemented with other BOS components to ensure the timeliness and accuracy of information on the dashboard.

What level of configurability are you proposing (User Configurable, Configurable or Fixed)? Explain below.

Will the Vendor solution utilize a COTS product(s)? Choose one and explain below.

Solution will utilize a COTS product(s)

Solution will NOT utilize a COTS product(s)

25.6 Maintenance RequirementsPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

25.7 Notification and Recording of Maintenance ActivitiesPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

25.8 Routine MaintenancePart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One:

Page 107

Page 119: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

25.9 Incident Management Part A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Describe the Vendor’s approach for identifying and responding to incidents.

Describe the role of the proposed MOMS solution in supporting the managing and tracking of incidents.

25.9.1 Severity Level 1 – HighPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

25.9.2 Severity Level 2 – MediumPart A Will the Vendor meet requirements in the referenced section of the RFP as

Page 108

Page 120: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

25.9.3 Severity Level 3 – LowPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

25.9.4 Release Management for System IncidentsPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

25.10 Equipment and Spares Inventory ManagementPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One:

Page 109

Page 121: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

25.11 Software Maintenance ServicesPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Describe the Vendor’s proposed approach (work steps and tools, etc.) utilized to manage and perform software maintenance services for the proposed BOS solution.

25.12 Test EnvironmentPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

25.13 Maintenance StaffingPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One:

Page 110

Page 122: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Describe the minimum and maximum staff strength needed to maintain the proposed solution and how they will be staffed and managed, beginning with the initial Phase 1 Go-Live.

25.14 Maintenance TrainingPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Describe the Vendor’s proposed approach for providing maintenance training for its staff. Provide examples of training courses that staff assigned to the BOS project during Operations and Maintenance will likely take.

Describe the frequency of the maintenance training during the implementation, Go-Live and operational stages of the proposed solution.

25.15 Annual Audit RequirementsPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Page 111

Page 123: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

Part C No response required.

25.15.1 PCI, SOC1, SOC2 and OCIO AuditsPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

25.15.2 System Performance AuditPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

25.15.3 Other Required Audit SupportPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

Page 112

Page 124: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

25.16 Incident and Revenue Loss ManagementPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Describe steps the Vendor will design and implement to identify and mitigate incidents related to revenue loss.

25.17 Cooperation with OthersPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Describe steps the Vendor will follow to collaborate and communicate with other vendors during the maintenance of the proposed BOS solution.

25.18 Emergency Response ManagementPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

Page 113

Page 125: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

25.19 System Maintenance and Version TrackingPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Will the Vendor solution utilize a COTS product(s)? Choose one and explain below.

Solution will utilize a COTS product(s)

Solution will NOT utilize a COTS product(s)

Describe the Vendor’s proposed version tracking tool to be utilized for maintenance and describe how it will be incorporated for maintaining the proposed solution.

Describe any training available for users on the proposed tracking tools.

26.0 Project Organization and Staffing

26.1 Project Organization ChartPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Provide a project organization chart in this response section or as an attachment to the Vendor’s Technical Proposal which clearly outlines the management structure for planning, organizing and executing the BOS project.

Page 114

Page 126: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

26.2 Vendor Key Personnel – Implementation Phases 1 and 2Part A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Identify all Key Personnel as outlined in this section and briefly summarize their experience as it applies to the requirements of the position.

Complete fully the resume template in Appendix 18 for each Key Personnel and provide as an attachment to the Vendor’s Technical Proposal. Template shall not exceed six (6) pages per person. Completed resume templates are not included in the page limitation for the Vendor’s Technical Proposal. Client contact information must be provided on the resume template.

26.3 Vendor Key Personnel – Operations and Maintenance PhasePart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

26.4 Substitution of Vendor Key Project PersonnelPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Page 115

Page 127: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

27.0 Go-Live and Acceptance of the System and Services

27.1 Approval for System Go-LivePart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

27.2 Phase 1 AcceptancePart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

27.3 Phase 2 AcceptancePart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

Page 116

Page 128: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

27.4 Final System AcceptancePart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

27.5 Acceptance of ModificationsPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

28.0 Project Office SpacePart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

Page 117

Page 129: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

29.0 Potential Future Contract Modifications

29.1 Enhancements to State Route 167 Toll FacilityPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

29.2 Interstate 405 Express Toll Lanes Bellevue to RentonPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

29.3 Onboarding of Unidentified Future Toll Facility – Fixed or Variable Pricing

Part A Will the Vendor meet requirements in the referenced section of the RFP as

Page 118

Page 130: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

29.4 Onboarding of Unidentified Future Toll Facility – Multiple Toll Points and Dynamic Pricing

Part A Will the Vendor meet requirements in the referenced section of the RFP as stated or with modification? Check One:

Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

30.0 Deliverables Part A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

Page 119

Page 131: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

30.1 General RequirementsPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

30.2 Project Initiation PhasePart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

30.2.1 WSDOT Partnering PlanPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

30.2.2 Initial Project SchedulePart A Will the Vendor meet requirements in the referenced section of the RFP as

Page 120

Page 132: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

30.2.3 Project Management Plan Part A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

30.2.4 Web-based Collaboration EnvironmentPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Provide an overview of the Vendor’s proposed Web-based collaboration environment including key functionality/capabilities.

What level of configurability are you proposing (User Configurable, Configurable or Fixed)? Explain below.

Will the Vendor solution utilize a COTS product(s)? Choose one and explain below.

Solution will utilize a COTS product(s)

Page 121

Page 133: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

Solution will NOT utilize a COTS product(s)

30.2.5 Quality Management PlanPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

30.2.6 Security PlanPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Nor response required.

30.2.7 Subcontractor Management PlanPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

Page 122

Page 134: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

30.2.8 Master Test PlanPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

30.2.9 Work Place Safety PlanPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

30.2.10 Project Office SpacePart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

30.2.11 CSC Operator Partnering PlanPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One:

Page 123

Page 135: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

30.3 Preliminary Design PhasePart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

30.3.1 Software Development Plan (SDP)Part A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

30.3.2 Installation PlanPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated

Page 124

Page 136: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

30.3.3 Requirements Traceability Matrix (RTM)Part A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

30.3.4 Initial Core Team TrainingPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Provide an outline of the anticipated Core Team Training curriculum and course content.

30.3.5 Configuration Management PlanPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

Page 125

Page 137: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Provide an outline of the contents of the Vendor’s proposed Configuration Management Plan.

30.3.6 System ArchitecturePart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Provide an outline of the contents of the Vendor’s proposed System Architecture document.

30.3.7 Organizational Change Management PlanPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Provide an outline of the contents of the Vendor’s proposed Organizational Change Management Plan.

30.3.8 Communications PlanPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

Page 126

Page 138: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Provide an outline of the contents of the Vendor’s proposed Communications Plan.

30.3.9 System Requirements Document (SRD)Part A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Provide an outline of the contents of the Vendor’s proposed SRD.

30.3.10 Training PlanPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Provide an outline of the contents of the Vendor’s proposed Training Plan.

30.3.11 Data Migration PlanPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Page 127

Page 139: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Provide an outline of the contents of the Vendor’s proposed Data Migration Plan.

30.4 Final Design PhasePart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

30.4.1 Disaster Recovery PlanPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Provide an outline of the contents of the Vendor’s proposed Data Migration Plan.

30.4.2 Interface Control Documents (ICD)Part A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Page 128

Page 140: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

30.4.3 Test ProceduresPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Describe the Vendor’s proposed approach for preparing test procedures. Provide an outline of contents and/or an example which illustrates the typical format, style and level of detail in a test procedure.

30.4.4 Data Migration SpecificationsPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

30.4.5 System Detail Design Document (SDDD)Part A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Page 129

Page 141: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Provide an outline of the contents of the Vendor’s proposed SDDD.

30.5 Procurement PhasePart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

30.5.1 Procurement PlanPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Provide an outline of the contents of the Vendor’s proposed Procurement Plan.

30.5.2 Hardware and Software Installed and AcceptedPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Page 130

Page 142: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

Part C No response required.

30.5.3 Third Party Hardware ManualsPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

30.5.4 Third Party Software ManualsPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

30.6 Installation and Testing PhasePart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Page 131

Page 143: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

Part C No response required.

30.6.1 Customer Website

30.6.1.1 Wireframes

Part A Will the Vendor meet requirements in the referenced section of the RFP as stated or with modification? Check One:

Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

30.6.1.2 Completion of WSDOT Usability Study on the Unit Tested Software

Part A Will the Vendor meet requirements in the referenced section of the RFP as stated or with modification? Check One:

Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

30.6.1.3 Visual Design Mock-ups

Part A Will the Vendor meet requirements in the referenced section of the RFP as stated or with modification? Check One:

Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Page 132

Page 144: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

Part C No response required.

30.6.1.4 Security Certification by Independent Firm

Part A Will the Vendor meet requirements in the referenced section of the RFP as stated or with modification? Check One:

Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

30.6.1.5 Accessibility Certification by Independent Firm

Part A Will the Vendor meet requirements in the referenced section of the RFP as stated or with modification? Check One:

Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

30.6.2 Test ReportsPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Provide an outline of the typical contents in the Test Report for

Page 133

Page 145: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

Integration and Commissioning Testing.

30.6.3 Data MigrationPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

30.6.3.1 Data Migration Development and Unit Test Report

Part A Will the Vendor meet requirements in the referenced section of the RFP as stated or with modification? Check One:

Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

30.6.3.2 Trial Migration Test Report

Part A Will the Vendor meet requirements in the referenced section of the RFP as stated or with modification? Check One:

Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

Page 134

Page 146: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

30.6.3.3 Full Migration Test Report

Part A Will the Vendor meet requirements in the referenced section of the RFP as stated or with modification? Check One:

Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

30.6.4 Transition PlanPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Provide an outline of the contents of the Vendor’s proposed Transition Plan.

30.6.5 Successful Completion of PCI AuditPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

Page 135

Page 147: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

30.6.6 Successful Completion of OCIO AuditPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

30.6.7 Successful Completion of SOC1 and SOC2 AuditPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

30.6.8 System Administration ManualPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Provide an outline for the Vendor’s proposed System Administration Manual highlighting the typical topics that will be included in the deliverable.

Page 136

Page 148: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

30.6.9 Post Go-Live Support PlanPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Provide an outline of the contents of the Vendor’s proposed Post Go-Live Support Plan.

30.6.10 Maintenance PlanPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Provide an outline of the contents of the Vendor’s proposed Maintenance Plan.

30.6.11 Maintenance and Service ManualsPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

Page 137

Page 149: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

30.6.12 Maintenance Online Management System (MOMS)Part A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

30.6.13 KPI DashboardPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

30.6.14 Annual Audit PlanPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

30.6.15 Data Dictionary (WSDOT Option for Data Warehouse)Part A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One:

Page 138

Page 150: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

30.7 Training PhasePart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

30.7.1 Training Courseware and Training MaterialsPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Provide an overview of the Vendor’s proposed Training Courseware and Training Materials (media, types of courseware, etc.) .

30.7.2 Training Pilot WalkthroughPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One:

Page 139

Page 151: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

30.7.3 User Acceptance Test TrainingPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

30.7.4 Train the Trainers Course(s) CompletedPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

30.7.5 End User Training CompletedPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

Page 140

Page 152: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

30.7.6 Readiness PlanPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C Provide an outline of the contents of the Vendor’s proposed Readiness Plan.

30.7.7 Updated Training Materials Post Go-LivePart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

30.8 Production Cut-Over PhasePart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Page 141

Page 153: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

30.8.1 System Go-LivePart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

30.8.2 Go-Live ReportPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

30.8.3 System Release NotesPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Page 142

Page 154: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

Part C No response required.

30.8.4 Hardware and Software InventoryPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

30.9 AcceptancePart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

30.9.1 Phase Acceptance LetterPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Page 143

Page 155: REQUEST FOR QUALIFICATIONS (RFQ) - wsdot.wa. Web view16.7Interface Sizing and Estimating ... 18.6Bill of Materials (BOM)75. ... make its proposed revision to the requirement language

WSDOT Good To Go! Back Office System – Appendix 4 RFP-2016-1201

Part C No response required.

30.9.2 Final Acceptance LetterPart A Will the Vendor meet requirements in the referenced section of the RFP as

stated or with modification? Check One: Yes, as stated Yes, with modification (explain in Part B)

No, will not meet (explain in Part B)

Part B Vendor’s proposed revision to the requirement language, if applicable:

Part C No response required.

Page 144