RequestforProposals
LobsterCatchabilityStudyProgram
Releasedate:March21,2016SubmissionDate:April8,2016
FundyOceanResearchCenterforEnergy(FORCE)www.fundyforce.ca
ContractManagerAnne-MarieBelliveau,DirectorofOperations
Request for Proposals Lobster Catchability Study March 21, 2016 // Page 2 of 9
2
1. InvitationDetailed proposals are invited from consultants, consulting firms and academic institutions hereafterreferredtoasthe“Consultants”)todesignandimplementaoneyearlobstercatchabilitystudyprogramaspartofFORCEEnvironmentalEffectsMonitoringProgram(EEMP)for itsmarinedemonstrationandtestingfacilityintheMinasPassage,BayofFundy.2. BackgroundandContextTheFundyOceanResearchCenter forEnergy(FORCE), isCanada’s leadingcentertodemonstrateandevaluate technology and undertake research on tidal in-stream energy conversion (TISEC). FORCEcollaborateswithdevelopers,regulatorsandresearcherstostudytheinteractionbetweentidalturbinesandthedynamicenvironmentalconditionsintheBayofFundy.TheFundyTidalEnergyDemonstrationProject (the Project), being undertaken by FORCE in theMinas Passage, presently involves five berthholders, each proposing to deploy a different technology over the next five years. AdditionalinformationandbackgroundontheFORCEProjectandEEMPstudiescompletedtodateareavailableonFORCE’swebsite:www.fundyforce.ca.TheProjectEnvironmentalAssessment (EA) received formalapprovalonSeptember15,2009.Oneoftheconditionsof theapproval requiredFORCE,as theApprovalholder, toestablishanEnvironmentalEffectsMonitoringProgram(EEMP)coveringanumberofsubjectareas. ThesesubjectareasareFish,Lobsters,MarineBirds,MarineMammals,Acoustics,PhysicalOceanography,CurrentsandWaves,andBenthicenvironment.Inaddition(asrequiredbytheEAapproval),anEnvironmentalMonitoringAdvisoryCommittee(EMAC)wasestablishedtoprovideindependentexpertscientificandtraditionalecologicalknowledgeadvicetoFORCEontheadequacyoftheEEMP.BasedonthedatagatheredunderpreviousFORCEEEMprogramsundertakenfrom2009to2013andfeedbackfromEMAC,itwasdeterminedthatthefutureFORCEEEMPshouldfocusonfivesubjects:Fish,Lobsters,MarineBirds,MarineMammalsandAcoustics(marinenoise).For the lobster indicator, the2009EAnotes that“potentialadverseeffectson thecommercial lobsterfisherieswillbeeliminatedorminimizedtoinsignificantlevelsthroughouttheProjectlife”.TheEAgoeson to predict that “apart from direct displacement of a limited number of individual lobsters in theimmediateProjectfootprint,theremaybeindirecteffectsonmigratinglobstersduringconstructionasaresultofnoise,vibrations,orsediments”(AECOM2009).Inorder to test thesepredictions, a seriesofEEMPs focusedon lobster “catchability”andmovementwereundertakenin2009and2010,pluslobstertaggingstudiesin2011through2013.The next TISEC deployment is anticipated inmid-2016 at site D, as indicated in Figure 1. Ongoinglobstermonitoring studies are required to assess the potential effects and test the EApredictions asadditionalTISECdevicesaredeployed.
Crown Lease Deployment Area
Cable Termination
Cable Termination
Cable Termination
Cable Termination
Main Anchor
Main Anchor
Main AnchorMain
Anchor
Grappling Anchor
Grappling Anchor
Grappling Anchor
Clump Weight
Clump Weight
Hub C
onne
ctor
Hub Connector
Open Hydro Hub
Data CablePower Cable B
Power Cable C
Power Cable D
Power Cable AE
D
A
C
B
64°24'30"W64°25'W64°25'30"W64°26'W64°26'30"W
45°2
2'30"N
45°2
2'N45
°21'3
0"N
387000 387500 388000 388500 389000 389500 39000050
2350
050
2400
050
2450
050
2500
050
2550
0
Bay of Fundy
Minas Basin
Parrsboro
¯
Seaforth Geosurveys Inc.300 Prince Albert Road, Suite 200
Dartmouth, Nova ScotiaCanada B2Y 4J2
Phone: (902)468-3579www.seaforthgeosurveys.com
Rev Date Prepared By Checked By Comments
Prepared By:Job / Proposal #: 612 Doc #: SGI-612-105-A
Title:
Client:
Project:
1:10,000
0 100 200 300 400 500 m
A 02/24/16 AA
Scale:
Datum / Projection: WGS84 UTM 20
Notes: 1) Plan view showing FORCE berths, cables and deployed Open Hydro assets.
2) The Data cable was laid in December, 2013; the power cables were laid in October, 2014; the Open Hydro hub and connectors were deployed in December, 2015.
FORCE
Fundy Tidal Energy Demonstration Project
FORCE POWER CABLES ANDBERTH POSITIONS
Legend
DRAFTGC
Cable FeaturesGround Tackle
Hub To HC ConnectorsCrown Lease Deployment Area
Power Cables And Berth Sites
Berth Site E
Cable & Berth ACable & Berth BCable & Berth C
D, InferredCable & Berth D
Unsurveyed Cable Sections Data Cable
Request for Proposals Lobster Catchability Study March 21, 2016 // Page 4 of 9
4
3. ObjectiveTheultimateobjectiveofthisEEMPistoassesstheimpactoftheFORCEprojectonlobstercatchability;that is,on thenumberandweightof lobstersenteringcommercial lobster traps in thevicinityof theProject.ThisinturnshouldprovideaperspectiveonthemagnitudeorsignificanceofProjecteffectsonthecommerciallobsterfishery.4. ScopeofWork4.1 TheConsultantwilldesignandimplementa lobstercatchabilitystudyforaperiodofoneyear
based on the methodology recommendations contained in Section 2 of the FORCEEnvironmental Effects Monitoring Program, dated March 2016. This Report and othersupporting documents are available for reference on the FORCE website, athttp://fundyforce.ca/environment/.The1yearcontractmaybeextendedforanadditionalyearuponreviewoftheConsultant’swork.
4.2 Provide descriptions of the data quality assurance program and its implementation for the
surveys;and,thestatisticalanalysisapproachtobeutilizedforthestudy.4.3 InconsultationwithFORCE,arrangeforproperlycertifiedand insuredvesselandcrewforthe
implementation and operation of the lobster catchability surveys (refer to Sections 7 and 8below). FORCE will provide the lobster traps, lines and buoys for the surveys. FORCE willcontractdirectlywiththevesselownerandsovesselcostscanbeexcludedfromtheproposal.However, the Consultant must provide an estimate of vessel rental days and associatedprofessionalfees.
4.4 Conduct the surveys and undertake the statistical analysis and data interpretation of the
collected data (including a comparison with data collected in the past) to meet the statedobjective,andprovideastatusreportforeachsurveyandafinal (summary)report. Thedataanalysisand interpretation in theFinalReportwill includeacomparison to thedatacollectedduringpreviousstudiesundertakenattheFORCEsite,asappropriate(seesection6below).
4.5 ProvideascheduleforsurveysanddeliveryofeachsurveystatusreportandtheDraftandFinal
report.4.6 TheConsultantwilldelivertoFORCEadigitalcopyof thestatusandfinalreports inMicrosoft
Word and PDF format addressing all of the requirements specified in the Detailed Scope ofWork,aswellasotherinformationconsideredbytheConsultanttoberelevanttoachievingthecontractualobjective.
5. SurveyTimingSurvey timing will be determined through discussions between FORCE and the Consultant, but theConsultant should propose a tentative schedule with supporting justification in the Proposal. Theultimate survey timingwill likely dependon turbine deployment, vessel availability, tides and lobsterfishingseason.
Request for Proposals Lobster Catchability Study March 21, 2016 // Page 5 of 9
5
Withrespecttothe initialsurvey,timingwillbecontingentuponthetimingofturbinedeploymentbyCape Sharp Tidal Venture (CSTV). It is critical thatmonitoring does not interfere with or cause anysafetyconcernsduringtheCSTVturbinedeployment.Thiscontractconsistsofdatacollection,processingandreportingforthreelobstercatchabilitysurveysat the FORCE site, post-turbine deployment. Should the CSTV turbine deployments be delayed, thisprogramwill continue in to2017untilall threestudiesarecompleteat theappropriate timeofyear,andtheassociateddataanalysisandreportingiscompleted.6. Reporting
Followingeachfieldsurvey,abriefinterimstatusreportwillbeprepareddescribingplanning,theworkundertaken, problems encountered, and results of the survey. The status reports will also describecosts incurred so that project expenditures can be tracked over the course of the year. Uponcompletion of the final survey, a draft Summary Report will be submitted to FORCE and EMAC forreview.ThedraftSummaryReportwillcompileallresultsandpresentacomprehensiveoverviewoftheobjectives, methods, results and conclusions of the program (including comparison with past data).OnceFORCEcommentshavebeenreceived,afinalSummaryReportwillbesubmittedtoFORCEwhointurnwillsubmitthereporttotheregulators.TheConsultantwilldelivertoFORCEadigitalcopyofthefinalSummaryReportinMicrosoftWordandPDF format addressing all of the requirements specified in the Scope of Work, as well as otherinformation considered by the Consultant to be relevant to achieving the contractual objective. TheConsultantwillalsodeliverthemetadataandprocessedandrawdatainaformattobedeterminedindiscussionswithFORCE.TheConsultantshouldbeawarethatallprojectdeliverableswillbemadepublicatFORCE’sdiscretion.7. OperationalSafetyPlanAll bidders must describe their safety planning process in the proposal. Upon contract reward, thesuccessfulConsultantmustprepareanOperationalSafetyPlanspecifictothescopeofworkoutlinedinthis contract and in compliance with FORCE’s safety requirements, which will be provided to thesuccessfulConsultantshortlyfollowingcontractaward.Acopyof theOperationalSafetyPlanshallbeprovided forcommentand reviewbyFORCEwithin21days after contract award. TheContractor is responsible for any training, certification and insurancerequirementsthatarerequiredtoparticipateintheseavoyages.8. Insurance,CertificationsandPermitsConsultants (and any sub-consultants) must meet the minimum Transport Canada insurancerequirements and have passenger and third-party liability coverage to the limits specified. TheConsultantshallprovideproofofcoveragebytheWorkers’CompensationBoarduponrequest.Consultants(andanysub-consultants)willmeetallTransportCanadacertificationstandardsapplicablefor the proposed work. Contractors will demonstrate that all vessels proposed in the RFP meetTransportCanadaregulationstoatleastthestandardrequiredfortheproposedwork.Thevesselswill
Request for Proposals Lobster Catchability Study March 21, 2016 // Page 6 of 9
6
have,throughouttheoperationalperiod,allcertificates, lifesavingequipmentandsafetyapparatusasrequiredbyTheCanadaShippingActandpursuantregulationsforthecrewandadditionalstaff.TheConsultantisresponsibleforobtaininganyrequiredscientificresearchorotherpermits.9. QualificationsThe consultant is expected to have a technical or academic background and extensive experience inmarinescience,includingexperiencewiththedesignandinterpretationofmarinemonitoringprograms.Competencyinstatisticalanalysisandmarinesamplingtechnologies,particularlyinregardtosamplingprotocolsisalsoarequirement.10. ProposalSubmissionThe Proposal must be submitted inWord document format as follows: single spaced, double sided,maximumof25pages,TimesNewRoman font, font size12-point,one inchmarginsonall sides,andreflect the requirements as presented in section 3. Appendices may be used for CVs and companybrochuresbuteffortshouldbetakentominimizethelengthoftheAppendices.TheSubmissionwillbeevaluatedaccordingtothecriteriainScheduleA.TheFullProposalshallbeorganizedwiththesubjectheadingsinthesequenceindicated:• Introduction.Describetheprojectobjectives.
• OrganizationandPersonnel. Indicatethelocationofyourofficeandofficesfromwhichthework
will be conducted. Identify the primary contact and provide brief biographies of the personnelassignedtothisproject.Thebiographiesshoulddescribetheperson’srelevantexperienceandroleintheproject.Pleaselistanddescribeanypartners,subcontractorsorexpertsformingpartoftheProposal,includingtheirexperienceandroles.
• Pastrelevantprojectexperience. TheProposalshallincludeatleastthree(3)examplesofrecent
projects as well as the applicable client contact information. Proponents must be able todemonstratethattheConsultantshasanin-depthknowledgeofthescopeofthisassignment.
• Proposed methodology. The proponent shall clearly indicate their proposed methodology,preferablydescribedonataskbytaskbasis,toaddressthescopeofworkasoutlinedinthisRFP.
• Proposed schedule. Proponents are to provide a detailed schedule for the tasks for the tasksabove,includingreviewandrevisionofdraftreports.
• Attentiontorelevantchallenges.ProponentsshalldescribeandattempttoaddressanychallengestotheassignmentwhichtheyhaveidentifiedbutmaynotbespokentointheRequest.
• Value added propositions and recommendations. Proponents may demonstrate an innovativeapproachtothecompletionoftheassignment,utilizingallpotentialresourcesavailabletothem.
Request for Proposals Lobster Catchability Study March 21, 2016 // Page 7 of 9
7
• Costproposal.Provideacostbreakdownbyproposedtaskandstatethefirmfixedtotalpriceforthe servicesoutlinedunder theScopeofWork. Pricesare tobequoted inCanadiandollars andexclusiveofHST.Please indicateunit rates incaseadditionalwork is required. Inadditionpleaseindicateiftheseunitrateswillremainunchangedifthisprojectisextendedforanadditionalyear.If the Consultant proposes to increase unit rates for a subsequent year, please indicate a fixedpercentincreaseonunitrates.
• References.Providetwo(2)referencesforwhichsimilarworkhasbeenprovided.
• Signature.TheFullProposalmustbesignedbyanauthorizedofficial.
TheresponsetothisrequestforproposalsisduetoFORCEby4pmASTonApril8,2016.Allproposalsreceived by the deadline will receive an acknowledgement by email. Consultants may respondelectronicallyorbyhardcopytothefollowingcontact:PleasesubmityourFullproposalto:Inhardcopyorondisc/memorystickFORCEC/OAnne-MarieBelliveauP.O.Box2573,Halifax,NSB3J3N5
[email protected]:LobsterCatchabilityStudy-FORCEEEMP
11. EnquiriesTheproponentisresponsibleforobtaininganyneededclarificationoftheRFPrequirements,whiletheRFPisopen.Therewillbenoinformationsession. QuestionsshouldbeaddressedinwritingtoAnne-MarieBelliveau,DirectorofOperations,[email protected] reserves the right tomakeanyorallquestionsandanswers toenquiriesavailable toallotherproponents. Questions and responses that are deemed to materially affect the RFP requirements,projectscope,timelines,etc.ortobeofinteresttoallprospectiveproponentsmaybemadeavailableviaAddendaatthesolediscretionofFORCE.Generally,onlysubstantialanswersthatclarifytheprocesswillbedistributed.12. ReservationsFORCEreserves the right to rejectanyorallproposalsand toaward thecontract in itsentirety,or inpart,whicheverinitsopinionbestservestheinterestofFORCEanditsstakeholders.Proponents are solely responsible for their own expenses in preparing and delivering their proposal.Unless otherwise specified, all proposals submitted shall be irrevocable for ninety (90) calendar daysfollowingtheclosingdate.Itistheresponsibilityofconsultantstoidentifyallpossibleconflictsofinterestthatmayaffectservices.
Request for Proposals Lobster Catchability Study March 21, 2016 // Page 8 of 9
8
13.ProposalModificationandWithdrawalAddendawillbeaccepteduntiltheclosingdate.Proposalsmaybewithdrawnonwrittenrequestoftheproponentanytimeuptothecontractsignature.AdditionalReferencesAECOM.2009.EnvironmentalAssessmentRegistrationDocument–FundytidalEnergyDemonstrationProject(Volume1:EnvironmentalAssessment;Volume2:Appendices).ProjectNumber107405.FORCE: Fundy Ocean Research Center for Energy. 2016. Environmental Effects Monitoring Programs2016-2021.March2016.FORCE: Fundy Ocean Research Center for Energy. 2011. Environmental Effects Monitoring Report,September2009toJanuary2011.AppendicesA-K.FORCE;FundyOceanResearchCenterforEnergy.2015.EnvironmentalEffectsMonitoringReport,2011to2013.AppendicesA-I.SLR: SLR Consulting Ltd. 2015. Proposed Environmental Effects Monitoring Program for 2015 -2020FundyOceanResearchCenterforEnergy(FORCE).
Request for Proposals Lobster Catchability Study March 21, 2016 // Page 9 of 9
9
ScheduleA
EvaluationCriteriaforAssessmentofFullProposalsTheFullProposalwillbeevaluatedaccordingtoFORCE’sprocurementcriteriaandtheircompleteness,content,andevidenceofsuccessfulimplementationandmanagementofsimilarprogramsforsimilarorganizations,andtheabilitiesoftheProponentanditsstaff.ThecriteriaforevaluatingFullProposalsare:
• FullProposalcontentandcompleteness: 20points
• OrganizationandPersonnel: 5points
• Pastrelevantprojectexperience: 30points
• ProposedMethodology(studydesign): 20points
• ProposedSchedule: 5points
• CostProposal: 20points
END