Request for Proposal For end-to-end implementation of Reconciliation of Transactions of Alternate Delivery Channels in Bank of India
Ref: BOI/HO/IT/ADC-RECON dated 18/05/2020
Sr. No RFP Clause and Page No. RFP Text Query BOI response
1Broad scope of work
3.2 x.viii
If the Bidder is not a manufacturer, they should
provide documentary evidence (e.g.
Manufacturers’ Authorization Form) for having
tied up with the main participating agencies in this
outsourcing project.
Request bank to consider bids only from OEMs. Accepted. Bids from only OEMs will be
considered.
2Broad scope of work
3.2 xx . 1
Successful Bidder’ is the system integrator or
bidder whose technical bid is proved responsive
and emerges as L1 bidder in commercials
evaluation process.
Request bank to consider techno-commercial
evaluation with 70% weightage to technical and 30%
to commercial as L1 evaluation dilutes the value that
technically competent bidders can provide.
Moreover, it draws the risk of low quality vendors
qualifying on price.
No change in RFP terms.
3 Anneuxre G - PenaltiesRequest bank to reconsider the pebalty terms and
conditions.
No change in RFP terms.
4 Warranty & Uptime 4.15 (vi)
Requesting bank to note that in case of unavailability
of hardware/ infrastructure/ software/ processes etc
recommended by the bidder, adhering to the
uptimes and SLAs will be challenging.
No change in RFP terms.
5 6.14 (17)
At the end of contract period of 5 years, the
bidder must offer the solution to Bank, for internal
use for unlimited period at a special cost of Re.1/-
.
We understand that the RFP asks for the solution to
be hosted at banks' premises, hence kindly clarify
this clause as it essentially translates to giving a
perpetual license to the bank
No change in RFP terms.
6 General Amalgamations and mergers
In the event of new banks/ RRBs merging with Bank
of India. Implementation of merging the operations
with new entities will be at additional cost.
No change in RFP terms.
7
Evaluation and Comparision of
bids
3.26 (v)
The products and/or Systems and/or Services
covered under this invitation are to be supplied,
installed and commissioned within the period
mentioned in 7.14. No credit will be given to early
deliveries. An adjustment of 0.5% of the Bid price
per week or part of week will be added for
evaluation of Bids offering delayed deliveries.
Request bank to waive off this adjustment as
deliveries can be delayed for multiple reasons not in-
control of bank or the bidder.
No change in RFP terms.
8
Evaluation and Comparision of
bids
3.26 (vi)
The TCC Clause 4.18 stipulates the payment
schedule offered by the Bank. If a Bid deviates
from the schedule and if such deviation is
considered acceptable to the Bank, the Bid will be
evaluated by calculating interest earned for any
early payment involved in the terms outlined in
the Bid as compared with those stipulated in this
invitation, at the rate of 18% per annum.
Request bank to elaborate this clause Bank will not accept any daviation from
RFP payment terms. However, for
normalization of the bids. 18% interest
component will be charged for the
period for which any advance payment
other than stipulated in RFP.
9Acceptance Procedure
4.9
On successful completion of installation,
commissioning, acceptability test, receipt of
deliverables, etc., and after the solution runs
successfully for three months after going live and
Bank/RRBs is satisfied with the working on the
system, the acceptance certificate (as mutually
decided and approved by the Bank/RRBs signed
by the Supplier and the representative of the
Purchaser will be issued. The date on which such
certificate is signed shall be deemed to be the
date of successful commissioning of the systems
as per Bank’s Format 6.9.
As this is unusual to RFPs, Request bank to
consider successful commissioning as the date
commissioning at the parent bank and allow the
service provider to commence billing for the
respective sites as they go live
No change in RFP terms.
10Insurance
4.12
The Successful Bidder shall take adequate
insurance cover against all kinds of risks
including fidelity clause for the loss arising from
acts of omission / commission /dishonesty of its
employees and / or agents/any claims by vendor’s
employees on Bank of India and would be
required to keep the insurance policy alive at all
times during the currency of the Contract.
Bring to banks notice that this clause needs
deliberation because, the solution is deployed at
banks' premises and has access to vendors' as well
as banks' officials.
No change in RFP terms.
11 Warranty 4.15 (vii) a
a. Any requirements changes/modifications
required by bank will have to be carried out by the
identified vendor free of cost.
Request bank to consider that requrements outside
the scope of work mutually signed off between tbe
bank and service provider be taken up as change
requests
No change in RFP terms.
12
3.14 Documents Establishing
System Integrator’s or Bidder’s
Eligibility and Qualifications
b. that, in the case of a system integrator or
Bidder offering to supply products and/or Systems
under the Contract which the system integrator or
Bidder did not produce, the system integrator or
Bidder has been duly authorized as per
authorization Format 6.8. given in the Bid, by the
products’ Producer to supply the products and / or
Systems in India;
c. In the above case, the system integrator or
bidder must also have a back to back
vi. proposes a software of another vendor and/or
OEM.
Request bank to elaborate this clause. Does this
mean that the SI can propose another vendor/ OEM
during the course of bid or duration of contract?
Accepted. Bids from only OEMs will be
considered.
13 Prebid MeetingRequest bank to consider prebid meeting on VC Pre bid meeting conducted through
Webex
14 Bid submission
Request Bank to accept electronic submission of
RFP response given the current situation in Mumbai
Signed hard copies are necessary for
audit purpose.
15PART 7: SCHEDULE OF
DATES, AMOUNTS ETC. (SDA)
7.4 Period within which the Successful Bidder
should Sign the Contract after receipt of the Form
of Contractn - 7 days
Request bank to extend this date suitably if possible
or to keep it not capped at 7 days
No change in RFP terms.
16PART 7: SCHEDULE OF
DATES, AMOUNTS ETC. (SDA)
7.7 Minimum Warranty period for the entire
Solution (refer 4.15.2 - 24 months
Request bank to commence warranty from date of
UAT acceptance of the first site
No change in RFP terms.
17Broad Scope of Work
Pg 8
To provide adequate training and operational
guidelines to designated bank-staff for data
extraction, conversion and uploading tasks,
Report Generation Software / Tools installed .The
Bank may provide a centralized location for
training or may ask the successful vendor to give
training at different centers required by Bank of
India.
Since resources will be deployed by the successful
bidder, request Bank to clarify the reason training on
the software is required
It is necessary for Bank users.
18Broad Scope of Work
Pg 10
Vendor has to make necessary changes in the
recon system whenever any requirement arises
due to any advisory of controlling agencies like
DFS,RBI,IBA,NPCI etc
Since neither bank nor the service provider has
visibility to future requirements, request bank to
amend this clause as follows:
"'Vendor has to make necessary changes in the
recon system whenever any requirement arises due
to any advisory of controlling agencies like
DFS,RBI,IBA,NPCI etc at the rates agreed for
customizations"
No change in RFP terms.
19Broad Scope of Work
Pg 10
As the TAT period of ATM failure transaction is
reduced from 7 working days to 5 calendar days,
vendor has to deploy their resources on holidays
also.
We understand that due to Harmonization of dispute
TATs, critical business activities needs to be
handled during holidays, request bank to confirm if
the understanding is correct.
Yes.
20Broad Scope of Work
Pg 10
There should be a separate tracker for
ombudsman complaints.
We understand that Banking Ombudsman
complaints are handled out of the proposed
reconciliation system; hence request bank to confirm
the input sources for tracking ombudsman
complaints.
Will be discussed with sucessful bidder.
21Bid Prices
Pg 15
The price schedule should include all the
components other than Windows server 2008 to
16, Computer Hardware, Oracle, SQL, necessary
at the Bank of India Data Centre Site and
Disaster Recovery Site
1) Please confirm whether resources need to be
deployed at DR site as well. The commercials
proposed will be basis the current DC (CBD Belapur)
and DR (Bangalore) sites of the bank, in case of
change of location of these sites, request bank to
accommodate revision in rate of resources.
2) We understand the resources will be deployed at
BOI DC for all recon activities including the RRBs.
Resources are to be deployed as per
the need of the project.
22 4.9 Acceptance Procedure / 28
On successful completion of installation,
commissioning, acceptability test, receipt of
deliverables, etc., and after the solution runs
successfully for three months after going live and
Bank/RRBs is satisfied with the working on the
system, the acceptance certificate (as mutually
decided and approved by the Bank/RRBs signed
by the Supplier and the representative of the
Purchaser will be issued.
May we know if we can estimate everytime there is a
new RRB?
We understand at present Bank has four RRBs
sponsored. Request you to please confirm if any
there are any changes to it.
AT present Bank has 3 RRBs, but in
the future if any RRB is added the
asme must be considered as part of
project.
23 4.17 Training: / 31
For each Application/Operating
System/database/middleware and third party
utilities installed, the Supplier is required to train
the designated Bank’s technical and end-user
personnel to enable them to effectively operate
and perform administration of the total system.
Training shall be conducted on the dates and the
locations as mutually agreed upon before the
Commissioning of the system at each location, as
per Clause 7.12.
Request bank to share details on
1. If the Training will happen out of a centralised
location
2. Approximate number of participants per training
batch
3. Number batches expected
Will be shared with sucessful vendor.
24FUNCTIONAL
SPECIFICATIONS / 40
Automated Vouching system for NFS, VISA,
Mastercard, Rupay and all the other
network and products.
Request bank to elaborate on what vouching system
is expected out of the system. Is it Voucher
generation?
Yes
25FUNCTIONAL
SPECIFICATIONS / 40
Capable to changes and modify the accounting
procedure according to NFS, VISA, Mastercard,
Rupay and all other Network
Request bank to confirm the plan to implement any
new interchange apart from NFS / VISA /
MASTERCARD / RUPAY
Any future interchange requirment to be
adressed.
26FUNCTIONAL
SPECIFICATIONS / 40
Generation of foreignexchange fluctuation for
foreign transactionsRequest bank to elaborate the requirement. Is this to
debit/credit customer account/Payable account?
Our CBS will take care
27FUNCTIONAL
SPECIFICATIONS / 42GST Calculation and Invoices Kindly brief on this requirement
Presently service provider are providing
the invoice and it future we may
generate the same from recon system.
28FUNCTIONAL
SPECIFICATIONS / 47Fraud Monitoring and Management System
Usually this is done by fraud monitoring tool.
Request the bank to exclude this from the RFP, else,
explain the kind of reports expected.
Report requirement will be need based.
29FUNCTIONAL
SPECIFICATIONS / 48
Reconciliation OF Entries IN NOSTRO AND
MIRROR Account
It is assumed that the scope is limited to reconciling
& generating match and unmatched reports, and
force match option for the user to manually reconcile
exception cases. GL entries generation outside
scope. Kindly confirm
30Functional Specifications
Pg 49
Dispute and Claim Management and
reconciliation of chargeback. Coordinating with
BCs & service providers for resolving customer
claims and recon mismatches.
Operations teams can co-ordinate with the service
providers of the BCs and will need Bank's
intervention for escalations / follow with BCs
No change in RFP terms.
31Functional Specifications
Pg 50ATM performance report
This report may be from the switch / ATM monitoring
system. Recon application would only have
transaction details and hence may not be able to
provide the ATM performance report. Hence request
to keep it out of scope.
No change in RFP terms.
32FUNCTIONAL
SPECIFICATIONS / 50
Card Base report as per card management
system
Card base is generally not part of Recon solution.
Request bank to confirm the requirement.
Preparation of GST received & paid on
the basis of raw files received from
scheme providers (NFS/VISA/MC)
33FUNCTIONAL
SPECIFICATIONS / 50
Monthly card base report Region wise branch
wise
Card base is generally not part of Recon solution.
Request bank ton confirm the requirement.
No change in RFP terms.
34FUNCTIONAL
SPECIFICATIONS / 50
Monthly ATM deploying reports Generate
Periodical reports as per requirement
Kindly confirm if this refers to the number of ATMs
added in the Recon system for the month. If not,
kindly provide more information.
No change in RFP terms.
35FUNCTIONAL
SPECIFICATIONS / 52Validation of transaction from database Request bank to elaborate the requirement
There should not be duplicacy of data.
36FUNCTIONAL
SPECIFICATIONS / 53
Age wise break up for all pending payments for
merchant
Merchant Payments and Merchant-acquirer
transaction reconciliation is part of another business
entity, so kindly confirm if this was intended to be
part of the scope? If yes, please provide more clarity
on the number of merchants and merchant
settlement process and volumes.
Will be shared with sucessful bidder as
this is a sensitive business data.
37FUNCTIONAL
SPECIFICATIONS / 57
Automated Cash forecasting for ATM and cash
Recyclers
This is usually part of Monitoring tool, request bank
to exclude this requirement, else, Request bank to
elaborate the requirement on this.
No change in RFP terms.
38FUNCTIONAL
SPECIFICATIONS / 57
Cross verification of actual cash loaded and
Logical cash loaded
Request bank to elaborate the requirement, as the
system will be capable of generating report, whereas
the CRA will have to cross verify.
No change in RFP terms.
39FUNCTIONAL
SPECIFICATIONS / 58
Verification of Billing & Income sharing of GST,
Partners
Billing & Business
Correspondent (BC)
Request bank to elaborate the requirement
Preparation of GST received & paid on
the basis of raw files received from
scheme providers (NFS/VISA/MC etc.)
40Schedule of Implementation
Pg 83
The vendor should commence implementation of
the Solution within two months from the date of
award of contract at BOI Head Office as well as at
the DR Site. The implementation shall comprise
of System Configuration, Customization, Pilot
Implementation, UAT and System Roll Out. (DR
SITE location).
The solution implementation will require time to
understand, customize and implement the Bank
specific requirements, testing and production
movement. Request the bank to consider a timeline
of 24 weeks.
The vendor should complete
implementation of the Solution within
two months from the date of award of
contract at BOI Head Office as well as
at the DR Site. The implementation
shall comprise of System
Configuration, Customization, Pilot
Implementation, UAT and System Roll
Out. (DR SITE location included).
41 General Transaction Volumes
Request Bank to provide the interchange / product
wise transaction volumes and projections for BOI
and its RRBs for the period of the contract
Onus
VISA
MasterCard
RuPay
NFS
UPI
IMPS
AEPS
BBPS
Being sensitive business data, will be
shared with the sucessful vendor.
42 General Number of ATM / Recylcer
Request Bank to provide the number of ATMs /
Recycler and the projections for the period of the
contract for BOI and its RRBs
Being sensitive business data, will be
shared with the sucessful vendor.
43 General Migration Is data migration from the existing system involved?Yes.
44 Pg 97 Delay in processingWe understand the time line will be calculated after
receipt of all input files. Please confirm
Yes
45 Page 9- Clause XV
Vendor must provide minimum 20 qualified fit &
proper resources verified by the police, having
graduation or diploma onsite resources during
office hours of the bank and in case of exigencies
the bank can request for extra hours and night
shifts
Is this headcount of 20 resources only for Business
Operations (Reconciliation and Settlement &
Disputes) or is this resource pool for Business
Operations + Technical Support (Application
Support, DB, Middleware, OS). Kindly clarify
Minimum mandatory head count
46 Page 9- Clause XV
Vendor must provide minimum 20 qualified fit &
proper resources verified by the police, having
graduation or diploma onsite resources during
office hours of the bank and in case of exigencies
the bank can request for extra hours and night
shifts
Please specify the working hours of this onsite pool
of resources
As per the need of the project/Bank.
47 Page 9- Clause XV
Vendor must provide minimum 20 qualified fit &
proper resources verified by the police, having
graduation or diploma onsite resources during
office hours of the bank and in case of exigencies
the bank can request for extra hours and night
shifts
Please specify the existing headcount performing
the Reconciliation and Settlement & Disputes activity
for the Bank. Please provide a split across the
functions of Recon, Settlement and Disputes.
Bank do not have this data.
48 Page 10- Clause XXIV
The primary vendor will be responsible for
patching of OS and closing of any Vulnerabilities
in the Servers(i.e Application, Data Base and all
related servers) as reported by the VAPT Audit of
the Information Security Cell of Bank of India.
Furthermore, the upgradation of DBMS and any
other software being utilized by the Vendor would
be the responsibility of the Vendor.
Do we have to provide OS/DB/MW admins as part of
the support services
Vendor to provide all the support in this
area.
49 Page 83 - 7.17
Capacity to handle a volume of transactions
generated from our accounts with annual
increase in volumes.
Please specify the transaction volumes in the First
Year expected for Reconciliation, Settlements and
Disputes. Kindly also provide the annual growth in
volumes expected for each of the above.
Will be shared with sucessful vendor.
50 Page 83 - 7.21 i
The vendor should commence implementation of
the Solution within two months from the date of
award of contract at BOI Head Office as well as at
the DR Site.
Does the Bank expect the onsite pool of 20
resources to be split between the DC location and
DR location or will all be based at the DC only? If the
team is to be split, please specify the headcount
required in DC and in DR
Minimum head count is 20. Vendor can
deploy more resources at any location
to ensure SLA compliance.
51 GeneralWhat are the key reasons for the Bank to initiate this
RFP at this time?
This is Bank's descrition
52 GeneralWhat are the shortfalls if any in the Bank's existing
Recon and Settlement/Disputes system?
Present system is working well and
contract is coming to an end.
53 Page 97
In addition to above, following table indicates
period specific penalties in respect of different
work areas
We would request the Bank to consider reducing the
penalties specified to a fourth of the all amounts
shown in this table. Pls confirm.
No change in RFP terms.
54 3.1 / Pg-7
Solution will also have to be extended to the Bank
of India sponsored RRBs for which only
implementation cost will be paid by the Bank.
Request bank to clarify on the number of RRB's
bank is referring to and please provide details of
those RRB's
Bank has 3 RRBs at present. Other
details will be share with
55 3.2 XV/ Pg-9
Vendor must provide minimum 20 qualified fit &
proper resources verified by the police, having
graduation or diploma onsite resources during
office hours of the bank and in case of exigencies
the bank can request for extra hours and night
shifts
We understand that the scope involves supply and
installation of Recon solution and onsite support,
and for onsite support Bidder is required to provide
20 resources, Request Bank to confirm.
Minimum head count is 20. Vendor can
deploy more resources at any location
to ensure SLA compliance.
56 3.2 XVi/ Pg-9
The Bank may provide a centralized location for
training or may ask the successful vendor to give
training at the centres required by Bank of India.
Request bank to provide more details about training
like duration, time line, batch strength, frequency of
training etc.,
Will be shared with sucessful vendor.
57 3.4xvii/ Pg-12
At the end of contract period of 5 years, the
bidder must offer the solution to Bank, for internal
use for unlimited period at a special cost of Re.1/-
.
Request bank to remove this clause.
Stands deleted. Appropriate decision in
this regard will be taken at the end of
contract period.
58 3.26/ Pg-21
The bidder may quote the best competitive price
in the commercial bid as Bank may or may not opt
for Reverse Auction and in case Bank does not
opt for Reverse Auction, the commercial bid
submitted by you will be opened to decide the L1
price.
We understand that the L1 bidder will be finalized
based on the TCO value, Request Bank to clarify
whether Bank will opt for Reverse auction to
evaluate the L1 bidder.
As per RFP terms
59 4.24 i / Pg-33
….as liquidated damages, a sum equivalent to
1% per week per site of the total contract value
ordered out of contract price subject to maximum
deduction of 5% of the total contract value for
each week or part thereof of delay, until actual
delivery. Partial delivery shall be treated as non-
delivery of the entire goods ordered.
Request bank to limit over all penalties + LD to 10%
of contract value.
No change in RFP terms.
60 4.28 / Pg-34
Termination for Convenience
The Bank, by written notice sent to the Supplier,
may terminate the Contract, in whole or in part, at
any time for its convenience. The notice of
termination shall specify that termination is for the
Bank’s convenience, the extent to which
performance of the Supplier under the Contract is
terminated, and the date upon which such
termination becomes effective.
Request bank to remove this clause, as termination
should not be based on the convenience, but on the
performance of the bidder.
No change in RFP terms.
61 7.20 -II/ Pg-83
The vendor should provide changes and
upgrades with regard to changes in statutory
requirements at the earliest and free of cost
during the contract period.
Request Bank to modfy the clause as follows: "The
vendor should provide changes and upgrades with
regard to changes in statutory requirements at
mutually agreed rates".
No change in RFP terms.
62 7.21 - III/ Pg-83
The support services shall be for a period of at
least 5 years after the expiry of warranty period.
Bank should have at least one onsite DBA
support during office hours of the bank and in
case of exigencies, request for extended hours
will have to be considered by the vendor.
we understand that the contract period is for 5 yrs,
however bank is asking support for (warranty)+5 yrs,
request bank to limit support period to 3 Yrs after
warranty i.e. for total contract period.
No change in RFP terms.
63 7.22 -III/ Pg-84
The bidder should commit to provide services for
implementation, roll-out, support, maintenance
etc. for minimum 5 years. Continuing the
services/maintenance for beyond 5 years/contract
period as per the RFP shall be at the sole
discretion of the Bank.
Request Bank to modfy the clause as follows:
"….....Continuing the services/maintenance for
beyond 5 years/contract period as per the RFP shall
be mutually agreed with the Bidder".
No change in RFP terms.
64 Pg-85
During the currency of the contract if the
cumulative penalty amount exceed 10%
project cost, the Bank may consider termination of
the Contract.
we understand that the cumulative mentioned in this
clause doesn't include liquidated damages Request
bank to clarify.
No change in RFP terms.
65 Pg-85 Penalty & LD- GeneralRequest bank to limit over all penalties + LD to 10%
of contract value.
No change in RFP terms.
66 7.23/ Pg. -85 Annexure-DRequest bank to clarify whether L1 bidder will be
finalized based on the Reverse auction
As per RFP terms
67 Clause 1.1 / Page No.3
1.1. ..Our Bank is inviting Bids from the bidders to
provide Reconciliation Solution in Bank of India
as well as Regional Rural Banks of Bank of India
on an OPEX (operational expenditure) model.
BIIDER request the Bank to confirm the requirement
of license period and term of the AMC period.
Bank envisages OPEX model
68 Clause 2.3 / Page No.5
2.3 This is not an offer by the Bank but only an
invitation to bid in the selection process initiated
by the Bank. No contractual obligation
whatsoever shall arise from the RFP process until
a formal contract is executed by the duly
authorized signatory of the Bank and the Bidder.
Bidder would like to clarify that the proposal to be
submitted by the Bidder is for the sole purpose of
evaluating the Bidder w.r.t RFP and the mutual rights
& obligations shall be agreed in the final binding
contract. Submission of bid shall not impose any
obligations on the part of the bidder unless final
contract is executed between the parties.
No change in RFP terms.
69 Clause 3.32 / Page No.23
3.32 Signing of Contract
i. At the same time as the Bank notifies the
successful system integrator or Bidder that its’ Bid
has been accepted, the Bank will send the system
integrator or Bidder the Contract Form as per
Format given in the RFP incorporating all
agreements between the parties.
ii. Within the period prescribed in Clause 7.4,
from the date of receipt of the Form of contract,
the successful Bidder shall sign and date the
Contract and return it to the Bank.
Bidder requests the final binding contract shall
include mutual contractual clauses considering the
mutual interests of the parties.
No change in RFP terms.
70 Clause 4.4 / Page No.26
4.4 Use of Contract Documents and Information
i. The Supplier shall not, without the Bank’s prior
written consent, disclose the Contract, or any
provision thereof, or any specification, plan,
drawing, pattern, sample or information furnished
by or on behalf of the Bank in connection
therewith, to any person other than a person
employed by the Supplier in the performance of
the Contract. Disclosure to any such employed
person shall be made in confidence and shall
extend only as far as may be necessary for
purposes of such performance.
ii. The Supplier shall not, without the Bank’s prior
written consent, make use of any document or
information for purposes of performing the
Contract.
iii. Any document, other than the Contract itself,
shall remain the property of the Bank and shall be
returned (in all copies) to the Bank on completion
of the Supplier’s performance under the Contract,
if so required by the Bank.
Bidder requests that the proposal to be submitted by
the Bidder shall also be treated confidential by the
Bank and the ownership of the same shall be with
the Bidder.
No change in RFP terms.
71 Clause 4.5 / Page No.26
4.5 Patent Rights
i. In the event of any claim asserted by a third
party of infringement of copyright, patent,
trademark, industrial design rights, etc. arising
from the use of the Goods or any part thereof in
India, the Supplier shall act expeditiously to
extinguish such claim. If the Supplier fails to
comply and the Bank is required to pay
compensation to a third party resulting from such
infringement, the Supplier shall be responsible for
the compensation to claimant including all
expenses, court costs and lawyer fees. The Bank
will give notice to the Supplier of such claim, if it is
made, without delay.
4.36 Patent Rights/Intellectual Property Rights
In the event of any claim asserted by a third party
of infringement of trademark, trade names,
copyright, patent, intellectual property rights or
industrial design rights arising from the use of the
Products or any part thereof in India, the Supplier
shall act expeditiously to extinguish such claim. If
the Supplier fails to comply and the Bank is
required to pay compensation to a third party
resulting from such infringement, the Supplier
shall be responsible for the compensation
including all expenses, court costs and lawyer
BIDDER would like to clarify that 3rd party claims of
infringement of intellectual property rights is
restricted to Indian territory and for solution that are
created and delivered "as is" by BIDDER but
BIDDER will not assume the obligation for use or
misuse of the solution by the Bank or any use by
Bank or its persons due to lack of visibility or
modification of the solution or combination with any
equipment, other hardware, or software, method or
data that is not provided, recommended or approved
by BIDDER or services done by any 3rd party other
than the BIDDER.
No change in RFP terms.
72 Clause 4.22 / Page No.32
4.22 Assignment
The Supplier shall not assign, in whole or in part,
its obligations to perform under the Contract,
except with the Bank’s prior written consent.
Bidder requests exception in the event of
subsidiaries & affiliates and in the event of merger &
acquisition.
No change in RFP terms.
73 Clause 4.24 / Page No.33
4.24 Liquidated Damages
i. LD on Delivery and Installation If the
Supplier fails to deliver any or all of the softwares,
licenses etc within the time period specified in the
Contract, the Bank shall, without prejudice to its
other remedies under the Contract, deduct from
the Contract Price, as liquidated damages, a sum
equivalent to 1% per week per site of the total
contract value ordered out of contract price
subject to maximum deduction of 5% of the total
contract value for each week or part thereof of
delay, until actual delivery. Partial delivery shall
be treated as non-delivery of the entire goods
ordered. Once the maximum is reached, the Bank
may consider termination of the Contract. All
items placed under one purchase order to be
delivered within the stipulated delivery period.
ii. LD on delay in commissioning of service
inclusive of all modules, applications and portals.
The bidder shall commission the Solution and
ensure its signoff required to obtain complete
certification all features to Bank officials within 2
months from the date of issuance purchase order.
If the Supplier fails to deliver any or all of the
features within the time period specified in the
Contract, the Bank shall, without prejudice to its
other remedies under the Contract, deduct a sum
Bidder requests that LD percentage could be
mutually negotiated agreed during contract award
stage.
No change in RFP terms.
74 Clause 4.25 / Page No.33
4.25 Termination for Default
i. The Bank, without prejudice to any other
remedy for breach of Contract, by a written notice
of default sent to the Supplier, may terminate the
Contract in whole or in part:
• if the Supplier fails to deliver any or all of the
Products and Services within the period(s)
specified in the Contract, or within any extension
thereof granted by the Bank;
or
• if the Supplier fails to perform any other
obligation(s) under the Contract.
Bidder requests that any and all termination under
the agreement shall be with cure period of 90 days.
Termination right shall also be made mutual.
No change in RFP terms.
75 Clause 4.25 / Page No.34
4.25
ii. In the event the Bank terminates the Contract in
whole or in part, it may procure, upon such terms
and in such manner as it deems appropriate,
Products and Services similar to those
undelivered, and the Supplier shall be liable to
the Bank for any excess costs for such similar
Products or Services. However, the Supplier shall
continue performance of the Contract to the
extent not terminated.
Bidder requests deletion of this clause. Bidder shall
not be held liable for excess costs.
No change in RFP terms.
76 Clause 4.27 / Page No.34
4.27 Termination for Insolvency
The Bank may, at any time, terminate the
Contract by giving written notice to the Supplier if
the Supplier becomes bankrupt or otherwise
insolvent. In this event, termination will be without
compensation to the Supplier, provided that such
termination will not prejudice or affect any right of
action or remedy, which has accrued or will
accrue thereafter to the Bank.
Bidder requests to make the clause mutual.
No change in RFP terms.
77 Clause 4.28 / Page No.34
4.28 Termination for Convenience
The Bank, by written notice sent to the Supplier,
may terminate the Contract, in whole or in part, at
any time for its convenience. The notice of
termination shall specify that termination is for the
Bank’s convenience, the extent to which
performance of the Supplier under the Contract is
terminated, and the date upon which such
termination becomes effective.
Bidder requests deletion of termination for
convenience. Request the Bank to conside this since
BIDDER shall incur the costs implementing the
solutuon required under this RFP. Termiantion
without cause shall affect us.
No change in RFP terms.
78 Clause 4.29 / Page No.35
4.29 Resolution of Disputes
iii.
• Arbitration proceedings shall be held at Mumbai,
and the language of the arbitration proceedings
and that of all documents and communications
between the parties shall be English;
Bidder requests for seat of arbitration at Chennai.
No change in RFP terms.
79 Clause 4.31 / Page No.35
4.31 Applicable Law
The Contract shall be interpreted in accordance
with the laws of the Union of India and the Bidder
shall agree to submit to the courts under whose
exclusive jurisdiction the Registered Office of the
Bank falls.
Bidder requests for Chennai jurisdiction.
No change in RFP terms.
80 Clause 4.35 / Page No.37
4.35 Supplier’s obligations
iv. The Supplier will treat as confidential all data
and information about the Bank, obtained in the
execution of his responsibilities, in strict
confidence and will not reveal such information to
any other party without the prior written approval
of the Bank.
Bidder requests that confidentiality obligation shall
be mutual.
As per internal directions Bank nerver
divulges any business details .
81 Clause 4.40 / Page No.37
4.40 Indemnity The vendor shall keep and
hold the Bank and its directors, employees,
affiliates etc. indemnified and harmless from
time and at all times against all actions,
proceedings claims, suits, liabilities (including
statutory liability),penalties, charges, costs
(including legal costs) and expenses, damages,
losses and any other expenses which may be
caused to or suffered by or made or taken against
the Bank arising out of:
i. breach, default or non-performance of
undertakings, warranties, covenants or
obligations under this agreement by the Vendor
and/or
ii. Malfunctioning of the reconciliation software
solution under the project as supplied installed
and migrated by him/her and/or
iii. Any contravention or Non-compliance with any
applicable laws, regulations, rules, statutory or
legal requirements by the vendor and/or
iv. an act or omission (including misconduct or
negligence) of the Vendor, its employees, its
agents, sub-contractors in the performance of the
obligations of the Vendor under this Agreement;
and/or claims made by employees or
subcontractor's or subcontractors employees who
are deployed by the Vendor against the Bank;
Bidder requests that indemnity could be agreed only
for breach of confidentiality, applicable laws and IP
rights. Bidder requests modification to this effect in
the final binding contract.
No change in RFP terms.
82 Clause 4.41 / Page No.38
4.41 Limitation of Liability
The liability under this Agreement, to the extent
allowed by Indian laws, shall be limited to the total
contract value and neither party shall be liable for
indirect and remote loss and damages. However
the liability under no circumstances shall be
capped for any claims, losses, damages relating
to the following: -
(i) Violation of the confidentiality obligations, and
(ii) Violation/infringement of IPR, patents, copy
rights, trade marks etc, and
(iii) Claim against the bank by the vendor’s
agent/employees, and
(iv) Willful/deliberate act or omission on the part
of vendor or its employees or agents and/or fraud.
Bidder would like to negotiate the cap on liability
during contract award stage.
No change in RFP terms.
83 Clause 4.42 / Page No.39 4.42 Confidentiality Bidder requests to make the clause mutual. No change in RFP terms.
84 Form 6.2 / Page No.62FORMAT 6.2
NON-DISCLOSURE AGREEMENT Bidder requests to make NDA mutual.
No change in RFP terms.
85 Form 6.5 / Page No.66 FORMAT 6.5 CONTRACT FORM
Bidder requests that the Bidder be given the right to
negotiate the legal clauses such as Indemnity,
Limitation of Liability, Non-Solicitation,
Confidentiality, IP rights, Warranty, Dispute
resolution, etc. and mutual business interests shall
be considered in executing the final binding contract.
No change in RFP terms.
86 Form 6.15 / Page No.79
Format 6.15
UNCONDITIONAL ACCEPTANCE OF THE
TERMS & CONDITIONS OF THE RFP
While Bidder understands that the Bank's technical
requirement has to be complied with, unilateral
contractual obligations could not be imposed on the
Bidder. Any and all binding terms and conditions are
subject to mutual negotiation and agreement.
No change in RFP terms.
87 GeneralClauses required to be included in the Contract
upon mutual consultation between the parties
BIDDER would request the Bank that any binding
terms and conditions shall be on a mutually agreed
basis.
BIDDER requires inclusion of the following crucial
clauses on a mutually agreed basis and in this
regard the BIDDER would like to discuss with Bank.
This list is inclusive of various other terms of the
agreement and is not exhaustive.
1) Cap of Liability and exclusion of indirect damages
from Liability
2) Non-solicitation
3) Intellectual Property Rights
4) Assignment etc.
5) Representation and Warranties
6) Indemnities by Bank
7) Termination
8) LD
9) Confidentiality
We would also request the Bank to consider the
below aspects: 1) Termination compensation by the
Bank in the event of termination of the agreement by
the Bank prior to completion of the term, 2) Any
update / upgrade / modification (after the date of
award of contract to BIDDER) on account of
statutory requirements shall be borne by the Bank.
No change in RFP terms.
88 3.2 Broad Scope of Work, ii., Pg8ii. Network security and other
infrastructure will be provided by the Bank
Kindly confirm that the Bank will allow Bidder to
leverage to secure the proposed platform for network
and server security services.
Security tools:
Network Security -
Firewalls
Network IPS
WAF
Server Security -
Anti-virus and anti-malware
FIM (File Integrity Monitoring)
Patching systems
Encryption
Privilege Identity/access/user management
Vulnerability assessment and penetration test
Application Security-
Identity and access management
Application security testing tool
All security directions wil be adhered to.
89 3.2 Broad Scope of Work, Pg10
xxiii. Bank will provide Hardware with operating
windows server of 2008-2016 & database as SQL
& Oracle. Any other software required to run the
solution should be provided by bidder
We presume Bank's firewall, load balancers have
the required capacity to deploy the platform and will
provide AV/HIPS with licenses to install on the
servers.
Will be discussed with sucessful bidder.
90 3.2 Broad Scope of Work, Pg10
xxiv. The primary vendor will be responsible for
patching of OS and closing of any Vulnerabilities
in the Servers(i.e Application, Data Base and all
related servers) as reported by the VAPT Audit of
the Information Security Cell of Bank of India.
Understanding is bidder has to fixed the gaps for the
identified Vulnerabilities and audit observation.
1) Vulnerability Assessment (VA) & Audit activities
are not in bidder scope.
2) Whether bidder can leverage Bank's existing
Vulnerability Assessment and Patch Management
tool, or bidder has to provision this tool. Kindly
confirm.
No change in RFP terms.
91 3.2 Broad Scope of Work, Pg10
xxv. Vendor has to make necessary changes in
the recon system whenever any requirement
arises due to any advisory of controlling agencies
like DFS,RBI,IBA,NPCI etc.
As upcoming mandates are unknown, the cost of the
same cannot be estimated. Request bank to change
the clause to pay for efforts on T & M, or on Actual
Basis.
No change in RFP terms.
92 3.2 Broad Scope of Work, Pg10xvi. The solution provided should be PCI-DSS or
PA-DSS Compliant.
Bidder Understanding is to adhere to client existing
SOP policies and procedures to build up the setup.
PCI-DSS certfication & compaliance will be
Bank's responsbility
No change in RFP terms.
93Clause 1.2
Pg3
The solution will have to be upgraded by the
Vendor free of cost any time in the event of any
changes / modification / new regulatory
requirements or reporting requirements which
warrants compliance.
While we agree that our product/s complies with all
applicable laws existing as on date of submission of
bid, it is not possible for the bidder to envisage
regulatory requirements which may be applicable in
future and corresponding changes to be done to the
product/solution, thus we request that bidders
product/s should be liable for compliance of all laws
applicable as on date of submission of bid and
compliance to any change in law of enactment of
new laws or changes to existing laws/regulations
shall be done at extra cost, if having a direct or
indirect cost implication, mutually agreed between
the parties preferably by a defined Change
Request/Control process and this clause should be
amended accordingly.
No change in RFP terms.
94Clause 3.2 XXV
Pg10
Vendor has to make necessary changes in the
recon system whenever any requirement arises
due to any advisory of controlling agencies like
DFS,RBI,IBA,NPCI etc.
While we agree that our product/s complies with all
applicable laws existing as on date of submission of
bid, it is not possible for the bidder to envisage
regulatory requirements which may be applicable in
future and corresponding changes to be done to the
product/solution, thus we request that bidders
product/s should be liable for compliance of all laws
applicable as on date of submission of bid and
compliance to any change in law of enactment of
new laws or changes to existing laws/regulations
shall be done at extra cost, if having a direct or
indirect cost implication, mutually agreed between
the parties preferably by a defined Change
Request/Control process and this clause should be
amended accordingly.
No change in RFP terms.
95Clause 4.15 vii. e.
Pg31
Any upgradation or modification required by the
Bank till the time of Go-Live and any upgradation
or modification required as per the requirement of
any regulator (FIU-IND, RBI or IBA) to be
provided free of cost by the vendor.
While we agree that our product/s complies with all
applicable laws existing as on date of submission of
bid, it is not possible for the bidder to envisage
regulatory requirements which may be applicable in
future and corresponding changes to be done to the
product/solution, thus we request that bidders
product/s should be liable for compliance of all laws
applicable as on date of submission of bid and
compliance to any change in law of enactment of
new laws or changes to existing laws/regulations
shall be done at extra cost, if having a direct or
indirect cost implication, mutually agreed between
the parties preferably by a defined Change
Request/Control process and this clause should be
amended accordingly.
No change in RFP terms.
96Formar 6.2
Pg.62NON-DISCLOSURE AGREEMENT
The NDA shall be cover mutual confidentiality
obligations. Request the Bank to make the NDA
mutual as bidder will also be sharing confidential
information such as Commercials, Product
Information, etc. with the bank.
No change in RFP terms.
97Formar 6.15
Pg.80
UNCONDITIONAL ACCEPTANCE OF THE
TERMS & CONDITIONS OF THE RFP
This is to confirm that we unconditionally accept
all the terms and conditions as mentioned in the
said RFP including all addendum/amendment
floated for Bank of India pertaining to this RFP.
The RFP contains several unilateral and ambigous
clauses and acceptance of the terms and conditions
as it is is detrimental to the bidder' interest, unless
the contract form contains the terms and conditions
as mutually agreed between the parties or bank
accepts the deviations as requested during pre-bid
stage.
No change in RFP terms.
98
Annexure E - PRE-CONTRACT
INTEGRITY PACT
Pg.106
Fail Clause: The BIDDER undertakes that it has
not supplied / is not supplying similar product /
systems or subsystems at a price lower than that
offered in the present bid in respect of any other
Ministry / Department of the Government of India
or PSU and if it is found at any stage that similar
product / systems or sub systems was supplied by
the BIDDER to any other Ministry / Department of
the Government of India or a PSU at a lower
price, then that very price, with due allowance for
elapsed time, will be applicable to the present
case and the difference in the cost would be
refunded by the BIDDER to the BUYER, if the
contract has already been concluded.
Request to remove the clause No change in RFP terms.
99
Broad Scope of Work (ii) Pg.8 Bidder has to supply, install and configure all the
required software/hardware etc for the successful
implementation of the proposed solution for both
DC & DR sites
Please share the complete Address of DC and DR
site of Bank
Will be shared with the sucesssful
vendor.
100
Broad Scope of Work ( xv) Pg.9 Vendor must provide minimum 20 qualified fit &
proper resources verified by the police, having
graduation or diploma onsite resources during
office hours of the bank and in case of exigencies
the bank can request for extra hours and night
shifts
Request bank to confirm on qualification criteria if
any for the said resources. Also please specify the
location where these resources are expected to be
based.
Will be shared with the sucesssful
vendor.
101
Eligibility Criteria (ii) Pg.11 Bidder or OEM should have implemented and/or
managed end to end Reconciliation Solution
successfully for minimum 03 year, in at least two
Private / Public Sector Undertaking Bank /Foreign
Bank in India or abroad. One of the locations
must be a ‘Finacle’ location. Software solution
should be capable of handling minimum 1.5 Cr.
transaction in a Billing Cycle. Bidder should give
proof of handling mimimum10 Crore transactions
in PSBs.
Request bank to clarify that handling of Minimum 10
Crore Transactions is for any PSU / Private / Foreign
Bank in India or abroad as its mentions PSB's in
clause. Also Request bank to relax this clause to 10
Crore transaction on per anunum basis in any
Public/ Private or Foreign Bank to have larger
particpation in the Bid process
No change in RFP terms.
102
Eligibility Criteria (xvii ) Pg. 12 At the end of contract period of 5 years, the
bidder must offer the solution to Bank, for internal
use for unlimited period at a special cost of Re.1/-
.
Request bank to remove the said clause as the
model is RFP is on OPEX Model.
No change in RFP terms.
103
Submission of Bids (i) Pg. 19 The System integrators or Bidders shall seal the
envelopes containing “Technical Bid” and “Price
Bid” separately and the two envelopes shall be
enclosed and sealed in an outer envelope. The
bidder should submit the soft copy of the
Technical bid document in the form of CD, in the
sealed envelope containing ‘Technical Bid”
In view of Current Covid 19 Pandemic, request bank
to consider Digital Submission of the documents
rather then physical submission
No change in RFP terms.
104
Acceptance Procedure Pg. 28 On successful completion of installation,
commissioning, acceptability test, receipt of
deliverables, etc., and after the solution runs
successfully for three months after going live and
Bank/RRBs is satisfied with the working on the
system, the acceptance certificate (as mutually
decided and approved by the Bank/RRBs signed
by the Supplier and the representative of the
Purchaser will be issued. The date on which such
certificate is signed shall be deemed to be the
date of successful commissioning of the systems
as per Bank’s Format 6.9
Request bank to clarify and confirm when would the
billing start? Will the cost of Acceptability test and
work done during the said period reimbursed
No change in RFP terms.
105
3.1 General Pg. 7 Solution will also have to be extended to the Bank
of India sponsored RRBs for which only
implementation cost will be paid by the Bank.
Request Bank to mention the no. of RRBs to be
supported
3 RRBs(1.Narmada Malawa Gramin
Bank 2. Wainganga Krishna Gramin
Bank 3.Aryavart Gramin Bank)
106
3.1 General Pg. 7 Solution will also have to be extended to the Bank
of India sponsored RRBs for which only
implementation cost will be paid by the Bank.
Request Bank to name the Switch and CBS solution
implemented for each of the RRBs.
Same as BOI
107
3.1 General Pg. 7 Vendor will also be required to support Bank and
RRBs in integration of future solutions, which
Bank/RRBs are going to procure.
Since the scope of the future integrations are not
know at present, Request Bank to consider
implementation of such changes on time and
material basis.
No change in RFP terms.
108
3.2 Broad Scope of Work Pg. 8 The vendor will have to supply and install the
solution at Bank and respective RRBs Head
Offices / Data Centre and also should replicate at
Disaster Recovery Site, Bangalore/ other major
city in India. DC and DR will function as
Active/Passive. The RTO and RPO requirement
for DC DR replication will be 15 minutes.
Application and database to have separate
instance for Bank and each RRB. Implementation
will be at DC (CBD Belapur-Navi Mumbai) and
DR at Bengaluru. These locations, if changed, the
solution be implemented accordingly. Network
security and other infrastructure will be provided
by the Bank.
Application and database separate instance for both
BOI and RRBs is required to be implemented at BOI
Data center or at respective RRBs data centers?
Separate H/w and S/w is to be recommended for
RRBs? Or It will be single infra hosting all RRBs at
BOI DC.
AT present Bank has 3 RRBs, but in
the future if any RRB is added the
asme must be considered as part of
project.
109
3.2 Broad Scope of Work Pg. 9 Further, the system integrator or bidder should be
able to provide the necessary interfaces with our
existing Service Provider/s. This includes Finacle,
Data warehouse or any other solution as needed
by the Bank.
The mode of integration with CBS and Data
warehouse will be Batch/file based. Please confirm
Yes
110
3.2 Broad Scope of Work Pg. 10 All the complaints related to ATM/POS should
reflect in our OCRM system and there should be
on line tracker for tracing the customer
complaints.
Understand that the integration with the OCRM
system will be file based, please confirm.
Yes
111
PART 5: TECHNICAL &
FUNCTIONAL
SPECIFICATIONS (TFS) Pg. 40
**Note: - All the transactions must be reconciled
as far as possible on real time basis
For Recon to happen on real time the data from
Switch, CBS, Interchanges etc. need to be made
available on real time. Request the Bank to consider
Recon T+0 or T+1 basis, based on availability of
data
No change in RFP terms.
112
NFS / VISA / MASTERCARD /
RUPAY Pg. 41
Reconciliation of all incoming and outgoing
transaction (debit/credit/PPI cards etc.) with
regards to NFS, VISA, Mastercard, Rupay and all
other networks including POS transactions
Request Bank to specify the complete list of
Networks/Interchanges to be supported.
No change in RFP terms.
113
Fraud Monitoring and
Management System Pg. 48
Track details of customer performing more
transaction at night specifically at switching time.
Understanding is that offline reporting is to done for
such transactions. Please confirm
Yes
114
Reconciliation OF Entries IN
NOSTRO AND MIRROR Account
Pg. 49
Case management with-in department and
outside department
Request Bank to provide more details on the
requirement.
Nostro recon requirement stands
deleted.
115
Micro ATM & RRB transaction
reconciliation Pg. 49
Micro ATM and RRB transaction reconciliation
(Issuing & Acquiring)
Request Bank to inform which all RRBs Micro ATM
Recon is to be supported and who is the FI gateway
provider?
Will be shared with sucessful bidder.
116Micro ATM & RRB transaction
reconciliation Pg. 49
Micro ATM and RRB transaction reconciliation
(Issuing & Acquiring)
Request Bank to provide number of transaction
happening through Micro ATM, RRB wise
Will be shared with sucessful bidder.
117Accounting and Third Party
Reconciliation Pg. 50
NFS, VISA, Mastercard, rupay and all other
Network and products of DBD.
What is meant by DBD? Digital Banking Department.
118MIS Reports and Decision
Making system Pg. 50
Card Base report as per card management
system
What is expected in card base report? Reports based on different logic
119
Dispute Management Pg. 51 Management of claims received through ATM
CLAIM menu within TAT
Understanding is that this is same as OCRM and the
integration with the ATM CLAIM/OCRM will be file
based
Yes
120
Dispute Management Pg. 53 Collection of charge slip from Merchants for
chargeback Retrieval request and other Dispute
Received
This is part of the Merchant Management system,
where you have the complete correspondence with
the merchant and tracking of merchant response,
recovery etc. This is not part of the Recon's dispute
management system. Request Bank to remove the
same
No change in RFP terms.
CPD
121Dispute Management Pg. 53 Age wise break up for all pending payments for
merchant
This is part of merchant management system.
Request Bank to clarify on the requirement
Will be shared with sucessful bidder as
this is a sensitive business data.
122
Cash In ATM” Reconciliation Pg.
57
Automated Cash forecasting for ATM and cash
Recyclers
Request Bank to elaborate what is expected on
automated cash forecasting?
Forecasting of cash requirment for
ATM/CRM on the basis of cash
dispensation pattern.
123
Cash In ATM” Reconciliation Pg.
59
Verification of Billing & Income sharing of GST,
Partners Billing & Business Correspondent (BC)
Request Bank to elaborate on the requirement Preparation of GST received & paid on
the basis of raw files received from
scheme providers (NFS/VISA/MC)
124
Format 6.13 Pg. 75 Bill of Material
Part-A
Bidder is expected to provide modules list of Recon
System in this section?
No. of installation of the different modules at various
customer location is what asked here?. Kindly
provide more information to respond to this section
The Bidder should provide Bill of
Material (details of all Modules /
Components of Software including
those bought-out, off-the-shelf or third-
party products / items required) Module-
wise, in the following format. Details of
all relevant/applicable System, Utility,
Security, Communication and
Application Software components
should be included
125
General General Request Bank to provide the following volumetric
details
No. of ATM/POS Issuing txn per day
No. of ATM acquiring txn per day
No. of IMPS, UPI, BBPS, AEPS, PG, Micro ATM
transaction count per day
Data retention period
No. of users of the system
No. of concurrent users of the system
Being sensitive business data, will be
shared with the sucessful vendor.
126
1.2 Objective , Page 3 The solution would need to be interfaced to the
CBS and other 3rd party solutions to meet the
business requirements.
what are 3rd party application and message
exchange methods to be intrefaced with?
Bank will specify in due course.
127
Eligibility Criteria 3.4, ii
Page -11
Bidder or OEM should have implemented and/or
managed end to end Reconciliation Solution
successfully for minimum 03 year, in at least two
Private / Public Sector Undertaking Bank /Foreign
Bank in India or abroad. One of the locations
must be a ‘Finacle’ location. Software solution
should be capable of handling minimum 1.5 Cr.
transaction in a Billing Cycle. Bidder should give
proof of handling mimimum10 Crore transactions
in PSBs.
End to End reconciliation is a relatively new concept
and hence there may not be many installation which
would be 3 years or older in end to end
reconciliation. Hence we request Bank to please -
"Bidder or OEM should have implemented and/or
managed end to end Reconciliation Solution
successfully for minimum 01 year, in at least two
Private / Public Sector Undertaking Bank /Foreign
Bank in India or abroad. One of the locations must
be a ‘Finacle’ location. Software solution should be
capable of handling minimum 1.5 Cr. transaction in a
Billing Cycle". Bidder should give proof of handling
minimum 10 Crores transaction in PSB.
No change in RFP terms.
128
Eligibility -2 , Format 6.14 , Page -77Supported by documentary evidence and also
copies of the Service Contracts wherever entered.
(The Bank will consider the arrangements to be
firmed up only when documents evidencing
agreements signed or undertakings /
commitments made are submitted. Bidders who
have not firmed up arrangements with other
vendors / subcontractors are not likely to be
considered.) . Letter from the organization
concerned confirming successful
implementation of fraud monitoring solution
for card based transactions with them, to be
submitted with following details – ·
We are assuming,( successful implementation of
fraud monitoring solution for card based
transactions ) this is mistakenly included; Please
direct, what are the supporting documents required
?
Bank will specify in due course.
129
Eligibility -11 , Format 6.14 , Page -79The bidder must have satisfactorily conducted
Bank Account. We request the bank to provide any specific details
that needs to be mentioned by the bidder's bank.
No change in RFP terms.
130
Eligibility -16 , Format 6.14 , Page -79The solution proposed by the system integrator or
bidder should have been operationalised and
continue to be in successful operation in at least
two Private / Public Sector Undertaking Bank
/Foreign Bank in India or abroad for at least three
years.
As per the earlier point No. 2, request the bank to
consider the following change - The solution
proposed by the system integrator or bidder should
have been operationalised and continue to be in
successful operation in at least two Private / Public
Sector Undertaking Bank /Foreign Bank in India or
abroad for at least One year.
No change in RFP terms.
131
Eligibility -17 , Format 6.14 , Page -79At the end of contract period of 5 years, the
bidder must offer the solution to Bank, for internal
use for unlimited period at a special cost of Re.1/-
.
We understand that the bank wants to get the
license to use the solution post closure of the
contract. Bank would pay any agreed Maintenance
Cost if they need support on the solution.
No change in RFP terms.
132
Scope of Work -II , Page -8 The RTO and RPO requirement for DC DR
replication will be 15 minutes
As Reconciliation is offline solution, We requesting
Bank to Please keep The RTO and RPO
requirement for DC DR replication to 30 Minutes
No change in RFP terms.
133
4.15 Warranty - vii a , Page - 31 Supplier/his representative shall solve the
software problem within maximum 6 (six) hours of
reporting of the problem by the Bank to the
Supplier's nearest office by phone, fax, e-mail or
letter
Problem resolution is depend on its nature,
committing 6 hrs without knowing it will be difficult;
therefore please reconsider the clause.
No change in RFP terms.
134
FUNCTIONAL
SPECIFICATIONS
Page- 41
Submission of Exceptional Transactions (online/
Offline) on T+1 basis
What is online/offlien refreed to here? Online means which effect immediately
and offline which posted by bank later.
135
FUNCTIONAL
SPECIFICATIONS
Page- 41
Generation of foreign exchange fluctuation for
foreign transactions
what is scope of this activity? What will be base
value of foreign exchange
This will be taken care by CBS.
136
FUNCTIONAL
SPECIFICATIONS
Page - 43
GST Calculation and invoices. which invoices to be generated through recon
system?
Presently service provider are providing
the invoice and it future we may
generate the same from recon system.
137
FUNCTIONAL
SPECIFICATIONS
Page - 44
GST Calculation and invoices. which invoices to be generated through recon
system?
Presently service provider are providing
the invoice and it future we may
generate the same from recon system.
138
FUNCTIONAL
SPECIFICATIONS
Page - 47
Fraud Monitoring and Management System Do we need to provide fraud monitoring system or
reports generated from recon system as per
requirement will suffice?
Need based reports must be made
available.FRMD
139
PART 5: TECHNICAL &
FUNCTIONAL
SPECIFICATIONS (TFS) - Point -
7 , Page -47
Fraud Monitoring and Management System Assuming Bidder shall provide/generate the
mentioned reports under Fraud Monitoring and
Management System
Need based reports must be made
available.
FRMD
140
FUNCTIONAL
SPECIFICATIONS
Page - 48
Reconciliation OF Entries IN NOSTRO AND
MIRROR Account
Honoring the payment messages sent by the
bank/Payment of draft issued by the bank
Does bank want recon system to approve
transacitons?
Nostro recon requirement stands
deleted.
141
FUNCTIONAL
SPECIFICATIONS
Page - 48
Payment on account of interbank deals do we need to generate report for bank to make
payment or payment need to be initiated from recon
system?
Reconcilation capability for the same
must be available.
142
FUNCTIONAL
SPECIFICATIONS
Page- 50
Card Base report as per card management
system
This is part of card management system No change in RFP terms.
CPD
143
FUNCTIONAL
SPECIFICATIONS
Page - 51
Management of claims received through ATM
CLAIM menu within TAT
what is ATM CLAIM menu and how it will send data
to recon system?
It is the menu in CBS by which our
branches are capturing the customer
complaint related to ATM/POS failure
transactions.
144
FUNCTIONAL
SPECIFICATIONS
Page - 51
Status updation of claims to customer assuming status update to be done on ATMCLAIM
menu, please confirm how recon system will send
update to ATMCLAIM menu?
Based on the complaint status in recon
system ,same will be update in CBS.
145
FUNCTIONAL
SPECIFICATIONS
Page - 52
Multiple dispute chargeback letters. what is required in this? Mail to branches at different stage of
the chargeback like(Chargeback,Pre-
Arb,Arbitration)
146
FUNCTIONAL
SPECIFICATIONS
Page - 52
Dispute management of Tie up and Third Party what is tieup and thirdparty scopes Tie up means various setvice providers
like VISA/MASTER/RUPAY and third
party means acquirer disputes.
147
FUNCTIONAL
SPECIFICATIONS
Page - 53
Handling of All the Banking Ombudsman cases,
Consumer forum cases and RTI queries
RTI queries should be hadnled by PRO of bank. if
we receive disputes cases in dispute file or through
DMS portal, we can respond to it
Bank person will involve but recon team
will provide all necessary documents.
148
FUNCTIONAL
SPECIFICATIONS
Page - 53
Collection of charge slip from Merchants for
chargeback Retrieval request and other Dispute
Received
what are number of merchants and what will be
mode of contact?
Email and Phone
CPD
149
FUNCTIONAL
SPECIFICATIONS
Page - 53
System should have capability to store and
Retrieve all the documents received from different
network and branches
what kind of documetns wil be received from
branches nad network? Is it related to disputes?
Yes.
150
FUNCTIONAL
SPECIFICATIONS
Page - 54
Bidder should have different Dispute
Management system to keep History of all the
disputes and Management of Dispute.
what is recon system has integrated DMS with all
functions required
No change in RFP terms.
151
FUNCTIONAL
SPECIFICATIONS
Page - 54
Accounting for all type of disputes in CBS what kind of disputes are raised in CBS and how it
will be trasfreed to DMS?
All disputes means disputes related to
ATM/POS/IMT/UPI etc
152
FUNCTIONAL
SPECIFICATIONS
Page - 57
Automated Cash forecasting for ATM and cash
Recyclers
this is part of cash forecasting system No change in RFP terms.
153
FUNCTIONAL
SPECIFICATIONS
Page - 58
Cross verification of actual cash loaded and
Logical cash loaded
This is manual activity and need to done by
custodian. This cannot be verified by recon system.
This means cross verification between
EJ loading and C3R loading.
154
FUNCTIONAL
SPECIFICATIONS
Page - 58
System should generate report like CBS
outstanding, Switch outstanding, Tie up
outstanding
what is tieup outstadning? Tie up meanse settlement file.
155
Page 26
4.6(ii)
The proceeds of the performance security shall
be payable to the Bank as compensation for any
loss resulting from the Supplier’s failure to
complete its obligations under the Contract.
Suggested Changes- ) Suggest to have a cure
period of 30 days to be given to the Bidder by the
Bank to cure the deficiency in services before
deducting/invoking the performance security
amount. b) Bidder's
liability shall be limited to the actual loss/damage
suffered by the Bank . Also, Bidder shall not be liable
for any indirect,incidental, consequential or puniive
damages to the Bank.
No change in RFP terms.
156
Page 27
4.7(ii)
The Bank’s right to inspect, test and where
necessary reject the products after the products
arrival at the destination shall in no way be limited
or waived by reason of the products having
previously being inspected, tested and passed by
the Bank or its representative prior to the products
shipment from the place of origin.
Suggested Changes- any inspection or test of
products deliverd should be done by the bank within
7 days from the date of delivery. In case no
complaints received from bank with regards to the
product within an aforementioned timeline then
such deliverd products shall deemed to be accepted
by the bank and no complaints will be entertained by
the Bidder thereafter.
No change in RFP terms.
157
Page 28
4.8(i)
The supplier shall provide complete and legal
documentation of all subsystems, operating
systems, system software, utility software and
other software. The supplier shall also provide
licensed software for all software products
whether developed by it or acquired from others.
The supplier shall also indemnify the Bank
against any levies / penalties on account of any
default in this regard.
Suggested Changes- Cannot agree for any
indemnification.
No change in RFP terms.
158
Page 28
4.9
On successful completion of installation,
commissioning, acceptability test, receipt of
deliverables, etc., and after the solution runs
successfully for three months after going live and
Bank/RRBs is satisfied with the working on the
system, the acceptance certificate (as mutually
decided and approved by the Bank/RRBs signed
by the Supplier and the representative of the
Purchaser will be issued. The date on which such
certificate is signed shall be deemed to be the
date of successful commissioning of the systems
as per Bank’s Format 6.9.
Suggested Changes- the date on which products
has been installed and commissioned will be
considered as the date of sucessful commissioning
of the systems.
No change in RFP terms.
159
Page 29
4.12
Insurance Suggested Changes- Bidder will provide only in
transit insurance till the delivery of the products and
bank shall take all other insurance thereafter and
bidder shall not be responsible for any insurance
thereafter.
No change in RFP terms.
160
Page 33
4.23(iii)
Except as provided in the above clause, a delay
by the Supplier in the performance of its delivery
obligations shall render the Supplier liable to the
imposition of liquidated damages, unless an
extension of time is agreed upon without the
application of liquidated damages.
Suggested Changes- Suggest to have a cure period
of 30 days to be given to the Bidder by the Bank to
cure the deficiency in services before levying any
liquidated damages. Also, any liquidated charges will
not be levied before mutual agreement/consent of
the Bidder.
No change in RFP terms.
161
Page 34
4.27
The Bank may, at any time, terminate the
Contract by giving written notice to the Supplier if
the Supplier becomes bankrupt or otherwise
insolvent. In this event, termination will be without
compensation to the Supplier, provided that such
termination will not prejudice or affect any right of
action or remedy, which has accrued or will
accrue thereafter to the Bank.
Suggested Changes- bank shall without demur will
be obliged to pay the charges to the bidder till the
last date of termination even in case of termination
of contract in the event of insovency or bankcruptsy
by the bank. However, in case bank fails to make the
payment to the Bidder in aforementioned scenerio
then Bank shall compensate the Bidder for any loss
caused to the bidder for non payment of fees by the
Bank.
No change in RFP terms.
162
Page 38
4.40
Indemnity Suggested Changes- The clause should be mutual.
a)Further, Bank shall indemnify Bidder incase of
infringement by any third party arising out of
Intellectual Property Rights.
b)Further, the Liability of the Bidder shall not apply in
case of negligence handling or any unauthorised
usage by the Bank or its employees.
c) Bank shall indemnify Bidder in case of any injury
or death caused to the employees/worker of the
Bidder due to any act or ommission done while in the
premises of the Bank
d)Bidder will not indemnify to the Bank for any
indirect, special,incidental,consequential,punitive
and reputational damagesor loss or claims and or
for suit proceedings arising out of software
infringement in cases wherein, Bank itself has
modified or done some un authorised act with regard
to the software of the Bidder."
No change in RFP terms.
163
Page 39
4.42
Confidentiality Suggested Changes- Suggest to make this clause
mutual. Also, the Company shall disclose the
confidential information in event where : (A)
information was developed independently by the
Receiving Party; or
(B) is in the public domain at the date hereof or
subsequently enters into the public domain
otherwise than by any breach of this Agreement by
the Receiving Party; or
(C) is subsequently disclosed to the Receiving Party
by a third party who did not have any confidentiality
obligations to the Disclosing Party; or
(D)is required to be disclosed to (a) a government/
judicial/ quasi judicial body in pursuance of an order;
(b) However, the Receiving Party shall give
adequate written notice to the Disclosing Party if
possible or allowed bythe governemnt authority
before making any disclosure so that the Disclosing
Party may have opportunity to respond prior to such
disclosures; as also make disclosure only to the
extent as required.
No change in RFP terms.
164
Page No. 62
Format-6.2
NDA Suggested Changes:Format of Non-Disclosure
Agreementshall not be as per the formats to be
provided by the Bank , however the same shall be
discussed, negotiated and agreed between the
Parties
No change in RFP terms.
165
Page No.65
Format-6.5
Contract Form Suggested Changes:Format ofContract Form shall
not be as per the formats to be provided by the Bank
, however the same shall be discussed, negotiated
and agreed between the Parties
No change in RFP terms.
166
Page Number 7.
3.1 General
i. Bank of India (hereinafter referred to as BOI or
Bank) wishes to put in place Reconciliation of
Transactions of Alternate Delivery Channels in
Bank of India and a minimum uptime time of
99.95%.
Request Bank to clarify if the services to be
extended on a 24/7 or will the proposed vendor be
required to maintain the said uptime during the
standard working hours of 10am to 6pm on all Bank
working days.
At all times
167
Page Number 7.
3.1 General
ii. Solution will also have to be extended to the
Bank of India sponsored RRBs for which only
implementation cost will be paid by the Bank
Request Bank to clarify if the hardware will be
provided by Bank for both Bank as well as RRBs and
will the RRB recon also be worked out from Bank
DC & DR at Bank DR in Bangalore.
Bank to also clarify if the Hardware Specifications
will be as per successful Vendor pre-requisites for
both Bank & its RRBs.
Request the bank to clarify whether the bank with
pay the implementation cost for each RRB where the
solution would be implemented.
We observe that it is not included in the commercial
format. The commercial format is silent on the cost
as well as transaction charges.
Since it is an opex model, no
implementation cost will be provided.
168
Page Number 7.
3.1 General
iii. Towards this end, BOI wishes to select a
competent vendor who will be able to deliver /
implement the required solution and integrate the
same with the Banks’ applications of respective
and that of RRBs. Vendor will also be required to
support Bank and RRBs in integration of future
solutions, which Bank/RRBs are going to procure.
Request Bank to clarify if the Bank will bear the
commercials for future solutions of the Bank or
RRBs.
Change Management process will be followed with
applicable commercials through mutual discussions.
No change in RFP terms.
169
Page Number 8.
3.2 Broad Scope of Work.
ii. The vendor will have to supply and install the
solution at Bank and respective RRBs Head
Offices / Data Centre and also should replicate at
Disaster Recovery Site, Bangalore/ other major
city in India. DC and DR will function as
Active/Passive. The RTO and RPO requirement
for DC DR replication will be 15 minutes.
Application and database to have separate
instance for Bank and each RRB. Implementation
will be at DC (CBD Belapur-Navi Mumbai) and
DR at Bengaluru. These locations, if changed, the
solution be implemented accordingly. Network
security and other infrastructure will be provided
by the Bank.
Request clarification on whether the location of
implementation of a separate solution for RRBs
Head Office are within Mumbai preferably at Bank of
India, DC to help in managing the solution efficiently.
For scattered deployments, there will be
uncontrollable delay in implementation and
maintenance of the solution including operations
managing the deliverables.
Request Bank to maintain a Single DC for Bank &
RRBs together.
AT present we have single DC
premises.
170
Page Number 8.
3.2 Broad Scope of Work.
vi. To provide details regarding Database Design,
Table Structure, Application Programming
Interface etc. so as to give the Bank , sufficient
insight on working of the application or software.
Request Bank to clarify the point on providing the
requisite details.
The Solution provided is the IPR owned by the
solution provider and not design of the application or
the database can be shared.
Necessary for assessing the efficay of
the solution being offered.
171
Page Number 8.
3.2 Broad Scope of Work.
viii. The solution provider (bidder) must ensure
that the solution given is compatible to integrate
with our systems especially the CBS which use
Oracle as database. Any middleware if required
for necessary integration, needs to be provided by
the bidder within the same quote given for the
entire solution.
Request Bank to confirm the CBS used.
For Database it has specified as Oracle, therefore
need clarification
Details will be shared by sucessful
vendor.
172
Page Number 9.
3.2 Broad Scope of Work.
xv. Vendor must provide minimum 20 qualified fit
& proper resources verified by the police, having
graduation or diploma onsite resources during
office hours of the bank and in case of exigencies
the bank can request for extra hours and night
shifts.
Request Bank to clarify if the cost of deploying
operations for extra hours and night shifts during
exigencies, will be borne by the Bank as these are
outside of the normal working hours.
No extra cost will be borne by Bank.
173
Page Number 9.
3.2 Broad Scope of Work.
xix. Further, the system integrator or bidder
should be able to provide the necessary
interfaces with our existing Service Provider/s.
This includes Finacle, Data warehouse or any
other solution as needed by the Bank.
Request Bank to clarify if Bank requires direct
interface or an offline mode will suffice as the
Vendor solution is a stand-alone solution out of Bank
Domain and for Infosec Security reasons, direct
interface may not be permitted by the Bank.
To be provided wherever needed by
Bank.
174
Page Number 10.
3.2 Broad Scope of Work
xxiii. Bank will provide Hardware with operating
windows server of 2008-2016 & database as SQL
& Oracle. Any other software required to run the
solution should be provided by bidder.
Contradictory information is provided on page
number 40 (TECHNICAL SPECIFICATIONS) that
"Vendor to provide the Architecture and the
Computer hardware, OS and database required for
the solution being procured."
We trust bank will bear all the Hardware requirement
including the requsite server
Bank will provide the Hardware
175
Page Number 10.
3.2 Broad Scope of Work
xxvi. As the TAT period of ATM failure transaction
is reduced from 7 working days to 5 calendar
days, vendor has to deploy their resources on
holidays also.
What about RTGS Holidays of NPCI, 26th Jan, 15th
Aug & 2nd Oct.
Request Bank to clarify if the cost of deploying
operations resources on holidays will be borne by
the Bank, as these are outside of the normal working
hours.
The expectation is that operations resources will
work as per working days of the Bank.
No change in RFP terms.
176
Page Number 11.
3.4 Eligibility Criteria
ii. Bidder or OEM should have implemented
and/or managed end to end Reconciliation
Solution successfully for minimum 03 year, in at
least two Private / Public Sector Undertaking
Bank /Foreign Bank in India or abroad. One of the
locations must be a ‘Finacle’ location. Software
solution should be capable of handling minimum
1.5 Cr. transaction in a Billing Cycle. Bidder
should give proof of handling mimimum10 Crore
transactions in PSBs.
Bank has stated that the vendor must be capable of
handling 1.5 Cr. In a billing cycle. We trust 1.5 Cr.
Transaction is on monthly basis.
No change in RFP terms.
177
Page Number 11.
3.4 Eligibility Criteria
iv. The Bidder should have yearly sales turnover
of not less than Rs.100 Crores during last two
financial years (2016-17 and 2017-18). Bidder
should submit the latest Annual Financial
Statement i.e. of FY-2017-18, if audited.
(Certificate from a Chartered Accountant to be
attached).
During the last 2 F.Y. i.e. 2017-18 and 2018-19, we
had Turnover of more than 100 Crore. Whether this
criteria will apply for 2016-17?
We may add that at the time of last RFP the bank
had stifulated Turnover criteria of 100 Crore, but
subsequently brought down to 50 Crores.
We suggest the same criteria may be made
applicable for this RFP also.
Financial years are to be read as 2016-
17, 2017-18,2018-19. any of the above
two financial years,
178
Page Number 11.
3.4 Eligibility Criteria
v. The bidder must be having positive net worth in
at least two of the last three years (2015-16),
(2016-17) and (2017-18). Bidder should submit
the latest Annual Financial Statement i.e. of FY-
2017-18, if audited. (Certificate to that effect from
Chartered Accountant to be attached).
Request Bank to clarify if the dates mentioned are
correct or in error.
Does the Bank mean positive Net Worth in atlease
two of the last three years (2016-17, 2017-18 &
2018-19) and Auditors Certificate to that effect.
Financial years are to be read as 2016-
17, 2017-18,2018-19.
179
Page Number 11.
3.4 Eligibility Criteria
ix. The Bank also reserves the right to inspect
such installation/s while evaluating the Technical
Bid. The vendor should bear all the expenses in
this regard. Site visits by Bank’s Evaluation Team
are mandatory and all the expenses incidental to
same are to be borne by vendor.
Trust that the Bank will bear all the expenses for site
visit.
No change in RFP terms.
180
Page Number 12.
3.4 Eligibility Criteria
xvii. At the end of contract period of 5 years, the
bidder must offer the solution to Bank, for internal
use for unlimited period at a special cost of Re.1/-
.
Request Bank to clarify if the cost of the Application,
IPR owned by the Proposed Vendor, be paid to the
Vendor through mutual negotiations as the solution
has been customized to suit the Bank requirements.
Support, if any required by Bank for the customized
application should also be chargeable, due to the
complexity of the solution.
Please clarify, during the course of implementation
there will be certain requirements which the vendor
might not have and will have to tie up with a third
party. In this case what if the third party refuses to
share the solution / application, what will be the
penalty or the implication on this RFP.
It may be noted that such condition was stipulated in
the last RFP. The bank has subsequently removed
this criteria.
Stands deleted. Appropriate decision in
this regard will be taken at the end of
contract period.
181
Page Number 17.
3.16. Bid Security
iii. a bank guarantee issued by a nationalised /
public sector bank in India (other than Bank of
India), acceptable to the Bank, in the form as per
Format 6.4 provided in the Bid, valid for forty-five
(45) days beyond the validity of the Bid.
OR
a Banker’s Cheque / Demand Draft, issued by a
Nationalised / Public sector Bank in India, drawn
in favour of Bank of India and valid for a period of
three months.
Request the bank to accept a Bid Security in the
form of Bank Guarantee or Banker's Cheque/
Demand Draft issued by any private sector banks in
India like Kotak Mahindra Bank, HDFC Bank, etc.
BG from any Scheduled commercial
Bank or Nationalized Bank other than
Bank of India.
182
Page Number 27.
4.6 Performance Security
iii. The Performance Security shall be
denominated in Indian Rupees and shall be by
way of bank Guarantee issued by a Nationalised /
Public Sector bank in India (Other than Bank of
India), acceptable to the bank in the Format 6.6
provided in the Bid.
Request the bank to accept a performance Security
in the form of Bank Guarantee issued by any private
sector banks in India like Kotak Mahindra Bank,
HDFC Bank, etc.
BG from any Scheduled commercial
Bank or Nationalized Bank other than
Bank of India.
183
Page Number 31.
vii.
a. Any requirements changes/modifications
required by bank will have to be carried out by the
identified vendor free of cost.
The changes if any required by the bank, the vendor
will carry out the estimated time and the cost which
will be shared with the bank.
No change in RFP terms.
184
Page Number 31.
vii.
e. Any upgradation or modification required by the
Bank till the time of Go-Live and any upgradation
or modification required as per the requirement of
any regulator (FIU-IND, RBI or IBA) to be
provided free of cost by the vendor.
Request the Bank to clarify if the Bank will bear the
commercials for any upgradation or modifications
required by the bank after the go-live of the solution
and any upgradation or modification required as per
the requirement of any regulator (FIU-IND, RBI or
IBA).
Change Management process will be followed with
applicable commercials through mutual discussions
No change in RFP terms.
185
Page Number 41.
PART 5: TECHNICAL &
FUNCTIONAL
SPECIFICATIONS (TFS)
Reconciliation of all incoming and outgoing
transaction (debit/credit/PPI cards etc.) with
regards to NFS, VISA, Mastercard, Rupay and all
other networks including POS transactions
Request Bank to clarify what PPI cards stands for. Pre-paid instrument
CPD
186
Page Number 64.
FORMAT – 6.3
Price Schedule Part I Request the bank to clarify with example that the
TCO will be calculated. How the TCO will be arrived,
cite an example.
The commercial format is silent on the cost as well
as transaction charges.
In opex model TCO cannot be
confirmed in advance.
187
Page Number 81.
PART 7: SCHEDULE OF
DATES, AMOUNTS ETC. (SDA)
7.3 Period within which Performance Security or
Amendment thereto is to be submitted by the
Successful Bidder upon notification of Award Of
Contract: 21 days
Request the bank to provide 45 days time from the
date of receipt of the purchase order.
No change in RFP terms.
188
Page Number 81.
PART 7: SCHEDULE OF
DATES, AMOUNTS ETC. (SDA)
7.6 Performance Security Amount: Rs.1 crore Request the bank to reduce the performance
security amount to Rs. 50 Lakhs
No change in RFP terms.
189
Page Number 82.
7.14
Period within which Products / Services under the
Contract are to be installed/commissioned from
the Date of signing of Contract:
- Initial Installation as given in Part 5 under
implementation 60 days.
- Subsequent installation as mutually decide.
Please clarify what is initial installation? What all
services will be included in initial installation?
In case the new vendor is not within 60 days we
assume that as per the industry practice the vendor
will not be quote for future RFPs of Bank Of India.
Also please clarify the timelines of 60 days is:
1. From the date of PO issued by the Bank?
2. From the date of PO accepted by the L1
vendor?
3. Are 60 days the calendar days or working days?
Date will be reckoned after issue of PO,
as per calendar days, unless otherwise
indicated.
190
General Are existing ATM service providers and Switch
providers allowed to bid for this RFP? This might
lead to conflict of interest.
Appropriate decision will be taken as
per internal process.
191General Credit card recon & POS recon – are these services
also scope of the RFP.Yes.
192General In case there is only 1 qualified vendor, how will the
Bank proceed?The decision will be taken as per extant
guidelines of the Bank.
193
General
During the last tender it was observed that quoted
accepted was below the industry standard more on a
trial and error basis. This is not an industry practice
and might lead to unfair practices. How the bank will
handle such situation in the proposed RFP?
Since the Reverse Auction was
adhered to in the process , Bank does
not have any control on the same since
it is vendor's descretion to quote any
amount, and Bank has to honour the
result unless the vendor expresses
inability with written communication.
194
General Request the bank to provide IFSC code for issuance
of Bank Guarantee.
These details will only be required at
the time of invocation of BG and will
depend on our internal practice
prevailing then.
195
General Request the bank to give 15 days time for
submission of documents from the date of
publication of pre -bid queries on the website.
Extension, if any, in last date for bis
submission will be hosted on Bank's
website.