INSPECTION REQUEST
TO: SUPERVISORINSPECTION UNITENGINEERING DIVISION
FROM:
Tel.: ____________ Fax.: ___________
Request No.: ________________
Request Date: _______________
This is to inform you that the following job is scheduled to start as detailed below. Please provide the required inspection coverage.
Work Description: (Include Plant No., Location of work, etc.)
Start Date: ___ / ___ / ______ Time: ________
Completion Date: ___ / ___ / ______ Time:_______
Inspection Required: ________ Pre – T&I ________ Pre – T&I ________ None T&I
Mechanical Welding Electrical Paints & Coating Cath. Protection Relief Valves
Engineering Package: (Repairs / Modifications / Maintenance Projects)
Available Under Preparation Not Required
Inspection Worksheet:
Available IWS #: IU- ________
Required Not Required
Comments:
______________________ Area Rep. Sign
For Inspection Unit Use Only
Assigned Inspector: _____________________Inspection Supvr. Instructions: __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
cc: Supt. ED Supvr. OEU _____________________ Supvr. MSU Inspection Unit Sup. Operations Forman