REQUEST FOR WAIVER/DEVIATION (Ref. Sig 3-760) For Sig Sauer use: Request # (=P/N & Expiration Date) SIG 4-073 Rev 16 Definitions Deviation: Mandatory departure from specified drawing or specification or process, for which Sig Sauer assumes responsibility. Waiver: Authorization to depart from requirements of the purchase order and its referenced documents. Sig Sauer reserves the right to revoke a waiver at any time, at the supplier's expense, should the parts be determined to be unsuitable for use. Expiration Date: Date after which receipt of parts under the subject approval are no longer valid. Note: Expiration date not to exceed the following: (Unless otherwise approved in writing by Sig Sauer) Waiver: 90 days Deviation: 365 Days (1 Year) A copy of this document must be included with relevant Purchase Order shipments to Sig Sauer. * = as applicable Supplier : Waiver Deviation Internal Requestor : *External Requestor : Date : *Qty. Affected : *PO# : Submitted to : Sig Sauer, Inc. Part # : Revision: *Tool # / Cavity #(s) : Part Description: Use attachments to supplement the below if necessary. Is this an extension for an expired Request? Yes No Previous # : If No, then go to Reason/Description of Request If extending, why were Permanent Corrective Actions (PCA’s) not implemented as planned? Reason/Description of Request (Actual vs. nominal with tolerance, include item or note #s if applicable): Special Instructions: *Plan to eliminate Waiver/Deviation: --------------------Below is for Sig Sauer use only--------------------- Notes: 1) *If determined by Engineering, otherwise Engineering signatory to state “N/A” in comments block. 2) AQE approval signature required on RFWD requests affecting assembly fit, form, function, interchangeability or cosmetic condition. 3) MQE approval signature required on RFWD requests affecting machinability. 4) MHS PM and R&D required for MHS M17/M18 part number Gov’t approved waiver or deviation, no exceptions. Department Name Signature Date Comments Sustaining Engineering Research & Development (R&D)* Assembly Quality Eng. (AQE)* Machining Quality Eng. (MQE)* Supplier Quality Eng. (SQE)* Purchasing* L.E. / Military MHS PM * Manufacturing / Machining* Production / Assembly* Product Planning* Machining Planning* Product Management* Other *: Change Request (CR) # or Equivalent:

Transcript of REQUEST FOR For Sig Sauer use: Request # (=P/N ...€¦ · REQUEST FOR WAIVER/DEVIATION (Ref. Sig...

Page 1: REQUEST FOR For Sig Sauer use: Request # (=P/N ...€¦ · REQUEST FOR WAIVER/DEVIATION (Ref. Sig 3-760) For Sig Sauer use: Request # (=P/N & Expiration Date) SIG 4-073 Rev 16 Definitions

REQUEST FOR WAIVER/DEVIATION

(Ref. Sig 3-760)

For Sig Sauer use: Request # (=P/N & Expiration Date)

SIG 4-073 Rev 16

Definitions Deviation: Mandatory departure from specified drawing or specification or process, for which Sig Sauer assumes responsibility. Waiver: Authorization to depart from requirements of the purchase order and its referenced documents. Sig Sauer reserves the right to revoke a waiver at any time, at the supplier's expense, should the parts be determined to be unsuitable for use. Expiration Date: Date after which receipt of parts under the subject approval are no longer valid. Note: Expiration date not to exceed the following: (Unless otherwise approved in writing by Sig Sauer) Waiver: 90 days Deviation: 365 Days (1 Year) A copy of this document must be included with relevant Purchase Order shipments to Sig Sauer. * = as applicable

Supplier : Waiver Deviation Internal Requestor : *External Requestor :

Date : *Qty. Affected :

*PO# : Submitted to : Sig Sauer, Inc.

Part # : Revision: *Tool # / Cavity #(s) : Part Description:

Use attachments to supplement the below if necessary. Is this an extension for an expired Request? Yes No Previous # : If No, then go to Reason/Description of Request If extending, why were Permanent Corrective Actions (PCA’s) not implemented as planned? Reason/Description of Request (Actual vs. nominal with tolerance, include item or note #s if applicable): Special Instructions: *Plan to eliminate Waiver/Deviation:

--------------------Below is for Sig Sauer use only---------------------

Notes: 1) *If determined by Engineering, otherwise Engineering signatory to state “N/A” in comments block. 2) AQE approval signature required on RFWD requests affecting assembly fit, form, function, interchangeability or cosmetic condition. 3) MQE approval signature required on RFWD requests affecting machinability. 4) MHS PM and R&D required for MHS M17/M18 part number Gov’t approved waiver or deviation, no exceptions.

Department Name Signature Date Comments Sustaining Engineering Research & Development (R&D)* Assembly Quality Eng. (AQE)* Machining Quality Eng. (MQE)* Supplier Quality Eng. (SQE)* Purchasing* L.E. / Military MHS PM * Manufacturing / Machining* Production / Assembly* Product Planning* Machining Planning* Product Management* Other *:

Change Request (CR) # or Equivalent: