Republic of Yemen MINISTRY OF ELECTRICITY & ENERGY PUBLIC ELECTRICITY CORPORATION (P.E.C)

18
Sana’a – Dhban- Tel: +967-1-328286 Fax: +967-1-326185 www.tcmpec.com.ye - Email: [email protected]

description

Republic of Yemen MINISTRY OF ELECTRICITY & ENERGY PUBLIC ELECTRICITY CORPORATION (P.E.C). The Technical Training & Manufacturing Center. Sana’a – Dhban- Tel: +967-1-328286 Fax: +967-1-326185 www.tcmpec.com.ye - Email: [email protected]. Submitted by : Engineer Abdul Ghani M. Motaher. - PowerPoint PPT Presentation

Transcript of Republic of Yemen MINISTRY OF ELECTRICITY & ENERGY PUBLIC ELECTRICITY CORPORATION (P.E.C)

Page 1: Republic of Yemen  MINISTRY OF ELECTRICITY & ENERGY  PUBLIC ELECTRICITY CORPORATION (P.E.C)

Sana’a – Dhban- Tel: +967-1-328286 Fax: +967-1-326185 www.tcmpec.com.ye - Email: [email protected]

Page 2: Republic of Yemen  MINISTRY OF ELECTRICITY & ENERGY  PUBLIC ELECTRICITY CORPORATION (P.E.C)

Submitted by:

Engineer Abdul Ghani M. Motaher

Page 3: Republic of Yemen  MINISTRY OF ELECTRICITY & ENERGY  PUBLIC ELECTRICITY CORPORATION (P.E.C)

Framework to Promote Domestic Solar Water Heaters

1. Domestic Solar Water Heaters

Significant demand exists for domestic water heating in the highlands of Yemen .Solar water heating offers a good opportunity for the highlands since during this period the solar radiation availability is high (more than 8 hours per day).

Page 4: Republic of Yemen  MINISTRY OF ELECTRICITY & ENERGY  PUBLIC ELECTRICITY CORPORATION (P.E.C)

The proposed renewable energy policy framework targets a maximum potential savings of around 686 GWh from domestic solar water heaters in 2025 (Chapter 2 of this study). Urban household’s solar water heating demand was taken from the empirical study. The urban household’s electricity consumption, water heating load, and estimated collected energy by solar water heating systems.

Page 5: Republic of Yemen  MINISTRY OF ELECTRICITY & ENERGY  PUBLIC ELECTRICITY CORPORATION (P.E.C)

Table 5‑1: Urban household electricity demand, water heating load and energy collected by SWH systems

HH Categ

ory

Average consump

tionWater heating

load per monthEnergy collected by SWH

systems (kWh/month)

kWh/month %total load kWh

2 m2 (50 liters

storage)

4 m2 (100 liters

storage)

6 m2 (200

liters storage)

1 107 0 0

2 m2 50 liters

storage

2 266 25-35 67 – 93 79 - 99

3 466 40-50 186 – 233 157 - 198

4 1149 50-60 574 – 689236 –

297

Page 6: Republic of Yemen  MINISTRY OF ELECTRICITY & ENERGY  PUBLIC ELECTRICITY CORPORATION (P.E.C)

In order for the government to achieve the proposed targets, it needs to address the main barriers to solar water heaters in Yemen. Based on consultant’s interviews with technology suppliers and stake holders, key barriers are the following:Lack of government policy and institutional support to kick-off the transformation of solar water heater market,Lack of awareness (consumers, policy makers, general stakeholders) on the benefits of the technology,High initial capital costs of solar water heaters, and Lack of financing mechanisms supporting the development of the market.The following sections propose strategic actions for the government to kick-off market development of solar water heaters in the country.

Page 7: Republic of Yemen  MINISTRY OF ELECTRICITY & ENERGY  PUBLIC ELECTRICITY CORPORATION (P.E.C)

1.2 Financial AnalysisBased on the estimated electricity savings from the use of solar water heaters, the study analyzed the financial attractiveness of the technology in Yemen. The solar water heater will bring significant decrease of monthly electricity consumption and each household will move one notch below PEC’s tariff classification table. The overall financial benefit of the use of SWH is shown in Table 5‑2.

Similarly, the study carried out financial simulation and the financial analysis indicators are shown in Table 5‑3.

Page 8: Republic of Yemen  MINISTRY OF ELECTRICITY & ENERGY  PUBLIC ELECTRICITY CORPORATION (P.E.C)

Table 5‑2: Domestic Solar Water Financial Benefits

HH Category

Consumption (kWh/mon

th) Savings (kWh/mont

h)

Demand rang

e (kW

h)

Tariff (c/kWh

)

HH Financial Benefits($ per month)

beforeafter

Savings effec

t

Price effect

Total

1 - - - Up to 200

2.1 - - -

2 266 186 80 201-350 3.6 2.9 2.8 5.7

3 466 288 177 351-700 5.2 9.2 4.6 13.8

4 1149 628 521 >700 8.72 45.5 22.1 67.6

Page 9: Republic of Yemen  MINISTRY OF ELECTRICITY & ENERGY  PUBLIC ELECTRICITY CORPORATION (P.E.C)

Table 5‑3: Solar Water Heater Financial Indicators

Collector Size

Capital Cost

($)

Annual Savings

($)

Payback Period (years)

[1]

NPV($) [2]

2 m2 266 68 3.9 337

4 m2 594 166 3.6 873

6 m2 756 811 0.9 6214

Page 10: Republic of Yemen  MINISTRY OF ELECTRICITY & ENERGY  PUBLIC ELECTRICITY CORPORATION (P.E.C)

1.3 Market Transformation Framework

The financial analysis reveals that solar water heaters are cost-effective and that it is not necessary to provide financial incentives to urban households in order to promote the use of solar water heaters. Key market transformation activities could include the following:

1.Development of market transformation plan2.Launching of information and education campaign3.Establishment of a revolving fund under the

Renewable Energy Fund in the short term and partnership with microfinance institutions in the long term.

Page 11: Republic of Yemen  MINISTRY OF ELECTRICITY & ENERGY  PUBLIC ELECTRICITY CORPORATION (P.E.C)

Under the market transformation plan, MEE needs to :

identify priority areas – this could target capital cities and large towns in the Highlandsidentify existing and potential SWH dealers in these cities and large towns and to accredit themspecify acceptable technologies, giving priority to locally manufacture technologiesprepare criteria for programme participants, specifying certain conditions each household must satisfyprepare a 5-year financing plan

Page 12: Republic of Yemen  MINISTRY OF ELECTRICITY & ENERGY  PUBLIC ELECTRICITY CORPORATION (P.E.C)

This is shown in Figure 5‑1. The development of the market and identification of programme participants will be left to the accredited dealers.

To stimulate household investments in solar water heaters, in the short-term MEE could initiate a financing mechanism in a form of a revolving fund to be established as one of the accounts under the REN Fund.

The fund would provide low interest loan for the purchase of the solar water heaters. The loan payment could be integrated in the electricity bill.

Page 13: Republic of Yemen  MINISTRY OF ELECTRICITY & ENERGY  PUBLIC ELECTRICITY CORPORATION (P.E.C)

In order not to create an increase in electricity payments, monthly loan payments should be set equal to electricity savings. Since the estimated payback period for smaller units is around 3 years, the revolving fund could provide a 3 year loan term to this consumers group. For larger households, financing terms could be shorter - maximum of one year.

Page 14: Republic of Yemen  MINISTRY OF ELECTRICITY & ENERGY  PUBLIC ELECTRICITY CORPORATION (P.E.C)

MEESWH Market Study and Transformation Plan- List of priority areas/technologies- programme participation criteria- 5 year financing plan

City 1 Governorate 1

City n Governorate n

City 2 Governorate 2

SWH Dealers Governorate 1

SWH Dealers Governorate 2

SWH Dealers Governorate 3

market development

market development

market development

Prequalification and Accreditation of dealers and SWH technology

Figure 5‑1: Market Facilitation Strategy

Page 15: Republic of Yemen  MINISTRY OF ELECTRICITY & ENERGY  PUBLIC ELECTRICITY CORPORATION (P.E.C)

Figure 5‑2: Short-Term SWH Financing Mechanism

SWH Dealers

Domestic Consumers

MoEREN Fund

Advisory Committe

PEC billing

• donors• govt budget• electric rate surcharge

REN SWH revolving Fund

accreditation SWH

monthly payment, equivalent to savings, n years

Financing Proposal transfer

financing

provide information

Page 16: Republic of Yemen  MINISTRY OF ELECTRICITY & ENERGY  PUBLIC ELECTRICITY CORPORATION (P.E.C)

As shown in Figure 5‑2, accredited dealers will be responsible for the development of the market and will initially screen programme participants based on screening criteria from MEE.

Page 17: Republic of Yemen  MINISTRY OF ELECTRICITY & ENERGY  PUBLIC ELECTRICITY CORPORATION (P.E.C)

In the long term, once the market for solar water heaters as well as micro-financing will kick-off in Yemen, MEE could transfer the financing functions to banks and micro finance institutions. This is shown in Figure 5‑3.

Page 18: Republic of Yemen  MINISTRY OF ELECTRICITY & ENERGY  PUBLIC ELECTRICITY CORPORATION (P.E.C)

Thank you