Transcript of Republic of the Union of Myanmar Ministry of Energy
OIL AND GAS SECTOR IN MYANMAR
Warmly Welcome All Delegates from United State of America
Myanmar in BriefMyanmar in Brief
• Myanmar is the second largest nation in South-East Asia • Total area is 676,577 square kilometers• Coastal strip is 2832 kilometers • Population is about 60 million
The Republic of the Union of The Republic of the Union of MyanmarMyanmar
Ministry of Energy
Energy Planning
Department(EPD)
Myanma Oiland Gas
Enterprise(MOGE)
Myanma Petrochemical
Enterprise(MPE)
Myanma PetroleumProducts
Enterprise(MPPE)
• Exploration• Drilling• Production• Onshore Pipeline Network• CNG
• Refineries & Process• Fertilizer Plants• Methanol Plant• CO2 and LPG Plants• Waxing & Tar
• Coordination• Management• Regulation
• Marketing• Distribution
3
Organization Setup of Ministry of EnergyOrganization Setup of Ministry of Energy
Demarcated Blocks for Demarcated Blocks for Production Sharing BasisProduction Sharing Basis
• Onshore Blocks 53 blocks
• Offshore Blocks 51 blocks
Total 104 blocks for Onshore and offshore
• Type of ContractMainly Production Sharing
Contract (PSC)
Current ActivitiesCurrent Activities
Onshore BlocksOnshore BlocksCurrently,Currently,1717 Blocks are under operating by Blocks are under operating by 1212 companies in onshore area. companies in onshore area.
11stst bidding round was completed in 2011 bidding round was completed in 2011 andand22ndnd bidding round was launched on bidding round was launched on 17.1.201317.1.2013..
Offshore BlocksOffshore BlocksCurrently, Currently, 2020 Blocks are under operating by Blocks are under operating by 99 companies in offshore area.companies in offshore area.
Offshore bidding round will be launched in Offshore bidding round will be launched in very near future.very near future.
Projects in OffshoreProjects in Offshore
Existing ProjectsExisting Projects1)1) Yadana Project Yadana Project ~~~ Exporting to Thailand~~~ Exporting to Thailand
(some amount is used for domestic supply)(some amount is used for domestic supply)
2)2) Yetagun Project Yetagun Project ~~~ Exporting to Thailand~~~ Exporting to Thailand
Ongoing ProjectsOngoing Projects1)1) Shwe Project Shwe Project ~~~ Exporting to China~~~ Exporting to China
(some amount will be used for domestic supply)(some amount will be used for domestic supply)
2)2) Zawtika Project Zawtika Project ~~~ Exporting gas to Thailand~~~ Exporting gas to Thailand (some amount will be used for domestic supply)(some amount will be used for domestic supply)
Future ProjectFuture Project1)1) Block M-3 Project Block M-3 Project ~~~ New Discovery,~~~ New Discovery,
(All of M-3 gas will be used for Domestic supply)(All of M-3 gas will be used for Domestic supply)
00
LOCATION : MOATTAMA OFFSHOREBLOCKS : M-5 / M-6SELLERS : TOTAL 31.24 %
UNOCAL 28.26 % PTTEP 25.50 % MOGE 15.00 %
BUYER : PTT PlcRESERVES : 6.5 TCFEXPORT DCQ : 565 MMCFDDOMESTIC GAS : 200 MMCFDOFFSHORE FACILITIES : WELL HEAD PLATFORM 1 ( 8 WELLS )
WELL HEAD PLATFORM 2 ( 7 WELLS ) WELL HEAD PLATFORM 3 ( 2 WELLS ) PROCESSING PLATFORM LIVING QUARTER PLATFORM FLARE PLATFORM MEDIUM COMPRESSION PLATFORM
ONSHORE FACILITIES : PIPELINE CENTER METERING STATION
PIPELINES : 216 MILES 36” PIPELINE ( OFFSHORE ) 39 MILES 36” PIPELINE ( ONSHORE )
START OF GAS EXPORT : 1998PROJECT COST : 1200 MM$
Yadana ProjectYadana Project
LOCATION : TANINTHARYI OFFSHOREBLOCKS : M-12 / M-13 / M-14SELLERS : PETRONAS 40.75 %
NIPPON 19.40 %PTTEP 19.40 %MOGE 20.45 %
BUYER : PTT PlcRESERVES : 4.16 TCFEXPORT DCQ : 400 MMCFD
( ABOUT 30 BL CONDENSATE / MMCF )OFFSHORE FACILITIES: WELLHEAD PLATFORM ( 10 WELLS )
PROCESSING PLATFORMFSOCOMPRESSION PLATFORMYTG BOOSTER COMPRESSION PLATFORM
ONSHORE FACILITIES : PIPELINE CENTERMETERING STATION
PIPELINES : 126 MILES 24” PIPELINE ( OFFSHORE )42 MILES 24” PIPELINE ( ONSHORE )
START OF GAS EXPORT : 2000PROJECT COST : ABOUT 700 MM$
Yetagun ProjectYetagun Project
LOCATION : RAKHINE OFFSHOREBLOCKS : A-1 / A-3SELLERS : DAEWOO 51 %
ONGE 17 % GAIL 8.5 % KOGAS 8.5 % MOGE 15 %
BUYER : CHINA OILRESERVES : 4.5 TCFEXPORT DCQ : 400 MMCFDDOMESTIC GAS : 100 MMCFDOFFSHORE FACILITIES : SHWE PROCESSING PLATFORM ( 11 WELLS )
MYA-NORTH SUB-SEA WELL HEAD (4 WELLS)ONSHORE FACILITIES : ONSHORE GAS TERMINALPIPELINES : 110 KM 32” PIPELINE ( OFFSHORE )
5.7 KM 32” PIPELINE ( ONSHORE )START OF GAS EXPORT : 2013PROJECT COST : ~ 2000 MM$
Shwe ProjectShwe Project
LOCATION : MOATTAMA OFFSHOREBLOCKS : M-9SELLERS : PTTEPI 80 %
MOGE 20 %BUYER : PTT PlcRESERVES : 1.44 TCFEXPORT DCQ : 245 MMCFDDOMESTIC GAS : 100 MMCFDOFFSHORE FACILITIES : ZAWTIKA PROCESSING QUARTER
WELL HEAD PLATFORM 1 ( 7 WELLS ) WELL HEAD PLATFORM 2 ( 12 WELLS ) WELL HEAD PLATFORM 3 ( 16 WELLS )
ONSHORE FACILITIES : ZAWTIKA PIPELINE OPERATING CENTER ZAWTIKA METERING STATION
PIPELINES : 230 KM 28” PIPELINE ( OFFSHORE ) 72 KM 28” PIPELINE ( ONSHORE )
START OF GAS EXPORT : 2013PROJECT COST : ~ 2000 MM$
Zawtika ProjectZawtika Project
Length : 770 kmDiameter : 32 inchesDCQ : 400,000 blFirst Oil Transport : 2013Project Cost : 2.45 billion US$
Length : 792 kmDiameter : 40 inchesDCQ : 500 mmcfFirst Gas Transport : 2013Project Cost : 2.15 billion US$
Myanmar-China Oil and Gas Pipeline ProjectsMyanmar-China Oil and Gas Pipeline Projects
• MOGE has been laying the pipes throughout Myanmar to expand its national pipeline network.
• Various size from 6” to 24” of pipeline were constructed.
• Total length is about 2100 miles
12
Domestic PipelineDomestic Pipeline
Offshore Onland
• Yadana(36”) 216 miles 39 miles
• Yetagun (24”) 126 miles 43 miles
• Zawtika (28”) 143 miles 42 miles
• Shwe (32”) 65 miles 3 miles
• China-Myanmar(40”) nil 495 miles(Gas)
• China-Myanmar(32”) nil 481 miles(Oil)
Export PipelineExport Pipeline
Pipeline NetworkPipeline Network
(40)
CNG / NGV Converting ProgrammeCNG / NGV Converting Programme Initiated in Myanmar since 1985. 1985 – August 2004 : - 5 CNG Filling Stations ;
- 2 in Yangon City- 2 in Yenangyaung Field- 1 in Chauk Field
- 587 NGVs (Converted from petrol buses) CNG / NGV Programme was reactivated
in August 2004 and Widely used in 2005. As at 2012 : - 45 CNG Filling Stations were constructed
- 40 in Yangon City- 2 in Mandalay City- 2 in Yenangyaung Oil Field- 1 in Chauk Oil Field
Currently, more than 27600 passenger cars were converted to NGVsThe project is still continuing with high momentum
Sectorwise Supply in 2012Sectorwise Supply in 2012
Supply and DemandSupply and Demand
Gas Supply ForecastGas Supply Forecast
Refineries -No. 1 Refinery (Thanlyin) (20,000 B/D)No. 2 Refinery (Chauk) (6,000 B/D)Petrochemical Complex (Thanbayakan) (25,000 B/D)
Urea Plants -No. 1 Fertilizer Factory (Sale) (465 MT/D)No. 2 Fertilizer Factory(KyunChaung) (207 MT/D)No. 3 Fertilizer Factory (Kyawzwa) (600 MT/D)No. 4 Fertilizer Factory(Myaungdaga) (500 MT/D)No. 5 Fertilizer Factory(Kangyidauk) (500 MT/D)
Others -LPG Extraction Plant (Minbu) (24 mmcfd gas)Skid-Mounted LPG Plant(Nyaungdon) (10-16 mmcfd)Skid-Mounted LPG Plant(Kyunchaung) (8-10 mmcfd)Methanol Plant (Seiktha) (450 MT/D)Bitumen Plant (Thanlyin) (548 MT/D)
Urea Plants - Downstream SectorDownstream Sector
Health
Infrastructure
Education
Socio-Economic Programme ActivitiesSocio-Economic Programme Activities
18