REPUBLIC OF SINGAPORE AIP SUPPLEMENT AFS: · PDF filerunway resurfacing works, diversion of...
Embed Size (px)
Transcript of REPUBLIC OF SINGAPORE AIP SUPPLEMENT AFS: · PDF filerunway resurfacing works, diversion of...
Page 1 of 4
Telephone: (65) 6595 6051 AFS: WSSSYNYX Facsimile: (65) 6441 0221 [email protected] www.caas.gov.sg
REPUBLIC OF SINGAPORE AERONAUTICAL INFORMATION SERVICES
CIVIL AVIATION AUTHORITY OF SINGAPORE SINGAPORE CHANGI AIRPORT P.O. BOX 1, SINGAPORE 918141
AIP SUPPLEMENT
2/16
18TH FEBRUARY
WORKS SCHEDULE AND MOVEMENT AREA RESTRICTIONS PERTAINING TO RUNWAY RESURFACING WORKS, DIVERSION OF AIRSIDE SERVICES AND SOIL
IMPROVEMENT WORKS AT SINGAPORE CHANGI AIRPORT
1. INTRODUCTION
1.1. This AIP Supplement is to update the aviation industry of the works schedule and movement areas restrictions at Singapore Changi Airport for the period from 26 March 2016 2201UTC to 29 October 2016 2200UTC due to the on-going upgrading programme to resurface the runway, divert the airside services infrastructure and carry out soil improvement works and other associated works.
2. CONSTRUCTION ZONES FOR AIRSIDE SERVICES DIVERSION
2.1. Please refer to Appendix A for the location of the construction works zones.
3. CONSTRUCTION ZONES FOR SOIL IMPROVEMENT
3.1. Please refer to Appendix B for the location of the construction works zones.
4. RUNWAY 02L/20R and Runway 02C/20C RESURFACING WORKS
4.1 Runway 02L/20R and Runway 02C/20C resurfacing works will take place during the runway closure for works and maintenance between 1630UTC and 2200UTC on the dates specified in paragraph 5.1.
4.2 In the event of an emergency, Runway 02L/20R and Runway 02C/20C will be reopened upon notification based on the following stipulated timings:
(i) Between 1630 and 1930 runway will be re-opened within 120 minutes;
(ii) Between 1930 and 2100 runway will be re-opened by 2130UTC; and
(iii) Between 2100 and 2130 runway will be re-opened within 30 minutes.
Page 2 of 4
5. LONG CLOSURES OF RUNWAY 02L/20R and RUNWAY 02C/20C
5.1 Runway 02L/20R and Runway 02C/20C will be closed between 1630UTC and
2200UTC nightly from 26 March 2016 to 29 October 2016 for works and
maintenance as follows:
Month Runway 02L/20R Runway 02C/20C
March 2016 28 and 31. 26, 27, 29 and 30.
April 2016 4, 7, 11, 14, 18, 21, 25 and 28. 1, 2, 3, 5, 6, 8, 9, 10, 12, 13, 15,
16, 17, 19, 20, 22, 23, 24, 26, 27,
29 and 30.
May 2016 2, 5, 9, 12, 16, 19, 23, 26 and 30. 1, 3, 4, 6, 7, 8, 10, 11, 13, 14, 15,
17, 18, 20, 21, 22, 24, 25, 27, 28,
29 and 31.
June 2016 2, 6, 9, 13, 16, 20, 23, 27 and 30. 1, 3, 4, 5, 7, 8, 10, 11, 12, 14, 15,
17, 18, 19, 21, 22, 24, 25, 26, 28
and 29.
July 2016 4, 7, 11, 14, 18, 21, 25 and 28. 1, 2, 3, 5, 6, 8, 9, 10, 12, 13, 15,
16, 17, 19, 20, 22, 23, 24, 26, 27,
29, 30 and 31.
August 2016 1, 4, 8, 11, 15, 18, 22, 25 and 29. 2, 3, 5, 6, 7, 9, 10, 12, 13, 14, 16,
17, 19, 20, 21, 23, 24, 26, 27, 28,
30 and 31.
September 2016 1, 5, 8, 12, 15, 19, 22, 26 and 29. 2, 3, 4, 6, 7, 9, 10, 11, 13, 14, 16,
17, 18, 20, 21, 23, 24, 25, 27, 28
and 30.
October 2016 3, 6, 10, 13, 17, 20, 24 and 27. 1, 2, 4, 5, 7, 8, 9, 11, 12, 14, 15,
16, 18, 19, 21, 22, 23, 25, 26, 28
and 29.
5.2 For Runway 02C/20C closure from 1630UTC to 2200UTC, Taxiway EP between
Taxiway L9 and Taxiway E11 will also be closed due to work in progress.
Page 3 of 4
6. SHORT CLOSURES OF RUNWAY 02L/20R and RUNWAY 02C/20C
6.1 Reference to AIP Singapore section WSSS AD 2.12 item 12, paragraphs 1b) and 2b), short maintenance closure of 5 minutes which are scheduled to be conducted daily between 2300-2305 and 2320-2325 on Runway 02L/20R and Runway 02C/20C respectively, will be replaced by a 15 minutes maintenance closure, depending on which runway is closed. The table below shows the details and the maintenance closure timing for each runway.
Closure of RWY on dates specified in paragraph 5.1
Cancellation of 5 minutes RWY maintenance closure
Addition of 15 minutes RWY maintenance closure
RWY 02L/20R 1630-2200
RWY 02C/20C 2320-2325
RWY 02C/20C 2315-2330
RWY 02C/20C 1630-2200
RWY 02L/20R 2300-2305
RWY 02L/20R 2300-2315
7. MARKING AND LIGHTING
7.1 All unserviceable areas on taxiways or aprons will be demarcated by marker boards. The marker boards will be painted in alternate bands of red and white, and will be lighted at night and during limited visibility conditions by omni-directional fixed red lights.
7.2 All unserviceable areas 105m from Runway 02C/20C centreline will be demarcated
by marker boards placed parallel to Runway 02C/20C (refer to Appendix A). The
marker boards will be painted in alternate bands of red and white.
8. PRECAUTIONS
a. During the construction period, pilots are to take note of the following at the work
areas as shown in Appendices A and B:
a) Presence of construction equipment beyond 105m from Runway 02C/20C
centreline and on the northern and southern ends of Runway 02C/20C threshold.
b) All construction equipment will be kept clear of the obstacle free zone when
Runway 02C/20C is operational.
c) Emergency response and evacuation plan (for removal of machinery and
manpower) will be in place in case of any airport emergency.
Page 4 of 4
d) Runway 02C/20C will be closed between 1630UTC and 2200UTC on the dates
specified in paragraph 5.1. All aircraft operators operating during these periods
are to plan to carry sufficient contingency fuel as only one runway will be
available.
9. CHANGES
a. Any changes to the contents of this AIP Supplement will be notified through NOTAM.
Airside Service Diversion Construction Zones
Appendix A
E
X
T
G
5
.7
m
W
ID
E
D
R
A
IN
E
X
T
G
1
3
m
W
ID
E
D
R
A
IN
EAST PERIMETER ROAD
EAST PERIMETER ROAD
EAST PERIMETER ROAD
EA
ST
P
ER
IM
ET
ER
R
OA
D
EAST PERIMETER ROAD
EAST PERIMETER ROAD
CATERINGINFLIGHT
FIRE STATION 1
CATERINGCENTRE
DNATAINFLIGHT
MAINT.
E4E6
EP
E5
E9
E7
E10 E8E11
A7
EP
A3
NO
RT
H C
RO
SS
1SO
UT
H C
RO
SS
1
B1B3
C2
C3
NO
RT
H C
RO
SS
3
B2
SC1
W6W3W7
V3
WC
CAR PARK 2A
EA
BASE
CSS
TREATMENTWATER
SATS
CENTRE
SOUTHPUMP STN.
W E S T A P R O N
APRONNORTH EASTSOUTH EASTAPRON
APRONCENTRAL
NC1
W4
NC
1
W5
22 / 66 KVSUB STATION
C7
C6
WP
WA
WP
NC
2
WP
A1
A4
A7
V6 VY
U1
WA
VZ
C1
A6
C1
C3
V8 V7
VZ
02L
A6
EP
A6
EP
A7
02C
SC1
SC2
SO
UT
H C
RO
SS
2
EP
WP
W10
A4
N2
N1
N3
TAXI STAND
S 4488.74
E 1199.50
S 4496.04
E 1183.40
PROVISION FOR EXPANSION SO AS
NOT TO DISRUPT THE USE OF PAX
BOARDING AREA
EXISTING APRON DRIVEWAY
PAX BOARDING AREA
(2.9m CLEAR HEIGHT)
TURF WITH KERB
6 9
93
WA
SPRINKLERTANK
TOILET
L7
L5
L4
SC2
FH
FH
FHFH
BUDGET
A2 A1
TERMINAL
E1
E3
E2
N3
N1
BUS SHELTER
A
PAN
ISLA
ND
EXP
RES
SWA
Y
(TO
OTH
ER P
AR
TS O
F TH
E IS
LAN
D)
EAST COAST PARKWAY(TO CITY BOUND)
CALS
HOT R
OAD
TANAH MERAH
TRAINING AES
CLUBHOUSECOUNTRY CLUB
TOWERCONTROL
HOTELAIRPORT
18.00M
W
ID
E
U
-D
R
A
IN
TERMINAL 3
TE
RM
INA
L 1
CAR PARK 2B
EP
A3
NC
3N
C3
NC
3
V4NC2
EN
U4
L6
WA
U3
NC3
W9 W8
20C
TERMINAL 2
PG8
PLANT
DNATA
N7A
GS19
L8 777-Freighter777-Freighter
77
7-
Fr
ei
gh
te
r
777-Freighter
T
A
X
I
L
A
N
E
E
C
611
612
T
A
X
I
L
A
N
E
E
C
B
7
7
7
F
R
E
IG
H
T
E
R
B777 FREIGHTER
B
7
7
7
F
R
E
IG
H
T
E
R
B777 FREIGHTER
L9 L10
EASTSERVICEAPRON
EASTCARGOAPRON
RUNWAY 2 RUNWAY 2
A5
EPEP EP EP EP
EA
NC
3
Zone S1
Marker board
Service duct 110m
from RWY centerline
Zone S1
25 Oct 2015 to 30 Jun 2016
Zone S2
01 Sep 2015 to 30 Jun 2016
Zone S3
01 Sep 2015 to 30 Jun 2016
Zone S4
25 Oct 2015 to 30 Jun 2016
Zone S5
25 Oct 2015 to 30 Jun 2016
Service corridor
Marker board
Set16-500-13-26-0002Text Box26 March 2016 to 29 Oct 2016
Set16-500-13-26-0002Text Box26 March 2016 to 29 Oct 2016
Set16-500-13-26