Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Page 1 CRE Policy, Labelling 2006/06/22 - Toulouse ANTD-3300000-1-002-SFP Design, Manufacture, Transport and Integration on-site in Chile of ALMA Antennas CRE Policy & Labelling For ALMA Antenna Project Progress Meeting # 05 Dated June 21 th , 2006

Transcript of Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden CRE Policy, Labelling...

Page 1: Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden CRE Policy, Labelling 2006/06/22 - Toulouse ANTD-3300000-1-002-SFP Page 1 Design,

Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden

Page 1CRE Policy, Labelling2006/06/22 - Toulouse

ANTD-3300000-1-002-SFP

Design, Manufacture, Transport and Integration on-site in Chile of ALMA Antennas

CRE Policy & LabellingFor ALMA Antenna Project

Progress Meeting # 05

Dated June 21th, 2006

Page 2: Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden CRE Policy, Labelling 2006/06/22 - Toulouse ANTD-3300000-1-002-SFP Page 1 Design,

Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden

Page 2CRE Policy, Labelling2006/06/22 - Toulouse

ANTD-3300000-1-002-SFP

Change Request Policy

Page 3: Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden CRE Policy, Labelling 2006/06/22 - Toulouse ANTD-3300000-1-002-SFP Page 1 Design,

Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden

Page 3CRE Policy, Labelling2006/06/22 - Toulouse

ANTD-3300000-1-002-SFP

Issue of Change Request policy was first mentioned by ESO at PM2 as : The requirements for change control are defined in the SOW ESO want to have a light procedure and to avoid burden of unnecessary

work The Change request policy is to be described as part of the Configuration

Control Plan (DRD-03).

AEM submitted a proposal to ESO on 2006/04/13: TM05 Introduction of Class A and Class B changes Class A change is applied to major changes and requires formal ESO

approval before starting the implementation. Class B change is applied to minor change: no CRE is issued to ESO, AEM

implements the change. The change is then reported to ESO within released documents (as part of document change record).

ESO answered to AEM proposal on 2006/06/01: TM 26 ESO confirms that configuration control is to be applied from PPDR closure. ESO requests information on Class B change prior to implementation. ESO wants to formally agree on change classification. New proposal for class A & B definition (nearly all changes will be class A)

CRE Policy : recall on history

Page 4: Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden CRE Policy, Labelling 2006/06/22 - Toulouse ANTD-3300000-1-002-SFP Page 1 Design,

Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden

Page 4CRE Policy, Labelling2006/06/22 - Toulouse

ANTD-3300000-1-002-SFP

Simplify : remove the Class A & B and propose a unique CRE as per SOW :

The issue of classification will introduce additional discussions with ESO and will introduce unnecessary delays.

Apply the Configuration Control as defined by the SOW section 6.6 No need for further discussions and delays in order to define new

procedures.

Configuration Control to be applied to documents as defined by the SOW:

SOW Section 6.5: “All applicable technical documents, which define the end product, shall be put under configuration control at PPDR”.

SOW appendix 1 defines the project milestone at which a document becomes applicable.

CRE Policy : New proposal from AEM

(1/2)

Page 5: Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden CRE Policy, Labelling 2006/06/22 - Toulouse ANTD-3300000-1-002-SFP Page 1 Design,

Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden

Page 5CRE Policy, Labelling2006/06/22 - Toulouse

ANTD-3300000-1-002-SFP

CRE Policy : New proposal from AEM

(2/2)

Applicable documents from the contract

time

PPDR datapackage

AIPC & ACRV

documents

Kick-off MEETING

Any change requires approval by ESO : use of CRE

ESO approved documents : Anychangerequires approvalby ESO : use of CRE

CRE from AEM

CRE from ESO

Any change requires theuse of CRE

PPDR closure Acceptance of Antenna Unit #1

Acceptance of Antenna Unit #25

…...

Documents due at

T0 + 4wAny change requires approval by ESO : use of CRE

ESO approval

ESO Reviewed documents : Configuration Management

Anychangerequires approvalby ESO : use of CRE

Anychangerequires approvalby ESO : use of CRE

Applicable documents from the contract

time

PPDR datapackage

AIPC & ACRV

documents

Kick-off MEETINGKick-off MEETING

Any change requires approval by ESO : use of CRE

ESO approved documents : Anychangerequires approvalby ESO : use of CRE

CRE from AEM

CRE from ESO

Any change requires theuse of CRE

PPDR closurePPDR closure Acceptance of Antenna Unit #1Acceptance of

Antenna Unit #1Acceptance of

Antenna Unit #25Acceptance of

Antenna Unit #25

…...

Documents due at

T0 + 4wAny change requires approval by ESO : use of CRE

ESO approval

ESO approval

ESO Reviewed documents : Configuration Management

Anychangerequires approvalby ESO : use of CRE

Anychangerequires approvalby ESO : use of CRE

Documents for approval by ESO

Documents for review by ESO

Page 6: Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden CRE Policy, Labelling 2006/06/22 - Toulouse ANTD-3300000-1-002-SFP Page 1 Design,

Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden

Page 6CRE Policy, Labelling2006/06/22 - Toulouse

ANTD-3300000-1-002-SFP

Labelling

Page 7: Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden CRE Policy, Labelling 2006/06/22 - Toulouse ANTD-3300000-1-002-SFP Page 1 Design,

Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden

Page 7CRE Policy, Labelling2006/06/22 - Toulouse

ANTD-3300000-1-002-SFP

ESO Technical specification (sections 9.5 & 9.6) : As a general rule the main parts and all exchangeable units shall be equipped

with nameplates which are visible after installation of the part/unit and which contain the following information:

Part/unit name Drawing number including revision Serial number Manufacturing month and year Name of manufacturer.

Alternatively a system of marking based on barcodes or similar system may be used upon approval by ALMA

All cables and switches, junction boxes, sensors, and similar equipment shall be labeled.

Electrical cabinets, switch panels, UPS, and all electrical equipment which can be manually operated or is relevant for safety shall be labeled in English and Spanish.

SOW (section 6.5): Produce a Configuration Item marking plan which uniquely identifies each

configuration item according to the requirements of Section 9 of AD 01 (ESO Technical specification).

Requirements on labelling

Page 8: Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden CRE Policy, Labelling 2006/06/22 - Toulouse ANTD-3300000-1-002-SFP Page 1 Design,

Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden

Page 8CRE Policy, Labelling2006/06/22 - Toulouse

ANTD-3300000-1-002-SFP

Labelling shall be applied officially at : Complete antenna level Configuration Item (CI) level (main parts) LRU level (Lowest Replaceable Unit) (exchangeable units) Consumable parts are not labelled, the reference to the lot number will

appear in the log of activities. ESO provides the labelling for all the parts delivered to AEM for integration

with the antenna. Some specific marking could be available on parts at lower level than

LRU : To be decided on case by case, according to the pertinence and feasibility. The marking may not follow AEM rules : e.g. manufacturer marking.

The PDM shall trace (as-Built Status): Any update at LRU level Updates at lower level than LRU : log and batch or lot number. Information on Part/unit name, Drawing number including revision, Serial

number, Manufacturing month and year and Name of manufacturer will be provided by WAND and are not present on the labelling plate

Configuration Item marking plan to be included in the configuration control plan (DRD-03).

Proposal on Labelling

Page 9: Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden CRE Policy, Labelling 2006/06/22 - Toulouse ANTD-3300000-1-002-SFP Page 1 Design,

Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden

Page 9CRE Policy, Labelling2006/06/22 - Toulouse

ANTD-3300000-1-002-SFP

Proposed labelling plate (at CI and LRU level)

The marking of parts could be implemented in different type and format :

Rigid aluminium plate Flexible aluminium plate Sticker Gravure Printed paper inside a plastic bag (for cable

Configuration Item reference (from PDM)

Hierarchical part numbering for this part (from PDM)

Serial number for this part number

CONFIG. ITEM NUMBER :

PART & SERIAL NUMBER :

ANTD-3320020

3.182

ALMA EUROPEAN CONSORTIUM

Part number within this configuration item

Labelling plate (1/2)

Page 10: Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden CRE Policy, Labelling 2006/06/22 - Toulouse ANTD-3300000-1-002-SFP Page 1 Design,

Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden

Page 10CRE Policy, Labelling2006/06/22 - Toulouse

ANTD-3300000-1-002-SFP

AEM proposes a numbering scheme for parts : The first number identifies the generic part within the generic parts list for

this configuration item. The second number (after the “.”) is the instance number for this generic

part. It identifies the serial production number for the part if the part is specifically produced for ALMA or the subcontractor serial production number if the part is a commercial product (e.g. electric motor).

This labelling do not mention antenna number : Parts are not attached to a specific antenna From the information on the label, Wand shall identify the antenna number

where this part is installed. Also Wand shall provide the complete list of parts together with their

complete references for a given antenna number. A specific label (big plate, e.g., on the antenna base) will identify the

antenna number. Wand shall be updated when a part is moved from one antenna to another

antenna. The model digit (F, P) is not present on the label but is available in Wand

database.

Proposal on Labelling

Page 11: Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden CRE Policy, Labelling 2006/06/22 - Toulouse ANTD-3300000-1-002-SFP Page 1 Design,

Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden

Page 11CRE Policy, Labelling2006/06/22 - Toulouse

ANTD-3300000-1-002-SFP

CONFIG. ITEM NUMBER :

PART & SERIAL NUMBER :

ANTD-3315010

2 / 46127R09-2007

ALMA EUROPEAN CONSORTIUM

In case of off-the-shelf equipment (e.g. electrical engine), in addition to the subcontractor plate, AEM will add its own labelling :

Manufacturing serial number (provided by Manufacturer)

Hierarchical part numbering for this part (*)

Labelling plate (2/2)

Each consortium member shall : Enter in the PDM tool the generic parts list for its configuration items

(to be taken from drawings). Provide all the label plates for its parts and perform their labelling. Update the PDM tool with the parts labelling information. Keep updated these information inside the PDM tool.

Page 12: Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden CRE Policy, Labelling 2006/06/22 - Toulouse ANTD-3300000-1-002-SFP Page 1 Design,

Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden

Page 12CRE Policy, Labelling2006/06/22 - Toulouse

ANTD-3300000-1-002-SFP

The labelling for cables shall contain : The labelling of the part : cable (a specific product is identified as “Cabling”) The reference of both end connectors and equipment : some end equipment

could be outside ANTD project, compliance to be checked. The cable labelling shall be repeated every 5 meters. Source and destination defined by Configuration Item reference and part &

serial number (e.g. ANTD-3335030_03.15). Multiple board and port devices : the board number is identified with /02 and

the port number with /05 (e.g. ANTD-3335030_03.15/02/05).

Cable labelling proposal

ANTD-3335030_03.15/02/05ANTD-3335030_02. 5/01

ANTD-3350030_02.21

Source & Destination labelCable label

Source & Destination

labelCable label

Cable label

Cable label

Source & Destination

labelCable label

5 meters 5 meters 5 meters