Report to the collaboration Yifang Wang IHEP Progress of the construction –SSM: Valve box...

15
Report to the collaboration Yifang Wang IHEP

Transcript of Report to the collaboration Yifang Wang IHEP Progress of the construction –SSM: Valve box...

Page 1: Report to the collaboration Yifang Wang IHEP Progress of the construction –SSM: Valve box successful, magnet cool down in mid June –Mechanical structure.

Report to the collaboration

Yifang Wang

IHEP

Page 2: Report to the collaboration Yifang Wang IHEP Progress of the construction –SSM: Valve box successful, magnet cool down in mid June –Mechanical structure.

Progress of the construction

– SSM: Valve box successful, magnet cool down in mid June

– Mechanical structure of EMC: under manufacture

– Schedule: Keep on– Funding: Keep on

Page 3: Report to the collaboration Yifang Wang IHEP Progress of the construction –SSM: Valve box successful, magnet cool down in mid June –Mechanical structure.

EB meetings

• Website

• Computing

• Progress of construction

• Management plan

Page 4: Report to the collaboration Yifang Wang IHEP Progress of the construction –SSM: Valve box successful, magnet cool down in mid June –Mechanical structure.

A Proposal for the BESIII Management

Yifang Wang

Page 5: Report to the collaboration Yifang Wang IHEP Progress of the construction –SSM: Valve box successful, magnet cool down in mid June –Mechanical structure.

Management structureSpokespersonsEB

Technical coordinator

Run coordinator

Software and Computing coordinator

Physics coordinators

Speakers bureau

Publicationcommittee

Technical board

Computing board

PCC

SCC

Page 6: Report to the collaboration Yifang Wang IHEP Progress of the construction –SSM: Valve box successful, magnet cool down in mid June –Mechanical structure.

Technical coordinator• Appointment procedure

– Nominated by spokesperson(s) in consultation with EB and ratified by IB

– Term: three years renewable

• Responsibilities– Coordinate activities for detector construction and

upgrades, organize discussions on technical matters, resource allocation, etc.

– Organize safety efforts and enforce safety rules – Plan and organize detector installation– Organize efforts for the summer maintenance

Nomination: Yuan-Bo Chen(IHEP)

Page 7: Report to the collaboration Yifang Wang IHEP Progress of the construction –SSM: Valve box successful, magnet cool down in mid June –Mechanical structure.

Run coordinator

• Appointment procedure – Nominated by spokesperson(s) in consultation with

EB and ratified by IB– Term: three years renewable

• Responsibilities– Daily operation of the detector– Resource management for the daily operation– Responsible for external contacts for daily operation:

accelerator, utilities, …– Shift planning, training and organization

Nomination: Jun-Guang Lu(IHEP)

Page 8: Report to the collaboration Yifang Wang IHEP Progress of the construction –SSM: Valve box successful, magnet cool down in mid June –Mechanical structure.

Software and computing coordinator• Appointment procedure

– Nominated by the spokesperson(s) in consultation with EB and ratified by IB

– Term: three years renewable

• Responsibilities– Organize software groups and recommend their group leaders

to EB after consultation with the software coordination committee (SCC).

– Allocate resources (man power, computing…) for software development and data production

– Responsible for the software development, testing, release and maintenance

– Responsible for establishing the computing environment

– Responsible, assisted by physics coordinator(s), for the data production, quality control, calibration and data management

Nomination: Wei-Dong Li(IHEP)

Page 9: Report to the collaboration Yifang Wang IHEP Progress of the construction –SSM: Valve box successful, magnet cool down in mid June –Mechanical structure.

Software Coordination committee (SCC)

• Organization– Software and computing coordinator

– Computing board chair

– Physics coordinator and deputy coordinator

– Software group leaders

– Chaired by the software and computing coordinator

• Responsibilities– Discuss all important matters related to software and

advise the software and computing coordinator

Page 10: Report to the collaboration Yifang Wang IHEP Progress of the construction –SSM: Valve box successful, magnet cool down in mid June –Mechanical structure.

Physics coordinators• Appointment procedure

– Nominated by spokespersons in consultation with EB and ratified by IB – Term: 1 year as deputy coordinator and 1 year as coordinator

• Responsibilities– Organize physics analysis and physics tools groups, recommend their

conveners to EB after consultation with the physics coordination committee (PCC).

– Organize and chair analysis meetings, arrange parallel and plenary physics sessions at collaboration meetings.

– Organize discussions on physics priorities, running plans, Monte Carlo production priorities, etc.

– Allocate resources(computing, man power,…) for physics analysis– Organize efforts, in coordination with the software coordinator, for

data quality checks, performance tests, calibration verification, …– Organize efforts to provide common analysis tools, methods, standards,

and data (such as luminosities, bad runs, …) – Responsible for high quality and efficient publication of physics papers,

including tracking analysis progress, appointing paper referees, …

Nomination: Ya-Jun Mao(PKU) Haibo Li(IHEP)

Page 11: Report to the collaboration Yifang Wang IHEP Progress of the construction –SSM: Valve box successful, magnet cool down in mid June –Mechanical structure.

Physics coordination committee (PCC)

• Organization– Physics coordinator and deputy coordinator

– Software and computing coordinator

– Computing board chair

– Publication committee chair

– Speakers Bureau Chair

– physics group and analysis tool group conveners

– Chaired by the Physics coordinator

• Responsibilities – Discuss all important matters to physics analysis and

advise the physics coordinator

Page 12: Report to the collaboration Yifang Wang IHEP Progress of the construction –SSM: Valve box successful, magnet cool down in mid June –Mechanical structure.

Speakers bureau• Organization

– Nine members: three standing members, six appointed members – Standing members: Physics coordinator, software coordinator and

technical coordinator– Appointed members: Nominated by spokespersons in consultation with

EB and ratified by IB for a renewable term of 1 years– Chaired by speakers bureau chairman, appointed by the spokesperson

in consultation with EB and ratified by IB for a renewable term of 1 year

– Spokespersons may attend the meeting as ex officio members

• Responsibilities– propose policies for selecting speakers– Keep statistics of speakers– Contact potential conference organizers to get talks– Appoint speakers– Organize rehearsal of talks for conferences

Nomination: Chair: Xiao-Yan Shen(IHEP)Secretary: X.H. Mo(IHEP)Member: S. Komamiya(Tokyo) Z.P. Zhang(USTC) K.J. Zhu(IHEP) S. Jin(IHEP)

Page 13: Report to the collaboration Yifang Wang IHEP Progress of the construction –SSM: Valve box successful, magnet cool down in mid June –Mechanical structure.

Technical board• Organization

– Spokesperson(s), technical coordinator, run coordinator, physics coordinator, software coordinator, chief engineers, sub-detector group leaders, safety and quality control officers,…

– Chaired by the spokesperson, if absent, by the technical coordinator

• Responsibilities– Discuss and resolve all technical matters of the detector

construction, installation and operation– Establish major maintenance plan– Propose detector upgrades– Discuss and allocate resources (man power, funding, …)

Page 14: Report to the collaboration Yifang Wang IHEP Progress of the construction –SSM: Valve box successful, magnet cool down in mid June –Mechanical structure.

Publication committee• Organization

– Seven members: two standing members, five appointed members– Standing members: physics and deputy physics coordinator– Appointed members: Nominated by spokespersons in consultation

with EB and ratified by IB for a renewable term of 1 years– Chaired by the publication committee chairman, appointed by the

spokesperson in consultation with EB and ratified by IB for a renewable term of 1 year

– Spokespersons may attend the meeting as ex officio members

• Responsibilities– propose publication policies, including review and submission

processes, final paper editing, documentation requirements, responsibilities and obligations of paper writers and referees, …

– propose similar policies for conference talks– Enforce common analysis tools, methods, standards, and data (such

as luminosities, bad runs, …) – Resolve or propose to resolve paper disputes

Nomination: Chair: W.G. Li(IHEP)Member: U. Wiedner(Bochum) C.Z. Yuan(IHEP) X.Y Zhang(SDU) G. Rong(IHEP)

Page 15: Report to the collaboration Yifang Wang IHEP Progress of the construction –SSM: Valve box successful, magnet cool down in mid June –Mechanical structure.

Computing board• Organization

– Seven members: two standing members, five appointed members– Standing members: Software and computing coordinator, Physics

coordinator– Appointed members: Nominated by spokespersons in consultation

with EB and ratified by IB for a renewable term of 3 years– Chaired by the board chairman, appointed by the spokesperson in

consultation with EB and ratified by IB for a renewable term of 3 year. If absent, chaired by the Software and computing coordinator.

• Responsibilities– Estimate and determine the needs of computing resources (including

CPU, networking and storage) for the data production and analysis– coordinate resources (funding, computing power from inside and

outside of IHEP, …)– Organize efforts to build the computing facility– Discuss and resolve all technical matters for the computing system– Establish policies for the use of computing facilities– Propose upgrade plans

Nomination: Chair: G. Chen(IHEP)Member: K. Peters(GSI) Y.N. Gao(Tsinghua) Y.Z. Sun(IHEP) J.L. Ping(NNU)