REPORT TO THE BOARD OF PORT COMMISSIONERS

17
IV. 1 REPORT TO THE BOARD OF PORT COMMISSIONERS APRIL 2015 SUBJECT: REPORTS REQUIRED UNDER THE PROVISIONS OF THE MASTER POLICY REPORT NO ACTION ATTACHED Leases Executed X Lease Bond, Rent Security Deviations Annual Report X Month to Month/Holdover Leases Annual Report X Cancelled Property Leases X Vacant Property Available X Work Contracts Executed by the Executive Director X Change Orders Authorized X Work by Port Crews or Day Labor (over $50,000) X Claims Settled (under $7,500) X Professional & Personal Consulting Services Awarded X Travel Approved within US and Canada under (under $1,000) X Uncollectible Accounts Written Off X Experts Engaged for Litigation X Surplus Property $10,000 or less X Surplus Property over $10,000 X Tariff Adjustments X Quarterly Treasurer Investment Reports (April, July, October, January) X

Transcript of REPORT TO THE BOARD OF PORT COMMISSIONERS

IV. 1

REPORT TO THE BOARD OF PORT COMMISSIONERS APRIL 2015

SUBJECT: REPORTS REQUIRED UNDER THE PROVISIONS OF THE MASTER POLICY

REPORT

NO ACTION

ATTACHED

Leases Executed

X

Lease Bond, Rent Security Deviations

Annual Report

X

Month to Month/Holdover Leases Annual Report

X

Cancelled Property Leases X

Vacant Property Available X Work Contracts

Executed by the Executive Director

X

Change Orders Authorized

X

Work by Port Crews or Day Labor (over $50,000)

X

Claims Settled (under $7,500)

X

Professional & Personal Consulting Services Awarded

X

Travel Approved within US and Canada under (under $1,000)

X

Uncollectible Accounts Written Off

X

Experts Engaged for Litigation

X

Surplus Property $10,000 or less X

Surplus Property over $10,000 X Tariff Adjustments

X

Quarterly Treasurer Investment Reports

(April, July, October, January)

X

IV. 2

IV. 3

IV. 4

IV. 5

IV. 6

VACANT PROPERTY AVAILABLE

APRIL 2015

Property Description Address SQFT ACRES

South Airport

Hangar 17W at Airport Terminal 1402 William R Fairchild Airport Rd

3,030

Hangar 17E at Airport Terminal 1402 William R Fairchild Airport Rd

3,000

Airport Coffee Shop 1402 William R Fairchild Airport Rd

2,000

South Airport Land ACRES

26 Acres Land SE Airport Terminal (zoned High Industrial) 26

Airport Pads (Land) ACRES

Hangar Pad E 0.69

Hangar Pad F 0.69

North Airport / Industrial Park / CMC Address SQFT

Office Building 2417 W. 19th St. 2,000

Office Building / Storage (stg: 3000sf) 2032 S O Street 1,500

Shell Building at CMC 2220 W 18th St 25,000

N Airport Industrial Park (Land) SQFT ACRES

27 Acres near CMC (zoned Light Industrial) 27

150 Acres at Cross Wind Runway (zoned Light Industrial) 150

Waterfront (Land) Address SQFT ACRES

10.5 Acres at Former PenPly Facility NNA Marine Dr 10.5

Marine Drive Address SQFT

Office Building 439 Marine Dr 5,000

Industrial Building 916 Marine Dr. 5,000

Industrial Building 914 Marine Dr. 3,000

Boat Haven Drive Address SQFT

Office Building 937 Boat Haven Dr. 900

IV. 7

WORK CONTRACTS EXECUTED BY THE EXECUTIVE DIRECTOR (In Accordance with Master Policy)

APRIL 2015

NAME OF CONTRACTOR

DESCRIPTION OF WORK

ESTIMATED

COST OF PROJECT

OTHER

CONTRACT

TERMS

Olympic Electric Company,

Inc.

Port of Port Angeles John Wayne

Marina Sub-meter System

$43,305.80

CHANGE ORDERS AUTHORIZED BY THE EXECUTIVE DIRECTOR

(In Accordance with Master Policy APRIL 2015

PROJECT

REASON FOR CHANGE

COST OF

CHANGE

ORDER

TOTAL OF ALL CHANGE

ORDERS

% OF TOTAL

PROJECT

COST

FIA GA Access Road

Gate Revisions & Addition of Drainage

Swale

$63,137.56

$151,377.95

16.5%

PROFESSIONAL & PERSONAL SERVICES AWARDED BY THE EXECUTIVE DIRECTOR

(In Accordance with Master Policy) APRIL 2015

CONSULTANT

PROJECT

EST. COST

OTHER

CONTRACT PROVISIONS

Jerry Hendricks

Environmental Site Historical Research

Up to $6,000.00

Kennedy/Jenks

Waterfront Stormwater Improvement – Phase 2

$300,000.00

Not to Exceed

IV. 8

TRAVEL APPROVED BY THE EXECUTIVE DIRECTOR/COMMISSION

(In Accordance with Master Policy) APRIL 2015

STAFF PERSON

LOCATION OF MTG.

DATE(S)

PURPOSE

Ken O’Hollaren Chris Hartman Jesse Waknitz

Seattle 4/6 WPAHG

Jennifer States

Olympia 4/6 Clean Tech Day

Jerry Ludke

Seattle 4/6-8

FAA NW Mountain Region Airports Conference

Jesse Waknitz

Seattle 4/8

Terminal 1 Permit at Corps of Engineers

Diane Barth

Seattle 4/17 WPPA Finance Meeting

Jennifer States

Freidrickson 4/21-22 Earth Day Event and Meetings

Jesse Waknitz

Lacey 4/23 DOE Grant Training

Mike Nimmo

Kalama 4/23-24

NW Marine Terminal Association Meeting

Com Calhoun Com McAleer

Ken O’Hollaren Mike Nimmo

Victoria, BC 4/29-5/1 Olympic Logging Conference

Diane Barth

Portland, OR 4/29-5/1 GFOA Training

IV. 9

REPORT TO THE BOARD OF PORT COMMISSIONERS LOG HANDLING AND MARINE TERMINAL OPERATIONS

APRIL 2015

Log Handling MTD 2015

YTD 2015

YTD 2014

Log Operation:

Dumped Loads 111 212 461

Decked Loads 34 534 2,863

T3 Cargo Staging Area (start date 9/19/12)

0 0 1,134

Green Creek Roll Out – Camp Run 30 187 69

T-7 Container Operations*

# Containers Loaded 46 263 346

T-7/T-5 Log Operation-Discharge (Inbound/DeWater)

# of Barges 0 0 0

# Barge Loads-Offload 0 0 0

# DeWater Loads 0 223 0

TOTAL LOADS 221 1,419 4,873

* Ops commenced 8/19/08

Terminals #1 & #3 MTD 2015

YTD 2015

YTD 2014

Terminal Activity

Repair Vessels – Tanker 0 3 10

Repair Vessels – Other+ 0 6 8

Cargo Vessels * Log Ship 1 3 7

Other 32 60 47

TOTAL # VESSELS 33 72 72

TOTAL # DOCK DAYS 50 147 213

* Includes passenger vessels 1 Alcan 1 M&R l/s 4 M&R l/s, 2 Alcan 0 Cruise 1 Munro 1 Munro 1 Alcan 0 Cruise 0 Interfor/Susheen

Terminal #7 MTD 2015

YTD 2015

YTD 2014

Terminal Activity

TOTAL # VESSELS @ Berth 0 0 16

TOTAL # DOCK DAYS 0 0 36

Terminal #4 MTD 2015

YTD 2015

YTD 2014

Terminal Activity

TOTAL # VESSELS @ Berth 0 3 0

TOTAL # DOCK DAYS 0 3 0

NOTE: Unaudited information

IV. 10

Port of Port Angeles

LY Loads - CumulativeJanuary 2010 – April 2015

0

2,000

4,000

6,000

8,000

10,000

12,000

14,000

1/10 1/11 1/12 1/13 1/14 1/15

Year Jan Feb Mar April May June July Aug Sept Oct Nov Dec

2010 548 1,276 2,234 2,694 3,357 4,421 5,030 5,928 6,519 7,688 8,541 9,435

2011 569 1,578 2,599 3,672 4,446 4,872 5,689 6,882 8,285 8,961 10,194 10,627

2012 174 1,168 2,131 2,960 3,352 3,858 4,486 5,045 5,548 5,775 6,548 6,966

2013 463 833 1,335 2,089 2,662 3,376 4,579 5,768 6,674 7,608 9,024 9,796

2014 984 1,835 3,332 4,873 6,796 8,196 9,527 10,557 11,594 12,304 12,804 13,851

2015 600 1,021 1,198 1,419

2015 Budget =

10,300 Loads

IV. 11

Port of Port Angeles

MT Tanker Days - CumulativeJanuary 2010 – April 2015

0

20

40

60

80

100

120

140

160

180

200

1/10 1/11 1/12 1/13 1/14 1/15

Year Jan Feb Mar April May June July Aug Sept Oct Nov Dec

2010 0 19 27 45 61 61 102 126 150 173 184 191

2011 22 34 45 57 64 85 85 92 92 101 118 131

2012 15 25 39 49 61 65 81 89 103 104 115 118

2013 11 27 38 44 47 55 64 70 70 79 84 103

2014 21 34 34 40 44 72 72 95 95 106 127 127

2015 5 19 19 19

2015 Budget =

120 Tanker Days

IV. 12

REPORT TO THE BOARD OF PORT COMMISSIONERS

OPERATIONS REPORT FOR APRIL 2015

Port Angeles Boat Haven

Slip Length

Side Tie

Length No. of Slips Occupied Vacant

Occupancy Rate

Wait List

20' 69 28 41 41% 0

25’ 24 20 4 83%

0

30' 80 79 1 99% 0

36' 29 29 0 100% 0

40' 32 32 0 100% 0

46' 17 17 0 100% 0

50' 91 88 3 97% 0

Side Tie, including End Tie 54 33 21 61% 0

Boathouses 46 46 0 100% 0

TOTAL 442 372 70 0

Boat Yard Report Boats into the yard 35

Boats into the water 37

Total Travel Lift Operations 72

2015 Year-To-Date Launch Ramp Permit Sales 461

John Wayne Marina

Slip Length

Side Tie

Length No. of Slips Occupied Vacant

Occupancy Rate

Wait List

28' 72 72 0 100% 0

30’ 46 35 11 76%

0

32' 28 18 10 64% 0

36' 22 22 0 100% 0

40' 19 16 3 84% 0

42' 21 15 6 71% 0

45' 10 9 1 90% 0

50' 27 19 8 70% 1

End Tie 49’ 25 25 0 100% 0

Limited 20’ 30 19 11 63% 0

TOTAL 2215 ft 300 250 50 0

IV. 13

Port of Port Angeles

PABH OccupancyRevenue-Based

Maximum monthly

revenue: $102,321

0%

20%

40%

60%

80%

100%

2012 2013 2014 2015

IV. 14

Port of Port Angeles

PABH OccupancySlip-Based

0%

20%

40%

60%

80%

100%

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

2014 2015

0%

20%

40%

60%

80%

100%

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

2014 2015

0%

20%

40%

60%

80%

100%

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

2014 2015

0%

20%

40%

60%

80%

100%

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

2014 2015

20-29’ Slip Length 30-39’ Slip Length

40-49’ Slip Length

50-59’ Slip Length

IV. 15

Port of Port Angeles

JWM OccupancyRevenue-Based

Maximum monthly

revenue: $76,578

0%

20%

40%

60%

80%

100%

2012 2013 2014 2015

IV. 16

Port of Port Angeles

JWM OccupancySlip-Based

0%

20%

40%

60%

80%

100%

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

2014 2015

0%

20%

40%

60%

80%

100%

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

2014 2015

0%

20%

40%

60%

80%

100%

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

2014 2015

0%

20%

40%

60%

80%

100%

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

2014 2015

20-29’ Slip Length 30-39’ Slip Length

40-49’ Slip Length

50-59’ Slip Length

IV. 17

MEM O R A N D U M DATE: 5/1/15 TO: Ken O’Hollaren FROM: Holly Hairell RE: Reimbursable Days Summary for Commissioners April 2015 John Calhoun YTD 4/1/15 Forks Chamber of Commerce meeting 4/6/15 Port Angeles Chamber of Commerce meeting 4/8/15 Forks Chamber of Commerce meeting 4/9/15 Special Port Commission meeting 4/10/15 Strategic Plan workshop 4/13/15 Executive Director Evaluation 4/14/15 Port Commission meeting 4/15/15 DNR Timber Sales meeting 4/22/15 Forks Chamber of Commerce meeting 4/28/15 Port Commission meeting 4/29/15 Olympic Logging Conference 4/30/15 Olympic Logging Conference 40 Jim Hallett April not available at this time 24 Colleen McAleer 4/3/15 County Commission Presentation at Sequim library 4/7/15 PABA meeting and Green Crow meeting 4/8/15 Platypus discussion and meeting 4/9/15 Economic Development Council meeting 4/10/15 Strategic Plan workshop 4/14/15 Port Commission meeting and Center of Excellence meeting 4/15/15 Meeting on Platypus – Constituents 4/17/15 Meeting with ACTI 4/21/15 Meeting with David Sellars 4/22/15 Meeting with Executive Director 4/23/15 Meeting with Westport 4/28/15 Port Commission meeting 51

Maximum number of compensated meeting days allowed each calendar year - Total 96.