Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and...

211
Report on Water Auditing of Irrigation Projects in Maharashtra State 2017-18 Water Resources Department Government of Maharashtra, India April- 2019

Transcript of Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and...

Page 1: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Report on Water Auditing of Irrigation Projects in

Maharashtra State 2017-18

Water Resources Department

Government of Maharashtra, India April- 2019

Page 2: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Report on Water Auditing of Irrigation Projects in

Maharashtra State 2017-18

* * *

Government of Maharashtra Water Resources Department

April-2019 This report is also available on www.wrd.maharashtra.gov.in

Page 3: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

FOREWORD

Maharashtra State has created 5.037 MHa. Irrigation potential by the

end of June 2017 through 87 Major, 297 Medium and 3519 state sector minor Irrigation

projects. However, utilization of created irrigation potential has become a challenging

issue for the system managers. The ever increasing demand for non-irrigation uses is

affecting the quantum of water available for irrigation. In light of the above, the state has

decided to undertake Water Auditing since 2003-04.

Maharashtra is one of the forward states in the country to incorporate the

subject of Water-Audit in the State Water policy as a part of sectoral reforms in Water

Management. The State Water Policy has stressed importance of Water-Audit and state

has decided to undertake Water-Auditing since 2003-04.The Government of India also

given due importance to this subject by issuing guidelines for water audit in 2005.

In Maharashtra state utilization of created irrigation potential has become a

challenging issue for the system managers. The ever-increasing demand for non-

irrigation uses is affecting the quantum of water available for irrigation day by day due to

urbanization & increasing population.

There iswide variation in availability of water in the reservoir due to variation

of rainfall. During year 2017-18 yield received in most of the projects is comparatively

lesser than previous year. Water-Auditing assumes great importance in such situation for....'efficient and judicious utilization of the available water in the state to enhance the

efficiencies of every project.

Water-Auditing is being conducted in the state since last fifteenth years.

Various Government Regulation, Circulars and Guidelines have been issued by the

Government for the procedure to be adopted for IrrigationWater Management from time

to time. Training is also being given to the field staff regularly for developing awareness

Page 4: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

for proper method of collection of data. The number of projects audited this year has

increased by 28 over last year, making a total of 2532.

This IS the fifteenth consecutive water audit report of year 2017-18 which

includes 2532 projects (64 Major, 255 Medium and 2213 Minor). We analyzed and

evaluate available data of all the projects plan group wise i .e (Highly deficit, Deficit,

Normal, Surplus, Abundant). This water audit report is prepared considering various

indicators, for Major and Medium project's such as water availability in reservoirs on 15th

October; percentage of actual evaporation to gross storage / projected evaporation; target

and Achievement of I P Utilization; water Use pattern; Irrigation system performance

(canals); percentage of planned & actual non irrigation Use; percentage of unutilized

water to live storage; conveyance efficiency of main canals & Actual Cropping pattern.

Also, water Availability in MI tanks, percentage of actual evaporation to gross storage in

minor irrigation; water Use pattern in MI tanks & Irrigation system performance are the

indicators used for minor Irrigation projects

I appreciate the sheer efforts taken by Shri. D. D. Tawar, Chief Auditor,

Water and Irrigation (Maharashtra State), Aurangabad and his team for preparation of

this report.

Comments and Suggestion on this report will be appreciated.

E3-£( Rajendra Pawar )

Secretary (CAD ),WRD

Page 5: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

iii

Chief Auditor, Water and Irrigation Maharashtra State, Aurangabad.

Team associated with Water Audit Report Year 2017-18

Shri D.D Tawar Chief Auditor

Shri V.Y.Muley Executive Engineer

Smt S.A. Mungekar Executive Engineer

Shri.S.N.Bolbhat Executive Engineer

Smt.V.M.Bhawsar Executive Engineer

Shri.V.P.Pandhre Executive Engineer

Shri. N.N. Bhamre Executive Engineer

Smt. R.S..Pujari Assistant Engineer Grade I

Smt. S.M..Razvi Assistant Engineer Grade I

Shri S.P.Arankalle Sub Divisional Engineer

Shri A.K.Dabir Sub Divisional Engineer

Shri S.A.Wadgawe Sub Divisional Engineer

Shri R.V. Pattiwar Sub Divisional Engineer

Shri A.D.Mahajan Sub Divisional Engineer

Shri M.C.Rathi Sub Divisional Engineer

Shri B.S. Walke Sub Divisional Engineer

Shri G.J.Gawai Sub Divisional Officer

Shri J.V.Chemate Sub Divisional Officer

Smt V.M.Kulkarni Sub Divisional Officer

Shri P.R.Bahalaskar Sectional Engineer

Shri K.K.Barbind Sectional Engineer

Shri P.R.Manthekar Sectional Engineer

Shri C.N. Nehate Sectional Engineer

Shri A.J.Pawar. Sectional Engineer

Shri V.C.Kulkarni Sectional Engineer

Shri R.S. Puri Assistant Engineer Grade II

Smt. R.D .Virulkar Assistant Engineer Grade II

Shri . A.S.Mahalinge Junior Engineer

Shri B.R. Kadam Junior Engineer

Ms. R.A.Wadekar Junior Engineer

Ms. P.D. Mene Junior Engineer

Ms. D.A. Jarange Junior Engineer

Smt. N.N. Walde Junior Engineer

Ms. S.S.Ekal Junior Engineer

Smt. M.S.Tupe Typist / Sr.clerk

Page 6: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

iv

ABBREVIATIONS

CCA Culturable Command Area CRT Converted Regular Temporary Cum Cubic Metre CWC Central Water Commission GOI Government of India GOM Government of Maharashtra Ha Hectare HW Hot Weather IMD India Meteorological Department IWM Irrigation Water Management ISP Irrigation System Performance

(Area irrigated per unit of water utilized at source in ha/ Mcum) K.T. Weirs Kolhapur Type Weirs LBC Left Bank Canal LS Live Storage Mha Million hectares MERI Nashik Maharashtra Engineering Research Institute, Nashik MWIC Maharashtra Water & Irrigation Commission CAWIMS Chief Auditer Water & Irrigation Maharashtra State,

(formerly Maharashtra Water Resourse Development Centere) MWSIP Maharashtra Water Sector Improvement Program NI Use Non Irrigation Use NMC Nandur Madhmeshwar Canal MWRRA Maharashtra Water Resources Regulatory Authority PIM Participatory Irrigation Management PR Project Report PIP Preliminary Irrigation Program RBC Right Bank Canal SWF Standing Wave Flume WALMI Water and Land Management Institute, Aurangabad WUA Water Users’ Association AIC Akola Akola Irrigation Circle, Akola AIC Aurangabad Aurangabad Irrigation Circle Aurangabad BIPC Buldhana Buldhana Irrigation Project Circle Buldhana BIPC Parli (V) Beed Irrigation Project Circle, Parli (V) CADA Command Area Development Authority CIPC Chandrapur Chandrapur Irrigation Project Circle, Chandrapur GKLIC Bhandara Gosi Khurd Lift Irrigation Circle, Bhandara JIPC Jalgaon Jalgaon Irrigation Project Circle, Jalgaon JPC, Aurangabad Jaykawadi Irrigation Circle, Aurangabad KIC Ratnagiri Konkan Irrigation Circle, Ratnagiri KIC Kolhapur Kolhapur Irrigation Circle, Kolhapur NIC Nagpur Nagpur Irrigation Circle, Nagpur NIC Nanded Nanded Irrigation Circle, Nanded NIPC Dhule Nashik Irrigation Project Circle, Dhule NKIPC Thane North Konkan Irrigation Project Circle, Thane PIC Pune Pune Irrigation Circle, Pune SIC Sangli Sangli Irrigation Circle, Sangli SKIPC Oras South Konkan Irrigation Project Circle, Oras TIC Thane Thane Irrigation Circle, Thane UWPC Amrawati Upper Wardha Project Circle, Amrawati YIC Yavatmal Yavatmal Irrigation Circle, Yavatmal WIC Washim Washim Irrigation Circle, Washim

Page 7: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

v

C O N T E N T S

Sr. No. Description Page No.

1 Executive Summary 1 to 9

2 Chapter-1 : Introduction 10 to18

3 Chapter-2 : Annual Water Account 2017-18 19 to 21

4 Chapter-3 : Water Auditing of Irrigation Projects– A state Preview

22 to 24

5 Charts I to XVII and Table 4.1 to 4.6 25 to 52

6 Annexures

i Annexure I: Indicators of Major project 53 to 104

ii Annexure II: Indicators of Medium project 105 to 189

iii Annexure III: Indicators of Minor project 190 to 201

Page 8: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

1

Executive summary

Geographical area of Maharashtra is 3.08 lakh sq km, out of which cultivable

area is 2.25 lakh sq km.The area is divided into five major river basins, namely

Krishna, Godawari, Tapi, Narmada & West flowing rivers in Konkan. Maharashtra

Water & Irrigation Commission (1999) proposed delineation of the river basin into 25

sub basins.

Maharashtra state has created 5.037 Mha Irrigation potential created by

the end of June 2017 through 87 major, 297 medium & 3519 state sector minor

irrigation projects.

Maharashtra is one of the forward state in India to incorporate the

subject of water audit in State Water Policy as sectoral reforms in water

management. GOM set up a committee under the chairmanship of Chief Engineer

and Secretary (MWIC), in September 2002, & committee submitted its report to

GOM in January 2003. The proformae and procedure to be adopted for Water Audit

were issued by GOM in Nov.2003. Water-Auditing of selected projects in the State

was undertaken since 2003-04.

Details of Year wise projects audited are as exhibited below:

Year No. of Projects Audited 2003-04 1229 2004-05 1624 2005-06 1957 2006-07 1971 2007-08 2007 2008-09 2110 2009-10 2234 2010-11 2298 2011-12 2334 2012-13 2310 2013-14 2397 2014-15 2332 2015-16 2113 2016-17 2504 2017-18 2532

Page 9: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

2

On receipt of the water accounts, its scrutiny is carried out in the Office of Chief

Auditor, Water and Irrigation (MS), Aurangabad. While scrutinizing the water account

of a project, emphasis is given on following points:

i) Total available live storage is tallied with different water uses,

evaporation losses, leakages, replenishment received in June and

unutilised water at the end of irrigation year.

ii) Season-wise availability of water and extent of water use.

iii) Irrigation System Performance actually observed as compared to

norms fixed by Water Resources Department Government of

Maharashtra.

This is the 15 th consecutive report of year 2017-18 shows 2532 projects

including 64 major (having 91 reservoirs), 255 medium (having 257 reservoirs) and

2213 minor projects. We have analyzed and evaluated above major, medium and

minor projects Plan Groupwise (i.e. Highly Deficit, Deficit, Normal, Surplus, &

Abundant) with available data.

In some major/medium projects there is a combination of two or more

reservoirs know as complex projects. And in some lift irrigation projects they have no

storage or reservoir. The water audit report is limited to these projects only.

Water audit report for year 2017-18 is being published. The numerical data

contained in the report is based on the data received from field Superintending

Engineer, Executive Engineer. The lacuna if identified, or detail verification/

information / values if required are available with field SE/ Project authority.

The storage in the reservoir of these projects on 15th October is categories

percentagewise as follows:

Sr. No.

15th October Storage

(Percent)

No of Projects

Major Medium Minor Total

1 80 to 100 & above 42 127 997 1166

2 50 to 80 5 46 272 323

3 Below 50 17 82 944 1043

Total : 64 255 2213 2532

Page 10: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

3

The plan group-wise distribution of projects is as follows:

Plan group Water

availability (Cum/ha)

No. of Projects in plan group

Major Medium Minor Total

Highly Deficit Below 1500 4 38 345 387

Deficit 1501-3000 14 103 741 858

Normal 3001-8000 29 59 614 702

Surplus 8001-12000 3 28 182 213

Abundant Above 12000 14 27 331 372

Total 64 255 2213 2532

Some projects are complex projects such as Khadakwasla, Bhatghar-

Veer, Kukadi, Upper Godavari, Purna, Pench, Bagh, Lower Wunna etc, having more

than one reservoir. Hence these project complexes are considered as single project

to have correct water accounts.

The report of Water-Auditing, which includes indicator wise performance, prepared

on the basis of data collected and analyzed in Office of, “The Chief Auditor, Water

and Irrigation, Maharashtra State, Aurangabad.”

Total Nine indicators, as mentioned below, are used for Water Auditing

of major project.

I. Water Availability in Reservoirs on 15th October

II. Percentage of Actual Evaporation to Actual Gross Storage

II (A) Percentage of Actual Evaporation to Projected Evaporation.

III. Target and Achievement of Irrigation Potential Utilisation

IV. Water Use Pattern

V. Irrigation System Performance (For Canals)

VI. Percentage of Planned & Actual Non-Irrigation Use

VII. Percentage of Unutilized Water to Live Storage.

VIII. Conveyance efficiency of main Canals

IX. Actual cropping pattern

Page 11: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

4

For Water Auditing of medium project, all above indicators except indicator

number VIII & II (A) are used.

Looking at the number and availability of data, the analysis for minor projects

is limited to the following four indicators only.

I. Water Availability in Tanks on 15th October.

II. Percentage of Actual Evaporation to Actual Gross Storage

III. Water Use Pattern

IV. Irrigation System Performance

Indicator II shows percentage of actual evaporation to live Storage. Here

comparison of evaporation of full year of all seasons is done with the live storage on

15th October. In a particular projects when live storage is very low or Nil, then this

Indicator shows exorbitant percentage of evaporation, due to which there was

untruth picture of evaporation, sometimes more than 100%. There were many audit-

para’s regarding this exorbitant percentage of evaporation loss for a particular

project. Practically evaporation in any water spread occurs throughout the year

including evaporation in dead storage, when water depletes to the level of dead

storage. So it is necessary and practical to compare total evaporation of the year

with the gross storage of the project. From year 2012-13 onwards change is done in

Indicator II that the percentage loss in evaporation can be seen.

After consolidating and analyzing the water accounts of 64 Major, 255

Medium and 2213 minor projects in the light of information supplied by the

concerned project authorities, the main observations are as listed below:

1. There is large variation in actual evaporation compared to projected

evaporation. In major projects like Sina kolegaon, Wan,Tulshi, Kanher and

Urmodi the percent variation is 155%, 179%,160%, 148%, 169% respectively.

Field authorities adviced to review the actual evaporation occurred as

compared to projected evaporation and do needful action.

2. Total irrigation potential utilized on Major and Medium project is 21.28 lakh

Ha against PIP of 18.22 lakh Ha.

Page 12: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

5

Lapses in discharge measurement on account of non-functioning of

SWF, non-installation of water meter on Lift Irrigatiion Schemes/NI schemes,

alongwith unmeasured accumulated silt, all these may be responsible for

apparent excess water use.

Annual actual area irrigated on canal, reservoir, and river lifts (of major

and medium projects) as compared to PIP is 117% However; the

achievement on some projects (Jayakwadi stage I and II, Waghur, Wan,

Upper Painganga, Gangapur, NM weir, Bor, Lower wardha) and in medium

projects ( Talwar, Khandala, Kadi, Kada, Benitura, Harni, Sakat, Chandani,

Mehkari, Kurnoor, Shivni, Waghe Babhulgaon, Sangmeshwar( Dokewadi),

Terna, Nirguna, Chandrabhaga ( Amarawati), Sapan, Purna (Achalpur),

Dongargaon (Chandrapur), Abhora, Suki, Nagzari, Loni, Lowerpus,

Dongargaon (Wardha), Rengepar, Chulband, Bodalkasa, Khairbanda,

Mordham, Panchadhara Complex, Khekara Nalla ) was below 50% of the set

target in PIP. Field authorities should make realistic PIP considering the

ground realities.

For 19 Major projects (Lower Manar, Katepurna, Khadakpurna, Hatnur,

Pus, Neera Devdhar, Pawana, NMC Express Mukane, Bhawali, Darna,

Mukane, Lower Wunna Complex, Upper Wardha, Bembla, Vaitarna, Bhatsa,

Tillari Complex, Tarali, Urmodi ) and 95 Medium projects (Buddhihal, Ashti,

Dodda Nalla, Sankh, Khairy, Basappawadi, Siddhewadi, Hiwara, Agnavati,

Upper Kundalika, Masoli, Bodhegaon, Kundalika, Wan (Beed), Kudala,

Devarjan, Gharni, Raigavan, Renapur, Tawarja, Kundrala, Mahalingi,

Pethwadaj, Amravati, Bahula, Prakasha Barrage, Sarang Kheda Barrage,

Sulwade Barrage, Shivan, Burai, Jamkhedi, Rangawali, Tondapur,

Dnyanganga, Mun, Torna, Uma, Shahnoor, Wakod, Jivrekha, Jui, Kalyan

Girija, Karpara, Khelna, Pir Kalyan, Purna Nevpur, Sukhana, Upper Dudhana,

Aner, Bhoka( Mangrul), Karwand, Mor, Kordi, Jam, Koradi, Sonal, Adan, Goki,

Waghadi, Akkalpada (Lower Panzra), Malangaon, Panzara, Sonwad, Wadi

Shewadi, Shetphal, Kalmodi, Dheku, Alandi, Bhojapur, Gautami, Kashyapi,

Waldevi, Manikpunj, Lal Nalla, Betekar Bothli, Sorna, Kanholibara, Wena,

Chandai, Chargaon, Labhansarad, Asolamendha, Ghorazari, Naleshwar, Gad

Nadi, Deoghar, Uttarmand, Dhamni (Kolhapur), Ghatprabha, Hiranyakeshi,

Page 13: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

6

Jambre, Maishal LIS, Takari LIS, Gadadgad, Galhati) PIP was not prepared

and submitted in water audit data.

In Some major project such as Pentakli, Khadakwasla Complex,

Punand And Surya PIP % achievement Was 255%, 266%, 257% and 1402%

respectively and for medium projects with PIP % such as Andhali (363%),

Kharola (253%), Bindusara (283%), Tagarkheda (263%), Limbala (314%) ,

Nagzari Latur (450%), Ghatshil Pargaon (440%), Pandharbodi (349%),

Makardhoka-Saiki (998%), Kasari (367%), Natuwadi (649%), Hetwane

(435%) Project Authority should prepare PIP on realistic basic considering

past experience. For every Major and Medium project PIP should be prepared

and get sanctioned from competent authority.

3. Irrigation System Performance observed on major projects in Rabi season

(Girna+Panzan, Jayakwadi stage I and II, Chaskaman, Khadakwasla

Complex, Gangapur, Kadwa, NM Weir, Upper Prawara Complex, Bor, Upper

Wardha, Kanher, Lower Wunna Complex, Lower Wardha, Surya, Bhatsa and

Tillari Complex) was below 60% of the State norms. Irrigation System

Performance observed on Medium projects in Rabi season (Kada, Mehakari,

Talwar, Yeralwadi, Manyad, Kundalika, Wan (Beed), Gharni, Mahasangvi,

Burai, Jamkhedi, Paldhag, Torna, Utawali, Chyandrabhaga (Amravati),

Sapan, Karpara, Abhora, Aner, Karwand, Suki, Kordi, Jam, Lower Pus,

Panzara, Sonwad, Lal Nalla, Kar, Chandrabhaga (Nagpur), Kesar Nalla,

Khekara Nalla, Mordham, Panchadhara Complex, Pandharbodi, Wena,

Chandai, Hetwane, Rajanalla Complex, Wandri, Gad Nadi, Deoghar,

Natuwadi) was below 60% of the state norms. In some projects like

Labhansarad, Krishna Canal and Khodashi backwater absurd values of ISP

are observed. For above mention projects field authority to review the ISP and

do needful action to achive State Norms.

4. Conveyance efficiency of canals of Jayakwadi stage I, Wan, Arunawati,

Neera Complex, Chaskaman, Kadwa, Upper Godavari complex, N.M.Weir,

Tillari Complex, Hatnur, Urmodi, Kukadi complex, Khadakwasla Complex,

Upper Prawara Complex and Pench Complex was less than 50%. In some

projects like Waghur, Nalganga, Gangapur, Upper Wardha, Upper painganga

Sina madha LIS, Vishnupuri, Jayakwadi stage II, Lower terna, NMC Express

Page 14: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

7

Mukane,Mula are having unrealistic value.For above mention projects field

authority to review the conveyance efficiency of projects and do needful action

to achive State Norms.

5. Percentage of leakages on MI projects was 8 % and evaporation losses were

21%. Thus 29 % of water is lost in evaporation and leakages on MI projects.

Water Use:

At state level, during the irrigation year 2017-18, actual live storage of 28559

Mcum was available on 15th October 2017, against total design live storage of 35664

Mcum. In all the major, medium & minor projects considered together

(12624+2325+1538) 16488 Mcum of water was used on canals, reservoir & river lifts

for irrigation purpose. Total non irrigation water use is (3718+617+173) 4509 Mcum,

which is 16% of the actual live storage. The total irrigation use is 58% of the actual

live storage (both excluding the evaporation).

Water use on reservoirs through lift on all type of projects is (1299+971+988)

3258 Mcum which is 20 % of the total irrigation water use.

The total evaporation loss on major projects 2547 Mcum (12%), medium 798

Mcum (20%) and minor 646 Mcum (21%) are observed. Total overall loss of water

on account of evaporation at State level is 3991 Mcum (14%) of live storage.

Evaporation in Major projects (Lower Terna, Bembla, Itiadoh.) is remarkably high.

The range is from 31% to 42% respectively.

In medium project the evaporation percent varies from 50 to 100% for following

projects (Ashti, Bahula, Amarawati, Mas, Anjana Palashi, Kalyan Girija, Lahuki,

Upper Dudhana, Sonwad, Wadi Shewadi, Kalpathari, Katangi, Khairbanda,

Chandai, Chargaon, Labhansarad, Dhamna and Jui) and percent variation above

100% observed in Bhokarbari and Bagheda. The project authorities need to verify

the same.

A gross Preliminary Irrigation Programme of Major and Medium projects

(1555095+267007) = 1822102 hectares was framed during the irrigation year.

Against the target, actual area irrigated is 2128282 Ha (117%). In Sina Kolegaon,

Chankapur, Nalganga, Neera Complex, Upper Prawara Complex, Tulshi,

Dudhaganga, Warna and Kanher achievement varies is from 140% to 200% of

Page 15: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

8

PIP.In Pen Takli, Arunawati, Khadakwasla Complex, Punand, Surya, Dhom

Complex project achievement is above 200%.

In medium projects Kelzar, Ghanasargaon, Renapur Medium Project,

Binagihal, Sai, Takalgaon Devla, Belpara, Saikheda, Nazare, Chikotra, Mandhol,

Chitri and Krishna Canal and Khodshi Backwater achievement is varies from 140%

to 200%. In Andhali, Nagyasakya, Haranbari, Kharola, Bindusara, Limbala,

Tagarkheda, Hosur Barrage, Tiru, Utawali, Ghatshil Pargaon, Kasari,Patgaon,

Nazari (Latur), Pandharbodi, Natuwadi and Makardhokada-Sayki achievement is

above 200%.

In above mentioned projects it shows that the PIP is not prepared based on past

irrigation experience.

Annual average ISP observed at the State level of Major Project is 135

Ha/Mcum and of Medium Project is 181 Ha/Mcum.

Unutilised Water

Unutilized storages at the end of irrigation year (excluding inflow in HW &

design carry over), in major and medium projects are 1747 and 680 Mcum

respectively. The total unutilized storage compared to live storage on 15th October

2017 is 10% for major and medium project.

In addition to above, large quantity of water remained unutilized at the end of

the irrigation year in some major and medium projects as shown below.

Large quantities of unutilised water Quantity in Mcum

Sr. No. Type of project

No of projects

Live Storage

Unutilized water

Percentage with actual live storage

1 Major 23 11783 1707 14

2 Medium 33 1933 529 27

Note: Unutilized water above 10 Mcum & 5 Mcum is considered for major and medium project

respectively.

Page 16: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

9

Though the overall percentage of unutilized water in major projects is

14%, Urmodi, Wan, Waghur, Dudhaganga, Itiadoh, Pawana, Tillari Complex, Tulshi,

Warna, Krishna LIS complex,Lower Terna, Lower Manar, Punand, Bor , Bembla and

Itiadoh projects had large quantities ranging from 11% to 50%.

While implementing Rabi and Hot Weather rotation field authority should watch on

full utilization of storage available for irrigation purpose so that unutilized Storage at

the end of season will be used for irrigation and nonirrigation.

Conclusions

To have realistic evaporation data, field authorities should install Pan

Evaporimeter for evaporation data collection and calculating this losses using

relavent coefficient for this purpose.

It is necessary to provide accurate measuring devices at all canal network for

correct data about irrigation water use.Proper action should be taken to calibrate the

measuring devices regularly with competent authority.

Siltation survey of major projects is taken every five years. So that net water

availability (making suitable deduction for silt) can be worked out while preparing the

PIP and water account will also be more realistic. When CIR shall be maintained

properly.

More emphasis shall be given to install Digitalwater meters for NI water

supply as well as Lift Irrigation Schemes so that lapses in flow measurements of

these schemes will not affect the data about canal water use

Irrigated area is measured by remote sensing/Drone technique. Project

authorities are advised to prepare action plan for improvement in water use

efficiency by reducing the transit losses and other measures.

Project authorities are required to concentrate on full utilization of available

water, by planning the water use at the optimum level.

Page 17: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

10

Chapter-1

Introduction Background

Geographical area of Maharashtra is 3.08 lakh sq km and as per Maharashtra Water and Irrigation Commission report 1999, the cultivable area is 225 lakh Ha. The area is divided mainly into five major river basins of Godavari, Krishna, Tapi, Narmada and westward flowing rivers comprising a basin group of 25 narrow sub-basins. There is also a very small area of Mahanadi basin in Gadchiroli district.

MWIC (1999) has proposed delineation of five river basins basically into 25 distinct sub basins for planning of water resources development in the State. The classification of sub basins proposed is solely on the basis of natural availability of water. The basic characteristics of sub basins are dictated by the hydrological regime, which in turn, is a function of climate, rainfall distribution and the type and characteristic of draining area.

The sub basins are as follows:

Sr. No.

River Basin Sub basin Short name

Classification for planning on the basis of availability of natural water per unit of CCA

I Godavari 1) Upper Godavari (Up to Paithan Dam) Upper Godavari Normal

2) Lower Godavari (D/S of Paithan Dam) Lower Godavari Deficit

3) Purna (including Dudhana) Purna Dudhana Deficit

4) Manjra Manjra Deficit

5) Godavari-Sudha-Swarna Remaining Godavari Normal

6) Painganga Painganga Normal 7) Wardha Wardha Normal 8) Middle Wainganga Middle Wainganga Surplus 9) Lower Wainganga Lower Wainganga Abundant II Tapi 10) Purna (Tapi) Purna Tapi Deficit 11) Girna Girna Deficit 12) Panzara Panzara Normal

13) Middle Tapi Middle Tapi (Satpuda) Normal

Middle Tapi (South) Deficit III Narmada 14) Narmada Narmada Surplus IV Krishna 15) Upper Krishna (West) Upper Krishna (W) Abundant 16) Upper Krishna (East) Upper Krishna (E) Highly Deficit

Page 18: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

11

Sr. No.

River Basin Sub basin Short name

Classification for planning on the basis of availability of natural water per unit of CCA

17) Upper Bhima (Up to Ujjani) Upper Bhima Normal

18) Remaining Bhima Remaining Bhima Normal

19) Sina-Bori-Benetura

Remaining Bhima Including Man Highly Deficit

Sina – Bori-Benetura Highly Deficit

V

West Flowing Rivers in Konkan

20) Damanganga-Par Damanganga-Par Abundant 21) North Konkan North Konkan Abundant 22) Middle Konkan Middle Konkan Abundant 23) Vashisthi Vashishthi Abundant 24) South Konkan South Konkan Abundant 25) Terekhol – Tillari Terekhol – Tillari Abundant

Classification of plan groups, on the basis of naturally availabile water, is given below:

Sr. No. Plan group Per Ha availability

(cum) Percent of

cultivable area of State

1 Highly Deficit Below 1500 13 2 Deficit 1501-3000 32 3 Normal 3001-8000 34 4 Surplus 8001-12000 06 5 Abundant Above 12000 15

Plangroup-wise percentage of cultivable area of State

13

32

34

6

15

Highly Deficit Deficit Normal Surplus Abundant

A graph showing basin-wise availability of water is shown below.

Page 19: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

12

Subbasin-wise water availability

8335

2957

2820

4644

3218

3595

8293

3112

9063

6332

2374

1197

2122

1811

2131

6768

5809

0

2000

4000

6000

8000

10000

12000

14000

16000

Subbasin

cum

/ha

Availability per ha.of CCA Avail 1500 Avail 3000 Avail 8000 Avail 12000

From above graph it is seen that, there are nine sub basins from highly deficit & deficit plan group, which has water availability less than 3000 cum per unit CCA which is a minimum basic water requirement for agriculture. However, these sub basins along with other sub basins are likely to get suffered more in near future considering continuous increase in non irrigation water use due to growth in population & industrialization. Water Auditing as mentioned in state water policy is an efficient management tool to check & curb the excessive losses and improve Irrigation System Performance. The State has already started Water auditing of irrigation projects since 2003-04, as per State Water policy.

Page 20: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

13

Page 21: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

14

1.1 What is Water Auditing?

Water auditing is a systematic & scientific examination of water accounts of the projects. It is an intelligent & critical examination by independent organization. It is a critical review of system of accounting.

A water audit determines the amount of water used in different sectors, amount of water lost from distribution system due to leakages. Comprehensive Water Audit can give a detailed profile of distribution system & water users, thereby facilitating easier & effective management of resources and improved reliability.

It has proved to be an effective tool for understanding & assessment of performance level of the projects.

Water auditing involves checking of sector-wise water use against project planning, Preliminary Irrigation Program, assessment of Irrigation System Performance (ISP) and losses actually realized on the projects. Water audit thus helps in identifying the causes of low ISP & excessive losses in the system. Service Provider then can initiate the action for minimizing the losses and improving the ISP. 1.2 Water Auditing National Scenario: The Central Water Commission, Ministry of Water Resources, GOI & Central Ground Water Board took an initiative in this regard and issued guidelines for water auditing of projects in December 2005. These guidelines are only indicative and on broad spectrum. Every State is required to prepare its own guidelines considering peculiarities and necessities of individual State. 1.3 Water Auditing-State Scenario:

Large number of irrigation projects are constructed in Maharashtra to harness the water resources of the State.Maharashtra has incorporated the subject of water audit in State Water Policy as a sector reform in water management and has taken up the issue since 2003-04. With increasing population, urbanization, and industrialization, the water demand is increasing day by day for various sectors.

Water auditing of irrigation projects, which are constructed through public investment, is necessary to monitor the water use, evaporation & other losses. In case there is any variation, water auditing enables to locate the reasons for the same and facilitate suitable corrective measures.

In compliance to commitment in State Water Policy, Government issued a circular dated 26.06.2003, briefing therein methodology for keeping project wise water accounts and their auditing. Administrative arrangements are set up by creating water audit units under Chief Engineer, Maharashtra Water Resources Development Centre, at Aurangabad, to carrying out the water audit of State sector projects since 2003-04.

Page 22: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

15

As per Govt. resolution no CA/2016/(65/16)/cad(estt) dated 18/05/2016 MWRDC office is converted in to Chief Auditor Water & Irrigation Maharashtra State Aurangabad with Six Inspection Units for each Irrigation Development Corporations.

1.4 Administrative set up for Irrigation Management Executive Engineer is overall responsible for maintenance of irrigation system and

water management right up to field level. Apart from technical duties, the Executive Engineer has to exercise duties as per the Irrigation Act and rules there under. Irrigation Water Management is an important task assigned to the Executive Engineer, which mainly involves preparation & implementation of water rotation schedule so as to provide canal water to each individual irrigator or WUA at the pre-decided time. Map showing location of irrigation circles is exhibited on page 18 of this report but this map is not showing the circles which are carrying the irrigation duties but some are actually construction circle. 1.5 Water Audit Procedure 1.5.1 Checking Water Account

While scrutinizing the water account of a project, emphasis is given on following points. i) Total available live storage is tallied with different water uses, i.e. evaporation losses, leakages, replenishment received in June and unutilised water at the end of irrigation year. ii) Season-wise availability and use of water. iii) Irrigation System Performance observed as compared to norms fixed by GOM. iv) Actual evaporation losses as compared to designed evaporation losses. v) Percentage of leakages through dam and efforts taken to minimise the leakages. vi) Actual season wise water use & area irrigated as compared to project planning / Preliminary Irrigation Programme

1.5.2 Inspection of Irrigation offices

To have a cross check over the data submitted in water accounts & to verify whether records about water storages, water use, different losses along with crop wise area measurements, revenue assessment and its recovery are maintained up-to-date & in prescribed forms, annual inspections of Irrigation offices are carried out every year.

During office inspections, normally following records are checked to ascertain the validity of water account data submitted to Chief Auditer Water & Irrigation Maharashtra State.

i) Daily lake level & water storage register. ii) Daily evaporation record register (for major & medium projects) iii) Gauge register of main canal (daily, rotation-wise, season-wise) iv) Agency-wise non irrigation water use register.

Page 23: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

16

v) Register for leakages through dam. vi) Record of measurement of irrigated area vii) Crop-wise area assessed. viii) Revenue recovered.

Revenue recovery being an important aspect of irrigation management, a review of revenue assessed, recovered and arrears at the end of the year is specially taken during such inspections.

Preparation and sanction of Preliminary Irrigation Program (PIP) before stipulated date, conducting meetings of canal advisory committee, timely and wide publicity to Public Notice, timely submission of rotation-wise water demands (Proforma I and IA) and water use (Proforma III and IIIA) by field offices to controlling authorities, daily gauging of discharges through distributaries/minors plays an important role in Irrigation Water Management of a project. Whether such procedure is followed or not is also verified by scrutinizing the relevant records during inspections. The lapses, deficiencies noted during the inspection are then communicated to concerned Executive Engineer under intimation to concerned Superintending Engineer, for taking proper actions for improvement in future.

1.6 Water Audit Report 2017-18

1.6.1 During 2017-18 water accounts of 64 major projects (having 91 reservoirs), 255 medium projects (having 257 reservoirs) & 2213 State sector minor projects were received and audited. The water audit report is limited to these projects only. The lesser number of major projects (than reservoirs) is due to grouping of reservoirs in a complex project.

At present, there are 91 divisions looking after the irrigation management mainly of completed projects in the State. Some projects are under construction, where irrigation potential is partially created. In these projects irrigation is managed by construction organization only. Obviously, water accounts of such projects are not received; hence those projects are not covered in this report.

The status of inspections during 2017-18 is as below:

Water Audit Unit

Number of Divisions Total Inspected

KIDC 13 1 TIDC 8 0

MKVDC 20 11 GMIDC 22 9 VIDC 28 7 Total 91 28

Page 24: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

17

During year 2017-18, 28 divisions were inspected for water audit.and remarks were communicated to concerned division. And compliances of the same is expected before the next year inspection.

1.7 Guidelines for efficient and economical use of water

Detailed guidelines are issued from time to time by Government, for efficient and economical use of water available for irrigation. Some extracts from the Government Resolutions dated 14.03.1988, 02.11.1988, 7.3.2001, 05.12.2001; 21.11.2002 and 20.05.2004 are as follows.

I. Irrigating maximum possible lands with available storages. II. Adopting rotational water supply. III. Keeping flow period to the minimum possible by letting maximum

possible discharge in canals, to minimize the transit losses. IV. Encourage night irrigation. V. Encourage farmers’ participation in irrigation planning and management

through canal advisory committees, and village meetings. VI. Keeping rotation-wise and season-wise water accounts for monitoring

the efficiency of water use by concerned field staff & officers. VII. Setting up evaporimeters at every project, having CCA more than 1000

hectares, for proper assessment of evaporation. VIII. Providing measuring devices on canals, wherever necessary. IX. The responsibility of preparing and submitting water accounts is to be

seriously followed by field staff. X. The norms for Irrigation System Performance in Rabi & Hot Weather

season are decided as 150 Ha/Mcum and 110 Ha/Mcum respectively. XI. Percentage checking of cropped area by Executive Engineer, Sub-

Divisional Engineer & Section Officer for assuring 100 percent assessment of irrigated area.

XII. Norms for quota of water for lift irrigation on reservoirs and canals. XIII. Agreement for water supply for non irrigation water use and assessment

of water charges.

Page 25: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

18

Map Location of Irrigation Circle

Page 26: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

19

Chapter-2 Annual Water Accounts 2017-18

Water accounts of 64 major, 255 medium and 2213 minor projects were received

from concerned circles in standard template files provided by Chief Auditor, Water and Irrigation Maharashtra State office, Aurangabad. Following are the general observations after analysis of the data.

2.1 Water Availability in Reservoirs: Region wise availability of storages is as follows.

Water-Mcum. Sr. no. Region Storage in Mcum Percentage

1 Aurangabad 4955 65 2 Nashik 4204 86 3 Amravati 1602

1602 52 4 Nagpur 1897 52 5 Pune 12721 97 6 Konkan 3180 92

Total 28559 80 2.2 Percentage of Actual Evaporation to Gross Storage:

Region wise actual evaporation observed is as follows. Water- Mcum Sr. no. Region Evaporation Gross

storage Percentage with

live storage

1 Aurangabad 1217 7228 17 2 Nashik 563 4952 11 3 Amrawati 423 2067 20 4 Nagpur 429 2352 18 5 Pune 1126 15371 7 6 Konkan 233 3365 7

State Total 3991 35335 11

Page 27: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

20

2.3 Target and Achievement of Irrigation Potential Utilisation: Utilization of irrigation potential (major and medium projects) in different regions is as follows.

Sr. no. Region

Targeted utilization of

irrigation potential

In Ha

Actual utilization of

irrigation potential in

Ha

Available storage in

percentage in Mcum

Percentage with

utilisation target

1 Aurangabad 334620 192279 65 57 2 Nashik 240455 83775 89 35 3 Amrawati 33505 159567 56 476 4 Nagpur 234650 1225230 51 522 5 Pune 973759 1426762 98 147 6 Konkan 5113 33096 98 647

Total 1822102 2128282 83 117 In projects where the percentage is more than 100, care should be taken while framing the PIP. 2.4 Water Use Pattern:

Region wise Unutilized water (major and medium projects) is as follows.

Water - Mcum Region Design

Live Storage

Actual Live

Storage

Total irrigation

Use

NI Water Use

Evapo -ration

Water Use On

Reservior

Unutilised Storage

Percentage of

Unutilised water with

Live Storage

Aurangabad 5974.4 3871.85 2653.66 482.3 932.14 743.67 174.29 4.50 Nashik 4316.16 3825.38 1997.87 1066.09 505.11 187.23 236 6.17

Amrawati 2183.69 1215.99 488.43 236.06 324.19 105.44 102.92 8.46 Nagpur 3139.99 1601.99 1127.95 348.14 348.23 27.31 173.12 10.81 Pune 12361.90 12170.69 8283.76 1355.57 1064.67 1197.35 1466.11 12.05

Konkan 2798.84 2738.96 397.76 847.14 170.48 9.87 273.61 9.99 State 30774.98 25424.86 14949.43 4335.3 3344.82 2270.87 2426.05 9.54

Evaluation of measuring devices of main canal as well as distributaries is

necessary for realistic data about water use. Water meters shall be installed for all lift irrigation and NI schemes. Project authorities are required to concentrate on full utilization of available storage. The percentage of unutilized storage in Nagpur and Pune region is high.

Page 28: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

21

2.5 Irrigation System Performance:

Irrigation system performance (major and medium projects) observed in different regions is as follows

ISP – Ha/Mcum Sr. No.

Region Irrigation system

performance (ISP)

observed

State norm for

ISP

Ratio

1 Aurangabad 68

130

0.52 2 Nashik 110 0.85 3 Amrawati 118 0.91 4 Nagpur 187 1.44 5 Pune 172 1.32 6 Konkan 83 0.64

State 142 1.10

The ISP in Aurangabad region is very low compared to other regions and State norms. Project authorities are advised to prepare action plans for securing improvement in water use efficiencies.

2.6 Conveyance Efficiency of main Canals

The conveyance efficiency of main canals is the ratio of the sum of water supplied to distributaries and lifts to water released in main canal. The conveyance efficiency of main canals can be ascertained subject to correct measurements. For obtaining correct data, construction of measuring devices at different locations, calibration of existing devices, proper maintenance of the structures and canal systems is necessary. Similarly the water lifted for different uses should be decided properly.

Page 29: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

22

Chapter 3 Water Auditing of Irrigation Projects – A State Preview

3.1 Conventional method of Water Audit

In the State Water Policy as well as MWIC Report, it has been categorically mentioned to plan the use of available water resources & implement the Irrigation water management considering basin or sub-basin as a unit.

Conventionally, water accounting system in the State was in vogue since 1930. Preliminary irrigation programmes were prepared depending upon availability of water. These programmes were followed for the year and at the end of irrigation year, completion irrigation reports were prepared at project level.

Different accounting systems were in practice in different regions of the State. In order to bring uniformity in accounting system and to audit the accounts at state level, new proformae were devised and water auditing was initiated in the State since 2003-04. This is in conformity with clause 2.6 of State Water Policy 2003.

Publication of water audit report of the State was initiated in 2003-04. Initially the water accounts were analyzed circle wise, referring a project in particular wherever necessary. State’s 25 sub basins are classified in to five Plan groups in accordance with the availability of water per unit Ha of CCA. There are 31 circles which deal with the Irrigation Water Management. Number of circles, depending upon the location of a project under their jurisdiction, is related with more than one plan group. As a result, the performance of such circles obtained by analyzing the water account can not be visualized or summarized very easily. Moreover, it was experienced that Indicator wise analysis did not give the consolidated picture of performance of such individual circle or region as a whole.

Analysis of a circle or region as a whole is necessary for knowing the present status of that region /circle for taking the administrative review as well as framing the action strategy at regional as well as at circle level for bringing improvement in the performance of irrigation projects.

3.2 Water Auditing at Administrative levels

In addition to the present conventional method of water audit analysis, an attempt has been made to consolidate, analyse and evaluate the water account circle wise. The results thus obtained give the project category wise (major/ medium/minor), region as well as circlewise information about water availability, water use in different sectors, water losses along with area planned in PIP, area actually irrigated & average Irrigation System Performance achieved during the irrigation year.

Page 30: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

23

Project category wise details about water availability, water use, area irrigated, Irrigation System Performance attained etc at different administrative levels are given in Table 4.1 to 4.6 appended here with from page no 39 to 49.

3.3 State level preview 3.3.1 Data Analysis : The Indicatorwise analysis of Water Audit Report 2017-18 is

prepared on the data received from concerned field office and if any discrepancy observed

in this report due to incorrect data, responsibility lies with concerned field officer.

3.3.2 Water Use: From the information shown in above mentioned tables it appears that, at state level during the irrigation year 2017-18, actual live storage of 28559 Mcum was available against total design live storage of 35664 Mcum on 15th October 2017. On 64 major, 255 medium & 2213 minor projects considered together (12624+2325+1538) 16488 Mcum of water was used on canals; Reservoir & River lifts for irrigation purpose. Total Non Irrigation water use was (3718+617+173) 4509 Mcum, which is 16% of the actual live storage. The total irrigation use is 58% of the actual live storage.

Water use on reservoir of all types of projects was (1299+971+988) 3258 Mcum which is 20% of the total irrigation water use.

Total evaporation loss on Major projects is 2547 Mcum (12%), on Medium 798 Mcum (20%) & on Minor 646 Mcum (21%) of the actual live storage.

3.3.2 Area Planned and Irrigated Data collected from 64 major & 255 medium projects shows that, a gross

Preliminary Irrigation Programme of (1555095+267007)1822102 Ha. was framed during the irrigation year 2017-18. Against the target, actual area irrigated was 2128282 Ha (117%).

3.3.3 System Performance Annual average ISP observed at the State level of Major Project is 135 Ha/Mcum and of Medium Project is 181 Ha/Mcum. 3.3.4 Unutilised storages Unutilized storages at the end of irrigation year (excluding inflow in HW & design carry over), on major and medium projects were 1747 Mcum and 680 Mcum respectively. Project wise details are given in Table 4.1 to 4.4(A). The total unutilized storage as compared to 15th October 2015 live storage was 10 %.

Page 31: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

24

3.3.5 Water Auditing at Region/ Circle Administrative Level

Region, circle and project wise data attached in enclosed tables 4.1 to 4.6 and charts I to XVII attached herewith are self sufficient to explain the irrigation performance of any revenue region or irrigation Circle in particular. The Analysis also can be extended to respective Chief Engineer’s administrative zone by consolidating the data of concerned circles together.

Considering the geographical continuity of area and where more or less similar climatological condition under a Regional Chief Engineer’s zone persists, the data obtained here will be helpful to concerned project authorities.

Page 32: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

25

Page 33: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

26

Page 34: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

27

Page 35: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

28

Page 36: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

29

Page 37: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

30

Page 38: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

31

Page 39: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

32

Page 40: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

33

Page 41: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

34

Page 42: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

35

Page 43: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

36

Page 44: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

37

Page 45: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

38

Page 46: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

39

Page 47: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

40

Page 48: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

41

Page 49: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Table 4.1: Project Wise Details Of Water Availability, Water Use On Major Projects (2017-18) - Page 1 of 2Water: Mcum

Circle Project Design

Live

Storage

Total

Irrigation

Use

NI Water

Use

Evaporation

Losses

Water Use

On

Reservoir

Unutilised

Storage

ActualPIP

Irrigated Area (ha) Average

ISP

(Ha/Mcu

Actual Live

Storage

15 Oct

BIC Bhandara Bagh Complex 229.36 60.40 67.09 9.59 17.92 0.00 6.37 22800.00 22764.78 339

BIC Bhandara Itiadoh 317.87 114.88 112.57 11.99 64.94 0.00 57.44 17625.00 17674.00 157

CADA Nagpur Bor 127.42 81.26 45.53 0.00 7.61 0.00 14.90 14500.00 3904.00 86

CADA Nagpur Lower Wunna Complex 188.08 171.48 139.94 27.76 38.54 4.87 6.22 0.00 7802.00 56

CADA Nagpur Pench Complex 1299.93 610.14 274.54 224.72 63.08 0.00 10.79 100849.00 78343.00 285

CIPC Chandrapur Dina 67.54 15.81 67.91 0.00 4.78 0.00 0.00 11000.00 11022.00 162

NIC Nagpur Lower Wardha 216.87 139.91 113.96 30.00 31.37 0.00 12.65 18000.00 7819.61 69

AIC Akola Katepurna 86.35 16.46 0.00 22.02 3.93 0.00 0.00 0.00 36.30 0

AIC Akola Khadakpurna 93.40 18.29 36.06 8.64 23.79 36.06 0.00 0.00 6071.00 168

AIC Akola Nalganga 69.32 28.73 11.06 2.27 7.22 6.40 0.00 780.00 1485.75 134

AIC Akola Pen Takli 59.97 26.18 20.44 3.96 7.01 7.56 1.47 2656.00 6771.00 331

AIC Akola Wan 81.96 77.67 6.69 26.91 7.96 0.00 19.92 12016.00 656.00 98

UWIC Amravati Upper Wardha 564.05 564.05 275.66 68.07 93.22 27.83 0.00 0.00 22837.00 83

YIC Yavatmal Arunawati 169.67 40.60 19.26 12.44 10.09 7.10 0.00 741.43 1535.29 80

YIC Yavatmal Bembla 302.67 89.97 37.66 0.00 46.07 0.00 32.15 0.00 8010.00 213

YIC Yavatmal Pus 91.27 21.54 0.00 8.27 8.17 0.00 0.00 0.00 0.00 0

CADA Solapur Bhima (Ujjani) 1517.20 1688.41 1516.83 94.90 325.92 444.27 0.00 91000.00 82387.00 54

CADA Solapur Sina Madha Link Canal 0.00 0.00 121.92 1.60 16.73 0.00 0.00 30800.00 30546.00 251

CADA Solapur Sina Madha LIS 0.00 0.00 56.79 0.00 14.52 0.00 0.00 11896.00 9557.00 168

KIC Kolhapur Dudhaganga 679.11 679.11 293.45 24.67 31.13 1.10 129.61 37065.00 53958.00 184

KIC Kolhapur Radhanagari 219.97 219.97 311.12 53.62 16.71 0.00 20.98 49645.00 60059.10 193

KIC Kolhapur Tulshi 91.92 91.92 52.68 0.61 7.75 3.39 30.12 5000.00 8923.00 169

KIC Kolhapur Warana 779.35 779.35 242.18 18.49 37.54 0.00 179.16 43860.00 66671.00 275

KIC Pune Ghod 154.80 154.43 165.59 8.06 31.63 24.02 0.00 27839.00 26408.00 159

KIC Pune Kukadi Complex 864.40 811.36 765.04 3.98 146.92 49.85 0.00 89100.00 93871.00 123

PIC Pune Bhama Askhed 217.10 217.10 142.72 10.61 15.10 7.64 8.64 25640.00 25864.00 181

PIC Pune Chaskaman 214.50 214.50 307.62 7.62 18.00 9.82 0.00 16700.00 22198.00 72

PIC Pune Khadakwasla Complex 825.66 777.41 488.82 627.52 54.54 11.38 0.00 27850.00 74104.00 152

PIC Pune Neera Complex 932.01 932.01 1304.31 51.02 69.27 41.55 40.70 137054.00 264363.00 203

PIC Pune Neera Devdhar 332.15 332.15 2.91 0.00 10.27 0.60 0.00 0.00 86.00 30

PIC Pune Pawana 240.97 240.97 40.08 138.20 1.54 4.08 52.01 0.00 7040.00 176

SIC Sangli Krishna LIS Complex 2835.68 2814.73 475.41 133.54 0.00 0.00 648.02 192900.00 229706.00 483

SIC Satara Dhom Complex 443.19 435.84 355.55 0.68 30.67 3.50 0.00 28555.00 64790.00 182

SIC Satara Kanher 271.68 268.65 295.85 0.19 29.80 1.72 28.22 22308.00 37270.00 12642

Page 50: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Table 4.1: Project Wise Details Of Water Availability, Water Use On Major Projects (2017-18) - Page 2 of 2Water: Mcum

Circle Project Design

Live

Storage

Total

Irrigation

Use

NI Water

Use

Evaporation

Losses

Water Use

On

Reservoir

Unutilised

Storage

ActualPIP

Irrigated Area (ha) Average

ISP

(Ha/Mcu

Actual Live

Storage

15 Oct

SIC Satara Urmodi 273.37 272.58 144.86 5.41 24.73 0.61 96.43 0.00 3165.00 22

SIPC Satara Tarali 165.46 147.34 10.99 0.23 7.96 0.00 11.41 0.00 3158.00 287

SKIPC oros Tillari Complex 536.14 516.71 91.55 0.00 41.53 0.00 57.59 0.00 2120.00 23

TIC Thane Bhatsa 942.10 942.10 63.51 507.20 29.78 0.00 50.10 0.00 9887.50 156

TIC Thane Surya 276.35 276.35 163.01 70.26 22.76 0.00 0.00 715.00 10024.00 61

TIC Thane Vaitarna 331.31 331.31 9.87 206.29 32.44 9.87 0.00 0.00 2987.00 303

CADA Jalgaon Girna+Panzan 525.05 366.34 148.13 73.80 45.87 6.38 0.00 22125.00 12820.00 87

CADA Jalgaon Hatnur 255.00 255.00 50.49 102.64 68.44 22.59 0.00 0.00 6017.00 119

CADA Nashik Bhawli 40.60 40.60 1.08 0.00 3.33 0.00 0.00 0.00 170.58 158

CADA Nashik Chankapur 68.72 68.72 7.42 59.06 6.01 0.65 4.04 1567.00 2536.99 342

CADA Nashik Darna 202.44 202.44 28.10 35.37 23.14 8.63 0.00 0.00 6147.44 219

CADA Nashik Gangapur 159.42 157.13 41.99 168.41 16.42 10.01 0.00 11499.00 4095.62 98

CADA Nashik Kadwa 47.79 47.79 43.48 18.57 8.94 5.00 1.78 2600.00 3614.71 83

CADA Nashik Mukane 204.98 192.67 6.53 4.34 11.51 4.91 0.00 0.00 1183.32 181

CADA Nashik Mula 608.81 608.81 573.14 65.62 47.83 5.85 3.86 96040.00 72240.61 126

CADA Nashik NMWeir 7.27 6.62 168.82 97.24 0.00 0.00 0.00 45341.00 13388.76 79

CADA Nashik Upper Godavari Complex 329.16 326.36 195.22 151.51 33.25 29.29 28.06 25547.00 28213.74 145

CADA Nashik Upper Prawara Complex 532.85 532.43 397.96 46.98 34.54 2.16 0.00 20279.00 30947.00 78

DIPC Dhule Punand 36.99 36.99 5.11 15.57 3.69 0.56 11.10 359.00 924.00 181

JIPC Jalgaon Waghur 248.21 181.30 10.73 46.55 61.20 7.17 75.06 3300.00 1548.43 144

CADA Abad Jayakwadi Stage I 2170.94 2170.93 1555.00 133.28 341.77 297.39 78.34 185000.00 47651.00 31

CADA Abad NMC Express Mukane 0.00 0.00 104.43 28.49 0.00 0.00 0.00 0.00 18124.00 174

CADA Beed Jayakwadi Stage II (Majalgaon) 312.00 286.60 242.63 27.30 100.38 35.40 0.31 23920.00 11052.00 46

CADA Beed Lower Terna 113.95 74.68 28.18 2.01 38.13 10.33 21.95 4770.00 6028.12 214

CADA Beed Manjra 176.96 176.96 94.29 24.68 55.49 14.96 3.28 12490.00 8883.81 94

CADA Beed Sina Kolegaon 76.19 76.19 50.26 0.30 36.22 49.83 0.00 4000.00 7636.00 152

NIC Nanded Lower Manar 138.21 30.72 14.09 6.75 7.63 14.09 3.86 0.00 2344.00 166

NIC Nanded Purna Complex 890.73 151.14 80.43 46.96 60.90 8.66 0.00 18000.00 14958.00 186

NIC Nanded Upper Penganga 964.10 136.67 40.87 108.02 77.57 1.64 0.00 27500.00 9587.00 235

NIC Nanded Vishnupuri 80.79 80.79 84.97 33.65 11.36 60.70 0.00 11864.00 10914.00 128

Grand Total: 135 25301 21430 12624 3718 2547 1299 1747 1555095 1706900

43

Page 51: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Table 4.2: Circlewise Details of Water availability, Water Use and Losses on Major Project (2017-18) - Page 1 of 1Water: Mcum

Circle

Design

Live

Storage

Actual Live

Storage

15th Oct

Total

Irrigation

Use

NI Water

Use

Evaporation

Losses

Water Use On

Reservoir

Unutilized

Storage

Average

ISP

(Ha/Mcum)

Irrigated Area (ha)

PIP Actual

BIC Bhandara 547.23 175.28 179.66 21.57 82.86 0.00 63.80 40425.00 40438.78 225

CADA Nagpur 1615.43 862.87 460.00 252.48 109.22 4.87 31.92 115349.00 90049.00 196

CIPC Chandrapur 67.54 15.81 67.91 0.00 4.78 0.00 0.00 11000.00 11022.00 162

NIC Nagpur 216.87 139.91 113.96 30.00 31.37 0.00 12.65 18000.00 7819.61 69

AIC Akola 391.00 167.33 74.25 63.81 49.91 50.02 21.39 15452.00 15020.05 202

UWIC Amravati 564.05 564.05 275.65 68.07 93.22 27.83 0.00 0.00 22837.00 83

YIC Yavatmal 563.61 152.11 56.92 20.71 64.33 7.10 32.15 741.43 9545.29 168

CADA Solapur 1517.20 1688.41 1695.54 96.50 357.16 444.27 0.00 133696.00 122490.00 72

KIC Kolhapur 1770.35 1770.35 899.43 97.38 93.13 4.49 359.86 135570.00 189611.10 211

KIC Pune 1019.20 965.79 930.63 12.04 178.55 73.86 0.00 116939.00 120279.00 129

PIC Pune 2762.39 2714.14 2286.45 834.97 168.72 75.07 101.35 207244.00 393655.00 172

SIC Sangli 2835.68 2814.73 475.41 133.54 0.00 0.00 648.02 192900.00 229706.00 483

SIC Satara 988.24 977.07 796.26 6.28 85.20 5.83 124.65 50863.00 105225.00 132

SIPC Satara 165.46 147.34 10.99 0.23 7.96 0.00 11.41 0.00 3158.00 287

SKIPC oros 536.14 516.71 91.55 0.00 41.53 0.00 57.59 0.00 2120.00 23

TIC Thane 1549.76 1549.76 236.38 783.75 84.98 9.87 50.10 715.00 22898.50 97

CADA Jalgaon 780.05 621.34 198.62 176.44 114.31 28.97 0.00 22125.00 18837.00 95

CADA Nashik 2202.03 2183.57 1463.72 647.09 184.96 66.50 37.74 202873.00 162538.77 111

DIPC Dhule 36.99 36.99 5.11 15.57 3.69 0.56 11.10 359.00 924.00 181

JIPC Jalgaon 248.21 181.30 10.73 46.55 61.20 7.17 75.06 3300.00 1548.43 144

CADA Abad 2170.93 2170.93 1659.43 161.77 341.77 297.39 78.34 185000.00 65775.00 40

CADA Beed 679.10 614.43 415.35 54.29 230.22 110.52 25.54 45180.00 33599.93 81

NIC Nanded 2073.83 399.32 220.36 195.39 157.47 85.09 3.86 57364.00 37803.00 172

Grand Total: 25301 21430 12624 3718 2547 1299 1747 1555095 1706900 135

44

Page 52: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Water: McumTable 4.3: Region wise Abstract of Water availability, Water use and Losses on Major Project (2017-18) - Page 1 of 1

Region

Design

Live

Storage

Actual

Live

Storage

Total

Irrigation

Use

NI Water

Use

Evaporation

Losses

Water Use On

Reservior

Unutilized

Storage

Average ISP

(ha/MCum)Irrigated Area (ha)

PIP Actual

Nagpur 2447.07 1193.87 821.52 304.06 228.23 4.87 108.37 184774.00 149329.39 182

Amravati 1518.65 883.48 406.83 152.59 207.46 84.96 53.54 16193.43 47402.34 117

Pune 11058.52 11077.83 7094.69 1180.95 890.71 603.52 1245.29 837212.00 1164124.10 164

Konkan 2085.90 2066.47 327.93 783.75 126.51 9.87 107.70 715.00 25018.50 76

Nashik 3267.28 3023.20 1678.18 885.65 364.17 103.20 123.89 228657.00 183848.20 110

Aurangabad 4923.87 3184.68 2295.13 411.44 729.46 492.99 107.73 287544.00 137177.93 60

Grand Total: 25301 21430 12624 3718 2547 1299 1747 1555095 1706900 135

Note: Actual live storage is of Oct 15 & utilisation is for the period July 1 to June 30

45

Page 53: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Water: Mcum Table 4.4: Details Of Water Availability, Water Use And Losses On Medium Project (2017-18) - Page 1 of 2

Region CircleDesign

Live

Storage

Actual

Live

Storage

Total

Irrigation

Use

NI Water

Use

Evaporation Water Use

On

Reservoir

Unutilized

StoragePIP Actual

Irrigated AreaAverag

e ISP

(Ha/Mc

Nagpur BIC Bhandara 62.55 10.28 32.09 0.22 5.27 0.24 2.63 14866.23 12250.57 382

Nagpur CADA Nagpur 280.08 193.34 117.11 22.06 47.38 8.01 29.66 22210.00 17723.21 151

Nagpur CIPC Chandrapur 313.24 180.34 142.85 19.43 58.72 12.65 30.53 10800.00 29402.30 206

Nagpur NIC Nagpur 37.06 24.16 14.38 2.37 8.63 1.54 1.92 2000.00 1730.00 120

Amravati UWIC Amravati 161.26 127.14 35.46 29.10 29.34 0.00 23.80 8583.00 2906.00 82

Amravati WIC Washim 28.89 4.95 0.71 5.97 1.35 0.71 0.00 460.00 131.00 185

Amravati YIC Yavatmal 251.21 118.33 25.93 15.80 52.24 11.06 18.99 4975.00 4717.00 182

Amravati AIC Akola 223.68 82.09 19.49 32.59 33.81 8.70 6.60 3294.00 2483.30 127

Pune CADA Solapur 204.83 141.27 114.98 13.05 39.77 101.45 22.74 13585.00 17709.25 154

Pune CADA Pune 24.59 16.67 5.86 0.00 0.10 0.00 8.45 0.00 2571.00 439

Pune KIC Kolhapur 525.87 508.34 353.74 13.72 42.57 0.57 139.75 36020.00 71622.00 202

Pune KIC Pune 116.27 111.63 80.38 5.00 32.70 27.40 4.00 12084.00 11087.00 138

Pune PIC Pune 275.89 227.14 138.84 17.94 36.17 29.59 38.55 22996.12 26574.65 191

Pune SIC Sangli 110.69 68.12 464.00 120.12 13.84 416.84 3.72 48769.00 129297.00 279

Pune SIC Satara 45.24 19.70 31.28 4.78 8.82 17.98 3.61 3092.50 3777.00 121

Konkan SKIPC oros 98.02 92.68 13.81 0.00 5.87 0.00 10.69 0.00 1477.15 107

Konkan KIC Ratnagiri 27.23 27.23 15.23 0.69 0.99 0.00 9.82 210.00 1363.00 89

Konkan NKIPC Thane 227.88 204.96 4.39 62.70 11.72 0.00 86.66 100.00 591.00 135

Konkan TIC Thane 359.81 347.63 36.39 0.00 25.39 0.00 58.73 4088.00 4646.14 128

Nashik DIPC Dhule 40.45 32.37 13.77 7.74 3.18 2.25 7.22 0.00 1525.00 111

Nashik JIPC Jalgaon 22.76 17.34 0.00 14.55 5.77 0.00 0.00 0.00 0.00 0

Nashik CADA Nashik 280.46 266.14 98.53 52.61 22.69 27.74 15.51 7435.00 17807.32 181

Nashik CADA Jalgaon 705.22 486.33 207.38 105.53 109.30 54.04 89.38 4363.00 17040.65 82

Aurangabad CADA Abad 303.25 95.62 47.97 26.14 43.41 31.79 5.72 0.00 5604.46 117

Aurangabad CADA Beed 472.29 420.61 213.94 35.13 119.75 147.06 37.28 35118.20 24279.14 113

Aurangabad AIC Abad 47.85 1.47 0.00 0.20 1.34 0.00 0.00 0.00 92.00 0

Aurangabad BIPC Parli (V) 88.07 70.60 39.48 0.41 17.31 39.48 8.05 5146.00 6341.57 161

Aurangabad NIC Nanded 139.07 98.88 57.15 8.97 20.87 32.35 15.51 6812.00 6632.40 116

46

Page 54: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Water: Mcum Table 4.4: Details Of Water Availability, Water Use And Losses On Medium Project (2017-18) - Page 2 of 2

Region CircleDesign

Live

Storage

Actual

Live

Storage

Total

Irrigation

Use

NI Water

Use

Evaporation Water Use

On

Reservoir

Unutilized

StoragePIP Actual

Irrigated AreaAverag

e ISP

(Ha/Mc

Grand Total: 5474 3995 2325 617 798 971 680 267007 421381 181

47

Page 55: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Water: Mc Table 4.4 A: Details Of Water Availability, Water Use And Losses On Medium Project (2017-18) - Page 1 of 1

RegionDesign

Live

Storage

Actual

Live

Storage

Total

Irrigation

Use

NI Water

Use

Evaporation Water Use

On

Reservoir

Unutilized

StoragePIP Actual

Irrigated Area Average

ISP

(Ha/Mcu

Nagpur 692.92 408.12 306.43 44.08 120.00 22.44 64.75 49876.23 61106.08 199

Amravati 665.04 332.51 81.60 83.47 116.73 20.48 49.38 17312.00 10237.30 125

Pune 1303.38 1092.86 1189.07 174.62 173.96 593.83 220.82 136546.62 262637.90 221

Konkan 712.94 672.49 69.83 63.39 43.97 0.00 165.91 4398.00 8077.30 116

Nashik 1048.88 802.18 319.69 180.44 140.94 84.03 112.11 11798.00 36372.97 114

Aurangabad 1050.53 687.17 358.53 70.86 202.68 250.68 66.56 47076.20 42949.57 120

Grand Total: 5474 3995 2325 617 798 971 680 267007 421381 181

48

Page 56: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Water: Mcum

Table 4.5: Statement Showing Water Availability, Water Uses And Losses Observed On Minor Projects

(2017-18) - Page 1 of 1

Region Circle Design

Live

Storage

Total

Irrigation

Use

Evaporation Reservior

Use

Irrigation

Leakages NI Water

Use

Actual

Live

Storage

Nagpur BIC Bhandara 167.86 35.21 25.15 0.00 1.15 1.26 71.50

Nagpur CADA Nagpur 163.61 69.69 31.16 10.68 4.43 5.39 113.28

Nagpur CIPC Chandrapur 121.17 64.55 20.22 0.26 0.00 0.00 99.89

Nagpur NIC Nagpur 27.17 5.40 4.39 0.00 0.62 0.00 10.42

Amravati AIC Akola 260.02 43.93 23.12 34.26 1.90 5.17 93.20

Amravati BIPC Buldhana 1.84 0.00 0.54 0.00 0.00 0.00 0.65

Amravati UWIC Amravati 122.46 44.74 26.95 8.32 0.73 5.05 78.23

Amravati WIC Washim 207.08 25.71 13.92 25.71 0.00 3.03 54.31

Amravati YIC Yavatmal 277.60 37.23 34.06 6.56 19.58 0.99 159.32

Pune CADA Solapur 32.08 14.15 7.09 7.87 2.33 0.00 15.38

Pune KIC Kolhapur 181.78 106.42 13.50 44.69 2.74 1.45 159.24

Pune KIC Pune 90.61 57.76 16.66 56.74 9.18 4.92 80.78

Pune PIC Pune 178.53 151.49 22.20 129.65 9.85 21.59 163.28

Pune SIC Sangli 172.95 53.45 20.38 47.23 5.50 6.94 99.59

Pune SIC Satara 44.60 18.02 9.23 9.69 0.00 2.17 32.01

Konkan KIC Ratnagiri 370.90 28.33 18.53 2.44 99.10 10.03 246.62

Konkan NKIPC Thane 49.17 2.33 6.96 0.00 3.06 1.28 43.53

Konkan SKIPC oros 28.03 1.18 1.67 0.23 3.74 0.01 12.81

Konkan TIC Thane 216.32 55.04 35.21 7.64 1.40 42.14 138.14

Nashik CADA Jalgaon 312.28 70.19 33.37 18.45 20.08 12.77 153.39

Nashik CADA Nashik 237.16 126.17 21.44 93.42 14.87 19.54 201.03

Nashik DIPC Dhule 31.70 7.30 3.16 1.31 0.28 0.28 24.35

Aurangabad AIC Abad 227.70 53.29 62.69 51.62 0.00 3.85 127.69

Aurangabad BIPC Parli (V) 6.48 2.91 1.18 2.91 0.00 0.25 6.48

Aurangabad CADA Abad 182.62 22.43 18.36 14.36 3.12 19.17 70.22

Aurangabad CADA Beed 870.89 403.31 159.45 388.73 29.04 4.92 639.58

Aurangabad NIC Nanded 236.99 27.28 10.90 14.41 6.59 1.01 208.96

Aurangabad OIC Osmanabad 69.53 10.56 4.85 10.56 2.35 0.00 30.38

Grand Total: 4889 3134 1538 646 173 242 988

49

Page 57: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Water: Mcum

Table 4.5 A: Statement Showing Water Availability, Water Uses And Losses Observed On Minor Projects

(2017-18) - Page 1 of 1

Region Design

Live

Storage

Total

Irrigation

Use

Evaporation Reservior

Use

Irrigation

Leakages NI Water

Use

Actual

Live

Storage

Nagpur 479.81 174.86 80.92 10.95 6.20 6.65 295.09

Amravati 869.00 151.61 98.60 74.85 22.21 14.23 385.71

Pune 700.55 401.29 89.06 295.87 29.61 37.07 550.28

Konkan 664.42 86.87 62.37 10.30 107.30 53.46 441.10

Nashik 581.14 203.66 57.97 113.18 35.22 32.59 378.77

Aurangabad 1594.21 519.78 257.44 482.59 41.10 29.21 1083.31

Grand Total: 4889 3134 1538 646 173 242 988

50

Page 58: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Table 4.6: Unutilised Storage Observed On Major Projects (2017-18) - Page 1 of 2

Region Circle Project

Actual Live

Storage 15th

Oct. (Mcum)

Unutilised

Storage

(Mcum)

Nagpur BIC Bhandara Bagh Complex 60.40 6.37

Nagpur BIC Bhandara Itiadoh 114.88 57.44

Nagpur CADA Nagpur Bor 81.26 14.90

Nagpur CADA Nagpur Lower Wunna Complex 171.48 6.22

Nagpur CADA Nagpur Pench Complex 610.14 10.79

Nagpur CIPC Chandrapur Dina 15.81 0.00

Nagpur NIC Nagpur Lower Wardha 139.91 12.65

Amravati AIC Akola Katepurna 16.46 0.00

Amravati AIC Akola Khadakpurna 18.29 0.00

Amravati AIC Akola Nalganga 28.73 0.00

Amravati AIC Akola Pen Takli 26.18 1.47

Amravati AIC Akola Wan 77.67 19.92

Amravati UWIC Amravati Upper Wardha 564.05 0.00

Amravati YIC Yavatmal Arunawati 40.60 0.00

Amravati YIC Yavatmal Bembla 89.97 32.15

Amravati YIC Yavatmal Pus 21.54 0.00

Pune CADA Solapur Bhima (Ujjani) 1688.41 0.00

Pune CADA Solapur Sina Madha Link Canal 0.00 0.00

Pune CADA Solapur Sina Madha LIS 0.00 0.00

Pune KIC Kolhapur Dudhaganga 679.11 129.61

Pune KIC Kolhapur Radhanagari 219.97 20.98

Pune KIC Kolhapur Tulshi 91.92 30.12

Pune KIC Kolhapur Warana 779.35 179.16

Pune KIC Pune Ghod 154.43 0.00

Pune KIC Pune Kukadi Complex 811.36 0.00

Pune PIC Pune Bhama Askhed 217.10 8.64

Pune PIC Pune Chaskaman 214.50 0.00

Pune PIC Pune Khadakwasla Complex 777.41 0.00

Pune PIC Pune Neera Complex 932.01 40.70

Pune PIC Pune Neera Devdhar 332.15 0.00

Pune PIC Pune Pawana 240.97 52.01

Pune SIC Sangli Krishna LIS Complex 2814.73 648.02

Pune SIC Satara Dhom Complex 435.84 0.00

Pune SIC Satara Kanher 268.65 28.22

Pune SIC Satara Urmodi 272.58 96.43

Pune SIPC Satara Tarali 147.34 11.41

Konkan SKIPC oros Tillari Complex 516.71 57.59

Konkan TIC Thane Vaitarna 331.31 0.00

Konkan TIC Thane Bhatsa 942.10 50.10

Konkan TIC Thane Surya 276.35 0.00

Nashik CADA Jalgaon Girna+Panzan 366.34 0.00

Nashik CADA Jalgaon Hatnur 255.00 0.00

Nashik CADA Nashik Upper Godavari Complex 326.36 28.06

51

Page 59: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Table 4.6: Unutilised Storage Observed On Major Projects (2017-18) - Page 2 of 2

Region Circle Project

Actual Live

Storage 15th

Oct. (Mcum)

Unutilised

Storage

(Mcum)

Nashik CADA Nashik Upper Prawara Complex 532.43 0.00

Nashik CADA Nashik Bhawli 40.60 0.00

Nashik CADA Nashik Chankapur 68.72 4.04

Nashik CADA Nashik Darna 202.44 0.00

Nashik CADA Nashik Gangapur 157.13 0.00

Nashik CADA Nashik Kadwa 47.79 1.78

Nashik CADA Nashik Mukane 192.67 0.00

Nashik CADA Nashik Mula 608.81 3.86

Nashik CADA Nashik NMWeir 6.62 0.00

Nashik DIPC Dhule Punand 36.99 11.10

Nashik JIPC Jalgaon Waghur 181.30 75.06

Aurangabad CADA Abad Jayakwadi Stage I 2170.93 78.34

Aurangabad CADA Abad NMC Express Mukane 0.00 0.00

Aurangabad CADA Beed Jayakwadi Stage II (Majalgaon) 286.60 0.31

Aurangabad CADA Beed Lower Terna 74.68 21.95

Aurangabad CADA Beed Manjra 176.96 3.28

Aurangabad CADA Beed Sina Kolegaon 76.19 0.00

Aurangabad NIC Nanded Lower Manar 30.72 3.86

Aurangabad NIC Nanded Vishnupuri 80.79 0.00

Aurangabad NIC Nanded Purna Complex 151.14 0.00

Aurangabad NIC Nanded Upper Penganga 136.67 0.00

Grand Total: 21430 1747

52

Page 60: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Annexure I

Indicators of Major

Projects

Page 61: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

0 0

100

111

17 1

9 20 2

2

41

66

70

73

92

95

100

100

100

100

0

14

24

24

30

44

64 65

91

91

94

94

94

99

99 100

100

100

100

100

100

100

100

100

100

100

100

100

100

26

36

47

23

89

96 9

8 99

99 100

100

100

100

100

100

100

100

Perc

enta

ge

Sin

a M

ad

ha

Lin

k C

an

al

Sin

a M

ad

ha

LIS

Sin

a K

ole

ga

on

Bh

ima

(U

jjan

i)

Pu

rna

Co

mp

lex

Ka

tep

urn

a

Kh

ad

akp

urn

a

Lo

we

r M

an

ar

Na

lga

ng

a

Lo

we

r T

ern

a

Gir

na

+P

an

za

n

Wa

gh

ur

Ja

ya

kw

ad

i S

tag

e I

I

Wa

n

Ja

ya

kw

ad

i S

tag

e I

Ch

an

ka

pu

r

Ma

njr

a

Vis

hn

up

uri

NM

C E

xp

ress M

uka

ne

Up

pe

r P

en

ga

ng

a

Pu

s

Aru

na

wa

ti

Be

mb

la

Pe

n T

akli

Bo

r

Lo

we

r W

ard

ha

NM

We

ir

Lo

we

r W

un

na

Co

mp

lex

Mu

ka

ne

Ku

ka

di C

om

ple

x

Kh

ad

akw

asla

Co

mp

lex

Ga

ng

ap

ur

Up

pe

r G

od

ava

ri C

om

ple

x

Pu

na

nd

Up

pe

r P

raw

ara

Co

mp

lex

Up

pe

r W

ard

ha

Mu

la

Ne

era

Co

mp

lex

Pa

wa

na

Ne

era

De

vd

ha

r

Da

rna

Gh

od

Ha

tnu

r

Ka

dw

a

Ch

aska

ma

n

Bh

am

a A

skh

ed

Bh

aw

li

Ba

gh

Co

mp

lex

Itia

do

h

Pe

nch

Co

mp

lex

Din

a

Ta

rali

Till

ari

Co

mp

lex

Dh

om

Co

mp

lex

Ka

nh

er

Kri

sh

na

LIS

Co

mp

lex

Du

dh

ag

an

ga

Bh

ats

a

Ra

dh

an

ag

ari

Su

rya

Tu

lsh

i

Urm

od

i

Va

ita

rna

Wa

ran

a

53

Page 62: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

10

0

11

1

24

43

70

73

89

10

0

10

0

0

14

27

44

65

80

95

98 99 10

0

10

0

10

0

32

47

23

89

96

99

99 10

0

10

0

Percentage

CA

DA

Beed

CA

DA

Sola

pur

NIC

Nanded

AIC

Akola

CA

DA

Jalg

aon

JIP

C J

alg

aon

CA

DA

Beed

CA

DA

Abad

CA

DA

Nashik

CA

DA

Abad

NIC

Nanded

YIC

Yavatm

al

AIC

Akola

NIC

Nagpur

CA

DA

Nagpur

KIC

Pune

PIC

Pune

CA

DA

Nashik

CA

DA

Jalg

aon

DIP

C D

hule

UW

IC A

mra

vati

BIC

Bhandara

CA

DA

Nagpur

CIP

C C

handra

pur

SIP

C S

ata

ra

SK

IPC

oro

s

SIC

Sangli

SIC

Sata

ra

KIC

Kolh

apur

TIC

Thane

54

Page 63: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator I: Water Availability in Reservoirs on 15th Oct - Page 1 of 3

(Major Projects / 2017-18) Unit: Mcum

Subbasin/PlanGroup Project/ CircleLive Storage

As On 15 OctDesigned Live

Storage

Percent Live

Storage

Highly Deficit

Remaining Bhima+ Man Bhima (Ujjani) 111 1,688.41 1,517.20CADA Solapur 111 1,688.41 1,517.20

Sina Sina Madha Link Canal 0 0.00 0.00

Sina Madha LIS 0 0.00 0.00CADA Solapur 0 0.00 0.00

Sina Sina Kolegaon 100 76.19 76.19CADA Beed 100 76.19 76.19

Highly Deficit 111 1,764.60 1,593.39

Deficit

Girna Chankapur 100 68.72 68.72CADA Nashik 100 68.72 68.72

Girna Girna+Panzan 70 366.34 525.05CADA Jalgaon 70 366.34 525.05

Lower Godavari Vishnupuri 100 80.79 80.79NIC Nanded 100 80.79 80.79

Lower Godavari Jayakwadi Stage II

(Majalgaon)

92 286.60 312.00

CADA Beed 92 286.60 312.00

Lower Godavari Jayakwadi Stage I 100 2,170.93 2,170.94CADA Abad 100 2,170.93 2,170.94

Manjra Lower Manar 22 30.72 138.21NIC Nanded 22 30.72 138.21

Manjra Lower Terna 66 74.68 113.95

Manjra 100 176.96 176.96CADA Beed 87 251.64 290.91

Middle Tapi (South) Waghur 73 181.30 248.21JIPC Jalgaon 73 181.30 248.21

Purna (Tapi) Katepurna 19 16.46 86.35

Nalganga 41 28.73 69.32

Wan 95 77.67 81.96AIC Akola 52 122.86 237.63

Purna+Dudhana Khadakpurna 20 18.29 93.40AIC Akola 20 18.29 93.40

Purna+Dudhana Purna Complex 17 151.14 890.73NIC Nanded 17 151.14 890.73

Deficit 74 3,729.33 5,056.59

Normal

Middle Tapi (Satpuda) Hatnur 100 255.00 255.0055

Page 64: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator I: Water Availability in Reservoirs on 15th Oct - Page 2 of 3

(Major Projects / 2017-18) Unit: Mcum

Subbasin/PlanGroup Project/ CircleLive Storage

As On 15 OctDesigned Live

Storage

Percent Live

Storage

CADA Jalgaon 100 255.00 255.00

Painganga Pen Takli 44 26.18 59.97AIC Akola 44 26.18 59.97

Painganga Pus 24 21.54 91.27

Arunawati 24 40.60 169.67YIC Yavatmal 24 62.14 260.94

Painganga Upper Penganga 14 136.67 964.10NIC Nanded 14 136.67 964.10

Remaining Bhima (Neera) Neera Devdhar 100 332.15 332.15

Neera Complex 100 932.01 932.01PIC Pune 100 1,264.16 1,264.16

Upper Bhima Ghod 100 154.43 154.80

Kukadi Complex 94 811.36 864.40KIC Pune 95 965.79 1,019.20

Upper Bhima Chaskaman 100 214.50 214.50

Bhama Askhed 100 217.10 217.10

Pawana 100 240.97 240.97

Khadakwasla Complex 94 777.41 825.66PIC Pune 97 1,449.98 1,498.23

Upper Godavari NMC Express Mukane 0 0.00 0.00CADA Abad 0 0.00 0.00

Upper Godavari Punand 100 36.99 36.99DIPC Dhule 100 36.99 36.99

Upper Godavari NMWeir 91 6.62 7.27

Bhawli 100 40.60 40.60

Kadwa 100 47.79 47.79

Gangapur 99 157.13 159.42

Mukane 94 192.67 204.98

Darna 100 202.44 202.44

Upper Godavari

Complex

99 326.36 329.16

Upper Prawara Complex 100 532.43 532.85

Mula 100 608.81 608.81CADA Nashik 99 2,114.85 2,133.31

Wardha Bembla 30 89.97 302.67YIC Yavatmal 30 89.97 302.67

Wardha Lower Wardha 65 139.91 216.87NIC Nagpur 65 139.91 216.87

Wardha Bor 64 81.26 127.42

Lower Wunna Complex 91 171.48 188.08CADA Nagpur 80 252.73 315.50

Wardha Upper Wardha 100 564.05 564.0556

Page 65: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator I: Water Availability in Reservoirs on 15th Oct - Page 3 of 3

(Major Projects / 2017-18) Unit: Mcum

Subbasin/PlanGroup Project/ CircleLive Storage

As On 15 OctDesigned Live

Storage

Percent Live

Storage

UWIC Amravati 100 564.05 564.05

Normal 83 7,358.42 8,890.98

Surplus

Middle Wainganga Bagh Complex 26 60.40 229.36

Itiadoh 36 114.88 317.87BIC Bhandara 32 175.28 547.23

Middle Wainganga Pench Complex 47 610.14 1,299.93CADA Nagpur 47 610.14 1,299.93

Surplus 43 785.42 1,847.16

Abundant

Lower Wainganga Dina 23 15.81 67.54CIPC Chandrapur 23 15.81 67.54

Middle Konkan Vaitarna 100 331.31 331.31TIC Thane 100 331.31 331.31

North Konkan Surya 100 276.35 276.35

Bhatsa 100 942.10 942.10TIC Thane 100 1,218.45 1,218.45

Telekhol- Tillari Tillari Complex 96 516.71 536.14SKIPC oros 96 516.71 536.14

Upper Krishna (E) Tarali 89 147.34 165.46SIPC Satara 89 147.34 165.46

Upper Krishna (W) Kanher 99 268.65 271.68

Urmodi 100 272.58 273.37

Dhom Complex 98 435.84 443.19SIC Satara 99 977.07 988.24

Upper Krishna (W) Tulshi 100 91.92 91.92

Radhanagari 100 219.97 219.97

Dudhaganga 100 679.11 679.11

Warana 100 779.35 779.35KIC Kolhapur 100 1,770.35 1,770.35

Upper Krishna (W) Krishna LIS Complex 99 2,814.73 2,835.68SIC Sangli 99 2,814.73 2,835.68

Abundant 98 7,791.78 7,913.17

Major 21,429.54 25,301.28 85

57

Page 66: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Perc

enta

ge

Bh

ima

(U

jjan

i)

Sin

a K

ole

ga

on

Sin

a M

ad

ha

Lin

k C

an

al

Sin

a M

ad

ha

LIS

Ch

an

ka

pu

r

Gir

na

+P

an

za

n

Ja

ya

kw

ad

i S

tag

e I

Ja

ya

kw

ad

i S

tag

e I

I

Ka

tep

urn

a

Kh

ad

akp

urn

a

Lo

we

r M

an

ar

Lo

we

r T

ern

a

Ma

njr

a

Na

lga

ng

a

Pu

rna

Co

mp

lex

Vis

hn

up

uri

Wa

gh

ur

Wa

n

Aru

na

wa

ti

Be

mb

la

Bh

am

a A

skh

ed

Bh

aw

li

Bo

r

Ch

aska

ma

n

Da

rna

Ga

ng

ap

ur

Gh

od

Ha

tnu

r

Ka

dw

a

Kh

ad

akw

asla

Co

mp

lex

Ku

ka

di C

om

ple

x

Lo

we

r W

ard

ha

Lo

we

r W

un

na

Co

mp

lex

Mu

ka

ne

Mu

la

Ne

era

Co

mp

lex

Ne

era

De

vd

ha

r

NM

C E

xp

ress M

uka

ne

NM

We

ir

Pa

wa

na

Pe

n T

akli

Pu

na

nd

Pu

s

Up

pe

r G

od

ava

ri C

om

ple

x

Up

pe

r P

en

ga

ng

a

Up

pe

r P

raw

ara

Co

mp

lex

Up

pe

r W

ard

ha

Ba

gh

Co

mp

lex

Itia

do

h

Pe

nch

Co

mp

lex

Bh

ats

a

Dh

om

Co

mp

lex

Din

a

Du

dh

ag

an

ga

Ka

nh

er

Kri

sh

na

LIS

Co

mp

lex

Ra

dh

an

ag

ari

Su

rya

Ta

rali

Till

ari

Co

mp

lex

Tu

lsh

i

Urm

od

i

Va

ita

rna

Wa

ran

a

58

Page 67: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Percentage

CA

DA

Sola

pur

CA

DA

Beed

CA

DA

Nashik

CA

DA

Jalg

aon

CA

DA

Abad

NIC

Nanded

AIC

Akola

JIP

C J

alg

aon

CA

DA

Beed

CA

DA

Abad

PIC

Pune

CA

DA

Nashik

DIP

C D

hule

UW

IC A

mra

vati

KIC

Pune

CA

DA

Nagpur

NIC

Nanded

CA

DA

Jalg

aon

NIC

Nagpur

AIC

Akola

YIC

Yavatm

al

CA

DA

Nagpur

BIC

Bhandara

SIC

Sangli

KIC

Kolh

apur

SIP

C S

ata

ra

TIC

Thane

SIC

Sata

ra

SK

IPC

oro

s

CIP

C C

handra

pur

59

Page 68: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator II: Percentage of Actual Evaporation to Gross Storage - Page 1 of 4(Major Projects / 2017-18) Unit: Mcum

Subbasin/

PlanGroupProject/ Circle Evaporation Actual Gross

Storage

Percentage of

Evaporation

Highly DeficitRemaining Bhima+ Man Bhima (Ujjani) 325.92 3491.21 9

CADA Solapur 325.92 3,491.21 9

Sina Sina Madha Link Canal 16.73 0.00 0

Sina Madha LIS 14.52 0.00 0

CADA Solapur 31.24 0.00 0

Sina Sina Kolegaon 36.22 150.49 24

CADA Beed 36.22 150.49 24

Highly Deficit 393.38 3641.70 11

DeficitGirna Chankapur 6.01 68.72 9

CADA Nashik 6.01 68.72 9

Girna Girna+Panzan 45.87 451.24 10

CADA Jalgaon 45.87 451.24 10

Lower Godavari Vishnupuri 11.36 83.55 14

NIC Nanded 11.36 83.55 14

Lower Godavari Jayakwadi Stage II (Majalgaon) 100.38 428.60 23

CADA Beed 100.38 428.60 23

Lower Godavari Jayakwadi Stage I 341.77 2909.04 12

CADA Abad 341.77 2,909.04 12

Manjra Lower Manar 7.63 39.43 19

NIC Nanded 7.63 39.43 19

Manjra Lower Terna 38.13 121.19 31

Manjra 55.49 224.09 25

CADA Beed 93.63 345.28 27

Middle Tapi (South) Waghur 61.20 258.09 24

JIPC Jalgaon 61.20 258.09 24

Purna (Tapi) Katepurna 3.93 27.78 14

Nalganga 7.22 31.27 23

Wan 7.96 79.18 10

AIC Akola 19.11 138.23 14

Purna+Dudhana Khadakpurna 23.79 85.49 28

AIC Akola 23.79 85.49 28

Purna+Dudhana Purna Complex 60.90 445.70 14

NIC Nanded 60.90 445.70 14

60

Page 69: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator II: Percentage of Actual Evaporation to Gross Storage - Page 2 of 4(Major Projects / 2017-18) Unit: Mcum

Subbasin/

PlanGroupProject/ Circle Evaporation Actual Gross

Storage

Percentage of

Evaporation

Deficit 771.66 5253.37 15

NormalMiddle Tapi (Satpuda) Hatnur 68.44 388.00 18

CADA Jalgaon 68.44 388.00 18

Painganga Pen Takli 7.01 33.56 21

AIC Akola 7.01 33.56 21

Painganga Arunawati 10.09 69.32 15

Pus 8.17 44.18 18

YIC Yavatmal 18.26 113.50 16

Painganga Upper Penganga 77.57 451.64 17

NIC Nanded 77.57 451.64 17

Remaining Bhima (Neera) Neera Complex 69.27 951.18 7

Neera Devdhar 10.27 337.41 3

PIC Pune 79.54 1,288.59 6

Upper Bhima Bhama Askhed 15.10 230.65 7

Chaskaman 18.00 241.69 7

Khadakwasla Complex 54.54 831.59 7

Pawana 1.54 272.11 1

PIC Pune 89.18 1,576.04 6

Upper Bhima Ghod 31.63 215.94 15

Kukadi Complex 146.92 1001.85 15

KIC Pune 178.55 1,217.79 15

Upper Godavari NMC Express Mukane 0.00 0.00 0

CADA Abad 0.00 0.00 0

Upper Godavari Punand 3.69 39.75 9

DIPC Dhule 3.69 39.75 9

Upper Godavari Bhawli 3.33 44.54 7

Darna 23.14 202.44 11

Gangapur 16.42 157.81 10

Kadwa 8.94 54.47 16

Mukane 11.51 201.85 6

Mula 47.83 736.23 6

NMWeir 0.00 6.62 0

Upper Godavari Complex 33.25 353.18 9

Upper Prawara Complex 34.54 548.18 6

CADA Nashik 178.95 2,305.32 8

Wardha Lower Wardha 31.37 176.38 18

61

Page 70: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator II: Percentage of Actual Evaporation to Gross Storage - Page 3 of 4(Major Projects / 2017-18) Unit: Mcum

Subbasin/

PlanGroupProject/ Circle Evaporation Actual Gross

Storage

Percentage of

Evaporation

NIC Nagpur 31.37 176.38 18

Wardha Bembla 46.07 109.37 42

YIC Yavatmal 46.07 109.37 42

Wardha Bor 7.61 92.58 8

Lower Wunna Complex 38.54 197.08 20

CADA Nagpur 46.15 289.65 16

Wardha Upper Wardha 93.22 678.27 14

UWIC Amravati 93.22 678.27 14

Normal 918.00 8667.86 11

SurplusMiddle Wainganga Pench Complex 63.08 734.21 9

CADA Nagpur 63.08 734.21 9

Middle Wainganga Bagh Complex 17.92 89.12 20

Itiadoh 64.94 178.60 36

BIC Bhandara 82.86 267.72 31

Surplus 145.94 1001.92 15

AbundantLower Wainganga Dina 4.78 21.02 23

CIPC Chandrapur 4.78 21.02 23

Middle Konkan Vaitarna 32.44 353.96 9

TIC Thane 32.44 353.96 9

North Konkan Bhatsa 29.78 976.10 3

Surya 22.76 285.31 8

TIC Thane 52.54 1,261.41 4

Telekhol- Tillari Tillari Complex 41.53 553.54 8

SKIPC oros 41.53 553.54 8

Upper Krishna (E) Tarali 7.96 147.59 5

SIPC Satara 7.96 147.59 5

Upper Krishna (W) Krishna LIS Complex 0.00 2959.20 0

SIC Sangli 0.00 2,959.20 0

Upper Krishna (W) Dhom Complex 30.67 490.50 6

Kanher 29.80 282.97 11

Urmodi 24.73 281.35 9

SIC Satara 85.20 1,054.82 8

Upper Krishna (W) Dudhaganga 31.13 719.12 4

62

Page 71: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator II: Percentage of Actual Evaporation to Gross Storage - Page 4 of 4(Major Projects / 2017-18) Unit: Mcum

Subbasin/

PlanGroupProject/ Circle Evaporation Actual Gross

Storage

Percentage of

Evaporation

Radhanagari 16.71 236.79 7

Tulshi 7.75 98.29 8

Warana 37.54 974.19 4

KIC Kolhapur 93.13 2,028.39 5

Abundant 317.57 8379.94 4

2546.54 26944.79 9Major Project - Grand Total:

63

Page 72: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

64

Page 73: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator No. II (A): Percentage of Actual Evaporation to Projected Evaporation

Major Projects (2017-18) - Page 1 of 3 Unit: Mcum

Subbasin/

PlanGroup

Circle/Project Actual

Evaporation

Projected

Evaporation

Percentage of

Evaporation

Highly DeficitSina

Sina Kolegaon 36.22 23.35 155

CADA Beed 36.22 23.35 155

Remaining Bhima+ Man

Bhima (Ujjani) 325.92 453.20 72

Sina

Sina Madha Link Canal 16.73 0.00 0

Sina Madha LIS 14.52 0.00 0

CADA Solapur 357.16 453.20 79

Upper Krishna (E)

Tarali 7.96 8.67 92

SIPC Satara 7.96 8.67 92

Highly Deficit 485.21 401.34 83

DeficitPurna (Tapi)

Katepurna 3.93 20.81 19

Nalganga 7.22 8.50 85

Wan 7.96 4.46 179

Purna+Dudhana

Khadakpurna 23.79 31.77 75

AIC Akola 42.90 65.54 65

Lower Godavari

Jayakwadi Stage I 341.77 0.00 0

CADA Abad 341.77 0.00 0

Lower Godavari

Jayakwadi Stage II (Majalgaon) 100.38 128.76 78

Manjra

Lower Terna 38.13 52.66 72

Manjra 55.49 69.94 79

CADA Beed 194.00 251.36 77

Girna

Girna+Panzan 45.87 73.01 63

CADA Jalgaon 45.87 73.01 63

Girna

Chankapur 6.01 6.87 87

CADA Nashik 6.01 6.87 87

Middle Tapi (South)

Waghur 61.20 62.93 97

JIPC Jalgaon 61.20 62.93 97

Lower Godavari

Vishnupuri 11.36 18.04 63

Manjra

Lower Manar 7.63 31.14 25

Purna+Dudhana

Purna Complex 60.90 197.10 31

NIC Nanded 79.90 246.28 32

Deficit 705.99 771.66 109

65

Page 74: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator No. II (A): Percentage of Actual Evaporation to Projected Evaporation

Major Projects (2017-18) - Page 2 of 3 Unit: Mcum

Subbasin/

PlanGroup

Circle/Project Actual

Evaporation

Projected

Evaporation

Percentage of

Evaporation

NormalPainganga

Pen Takli 7.01 7.88 89

AIC Akola 7.01 7.88 89

Upper Godavari

NMC Express Mukane 0.00 0.00 0

CADA Abad 0.00 0.00 0

Middle Tapi (Satpuda)

Hatnur 68.44 107.60 64

CADA Jalgaon 68.44 107.60 64

Wardha

Bor 7.61 16.80 45

Lower Wunna Complex 38.54 49.59 78

CADA Nagpur 46.15 66.39 70

Upper Godavari

Bhawli 3.33 5.32 63

Darna 23.14 21.67 107

Gangapur 16.42 17.81 92

Kadwa 8.94 10.28 87

Mukane 11.51 42.41 27

Mula 47.83 76.45 63

NMWeir 0.00 0.00 0

Upper Godavari Complex 33.25 45.88 72

Upper Prawara Complex 34.54 25.34 136

CADA Nashik 178.95 245.16 73

Upper Godavari

Punand 3.69 2.93 126

DIPC Dhule 3.69 2.93 126

Upper Bhima

Ghod 31.63 34.05 93

Kukadi Complex 146.92 131.14 112

KIC Pune 178.55 165.19 108

Wardha

Lower Wardha 31.37 49.90 63

NIC Nagpur 31.37 49.90 63

Painganga

Upper Penganga 77.57 147.25 53

NIC Nanded 77.57 147.25 53

Remaining Bhima (Neera)

Neera Complex 69.27 85.15 81

Neera Devdhar 10.27 18.40 56

Upper Bhima

Bhama Askhed 15.10 15.04 100

Chaskaman 18.00 19.62 92

Khadakwasla Complex 54.54 81.62 67

Pawana 1.54 24.10 6

PIC Pune 168.72 243.93 69

Wardha

Upper Wardha 93.22 68.54 136

66

Page 75: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator No. II (A): Percentage of Actual Evaporation to Projected Evaporation

Major Projects (2017-18) - Page 3 of 3 Unit: Mcum

Subbasin/

PlanGroup

Circle/Project Actual

Evaporation

Projected

Evaporation

Percentage of

Evaporation

UWIC Amravati 93.22 68.54 136

Painganga

Arunawati 10.09 52.81 19

Pus 8.17 15.00 54

Wardha

Bembla 46.07 88.01 52

YIC Yavatmal 64.33 155.82 41

Normal 1260.59 918.00 73

SurplusMiddle Wainganga

Bagh Complex 17.92 67.08 27

Itiadoh 64.94 67.57 96

BIC Bhandara 82.86 134.65 62

Middle Wainganga

Pench Complex 63.08 131.10 48

CADA Nagpur 63.08 131.10 48

Surplus 265.75 145.94 55

AbundantLower Wainganga

Dina 4.78 5.21 92

CIPC Chandrapur 4.78 5.21 92

Upper Krishna (W)

Dudhaganga 31.13 33.98 92

Radhanagari 16.71 26.83 62

Tulshi 7.75 4.84 160

Warana 37.54 38.28 98

KIC Kolhapur 93.13 103.93 90

Upper Krishna (W)

Krishna LIS Complex 0.00 0.00 0

SIC Sangli 0.00 0.00 0

Upper Krishna (W)

Dhom Complex 30.67 30.02 102

Kanher 29.80 20.11 148

Urmodi 24.73 14.64 169

SIC Satara 85.20 64.77 132

Telekhol- Tillari

Tillari Complex 41.53 33.70 123

SKIPC oros 41.53 33.70 123

Middle Konkan

Vaitarna 32.44 31.80 102

North Konkan

Bhatsa 29.78 24.00 124

Surya 22.76 22.51 101

TIC Thane 84.98 78.31 109

Abundant 285.92 309.61 108

Grand Total: 2547 3003 85

67

Page 76: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Percentage

CA

DA

Sola

pur

CA

DA

Beed

CA

DA

Abad

JIP

C J

alg

aon

CA

DA

Jalg

aon

CA

DA

Beed

AIC

Akola

NIC

Nanded

CA

DA

Nashik

CA

DA

Abad

CA

DA

Jalg

aon

UW

IC A

mra

vati

NIC

Nanded

NIC

Nagpur

CA

DA

Nashik

CA

DA

Nagpur

KIC

Pune

PIC

Pune

AIC

Akola

DIP

C D

hule

YIC

Yavatm

al

CA

DA

Nagpur

BIC

Bhandara

SIP

C S

ata

ra

SK

IPC

oro

s

CIP

C C

handra

pur

SIC

Sangli

KIC

Kolh

apur

SIC

Sata

ra

TIC

Thane

68

Page 77: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator III: Target and Achievement of Irrigation Potential Utilisation - Page 1 of 4 (Major Projects / 2017-18) Unit: Ha

Project/ Circle

Subbasin/ PlanGroup

Planned Target as per PIP

Achievement Percent

Achievement

Highly Deficit Remaining Bhima+ Man

Bhima (Ujjani) 91000 82387 91

CADA Solapur 91000 82387 91

Sina

Sina Kolegaon 4000 7636 191

CADA Beed 4000 7636 191

Sina

Sina Madha LIS 11896 9557 80

Sina Madha Link Canal 30800 30546 99

CADA Solapur 42696 40103 94

Highly Deficit 137696 130126 95

Deficit Girna

Girna+Panzan 22125 12820 58

CADA Jalgaon 22125 12820 58

Girna

Chankapur 1567 2537 162

CADA Nashik 1567 2537 162

Lower Godavari

Jayakwadi Stage I 185000 47651 26

CADA Abad 185000 47651 26

Lower Godavari Jayakwadi Stage II (Majalgaon)

23920 11052 46

CADA Beed 23920 11052 46

Lower Godavari

Vishnupuri 11864 10914 92

NIC Nanded 11864 10914 92

Manjra

Lower Terna 4770 6028 126

Manjra 12490 8884 71

CADA Beed 17260 14912 86

Manjra

Lower Manar 0 2344 0

NIC Nanded 0 2344 0

Middle Tapi (South)

Waghur 3300 1548 47

JIPC Jalgaon 3300 1548 47

Purna (Tapi)

Katepurna 0 36 0

Nalganga 780 1486 190 69

Page 78: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator III: Target and Achievement of Irrigation Potential Utilisation - Page 2 of 4 (Major Projects / 2017-18) Unit: Ha

Project/ Circle

Subbasin/ PlanGroup

Planned Target as per PIP

Achievement Percent

Achievement

Wan 12016 656 5

AIC Akola 12796 2178 17

Purna+Dudhana

Khadakpurna 0 6071 0

AIC Akola 0 6071 0

Purna+Dudhana

Purna Complex 18000 14958 83

NIC Nanded 18000 14958 83

Deficit 295832 126985 43

Normal Middle Tapi (Satpuda)

Hatnur 0 6017 0

CADA Jalgaon 0 6017 0

Painganga

Pen Takli 2656 6771 255

AIC Akola 2656 6771 255

Painganga

Upper Penganga 27500 9587 35

NIC Nanded 27500 9587 35

Painganga

Pus 0 0 0

Arunawati 741 1535 207

YIC Yavatmal 741 1535 207

Remaining Bhima (Neera)

Neera Devdhar 0 86 0

Neera Complex 137054 264363 193

PIC Pune 137054 264449 193

Upper Bhima

Ghod 27839 26408 95

Kukadi Complex 89100 93871 105

KIC Pune 116939 120279 103

Upper Bhima

Pawana 0 7040 0

Chaskaman 16700 22198 133

Bhama Askhed 25640 25864 101

Khadakwasla Complex 27850 74104 266

PIC Pune 70190 129206 184

Upper Godavari

NMC Express Mukane 0 18124 0

CADA Abad 0 18124 0

Upper Godavari

Bhawli 0 171 0 70

Page 79: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator III: Target and Achievement of Irrigation Potential Utilisation - Page 3 of 4 (Major Projects / 2017-18) Unit: Ha

Project/ Circle

Subbasin/ PlanGroup

Planned Target as per PIP

Achievement Percent

Achievement

Darna 0 6147 0

Mukane 0 1183 0

Kadwa 2600 3615 139

Gangapur 11499 4096 36

Upper Prawara Complex 20279 30947 153

Upper Godavari Complex

25547 28214 110

NMWeir 45341 13389 30

Mula 96040 72241 75

CADA Nashik 201306 160002 79

Upper Godavari

Punand 359 924 257

DIPC Dhule 359 924 257

Wardha

Lower Wunna Complex 0 7802 0

Bor 14500 3904 27

CADA Nagpur 14500 11706 81

Wardha

Lower Wardha 18000 7820 43

NIC Nagpur 18000 7820 43

Wardha

Upper Wardha 0 22837 0

UWIC Amravati 0 22837 0

Wardha

Bembla 0 8010 0

YIC Yavatmal 0 8010 0

Normal 589245 767267 130

Surplus Middle Wainganga

Itiadoh 17625 17674 100

Bagh Complex 22800 22765 100

BIC Bhandara 40425 40439 100

Middle Wainganga

Pench Complex 100849 78343 78

CADA Nagpur 100849 78343 78

Surplus 141274 118782 84

Abundant Lower Wainganga

Dina 11000 11022 100

CIPC Chandrapur 11000 11022 100

Middle Konkan

Vaitarna 0 2987 0 71

Page 80: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Note:

A) ‘0’ value in planned target as per PIP Indicates that the PIP is not prepared. B) Indicator III is mainly to know how much area irrigated against its target by preparing PIP of concerned projects. However most of the field authorities of project concerned not prepared PIP of irrigation projects; hence the purpose of indicator is not fulfilled.

Indicator III: Target and Achievement of Irrigation Potential Utilisation - Page 4 of 4 (Major Projects / 2017-18) Unit: Ha

Project/ Circle

Subbasin/ PlanGroup

Planned Target as per PIP

Achievement Percent

Achievement

TIC Thane 0 2987 0

North Konkan

Bhatsa 0 9888 0

Surya 715 10024 1402

TIC Thane 715 19912 2785

Telekhol- Tillari

Tillari Complex 0 2120 0

SKIPC oros 0 2120 0

Upper Krishna (E)

Tarali 0 3158 0

SIPC Satara 0 3158 0

Upper Krishna (W)

Tulshi 5000 8923 178

Dudhaganga 37065 53958 146

Warana 43860 66671 152

Radhanagari 49645 60059 121

KIC Kolhapur 135570 189611 140

Upper Krishna (W)

Krishna LIS Complex 192900 229706 119

SIC Sangli 192900 229706 119

Upper Krishna (W)

Urmodi 0 3165 0

Kanher 22308 37270 167

Dhom Complex 28555 64790 227

SIC Satara 50863 105225 207

Abundant 391048 563741 144

Major 1555095 1706900 110

72

Page 81: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Perc

enta

ge

Bh

ima

(U

jjan

i)

Sin

a K

ole

ga

on

Sin

a M

ad

ha

Lin

k C

an

al

Sin

a M

ad

ha

LIS

Ch

an

ka

pu

r

Gir

na

+P

an

za

n

Ja

ya

kw

ad

i S

tag

e I

Ja

ya

kw

ad

i S

tag

e I

I

Ka

tep

urn

a

Kh

ad

akp

urn

a

Lo

we

r M

an

ar

Lo

we

r T

ern

a

Ma

njr

a

Na

lga

ng

a

Pu

rna

Co

mp

lex

Vis

hn

up

uri

Wa

gh

ur

Wa

n

Aru

na

wa

ti

Be

mb

la

Bh

am

a A

skh

ed

Bh

aw

li

Bo

r

Ch

aska

ma

n

Da

rna

Ga

ng

ap

ur

Gh

od

Ha

tnu

r

Ka

dw

a

Kh

ad

akw

asla

Co

mp

lex

Ku

ka

di C

om

ple

x

Lo

we

r W

ard

ha

Lo

we

r W

un

na

Co

mp

lex

Mu

ka

ne

Mu

la

Ne

era

Co

mp

lex

Ne

era

De

vd

ha

r

NM

C E

xp

ress M

uka

ne

NM

We

ir

Pa

wa

na

Pe

n T

akli

Pu

na

nd

Pu

s

Up

pe

r G

od

ava

ri C

om

ple

x

Up

pe

r P

en

ga

ng

a

Up

pe

r P

raw

ara

Co

mp

lex

Up

pe

r W

ard

ha

Ba

gh

Co

mp

lex

Itia

do

h

Pe

nch

Co

mp

lex

Bh

ats

a

Dh

om

Co

mp

lex

Din

a

Du

dh

ag

an

ga

Ka

nh

er

Kri

sh

na

LIS

Co

mp

lex

Ra

dh

an

ag

ari

Su

rya

Ta

rali

Till

ari

Co

mp

lex

Tu

lsh

i

Urm

od

i

Va

ita

rna

Wa

ran

a

73

Page 82: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Percentage

CA

DA

Beed

CA

DA

Sola

pur

AIC

Akola

CA

DA

Abad

CA

DA

Beed

CA

DA

Jalg

aon

CA

DA

Nashik

JIP

C J

alg

aon

NIC

Nanded

AIC

Akola

CA

DA

Abad

CA

DA

Jalg

aon

CA

DA

Nagpur

CA

DA

Nashik

DIP

C D

hule

KIC

Pune

NIC

Nagpur

NIC

Nanded

PIC

Pune

UW

IC A

mra

vati

YIC

Yavatm

al

BIC

Bhandara

CA

DA

Nagpur

CIP

C C

handra

pur

KIC

Kolh

apur

SIC

Sangli

SIC

Sata

ra

SIP

C S

ata

ra

SK

IPC

oro

s

TIC

Thane

74

Page 83: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator IV: Water Use Pattern - Page 1 of 5

(Major Projects/ 2017-18) Unit: Mcum

Project/ CircleOn Canals

Kharif Rabi HW

Reservoir

Lift

River

LiftNI Use Evapo-

ration

TotalSubbasin/

PlanGroup

Highly DeficitRemaining Bhima+

Man

Bhima (Ujjani) 1937.65411.63 325.9294.900.00444.27532.72128.21

CADA Solapur 325.9294.900.00444.27532.72128.21411.63 1937.65

Sina

Sina Kolegaon 86.780.00 36.220.300.0049.830.000.43

CADA Beed 36.220.300.0049.830.000.430.00 86.78

Sina

Sina Madha

Link Canal

140.250.00 16.731.60121.920.000.000.00

Sina Madha LIS 71.3120.85 14.520.000.000.0022.2113.73

CADA Solapur 31.241.60121.920.0022.2113.7320.85 211.56

Highly Deficit 494.10 121.92 96.80 393.38554.93142.37432.48 2235.98

DeficitGirna

Girna+Panzan 267.800.00 45.8773.808.806.388.34124.62

CADA Jalgaon 45.8773.808.806.388.34124.620.00 267.80

Girna

Chankapur 72.490.06 6.0159.061.140.650.934.64

CADA Nashik 6.0159.061.140.650.934.640.06 72.49

Lower Godavari

Jayakwadi

Stage I

2030.04157.79 341.77133.280.00297.39641.40458.42

CADA Abad 341.77133.280.00297.39641.40458.42157.79 2030.04

Lower Godavari

Jayakwadi

Stage II

(Majalgaon)

370.3024.00 100.3827.300.0035.4099.7883.46

CADA Beed 100.3827.300.0035.4099.7883.4624.00 370.30

Lower Godavari

Vishnupuri 129.980.00 11.3633.650.0060.707.2816.99

NIC Nanded 11.3633.650.0060.707.2816.990.00 129.98

Manjra

Lower Terna 68.337.82 38.132.010.0010.334.565.47

Manjra 174.460.00 55.4924.680.0014.9662.7416.59

CADA Beed 93.6326.700.0025.2967.3022.057.82 242.79

Manjra

Lower Manar 28.470.00 7.636.750.0014.090.000.0075

Page 84: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator IV: Water Use Pattern - Page 2 of 5

(Major Projects/ 2017-18) Unit: Mcum

Project/ CircleOn Canals

Kharif Rabi HW

Reservoir

Lift

River

LiftNI Use Evapo-

ration

TotalSubbasin/

PlanGroup

NIC Nanded 7.636.750.0014.090.000.000.00 28.47

Middle Tapi (South)

Waghur 118.490.00 61.2046.550.007.172.451.12

JIPC Jalgaon 61.2046.550.007.172.451.120.00 118.49

Purna (Tapi)

Katepurna 25.950.00 3.9322.020.000.000.000.00

Nalganga 20.560.00 7.222.270.006.400.464.20

Wan 41.560.00 7.9626.910.000.000.006.69

AIC Akola 19.1151.210.006.400.4610.890.00 88.07

Purna+Dudhana

Khadakpurna 68.490.00 23.798.640.0036.060.000.00

AIC Akola 23.798.640.0036.060.000.000.00 68.49

Purna+Dudhana

Purna Complex 188.290.00 60.9046.965.038.6627.6939.06

NIC Nanded 60.9046.965.038.6627.6939.060.00 188.29

Deficit 498.18 14.97 513.89 771.66855.61761.24189.67 3605.22

NormalMiddle Tapi

(Satpuda)

Hatnur 221.570.50 68.44102.6410.6822.590.0016.72

CADA Jalgaon 68.44102.6410.6822.590.0016.720.50 221.57

Painganga

Pen Takli 31.410.00 7.013.967.767.560.005.11

AIC Akola 7.013.967.767.560.005.110.00 31.41

Painganga

Upper Penganga 226.460.00 77.57108.020.001.640.0039.22

NIC Nanded 77.57108.020.001.640.0039.220.00 226.46

Painganga

Arunawati 41.795.32 10.0912.440.007.100.006.85

Pus 16.440.00 8.178.270.000.000.000.00

YIC Yavatmal 18.2620.710.007.100.006.855.32 58.23

Remaining Bhima

(Neera)

Neera Complex 1424.60333.02 69.2751.020.0041.55544.92384.81

Neera Devdhar 13.180.00 10.270.000.000.602.310.00

PIC Pune 79.5451.020.0042.15547.23384.81333.02 1437.78

Upper Bhima

76

Page 85: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator IV: Water Use Pattern - Page 3 of 5

(Major Projects/ 2017-18) Unit: Mcum

Project/ CircleOn Canals

Kharif Rabi HW

Reservoir

Lift

River

LiftNI Use Evapo-

ration

TotalSubbasin/

PlanGroup

Ghod 205.2748.58 31.638.060.0024.0259.0133.98

Kukadi

Complex

915.95169.90 146.923.9820.4249.85348.16176.72

KIC Pune 178.5512.0420.4273.86407.17210.69218.48 1121.22

Upper Bhima

Bhama Askhed 168.420.00 15.1010.61135.087.640.000.00

Chaskaman 333.23101.76 18.007.620.009.82104.8091.24

Khadakwasla

Complex

1170.89151.70 54.54627.521.6211.38206.28117.84

Pawana 179.820.00 1.54138.2036.004.080.000.00

PIC Pune 89.18783.95172.7032.92311.08209.07253.46 1852.36

Upper Godavari

NMC Express

Mukane

132.9233.78 0.0028.490.000.0019.1551.49

CADA Abad 0.0028.490.000.0019.1551.4933.78 132.92

Upper Godavari

Bhawli 4.410.00 3.330.001.080.000.000.00

Darna 86.610.00 23.1435.3719.478.630.000.00

Gangapur 226.810.00 16.42168.411.7110.0116.0814.19

Kadwa 70.9912.01 8.9418.570.525.000.0025.95

Mukane 22.370.00 11.514.341.624.910.000.00

Mula 686.59103.21 47.8365.620.005.85334.89129.19

NMWeir 266.0623.41 0.0097.240.000.0084.4560.96

Upper Godavari

Complex

379.9832.89 33.25151.512.4229.2946.9583.67

Upper Prawara

Complex

479.4780.74 34.5446.9862.672.16170.2682.13

CADA Nashik 178.95588.0389.4865.85652.64396.09252.25 2223.29

Upper Godavari

Punand 24.370.00 3.6915.570.000.562.841.71

DIPC Dhule 3.6915.570.000.562.841.710.00 24.37

Wardha

Bor 53.140.00 7.610.000.000.000.0045.53

Lower Wunna

Complex

206.2414.64 38.5427.760.004.879.31111.12

CADA Nagpur 46.1527.760.004.879.31156.6414.64 259.37

Wardha

Lower Wardha 175.3324.03 31.3730.000.000.005.9783.96

NIC Nagpur 31.3730.000.000.005.9783.9624.03 175.33

Wardha

Upper Wardha 436.9531.62 93.2268.070.0027.834.49211.7177

Page 86: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator IV: Water Use Pattern - Page 4 of 5

(Major Projects/ 2017-18) Unit: Mcum

Project/ CircleOn Canals

Kharif Rabi HW

Reservoir

Lift

River

LiftNI Use Evapo-

ration

TotalSubbasin/

PlanGroup

UWIC

Amravati

93.2268.070.0027.834.49211.7131.62 436.95

Wardha

Bembla 83.7320.66 46.070.000.000.000.0017.00

YIC Yavatmal 46.070.000.000.000.0017.0020.66 83.73

Normal 286.95 301.04 1840.27 918.001959.871791.081187.77 8284.98

SurplusMiddle Wainganga

Bagh Complex 94.6067.09 17.929.590.000.000.000.00

Itiadoh 189.49112.57 64.9411.990.000.000.000.00

BIC Bhandara 82.8621.570.000.000.000.00179.66 284.10

Middle Wainganga

Pench Complex 562.34192.65 63.08224.720.000.002.4979.40

CADA Nagpur 63.08224.720.000.002.4979.40192.65 562.34

Surplus 0.00 0.00 246.30 145.942.4979.40372.31 846.43

AbundantLower Wainganga

Dina 72.6967.91 4.780.000.000.000.000.00

CIPC

Chandrapur

4.780.000.000.000.000.0067.91 72.69

Middle Konkan

Vaitarna 248.600.00 32.44206.290.009.870.000.00

TIC Thane 32.44206.290.009.870.000.000.00 248.60

North Konkan

Bhatsa 600.490.00 29.78507.203.740.0016.5243.25

Surya 256.030.00 22.7670.265.030.0053.26104.71

TIC Thane 52.54577.468.770.0069.78147.960.00 856.51

Telekhol- Tillari

Tillari Complex 133.088.26 41.530.000.000.0027.9455.35

SKIPC oros 41.530.000.000.0027.9455.358.26 133.08

Upper Krishna (E)

Tarali 19.170.00 7.960.2310.990.000.000.00

SIPC Satara 7.960.2310.990.000.000.000.00 19.17

Upper Krishna (W)

Dudhaganga 349.250.00 31.1324.67228.131.1030.1734.05

Radhanagari 381.450.00 16.7153.62311.120.000.000.0078

Page 87: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator IV: Water Use Pattern - Page 5 of 5

(Major Projects/ 2017-18) Unit: Mcum

Project/ CircleOn Canals

Kharif Rabi HW

Reservoir

Lift

River

LiftNI Use Evapo-

ration

TotalSubbasin/

PlanGroup

Tulshi 61.030.00 7.750.6149.293.390.000.00

Warana 298.210.00 37.5418.49228.870.005.907.41

KIC Kolhapur 93.1397.38817.414.4936.0741.460.00 1089.94

Upper Krishna (W)

Krishna LIS

Complex

608.950.00 0.00133.54475.410.000.000.00

SIC Sangli 0.00133.54475.410.000.000.000.00 608.95

Upper Krishna (W)

Dhom Complex 386.9021.26 30.670.680.003.50167.79163.01

Kanher 325.8475.81 29.800.190.001.7297.01121.31

Urmodi 175.0030.06 24.735.4127.000.6176.7410.45

SIC Satara 85.206.2827.005.83341.54294.77127.13 887.74

Abundant 20.19 1339.57 1021.19 317.57475.32539.53203.30 3916.67

Major 2385.52 3313.62 3848.23 2546.553718.441777.501299.41 18889.28

79

Page 88: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

ISP

in

ha/M

cu

m

CA

DA

Beed

CA

DA

Sola

pur

CA

DA

Nashik

CA

DA

Jalg

aon

CA

DA

Beed

AIC

Akola

CA

DA

Abad

JIP

C J

alg

aon

NIC

Nanded

NIC

Nanded

PIC

Pune

KIC

Pune

NIC

Nagpur

UW

IC A

mra

vati

YIC

Yavatm

al

AIC

Akola

CA

DA

Abad

CA

DA

Jalg

aon

CA

DA

Nagpur

CA

DA

Nashik

DIP

C D

hule

CA

DA

Nagpur

BIC

Bhandara

CIP

C C

handra

pur

SIC

Sata

ra

SIP

C S

ata

ra

SK

IPC

oro

s

TIC

Thane

KIC

Kolh

apur

SIC

Sangli

80

Page 89: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator V: Irrigation System Performance (Canals) - Page 1 of 4 (Major / 2017-18) Unit: ha/MCum

Irrigation System Performance

Kharif Rabi HW Subbasin/PlanGroup Project/ Circle

Highly Deficit Remaining Bhima+ Man Bhima (Ujjani) 0 0 0

CADA Solapur 0 0 0

Sina Sina Kolegaon 0 0 0

CADA Beed 0 0 0

Sina Sina Madha Link Canal 0 0 0

Sina Madha LIS 191 170 146

CADA Solapur 191 170 146

Highly Deficit 191 170 146

Deficit Girna Girna+Panzan 0 71 19

CADA Jalgaon 0 71 19

Girna Chankapur 195 258 209

CADA Nashik 195 258 209

Lower Godavari Jayakwadi Stage I 51 23 14

CADA Abad 51 23 14

Lower Godavari Jayakwadi Stage II (Majalgaon)

91 12 54

CADA Beed 91 12 54

Lower Godavari Vishnupuri 0 118 69

NIC Nanded 0 118 69

Manjra Lower Terna 342 229 91

Manjra 0 134 73

CADA Beed 342 158 74

Manjra Lower Manar 0 0 0

NIC Nanded 0 0 0

Middle Tapi (South) Waghur 0 324 216

JIPC Jalgaon 0 324 216

Purna (Tapi) Katepurna 0 0 0

Nalganga 0 114 222

Wan 0 98 0

AIC Akola 0 104 222

Purna+Dudhana

81

Page 90: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator V: Irrigation System Performance (Canals) - Page 2 of 4 (Major / 2017-18) Unit: ha/MCum

Irrigation System Performance

Kharif Rabi HW Subbasin/PlanGroup Project/ Circle

Khadakpurna 0 0 0

AIC Akola 0 0 0

Purna+Dudhana Purna Complex 0 171 151

NIC Nanded 0 171 151

Deficit 68 46 29

Normal Middle Tapi (Satpuda) Hatnur 148 107 0

CADA Jalgaon 148 107 0

Painganga Pen Takli 0 180 0

AIC Akola 0 180 0

Painganga Upper Penganga 0 215 0

NIC Nanded 0 215 0

Painganga Arunawati 0 102 0

Pus 0 0 0

YIC Yavatmal 0 102 0

Remaining Bhima (Neera) Neera Complex 188 234 180

Neera Devdhar 0 0 0

PIC Pune 188 234 180

Upper Bhima Ghod 193 162 125

Kukadi Complex 109 208 54

KIC Pune 128 201 64

Upper Bhima Bhama Askhed 0 0 0

Chaskaman 48 75 53

Khadakwasla Complex 37 54 36

Pawana 0 0 0

PIC Pune 41 63 41

Upper Godavari NMC Express Mukane 169 189 140

CADA Abad 169 189 140

Upper Godavari Bhawli 0 0 0

Darna 0 0 0

Gangapur 0 89 70

Kadwa 69 56 0

Mukane 0 0 0

82

Page 91: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator V: Irrigation System Performance (Canals) - Page 3 of 4 (Major / 2017-18) Unit: ha/MCum

Irrigation System Performance

Kharif Rabi HW Subbasin/PlanGroup Project/ Circle

Mula 166 163 97

NMWeir 173 84 50

Upper Godavari Complex 138 120 130

Upper Prawara Complex 77 71 42

CADA Nashik 130 113 78

Upper Godavari Punand 0 218 126

DIPC Dhule 0 218 126

Wardha Bor 0 69 0

Lower Wunna Complex 40 53 8

CADA Nagpur 92 58 8

Wardha Lower Wardha 87 68 0

NIC Nagpur 87 68 0

Wardha Upper Wardha 111 67 31

UWIC Amravati 111 67 31

Wardha Bembla 234 187 0

YIC Yavatmal 234 187 0

Normal 128 136 98

Surplus Middle Wainganga Bagh Complex 338 0 0

Itiadoh 157 0 0

BIC Bhandara 225 0 0

Middle Wainganga Pench Complex 285 292 8

CADA Nagpur 285 292 8

Surplus 256 292 8

Abundant Lower Wainganga Dina 162 0 0

CIPC Chandrapur 162 0 0

Middle Konkan Vaitarna 0 0 0

TIC Thane 0 0 0

North Konkan Bhatsa 0 33 85

Surya 0 15 29

TIC Thane 0 20 42

Telekhol- Tillari Tillari Complex 242 2 1

83

Page 92: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Note:

The indicator value of ISP of some of the projects is not as per the state norms based on data provided by field authority.

Indicator V: Irrigation System Performance (Canals) - Page 4 of 4 (Major / 2017-18) Unit: ha/MCum

Irrigation System Performance

Kharif Rabi HW Subbasin/PlanGroup Project/ Circle

SKIPC oros 242 2 1

Upper Krishna (E) Tarali 0 0 0

SIPC Satara 0 0 0

Upper Krishna (W) Dudhaganga 0 104 109

Radhanagari 0 0 0

Tulshi 0 0 0

Warana 0 188 90

KIC Kolhapur 0 119 106

Upper Krishna (W) Krishna LIS Complex 0 0 0

SIC Sangli 0 0 0

Upper Krishna (W) Dhom Complex 711 162 110

Kanher 231 82 86

Urmodi 40 114 9

SIC Satara 266 128 80

Abundant 305 85 72

165 110 77

84

Page 93: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

5

64

14

9

0 0 0

73

14

0

25

0

35

12

4

0 0

59

0

24

3

39

54

0

12

6

0

20

0

4

0 0

10

8

54

10

0

13

3

11

9

82

40

10

7

10

5

14

5

10

0

0

10

8

0

65

10

1

11

6

22

7

41

16

7

10

0

85

0

10

0

6

0 0

89

Percent

CA

DA

Beed

CA

DA

Sola

pur

AIC

Akola

CA

DA

Abad

CA

DA

Beed

CA

DA

Jalg

aon

CA

DA

Nashik

JIP

C J

alg

aon

NIC

Nanded

AIC

Akola

CA

DA

Abad

CA

DA

Jalg

aon

CA

DA

Nagpur

CA

DA

Nashik

DIP

C D

hule

KIC

Pune

NIC

Nagpur

NIC

Nanded

PIC

Pune

UW

IC A

mra

vati

YIC

Yavatm

al

BIC

Bhandara

CA

DA

Nagpur

CIP

C C

handra

pur

KIC

Kolh

apur

SIC

Sangli

SIC

Sata

ra

SIP

C S

ata

ra

SK

IPC

oro

s

TIC

Thane

85

Page 94: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator VI: Percentage of Planned & Actual Non Irrigation Use - Page 1 of 4

(Major Projects / 2017-18) Unit: Mcum

NI Use as

per PRSubbasin/ PlanGroup Project/ Circle NI UseNI Use As

per PIP

Percent

wrt PR

Percent

wrt PIP

Highly DeficitRemaining Bhima+ Man

Bhima (Ujjani) 63 100 94.90 151.51 94.90

CADA Solapur 151.51 94.90 10063 94.90

Sina

Sina Kolegaon 5 55 0.30 6.23 0.55

CADA Beed 6.23 0.55 545 0.30

Sina

Sina Madha Link Canal 0 137 1.60 0.00 1.17

Sina Madha LIS 0 0 0.00 0.00 0.00

CADA Solapur 0.00 1.17 1370 1.60

Highly Deficit 157.74 96.61 10061 96.80

DeficitGirna

Girna+Panzan 0 40 73.80 0.00 183.83

CADA Jalgaon 0.00 183.83 400 73.80

Girna

Chankapur 0 107 59.06 0.00 55.21

CADA Nashik 0.00 55.21 1070 59.06

Lower Godavari

Jayakwadi Stage I 0 119 133.28 0.00 111.87

CADA Abad 0.00 111.87 1190 133.28

Lower Godavari

Jayakwadi Stage II

(Majalgaon)

0 68 27.30 0.00 40.25

CADA Beed 0.00 40.25 680 27.30

Lower Godavari

Vishnupuri 59 92 33.65 56.62 36.74

NIC Nanded 56.62 36.74 9259 33.65

Manjra

Lower Terna 14 20 2.01 14.36 10.00

Manjra 0 154 24.68 0.00 16.00

CADA Beed 14.36 26.00 103186 26.70

Manjra

Lower Manar 115 123 6.75 5.88 5.50

NIC Nanded 5.88 5.50 123115 6.75

Middle Tapi (South)

Waghur 73 105 46.55 64.00 44.54

JIPC Jalgaon 64.00 44.54 10573 46.55

Purna (Tapi)

Katepurna 0 0 22.02 0.00 0.0086

Page 95: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator VI: Percentage of Planned & Actual Non Irrigation Use - Page 2 of 4

(Major Projects / 2017-18) Unit: Mcum

NI Use as

per PRSubbasin/ PlanGroup Project/ Circle NI UseNI Use As

per PIP

Percent

wrt PR

Percent

wrt PIP

Nalganga 35 78 2.27 6.51 2.92

Wan 105 64 26.91 25.70 42.13

AIC Akola 32.21 45.05 114159 51.21

Purna+Dudhana

Khadakpurna 110 0 8.64 7.87 0.00

AIC Akola 7.87 0.00 0110 8.64

Purna+Dudhana

Purna Complex 0 258 46.96 0.00 18.20

NIC Nanded 0.00 18.20 2580 46.96

Deficit 180.94 567.19 91284 513.89

NormalMiddle Tapi (Satpuda)

Hatnur 35 108 102.64 290.46 95.29

CADA Jalgaon 290.46 95.29 10835 102.64

Painganga

Pen Takli 25 101 3.96 15.58 3.94

AIC Akola 15.58 3.94 10025 3.96

Painganga

Upper Penganga 0 116 108.02 0.00 92.76

NIC Nanded 0.00 92.76 1160 108.02

Painganga

Arunawati 525 204 12.44 2.37 6.10

Pus 250 132 8.27 3.31 6.28

YIC Yavatmal 5.68 12.38 167365 20.71

Remaining Bhima (Neera)

Neera Complex 0 84 51.02 0.00 60.48

Neera Devdhar 0 0 0.00 30.30 0.00

PIC Pune 30.30 60.48 84168 51.02

Upper Bhima

Ghod 0 68 8.06 0.00 11.93

Kukadi Complex 0 0 3.98 0.00 0.00

KIC Pune 0.00 11.93 1010 12.04

Upper Bhima

Bhama Askhed 268 354 10.61 3.96 3.00

Chaskaman 0 96 7.62 0.00 7.93

Khadakwasla Complex 443 0 627.52 141.60 0.00

Pawana 82 47 138.20 168.32 297.17

PIC Pune 313.88 308.10 254250 783.95

Upper Godavari 87

Page 96: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator VI: Percentage of Planned & Actual Non Irrigation Use - Page 3 of 4

(Major Projects / 2017-18) Unit: Mcum

NI Use as

per PRSubbasin/ PlanGroup Project/ Circle NI UseNI Use As

per PIP

Percent

wrt PR

Percent

wrt PIP

NMC Express Mukane 0 0 28.49 0.00 0.00

CADA Abad 0.00 0.00 00 28.49

Upper Godavari

Bhawli 0 0 0.00 0.00 0.00

Darna 0 0 35.37 0.00 0.00

Gangapur 5951 0 168.41 2.83 0.00

Kadwa 3095 164 18.57 0.60 11.33

Mukane 8 0 4.34 57.51 0.00

Mula 111 0 65.62 59.12 0.00

NMWeir 0 0 97.24 0.00 0.00

Upper Godavari

Complex

734 159 151.51 20.65 95.36

Upper Prawara

Complex

0 74 46.98 0.00 63.70

CADA Nashik 140.71 170.39 345418 588.03

Upper Godavari

Punand 0 65 15.57 0.00 24.07

DIPC Dhule 0.00 24.07 650 15.57

Wardha

Bor 0 0 0.00 6.35 0.00

Lower Wunna

Complex

174 0 27.76 16.00 0.00

CADA Nagpur 22.35 0.00 0124 27.76

Wardha

Lower Wardha 59 300 30.00 50.60 10.00

NIC Nagpur 50.60 10.00 30059 30.00

Wardha

Upper Wardha 39 41 68.07 174.92 165.76

UWIC Amravati 174.92 165.76 4139 68.07

Wardha

Bembla 0 0 0.00 32.64 0.00

YIC Yavatmal 32.64 0.00 00 0.00

Normal 1,077.12 955.11 193171 1,840.27

SurplusMiddle Wainganga

Bagh Complex 0 100 9.59 0.00 9.59

Itiadoh 0 100 11.99 0.00 11.99

BIC Bhandara 0.00 21.57 1000 21.57

Middle Wainganga

Pench Complex 126 85 224.72 179.00 265.51

CADA Nagpur 179.00 265.51 85126 224.72

Surplus 179.00 287.09 86138 246.3088

Page 97: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator VI: Percentage of Planned & Actual Non Irrigation Use - Page 4 of 4

(Major Projects / 2017-18) Unit: Mcum

NI Use as

per PRSubbasin/ PlanGroup Project/ Circle NI UseNI Use As

per PIP

Percent

wrt PR

Percent

wrt PIP

AbundantLower Wainganga

Dina 0 0 0.00 0.09 0.00

CIPC Chandrapur 0.09 0.00 00 0.00

Middle Konkan

Vaitarna 92 104 206.29 223.70 198.93

TIC Thane 223.70 198.93 10492 206.29

North Konkan

Bhatsa 119 74 507.20 426.80 684.11

Surya 95 0 70.26 73.83 0.00

TIC Thane 500.63 684.11 84115 577.46

Telekhol- Tillari

Tillari Complex 0 0 0.00 111.47 0.00

SKIPC oros 111.47 0.00 00 0.00

Upper Krishna (E)

Tarali 0 0 0.23 51.25 0.00

SIPC Satara 51.25 0.00 00 0.23

Upper Krishna (W)

Dudhaganga 14 109 24.67 180.93 22.66

Radhanagari 473 98 53.62 11.33 54.66

Tulshi 0 139 0.61 0.00 0.44

Warana 6 92 18.49 306.33 20.00

KIC Kolhapur 498.59 97.76 10020 97.38

Upper Krishna (W)

Krishna LIS Complex 0 424 133.54 0.00 31.50

SIC Sangli 0.00 31.50 4240 133.54

Upper Krishna (W)

Dhom Complex 1 1 0.68 83.12 54.55

Kanher 0 0 0.19 66.55 40.00

Urmodi 105 105 5.41 5.13 5.13

SIC Satara 154.80 99.68 64 6.28

Abundant 1,540.51 1,111.97 9266 1,021.19

Major 3,135.31 3,017.97 119 123 3,718.44

89

Page 98: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

90

Page 99: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator VII: Percentage of Unutilized water to Live Storage - Page 1 of 4

(Major Projects / 2017-18) Unit: Mcum

Subbasin/PlanGroup Project/ Circle

Live storage

on

30th June

Designed

Carry OverInflow

in HW

Live

Stoage

15Oct

Percent

Unutilised

Net

Unutilised

Highly DeficitRemaining Bhima+ Man Bhima (Ujjani) 0.00 0.00 33.03 0.00 1688.41 0

CADA Solapur 0.00 0.00 33.03 0.00 1,688.41 0

Sina Sina Kolegaon 0.00 0.00 0.00 0.00 76.19 0

CADA Beed 0.00 0.00 0.00 0.00 76.19 0

Sina Sina Madha Link

Canal

0.00 0.00 63.45 0.00 0.00 0

Sina Madha LIS 0.00 0.00 31.92 0.00 0.00 0

CADA Solapur 0.00 0.00 95.37 0.00 0.00 0

Highly Deficit 0.00 0.00 128.40 1764.60 0.00 0

DeficitGirna Girna+Panzan 52.14 155.65 72.49 0.00 366.34 0

CADA Jalgaon 52.14 155.65 72.49 0.00 366.34 0

Girna Chankapur 7.78 0.00 3.74 4.04 68.72 6

CADA Nashik 7.78 0.00 3.74 4.04 68.72 6

Lower Godavari Jayakwadi Stage

I

460.34 382.00 0.00 78.34 2170.93 4

CADA Abad 460.34 382.00 0.00 78.34 2,170.93 4

Lower Godavari Jayakwadi Stage

II (Majalgaon)

3.80 0.00 3.49 0.31 286.60 0

CADA Beed 3.80 0.00 3.49 0.31 286.60 0

Lower Godavari Vishnupuri 17.46 0.00 42.81 0.00 80.79 0

NIC Nanded 17.46 0.00 42.81 0.00 80.79 0

Manjra Lower Terna 23.87 0.00 1.92 21.95 74.68 29

Manjra 12.48 4.42 4.78 3.28 176.96 2

CADA Beed 36.35 4.42 6.70 25.23 251.64 10

Manjra Lower Manar 12.77 0.00 8.91 3.86 30.72 13

NIC Nanded 12.77 0.00 8.91 3.86 30.72 13

Middle Tapi (South) Waghur 88.00 12.94 0.00 75.06 181.30 41

JIPC Jalgaon 88.00 12.94 0.00 75.06 181.30 41

Purna (Tapi) Katepurna 6.94 5.17 7.26 0.00 16.46 0

Nalganga 7.42 18.40 0.00 0.00 28.73 0

Wan 48.50 28.58 0.00 19.92 77.67 26

AIC Akola 62.86 52.15 7.26 19.92 122.86 16

Purna+Dudhana Khadakpurna 0.00 0.00 0.00 0.00 18.29 0

AIC Akola 0.00 0.00 0.00 0.00 18.29 0

Purna+Dudhana Purna Complex 0.00 243.52 35.00 0.00 151.14 0

NIC Nanded 0.00 243.52 35.00 0.00 151.14 0

Deficit 741.49 850.68 180.41 3729.33 206.75 6

91

Page 100: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator VII: Percentage of Unutilized water to Live Storage - Page 2 of 4

(Major Projects / 2017-18) Unit: Mcum

Subbasin/PlanGroup Project/ Circle

Live storage

on

30th June

Designed

Carry OverInflow

in HW

Live

Stoage

15Oct

Percent

Unutilised

Net

Unutilised

NormalMiddle Tapi (Satpuda) Hatnur 20.60 205.00 79.07 0.00 255.00 0

CADA Jalgaon 20.60 205.00 79.07 0.00 255.00 0

Painganga Pen Takli 1.47 0.00 0.00 1.47 26.18 6

AIC Akola 1.47 0.00 0.00 1.47 26.18 6

Painganga Upper Penganga 32.80 0.00 127.46 0.00 136.67 0

NIC Nanded 32.80 0.00 127.46 0.00 136.67 0

Painganga Arunawati 25.59 72.00 21.67 0.00 40.60 0

Pus 43.75 28.37 35.16 0.00 21.54 0

YIC Yavatmal 69.34 100.37 56.83 0.00 62.14 0

Remaining Bhima (Neera) Neera Complex 110.71 0.00 491.04 40.70 932.01 4

Neera Devdhar 71.12 69.80 65.44 0.00 332.15 0

PIC Pune 181.83 69.80 556.48 40.70 1,264.16 3

Upper Bhima Ghod 0.00 0.00 12.42 0.00 154.43 0

Kukadi Complex 47.81 128.56 284.72 0.00 811.36 0

KIC Pune 47.81 128.56 297.15 0.00 965.79 0

Upper Bhima Bhama Askhed 72.39 58.74 5.01 8.64 217.10 4

Chaskaman 13.74 18.55 22.77 0.00 214.50 0

Khadakwasla

Complex

98.25 107.04 448.01 0.00 777.41 0

Pawana 52.01 0.00 0.00 52.01 240.97 22

PIC Pune 236.39 184.33 475.79 60.65 1,449.98 4

Upper Godavari NMC Express

Mukane

0.00 0.00 39.95 0.00 0.00 0

CADA Abad 0.00 0.00 39.95 0.00 0.00 0

Upper Godavari Bhawli 7.03 0.00 8.51 0.00 40.60 0

Darna 42.22 0.00 44.69 0.00 202.44 0

Gangapur 52.59 0.00 61.13 0.00 157.13 0

Kadwa 2.57 0.00 0.79 1.78 47.79 4

Mukane 1.86 0.00 7.83 0.00 192.67 0

Mula 6.51 0.00 2.66 3.86 608.81 1

NMWeir 6.75 0.00 162.45 0.00 6.62 0

Upper Godavari

Complex

34.17 0.00 58.59 28.06 326.36 9

Upper Prawara

Complex

111.08 0.00 519.76 0.00 532.43 0

CADA Nashik 264.78 0.00 866.39 33.70 2,114.85 2

Upper Godavari Punand 11.47 0.00 0.37 11.10 36.99 30

DIPC Dhule 11.47 0.00 0.37 11.10 36.99 30

92

Page 101: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator VII: Percentage of Unutilized water to Live Storage - Page 3 of 4

(Major Projects / 2017-18) Unit: Mcum

Subbasin/PlanGroup Project/ Circle

Live storage

on

30th June

Designed

Carry OverInflow

in HW

Live

Stoage

15Oct

Percent

Unutilised

Net

Unutilised

Wardha Bor 33.27 15.80 2.57 14.90 81.26 18

Lower Wunna

Complex

16.70 0.00 10.48 6.22 171.48 4

CADA Nagpur 49.97 15.80 13.05 21.13 252.73 8

Wardha Lower Wardha 32.00 0.00 19.35 12.65 139.91 9

NIC Nagpur 32.00 0.00 19.35 12.65 139.91 9

Wardha Upper Wardha 197.93 188.27 28.77 0.00 564.05 0

UWIC

Amravati

197.93 188.27 28.77 0.00 564.05 0

Wardha Bembla 81.15 0.00 49.00 32.15 89.97 36

YIC Yavatmal 81.15 0.00 49.00 32.15 89.97 36

Normal 1227.52 892.13 2609.67 7358.42 213.53 3

SurplusMiddle Wainganga Bagh Complex 13.15 0.00 19.06 6.37 60.40 11

Itiadoh 73.47 0.00 16.04 57.44 114.88 50

BIC Bhandara 86.62 0.00 35.09 63.80 175.28 36

Middle Wainganga Pench Complex 186.32 504.00 85.36 10.79 610.14 2

CADA Nagpur 186.32 504.00 85.36 10.79 610.14 2

Surplus 272.94 504.00 120.45 785.42 74.59 9

AbundantLower Wainganga Dina 1.78 0.00 3.88 0.00 15.81 0

CIPC

Chandrapur

1.78 0.00 3.88 0.00 15.81 0

Middle Konkan Vaitarna 106.19 103.00 23.47 0.00 331.31 0

TIC Thane 106.19 103.00 23.47 0.00 331.31 0

North Konkan Bhatsa 345.10 225.42 69.58 50.10 942.10 5

Surya 107.63 165.88 26.37 0.00 276.35 0

TIC Thane 452.73 391.30 95.95 50.10 1,218.45 4

Telekhol- Tillari Tillari Complex 84.94 21.85 89.22 57.59 516.71 11

SKIPC oros 84.94 21.85 89.22 57.59 516.71 11

Upper Krishna (E) Tarali 36.44 0.00 25.03 11.41 147.34 8

SIPC Satara 36.44 0.00 25.03 11.41 147.34 8

Upper Krishna (W) Dudhaganga 201.37 0.00 71.76 129.61 679.11 19

Radhanagari 61.40 0.00 40.42 20.98 219.97 10

Tulshi 42.03 5.24 6.67 30.12 91.92 33

Warana 262.25 0.00 83.09 179.16 779.35 23

KIC Kolhapur 567.04 5.24 201.94 359.86 1,770.35 20

Upper Krishna (W) Krishna LIS

Complex

698.11 0.00 50.08 648.02 2814.73 23

93

Page 102: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator VII: Percentage of Unutilized water to Live Storage - Page 4 of 4

(Major Projects / 2017-18) Unit: Mcum

Subbasin/PlanGroup Project/ Circle

Live storage

on

30th June

Designed

Carry OverInflow

in HW

Live

Stoage

15Oct

Percent

Unutilised

Net

Unutilised

SIC Sangli 698.11 0.00 50.08 648.02 2,814.73 23

Upper Krishna (W) Dhom Complex 73.78 0.00 114.23 0.00 435.84 0

Kanher 48.35 0.00 20.13 28.22 268.65 11

Urmodi 98.92 0.00 2.49 96.43 272.58 35

SIC Satara 221.05 0.00 136.86 124.65 977.07 13

Abundant 2168.27 521.39 626.43 7791.78 1251.64 16

4410.23 2768.20 3665.36 1746.51 21429.54 Major 8

94

Page 103: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

CA

DA

Beed

CA

DA

Sola

pur

AIC

Akola

CA

DA

Abad

CA

DA

Beed

CA

DA

Jalg

aon

CA

DA

Nashik

JIP

C J

alg

aon

NIC

Nanded

AIC

Akola

CA

DA

Abad

CA

DA

Jalg

aon

CA

DA

Nagpur

CA

DA

Nashik

DIP

C D

hule

KIC

Pune

NIC

Nagpur

NIC

Nanded

PIC

Pune

UW

IC A

mra

vati

YIC

Yavatm

al

BIC

Bhandara

CA

DA

Nagpur

CIP

C C

handra

pur

KIC

Kolh

apur

SIC

Sangli

SIC

Sata

ra

SIP

C S

ata

ra

SK

IPC

oro

s

TIC

Thane

95

Page 104: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator VIII: Conveyance Efficiency of Main Canals - Page 1 of 4 (Major / 2017-18) Unit: %

LBC RBC LBC RBC Subbasin/PlanGroup Project/ Circle

Rabi HW

Highly Deficit Remaining Bhima+ Man Bhima (Ujjani) 0 0 0 0

CADA Solapur

Sina Sina Kolegaon 0 0 0 0

CADA Beed Sina Sina Madha Link Canal 0 0 0 0

Sina Madha LIS 82 0 81 0

CADA Solapur 82 81

Highly Deficit 82 81

Deficit Girna Girna+Panzan 56 76 61 0

CADA Jalgaon 56 76 61 Girna Chankapur 72 68 73 0

CADA Nashik 72 68 73

Lower Godavari Jayakwadi Stage I 21 0 26 0

CADA Abad 21 26 Lower Godavari Jayakwadi Stage II

(Majalgaon) 0 77 0 86

CADA Beed 77 86 Lower Godavari Vishnupuri 0 88 0 81

NIC Nanded 88 81

Manjra Lower Terna 84 82 80 72

Manjra 64 71 60 66

CADA Beed 74 77 70 69 Manjra Lower Manar 0 0 0 0

NIC Nanded

Middle Tapi (South) Waghur 100 100 100 100

JIPC Jalgaon 100 100 100 100

Purna (Tapi) Katepurna 0 0 0 0

Nalganga 0 100 0 59

Wan 40 0 0 0

AIC Akola 40 100 59

Purna+Dudhana Khadakpurna 0 0 0 0

AIC Akola

96

Page 105: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator VIII: Conveyance Efficiency of Main Canals - Page 2 of 4 (Major / 2017-18) Unit: %

LBC RBC LBC RBC Subbasin/PlanGroup Project/ Circle

Rabi HW

Purna+Dudhana Purna Complex 77 0 75 0

NIC Nanded 77 75

Deficit 64 83 68 77

Normal Middle Tapi (Satpuda) Hatnur 0 41 0 0

CADA Jalgaon 41

Painganga Pen Takli 0 0 0 0

AIC Akola Painganga Upper Penganga 78 82 79 80

NIC Nanded 78 82 79 80 Painganga Arunawati 38 58 0 0

Pus 0 0 0 0

YIC Yavatmal 38 58

Remaining Bhima (Neera) Neera Complex 44 59 38 55

Neera Devdhar 0 0 0 0

PIC Pune 44 59 38 55

Upper Bhima Ghod 76 63 51 51

Kukadi Complex 44 39 39 36

KIC Pune 60 51 45 43 Upper Bhima Bhama Askhed 0 0 0 0

Chaskaman 47 0 43 0

Khadakwasla Complex 0 20 0 20

Pawana 0 0 0 0

PIC Pune 47 20 43 20

Upper Godavari NMC Express Mukane 100 0 100 0

CADA Abad 100 100 Upper Godavari Bhawli 0 0 0 0

Darna 0 0 0 0

Gangapur 100 0 92 0

Kadwa 0 40 0 0

Mukane 0 0 0 0

Mula 86 63 53 77

NMWeir 30 30 31 21

Upper Godavari Complex

48 56 42 51

97

Page 106: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator VIII: Conveyance Efficiency of Main Canals - Page 3 of 4 (Major / 2017-18) Unit: %

LBC RBC LBC RBC Subbasin/PlanGroup Project/ Circle

Rabi HW

Upper Prawara Complex 44 35 43 33

CADA Nashik 62 45 52 46 Upper Godavari Punand 70 0 70 60

DIPC Dhule 70 70 60

Wardha Bor 79 0 0 0

Lower Wunna Complex 0 0 0 0

CADA Nagpur 79 Wardha Lower Wardha 0 0 0 0

NIC Nagpur Wardha Upper Wardha 97 84 0 0

UWIC Amravati 97 84 Wardha Bembla 0 79 0 0

YIC Yavatmal 79

Normal 65 54 57 48

Surplus Middle Wainganga Bagh Complex 0 0 0 0

Itiadoh 0 0 0 0

BIC Bhandara Middle Wainganga Pench Complex 10 0 0 0

CADA Nagpur 10

Surplus 10

Abundant Lower Wainganga Dina 0 0 0 0

CIPC Chandrapur

Middle Konkan Vaitarna 0 0 0 0

TIC Thane

North Konkan Bhatsa 0 61 0 63

Surya 64 58 61 54

TIC Thane 64 60 61 59

Telekhol- Tillari Tillari Complex 39 37 64 65

SKIPC oros 39 37 64 65

Upper Krishna (E) Tarali 0 0 0 0

SIPC Satara

98

Page 107: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Note:

Values of conveyance efficiency of major project given by project authority for some of the project may not be realistic due to efficiency varies with canal length , physical condition of canal and either the canal is lined or unlined hence indicator values of conveyance efficiency of major projects are not as per requisite.

Indicator VIII: Conveyance Efficiency of Main Canals - Page 4 of 4 (Major / 2017-18) Unit: %

LBC RBC LBC RBC Subbasin/PlanGroup Project/ Circle

Rabi HW

Upper Krishna (W) Dudhaganga 0 0 0 0

Radhanagari 0 0 0 0

Tulshi 0 0 0 0

Warana 0 0 0 0

KIC Kolhapur Upper Krishna (W) Krishna LIS Complex 0 0 0 0

SIC Sangli Upper Krishna (W) Dhom Complex 59 75 46 58

Kanher 62 50 62 51

Urmodi 45 0 51 0

SIC Satara 55 63 53 54

Abundant 54 56 57 58

99

Page 108: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

CA

DA

Sola

pur

CA

DA

Beed

NIC

Nanded

CA

DA

Jalg

aon

CA

DA

Nashik

JP

C A

ura

ngabad

JIP

C J

alg

aon

CA

DA

Abad

AIC

Akola

CA

DA

Beed

CA

DA

Jalg

aon

NIC

Nagpur

CA

DA

Nashik

CA

DA

Abad

CA

DA

Nagpur

UW

IC A

mra

vati

DIP

C D

hule

JIP

C J

alg

aon

NIC

Nanded

YIC

Yavatm

al

AIC

Akola

PIC

Pune

KIC

Pune

BIC

Bhandara

GLIC

Bhandara

CA

DA

Nagpur

KIC

Kolh

apur

CIP

C C

handra

pur

TIC

Thane

SIC

Sangli

SIC

Sata

ra

SIP

C S

ata

ra

SK

IPC

oro

s

100

Page 109: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator IX: Actual Cropping Pattern - Page 1 of 4

(Major Projects / 2017-18) Unit: %

Subbasin/PlanGroup Project/ Circle Kharif

seasonals

Two

seasonals

Rabi

seasonals

HW

seasonals

Perennials

Highly DeficitRemaining Bhima+ Man

17 0 20 16 47Bhima (Ujjani)

CADA Solapur 17 20 47 16

Sina

0 0 49 2 50Sina Kolegaon

CADA Beed 49 50 2

Sina

26 0 33 14 27Sina Madha Link Canal

32 0 15 19 35Sina Madha LIS

CADA Solapur 29 0 24 31 16

Highly Deficit

DeficitGirna

19 20 57 1 3Girna+Panzan

CADA Jalgaon 19 20 57 3 1

Girna

66 1 31 0 1Chankapur

CADA Nashik 66 1 31 1

Lower Godavari

4 19 27 10 41Jayakwadi Stage I

CADA Abad 4 19 27 41 10

Lower Godavari

2 20 22 3 54Jayakwadi Stage II

(Majalgaon)

CADA Beed 2 20 22 54 3

Lower Godavari

0 5 66 1 29Vishnupuri

NIC Nanded 5 66 29 1

Manjra

42 2 34 3 19Lower Terna

0 0 26 7 67Manjra

CADA Beed 42 2 30 43 5

Manjra

4 26 45 7 18Lower Manar

NIC Nanded 4 26 45 18 7

Middle Tapi (South)

21 0 44 36 0Waghur

JIPC Jalgaon 21 44 36

Purna (Tapi)

101

Page 110: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator IX: Actual Cropping Pattern - Page 2 of 4

(Major Projects / 2017-18) Unit: %

Subbasin/PlanGroup Project/ Circle Kharif

seasonals

Two

seasonals

Rabi

seasonals

HW

seasonals

Perennials

0 12 88 0 0Katepurna

0 55 43 0 2Nalganga

0 11 86 1 3Wan

AIC Akola 26 72 2 1

Purna+Dudhana

17 18 64 0 2Khadakpurna

AIC Akola 17 18 64 2

Purna+Dudhana

4 17 39 21 19Purna Complex

NIC Nanded 4 17 39 19 21

Deficit

NormalMiddle Tapi (Satpuda)

17 22 36 6 19Hatnur

CADA Jalgaon 17 22 36 19 6

Painganga

0 0 97 3 0Pen Takli

AIC Akola 97 3

Painganga

25 10 49 0 16Upper Penganga

NIC Nanded 25 10 49 16

Painganga

0 39 54 2 4Arunawati

0 0 0 0 0Pus

YIC Yavatmal 39 54 4 2

Remaining Bhima (Neera)

23 0 19 21 37Neera Complex

22 0 55 22 0Neera Devdhar

PIC Pune 23 37 37 21

Upper Bhima

35 0 26 24 15Ghod

22 0 51 21 5Kukadi Complex

KIC Pune 28 39 10 23

Upper Bhima

46 0 13 10 31Bhama Askhed

36 0 27 13 25Chaskaman

29 0 19 12 40Khadakwasla Complex

36 0 42 6 16Pawana

PIC Pune 37 25 28 10

102

Page 111: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator IX: Actual Cropping Pattern - Page 3 of 4

(Major Projects / 2017-18) Unit: %

Subbasin/PlanGroup Project/ Circle Kharif

seasonals

Two

seasonals

Rabi

seasonals

HW

seasonals

Perennials

Upper Godavari

21 19 41 12 7NMC Express Mukane

CADA Abad 21 19 41 7 12

Upper Godavari

0 0 100 0 0Bhawli

6 0 58 2 33Darna

4 0 41 6 49Gangapur

18 0 73 6 4Kadwa

9 0 62 29 0Mukane

13 5 21 18 42Mula

27 0 35 0 37NMWeir

16 2 46 8 28Upper Godavari Complex

24 0 44 19 13Upper Prawara Complex

CADA Nashik 15 4 53 26 12

Upper Godavari

0 0 93 7 0Punand

DIPC Dhule 93 7

Wardha

0 34 66 0 0Bor

0 58 39 0 3Lower Wunna Complex

CADA Nagpur 0 46 52 2

Wardha

3 64 33 0 0Lower Wardha

NIC Nagpur 3 64 33

Wardha

3 42 43 0 13Upper Wardha

UWIC Amravati 3 42 43 13 0

Wardha

7 82 11 0 0Bembla

YIC Yavatmal 7 82 11

Normal

SurplusMiddle Wainganga

100 0 0 0 0Bagh Complex

100 0 0 0 0Itiadoh

BIC Bhandara 100

Middle Wainganga

64 4 30 0 1Pench Complex

CADA Nagpur 64 4 30 1 0

103

Page 112: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator IX: Actual Cropping Pattern - Page 4 of 4

(Major Projects / 2017-18) Unit: %

Subbasin/PlanGroup Project/ Circle Kharif

seasonals

Two

seasonals

Rabi

seasonals

HW

seasonals

Perennials

Surplus

AbundantLower Wainganga

100 0 0 0 0Dina

CIPC Chandrapur 100

Middle Konkan

22 0 34 0 44Vaitarna

TIC Thane 22 34 44

North Konkan

65 0 19 16 1Bhatsa

58 0 13 13 16Surya

TIC Thane 61 16 8 14

Telekhol- Tillari

93 0 2 1 4Tillari Complex

SKIPC oros 93 2 4 1

Upper Krishna (E)

55 0 31 0 14Tarali

SIPC Satara 55 31 14

Upper Krishna (W)

49 0 6 2 44Dudhaganga

36 0 9 1 55Radhanagari

44 0 13 1 42Tulshi

38 0 19 1 42Warana

KIC Kolhapur 42 11 46 1

Upper Krishna (W)

34 0 17 0 50Krishna LIS Complex

SIC Sangli 34 17 50

Upper Krishna (W)

25 0 37 17 21Dhom Complex

37 0 21 10 31Kanher

42 0 24 34 1Urmodi

SIC Satara 35 0 27 18 20

Abundant

104

Page 113: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Annexure II

Indicators of Medium

Projects

Page 114: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

105

Page 115: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator I: Water Availability in Reservoirs on 15th Oct - Page 1 of 8

(Medium Projects / 2017-18) Unit: Mcum

Subbasin/PlanGroup Project/ CircleLive Storage

As On 15 OctDesigned Live

Storage

Percent Live

Storage

Highly Deficit

Remaining Bhima (Neera) Buddhihal 0 0.00 19.03SIC Sangli 0 0.00 19.03

Remaining Bhima (Neera) Andhali 5 0.34 7.43

Ranand 34 2.17 6.42SIC Satara 18 2.51 13.85

Remaining Bhima (Neera) Tisangi 100 24.47 24.47PIC Pune 100 24.47 24.47

Remaining Bhima+ Man Mhaswad 11 4.86 46.12PIC Pune 11 4.86 46.12

Remaining Bhima+ Man Dodda Nalla 21 1.25 6.06

Sankh 100 14.86 14.87SIC Sangli 77 16.11 20.93

Remaining Bhima+ Man Jawalgaon 70 20.55 29.19

Ashti 89 20.57 23.01CADA Solapur 79 41.12 52.20

Sina Khairy 100 13.74 13.74

Sina 100 52.30 52.30KIC Pune 100 66.04 66.04

Sina Pimpalgaon (Dhale) 100 9.86 9.86

Bori 79 15.23 19.25

Ekrukh 32 19.39 61.16

Mangi 78 23.72 30.40

Hingani (Pangaon) 100 31.96 31.96CADA Solapur 66 100.16 152.63

Sina Kambli 100 2.01 2.01

Talwar 100 3.23 3.23

Turori 55 3.44 6.20

Jakapur 62 4.92 7.96

Banganga 100 4.96 4.96

Khandala 100 5.24 5.24

Ramganga 100 5.34 5.34

Kadi 100 6.33 6.33

Kada 100 8.58 8.55

Khandeshwar 100 8.78 8.78

Ruti 100 10.37 10.37

Harni 100 11.18 11.18

Benitura 100 11.50 11.50

Khasapur 100 13.04 13.04

Sakat 100 13.47 13.47

Mehkari 100 15.23 15.23

Chandani 87 18.83 21.58

Kurnoor 100 32.28 32.28CADA Beed 95 178.72 187.25

106

Page 116: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator I: Water Availability in Reservoirs on 15th Oct - Page 2 of 8

(Medium Projects / 2017-18) Unit: Mcum

Subbasin/PlanGroup Project/ CircleLive Storage

As On 15 OctDesigned Live

Storage

Percent Live

Storage

Upper Krishna (E) Siddhewadi 0 0.00 6.10

Basappawadi 5 0.31 6.27SIC Sangli 2 0.31 12.37

Upper Krishna (E) Nher 52 6.11 11.79

Yeralwadi 57 11.08 19.60SIC Satara 55 17.19 31.39

Highly Deficit 72 451.48 626.28

Deficit

Girna Gadadgad 100 4.64 4.64CADA Abad 100 4.64 4.64

Girna Agnavati 0 0.00 2.76

Hiwara 46 4.45 9.60

Manyad 56 22.53 40.27CADA Jalgaon 51 26.98 52.63

Girna Nagya Sakya 45 5.10 11.24

Kelzar 100 16.22 16.22

Haranbari 100 33.02 33.02CADA Nashik 90 54.34 60.48

Lower Godavari Kudala 100 4.35 4.35NIC Nanded 100 4.35 4.35

Lower Godavari Kharola 100 0.25 0.25

Ghanasargaon 100 0.29 0.29

Renapur Medium Project 100 0.35 0.35

Upper Kundlika 100 15.57 15.57BIPC Parli (V) 100 16.46 16.46

Lower Godavari Masoli 28 7.71 27.14

Galhati 100 13.86 13.83CADA Abad 53 21.57 40.97

Lower Godavari Bodhegaon 100 3.65 3.65

Saraswati 100 6.21 6.21

Bindusara 100 7.11 7.11

Borna 80 7.17 8.97

Sindphana 100 7.36 7.36

Wan (Beed) 75 16.43 21.91

Kundalika 100 37.69 37.69CADA Beed 92 85.61 92.89

Manjra Borgaon Anjanpur 0 0.00 1.50

Limbala 97 0.28 0.29

Rajegaon 93 0.55 0.59

Tagarkheda 100 0.77 0.77

Wangdari 100 0.84 0.84

Takalgaon Devla 71 1.30 1.83

Killlari 2 100 1.30 1.30

Madansuri 75 1.31 1.74107

Page 117: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator I: Water Availability in Reservoirs on 15th Oct - Page 3 of 8

(Medium Projects / 2017-18) Unit: Mcum

Subbasin/PlanGroup Project/ CircleLive Storage

As On 15 OctDesigned Live

Storage

Percent Live

Storage

Binagihal 100 1.35 1.35

Gunjarga 100 1.37 1.37

Sai 40 1.40 3.47

Bhusni 100 1.49 1.49

Dhanegaon 19 2.13 11.31

Hosur Barrage 100 2.25 2.25

Nagzari (Latur) 87 3.02 3.49

Karsa Pohegaon 100 3.41 3.41

Wanjarkheda 100 3.61 3.61

Aurad 100 3.67 3.67

Shivni 67 6.48 9.72

Dongargaon (Latur) 100 7.89 7.89

Kholgapur 100 9.73 9.72BIPC Parli (V) 76 54.13 71.61

Manjra Mahalingi 0 0.00 4.79

Kundrala 11 1.10 10.42

Pethwadaj 19 1.68 9.04

Karadkhed 79 8.74 11.01

Upper Manar 84 63.75 75.71NIC Nanded 68 75.27 110.97

Manjra Belpara 39 2.29 5.82

Raigavan 23 2.55 11.26

Waghe Babhulgaon 100 3.74 3.74

Mahasangvi 100 5.88 5.89

Sakol 57 6.20 10.95

Whati 82 6.81 8.27

Tiru 52 7.99 15.29

Devarjan 76 8.09 10.68

Rui 100 8.61 8.61

Masalga 100 13.60 13.60

Sangameshwar

(Dokewadi)

100 15.04 15.03

Renapur 77 15.76 20.55

Tawarja 87 17.61 20.35

Terna 100 19.66 19.66

Gharni 100 22.47 22.46CADA Beed 81 156.27 192.15

Middle Tapi (Satpuda) Shivan 61 12.58 20.66DIPC Dhule 61 12.58 20.66

Middle Tapi (Satpuda) Amarawati 0 0.00 21.25

Bori (Jalgaon) 0 0.00 25.15

Bahula 3 0.55 16.33

Sulwade Barrage 74 48.02 65.05

Prakasha Barrage 89 55.43 62.11

Sarangkheda Barrage 94 86.68 91.81CADA Jalgaon 68 190.68 281.70

108

Page 118: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator I: Water Availability in Reservoirs on 15th Oct - Page 4 of 8

(Medium Projects / 2017-18) Unit: Mcum

Subbasin/PlanGroup Project/ CircleLive Storage

As On 15 OctDesigned Live

Storage

Percent Live

Storage

Middle Tapi (South) Ajanta Andhari 16 1.20 7.65CADA Abad 16 1.20 7.65

Middle Tapi (South) Bhokarbari 0 0.00 6.54

Kanoli 0 0.00 8.45

Tondapur 81 3.74 4.64

Jamkhedi 100 12.34 12.34

Rangawali 100 12.89 12.89

Burai 100 14.21 14.21CADA Jalgaon 73 43.18 59.07

Purna (Tapi) Uma 9 1.10 11.68

Torna 40 3.16 7.89

Mas 29 4.32 15.04

Paldhag 100 7.51 7.51

Morna (Akola) 18 7.62 41.46

Utawali 39 7.68 19.79

Mun 28 10.17 36.83

Nirguna 57 16.57 28.85

Dnyanganga 55 18.61 33.93AIC Akola 38 76.75 202.98

Purna (Tapi) Shahnoor 65 29.83 46.04

Chandrabhaga

(Amravati)

74 30.61 41.25

Sapan 81 31.35 38.60

Purna (Achalpur) 100 35.35 35.37UWIC Amravati 79 127.14 161.26

Purna+Dudhana Wakod 0 0.00 11.40AIC Abad 0 0.00 11.40

Purna+Dudhana Anjana Palashi 0 0.00 13.74

Dhamna 0 0.00 8.51

Girja 0 0.00 21.23

Lahuki 0 0.00 5.31

Khelna 5 0.56 11.07

Jivrekha 48 2.94 6.13

Upper Dudhana 26 3.13 12.22

Purna Nevpur 28 5.88 21.23

Jui 100 6.04 6.04

Kalyan Girija 65 6.27 9.67

Pir Kalyan 62 7.55 12.22

Sukhana 48 8.82 18.50

Karpara 77 19.14 24.90CADA Abad 35 60.33 170.77

Deficit 65 1,011.48 1,562.63

Normal

Lower Wainganga Dongargaon

(Chandrapur)

59 7.38 12.44109

Page 119: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator I: Water Availability in Reservoirs on 15th Oct - Page 5 of 8

(Medium Projects / 2017-18) Unit: Mcum

Subbasin/PlanGroup Project/ CircleLive Storage

As On 15 OctDesigned Live

Storage

Percent Live

Storage

CIPC Chandrapur 59 7.38 12.44

Middle Tapi (Satpuda) Kordi 100 10.33 10.33DIPC Dhule 100 10.33 10.33

Middle Tapi (Satpuda) Gul 76 17.34 22.76JIPC Jalgaon 76 17.34 22.76

Middle Tapi (Satpuda) Mor 64 5.10 7.96

Abhora 100 6.02 6.02

Bhokar (Mangrul) 100 6.41 6.41

Karwand 100 18.26 18.26

Suki 100 39.85 39.85

Aner 100 49.27 49.27CADA Jalgaon 98 124.91 127.77

Middle Wainganga Jam 100 24.30 24.30CADA Nagpur 100 24.30 24.30

Painganga Sonal 8 1.35 16.92

Ekbhuji 30 3.60 11.97WIC Washim 17 4.95 28.89

Painganga Koradi 26 5.35 20.70AIC Akola 26 5.35 20.70

Painganga Loni 49 4.07 8.38

Nagzari 97 6.38 6.57

Dongargaon (Nanded) 100 8.81 8.81NIC Nanded 81 19.26 23.75

Painganga Borgaon 13 0.88 6.61

Waghadi 18 6.37 35.36

Goki 15 6.61 42.71

Adan 34 22.87 67.25

Saikheda 100 27.18 27.18

Lower Pus 79 46.97 59.63YIC Yavatmal 46 110.88 238.74

Panzra Sonwad 0 0.00 14.36

Wadi Shewadi 0 0.00 33.91

Malangaon 100 11.33 11.33

Panzara 100 35.63 35.63

Akkalpada(Lower

Panzra)

60 53.63 88.82

CADA Jalgaon 55 100.59 184.05

Remaining Bhima (Neera) Nazare 55 9.17 16.65

Shetphal 100 16.78 16.78PIC Pune 78 25.95 33.43

Upper Bhima Chilhewadi 81 19.97 24.61

Visapur 100 25.62 25.62110

Page 120: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator I: Water Availability in Reservoirs on 15th Oct - Page 6 of 8

(Medium Projects / 2017-18) Unit: Mcum

Subbasin/PlanGroup Project/ CircleLive Storage

As On 15 OctDesigned Live

Storage

Percent Live

Storage

KIC Pune 91 45.59 50.23

Upper Bhima Kasarsai 100 16.06 16.06

Wadiwale 100 30.39 30.39

Kalmodi 100 42.67 42.67

Andra Khore 100 82.74 82.75PIC Pune 100 171.86 171.87

Upper Godavari Shivna Takali 4 1.47 36.45AIC Abad 4 1.47 36.45

Upper Godavari Bor Dahegaon 0 0.00 11.47

Tembhapuri 0 0.00 19.63

Narangi 7 0.82 11.50

Kolhi 31 0.99 3.24

Ambadi 6 1.29 21.23

Dheku 39 4.78 12.16CADA Abad 10 7.88 79.23

Upper Godavari Manikpunj 100 9.46 9.46DIPC Dhule 100 9.46 9.46

Upper Godavari Ghatshil Pargaon 8 0.68 8.50

Mandohol 100 8.77 8.78

Bhojapur 100 10.22 10.22

Alandi 100 27.46 27.46

Adhala 100 27.60 27.60

Waldevi 100 32.09 32.09

Kashyapi 100 52.43 52.43

Gautami 99 52.55 52.90CADA Nashik 96 211.80 219.98

Wardha Nawargaon 60 7.44 12.47YIC Yavatmal 60 7.44 12.47

Wardha Amalnalla 26 5.85 22.35

Lal Nala 34 9.53 27.61CIPC Chandrapur 31 15.38 49.96

Wardha Kar 100 21.06 21.06NIC Nagpur 100 21.06 21.06

Wardha Dongargaon (Wardha) 100 4.44 4.44

Madan Talav Project 66 8.81 13.26

Pothara 66 22.85 34.72

Dham 95 59.48 62.51CADA Nagpur 83 95.58 114.93

Normal 70 1,038.76 1,492.80

Surplus

Middle Wainganga Kalpathri 10 0.65 6.60

Katangi 26 2.45 9.40NIC Nagpur 19 3.10 16.00

Middle Wainganga Labhansarad 6 0.47 7.35111

Page 121: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator I: Water Availability in Reservoirs on 15th Oct - Page 7 of 8

(Medium Projects / 2017-18) Unit: Mcum

Subbasin/PlanGroup Project/ CircleLive Storage

As On 15 OctDesigned Live

Storage

Percent Live

Storage

Pakadigundam 25 2.94 11.80

Chandai 65 6.90 10.69

Chargaon 37 7.33 19.89CIPC Chandrapur 35 17.65 49.73

Middle Wainganga Sorna 2 0.09 5.74

Bagheda 8 0.38 4.54

Sangrampur 21 0.82 3.87

Chorakhmara 5 0.94 20.80

Betekar Bothli 35 1.29 3.67

Khairbanda 8 1.34 16.48

Rengepar 44 1.56 3.57

Managadh 31 2.20 7.05

Bodalkasa 13 2.58 19.73

Chulband 25 5.37 21.46

Chandpur 21 5.94 28.88BIC Bhandara 17 22.49 135.77

Middle Wainganga Kesarnala 83 3.27 3.93

Umri 73 3.75 5.14

Mordham 100 4.95 4.95

Chandrabhaga (Nagpur) 100 8.26 8.26

Panchadhara Complex 95 9.83 10.39

Pandharbodi 91 12.02 13.14

Wena 81 17.52 21.64

Khekara Nalla 77 18.39 23.81

Makardhokada-Saiki 82 18.69 22.69

Kanholibara 100 20.49 20.49

Kolar 87 26.40 30.42CADA Nagpur 87 143.58 164.86

Surplus 51 186.81 366.35

Abundant

Lower Wainganga Naleshwar 23 2.31 10.23

Ghorazari 57 23.46 41.32

Asolamendha 61 31.83 52.33CIPC Chandrapur 55 57.61 103.88

North Konkan Hetwane 97 140.54 144.98NKIPC Thane 97 140.54 144.98

North Konkan Wandri 100 35.94 35.94

Rajanalla Complex 96 311.69 323.87TIC Thane 97 347.63 359.81

South Konkan Gad Nadi 78 64.42 82.90NKIPC Thane 78 64.42 82.90

South Konkan Deoghar 95 92.68 98.02SKIPC oros 95 92.68 98.02

Upper Krishna (W) Uttarmand 68 16.67 24.59112

Page 122: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator I: Water Availability in Reservoirs on 15th Oct - Page 8 of 8

(Medium Projects / 2017-18) Unit: Mcum

Subbasin/PlanGroup Project/ CircleLive Storage

As On 15 OctDesigned Live

Storage

Percent Live

Storage

CADA Pune 68 16.67 24.59

Upper Krishna (W) Takari LIS 0 0.00 0.00

Yeoti Masoli 79 5.55 7.05

Tembhu LIS Barrage 56 6.64 11.80

Krishna Canal &

Khodshi Backwater

100 7.62 7.62

Maishal LIS 100 15.35 15.35

Morna (Sangli) 100 16.54 16.54SIC Sangli 89 51.70 58.36

Upper Krishna (W) Dhamni (Kolhapur) 0 0.00 0.00

Hiranyakeshi 0 0.00 0.00

Jambre 97 22.45 23.20

Chikotra 61 26.26 43.05

Jangamhatti 100 33.65 33.65

Ghataprbha 100 43.70 43.70

Chitri 100 52.48 52.48

Kadvi 100 70.56 70.56

Kumbhi 100 76.50 76.50

Kasari 100 77.97 77.97

Patgaon 100 104.77 104.77KIC Kolhapur 97 508.34 525.87

Vashishthi Natuwadi 100 27.23 27.23KIC Ratnagiri 100 27.23 27.23

Abundant 92 1,306.80 1,425.64

Medium 3,995.33 5,473.70 73

113

Page 123: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Percentage

SIC

Sangli

PIC

Pune

CA

DA

Sola

pur

CA

DA

Beed

SIC

Sata

ra

KIC

Pune

AIC

Abad

CA

DA

Nashik

DIP

C D

hule

NIC

Nanded

CA

DA

Jalg

aon

UW

IC A

mra

vati

BIP

C P

arli (V

)

CA

DA

Beed

AIC

Akola

CA

DA

Abad

CA

DA

Nashik

DIP

C D

hule

PIC

Pune

WIC

Washim

NIC

Nagpur

CA

DA

Jalg

aon

CIP

C C

handra

pur

NIC

Nanded

KIC

Pune

CA

DA

Nagpur

CA

DA

Abad

YIC

Yavatm

al

AIC

Abad

JIP

C J

alg

aon

AIC

Akola

CA

DA

Nagpur

BIC

Bhandara

CIP

C C

handra

pur

NIC

Nagpur

CA

DA

Pune

KIC

Ratn

agiri

NK

IPC

Thane

SK

IPC

oro

s

TIC

Thane

KIC

Kolh

apur

SIC

Sangli

CIP

C C

handra

pur

114

Page 124: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator II: Percentage of Actual Evaporation to Gross Storage - Page 1 of 9

(Medium Projects / 2017-18) Unit: Mcum

Subbasin/

PlanGroup

Project / Circle Evaporation Actual Gross

Storage

Percentage of

Evaporation

Highly DeficitRemaining Bhima (Neera) Buddhihal 0.00 0.00 0

SIC Sangli 0.00 0.00 0

Remaining Bhima (Neera) Andhali 0.79 2.18 36

Ranand 0.77 2.87 27

SIC Satara 1.57 5.05 31

Remaining Bhima (Neera) Tisangi 4.52 26.16 17

PIC Pune 4.52 26.16 17

Remaining Bhima+ Man Mhaswad 3.01 6.55 46

PIC Pune 3.01 6.55 46

Remaining Bhima+ Man Dodda Nalla 1.05 2.97 36

Sankh 4.29 19.92 22

SIC Sangli 5.35 22.89 23

Remaining Bhima+ Man Ashti 11.89 20.57 58

Jawalgaon 4.20 26.27 16

CADA Solapur 16.09 46.84 34

Sina Khairy 4.12 15.11 27

Sina 17.73 67.95 26

KIC Pune 21.86 83.06 26

Sina Bori 2.00 19.27 10

Ekrukh 5.55 19.39 29

Hingani (Pangaon) 6.81 45.57 15

Mangi 4.27 23.72 18

Pimpalgaon (Dhale) 5.06 12.00 42

CADA Solapur 23.68 119.95 20

Sina Banganga 1.33 5.94 22

Benitura 3.60 12.84 28

Chandani 6.43 21.03 31

Harni 2.65 12.58 21

Jakapur 1.77 7.13 25

Kada 2.14 9.99 21

Kadi 1.54 7.58 20

Kambli 0.50 2.08 24

Khandala 1.55 6.26 25

Khandeshwar 3.33 10.80 31

Khasapur 4.19 13.59 31

Kurnoor 7.35 35.26 21

Mehkari 3.65 16.11 23

Ramganga 1.63 6.14 27

Ruti 2.49 11.93 21

Sakat 4.70 14.49 32

115

Page 125: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator II: Percentage of Actual Evaporation to Gross Storage - Page 2 of 9

(Medium Projects / 2017-18) Unit: Mcum

Subbasin/

PlanGroup

Project / Circle Evaporation Actual Gross

Storage

Percentage of

Evaporation

Talwar 0.77 3.77 20

Turori 1.27 4.90 26

CADA Beed 50.88 202.41 25

Upper Krishna (E) Basappawadi 0.31 1.81 17

Siddhewadi 0.34 2.08 16

SIC Sangli 0.65 3.89 17

Upper Krishna (E) Nher 2.03 6.11 33

Yeralwadi 5.22 24.28 21

SIC Satara 7.25 30.39 24

Highly Deficit 134.84 547.20 25

DeficitGirna Gadadgad 0.54 5.49 10

CADA Abad 0.54 5.49 10

Girna Haranbari 1.79 34.78 5

Kelzar 1.72 17.10 10

Nagya Sakya 0.84 9.49 9

CADA Nashik 4.35 61.37 7

Girna Agnavati 0.00 0.00 0

Hiwara 2.27 7.63 30

Manyad 4.16 36.21 11

CADA Jalgaon 6.43 43.84 15

Lower Godavari Kudala 0.67 4.87 14

NIC Nanded 0.67 4.87 14

Lower Godavari Ghanasargaon 0.03 0.29 9

Kharola 0.03 0.25 12

Renapur Medium Project 0.04 0.35 11

Upper Kundlika 3.47 18.77 18

BIPC Parli (V) 3.56 19.66 18

Lower Godavari Galhati 3.94 16.37 24

Masoli 2.76 14.65 19

CADA Abad 6.69 31.02 22

Lower Godavari Bindusara 1.45 7.90 18

Bodhegaon 1.05 4.20 25

Borna 2.69 9.02 30

Kundalika 11.27 46.34 24

Saraswati 1.80 7.23 25

Sindphana 1.84 7.36 25

Wan (Beed) 4.92 19.71 25

CADA Beed 25.01 101.75 25

116

Page 126: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator II: Percentage of Actual Evaporation to Gross Storage - Page 3 of 9

(Medium Projects / 2017-18) Unit: Mcum

Subbasin/

PlanGroup

Project / Circle Evaporation Actual Gross

Storage

Percentage of

Evaporation

Manjra Aurad 0.90 3.67 25

Bhusni 0.40 1.49 27

Binagihal 0.43 1.35 32

Borgaon Anjanpur 0.21 0.00 0

Dhanegaon 0.41 2.13 19

Dongargaon (Latur) 3.50 7.90 44

Gunjarga 0.41 1.37 30

Hosur Barrage 0.38 2.25 17

Karsa Pohegaon 0.62 3.41 18

Kholgapur 1.62 9.73 17

Killlari 2 0.42 1.30 32

Limbala 0.01 0.28 2

Madansuri 0.63 1.31 48

Nagzari (Latur) 0.63 3.02 21

Rajegaon 0.17 0.55 32

Sai 0.55 1.40 39

Shivni 1.19 6.57 18

Tagarkheda 0.11 0.77 14

Takalgaon Devla 0.49 1.38 35

Wangdari 0.41 0.84 49

Wanjarkheda 0.27 3.61 8

BIPC Parli (V) 13.75 54.31 25

Manjra Karadkhed 1.72 10.11 17

Kundrala 0.45 2.46 18

Mahalingi 0.16 0.71 23

Pethwadaj 1.40 4.13 34

Upper Manar 11.83 96.03 12

NIC Nanded 15.56 113.43 14

Manjra Belpara 0.92 3.46 27

Devarjan 2.67 9.82 27

Gharni 1.96 25.09 8

Mahasangvi 1.41 6.74 21

Masalga 6.05 14.68 41

Raigavan 1.28 3.99 32

Renapur 4.81 16.89 28

Rui 2.83 8.94 32

Sakol 1.84 7.94 23

Sangameshwar (Dokewadi) 5.27 16.83 31

Tawarja 5.09 24.99 20

Terna 4.48 20.55 22

Tiru 1.86 16.02 12

Waghe Babhulgaon 1.45 4.85 30

Whati 1.96 8.05 24

117

Page 127: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator II: Percentage of Actual Evaporation to Gross Storage - Page 4 of 9

(Medium Projects / 2017-18) Unit: Mcum

Subbasin/

PlanGroup

Project / Circle Evaporation Actual Gross

Storage

Percentage of

Evaporation

CADA Beed 43.86 188.84 23

Middle Tapi (Satpuda) Shivan 1.10 16.11 7

DIPC Dhule 1.10 16.11 7

Middle Tapi (Satpuda) Amarawati 1.35 1.96 69

Bahula 3.88 4.25 91

Bori (Jalgaon) 4.94 10.26 48

Prakasha Barrage 7.46 56.96 13

Sarangkheda Barrage 10.77 87.06 12

Sulwade Barrage 7.78 48.04 16

CADA Jalgaon 36.17 208.53 17

Middle Tapi (South) Ajanta Andhari 0.29 2.08 14

CADA Abad 0.29 2.08 14

Middle Tapi (South) Bhokarbari 0.21 0.07 300

Burai 2.82 21.33 13

Jamkhedi 5.18 13.28 39

Kanoli 0.00 3.20 0

Rangawali 2.82 15.02 19

Tondapur 1.47 5.40 27

CADA Jalgaon 12.50 58.30 21

Purna (Tapi) Chandrabhaga (Amravati) 2.89 30.79 9

Purna (Achalpur) 3.73 41.74 9

Sapan 15.43 32.01 48

Shahnoor 7.29 31.64 23

UWIC Amravati 29.34 136.18 22

Purna (Tapi) Dnyanganga 7.38 20.94 35

Mas 4.52 6.78 67

Morna (Akola) 4.02 10.90 37

Mun 2.88 15.82 18

Nirguna 5.40 20.01 27

Paldhag 1.66 9.14 18

Torna 1.20 3.75 32

Uma 0.20 3.43 6

Utawali 2.36 8.70 27

AIC Akola 29.61 99.48 30

Purna+Dudhana Wakod 0.00 0.00 0

AIC Abad 0.00 0.00 0

Purna+Dudhana Anjana Palashi 0.03 0.04 60

Dhamna 1.25 1.90 66

Girja 0.00 0.01 0

118

Page 128: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator II: Percentage of Actual Evaporation to Gross Storage - Page 5 of 9

(Medium Projects / 2017-18) Unit: Mcum

Subbasin/

PlanGroup

Project / Circle Evaporation Actual Gross

Storage

Percentage of

Evaporation

Jivrekha 1.52 3.70 41

Jui 4.15 6.04 69

Kalyan Girija 5.30 7.78 68

Karpara 3.67 23.06 16

Khelna 0.19 2.09 9

Lahuki 0.62 0.69 89

Pir Kalyan 4.63 10.69 43

Purna Nevpur 1.96 9.15 21

Sukhana 2.92 11.67 25

Upper Dudhana 4.78 6.27 76

CADA Abad 31.02 83.09 37

Deficit 260.45 1228.34 21

NormalLower Wainganga Dongargaon (Chandrapur) 2.67 9.12 29

CIPC Chandrapur 2.67 9.12 29

Middle Tapi (Satpuda) Kordi 1.02 11.49 9

DIPC Dhule 1.02 11.49 9

Middle Tapi (Satpuda) Gul 5.77 17.83 32

JIPC Jalgaon 5.77 17.83 32

Middle Tapi (Satpuda) Abhora 1.89 7.44 25

Aner 14.40 93.62 15

Bhokar (Mangrul) 1.23 8.98 14

Karwand 4.23 18.26 23

Mor 1.06 6.64 16

Suki 8.66 50.16 17

CADA Jalgaon 31.47 185.11 17

Middle Wainganga Jam 4.79 29.00 17

CADA Nagpur 4.79 29.00 17

Painganga Ekbhuji 1.10 5.75 19

Sonal 0.24 4.70 5

WIC Washim 1.35 10.45 13

Painganga Koradi 4.20 12.81 33

AIC Akola 4.20 12.81 33

Painganga Dongargaon (Nanded) 1.78 9.61 19

Loni 1.00 4.90 20

Nagzari 1.86 7.00 27

NIC Nanded 4.64 21.51 22

Painganga Adan 13.29 33.94 39

Borgaon 1.09 2.68 41

119

Page 129: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator II: Percentage of Actual Evaporation to Gross Storage - Page 6 of 9

(Medium Projects / 2017-18) Unit: Mcum

Subbasin/

PlanGroup

Project / Circle Evaporation Actual Gross

Storage

Percentage of

Evaporation

Goki 3.87 14.12 27

Lower Pus 20.68 68.50 30

Saikheda 9.02 38.51 23

Waghadi 3.49 12.12 29

YIC Yavatmal 51.44 169.87 30

Panzra Akkalpada(Lower Panzra) 7.97 74.12 11

Malangaon 3.52 13.02 27

Panzara 8.05 43.41 19

Sonwad 1.77 2.93 60

Wadi Shewadi 1.41 1.94 73

CADA Jalgaon 22.72 135.41 17

Remaining Bhima (Neera) Nazare 5.03 14.83 34

Shetphal 5.02 17.56 29

PIC Pune 10.05 32.39 31

Upper Bhima Chilhewadi 1.91 22.53 8

Visapur 8.94 25.62 35

KIC Pune 10.85 48.15 23

Upper Bhima Andra Khore 8.12 83.30 10

Kalmodi 3.17 42.87 7

Kasarsai 2.50 17.38 14

Wadiwale 4.80 40.87 12

PIC Pune 18.59 184.42 10

Upper Godavari Manikpunj 1.06 14.01 8

DIPC Dhule 1.06 14.01 8

Upper Godavari Shivna Takali 1.34 4.38 31

AIC Abad 1.34 4.38 31

Upper Godavari Ambadi 0.53 4.56 12

Bor Dahegaon 0.36 1.47 25

Dheku 2.96 6.15 48

Kolhi 0.24 1.39 17

Narangi 0.60 2.61 23

Tembhapuri 0.17 0.70 24

CADA Abad 4.86 16.88 29

Upper Godavari Adhala 2.21 30.01 7

Alandi 5.07 29.53 17

Bhojapur 1.18 13.67 9

Gautami 0.81 52.87 2

Ghatshil Pargaon 1.00 4.64 21

Kashyapi 1.94 52.69 4

120

Page 130: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator II: Percentage of Actual Evaporation to Gross Storage - Page 7 of 9

(Medium Projects / 2017-18) Unit: Mcum

Subbasin/

PlanGroup

Project / Circle Evaporation Actual Gross

Storage

Percentage of

Evaporation

Mandohol 1.07 11.29 9

Waldevi 5.07 34.01 15

CADA Nashik 18.34 228.71 8

Wardha Nawargaon 0.80 9.95 8

YIC Yavatmal 0.80 9.95 8

Wardha Amalnalla 0.99 9.48 10

Lal Nala 2.72 11.43 24

CIPC Chandrapur 3.71 20.91 18

Wardha Kar 4.14 25.96 16

NIC Nagpur 4.14 25.96 16

Wardha Dham 19.28 69.43 28

Dongargaon (Wardha) 0.86 4.81 18

Madan Talav Project 3.87 10.73 36

Pothara 8.18 26.55 31

CADA Nagpur 32.19 111.52 29

Normal 236.00 1299.90 18

SurplusMiddle Wainganga Kalpathri 1.75 2.66 66

Katangi 2.74 4.17 66

NIC Nagpur 4.49 6.83 66

Middle Wainganga Bagheda 1.20 0.84 142

Betekar Bothli 0.40 1.78 23

Bodalkasa 1.07 3.52 30

Chandpur 2.60 6.08 43

Chorakhmara 0.67 1.19 57

Chulband 1.40 7.93 18

Khairbanda 1.08 2.18 50

Managadh 0.97 2.97 33

Rengepar 0.59 1.94 30

Sangrampur 0.34 1.28 26

Sorna 0.00 0.53 0

BIC Bhandara 10.32 30.24 34

Middle Wainganga Chandai 4.99 9.41 53

Chargaon 4.66 9.15 51

Labhansarad 1.10 1.34 82

Pakadigundam 1.32 4.45 30

CIPC Chandrapur 12.07 24.35 50

Middle Wainganga Chandrabhaga (Nagpur) 1.67 8.89 19

Kanholibara 3.94 22.21 18

Kesarnala 0.75 3.64 21

Khekara Nalla 5.23 20.72 25

121

Page 131: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator II: Percentage of Actual Evaporation to Gross Storage - Page 8 of 9

(Medium Projects / 2017-18) Unit: Mcum

Subbasin/

PlanGroup

Project / Circle Evaporation Actual Gross

Storage

Percentage of

Evaporation

Kolar 6.99 31.36 22

Makardhokada-Saiki 3.01 22.93 13

Mordham 1.14 5.44 21

Panchadhara Complex 1.11 10.86 10

Pandharbodi 2.21 12.74 17

Umri 0.83 4.38 19

Wena 5.93 19.45 30

CADA Nagpur 32.81 162.62 20

Surplus 59.69 224.04 27

AbundantLower Wainganga Asolamendha 8.62 46.52 19

Ghorazari 3.68 32.39 11

Naleshwar 0.53 3.01 17

CIPC Chandrapur 12.82 81.92 16

North Konkan Hetwane 9.01 143.05 6

NKIPC Thane 9.01 143.05 6

North Konkan Rajanalla Complex 20.25 351.75 6

Wandri 5.14 37.11 14

TIC Thane 25.39 388.86 7

South Konkan Gad Nadi 2.71 64.73 4

NKIPC Thane 2.71 64.73 4

South Konkan Deoghar 5.87 95.09 6

SKIPC oros 5.87 95.09 6

Upper Krishna (W) Uttarmand 0.10 17.00 1

CADA Pune 0.10 17.00 1

Upper Krishna (W) Krishna Canal & Khodshi

Backwater

1.01 7.62 13

Maishal LIS 0.00 19.20 0

Morna (Sangli) 4.31 21.18 20

Takari LIS 0.00 0.00 0

Tembhu LIS Barrage 1.33 9.84 14

Yeoti Masoli 1.20 5.80 21

SIC Sangli 7.85 63.64 12

Upper Krishna (W) Chikotra 1.44 26.32 5

Chitri 5.40 53.41 10

Dhamni (Kolhapur) 0.00 0.00 0

Ghataprbha 5.29 44.17 12

Hiranyakeshi 0.00 0.00 0

Jambre 4.42 22.48 20

Jangamhatti 5.60 34.65 16

122

Page 132: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator II: Percentage of Actual Evaporation to Gross Storage - Page 9 of 9

(Medium Projects / 2017-18) Unit: Mcum

Subbasin/

PlanGroup

Project / Circle Evaporation Actual Gross

Storage

Percentage of

Evaporation

Kadvi 5.83 71.24 8

Kasari 2.77 78.57 4

Kumbhi 5.53 76.88 7

Patgaon 6.29 105.24 6

KIC Kolhapur 42.57 512.96 8

Vashishthi Natuwadi 0.99 28.08 4

KIC Ratnagiri 0.99 28.08 4

Abundant 107.30 1395.33 8

798.28 4694.79 17Medium Project - Grand Total:

123

Page 133: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Percentage

SIC

Sangli

CA

DA

Beed

KIC

Pune

PIC

Pune

SIC

Sata

ra

CA

DA

Sola

pur

AIC

Abad

CA

DA

Abad

DIP

C D

hule

UW

IC A

mra

vati

AIC

Akola

CA

DA

Beed

BIP

C P

arli (V

)

NIC

Nanded

CA

DA

Nashik

CA

DA

Jalg

aon

AIC

Abad

AIC

Akola

CA

DA

Abad

DIP

C D

hule

JIP

C J

alg

aon

WIC

Washim

NIC

Nanded

CIP

C C

handra

pur

CA

DA

Nagpur

KIC

Pune

NIC

Nagpur

YIC

Yavatm

al

PIC

Pune

CA

DA

Nashik

CA

DA

Jalg

aon

CIP

C C

handra

pur

NIC

Nagpur

BIC

Bhandara

CA

DA

Nagpur

CA

DA

Pune

CIP

C C

handra

pur

SK

IPC

oro

s

TIC

Thane

KIC

Kolh

apur

SIC

Sangli

NK

IPC

Thane

KIC

Ratn

agiri

124

Page 134: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator III: Target and Achievement of Irrigation Potential Utilisation - Page 1 of 9 (Medium Projects / 2017-18) Unit: Ha

Project/ Circle

Subbasin/ PlanGroup

Planned Target as per PIP

Achievement Percent

Achievement

Highly Deficit Remaining Bhima (Neera)

Tisangi 2927 3564 122

PIC Pune 2927 3564 122

Remaining Bhima (Neera)

Buddhihal 0 882 0

SIC Sangli 0 882 0

Remaining Bhima (Neera)

Andhali 117 425 363

Ranand 502 694 138

SIC Satara 619 1119 181

Remaining Bhima+ Man

Ashti 0 4594 0

Jawalgaon 2640 2601 99

CADA Solapur 2640 7195 273

Remaining Bhima+ Man

Mhaswad 216 251 116

PIC Pune 216 251 116

Remaining Bhima+ Man

Dodda Nalla 0 935 0

Sankh 0 2230 0

SIC Sangli 0 3165 0

Sina

Kambli 208 135 65

Turori 313 224 72

Talwar 426 148 35

Banganga 580 674 116

Ramganga 737 722 98

Jakapur 761 434 57

Khandala 856 352 41

Kadi 958 338 35

Kada 1166 336 29

Ruti 1346 738 55

Khandeshwar 1350 870 64

Benitura 1390 545 39

Khasapur 1398 740 53

Harni 1718 810 47

Sakat 1896 810 43

Chandani 1912 839 44

Mehkari 2344 891 38

Kurnoor 4284 1424 33

CADA Beed 23643 11029 47

Sina

Ekrukh 945 933 99

Pimpalgaon (Dhale) 1445 1255 87 125

Page 135: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator III: Target and Achievement of Irrigation Potential Utilisation - Page 2 of 9 (Medium Projects / 2017-18) Unit: Ha

Project/ Circle

Subbasin/ PlanGroup

Planned Target as per PIP

Achievement Percent

Achievement

Mangi 1725 1660 96

Bori 2270 2291 101

Hingani (Pangaon) 4560 4375 96

CADA Solapur 10945 10514 96

Sina

Khairy 0 1242 0

Sina 4450 3773 85

KIC Pune 4450 5015 113

Upper Krishna (E)

Basappawadi 0 259 0

Siddhewadi 0 1370 0

SIC Sangli 0 1629 0

Upper Krishna (E)

Nher 1044 1193 114

Yeralwadi 1430 1465 102

SIC Satara 2474 2658 107

Highly Deficit 47914 47021 98

Deficit Girna

Gadadgad 0 795 0

CADA Abad 0 795 0

Girna

Agnavati 0 0 0

Hiwara 0 117 0

Manyad 3136 3051 97

CADA Jalgaon 3136 3168 101

Girna

Nagya Sakya 456 1044 229

Kelzar 1302 1822 140

Haranbari 2048 4532 221

CADA Nashik 3806 7398 194

Lower Godavari

Upper Kundlika 0 497 0

Kharola 61 154 253

Ghanasargaon 86 154 179

Renapur Medium Project 99 158 159

BIPC Parli (V) 246 964 392

Lower Godavari

Galhati 0 240 0

Masoli 0 865 0

CADA Abad 0 1105 0

Lower Godavari

Bodhegaon 0 287 0 126

Page 136: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator III: Target and Achievement of Irrigation Potential Utilisation - Page 3 of 9 (Medium Projects / 2017-18) Unit: Ha

Project/ Circle

Subbasin/ PlanGroup

Planned Target as per PIP

Achievement Percent

Achievement

Kundalika 0 764 0

Wan (Beed) 0 571 0

Bindusara 30 85 283

Saraswati 233 236 101

Borna 430 362 84

Sindphana 978 569 58

CADA Beed 1671 2874 172

Lower Godavari

Kudala 0 552 0

NIC Nanded 0 552 0

Manjra

Tagarkheda 30 79 263

Limbala 50 157 314

Nagzari (Latur) 60 270 450

Hosur Barrage 100 227 227

Rajegaon 100 111 111

Binagihal 132 230 174

Gunjarga 144 183 127

Bhusni 146 115 78

Borgaon Anjanpur 150 128 85

Madansuri 150 205 137

Sai 150 261 174

Takalgaon Devla 160 299 187

Killlari 2 194 210 108

Aurad 200 241 121

Wangdari 245 178 73

Karsa Pohegaon 250 201 80

Wanjarkheda 250 156 62

Dhanegaon 300 352 117

Dongargaon (Latur) 500 687 137

Shivni 641 231 36

Kholgapur 948 859 91

BIPC Parli (V) 4900 5378 110

Manjra

Devarjan 0 752 0

Gharni 0 1404 0

Raigavan 0 18 0

Renapur 0 920 0

Tawarja 0 1252 0

Belpara 172 251 146

Waghe Babhulgaon 430 79 18

Masalga 481 263 55

Mahasangvi 522 420 80

Tiru 563 1161 206

Rui 699 425 61

Whati 800 770 96 127

Page 137: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator III: Target and Achievement of Irrigation Potential Utilisation - Page 4 of 9 (Medium Projects / 2017-18) Unit: Ha

Project/ Circle

Subbasin/ PlanGroup

Planned Target as per PIP

Achievement Percent

Achievement

Sakol 1509 848 56

Sangameshwar (Dokewadi)

2217 892 40

Terna 2411 921 38

CADA Beed 9804 10376 106

Manjra

Kundrala 0 108 0

Mahalingi 0 252 0

Pethwadaj 0 56 0

Karadkhed 280 161 58

Upper Manar 3900 4330 111

NIC Nanded 4180 4907 117

Middle Tapi (Satpuda)

Amarawati 0 66 0

Bahula 0 14 0

Bori (Jalgaon) 0 0 0

Prakasha Barrage 0 1262 0

Sarangkheda Barrage 0 861 0

Sulwade Barrage 0 540 0

CADA Jalgaon 0 2743 0

Middle Tapi (Satpuda)

Shivan 0 314 0

DIPC Dhule 0 314 0

Middle Tapi (South)

Ajanta Andhari 0 0 0

CADA Abad 0 0 0

Middle Tapi (South)

Bhokarbari 0 0 0

Burai 0 741 0

Jamkhedi 0 302 0

Kanoli 0 0 0

Rangawali 0 1301 0

Tondapur 0 118 0

CADA Jalgaon 0 2462 0

Purna (Tapi)

Dnyanganga 0 449 0

Mas 0 0 0

Mun 0 42 0

Torna 0 205 0

Uma 0 172 0

Utawali 138 289 209

Paldhag 525 304 58

Morna (Akola) 767 0 0

Nirguna 1864 261 14

AIC Akola 3294 1722 52 128

Page 138: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator III: Target and Achievement of Irrigation Potential Utilisation - Page 5 of 9 (Medium Projects / 2017-18) Unit: Ha

Project/ Circle

Subbasin/ PlanGroup

Planned Target as per PIP

Achievement Percent

Achievement Purna (Tapi)

Shahnoor 0 203 0

Chandrabhaga (Amravati)

483 195 40

Sapan 1900 159 8

Purna (Achalpur) 6200 2349 38

UWIC Amravati 8583 2906 34

Purna+Dudhana

Wakod 0 92 0

AIC Abad 0 92 0

Purna+Dudhana

Anjana Palashi 0 0 0

Dhamna 0 0 0

Girja 0 0 0

Jivrekha 0 555 0

Jui 0 396 0

Kalyan Girija 0 451 0

Karpara 0 1021 0

Khelna 0 0 0

Lahuki 0 0 0

Pir Kalyan 0 330 0

Purna Nevpur 0 164 0

Sukhana 0 334 0

Upper Dudhana 0 250 0

CADA Abad 0 3500 0

Deficit 39620 51256 129

Normal Lower Wainganga

Dongargaon (Chandrapur)

1800 615 34

CIPC Chandrapur 1800 615 34

Middle Tapi (Satpuda)

Aner 0 3311 0

Bhokar (Mangrul) 0 303 0

Karwand 0 836 0

Mor 0 283 0

Abhora 277 101 36

Suki 950 409 43

CADA Jalgaon 1227 5243 427

Middle Tapi (Satpuda)

Kordi 0 209 0

DIPC Dhule 0 209 0

Middle Tapi (Satpuda)

Gul 0 0 0

JIPC Jalgaon 0 0 0 129

Page 139: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator III: Target and Achievement of Irrigation Potential Utilisation - Page 6 of 9 (Medium Projects / 2017-18) Unit: Ha

Project/ Circle

Subbasin/ PlanGroup

Planned Target as per PIP

Achievement Percent

Achievement

Middle Wainganga

Jam 0 1099 0

CADA Nagpur 0 1099 0

Painganga

Koradi 0 761 0

AIC Akola 0 761 0

Painganga

Nagzari 582 228 39

Loni 880 260 30

Dongargaon (Nanded) 1170 685 59

NIC Nanded 2632 1173 45

Painganga

Sonal 0 131 0

Ekbhuji 460 0 0

WIC Washim 460 131 28

Painganga

Adan 0 425 0

Borgaon 0 0 0

Goki 0 181 0

Waghadi 0 118 0

Saikheda 1755 2755 157

Lower Pus 3220 1238 38

YIC Yavatmal 4975 4717 95

Panzra

Akkalpada(Lower Panzra)

0 379 0

Malangaon 0 847 0

Panzara 0 1578 0

Sonwad 0 541 0

Wadi Shewadi 0 80 0

CADA Jalgaon 0 3425 0

Remaining Bhima (Neera)

Shetphal 0 1364 0

Nazare 700 1259 180

PIC Pune 700 2623 375

Upper Bhima

Chilhewadi 0 0 0

Visapur 7634 6072 80

KIC Pune 7634 6072 80

Upper Bhima

Kalmodi 0 190 0

Kasarsai 4000 4195 105

Wadiwale 6015 6614 110 130

Page 140: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator III: Target and Achievement of Irrigation Potential Utilisation - Page 7 of 9 (Medium Projects / 2017-18) Unit: Ha

Project/ Circle

Subbasin/ PlanGroup

Planned Target as per PIP

Achievement Percent

Achievement

Andra Khore 9138 9138 100

PIC Pune 19153 20137 105

Upper Godavari

Shivna Takali 0 0 0

AIC Abad 0 0 0

Upper Godavari

Ambadi 0 0 0

Bor Dahegaon 0 0 0

Dheku 0 205 0

Kolhi 0 0 0

Narangi 0 0 0

Tembhapuri 0 0 0

CADA Abad 0 205 0

Upper Godavari

Alandi 0 2361 0

Bhojapur 0 1708 0

Gautami 0 492 0

Kashyapi 0 167 0

Waldevi 0 1055 0

Ghatshil Pargaon 84 370 440

Mandohol 592 1107 187

Adhala 2953 3150 107

CADA Nashik 3629 10409 287

Upper Godavari

Manikpunj 0 1002 0

DIPC Dhule 0 1002 0

Wardha

Madan Talav Project 700 578 83

Dongargaon (Wardha) 720 345 48

Pothara 3900 2769 71

Dham 5100 3042 60

CADA Nagpur 10420 6734 65

Wardha

Amalnalla 0 0 0

Lal Nala 0 241 0

CIPC Chandrapur 0 241 0

Wardha

Kar 2000 1730 87

NIC Nagpur 2000 1730 87

Wardha

Nawargaon 0 0 0

YIC Yavatmal 0 0 0

Normal 54630 66526 122

Surplus 131

Page 141: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator III: Target and Achievement of Irrigation Potential Utilisation - Page 8 of 9 (Medium Projects / 2017-18) Unit: Ha

Project/ Circle

Subbasin/ PlanGroup

Planned Target as per PIP

Achievement Percent

Achievement Middle Wainganga

Betekar Bothli 0 854 0

Chorakhmara 0 0 0

Sorna 0 840 0

Rengepar 952 200 21

Managadh 962 983 102

Sangrampur 1104 681 62

Bagheda 1625 2004 123

Chulband 3005 1289 43

Bodalkasa 4241 825 19

Khairbanda 5794 2463 43

Chandpur 9000 7728 86

BIC Bhandara 26683 17867 67

Middle Wainganga

Kanholibara 0 1271 0

Wena 0 52 0

Pandharbodi 140 489 349

Kesarnala 250 261 104

Makardhokada-Saiki 353 3523 998

Umri 400 515 129

Mordham 600 286 48

Chandrabhaga (Nagpur) 700 450 64

Panchadhara Complex 1580 573 36

Khekara Nalla 1700 728 43

Kolar 3250 1937 60

CADA Nagpur 8973 10085 112

Middle Wainganga

Chandai 0 1479 0

Chargaon 0 1696 0

Labhansarad 0 190 0

Pakadigundam 0 0 0

CIPC Chandrapur 0 3365 0

Middle Wainganga

Kalpathri 0 0 0

Katangi 0 0 0

NIC Nagpur 0 0 0

Surplus 35656 31317 88

Abundant Lower Wainganga

Asolamendha 0 10499 0

Ghorazari 0 5832 0

Naleshwar 0 3039 0

CIPC Chandrapur 0 19370 0

North Konkan

Hetwane 100 435 435 132

Page 142: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Note: A) ‘0’ value in planned target as per PIP Indicates that the PIP is not prepared. B) Indicator III is mainly to know how much area irrigated against its target by preparing PIP of concerned projects. However most of the field authorities of project concerned not prepared PIP of irrigation projects; hence the purpose of indicator is not fulfilled.

Indicator III: Target and Achievement of Irrigation Potential Utilisation - Page 9 of 9 (Medium Projects / 2017-18) Unit: Ha

Project/ Circle

Subbasin/ PlanGroup

Planned Target as per PIP

Achievement Percent

Achievement

NKIPC Thane 100 435 435

North Konkan

Wandri 1738 2317 133

Rajanalla Complex 2350 2329 99

TIC Thane 4088 4646 114

South Konkan

Gad Nadi 0 156 0

NKIPC Thane 0 156 0

South Konkan

Deoghar 0 1477 0

SKIPC oros 0 1477 0

Upper Krishna (W)

Uttarmand 0 2571 0

CADA Pune 0 2571 0

Upper Krishna (W)

Dhamni (Kolhapur) 0 604 0

Ghataprbha 0 4937 0

Hiranyakeshi 0 1492 0

Jambre 0 4937 0

Kadvi 2500 2776 111

Kasari 2500 9185 367

Jangamhatti 4788 5823 122

Patgaon 5648 12979 230

Chikotra 5700 10069 177

Kumbhi 6934 6384 92

Chitri 7950 12436 156

KIC Kolhapur 36020 71622 199

Upper Krishna (W)

Maishal LIS 0 39021 0

Takari LIS 0 27426 0

Yeoti Masoli 2131 2104 99

Morna (Sangli) 2297 2476 108

Krishna Canal & Khodshi Backwater

10341 19507 189

Tembhu LIS Barrage 34000 33087 97

SIC Sangli 48769 123621 253

Vashishthi

Natuwadi 210 1363 649

KIC Ratnagiri 210 1363 649

Abundant 89187 225261 253

Medium 267007 421381 158

133

Page 143: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Percentage

CA

DA

Beed

CA

DA

Sola

pur

KIC

Pune

PIC

Pune

SIC

Sangli

SIC

Sata

ra

AIC

Abad

AIC

Akola

BIP

C P

arli (V

)

CA

DA

Abad

CA

DA

Beed

CA

DA

Jalg

aon

CA

DA

Nashik

DIP

C D

hule

NIC

Nanded

UW

IC A

mra

vati

AIC

Abad

AIC

Akola

CA

DA

Abad

CA

DA

Jalg

aon

CA

DA

Nagpur

CA

DA

Nashik

CIP

C C

handra

pur

DIP

C D

hule

JIP

C J

alg

aon

KIC

Pune

NIC

Nagpur

NIC

Nanded

PIC

Pune

WIC

Washim

YIC

Yavatm

al

BIC

Bhandara

CA

DA

Nagpur

CIP

C C

handra

pur

NIC

Nagpur

CA

DA

Pune

CIP

C C

handra

pur

KIC

Kolh

apur

KIC

Ratn

agiri

NK

IPC

Thane

SIC

Sangli

SK

IPC

oro

s

TIC

Thane

134

Page 144: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator IV: Water Use Pattern - Page 1 of 11

(Medium Projects/ 2017-18) Unit: Mcum

Project/ CircleOn Canals

Kharif Rabi HW

Reservoir

Lift

River

LiftNI Use Evapo-

ration

TotalSubbasin/

PlanGroup

Highly DeficitRemaining Bhima

(Neera)

Tisangi 24.470.00 4.520.000.001.959.028.99

PIC Pune 4.520.000.001.959.028.990.00 24.47

Remaining Bhima

(Neera)

Buddhihal 0.000.00 0.000.000.000.000.000.00

SIC Sangli 0.000.000.000.000.000.000.00 0.00

Remaining Bhima

(Neera)

Andhali 3.010.00 0.790.400.001.820.000.00

Ranand 4.490.00 0.770.130.001.780.731.08

SIC Satara 1.570.530.003.600.731.080.00 7.51

Remaining Bhima+

Man

Ashti 34.590.00 11.890.930.0021.770.000.00

Jawalgaon 26.650.00 4.200.210.0019.892.350.00

CADA Solapur 16.091.150.0041.662.350.000.00 61.25

Remaining Bhima+

Man

Mhaswad 5.100.00 3.010.000.002.100.000.00

PIC Pune 3.010.000.002.100.000.000.00 5.10

Remaining Bhima+

Man

Dodda Nalla 3.710.00 1.050.260.002.390.000.00

Sankh 11.130.00 4.290.000.006.830.000.00

SIC Sangli 5.350.260.009.220.000.000.00 14.83

Sina

Banganga 4.450.00 1.330.050.002.190.000.88

Benitura 9.290.00 3.601.150.004.530.000.00

Chandani 16.320.00 6.432.430.006.940.000.53

Harni 10.660.00 2.650.070.003.701.982.27

Jakapur 4.960.00 1.770.000.003.190.000.00

Kada 8.300.00 2.140.220.004.320.231.39

Kadi 5.930.00 1.540.000.001.362.240.78

Kambli 1.930.00 0.500.000.000.000.431.00

Khandala 4.360.00 1.550.000.000.831.980.00

Khandeshwar 9.100.00 3.330.000.005.130.650.00

Khasapur 13.400.00 4.192.040.004.180.812.19

Kurnoor 25.250.00 7.353.960.004.814.394.75

Mehkari 13.320.00 3.650.000.004.794.790.10

Ramganga 5.040.00 1.630.000.002.420.000.99

Ruti 10.090.00 2.490.260.005.650.201.49

Sakat 13.340.00 4.700.650.005.002.550.44

Talwar 3.140.00 0.770.000.001.400.250.72135

Page 145: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator IV: Water Use Pattern - Page 2 of 11

(Medium Projects/ 2017-18) Unit: Mcum

Project/ CircleOn Canals

Kharif Rabi HW

Reservoir

Lift

River

LiftNI Use Evapo-

ration

TotalSubbasin/

PlanGroup

Turori 4.270.00 1.271.170.001.820.000.00

CADA Beed 50.8811.990.0062.2420.5017.530.00 163.14

Sina

Bori 14.240.00 2.002.110.0010.130.000.00

Ekrukh 14.830.00 5.553.780.005.500.000.00

Hingani

(Pangaon)

39.840.00 6.811.020.0027.792.851.38

Mangi 25.870.00 4.274.780.009.886.950.00

Pimpalgaon

(Dhale)

11.760.00 5.060.210.006.490.000.00

CADA Solapur 23.6811.900.0059.799.791.380.00 106.54

Sina

Khairy 15.250.00 4.120.170.0010.960.000.00

Sina 63.761.12 17.731.550.0011.5422.559.27

KIC Pune 21.851.710.0022.5022.559.271.12 79.01

Upper Krishna (E)

Basappawadi 0.330.00 0.310.020.000.000.000.00

Siddhewadi 1.590.00 0.340.110.001.130.000.00

SIC Sangli 0.650.130.001.130.000.000.00 1.91

Upper Krishna (E)

Nher 9.700.00 2.031.111.272.020.003.27

Yeralwadi 27.670.00 5.223.140.0012.362.574.38

SIC Satara 7.254.251.2714.382.577.650.00 37.37

Highly Deficit 218.56 1.27 31.92 134.8467.5245.901.12 501.12

DeficitGirna

Gadadgad 4.320.00 0.540.670.001.160.551.40

CADA Abad 0.540.670.001.160.551.400.00 4.32

Girna

Agnavati 0.000.00 0.000.000.000.000.000.00

Hiwara 4.620.00 2.271.760.000.590.000.00

Manyad 27.290.00 4.160.730.0012.380.879.15

CADA Jalgaon 6.432.490.0012.970.879.150.00 31.91

Girna

Haranbari 41.930.00 1.7923.9214.901.100.000.22

Kelzar 14.810.36 1.723.576.460.910.001.79

Nagya Sakya 6.270.00 0.841.620.001.450.002.36

CADA Nashik 4.3529.1121.363.460.004.370.36 63.01

Lower Godavari

136

Page 146: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator IV: Water Use Pattern - Page 3 of 11

(Medium Projects/ 2017-18) Unit: Mcum

Project/ CircleOn Canals

Kharif Rabi HW

Reservoir

Lift

River

LiftNI Use Evapo-

ration

TotalSubbasin/

PlanGroup

Ghanasargaon 0.290.00 0.030.000.000.260.000.00

Kharola 0.250.00 0.030.000.000.220.000.00

Renapur

Medium Project

0.340.00 0.040.000.000.300.000.00

Upper Kundlika 7.960.00 3.470.390.004.100.000.00

BIPC Parli (V) 3.560.390.004.870.000.000.00 8.83

Lower Godavari

Galhati 10.330.00 3.940.960.005.030.060.35

Masoli 15.431.14 2.763.680.007.860.000.00

CADA Abad 6.694.630.0012.890.060.351.14 25.76

Lower Godavari

Bindusara 6.460.00 1.454.610.000.000.000.40

Bodhegaon 3.850.00 1.050.000.002.150.400.25

Borna 5.940.00 2.690.000.003.250.000.00

Kundalika 23.310.00 11.270.330.002.785.333.60

Saraswati 5.680.00 1.800.000.002.081.800.00

Sindphana 7.360.00 1.840.250.001.001.552.72

Wan (Beed) 12.870.00 4.922.650.003.100.002.20

CADA Beed 25.017.840.0014.369.089.170.00 65.46

Lower Godavari

Kudala 4.660.00 0.670.600.001.600.791.01

NIC Nanded 0.670.600.001.600.791.010.00 4.66

Manjra

Aurad 2.900.00 0.900.000.002.000.000.00

Bhusni 1.370.00 0.400.000.000.970.000.00

Binagihal 1.370.00 0.430.000.000.940.000.00

Borgaon

Anjanpur

1.110.00 0.210.000.000.900.000.00

Dhanegaon 3.160.00 0.410.000.002.750.000.00

Dongargaon

(Latur)

8.500.00 3.500.000.005.000.000.00

Gunjarga 1.370.00 0.410.000.000.960.000.00

Hosur Barrage 2.250.00 0.380.000.001.870.000.00

Karsa Pohegaon 2.340.00 0.620.020.001.700.000.00

Kholgapur 6.880.00 1.620.000.005.260.000.00

Killlari 2 1.950.00 0.420.000.001.530.000.00

Limbala 0.300.00 0.010.000.000.290.000.00

Madansuri 1.430.00 0.630.000.000.800.000.00

Nagzari (Latur) 2.590.00 0.630.000.001.960.000.00

Rajegaon 0.610.00 0.170.000.000.440.000.00

Sai 1.400.00 0.550.000.000.850.000.00

Shivni 4.820.00 1.190.000.003.630.000.00

137

Page 147: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator IV: Water Use Pattern - Page 4 of 11

(Medium Projects/ 2017-18) Unit: Mcum

Project/ CircleOn Canals

Kharif Rabi HW

Reservoir

Lift

River

LiftNI Use Evapo-

ration

TotalSubbasin/

PlanGroup

Tagarkheda 0.770.00 0.110.000.000.660.000.00

Takalgaon

Devla

1.090.00 0.490.000.000.600.000.00

Wangdari 0.710.00 0.410.000.000.300.000.00

Wanjarkheda 1.470.00 0.270.000.001.200.000.00

BIPC Parli (V) 13.750.020.0034.610.000.000.00 48.38

Manjra

Belpara 3.690.00 0.920.000.002.770.000.00

Devarjan 7.770.00 2.670.340.004.760.000.00

Gharni 16.250.00 1.960.270.006.152.944.93

Mahasangvi 5.890.00 1.410.630.003.400.000.44

Masalga 7.900.00 6.050.030.001.820.000.00

Raigavan 3.450.00 1.282.070.000.100.000.00

Renapur 13.730.00 4.813.240.005.680.000.00

Rui 9.550.00 2.832.950.003.770.000.00

Sakol 7.470.00 1.840.340.005.290.000.00

Sangameshwar

(Dokewadi)

13.180.00 5.270.270.007.640.000.00

Tawarja 15.510.00 5.091.140.007.901.380.00

Terna 15.980.00 4.482.810.007.780.220.69

Tiru 8.500.00 1.860.940.005.710.000.00

Waghe

Babhulgaon

2.710.00 1.450.000.001.260.000.00

Whati 8.660.00 1.960.270.006.430.000.00

CADA Beed 43.8615.300.0070.464.546.050.00 140.22

Manjra

Karadkhed 6.590.00 1.723.650.001.220.000.00

Kundrala 2.800.00 0.451.500.000.850.000.00

Mahalingi 1.290.00 0.160.000.001.130.000.00

Pethwadaj 2.110.00 1.400.170.000.530.000.00

Upper Manar 55.930.00 11.831.800.0025.430.9815.89

NIC Nanded 15.567.120.0029.150.9815.890.00 68.70

Middle Tapi

(Satpuda)

Amarawati 2.060.00 1.350.000.000.710.000.00

Bahula 4.230.00 3.880.000.000.350.000.00

Bori (Jalgaon) 8.170.00 4.943.230.000.000.000.00

Prakasha

Barrage

15.320.00 7.460.390.007.470.000.00

Sarangkheda

Barrage

37.770.00 10.778.260.0018.740.000.00

Sulwade

Barrage

35.990.00 7.7817.910.0010.300.000.00

CADA Jalgaon 36.1729.790.0037.580.000.000.00 103.53

138

Page 148: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator IV: Water Use Pattern - Page 5 of 11

(Medium Projects/ 2017-18) Unit: Mcum

Project/ CircleOn Canals

Kharif Rabi HW

Reservoir

Lift

River

LiftNI Use Evapo-

ration

TotalSubbasin/

PlanGroup

Middle Tapi

(Satpuda)

Shivan 8.600.00 1.103.751.980.220.001.55

DIPC Dhule 1.103.751.980.220.001.550.00 8.60

Middle Tapi (South)

Ajanta Andhari 1.410.00 0.291.120.000.000.000.00

CADA Abad 0.291.120.000.000.000.000.00 1.41

Middle Tapi (South)

Bhokarbari 0.370.00 0.210.160.000.000.000.00

Burai 13.650.00 2.821.181.780.002.145.74

Jamkhedi 10.200.00 5.180.320.000.000.004.70

Kanoli 0.000.00 0.000.000.000.000.000.00

Rangawali 13.100.00 2.821.513.770.003.961.04

Tondapur 4.650.00 1.472.370.000.730.000.09

CADA Jalgaon 12.505.535.550.736.1011.560.00 41.97

Purna (Tapi)

Dnyanganga 15.400.00 7.385.080.002.590.000.35

Mas 5.620.00 4.511.110.000.000.000.00

Morna (Akola) 5.730.00 4.021.710.000.000.000.00

Mun 8.560.00 2.885.260.000.420.000.00

Nirguna 20.080.00 5.4014.580.000.100.000.00

Paldhag 7.400.00 1.660.200.000.070.005.48

Torna 5.810.00 1.200.200.001.420.002.99

Uma 1.840.00 0.200.990.000.650.000.00

Utawali 6.070.00 2.361.140.000.590.001.98

AIC Akola 29.6130.270.005.840.0010.790.00 76.51

Purna (Tapi)

Chandrabhaga

(Amravati)

12.520.20 2.896.070.000.001.202.16

Purna

(Achalpur)

31.292.92 3.733.940.000.003.2917.41

Sapan 22.730.00 15.430.000.000.003.553.75

Shahnoor 27.360.00 7.2919.090.000.000.130.85

UWIC

Amravati

29.3429.100.000.008.1724.173.12 93.90

Purna+Dudhana

Wakod 0.000.00 0.000.000.000.000.000.00

AIC Abad 0.000.000.000.000.000.000.00 0.00

Purna+Dudhana

Anjana Palashi 0.530.00 0.030.500.000.000.000.00

Dhamna 2.350.00 1.251.100.000.000.000.00139

Page 149: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator IV: Water Use Pattern - Page 6 of 11

(Medium Projects/ 2017-18) Unit: Mcum

Project/ CircleOn Canals

Kharif Rabi HW

Reservoir

Lift

River

LiftNI Use Evapo-

ration

TotalSubbasin/

PlanGroup

Girja 0.000.00 0.000.000.000.000.000.00

Jivrekha 3.430.00 1.520.250.000.760.000.90

Jui 9.610.00 4.154.150.001.310.000.00

Kalyan Girija 8.220.00 5.300.030.001.910.000.99

Karpara 20.080.00 3.672.800.006.361.565.69

Khelna 0.550.00 0.190.360.000.000.000.00

Lahuki 1.350.00 0.620.730.000.000.000.00

Pir Kalyan 7.710.00 4.630.650.001.090.001.34

Purna Nevpur 5.490.00 1.962.300.001.230.000.00

Sukhana 6.440.00 2.920.200.001.120.002.20

Upper Dudhana 9.170.00 4.781.860.002.520.000.00

CADA Abad 31.0214.920.0016.301.5611.120.00 74.92

Deficit 246.18 28.89 182.66 260.4532.70106.594.62 862.09

NormalLower Wainganga

Dongargaon

(Chandrapur)

6.391.83 2.670.000.000.000.161.74

CIPC

Chandrapur

2.670.000.000.000.161.741.83 6.39

Middle Tapi

(Satpuda)

Abhora 4.450.00 1.890.000.000.060.931.58

Aner 44.633.44 14.401.000.000.0010.9714.83

Bhokar

(Mangrul)

3.650.00 1.230.002.420.000.000.00

Karwand 17.130.00 4.232.860.000.000.0010.04

Mor 3.330.00 1.060.002.270.000.000.00

Suki 30.110.00 8.661.1813.060.000.007.22

CADA Jalgaon 31.475.0417.750.0611.8933.673.44 103.30

Middle Tapi

(Satpuda)

Kordi 4.470.00 1.020.001.700.200.501.05

DIPC Dhule 1.020.001.700.200.501.050.00 4.47

Middle Tapi

(Satpuda)

Gul 20.320.00 5.7714.550.000.000.000.00

JIPC Jalgaon 5.7714.550.000.000.000.000.00 20.32

Middle Wainganga

Jam 22.560.00 4.793.400.000.890.0013.48

CADA Nagpur 4.793.400.000.890.0013.480.00 22.56

Painganga

Koradi 9.380.00 4.202.320.002.860.000.00

AIC Akola 4.202.320.002.860.000.000.00 9.38140

Page 150: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator IV: Water Use Pattern - Page 7 of 11

(Medium Projects/ 2017-18) Unit: Mcum

Project/ CircleOn Canals

Kharif Rabi HW

Reservoir

Lift

River

LiftNI Use Evapo-

ration

TotalSubbasin/

PlanGroup

Painganga

Dongargaon

(Nanded)

5.280.00 1.780.000.001.200.901.40

Loni 3.200.00 1.000.000.000.300.001.90

Nagzari 5.140.00 1.861.250.000.100.001.93

NIC Nanded 4.641.250.001.600.905.230.00 13.62

Painganga

Ekbhuji 6.790.00 1.105.690.000.000.000.00

Sonal 1.230.00 0.240.280.000.710.000.00

WIC Washim 1.355.970.000.710.000.000.00 8.02

Painganga

Adan 20.491.20 13.292.050.002.210.001.75

Borgaon 1.090.00 1.090.000.000.000.000.00

Goki 8.900.00 3.873.170.001.860.000.00

Lower Pus 29.940.00 20.680.120.001.590.007.55

Saikheda 19.391.20 9.020.680.005.320.003.17

Waghadi 6.930.00 3.493.350.000.090.000.00

YIC Yavatmal 51.449.360.0011.060.0012.472.40 86.74

Panzra

Akkalpada(Low

er Panzra)

90.940.00 7.9756.175.100.006.5215.18

Malangaon 9.930.04 3.522.680.000.001.042.65

Panzara 32.830.01 8.052.680.510.008.2213.36

Sonwad 4.580.00 1.770.000.002.060.000.75

Wadi Shewadi 3.230.00 1.411.160.000.660.000.00

CADA Jalgaon 22.7262.695.612.7215.7931.930.05 141.50

Remaining Bhima

(Neera)

Nazare 15.530.00 5.035.700.002.990.001.82

Shetphal 17.981.35 5.020.580.000.287.083.67

PIC Pune 10.056.280.003.277.085.491.35 33.51

Upper Bhima

Chilhewadi 1.910.00 1.910.000.000.000.000.00

Visapur 37.165.25 8.943.290.004.9011.143.64

KIC Pune 10.853.290.004.9011.143.645.25 39.07

Upper Bhima

Andra Khore 69.600.00 8.1210.3937.6213.470.000.00

Kalmodi 3.730.00 3.170.000.000.560.000.00

Kasarsai 19.410.00 2.500.4210.615.880.000.00

Wadiwale 37.140.00 4.800.8629.102.370.000.00

PIC Pune 18.5911.6777.3322.290.000.000.00 129.87141

Page 151: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator IV: Water Use Pattern - Page 8 of 11

(Medium Projects/ 2017-18) Unit: Mcum

Project/ CircleOn Canals

Kharif Rabi HW

Reservoir

Lift

River

LiftNI Use Evapo-

ration

TotalSubbasin/

PlanGroup

Upper Godavari

Shivna Takali 1.540.00 1.340.200.000.000.000.00

AIC Abad 1.340.200.000.000.000.000.00 1.54

Upper Godavari

Ambadi 2.070.00 0.531.550.000.000.000.00

Bor Dahegaon 0.360.00 0.360.000.000.000.000.00

Dheku 4.920.00 2.960.510.001.450.000.00

Kolhi 1.180.00 0.240.940.000.000.000.00

Narangi 2.410.00 0.601.810.000.000.000.00

Tembhapuri 0.170.00 0.170.000.000.000.000.00

CADA Abad 4.864.810.001.450.000.000.00 11.12

Upper Godavari

Adhala 26.470.00 2.211.040.007.038.567.63

Alandi 21.220.00 5.070.000.672.378.894.22

Bhojapur 22.592.14 1.1812.150.000.530.006.59

Gautami 11.600.00 0.816.460.004.330.000.00

Ghatshil

Pargaon

3.260.00 1.000.000.002.260.000.00

Kashyapi 3.610.00 1.940.000.001.670.000.00

Mandohol 9.860.00 1.071.880.003.461.202.26

Waldevi 12.220.00 5.071.982.542.630.000.00

CADA Nashik 18.3423.513.2124.2818.6520.712.14 110.82

Upper Godavari

Manikpunj 11.620.00 1.063.990.001.830.004.74

DIPC Dhule 1.063.990.001.830.004.740.00 11.62

Wardha

Dham 56.770.00 19.2812.230.0010.750.0014.51

Dongargaon

(Wardha)

2.030.00 0.860.000.000.000.001.17

Madan Talav

Project

8.820.00 3.870.430.000.000.004.52

Pothara 23.630.00 8.180.000.001.390.0014.06

CADA Nagpur 32.1912.660.0012.140.0034.260.00 91.24

Wardha

Amalnalla 3.630.00 0.992.640.000.000.000.00

Lal Nala 6.860.00 2.720.220.000.000.003.92

CIPC

Chandrapur

3.712.860.000.000.003.920.00 10.48

Wardha

Kar 20.351.47 4.141.840.001.540.2211.14

NIC Nagpur 4.141.840.001.540.2211.141.47 20.35142

Page 152: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator IV: Water Use Pattern - Page 9 of 11

(Medium Projects/ 2017-18) Unit: Mcum

Project/ CircleOn Canals

Kharif Rabi HW

Reservoir

Lift

River

LiftNI Use Evapo-

ration

TotalSubbasin/

PlanGroup

Wardha

Nawargaon 7.240.00 0.806.440.000.000.000.00

YIC Yavatmal 0.806.440.000.000.000.000.00 7.24

Normal 91.79 105.59 182.10 235.9966.33183.4617.92 883.18

SurplusMiddle Wainganga

Bagheda 10.613.00 1.200.000.000.002.214.22

Betekar Bothli 2.572.17 0.400.000.000.000.000.00

Bodalkasa 3.772.58 1.070.120.000.000.000.00

Chandpur 18.5115.57 2.600.100.000.240.000.00

Chorakhmara 0.670.00 0.670.000.000.000.000.00

Chulband 4.302.78 1.400.000.000.120.000.00

Khairbanda 5.274.19 1.080.000.000.000.000.00

Managadh 2.261.29 0.970.000.000.000.000.00

Rengepar 1.230.64 0.590.000.000.000.000.00

Sangrampur 1.591.25 0.340.000.000.000.000.00

Sorna 2.132.13 0.000.000.000.000.000.00

BIC Bhandara 10.320.220.000.372.214.2235.58 52.91

Middle Wainganga

Chandrabhaga

(Nagpur)

8.381.31 1.670.080.000.750.004.56

Kanholibara 15.102.25 3.940.000.000.830.008.08

Kesarnala 2.710.34 0.750.210.000.440.000.97

Khekara Nalla 12.061.29 5.230.000.000.000.005.53

Kolar 23.822.32 6.990.550.002.920.0910.96

Makardhokada-

Saiki

28.511.43 3.014.530.000.000.0219.55

Mordham 4.160.55 1.140.040.000.400.521.50

Panchadhara

Complex

8.361.12 1.110.000.000.000.006.13

Pandharbodi 13.564.35 2.212.880.000.000.004.11

Umri 3.640.55 0.830.000.000.710.021.54

Wena 17.520.00 5.939.940.000.950.000.71

CADA Nagpur 32.8118.230.007.000.6263.6515.52 137.82

Middle Wainganga

Chandai 5.670.00 4.990.000.000.000.000.68

Chargaon 10.952.75 4.661.510.000.000.002.03

Labhansarad 1.460.00 1.100.270.000.000.000.09

Pakadigundam 3.030.00 1.321.710.000.000.000.00

CIPC

Chandrapur

12.073.490.000.000.002.802.75 21.11

Middle Wainganga

143

Page 153: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator IV: Water Use Pattern - Page 10 of 11

(Medium Projects/ 2017-18) Unit: Mcum

Project/ CircleOn Canals

Kharif Rabi HW

Reservoir

Lift

River

LiftNI Use Evapo-

ration

TotalSubbasin/

PlanGroup

Kalpathri 1.750.00 1.750.000.000.000.000.00

Katangi 3.270.00 2.740.530.000.000.000.00

NIC Nagpur 4.490.530.000.000.000.000.00 5.02

Surplus 7.36 0.00 22.47 59.692.8270.6653.85 216.86

AbundantLower Wainganga

Asolamendha 64.3155.26 8.620.430.000.000.000.00

Ghorazari 29.6125.93 3.680.000.000.000.000.00

Naleshwar 8.717.24 0.530.430.000.510.000.00

CIPC

Chandrapur

12.820.860.000.510.000.0088.44 102.63

North Konkan

Hetwane 76.000.00 9.0162.700.000.001.153.14

NKIPC Thane 9.0162.700.000.001.153.140.00 76.00

North Konkan

Rajanalla

Complex

36.440.00 20.250.000.000.000.0016.20

Wandri 25.330.00 5.140.000.000.007.4312.77

TIC Thane 25.390.000.000.007.4328.960.00 61.78

South Konkan

Gad Nadi 2.810.00 2.710.000.000.000.000.10

NKIPC Thane 2.710.000.000.000.000.100.00 2.81

South Konkan

Deoghar 19.690.00 5.870.000.000.009.044.78

SKIPC oros 5.870.000.000.009.044.780.00 19.69

Upper Krishna (W)

Uttarmand 5.960.00 0.100.005.860.000.000.00

CADA Pune 0.100.005.860.000.000.000.00 5.96

Upper Krishna (W)

Chikotra 24.510.00 1.441.0621.440.570.000.00

Chitri 61.870.00 5.406.0350.430.000.000.00

Dhamni

(Kolhapur)

5.020.00 0.000.174.850.000.000.00

Ghataprbha 31.860.00 5.290.4226.140.000.000.00

Hiranyakeshi 3.070.00 0.000.442.630.000.000.00

Jambre 24.460.00 4.420.2819.760.000.000.00

Jangamhatti 29.880.00 5.600.7223.570.000.000.00

Kadvi 28.840.00 5.830.5322.490.000.000.00

Kasari 75.170.00 2.771.9170.490.000.000.00144

Page 154: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator IV: Water Use Pattern - Page 11 of 11

(Medium Projects/ 2017-18) Unit: Mcum

Project/ CircleOn Canals

Kharif Rabi HW

Reservoir

Lift

River

LiftNI Use Evapo-

ration

TotalSubbasin/

PlanGroup

Kumbhi 57.000.00 5.530.9150.560.000.000.00

Patgaon 68.350.00 6.291.2660.810.000.000.00

KIC Kolhapur 42.5713.72353.170.570.000.000.00 410.03

Upper Krishna (W)

Krishna Canal

& Khodshi

Backwater

48.735.51 1.010.630.0018.8413.759.00

Maishal LIS 202.460.00 0.0099.230.00103.220.000.00

Morna (Sangli) 28.290.00 4.310.8314.458.700.000.00

Takari LIS 139.080.00 0.0017.020.00122.060.000.00

Tembhu LIS

Barrage

156.380.00 1.331.590.00153.450.000.00

Yeoti Masoli 6.290.00 1.200.422.450.220.151.86

SIC Sangli 7.85119.7316.90406.4913.8910.865.51 581.22

Vashishthi

Natuwadi 16.910.00 0.990.690.000.003.3811.85

KIC Ratnagiri 0.990.690.000.003.3811.850.00 16.91

Abundant 407.57 375.93 197.70 107.3034.8859.7093.94 1277.02

Medium 171.46 466.30 204.26 798.27616.86511.67971.46 3740.28

145

Page 155: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

ISP

in

ha/M

cu

m

CA

DA

Beed

CA

DA

Sola

pur

KIC

Pune

PIC

Pune

SIC

Sangli

SIC

Sata

ra

UW

IC A

mra

vati

NIC

Nanded

DIP

C D

hule

CA

DA

Beed

CA

DA

Jalg

aon

CA

DA

Nashik

AIC

Abad

AIC

Akola

BIP

C P

arli (V

)

CA

DA

Abad

CA

DA

Abad

AIC

Akola

AIC

Abad

CA

DA

Nashik

CA

DA

Nagpur

CA

DA

Jalg

aon

DIP

C D

hule

JIP

C J

alg

aon

CIP

C C

handra

pur

NIC

Nanded

NIC

Nagpur

KIC

Pune

WIC

Washim

YIC

Yavatm

al

PIC

Pune

NIC

Nagpur

CIP

C C

handra

pur

CA

DA

Nagpur

BIC

Bhandara

CIP

C C

handra

pur

CA

DA

Pune

KIC

Ratn

agiri

KIC

Kolh

apur

SIC

Sangli

NK

IPC

Thane

SK

IPC

oro

s

TIC

Thane

146

Page 156: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator V: Irrigation System Performance (Canals) - Page 1 of 10 (Medium / 2017-18) Unit: ha/MCum

Irrigation System Performance

Kharif Rabi HW Subbasin/PlanGroup Project/ Circle

Highly Deficit Remaining Bhima (Neera) Tisangi 0 176 181

PIC Pune 0 176 181

Remaining Bhima (Neera) Buddhihal 0 0 0

SIC Sangli 0 0 0

Remaining Bhima (Neera) Andhali 0 0 0

Ranand 0 224 51

SIC Satara 0 224 51

Remaining Bhima+ Man Ashti 0 0 0

Jawalgaon 0 0 63

CADA Solapur 0 0 63

Remaining Bhima+ Man Mhaswad 0 0 0

PIC Pune 0 0 0

Remaining Bhima+ Man Dodda Nalla 0 0 0

Sankh 0 0 0

SIC Sangli 0 0 0

Sina Banganga 0 220 0

Benitura 0 0 0

Chandani 0 100 0

Harni 0 159 101

Jakapur 0 0 0

Kada 0 70 65

Kadi 0 123 21

Kambli 0 100 81

Khandala 0 0 123

Khandeshwar 0 0 108

Khasapur 0 105 74

Kurnoor 0 115 90

Mehkari 0 76 68

Ramganga 0 175 0

Ruti 0 161 330

Sakat 0 103 90

Talwar 0 83 80

Turori 0 0 0

CADA Beed 0 126 83

Sina

147

Page 157: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator V: Irrigation System Performance (Canals) - Page 2 of 10 (Medium / 2017-18) Unit: ha/MCum

Irrigation System Performance

Kharif Rabi HW Subbasin/PlanGroup Project/ Circle

Bori 0 0 0

Ekrukh 0 0 0

Hingani (Pangaon) 0 137 97

Mangi 0 0 155

Pimpalgaon (Dhale) 0 0 0

CADA Solapur 0 137 138

Sina Khairy 0 0 0

Sina 0 111 48

KIC Pune 0 111 48

Upper Krishna (E) Basappawadi 0 0 0

Siddhewadi 0 0 0

SIC Sangli 0 0 0

Upper Krishna (E) Nher 0 136 0

Yeralwadi 0 67 68

SIC Satara 0 96 68

Highly Deficit 0 135 98

Deficit Girna Gadadgad 0 267 144

CADA Abad 0 267 144

Girna Agnavati 0 0 0

Hiwara 0 0 0

Manyad 0 75 94

CADA Jalgaon 0 75 94

Girna Haranbari 0 155 0

Kelzar 236 251 0

Nagya Sakya 0 318 0

CADA Nashik 4269 282 0

Lower Godavari Ghanasargaon 0 0 0

Kharola 0 0 0

Renapur Medium Project 0 0 0

Upper Kundlika 0 0 0

BIPC Parli (V) 0 0 0

Lower Godavari Galhati 0 279 0

Masoli 134 0 0

CADA Abad 134 279 0

148

Page 158: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator V: Irrigation System Performance (Canals) - Page 3 of 10 (Medium / 2017-18) Unit: ha/MCum

Irrigation System Performance

Kharif Rabi HW Subbasin/PlanGroup Project/ Circle

Lower Godavari Bindusara 0 212 0

Bodhegaon 0 108 75

Borna 0 0 0

Kundalika 0 28 49

Saraswati 0 0 19

Sindphana 0 113 50

Wan (Beed) 0 54 0

CADA Beed 0 69 44

Lower Godavari Kudala 0 137 118

NIC Nanded 0 137 118

Manjra Aurad 0 0 0

Bhusni 0 0 0

Binagihal 0 0 0

Borgaon Anjanpur 0 0 0

Dhanegaon 0 0 0

Dongargaon (Latur) 0 0 0

Gunjarga 0 0 0

Hosur Barrage 0 0 0

Karsa Pohegaon 0 0 0

Kholgapur 0 0 0

Killlari 2 0 0 0

Limbala 0 0 0

Madansuri 0 0 0

Nagzari (Latur) 0 0 0

Rajegaon 0 0 0

Sai 0 0 0

Shivni 0 0 0

Tagarkheda 0 0 0

Takalgaon Devla 0 0 0

Wangdari 0 0 0

Wanjarkheda 0 0 0

BIPC Parli (V) 0 0 0

Manjra Belpara 0 0 0

Devarjan 0 0 0

Gharni 0 86 47

Mahasangvi 0 80 0

149

Page 159: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator V: Irrigation System Performance (Canals) - Page 4 of 10 (Medium / 2017-18) Unit: ha/MCum

Irrigation System Performance

Kharif Rabi HW Subbasin/PlanGroup Project/ Circle

Masalga 0 0 0

Raigavan 0 0 0

Renapur 0 0 0

Rui 0 0 0

Sakol 0 0 0

Sangameshwar (Dokewadi) 0 0 0

Tawarja 0 0 134

Terna 0 129 86

Tiru 0 0 0

Waghe Babhulgaon 0 0 0

Whati 0 0 0

CADA Beed 0 99 75

Manjra Karadkhed 0 0 0

Kundrala 0 0 0

Mahalingi 0 0 0

Pethwadaj 0 0 0

Upper Manar 0 95 9

NIC Nanded 0 95 11

Middle Tapi (Satpuda) Amarawati 0 0 0

Bahula 0 0 0

Bori (Jalgaon) 0 0 0

Prakasha Barrage 0 0 0

Sarangkheda Barrage 0 0 0

Sulwade Barrage 0 0 0

CADA Jalgaon 0 0 0

Middle Tapi (Satpuda) Shivan 0 116 0

DIPC Dhule 0 116 0

Middle Tapi (South) Ajanta Andhari 0 0 0

CADA Abad 0 0 0

Middle Tapi (South) Bhokarbari 0 0 0

Burai 0 87 49

Jamkhedi 0 64 0

Kanoli 0 0 0

Rangawali 0 174 43

Tondapur 0 129 0

150

Page 160: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator V: Irrigation System Performance (Canals) - Page 5 of 10 (Medium / 2017-18) Unit: ha/MCum

Irrigation System Performance

Kharif Rabi HW Subbasin/PlanGroup Project/ Circle

CADA Jalgaon 0 86 45

Purna (Tapi) Dnyanganga 0 200 0

Mas 0 0 0

Morna (Akola) 0 0 0

Mun 0 0 0

Nirguna 0 0 0

Paldhag 0 54 0

Torna 0 36 0

Uma 0 0 0

Utawali 0 70 0

AIC Akola 0 57 0

Purna (Tapi) Chandrabhaga (Amravati) 65 66 33

Purna (Achalpur) 77 103 99

Sapan 0 36 7

Shahnoor 0 128 723

UWIC Amravati 76 90 59

Purna+Dudhana Wakod 0 0 0

AIC Abad 0 0 0

Purna+Dudhana Anjana Palashi 0 0 0

Dhamna 0 0 0

Girja 0 0 0

Jivrekha 0 430 0

Jui 0 0 0

Kalyan Girija 0 148 0

Karpara 0 55 33

Khelna 0 0 0

Lahuki 0 0 0

Pir Kalyan 0 147 0

Purna Nevpur 0 0 0

Sukhana 0 97 0

Upper Dudhana 0 0 0

CADA Abad 0 113 33

Deficit 417 99 56

Normal Lower Wainganga Dongargaon (Chandrapur) 148 199 0

151

Page 161: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator V: Irrigation System Performance (Canals) - Page 6 of 10 (Medium / 2017-18) Unit: ha/MCum

Irrigation System Performance

Kharif Rabi HW Subbasin/PlanGroup Project/ Circle

CIPC Chandrapur 148 199 0

Middle Tapi (Satpuda) Abhora 0 44 29

Aner 306 88 87

Bhokar (Mangrul) 0 0 0

Karwand 0 83 0

Mor 0 0 0

Suki 0 57 0

CADA Jalgaon 306 78 83

Middle Tapi (Satpuda) Kordi 0 27 40

DIPC Dhule 0 27 40

Middle Tapi (Satpuda) Gul 0 0 0

JIPC Jalgaon 0 0 0

Middle Wainganga Jam 0 62 0

CADA Nagpur 0 62 0

Painganga Koradi 0 0 0

AIC Akola 0 0 0

Painganga Dongargaon (Nanded) 0 184 161

Loni 0 106 0

Nagzari 0 108 0

NIC Nanded 0 127 161

Painganga Ekbhuji 0 0 0

Sonal 0 0 0

WIC Washim 0 0 0

Painganga Adan 175 0 0

Borgaon 0 0 0

Goki 0 0 0

Lower Pus 0 33 0

Saikheda 159 104 0

Waghadi 0 0 0

YIC Yavatmal 167 54 0

Panzra Akkalpada(Lower Panzra) 0 0 0

Malangaon 57 284 88

Panzara 154 56 62

Sonwad 0 80 0

152

Page 162: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator V: Irrigation System Performance (Canals) - Page 7 of 10 (Medium / 2017-18) Unit: ha/MCum

Irrigation System Performance

Kharif Rabi HW Subbasin/PlanGroup Project/ Circle

Wadi Shewadi 0 0 0

CADA Jalgaon 83 93 65

Remaining Bhima (Neera) Nazare 0 152 0

Shetphal 81 170 84

PIC Pune 81 164 84

Upper Bhima Chilhewadi 0 0 0

Visapur 195 496 162

KIC Pune 195 496 162

Upper Bhima Andra Khore 0 0 0

Kalmodi 0 0 0

Kasarsai 0 0 0

Wadiwale 0 0 0

PIC Pune 0 0 0

Upper Godavari Shivna Takali 0 0 0

AIC Abad 0 0 0

Upper Godavari Ambadi 0 0 0

Bor Dahegaon 0 0 0

Dheku 0 0 0

Kolhi 0 0 0

Narangi 0 0 0

Tembhapuri 0 0 0

CADA Abad 0 0 0

Upper Godavari Adhala 0 152 100

Alandi 0 215 83

Bhojapur 90 217 0

Gautami 0 0 0

Ghatshil Pargaon 0 0 0

Kashyapi 0 0 0

Mandohol 0 93 103

Waldevi 0 0 0

CADA Nashik 90 179 92

Upper Godavari Manikpunj 0 91 0

DIPC Dhule 0 91 0

Wardha Dham 0 130 0

153

Page 163: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator V: Irrigation System Performance (Canals) - Page 8 of 10 (Medium / 2017-18) Unit: ha/MCum

Irrigation System Performance

Kharif Rabi HW Subbasin/PlanGroup Project/ Circle

Dongargaon (Wardha) 0 191 0

Madan Talav Project 0 128 0

Pothara 0 155 0

CADA Nagpur 0 142 0

Wardha Amalnalla 0 0 0

Lal Nala 0 61 0

CIPC Chandrapur 0 61 0

Wardha Kar 178 78 489

NIC Nagpur 178 78 489

Wardha Nawargaon 0 0 0

YIC Yavatmal 0 0 0

Normal 231 117 100

Surplus Middle Wainganga Bagheda 503 0 225

Betekar Bothli 394 0 0

Bodalkasa 319 0 0

Chandpur 492 0 0

Chorakhmara 0 0 0

Chulband 464 0 0

Khairbanda 588 0 0

Managadh 763 0 0

Rengepar 312 0 0

Sangrampur 544 0 0

Sorna 395 0 0

BIC Bhandara 486 0 225

Middle Wainganga Chandrabhaga (Nagpur) 103 45 0

Kanholibara 185 102 0

Kesarnala 339 84 0

Khekara Nalla 202 84 0

Kolar 243 90 101

Makardhokada-Saiki 10 176 0

Mordham 173 67 25

Panchadhara Complex 119 72 0

Pandharbodi 95 18 0

Umri 280 127 150

Wena 0 41 0

154

Page 164: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator V: Irrigation System Performance (Canals) - Page 9 of 10 (Medium / 2017-18) Unit: ha/MCum

Irrigation System Performance

Kharif Rabi HW Subbasin/PlanGroup Project/ Circle

CADA Nagpur 148 107 39

Middle Wainganga Chandai 0 78 0

Chargaon 344 370 0

Labhansarad 0 2043 0

Pakadigundam 0 0 0

CIPC Chandrapur 862 355 0

Middle Wainganga Kalpathri 0 0 0

Katangi 0 0 0

NIC Nagpur 0 0 0

Surplus 408 118 184

Abundant Lower Wainganga Asolamendha 190 0 0

Ghorazari 225 0 0

Naleshwar 417 0 0

CIPC Chandrapur 219 0 0

North Konkan Hetwane 0 32 74

NKIPC Thane 0 32 74

North Konkan Rajanalla Complex 0 29 0

Wandri 0 44 75

TIC Thane 0 36 75

South Konkan Gad Nadi 0 60 0

NKIPC Thane 0 60 0

South Konkan Deoghar 0 21 1

SKIPC oros 0 21 1

Upper Krishna (W) Uttarmand 0 0 0

CADA Pune 0 0 0

Upper Krishna (W) Chikotra 0 0 0

Chitri 0 0 0

Dhamni (Kolhapur) 0 0 0

Ghataprbha 0 0 0

Hiranyakeshi 0 0 0

Jambre 0 0 0

Jangamhatti 0 0 0

Kadvi 0 0 0

155

Page 165: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Note:

The indicator value of ISP of some of the projects is not as per the state norms based on data provided by field authority.

Indicator V: Irrigation System Performance (Canals) - Page 10 of 10 (Medium / 2017-18) Unit: ha/MCum

Irrigation System Performance

Kharif Rabi HW Subbasin/PlanGroup Project/ Circle

Kasari 0 0 0

Kumbhi 0 0 0

Patgaon 0 0 0

KIC Kolhapur 0 0 0

Upper Krishna (W) Krishna Canal & Khodshi Backwater

890 423 164

Maishal LIS 0 0 0

Morna (Sangli) 0 0 0

Takari LIS 0 0 0

Tembhu LIS Barrage 0 0 0

Yeoti Masoli 0 292 303

SIC Sangli 975 401 165

Vashishthi Natuwadi 0 15 0

KIC Ratnagiri 0 15 0

Abundant 327 97 94

368 112 92

156

Page 166: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

14

9

11

1

0 0 0 0

10

3

6

21

8

70

0

82 8

6

18

3

5

56

17

2

11

7

21

43

0 0

95

43

43

61

42

10

5

72

0 0

20

0

20

0

24

3

0 0 0

91 9

5

10

1

0

16

84

0

23

5

10

2

16

2

18

8

0

62

10

7

10

0

89

95

22

3

84

0

10

1

0

10

0

10

9

96

56

18

6

13

3

0 0 0 0

98

13

8

0 0 0

Percent

CA

DA

Beed

CA

DA

Sola

pur

KIC

Pune

PIC

Pune

SIC

Sangli

SIC

Sata

ra

AIC

Abad

AIC

Akola

BIP

C P

arli (V

)

CA

DA

Abad

CA

DA

Beed

CA

DA

Jalg

aon

CA

DA

Nashik

DIP

C D

hule

NIC

Nanded

UW

IC A

mra

vati

AIC

Abad

AIC

Akola

CA

DA

Abad

CA

DA

Jalg

aon

CA

DA

Nagpur

CA

DA

Nashik

CIP

C C

handra

pur

DIP

C D

hule

JIP

C J

alg

aon

KIC

Pune

NIC

Nagpur

NIC

Nanded

PIC

Pune

WIC

Washim

YIC

Yavatm

al

BIC

Bhandara

CA

DA

Nagpur

CIP

C C

handra

pur

NIC

Nagpur

CA

DA

Pune

CIP

C C

handra

pur

KIC

Kolh

apur

KIC

Ratn

agiri

NK

IPC

Thane

SIC

Sangli

SK

IPC

oro

s

TIC

Thane

157

Page 167: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator VI: Percentage of Planned & Actual Non Irrigation Use - Page 1 of 10

(Medium Projects / 2017-18) Unit: Mcum

NI Use as

per PRSubbasin/ PlanGroup Project/ Circle NI UseNI Use As

per PIP

Percent

wrt PR

Percent

wrt PIP

Highly DeficitRemaining Bhima (Neera)

Tisangi 0 0 0.00 0.00 3.67

PIC Pune 0.00 3.67 00 0.00

Remaining Bhima (Neera)

Buddhihal 0 0 0.00 0.00 0.00

SIC Sangli 0.00 0.00 00 0.00

Remaining Bhima (Neera)

Andhali 0 87 0.40 0.00 0.46

Ranand 0 19 0.13 0.00 0.69

SIC Satara 0.00 1.15 460 0.53

Remaining Bhima+ Man

Ashti 61 61 0.93 1.52 1.52

Jawalgaon 0 100 0.21 0.00 0.21

CADA Solapur 1.52 1.74 6675 1.15

Remaining Bhima+ Man

Mhaswad 0 0 0.00 0.00 0.56

PIC Pune 0.00 0.56 00 0.00

Remaining Bhima+ Man

Dodda Nalla 0 325 0.26 0.00 0.08

Sankh 0 0 0.00 0.00 0.00

SIC Sangli 0.00 0.08 3450 0.26

Sina

Banganga 0 0 0.05 0.00 0.00

Benitura 56 40 1.15 2.04 2.89

Chandani 0 77 2.43 0.00 3.17

Harni 0 0 0.07 0.00 0.00

Jakapur 0 0 0.00 0.00 0.00

Kada 0 1100 0.22 0.00 0.02

Kadi 0 0 0.00 0.00 0.01

Kambli 0 0 0.00 0.00 0.01

Khandala 0 0 0.00 0.00 0.00

Khandeshwar 0 0 0.00 0.00 0.00

Khasapur 0 618 2.04 0.00 0.33

Kurnoor 1320 84 3.96 0.30 4.74

Mehkari 0 0 0.00 0.00 0.00

Ramganga 0 0 0.00 0.00 0.00

Ruti 0 1300 0.26 0.00 0.02

Sakat 0 0 0.65 0.00 0.00

Talwar 0 0 0.00 0.00 0.09

Turori 0 62 1.17 0.00 1.90158

Page 168: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator VI: Percentage of Planned & Actual Non Irrigation Use - Page 2 of 10

(Medium Projects / 2017-18) Unit: Mcum

NI Use as

per PRSubbasin/ PlanGroup Project/ Circle NI UseNI Use As

per PIP

Percent

wrt PR

Percent

wrt PIP

CADA Beed 2.34 13.16 91513 11.99

Sina

Bori 100 100 2.11 2.10 2.10

Ekrukh 74 102 3.78 5.13 3.70

Hingani (Pangaon) 0 100 1.02 0.00 1.02

Mangi 0 96 4.78 0.00 5.00

Pimpalgaon (Dhale) 0 100 0.21 0.00 0.21

CADA Solapur 7.23 12.03 99165 11.90

Sina

Khairy 0 113 0.17 0.00 0.15

Sina 100 100 1.55 1.55 1.55

KIC Pune 1.55 1.69 101111 1.71

Upper Krishna (E)

Basappawadi 0 2 0.02 0.00 0.89

Siddhewadi 0 7 0.11 0.00 1.51

SIC Sangli 0.00 2.40 60 0.13

Upper Krishna (E)

Nher 0 73 1.11 0.00 1.52

Yeralwadi 0 104 3.14 0.00 3.03

SIC Satara 0.00 4.55 930 4.25

Highly Deficit 12.63 41.03 78253 31.92

DeficitGirna

Gadadgad 0 0 0.67 0.00 0.00

CADA Abad 0.00 0.00 00 0.67

Girna

Agnavati 0 0 0.00 0.00 0.00

Hiwara 0 62 1.76 0.00 2.86

Manyad 0 135 0.73 0.00 0.54

CADA Jalgaon 0.00 3.40 730 2.49

Girna

Haranbari 0 217 23.92 0.00 11.04

Kelzar 0 140 3.57 0.00 2.55

Nagya Sakya 0 86 1.62 0.00 1.88

CADA Nashik 0.00 15.47 1880 29.11

Lower Godavari

Ghanasargaon 0 0 0.00 0.00 0.00

Kharola 0 0 0.00 0.00 0.00

Renapur Medium

Project

0 0 0.00 0.00 0.00

Upper Kundlika 22 0 0.39 1.78 0.00159

Page 169: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator VI: Percentage of Planned & Actual Non Irrigation Use - Page 3 of 10

(Medium Projects / 2017-18) Unit: Mcum

NI Use as

per PRSubbasin/ PlanGroup Project/ Circle NI UseNI Use As

per PIP

Percent

wrt PR

Percent

wrt PIP

BIPC Parli (V) 1.78 0.00 022 0.39

Lower Godavari

Galhati 0 97 0.96 0.00 0.99

Masoli 0 102 3.68 0.00 3.62

CADA Abad 0.00 4.61 1000 4.63

Lower Godavari

Bindusara 0 84 4.61 0.00 5.47

Bodhegaon 0 0 0.00 0.00 0.48

Borna 0 0 0.00 0.00 0.30

Kundalika 0 100 0.33 0.00 0.33

Saraswati 0 0 0.00 0.00 0.00

Sindphana 0 625 0.25 0.00 0.04

Wan (Beed) 0 100 2.65 0.00 2.65

CADA Beed 0.00 9.27 850 7.84

Lower Godavari

Kudala 0 100 0.60 0.00 0.60

NIC Nanded 0.00 0.60 1000 0.60

Manjra

Aurad 0 0 0.00 0.00 0.00

Bhusni 0 0 0.00 0.00 0.00

Binagihal 0 0 0.00 0.00 0.00

Borgaon Anjanpur 0 0 0.00 0.00 0.00

Dhanegaon 0 0 0.00 1.77 0.00

Dongargaon (Latur) 0 0 0.00 1.18 0.00

Gunjarga 0 0 0.00 0.00 0.00

Hosur Barrage 0 0 0.00 0.00 0.00

Karsa Pohegaon 1 100 0.02 1.60 0.02

Kholgapur 0 0 0.00 0.00 0.00

Killlari 2 0 0 0.00 0.00 0.00

Limbala 0 0 0.00 0.00 0.00

Madansuri 0 0 0.00 0.00 0.00

Nagzari (Latur) 0 0 0.00 0.00 0.00

Rajegaon 0 0 0.00 0.00 0.00

Sai 0 0 0.00 1.01 0.00

Shivni 0 0 0.00 0.00 0.00

Tagarkheda 0 0 0.00 0.00 0.00

Takalgaon Devla 0 0 0.00 0.00 0.00

Wangdari 0 0 0.00 0.00 0.00

Wanjarkheda 0 0 0.00 0.00 0.00

BIPC Parli (V) 5.56 0.02 1000 0.02160

Page 170: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator VI: Percentage of Planned & Actual Non Irrigation Use - Page 4 of 10

(Medium Projects / 2017-18) Unit: Mcum

NI Use as

per PRSubbasin/ PlanGroup Project/ Circle NI UseNI Use As

per PIP

Percent

wrt PR

Percent

wrt PIP

Manjra

Belpara 0 0 0.00 0.00 0.00

Devarjan 0 0 0.34 0.00 0.00

Gharni 0 0 0.27 0.00 0.00

Mahasangvi 0 83 0.63 0.00 0.76

Masalga 0 3 0.03 0.00 1.00

Raigavan 0 93 2.07 0.00 2.23

Renapur 83 0 3.24 3.90 0.00

Rui 0 151 2.95 0.00 1.96

Sakol 0 58 0.34 0.00 0.59

Sangameshwar

(Dokewadi)

0 100 0.27 0.00 0.27

Tawarja 29 100 1.14 3.89 1.14

Terna 100 79 2.81 2.82 3.56

Tiru 0 48 0.94 0.00 1.94

Waghe Babhulgaon 0 0 0.00 0.00 0.00

Whati 0 0 0.27 0.00 0.00

CADA Beed 10.61 13.46 114144 15.30

Manjra

Karadkhed 0 104 3.65 0.00 3.50

Kundrala 0 0 1.50 0.00 0.00

Mahalingi 0 0 0.00 0.00 0.00

Pethwadaj 0 0 0.17 0.00 0.00

Upper Manar 20 22 1.80 9.00 8.27

NIC Nanded 9.00 11.77 6179 7.12

Middle Tapi (Satpuda)

Amarawati 0 0 0.00 0.47 0.04

Bahula 0 0 0.00 0.00 0.36

Bori (Jalgaon) 46 79 3.23 7.08 4.08

Prakasha Barrage 7 100 0.39 5.30 0.39

Sarangkheda Barrage 110 80 8.26 7.53 10.31

Sulwade Barrage 61 0 17.91 29.47 0.00

CADA Jalgaon 49.85 15.18 19660 29.79

Middle Tapi (Satpuda)

Shivan 82 0 3.75 4.60 0.00

DIPC Dhule 4.60 0.00 082 3.75

Middle Tapi (South)

Ajanta Andhari 0 0 1.12 0.00 0.00

CADA Abad 0.00 0.00 00 1.12

Middle Tapi (South)

Bhokarbari 0 0 0.16 0.00 0.00161

Page 171: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator VI: Percentage of Planned & Actual Non Irrigation Use - Page 5 of 10

(Medium Projects / 2017-18) Unit: Mcum

NI Use as

per PRSubbasin/ PlanGroup Project/ Circle NI UseNI Use As

per PIP

Percent

wrt PR

Percent

wrt PIP

Burai 0 100 1.18 0.00 1.18

Jamkhedi 178 100 0.32 0.18 0.32

Kanoli 0 0 0.00 1.71 1.71

Rangawali 100 100 1.51 1.51 1.51

Tondapur 276 0 2.37 0.86 0.00

CADA Jalgaon 4.26 4.71 117130 5.53

Purna (Tapi)

Dnyanganga 66 105 5.08 7.72 4.86

Mas 0 100 1.11 0.00 1.11

Morna (Akola) 27 285 1.71 6.34 0.60

Mun 51 100 5.26 10.32 5.26

Nirguna 694 0 14.58 2.10 0.00

Paldhag 54 105 0.20 0.37 0.19

Torna 0 0 0.20 0.00 0.00

Uma 43 141 0.99 2.28 0.70

Utawali 814 814 1.14 0.14 0.14

AIC Akola 29.26 12.86 235103 30.27

Purna (Tapi)

Chandrabhaga

(Amravati)

63 110 6.07 9.62 5.53

Purna (Achalpur) 69 81 3.94 5.73 4.85

Sapan 0 0 0.00 0.58 0.00

Shahnoor 0 114 19.09 0.00 16.81

UWIC Amravati 15.93 27.19 107183 29.10

Purna+Dudhana

Wakod 0 0 0.00 1.92 0.00

AIC Abad 1.92 0.00 00 0.00

Purna+Dudhana

Anjana Palashi 0 0 0.50 0.00 0.00

Dhamna 0 100 1.10 0.00 1.10

Girja 0 0 0.00 0.00 0.00

Jivrekha 0 0 0.25 0.00 0.00

Jui 178 0 4.15 2.33 0.00

Kalyan Girija 0 0 0.03 0.00 0.00

Karpara 0 131 2.80 0.00 2.14

Khelna 0 0 0.36 0.00 0.00

Lahuki 0 0 0.73 0.00 0.00

Pir Kalyan 30 135 0.65 2.14 0.48

Purna Nevpur 0 0 2.30 0.00 0.00

Sukhana 0 105 0.20 0.00 0.19162

Page 172: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator VI: Percentage of Planned & Actual Non Irrigation Use - Page 6 of 10

(Medium Projects / 2017-18) Unit: Mcum

NI Use as

per PRSubbasin/ PlanGroup Project/ Circle NI UseNI Use As

per PIP

Percent

wrt PR

Percent

wrt PIP

Upper Dudhana 0 0 1.86 0.00 0.00

CADA Abad 4.47 3.91 381334 14.92

Deficit 137.22 122.44 149133 182.66

NormalLower Wainganga

Dongargaon

(Chandrapur)

0 0 0.00 0.00 0.00

CIPC Chandrapur 0.00 0.00 00 0.00

Middle Tapi (Satpuda)

Abhora 0 0 0.00 0.00 0.00

Aner 0 100 1.00 0.00 1.00

Bhokar (Mangrul) 0 0 0.00 0.00 0.00

Karwand 87 87 2.86 3.27 3.27

Mor 0 0 0.00 0.00 0.00

Suki 207 92 1.18 0.57 1.28

CADA Jalgaon 3.83 5.55 91131 5.04

Middle Tapi (Satpuda)

Kordi 0 0 0.00 0.00 0.00

DIPC Dhule 0.00 0.00 00 0.00

Middle Tapi (Satpuda)

Gul 428 0 14.55 3.40 0.00

JIPC Jalgaon 3.40 0.00 0428 14.55

Middle Wainganga

Jam 69 92 3.40 4.95 3.71

CADA Nagpur 4.95 3.71 9269 3.40

Painganga

Koradi 56 89 2.32 4.12 2.60

AIC Akola 4.12 2.60 8956 2.32

Painganga

Dongargaon (Nanded) 0 0 0.00 0.00 0.00

Loni 0 0 0.00 0.00 0.00

Nagzari 43 109 1.25 2.92 1.15

NIC Nanded 2.92 1.15 10943 1.25

Painganga

Ekbhuji 749 0 5.69 0.76 0.00

Sonal 0 560 0.28 0.00 0.05

WIC Washim 0.76 0.05 12181785 5.97

Painganga

Adan 17 100 2.05 11.77 2.05

Borgaon 0 0 0.00 0.00 0.62

Goki 87 190 3.17 3.65 1.67163

Page 173: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator VI: Percentage of Planned & Actual Non Irrigation Use - Page 7 of 10

(Medium Projects / 2017-18) Unit: Mcum

NI Use as

per PRSubbasin/ PlanGroup Project/ Circle NI UseNI Use As

per PIP

Percent

wrt PR

Percent

wrt PIP

Lower Pus 0 2 0.12 0.00 6.99

Saikheda 105 25 0.68 0.65 2.75

Waghadi 97 45 3.35 3.47 7.50

YIC Yavatmal 19.53 21.58 4348 9.36

Panzra

Akkalpada(Lower

Panzra)

168 289 56.17 33.45 19.46

Malangaon 0 100 2.68 0.00 2.68

Panzara 182 100 2.68 1.47 2.68

Sonwad 0 0 0.00 0.00 0.00

Wadi Shewadi 163 0 1.16 0.71 0.00

CADA Jalgaon 35.63 24.82 253176 62.69

Remaining Bhima (Neera)

Nazare 79 95 5.70 7.25 6.01

Shetphal 0 129 0.58 0.00 0.45

PIC Pune 7.25 6.46 9787 6.28

Upper Bhima

Chilhewadi 0 0 0.00 0.00 0.00

Visapur 0 272 3.29 0.00 1.21

KIC Pune 0.00 1.21 2720 3.29

Upper Bhima

Andra Khore 30 99 10.39 34.91 10.50

Kalmodi 0 0 0.00 0.00 0.00

Kasarsai 0 105 0.42 0.00 0.40

Wadiwale 0 61 0.86 0.00 1.40

PIC Pune 34.91 12.30 9533 11.67

Upper Godavari

Shivna Takali 5 100 0.20 3.79 0.20

AIC Abad 3.79 0.20 1005 0.20

Upper Godavari

Ambadi 0 0 1.55 0.00 0.00

Bor Dahegaon 0 0 0.00 0.00 0.00

Dheku 170 22 0.51 0.30 2.32

Kolhi 0 100 0.94 0.00 0.94

Narangi 0 100 1.81 0.00 1.81

Tembhapuri 0 0 0.00 0.00 0.00

CADA Abad 0.30 5.07 951602 4.81

Upper Godavari

Adhala 0 160 1.04 0.00 0.65

Alandi 0 0 0.00 0.00 0.00164

Page 174: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator VI: Percentage of Planned & Actual Non Irrigation Use - Page 8 of 10

(Medium Projects / 2017-18) Unit: Mcum

NI Use as

per PRSubbasin/ PlanGroup Project/ Circle NI UseNI Use As

per PIP

Percent

wrt PR

Percent

wrt PIP

Bhojapur 0 0 12.15 0.00 0.00

Gautami 13 0 6.46 49.22 0.00

Ghatshil Pargaon 0 0 0.00 0.00 0.07

Kashyapi 0 0 0.00 33.98 0.00

Mandohol 0 100 1.88 0.00 1.88

Waldevi 7 0 1.98 28.32 0.00

CADA Nashik 111.52 2.60 90421 23.51

Upper Godavari

Manikpunj 0 101 3.99 0.00 3.96

DIPC Dhule 0.00 3.96 1010 3.99

Wardha

Dham 139 83 12.23 8.77 14.75

Dongargaon (Wardha) 0 0 0.00 0.00 0.00

Madan Talav Project 0 59 0.43 0.00 0.73

Pothara 0 0 0.00 0.00 0.00

CADA Nagpur 8.77 15.48 82144 12.66

Wardha

Amalnalla 42 0 2.64 6.36 0.00

Lal Nala 100 0 0.22 0.22 0.00

CIPC Chandrapur 6.58 0.00 043 2.86

Wardha

Kar 95 100 1.84 1.93 1.84

NIC Nagpur 1.93 1.84 10095 1.84

Wardha

Nawargaon 100 100 6.44 6.44 6.44

YIC Yavatmal 6.44 6.44 100100 6.44

Normal 256.63 115.01 15871 182.10

SurplusMiddle Wainganga

Bagheda 0 0 0.00 0.00 0.00

Betekar Bothli 0 0 0.00 0.00 0.00

Bodalkasa 22 100 0.12 0.54 0.12

Chandpur 0 0 0.10 0.00 0.00

Chorakhmara 0 0 0.00 0.00 0.00

Chulband 0 0 0.00 0.00 0.00

Khairbanda 0 0 0.00 0.00 0.00

Managadh 0 0 0.00 0.00 0.00

Rengepar 0 0 0.00 0.00 0.00

Sangrampur 0 0 0.00 0.00 0.00

Sorna 0 0 0.00 0.00 0.00165

Page 175: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator VI: Percentage of Planned & Actual Non Irrigation Use - Page 9 of 10

(Medium Projects / 2017-18) Unit: Mcum

NI Use as

per PRSubbasin/ PlanGroup Project/ Circle NI UseNI Use As

per PIP

Percent

wrt PR

Percent

wrt PIP

BIC Bhandara 0.54 0.12 18642 0.22

Middle Wainganga

Chandrabhaga

(Nagpur)

0 100 0.08 0.00 0.08

Kanholibara 0 0 0.00 0.00 0.00

Kesarnala 88 117 0.21 0.24 0.18

Khekara Nalla 0 0 0.00 0.00 0.00

Kolar 39 51 0.55 1.42 1.07

Makardhokada-Saiki 234 384 4.53 1.94 1.18

Mordham 0 100 0.04 0.00 0.04

Panchadhara Complex 0 0 0.00 0.00 0.00

Pandharbodi 133 171 2.88 2.16 1.68

Umri 0 0 0.00 0.00 0.00

Wena 86 105 9.94 11.55 9.50

CADA Nagpur 17.31 13.73 133105 18.23

Middle Wainganga

Chandai 0 0 0.00 1.26 0.00

Chargaon 0 0 1.51 0.00 0.00

Labhansarad 0 0 0.27 0.00 0.00

Pakadigundam 48 0 1.71 3.56 0.00

CIPC Chandrapur 4.82 0.00 072 3.49

Middle Wainganga

Kalpathri 0 0 0.00 0.00 0.00

Katangi 0 0 0.53 0.00 0.00

NIC Nagpur 0.00 0.00 00 0.53

Surplus 22.67 13.85 16299 22.47

AbundantLower Wainganga

Asolamendha 0 0 0.43 0.00 0.00

Ghorazari 0 0 0.00 0.00 0.00

Naleshwar 100 0 0.43 0.43 0.00

CIPC Chandrapur 0.43 0.00 0200 0.86

North Konkan

Hetwane 0 0 62.70 0.00 0.00

NKIPC Thane 0.00 0.00 00 62.70

North Konkan

Rajanalla Complex 0 0 0.00 0.00 0.00

Wandri 0 0 0.00 0.00 0.00

TIC Thane 0.00 0.00 00 0.00

South Konkan

Gad Nadi 0 0 0.00 25.78 0.00166

Page 176: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator VI: Percentage of Planned & Actual Non Irrigation Use - Page 10 of 10

(Medium Projects / 2017-18) Unit: Mcum

NI Use as

per PRSubbasin/ PlanGroup Project/ Circle NI UseNI Use As

per PIP

Percent

wrt PR

Percent

wrt PIP

NKIPC Thane 25.78 0.00 00 0.00

South Konkan

Deoghar 0 0 0.00 9.88 0.00

SKIPC oros 9.88 0.00 00 0.00

Upper Krishna (W)

Uttarmand 0 0 0.00 1.71 0.00

CADA Pune 1.71 0.00 00 0.00

Upper Krishna (W)

Chikotra 14 1060 1.06 7.70 0.10

Chitri 37 100 6.03 16.14 6.01

Dhamni (Kolhapur) 0 0 0.17 0.00 0.00

Ghataprbha 4 98 0.42 10.90 0.43

Hiranyakeshi 0 0 0.44 0.00 0.00

Jambre 0 0 0.28 0.00 0.00

Jangamhatti 11 73 0.72 6.84 0.98

Kadvi 54 106 0.53 0.99 0.50

Kasari 0 191 1.91 0.00 1.00

Kumbhi 0 28 0.91 0.00 3.26

Patgaon 5 73 1.26 26.19 1.73

KIC Kolhapur 68.76 14.00 9820 13.72

Upper Krishna (W)

Krishna Canal &

Khodshi Backwater

0 131 0.63 0.00 0.48

Maishal LIS 0 0 99.23 0.00 0.00

Morna (Sangli) 0 160 0.83 0.00 0.52

Takari LIS 0 0 17.02 0.00 0.00

Tembhu LIS Barrage 0 0 1.59 0.00 0.00

Yeoti Masoli 0 263 0.42 0.00 0.16

SIC Sangli 0.00 1.16 103300 119.73

Vashishthi

Natuwadi 0 138 0.69 0.00 0.50

KIC Ratnagiri 0.00 0.50 1380 0.69

Abundant 106.56 15.66 1262186 197.70

Medium 535.71 308.00 115 200 616.86

167

Page 177: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Percentage

PIC

Pune

KIC

Pune

CA

DA

Beed

CA

DA

Sola

pur

SIC

Sata

ra

SIC

Sangli

AIC

Abad

CA

DA

Nashik

CA

DA

Abad

CA

DA

Beed

AIC

Akola

BIP

C P

arli (V

)

NIC

Nanded

UW

IC A

mra

vati

CA

DA

Jalg

aon

DIP

C D

hule

AIC

Abad

AIC

Akola

CA

DA

Abad

JIP

C J

alg

aon

WIC

Washim

KIC

Pune

CA

DA

Nashik

CA

DA

Jalg

aon

NIC

Nagpur

CA

DA

Nagpur

DIP

C D

hule

YIC

Yavatm

al

PIC

Pune

CIP

C C

handra

pur

NIC

Nanded

NIC

Nagpur

CA

DA

Nagpur

CIP

C C

handra

pur

BIC

Bhandara

SIC

Sangli

SK

IPC

oro

s

TIC

Thane

CIP

C C

handra

pur

KIC

Kolh

apur

KIC

Ratn

agiri

NK

IPC

Thane

CA

DA

Pune

168

Page 178: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator VII: Percentage of Unutilized water to Live Storage - Page 1 of 10

(Medium Projects / 2017-18) Unit: Mcum

Subbasin/PlanGroup Project/ Circle

Live storage

on

30th June

Designed

Carry OverInflow

in HW

Live

Stoage

15Oct

Percent

Unutilised

Net

Unutilised

Highly DeficitRemaining Bhima (Neera) Tisangi 0.00 0.00 0.00 0.00 24.47 0

PIC Pune 0.00 0.00 0.00 0.00 24.47 0

Remaining Bhima (Neera) Buddhihal 0.00 0.00 0.00 0.00 0.00 0

SIC Sangli 0.00 0.00 0.00 0.00 0.00 0

Remaining Bhima (Neera) Andhali 0.00 0.00 0.00 0.00 0.34 0

Ranand 0.85 0.00 0.00 0.85 2.17 39

SIC Satara 0.85 0.00 0.00 0.85 2.51 34

Remaining Bhima+ Man Ashti 7.91 0.00 13.51 0.00 20.57 0

Jawalgaon 4.89 0.00 2.66 2.23 20.55 11

CADA Solapur 12.80 0.00 16.16 2.23 41.12 5

Remaining Bhima+ Man Mhaswad 0.00 0.00 0.00 0.00 4.86 0

PIC Pune 0.00 0.00 0.00 0.00 4.86 0

Remaining Bhima+ Man Dodda Nalla 0.00 2.33 0.03 0.00 1.25 0

Sankh 3.63 0.00 0.00 3.63 14.86 24

SIC Sangli 3.63 2.33 0.03 3.63 16.11 23

Sina Banganga 1.17 0.00 0.48 0.70 4.96 14

Benitura 3.28 0.00 0.90 2.38 11.50 21

Chandani 0.00 0.00 0.00 0.00 18.83 0

Harni 0.22 0.00 0.00 0.22 11.18 2

Jakapur 7.96 0.00 7.29 0.67 4.92 14

Kada 0.00 0.00 0.00 0.00 8.58 0

Kadi 0.37 0.00 0.00 0.37 6.33 6

Kambli 0.00 0.00 0.00 0.00 2.01 0

Khandala 1.19 0.00 0.45 0.74 5.24 14

Khandeshwar 0.00 0.00 0.00 0.00 8.78 0

Khasapur 0.86 0.00 0.00 0.86 13.04 7

Kurnoor 6.94 0.00 0.50 6.44 32.28 20

Mehkari 1.47 0.00 0.03 1.44 15.23 9

Ramganga 0.84 0.00 0.46 0.39 5.34 7

Ruti 0.00 0.00 0.00 0.00 10.37 0

Sakat 0.05 0.00 0.00 0.05 13.47 0

Talwar 0.00 0.00 0.04 0.00 3.23 0

Turori 3.87 0.00 3.22 0.65 3.44 19

CADA Beed 28.22 0.00 13.35 14.90 178.72 8

Sina Bori 1.94 0.00 5.99 0.00 15.23 0

Ekrukh 12.53 0.00 0.00 12.53 19.39 65

169

Page 179: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator VII: Percentage of Unutilized water to Live Storage - Page 2 of 10

(Medium Projects / 2017-18) Unit: Mcum

Subbasin/PlanGroup Project/ Circle

Live storage

on

30th June

Designed

Carry OverInflow

in HW

Live

Stoage

15Oct

Percent

Unutilised

Net

Unutilised

Hingani

(Pangaon)

0.53 0.00 0.00 0.52 31.96 2

Mangi 7.46 0.00 0.00 7.46 23.72 31

Pimpalgaon

(Dhale)

0.00 0.00 0.00 0.00 9.86 0

CADA Solapur 22.45 0.00 5.99 20.51 100.16 20

Sina Khairy 1.61 0.00 0.71 0.90 13.74 7

Sina 4.10 0.00 1.40 2.70 52.30 5

KIC Pune 5.71 0.00 2.11 3.60 66.04 5

Upper Krishna (E) Basappawadi 0.00 0.00 0.01 0.00 0.31 0

Siddhewadi 0.00 0.00 0.41 0.00 0.00 0

SIC Sangli 0.00 0.00 0.42 0.00 0.31 0

Upper Krishna (E) Nher 3.36 0.00 0.60 2.76 6.11 45

Yeralwadi 0.00 0.00 0.00 0.00 11.08 0

SIC Satara 3.36 0.00 0.60 2.76 17.19 16

Highly Deficit 77.02 2.33 38.66 451.48 48.49 11

DeficitGirna Gadadgad 0.39 0.00 0.20 0.19 4.64 4

CADA Abad 0.39 0.00 0.20 0.19 4.64 4

Girna Agnavati 0.00 0.00 0.00 0.00 0.00 0

Hiwara 0.00 0.00 0.30 0.00 4.45 0

Manyad 0.00 2.15 0.07 0.00 22.53 0

CADA Jalgaon 0.00 2.15 0.38 0.00 26.98 0

Girna Haranbari 3.32 0.00 2.25 1.07 33.02 3

Kelzar 0.82 0.00 0.59 0.23 16.22 1

Nagya Sakya 0.00 0.00 0.00 0.00 5.10 0

CADA Nashik 4.14 0.00 2.84 1.30 54.34 2

Lower Godavari Ghanasargaon 0.00 0.00 0.00 0.00 0.29 0

Kharola 0.00 0.00 0.00 0.00 0.25 0

Renapur

Medium Project

0.00 0.00 0.00 0.00 0.35 0

Upper Kundlika 8.14 0.00 0.79 7.35 15.57 47

BIPC Parli (V) 8.15 0.00 0.80 7.35 16.46 45

Lower Godavari Galhati 1.78 0.00 0.00 1.78 13.86 13

Masoli 0.00 0.00 2.46 0.00 7.71 0

CADA Abad 1.78 0.00 2.46 1.78 21.57 8

Lower Godavari Bindusara 1.93 0.00 0.42 1.51 7.11 21

Bodhegaon 0.00 0.00 0.14 0.00 3.65 0

Borna 0.22 0.00 0.01 0.22 7.17 3

170

Page 180: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator VII: Percentage of Unutilized water to Live Storage - Page 3 of 10

(Medium Projects / 2017-18) Unit: Mcum

Subbasin/PlanGroup Project/ Circle

Live storage

on

30th June

Designed

Carry OverInflow

in HW

Live

Stoage

15Oct

Percent

Unutilised

Net

Unutilised

Kundalika 12.50 0.00 3.33 9.18 37.69 24

Saraswati 0.28 0.00 0.45 0.00 6.21 0

Sindphana 0.00 0.00 0.00 0.00 7.36 0

Wan (Beed) 2.07 0.00 1.53 0.54 16.43 3

CADA Beed 17.01 0.00 5.87 11.44 85.61 13

Lower Godavari Kudala 2.23 0.00 2.57 0.00 4.35 0

NIC Nanded 2.23 0.00 2.57 0.00 4.35 0

Manjra Aurad 0.66 0.00 0.00 0.66 3.67 18

Bhusni 0.00 0.00 0.00 0.00 1.49 0

Binagihal 0.00 0.00 0.00 0.00 1.35 0

Borgaon

Anjanpur

0.02 0.00 0.91 0.00 0.00 0

Dhanegaon 2.13 0.00 2.16 0.00 2.13 0

Dongargaon

(Latur)

3.81 0.00 4.19 0.00 7.89 0

Gunjarga 0.34 0.00 0.73 0.00 1.37 0

Hosur Barrage 0.00 0.00 0.00 0.00 2.25 0

Karsa Pohegaon 0.22 0.00 2.82 0.00 3.41 0

Kholgapur 0.00 0.00 0.00 0.00 9.73 0

Killlari 2 0.45 0.00 0.45 0.00 1.30 0

Limbala 0.28 0.00 0.28 0.00 0.28 2

Madansuri 0.00 0.00 0.01 0.00 1.31 0

Nagzari (Latur) 1.68 0.00 1.68 0.00 3.02 0

Rajegaon 0.00 0.00 0.00 0.00 0.55 0

Sai 0.06 0.00 0.06 0.00 1.40 0

Shivni 0.00 0.00 0.00 0.00 6.48 0

Tagarkheda 0.66 0.00 0.62 0.04 0.77 5

Takalgaon Devla 0.31 0.00 0.39 0.00 1.30 0

Wangdari 0.96 0.00 0.96 0.00 0.84 0

Wanjarkheda 0.50 0.20 2.94 0.00 3.61 0

BIPC Parli (V) 12.06 0.20 18.20 0.70 54.13 1

Manjra Belpara 0.00 0.00 0.00 0.00 2.29 0

Devarjan 4.00 0.00 3.60 0.40 8.09 5

Gharni 17.81 0.00 15.64 2.17 22.47 10

Mahasangvi 0.00 0.00 0.00 0.00 5.88 0

Masalga 6.73 0.00 4.61 2.12 13.60 16

Raigavan 0.00 0.00 0.00 0.00 2.55 0

Renapur 2.17 0.00 2.52 0.00 15.76 0

171

Page 181: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator VII: Percentage of Unutilized water to Live Storage - Page 4 of 10

(Medium Projects / 2017-18) Unit: Mcum

Subbasin/PlanGroup Project/ Circle

Live storage

on

30th June

Designed

Carry OverInflow

in HW

Live

Stoage

15Oct

Percent

Unutilised

Net

Unutilised

Rui 0.19 0.00 0.00 0.19 8.61 2

Sakol 4.01 0.00 4.97 0.00 6.20 0

Sangameshwar

(Dokewadi)

2.55 0.00 3.53 0.00 15.04 0

Tawarja 0.00 0.00 0.00 0.00 17.61 0

Terna 6.05 0.00 0.00 6.05 19.66 31

Tiru 0.00 0.00 0.00 0.00 7.99 0

Waghe

Babhulgaon

0.00 0.00 0.01 0.00 3.74 0

Whati 0.61 0.00 1.94 0.00 6.81 0

CADA Beed 44.12 0.00 36.82 10.94 156.27 7

Manjra Karadkhed 4.83 0.00 0.29 4.54 8.74 52

Kundrala 0.00 0.00 0.40 0.00 1.10 0

Mahalingi 0.00 0.00 0.00 0.00 0.00 0

Pethwadaj 0.19 0.00 0.00 0.19 1.68 12

Upper Manar 12.24 0.00 6.07 6.17 63.75 10

NIC Nanded 17.27 0.00 6.76 10.90 75.27 14

Middle Tapi (Satpuda) Amarawati 0.00 0.00 0.00 0.00 0.00 0

Bahula 0.00 0.00 0.00 0.00 0.55 0

Bori (Jalgaon) 0.00 0.00 6.95 0.00 0.00 0

Prakasha Barrage 37.21 0.00 0.00 37.21 55.43 67

Sarangkheda

Barrage

16.71 0.00 0.25 16.46 86.68 19

Sulwade Barrage 13.02 0.00 0.00 13.02 48.02 27

CADA Jalgaon 66.94 0.00 7.21 66.69 190.68 35

Middle Tapi (Satpuda) Shivan 4.52 0.00 0.00 4.52 12.58 36

DIPC Dhule 4.52 0.00 0.00 4.52 12.58 36

Middle Tapi (South) Ajanta Andhari 0.00 0.00 0.00 0.00 1.20 0

CADA Abad 0.00 0.00 0.00 0.00 1.20 0

Middle Tapi (South) Bhokarbari 0.00 0.00 0.00 0.00 0.00 0

Burai 0.85 0.00 0.00 0.85 14.21 6

Jamkhedi 2.14 0.00 0.00 2.14 12.34 17

Kanoli 0.00 0.00 0.00 0.00 0.00 0

Rangawali 0.00 0.00 0.00 0.00 12.89 0

Tondapur 0.00 0.00 0.09 0.00 3.74 0

CADA Jalgaon 2.99 0.00 0.09 2.99 43.18 7

Purna (Tapi) Dnyanganga 6.31 6.40 0.00 0.00 18.61 0

Mas 0.00 0.00 0.00 0.00 4.32 0

Morna (Akola) 2.86 0.00 0.28 2.58 7.62 34

172

Page 182: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator VII: Percentage of Unutilized water to Live Storage - Page 5 of 10

(Medium Projects / 2017-18) Unit: Mcum

Subbasin/PlanGroup Project/ Circle

Live storage

on

30th June

Designed

Carry OverInflow

in HW

Live

Stoage

15Oct

Percent

Unutilised

Net

Unutilised

Mun 3.86 0.00 0.91 2.95 10.17 29

Nirguna 1.09 3.44 1.31 0.00 16.57 0

Paldhag 0.89 0.00 0.03 0.86 7.51 11

Torna 0.00 0.00 0.00 0.00 3.16 0

Uma 1.23 0.00 1.46 0.00 1.10 0

Utawali 0.55 0.00 0.34 0.21 7.68 3

AIC Akola 16.79 9.84 4.34 6.60 76.75 9

Purna (Tapi) Chandrabhaga

(Amravati)

13.34 0.00 1.88 11.47 30.61 37

Purna (Achalpur) 10.60 0.00 1.26 9.34 35.35 26

Sapan 13.97 6.98 4.00 2.99 31.35 10

Shahnoor 16.85 25.38 2.01 0.00 29.83 0

UWIC

Amravati

54.76 32.36 9.15 23.80 127.14 19

Purna+Dudhana Wakod 0.00 0.00 0.00 0.00 0.00 0

AIC Abad 0.00 0.00 0.00 0.00 0.00 0

Purna+Dudhana Anjana Palashi 0.00 0.00 0.17 0.00 0.00 0

Dhamna 0.00 0.00 0.08 0.00 0.00 0

Girja 0.00 0.00 0.00 0.00 0.00 0

Jivrekha 1.50 0.00 1.83 0.00 2.94 0

Jui 0.35 0.00 0.89 0.00 6.04 0

Kalyan Girija 3.57 0.00 3.39 0.18 6.27 3

Karpara 1.89 0.00 0.28 1.61 19.14 8

Khelna 0.00 0.00 0.09 0.00 0.56 0

Lahuki 0.00 0.00 0.00 0.00 0.00 0

Pir Kalyan 1.94 0.00 0.00 1.94 7.55 26

Purna Nevpur 0.52 0.00 0.51 0.01 5.88 0

Sukhana 1.92 0.00 2.20 0.00 8.82 0

Upper Dudhana 1.94 0.00 6.74 0.00 3.13 0

CADA Abad 13.63 0.00 16.18 3.75 60.33 6

Deficit 266.77 44.55 113.86 1011.48 152.93 15

NormalLower Wainganga Dongargaon

(Chandrapur)

1.81 1.74 0.42 0.00 7.38 0

CIPC

Chandrapur

1.81 1.74 0.42 0.00 7.38 0

Middle Tapi (Satpuda) Abhora 1.99 0.00 0.32 1.66 6.02 28

Aner 8.08 0.00 0.00 8.08 49.27 16

173

Page 183: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator VII: Percentage of Unutilized water to Live Storage - Page 6 of 10

(Medium Projects / 2017-18) Unit: Mcum

Subbasin/PlanGroup Project/ Circle

Live storage

on

30th June

Designed

Carry OverInflow

in HW

Live

Stoage

15Oct

Percent

Unutilised

Net

Unutilised

Bhokar

(Mangrul)

1.51 0.00 0.06 1.45 6.41 23

Karwand 1.76 0.00 0.63 1.13 18.26 6

Mor 1.90 0.00 0.42 1.47 5.10 29

Suki 14.68 13.00 5.73 0.00 39.85 0

CADA Jalgaon 29.91 13.00 7.16 13.80 124.91 11

Middle Tapi (Satpuda) Kordi 2.70 0.00 0.00 2.70 10.33 26

DIPC Dhule 2.70 0.00 0.00 2.70 10.33 26

Middle Tapi (Satpuda) Gul 3.11 2.88 7.46 0.00 17.34 0

JIPC Jalgaon 3.11 2.88 7.46 0.00 17.34 0

Middle Wainganga Jam 5.05 4.70 0.01 0.34 24.30 1

CADA Nagpur 5.05 4.70 0.01 0.34 24.30 1

Painganga Koradi 0.00 0.00 0.20 0.00 5.35 0

AIC Akola 0.00 0.00 0.20 0.00 5.35 0

Painganga Dongargaon

(Nanded)

2.75 0.00 0.12 2.64 8.81 30

Loni 0.49 0.00 0.10 0.39 4.07 10

Nagzari 1.79 0.00 0.21 1.58 6.38 25

NIC Nanded 5.04 0.00 0.43 4.61 19.26 24

Painganga Ekbhuji 1.94 0.00 2.34 0.00 3.60 0

Sonal 0.00 0.00 0.64 0.00 1.35 0

WIC Washim 1.94 0.00 2.98 0.00 4.95 0

Painganga Adan 31.15 0.00 23.70 7.46 22.87 33

Borgaon 0.83 0.00 0.83 0.00 0.88 0

Goki 3.49 0.00 4.04 0.00 6.61 0

Lower Pus 28.32 8.50 18.46 1.36 46.97 3

Saikheda 13.66 0.00 4.56 9.10 27.18 33

Waghadi 1.34 0.00 1.78 0.00 6.37 0

YIC Yavatmal 78.79 8.50 53.36 17.92 110.88 16

Panzra Akkalpada(Lowe

r Panzra)

1.65 0.00 0.00 1.65 53.63 3

Malangaon 1.44 0.00 0.00 1.44 11.33 13

Panzara 2.82 0.00 0.00 2.82 35.63 8

Sonwad 0.00 0.00 0.00 0.00 0.00 0

Wadi Shewadi 0.00 0.00 0.00 0.00 0.00 0

CADA Jalgaon 5.91 0.00 0.00 5.91 100.59 6

Remaining Bhima (Neera) Nazare 0.57 0.00 1.61 0.00 9.17 0

Shetphal 1.97 0.00 2.67 0.00 16.78 0

PIC Pune 2.54 0.00 4.28 0.00 25.95 0

174

Page 184: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator VII: Percentage of Unutilized water to Live Storage - Page 7 of 10

(Medium Projects / 2017-18) Unit: Mcum

Subbasin/PlanGroup Project/ Circle

Live storage

on

30th June

Designed

Carry OverInflow

in HW

Live

Stoage

15Oct

Percent

Unutilised

Net

Unutilised

Upper Bhima Chilhewadi 0.40 0.00 0.00 0.40 19.97 2

Visapur 2.12 0.00 2.67 0.00 25.62 0

KIC Pune 2.53 0.00 2.67 0.40 45.59 1

Upper Bhima Andra Khore 53.33 8.49 17.18 27.66 82.74 33

Kalmodi 85.74 30.31 81.31 0.00 42.67 0

Kasarsai 3.44 1.32 0.36 1.77 16.06 11

Wadiwale 11.72 0.00 2.60 9.12 30.39 30

PIC Pune 154.22 40.12 101.44 38.55 171.86 22

Upper Godavari Shivna Takali 0.00 0.00 1.81 0.00 1.47 0

AIC Abad 0.00 0.00 1.81 0.00 1.47 0

Upper Godavari Ambadi 0.00 0.00 0.00 0.00 1.29 0

Bor Dahegaon 0.00 0.00 0.00 0.00 0.00 0

Dheku 0.00 0.00 0.00 0.00 4.78 0

Kolhi 0.59 0.00 0.99 0.00 0.99 0

Narangi 0.00 0.00 0.38 0.00 0.82 0

Tembhapuri 0.00 0.00 0.00 0.00 0.00 0

CADA Abad 0.59 0.00 1.38 0.00 7.88 0

Upper Godavari Adhala 2.46 0.00 0.01 2.45 27.60 9

Alandi 4.11 0.00 1.43 2.68 27.46 10

Bhojapur 0.00 0.00 0.19 0.00 10.22 0

Gautami 2.71 0.00 3.36 0.00 52.55 0

Ghatshil Pargaon 0.00 0.00 0.36 0.00 0.68 0

Kashyapi 9.53 0.00 0.45 9.08 52.43 17

Mandohol 0.00 0.00 0.43 0.00 8.77 0

Waldevi 1.56 0.00 1.82 0.00 32.09 0

CADA Nashik 20.37 0.00 8.05 14.21 211.80 7

Upper Godavari Manikpunj 0.00 0.00 0.00 0.00 9.46 0

DIPC Dhule 0.00 0.00 0.00 0.00 9.46 0

Wardha Dham 12.02 0.00 3.87 8.15 59.48 14

Dongargaon

(Wardha)

2.73 0.00 0.20 2.52 4.44 57

Madan Talav

Project

3.70 0.00 0.69 3.01 8.81 34

Pothara 3.51 0.00 2.37 1.14 22.85 5

CADA Nagpur 21.96 0.00 7.13 14.83 95.58 16

Wardha Amalnalla 3.45 0.00 0.97 2.48 5.85 42

Lal Nala 3.08 0.00 1.20 1.89 9.53 20

CIPC

Chandrapur

6.53 0.00 2.16 4.37 15.38 28

175

Page 185: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator VII: Percentage of Unutilized water to Live Storage - Page 8 of 10

(Medium Projects / 2017-18) Unit: Mcum

Subbasin/PlanGroup Project/ Circle

Live storage

on

30th June

Designed

Carry OverInflow

in HW

Live

Stoage

15Oct

Percent

Unutilised

Net

Unutilised

Wardha Kar 3.32 0.00 1.40 1.92 21.06 9

NIC Nagpur 3.32 0.00 1.40 1.92 21.06 9

Wardha Nawargaon 5.89 0.00 4.82 1.07 7.44 14

YIC Yavatmal 5.89 0.00 4.82 1.07 7.44 14

Normal 352.19 70.94 207.14 1038.76 120.61 12

SurplusMiddle Wainganga Bagheda 1.94 0.00 4.48 0.00 0.38 0

Betekar Bothli 0.06 0.00 0.02 0.04 1.29 3

Bodalkasa 0.86 0.00 0.01 0.85 2.58 33

Chandpur 1.78 0.00 0.05 1.73 5.94 29

Chorakhmara 0.39 0.00 0.10 0.29 0.94 31

Chulband 1.78 0.00 0.00 1.78 5.37 33

Khairbanda 0.70 0.00 0.00 0.70 1.34 52

Managadh 0.72 0.00 0.00 0.72 2.20 33

Rengepar 0.68 0.00 0.05 0.63 1.56 41

Sangrampur 0.29 0.00 0.00 0.29 0.82 36

Sorna 0.00 0.00 0.00 0.00 0.09 3

BIC Bhandara 9.21 0.00 4.70 7.04 22.49 31

Middle Wainganga Chandrabhaga

(Nagpur)

0.68 0.00 0.28 0.40 8.26 5

Kanholibara 6.82 0.47 0.52 5.82 20.49 28

Kesarnala 0.78 0.37 0.00 0.41 3.27 13

Khekara Nalla 11.27 2.32 3.44 5.51 18.39 30

Kolar 5.02 4.06 0.00 0.96 26.40 4

Makardhokada-S

aiki

0.00 0.00 2.69 0.00 18.69 0

Mordham 1.38 0.00 0.17 1.21 4.95 24

Panchadhara

Complex

1.66 0.00 0.00 1.66 9.83 17

Pandharbodi 1.61 0.00 0.00 1.61 12.02 13

Umri 0.50 0.63 0.00 0.00 3.75 0

Wena 5.06 1.93 1.34 1.80 17.52 10

CADA Nagpur 34.78 9.79 8.44 19.38 143.58 13

Middle Wainganga Chandai 2.81 0.00 0.17 2.64 6.90 38

Chargaon 0.82 0.00 0.73 0.09 7.33 1

Labhansarad 0.04 0.00 0.50 0.00 0.47 0

Pakadigundam 1.84 0.00 1.36 0.48 2.94 16

CIPC

Chandrapur

5.52 0.00 2.76 3.21 17.65 18

176

Page 186: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator VII: Percentage of Unutilized water to Live Storage - Page 9 of 10

(Medium Projects / 2017-18) Unit: Mcum

Subbasin/PlanGroup Project/ Circle

Live storage

on

30th June

Designed

Carry OverInflow

in HW

Live

Stoage

15Oct

Percent

Unutilised

Net

Unutilised

Middle Wainganga Kalpathri 0.00 0.00 0.08 0.00 0.65 0

Katangi 0.00 0.00 0.08 0.00 2.45 0

NIC Nagpur 0.00 0.00 0.16 0.00 3.10 0

Surplus 49.51 9.79 16.07 186.81 29.63 16

AbundantLower Wainganga Asolamendha 5.79 0.00 1.29 4.51 31.83 14

Ghorazari 9.83 0.00 0.67 9.16 23.46 39

Naleshwar 0.00 0.00 0.53 0.00 2.31 0

CIPC

Chandrapur

15.62 0.00 2.48 13.66 57.61 24

North Konkan Hetwane 40.50 0.00 7.04 33.46 140.54 24

NKIPC Thane 40.50 0.00 7.04 33.46 140.54 24

North Konkan Rajanalla

Complex

64.54 0.00 9.71 54.83 311.69 18

Wandri 12.55 1.27 7.38 3.90 35.94 11

TIC Thane 77.09 1.27 17.09 58.73 347.63 17

South Konkan Gad Nadi 61.39 0.00 8.19 53.20 64.42 83

NKIPC Thane 61.39 0.00 8.19 53.20 64.42 83

South Konkan Deoghar 28.92 0.00 18.23 10.69 92.68 12

SKIPC oros 28.92 0.00 18.23 10.69 92.68 12

Upper Krishna (W) Uttarmand 36.36 0.00 27.91 8.45 16.67 51

CADA Pune 36.36 0.00 27.91 8.45 16.67 51

Upper Krishna (W) Chikotra 5.46 0.00 0.74 4.73 26.26 18

Chitri 14.79 0.00 6.87 7.92 52.48 15

Dhamni

(Kolhapur)

0.00 0.00 0.00 0.00 0.00 0

Ghataprbha 44.40 0.00 25.19 19.21 43.70 44

Hiranyakeshi 0.00 0.00 0.00 0.00 0.00 0

Jambre 14.47 0.00 10.31 4.16 22.45 19

Jangamhatti 10.87 0.00 2.72 8.15 33.65 24

Kadvi 39.91 0.00 7.46 32.45 70.56 46

Kasari 27.78 3.52 12.32 11.93 77.97 15

Kumbhi 36.03 0.00 11.93 24.10 76.50 31

Patgaon 43.43 0.00 16.32 27.11 104.77 26

KIC Kolhapur 237.14 3.52 93.87 139.75 508.34 27

Upper Krishna (W) Krishna Canal &

Khodshi

Backwater

0.00 7.62 122.84 0.00 7.62 0

Maishal LIS 12.42 0.00 332.10 0.00 15.35 0

177

Page 187: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator VII: Percentage of Unutilized water to Live Storage - Page 10 of 10

(Medium Projects / 2017-18) Unit: Mcum

Subbasin/PlanGroup Project/ Circle

Live storage

on

30th June

Designed

Carry OverInflow

in HW

Live

Stoage

15Oct

Percent

Unutilised

Net

Unutilised

Morna (Sangli) 2.49 7.13 6.19 0.00 16.54 0

Takari LIS 0.09 0.00 167.30 0.00 0.00 0

Tembhu LIS

Barrage

2.03 0.00 272.00 0.00 6.64 0

Yeoti Masoli 0.19 0.00 0.11 0.08 5.55 2

SIC Sangli 17.22 14.75 900.54 0.08 51.70 0

Vashishthi Natuwadi 13.92 0.00 4.09 9.82 27.23 36

KIC Ratnagiri 13.92 0.00 4.09 9.82 27.23 36

Abundant 528.15 19.54 1079.44 1306.80 327.85 25

1273.64 147.15 1455.17 679.52 3995.33 Medium 17

178

Page 188: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

SIC

Sangli

PIC

Pune

KIC

Pune

CA

DA

Sola

pur

CA

DA

Beed

SIC

Sata

ra

BIP

C P

arli (V

)

AIC

Abad

NIC

Nanded

CA

DA

Jalg

aon

CA

DA

Ahm

ednagar

CA

DA

Beed

AIC

Akola

UW

IC A

mra

vati

CA

DA

Nashik

DIP

C D

hule

JIP

C J

alg

aon

CA

DA

Abad

DIP

C D

hule

JIP

C J

alg

aon

CA

DA

Nashik

NIC

Nagpur

CA

DA

Nagpur

CA

DA

Abad

YIC

Yavatm

al

CA

DA

Jalg

aon

NIC

Nanded

AIC

Akola

WIC

Washim

PIC

Pune

KIC

Pune

CIP

C C

handra

pur

AIC

Abad

BIC

Bhandara

CIP

C C

handra

pur

CA

DA

Nagpur

NIC

Nagpur

CA

DA

Pune

KIC

Ratn

agiri

CIP

C C

handra

pur

KIC

Kolh

apur

SIP

C S

ata

ra

NK

IPC

Thane

TIC

Thane

SIC

Sangli

SK

IPC

oro

s

179

Page 189: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator IX: Actual Cropping Pattern - Page 1 of 10

(Medium Projects / 2017-18) Unit: %

Subbasin/PlanGroup Project/ Circle Kharif

seasonals

Two

seasonals

Rabi

seasonals

HW

seasonals

Perennials

Highly DeficitRemaining Bhima (Neera)

0 0 34 16 51Tisangi

PIC Pune 34 51 16

Remaining Bhima (Neera)

0 0 11 41 49Buddhihal

SIC Sangli 11 49 41

Remaining Bhima (Neera)

28 0 45 18 9Andhali

25 0 43 28 5Ranand

SIC Satara 26 44 7 23

Remaining Bhima+ Man

22 0 28 1 49Ashti

14 0 14 29 42Jawalgaon

CADA Solapur 18 21 45 15

Remaining Bhima+ Man

0 0 63 37 0Mhaswad

PIC Pune 63 37

Remaining Bhima+ Man

50 0 33 18 0Dodda Nalla

62 0 15 23 0Sankh

SIC Sangli 56 24 20

Sina

0 0 83 17 0Banganga

0 0 60 32 9Benitura

0 0 46 29 25Chandani

0 0 57 4 39Harni

0 0 46 26 27Jakapur

0 4 87 8 2Kada

0 8 79 6 8Kadi

0 11 83 4 2Kambli

0 0 22 43 36Khandala

0 0 45 52 3Khandeshwar

0 0 72 12 16Khasapur

0 0 55 12 33Kurnoor

0 3 70 13 13Mehkari

0 0 83 17 0Ramganga

0 3 85 8 4Ruti

0 0 48 32 21Sakat

0 0 88 11 1Talwar

180

Page 190: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator IX: Actual Cropping Pattern - Page 2 of 10

(Medium Projects / 2017-18) Unit: %

Subbasin/PlanGroup Project/ Circle Kharif

seasonals

Two

seasonals

Rabi

seasonals

HW

seasonals

Perennials

0 0 51 31 18Turori

CADA Beed 6 64 16 20

Sina

0 0 85 0 15Bori

8 0 57 6 30Ekrukh

17 0 24 19 39Hingani (Pangaon)

0 0 51 15 34Mangi

19 0 31 36 13Pimpalgaon (Dhale)

CADA Solapur 15 0 50 26 19

Sina

28 0 46 14 12Khairy

13 0 55 8 24Sina

KIC Pune 20 51 18 11

Upper Krishna (E)

71 0 20 0 9Basappawadi

49 0 14 10 27Siddhewadi

SIC Sangli 60 17 18 10

Upper Krishna (E)

26 0 62 7 5Nher

30 0 49 22 0Yeralwadi

SIC Satara 28 55 5 14

Highly Deficit

DeficitGirna

0 8 67 16 10Gadadgad

CADA Abad 8 67 10 16

Girna

25 16 45 7 7Agnavati

46 26 25 1 1Hiwara

15 16 54 1 13Manyad

CADA Jalgaon 29 20 41 7 3

Girna

74 1 25 0 0Haranbari

57 1 42 0 0Kelzar

0 0 100 0 0Nagya Sakya

CADA Nashik 66 1 56 0

Lower Godavari

0 0 71 0 29Ghanasargaon

0 0 88 0 12Kharola

0 0 92 0 8Renapur Medium Project

181

Page 191: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator IX: Actual Cropping Pattern - Page 3 of 10

(Medium Projects / 2017-18) Unit: %

Subbasin/PlanGroup Project/ Circle Kharif

seasonals

Two

seasonals

Rabi

seasonals

HW

seasonals

Perennials

0 1 4 1 94Upper Kundlika

BIPC Parli (V) 1 64 36 1

Lower Godavari

0 18 71 0 10Galhati

4 40 24 3 30Masoli

CADA Abad 4 29 48 20 3

Lower Godavari

0 12 88 0 0Bindusara

0 20 66 0 14Bodhegaon

0 0 59 0 41Borna

0 19 23 4 54Kundalika

0 34 37 8 20Saraswati

0 11 70 0 19Sindphana

0 12 67 0 21Wan (Beed)

CADA Beed 18 59 28 6

Lower Godavari

0 2 8 0 90Kudala

NIC Nanded 2 8 90 0

Manjra

0 0 96 0 4Aurad

0 0 76 0 24Bhusni

0 0 59 0 41Binagihal

0 0 29 1 71Borgaon Anjanpur

0 0 70 0 30Dhanegaon

0 0 72 0 28Dongargaon (Latur)

0 0 95 0 5Gunjarga

0 0 78 0 22Hosur Barrage

0 0 52 0 48Karsa Pohegaon

0 0 65 0 35Kholgapur

0 0 98 0 2Killlari 2

0 0 98 0 2Limbala

0 0 100 0 0Madansuri

0 0 20 0 80Nagzari (Latur)

0 0 100 0 0Rajegaon

0 0 41 0 59Sai

0 0 76 0 24Shivni

0 6 92 0 2Tagarkheda

0 0 6 0 94Takalgaon Devla

0 0 13 0 87Wangdari

0 0 33 0 67Wanjarkheda

182

Page 192: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator IX: Actual Cropping Pattern - Page 4 of 10

(Medium Projects / 2017-18) Unit: %

Subbasin/PlanGroup Project/ Circle Kharif

seasonals

Two

seasonals

Rabi

seasonals

HW

seasonals

Perennials

BIPC Parli (V) 6 65 38 1

Manjra

0 8 33 0 58Belpara

0 10 45 9 36Devarjan

0 0 53 3 44Gharni

0 0 86 6 8Mahasangvi

0 2 77 3 18Masalga

0 0 33 0 67Raigavan

0 0 50 3 47Renapur

0 0 61 25 14Rui

0 3 29 0 68Sakol

0 0 76 10 15Sangameshwar (Dokewadi)

0 5 41 2 52Tawarja

0 0 41 38 21Terna

0 4 62 4 30Tiru

0 2 96 0 2Waghe Babhulgaon

0 4 19 2 76Whati

CADA Beed 5 53 37 9

Manjra

12 38 23 26 1Karadkhed

0 36 17 0 47Kundrala

0 65 13 0 22Mahalingi

0 24 62 9 4Pethwadaj

0 19 51 1 29Upper Manar

NIC Nanded 12 36 33 21 12

Middle Tapi (Satpuda)

13 62 25 0 0Amarawati

8 46 43 1 3Bahula

35 44 20 0 1Bori (Jalgaon)

29 30 23 0 18Prakasha Barrage

15 34 37 0 14Sarangkheda Barrage

7 1 92 0 0Sulwade Barrage

CADA Jalgaon 18 36 40 9 1

Middle Tapi (Satpuda)

0 0 100 0 0Shivan

DIPC Dhule 100 0

Middle Tapi (South)

0 0 0 0 0Ajanta Andhari

CADA Abad

183

Page 193: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator IX: Actual Cropping Pattern - Page 5 of 10

(Medium Projects / 2017-18) Unit: %

Subbasin/PlanGroup Project/ Circle Kharif

seasonals

Two

seasonals

Rabi

seasonals

HW

seasonals

Perennials

Middle Tapi (South)

47 32 21 0 0Bhokarbari

43 0 53 3 0Burai

1 0 99 0 0Jamkhedi

30 61 0 9 0Kanoli

36 2 35 11 16Rangawali

36 42 13 4 5Tondapur

CADA Jalgaon 32 34 44 7 7

Purna (Tapi)

0 20 76 0 4Dnyanganga

0 0 0 0 0Mas

0 7 88 0 6Morna (Akola)

0 7 93 0 0Mun

9 31 52 0 9Nirguna

0 12 86 1 1Paldhag

0 0 100 0 0Torna

28 53 19 0 0Uma

0 0 100 0 0Utawali

AIC Akola 19 22 77 4 1

Purna (Tapi)

0 28 25 1 46Chandrabhaga (Amravati)

4 43 32 3 18Purna (Achalpur)

0 0 43 8 48Sapan

0 8 58 0 34Shahnoor

UWIC Amravati 4 20 40 37 3

Purna+Dudhana

0 0 0 0 0Wakod

AIC Abad

Purna+Dudhana

0 0 0 0 0Anjana Palashi

0 0 0 0 0Dhamna

0 0 0 0 0Girja

0 0 100 0 0Jivrekha

0 0 100 0 0Jui

20 17 63 0 0Kalyan Girija

2 7 72 14 5Karpara

0 0 0 0 0Khelna

0 0 0 0 0Lahuki

13 31 50 0 6Pir Kalyan

184

Page 194: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator IX: Actual Cropping Pattern - Page 6 of 10

(Medium Projects / 2017-18) Unit: %

Subbasin/PlanGroup Project/ Circle Kharif

seasonals

Two

seasonals

Rabi

seasonals

HW

seasonals

Perennials

0 28 72 0 0Purna Nevpur

0 29 49 0 22Sukhana

0 14 52 0 34Upper Dudhana

CADA Abad 12 21 70 17 14

Deficit

NormalLower Wainganga

33 56 11 0 0Dongargaon (Chandrapur)

CIPC Chandrapur 33 56 11

Middle Tapi (Satpuda)

5 20 26 2 47Abhora

22 31 46 0 1Aner

12 15 18 10 46Bhokar (Mangrul)

9 17 72 0 3Karwand

10 19 28 12 30Mor

14 12 26 4 44Suki

CADA Jalgaon 12 19 36 28 7

Middle Tapi (Satpuda)

0 0 38 17 45Kordi

DIPC Dhule 38 45 17

Middle Tapi (Satpuda)

70 0 30 0 0Gul

JIPC Jalgaon 70 30

Middle Wainganga

4 46 30 0 20Jam

CADA Nagpur 4 46 30 20

Painganga

0 70 30 0 0Koradi

AIC Akola 0 70 30

Painganga

0 22 35 5 38Dongargaon (Nanded)

0 38 24 0 38Loni

0 25 74 0 1Nagzari

NIC Nanded 29 44 25 5

Painganga

0 0 0 0 0Ekbhuji

19 11 69 0 1Sonal

WIC Washim 19 11 69 1

Painganga

0 100 0 0 0Adan

185

Page 195: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator IX: Actual Cropping Pattern - Page 7 of 10

(Medium Projects / 2017-18) Unit: %

Subbasin/PlanGroup Project/ Circle Kharif

seasonals

Two

seasonals

Rabi

seasonals

HW

seasonals

Perennials

0 0 0 0 0Borgaon

0 53 47 0 0Goki

0 45 48 3 5Lower Pus

0 81 18 1 0Saikheda

0 26 74 0 0Waghadi

YIC Yavatmal 61 47 3 2

Panzra

0 17 83 0 0Akkalpada(Lower Panzra)

26 0 69 3 2Malangaon

35 0 60 5 1Panzara

73 0 27 0 0Sonwad

0 0 100 0 0Wadi Shewadi

CADA Jalgaon 45 17 68 1 4

Remaining Bhima (Neera)

0 0 81 12 7Nazare

36 0 25 24 15Shetphal

PIC Pune 36 53 11 18

Upper Bhima

0 0 0 0 0Chilhewadi

23 0 40 16 20Visapur

KIC Pune 23 40 20 16

Upper Bhima

25 0 26 39 10Andra Khore

29 0 65 1 5Kalmodi

32 0 28 26 14Kasarsai

49 0 31 13 8Wadiwale

PIC Pune 34 38 9 20

Upper Godavari

0 0 0 0 0Shivna Takali

AIC Abad

Upper Godavari

0 26 73 0 1Ambadi

16 6 28 46 4Bor Dahegaon

0 15 85 0 0Dheku

17 6 40 30 7Kolhi

14 6 35 40 6Narangi

5 37 36 6 16Tembhapuri

CADA Abad 13 16 49 7 30

Upper Godavari

186

Page 196: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator IX: Actual Cropping Pattern - Page 8 of 10

(Medium Projects / 2017-18) Unit: %

Subbasin/PlanGroup Project/ Circle Kharif

seasonals

Two

seasonals

Rabi

seasonals

HW

seasonals

Perennials

11 0 72 1 16Adhala

4 0 28 7 60Alandi

30 0 66 3 0Bhojapur

0 0 76 0 24Gautami

18 0 71 0 11Ghatshil Pargaon

0 0 100 0 0Kashyapi

12 0 57 19 12Mandohol

9 0 72 18 0Waldevi

CADA Nashik 14 68 21 10

Upper Godavari

0 0 100 0 0Manikpunj

DIPC Dhule 100

Wardha

1 45 43 1 10Dham

0 60 40 0 0Dongargaon (Wardha)

0 52 40 0 8Madan Talav Project

0 79 21 0 0Pothara

CADA Nagpur 1 59 36 9 1

Wardha

0 100 0 0 0Amalnalla

0 38 59 0 2Lal Nala

CIPC Chandrapur 69 59 2

Wardha

15 0 79 6 0Kar

NIC Nagpur 15 79 6

Wardha

0 0 0 0 0Nawargaon

YIC Yavatmal

Normal

SurplusMiddle Wainganga

74 0 0 25 0Bagheda

100 0 0 0 0Betekar Bothli

100 0 0 0 0Bodalkasa

92 0 3 5 0Chandpur

0 0 0 0 0Chorakhmara

100 0 0 0 0Chulband

100 0 0 0 0Khairbanda

100 0 0 0 0Managadh

100 0 0 0 0Rengepar

187

Page 197: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator IX: Actual Cropping Pattern - Page 9 of 10

(Medium Projects / 2017-18) Unit: %

Subbasin/PlanGroup Project/ Circle Kharif

seasonals

Two

seasonals

Rabi

seasonals

HW

seasonals

Perennials

100 0 0 0 0Sangrampur

100 0 0 0 0Sorna

BIC Bhandara 97 2 0 15

Middle Wainganga

10 52 26 1 10Chandrabhaga (Nagpur)

0 66 34 0 0Kanholibara

1 84 8 0 7Kesarnala

0 100 0 0 0Khekara Nalla

0 82 14 1 3Kolar

0 39 59 2 0Makardhokada-Saiki

10 53 28 1 9Mordham

0 83 17 0 0Panchadhara Complex

51 12 37 0 0Pandharbodi

2 71 11 1 15Umri

1 0 38 1 61Wena

CADA Nagpur 9 64 27 15 1

Middle Wainganga

0 16 84 0 0Chandai

47 4 49 0 0Chargaon

0 0 100 0 0Labhansarad

23 77 0 0 0Pakadigundam

CIPC Chandrapur 35 32 78

Middle Wainganga

0 0 0 0 0Kalpathri

0 0 0 0 0Katangi

NIC Nagpur

Surplus

AbundantLower Wainganga

100 0 0 0 0Asolamendha

100 0 0 0 0Ghorazari

99 0 0 0 1Naleshwar

CIPC Chandrapur 100 1

North Konkan

57 0 23 20 0Hetwane

NKIPC Thane 57 23 20

North Konkan

80 0 19 0 2Rajanalla Complex

59 0 20 20 0Wandri

TIC Thane 70 19 2 20

188

Page 198: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator IX: Actual Cropping Pattern - Page 10 of 10

(Medium Projects / 2017-18) Unit: %

Subbasin/PlanGroup Project/ Circle Kharif

seasonals

Two

seasonals

Rabi

seasonals

HW

seasonals

Perennials

South Konkan

96 0 4 0 0Gad Nadi

NKIPC Thane 96 4

South Konkan

82 0 1 0 17Deoghar

SKIPC oros 82 1 17

Upper Krishna (W)

79 0 12 0 9Uttarmand

CADA Pune 79 12 9

Upper Krishna (W)

52 0 12 0 37Chikotra

19 0 11 1 69Chitri

46 0 18 0 36Dhamni (Kolhapur)

0 0 44 0 56Ghataprbha

31 0 19 2 48Hiranyakeshi

0 0 41 0 59Jambre

33 0 30 0 37Jangamhatti

63 0 16 1 20Kadvi

39 0 18 0 43Kasari

53 0 8 0 38Kumbhi

57 0 13 2 28Patgaon

KIC Kolhapur 44 21 43 1

Upper Krishna (W)

32 0 21 0 46Krishna Canal & Khodshi

Backwater

52 2 2 4 40Maishal LIS

34 0 26 0 40Morna (Sangli)

6 1 9 7 77Takari LIS

40 0 18 0 41Tembhu LIS Barrage

23 0 65 0 12Yeoti Masoli

SIC Sangli 31 2 23 43 4

Vashishthi

84 0 4 0 12Natuwadi

KIC Ratnagiri 84 4 12

Abundant

189

Page 199: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Annexure III

Indicators of Minor

Projects

Page 200: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

190

Page 201: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator I: Water Availability in MI Tanks (2017-18) - Page 1 of 2

Unit: Mcum

Circle Actual Live Storage Design Live Storage Percentage

OIC Osmanabad 20.86 56.37 37.01

CADA Solapur 15.38 32.08 47.94

SIC Satara 12.29 23.82 51.60

SIC Sangli 99.59 172.95 57.58

CADA Beed 215.20 277.00 77.69

KIC Pune 38.83 42.42 91.54

Highly Deficit 402.15 604.64 66.51

WIC Washim 5.28 48.62 10.86

CADA Jalgaon 23.80 81.52 29.20

BIPC Buldhana 0.65 1.84 35.33

AIC Akola 59.94 160.84 37.27

CADA Abad 70.22 182.62 38.45

AIC Aurangabad 127.69 227.70 56.08

CADA Beed 424.38 593.89 71.46

OIC Osmanabad 9.52 13.16 72.34

UWIC Amravati 43.99 53.74 81.86

CADA Nashik 126.86 151.33 83.83

NIC Nanded 89.39 99.47 89.87

BIPC Parli 6.48 6.48 100.00

Deficit 988.20 1621.21 60.95

WIC Washim 49.03 158.46 30.94

AIC Akola 33.26 99.18 33.53

UWIC Amravati 34.24 68.72 49.83

CADA Jalgaon 129.59 230.76 56.16

YIC Yavatmal 159.32 277.60 57.39

DIPC Dhule 24.35 31.70 76.81

SIC Satara 5.23 6.60 79.24

CADA Nashik 74.17 85.83 86.42

NIC Nanded 119.57 137.52 86.95

KIC Pune 41.95 48.19 87.05

CADA Nagpur 21.84 25.03 87.26

PIC Pune 163.28 178.53 91.46

Normal 855.83 1348.12 63.48

NIC Nagpur 10.42 27.17 38.35

BIC Bhandara 71.50 167.86 42.60

CADA Nagpur 71.16 106.35 66.91

CIPC Chandrapur 28.72 32.41 88.61

Surplus 181.80 333.79 54.47

SKIPC Oras 12.81 28.03 45.70

CADA Nagpur 20.28 32.23 62.92

TIC Thane 138.14 216.32 63.86

KIC Ratnagiri 246.62 370.90 66.49

CIPC Chandrapur 71.17 88.76 80.18

191

Page 202: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator I: Water Availability in MI Tanks (2017-18) - Page 2 of 2

Unit: Mcum

Circle Actual Live Storage Design Live Storage Percentage

KIC Kolhapur 159.24 181.78 87.60

NKIPC Thane 43.53 49.17 88.53

SIC Satara 14.49 14.18 102.19

Abundant 706.28 981.37 71.97

Grand Total: 3134.26 4889.13 64.11

192

Page 203: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

193

Page 204: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indiacator II: Percentage of Actual Evaporation to Gross Storage in Minor Irrigation

Tank (2017-18) - Page 1 of 2Unit: Mcum

Circle Evaporation Loss Gross Storage Observed Percentage

KIC Pune 6.71 48.03 13.97

OIC Osmanabad 3.76 24.79 15.17

SIC Sangli 20.38 129.06 15.79

CADA Beed 51.12 256.08 19.96

SIC Satara 4.97 16.36 30.38

CADA Solapur 7.09 22.08 32.11

496.40 94.03Highly Deficit 18.94

NIC Nanded 1.55 104.50 1.48

CADA Nashik 11.88 149.10 7.97

OIC Osmanabad 1.09 11.14 9.78

AIC Akola 12.41 81.52 15.22

BIPC Parli 1.18 7.71 15.30

WIC Washim 1.48 9.48 15.61

CADA Abad 18.36 95.65 19.19

CADA Beed 108.33 495.05 21.88

UWIC Amravati 14.78 50.08 29.51

CADA Jalgaon 10.70 33.44 32.00

AIC Aurangabad 62.69 158.66 39.51

BIPC Buldhana 0.54 0.81 66.67

1197.14 244.99Deficit 20.46

NIC Nanded 9.35 133.81 6.99

DIPC Dhule 3.16 35.56 8.89

CADA Nashik 9.56 82.47 11.59

PIC Pune 22.20 188.79 11.76

CADA Jalgaon 22.67 159.52 14.21

YIC Yavatmal 34.06 183.99 18.51

KIC Pune 9.95 49.52 20.09

WIC Washim 12.44 60.45 20.58

CADA Nagpur 5.94 23.22 25.58

AIC Akola 10.72 41.71 25.70

SIC Satara 1.71 6.12 27.94

UWIC Amravati 12.17 41.91 29.04

1007.07 153.93Normal 15.28

CIPC Chandrapur 5.24 32.79 15.98

CADA Nagpur 19.73 81.91 24.09

BIC Bhandara 25.15 103.11 24.39

NIC Nagpur 4.39 13.91 31.56

231.72 54.51Surplus 23.52

KIC Ratnagiri 18.53 267.42 6.93

KIC Kolhapur 13.50 166.43 8.11

SKIPC Oras 1.67 13.40 12.46

NKIPC Thane 6.96 45.78 15.20

194

Page 205: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indiacator II: Percentage of Actual Evaporation to Gross Storage in Minor Irrigation

Tank (2017-18) - Page 2 of 2Unit: Mcum

Circle Evaporation Loss Gross Storage Observed Percentage

SIC Satara 2.55 15.36 16.60

CIPC Chandrapur 14.98 82.68 18.12

TIC Thane 35.21 149.64 23.53

CADA Nagpur 5.49 22.53 24.37

763.24 98.89Abundant 12.96

Grand Total: 646.35 3695.57 17.49

195

Page 206: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

196

Page 207: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator III: Water Use Pattern - Minor Irrigation Tank (2017-18) - Page 1 of 2Unit: Mcum

Circle Kharif Rabi HW Reservoir NIuse Evaporation Leakage Total

2.33 7.09 0.00 7.87 2.17 4.11 0.00CADA Solapur 23.57

5.50 20.38 6.94 47.23 1.59 4.63 0.00SIC Sangli 86.27

16.40 51.12 4.92 133.66 1.35 2.39 0.00CADA Beed 209.84

9.18 6.71 2.51 19.69 0.47 0.55 0.00KIC Pune 39.11

0.00 4.97 0.93 4.28 0.00 1.14 2.20SIC Satara 13.52

2.35 3.76 0.00 9.56 0.00 0.00 0.00OIC Osmanabad 15.67

Highly Deficit 2.20 12.82 5.58 222.28 15.30 94.03 35.76 387.97

0.00 1.18 0.25 2.91 0.00 0.00 0.00BIPC Parli 4.34

0.00 1.09 0.00 1.00 0.00 0.00 0.00OIC Osmanabad 2.09

0.00 62.69 3.85 51.62 0.00 1.67 0.00AIC Aurangabad 119.83

3.12 18.36 19.17 14.36 0.49 7.58 0.00CADA Abad 63.09

12.65 108.33 0.00 255.07 3.46 7.38 0.00CADA Beed 386.89

0.66 14.78 1.49 3.77 2.70 18.66 0.00UWIC Amravati 42.06

0.00 1.48 0.97 3.58 0.00 0.00 0.00WIC Washim 6.04

11.02 11.88 16.52 47.95 4.01 15.37 0.34CADA Nashik 107.09

0.00 12.41 3.51 8.18 0.00 7.21 0.00AIC Akola 31.31

3.93 10.70 6.44 5.83 0.00 0.56 0.00CADA Jalgaon 27.46

0.00 0.54 0.00 0.00 0.00 0.00 0.00BIPC Buldhana 0.54

0.15 1.55 0.91 0.45 0.00 1.16 0.00NIC Nanded 4.22

Deficit 0.34 59.59 10.66 394.72 53.12 245.00 31.52 794.95

9.85 22.20 21.59 129.65 7.17 12.52 2.15PIC Pune 205.13

16.14 22.67 6.33 12.62 4.93 46.25 0.00CADA Jalgaon 108.94

1.90 10.72 1.66 26.08 0.00 1.20 1.26AIC Akola 42.81

3.85 9.56 3.02 45.47 4.25 8.45 0.33CADA Nashik 74.93

19.58 34.06 0.99 6.56 18.00 11.92 0.75YIC Yavatmal 91.87

0.00 9.95 2.42 37.05 0.00 0.00 0.00KIC Pune 49.42

0.00 12.44 2.05 22.13 0.00 0.00 0.00WIC Washim 36.63

0.28 3.16 0.28 1.31 0.57 5.42 0.00DIPC Dhule 11.02

0.07 12.17 3.56 4.55 2.59 12.31 0.16UWIC Amravati 35.41

0.00 1.71 0.27 2.60 0.12 0.58 0.00SIC Satara 5.28

6.44 9.35 0.09 13.97 0.89 10.82 0.00NIC Nanded 41.56

3.33 5.94 0.00 0.95 0.00 7.96 1.07CADA Nagpur 19.25

Normal 5.72 117.43 38.52 302.93 42.26 153.93 61.45 722.24

1.15 25.15 1.26 0.00 7.00 1.48 26.73BIC Bhandara 62.76

0.62 4.39 0.00 0.00 0.00 2.61 2.79NIC Nagpur 10.41

1.10 19.73 4.81 4.74 0.38 41.02 1.79CADA Nagpur 73.57

0.00 5.24 0.00 0.00 0.23 1.45 15.44CIPC Chandrapur 22.36

Surplus 46.75 46.56 7.61 4.74 6.07 54.51 2.87 169.11

3.06 6.96 1.28 0.00 0.00 2.33 0.00NKIPC Thane 13.63

99.10 18.53 10.03 2.44 0.00 25.89 0.00KIC Ratnagiri 155.98

2.74 13.50 1.45 44.69 31.20 30.53 0.00KIC Kolhapur 124.11

0.00 2.56 0.97 2.81 1.39 2.90 0.00SIC Satara 10.62

0.00 14.98 0.00 0.26 0.18 1.93 45.06CIPC Chandrapur 62.42

197

Page 208: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator III: Water Use Pattern - Minor Irrigation Tank (2017-18) - Page 2 of 2Unit: Mcum

Circle Kharif Rabi HW Reservoir NIuse Evaporation Leakage Total

0.00 5.49 0.58 4.99 0.14 3.99 2.66CADA Nagpur 17.86

1.40 35.21 42.14 7.64 14.33 33.07 0.00TIC Thane 133.80

3.74 1.67 0.01 0.23 0.51 0.44 0.00SKIPC Oras 6.59

Abundant 47.72 101.08 47.75 63.06 56.46 98.90 110.04 525.01

Grand Total: 103 337 110 988 173 646 242 2599

198

Page 209: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

199

Page 210: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Indicator IV - Irrigation System Performance.

Unit: Ha/Mcum

Circle Kharif Rabi HW

110.22 121.55 0.00CADA Beed

54.84 27.98 0.00CADA Solapur

140.43 185.45 0.00KIC Pune

0.00 0.00 0.00OIC Osmanabad

165.41 236.07 0.00SIC Sangli

0.00 146.49 13.64SIC Satara

13.64 117.72 143.51Highly Deficit

0.00 252.59 0.00NIC Nanded

0.00 0.00 0.00OIC Osmanabad

67.78 97.59 0.00UWIC Amravati

0.00 0.00 0.00WIC Washim

0.00 34.24 0.00AIC Akola

0.00 135.33 0.00AIC Aurangabad

0.00 0.00 0.00BIPC Buldhana

0.00 0.00 0.00BIPC Parli

44.90 163.16 0.00CADA Abad

71.97 78.50 0.00CADA Beed

0.00 275.00 0.00CADA Jalgaon

111.22 168.28 400.00CADA Nashik

400.00 73.97 150.58Deficit

0.00 274.17 7.94AIC Akola

31.07 75.51 0.00CADA Jalgaon

0.00 137.44 623.36CADA Nagpur

174.80 282.79 158.55CADA Nashik

87.72 49.93 0.00DIPC Dhule

0.00 0.00 0.00KIC Pune

86.52 97.50 0.00NIC Nanded

100.24 160.16 1.40PIC Pune

116.67 133.79 0.00SIC Satara

117.37 149.47 337.50UWIC Amravati

0.00 0.00 0.00WIC Washim

1.00 84.23 160.00YIC Yavatmal

214.79 89.42 144.50Normal

35.29 20.27 913.96BIC Bhandara

115.79 96.83 298.68CADA Nagpur

108.70 171.03 274.35CIPC Chandrapur

0.00 169.35 235.48NIC Nagpur

430.62 86.59 114.37Surplus

178.57 105.76 244.36CADA Nagpur

122.22 135.75 363.79CIPC Chandrapur

79.90 147.85 0.00KIC Kolhapur

0.00 31.14 0.00KIC Ratnagiri

0.00 45.92 0.00NKIPC Thane

83.45 136.90 0.00SIC Satara

53.39 41.08 0.00SKIPC Oras

84.51 78.83 0.00TIC Thane200

Page 211: Report on Water Auditing of Irrigation Projects in ......ii) Season-wise availability of water and extent of water use. iii) Irrigation System Performance actually observed as compared

Circle Kharif Rabi HW

304.08 100.34 90.40Abundant

Grand Total: 288 130 94

201