John Osborne : GS-SEM Civil Engineering18 May 2009
Report on behalf of CLIC Civil Engineering and Services (CES) WG
CTC 18 May 2010
CES studies for CDR :
1. Tunnel cross section2. Injection Complex 3. BDS Layout4. Experimental Area Layout5. Summary
![Page 2: Report on behalf of CLIC Civil Engineering and Services (CES) WG](https://reader035.fdocuments.in/reader035/viewer/2022062811/56815ecc550346895dcd50ed/html5/thumbnails/2.jpg)
John Osborne : GS-SEM Civil Engineering18 May 2009
1.Tunnel cross section
![Page 3: Report on behalf of CLIC Civil Engineering and Services (CES) WG](https://reader035.fdocuments.in/reader035/viewer/2022062811/56815ecc550346895dcd50ed/html5/thumbnails/3.jpg)
John Osborne : GS-SEM Civil Engineering18 May 2009 3
4.5m tunnel for CDR as agreed in 2009
![Page 4: Report on behalf of CLIC Civil Engineering and Services (CES) WG](https://reader035.fdocuments.in/reader035/viewer/2022062811/56815ecc550346895dcd50ed/html5/thumbnails/4.jpg)
John Osborne : GS-SEM Civil Engineering18 May 2009 4
Drawbacks with 4.5m tunnel identified in 2009
• Positioning of electronic racks not ideal• Solution : Re-position onto tunnel floor, but possibly means deleting safety barrier
• Difficult to access ‘tunnel wall’ side of modules• Solution : remove entire module for access ?
• Access to Drive Beam dumps • Solution : Local Tunnel enlargement to allow ‘ladder’ access (see next slides)
• Impact from vibration from floor embedded pipes• Solution : Further studies in TD Phase
• Reduced space due to transversal ventilation and perhaps not sufficient cooling power • Solution : Study longitudinal ventilation system during TD Phase
• No space for vehicle powering ‘monorail’ and integration conflict• Inductive powering for vehicle ?
![Page 5: Report on behalf of CLIC Civil Engineering and Services (CES) WG](https://reader035.fdocuments.in/reader035/viewer/2022062811/56815ecc550346895dcd50ed/html5/thumbnails/5.jpg)
John Osborne : GS-SEM Civil Engineering18 May 2009
Revised 4.5m cross section
![Page 6: Report on behalf of CLIC Civil Engineering and Services (CES) WG](https://reader035.fdocuments.in/reader035/viewer/2022062811/56815ecc550346895dcd50ed/html5/thumbnails/6.jpg)
John Osborne : GS-SEM Civil Engineering18 May 2009
Access to Drive beam dump
![Page 7: Report on behalf of CLIC Civil Engineering and Services (CES) WG](https://reader035.fdocuments.in/reader035/viewer/2022062811/56815ecc550346895dcd50ed/html5/thumbnails/7.jpg)
John Osborne : GS-SEM Civil Engineering18 May 2009
![Page 8: Report on behalf of CLIC Civil Engineering and Services (CES) WG](https://reader035.fdocuments.in/reader035/viewer/2022062811/56815ecc550346895dcd50ed/html5/thumbnails/8.jpg)
John Osborne : GS-SEM Civil Engineering18 May 2009
Access to LHC Dumps at Point 6
![Page 9: Report on behalf of CLIC Civil Engineering and Services (CES) WG](https://reader035.fdocuments.in/reader035/viewer/2022062811/56815ecc550346895dcd50ed/html5/thumbnails/9.jpg)
John Osborne : GS-SEM Civil Engineering18 May 2009
Cross section for ILC Europe (CERN) 5.2m diameter for Kly-Cluster
![Page 10: Report on behalf of CLIC Civil Engineering and Services (CES) WG](https://reader035.fdocuments.in/reader035/viewer/2022062811/56815ecc550346895dcd50ed/html5/thumbnails/10.jpg)
John Osborne : GS-SEM Civil Engineering18 May 2009
Possible 5.2m cross section for CLIC
![Page 11: Report on behalf of CLIC Civil Engineering and Services (CES) WG](https://reader035.fdocuments.in/reader035/viewer/2022062811/56815ecc550346895dcd50ed/html5/thumbnails/11.jpg)
John Osborne : GS-SEM Civil Engineering18 May 2009
‘Metro standard’ 5.6m tunnel +150MCHF : Proposed at CTC May 2009
![Page 12: Report on behalf of CLIC Civil Engineering and Services (CES) WG](https://reader035.fdocuments.in/reader035/viewer/2022062811/56815ecc550346895dcd50ed/html5/thumbnails/12.jpg)
John Osborne : GS-SEM Civil Engineering18 May 2009
2. Injection Complex :Input mainly from :L.RinolfiB.JeanneretF.Stulle
![Page 13: Report on behalf of CLIC Civil Engineering and Services (CES) WG](https://reader035.fdocuments.in/reader035/viewer/2022062811/56815ecc550346895dcd50ed/html5/thumbnails/13.jpg)
John Osborne : GS-SEM Civil Engineering18 May 2009 13
Injection Complex 2009 Layout
![Page 14: Report on behalf of CLIC Civil Engineering and Services (CES) WG](https://reader035.fdocuments.in/reader035/viewer/2022062811/56815ecc550346895dcd50ed/html5/thumbnails/14.jpg)
John Osborne : GS-SEM Civil Engineering18 May 2009 14
Injection Complex 2010 Layout
• 1.1km extra tunnel for turnarounds
• 500m extra for CR, DR• Injection cut and cover
tunnels lengths increased to 1.4km (from 1km)
‘turnaround’ is now a horizontal cut/cover design
![Page 15: Report on behalf of CLIC Civil Engineering and Services (CES) WG](https://reader035.fdocuments.in/reader035/viewer/2022062811/56815ecc550346895dcd50ed/html5/thumbnails/15.jpg)
John Osborne : GS-SEM Civil Engineering18 May 2009
‘Spiral descents’ removed
![Page 16: Report on behalf of CLIC Civil Engineering and Services (CES) WG](https://reader035.fdocuments.in/reader035/viewer/2022062811/56815ecc550346895dcd50ed/html5/thumbnails/16.jpg)
John Osborne : GS-SEM Civil Engineering18 May 2009 16
Surface tunnels / halls for Injection Complex2010 Layout : Surface buildings added
![Page 17: Report on behalf of CLIC Civil Engineering and Services (CES) WG](https://reader035.fdocuments.in/reader035/viewer/2022062811/56815ecc550346895dcd50ed/html5/thumbnails/17.jpg)
John Osborne : GS-SEM Civil Engineering18 May 2009
CLIC Damping Rings schematic layout
e+ Damping Ring
e- Damping Ring
e- Pre-damping Ringe+ Pre-damping Ring
e+ linac to PDR transfer line
e- linac to PDR transfer line
e+ PDR to DR transfer line
e+ DR to Booster linac transfer line
e- PDR to DR transfer line
e- DR to Booster linac transfer line
205 m
205 m
80 m
80 m
Dump
157 m
64 m
Damping rings still to be finalised
![Page 18: Report on behalf of CLIC Civil Engineering and Services (CES) WG](https://reader035.fdocuments.in/reader035/viewer/2022062811/56815ecc550346895dcd50ed/html5/thumbnails/18.jpg)
John Osborne : GS-SEM Civil Engineering18 May 2009
ON - HOLD
![Page 19: Report on behalf of CLIC Civil Engineering and Services (CES) WG](https://reader035.fdocuments.in/reader035/viewer/2022062811/56815ecc550346895dcd50ed/html5/thumbnails/19.jpg)
John Osborne : GS-SEM Civil Engineering18 May 2009
3. BDS Layout
Input mainly from :Rogelio Tomas GarciaEdda Gschwendtner
![Page 20: Report on behalf of CLIC Civil Engineering and Services (CES) WG](https://reader035.fdocuments.in/reader035/viewer/2022062811/56815ecc550346895dcd50ed/html5/thumbnails/20.jpg)
John Osborne : GS-SEM Civil Engineering18 May 2009
Main Beam Dumps
![Page 21: Report on behalf of CLIC Civil Engineering and Services (CES) WG](https://reader035.fdocuments.in/reader035/viewer/2022062811/56815ecc550346895dcd50ed/html5/thumbnails/21.jpg)
John Osborne : GS-SEM Civil Engineering18 May 2009
Tune-Up Dumps added
![Page 22: Report on behalf of CLIC Civil Engineering and Services (CES) WG](https://reader035.fdocuments.in/reader035/viewer/2022062811/56815ecc550346895dcd50ed/html5/thumbnails/22.jpg)
John Osborne : GS-SEM Civil Engineering18 May 2009
4. Experimental Area Layout
![Page 23: Report on behalf of CLIC Civil Engineering and Services (CES) WG](https://reader035.fdocuments.in/reader035/viewer/2022062811/56815ecc550346895dcd50ed/html5/thumbnails/23.jpg)
John Osborne : GS-SEM Civil Engineering18 May 2009
CLIC Detector hall layout developed by :A.GaddiH.GerwigA.Herve
CES will now use this as starting point for CE & services design, including cost estimates
![Page 24: Report on behalf of CLIC Civil Engineering and Services (CES) WG](https://reader035.fdocuments.in/reader035/viewer/2022062811/56815ecc550346895dcd50ed/html5/thumbnails/24.jpg)
John Osborne : GS-SEM Civil Engineering18 May 2009
Machine By-Pass added
Survey gallery added
Emergency escape tunnel
Better to delete cavern ‘technical alcoves’
Gantry crane capacities to be determined
CV being consulted about requirements
![Page 25: Report on behalf of CLIC Civil Engineering and Services (CES) WG](https://reader035.fdocuments.in/reader035/viewer/2022062811/56815ecc550346895dcd50ed/html5/thumbnails/25.jpg)
John Osborne : GS-SEM Civil Engineering18 May 2009
ILC 3d models developed at CERN using CATIA :CLIC models to follow once draughtsman is identified
![Page 26: Report on behalf of CLIC Civil Engineering and Services (CES) WG](https://reader035.fdocuments.in/reader035/viewer/2022062811/56815ecc550346895dcd50ed/html5/thumbnails/26.jpg)
John Osborne : GS-SEM Civil Engineering18 May 2009Overall layout updated (full symmetry)
![Page 27: Report on behalf of CLIC Civil Engineering and Services (CES) WG](https://reader035.fdocuments.in/reader035/viewer/2022062811/56815ecc550346895dcd50ed/html5/thumbnails/27.jpg)
John Osborne : GS-SEM Civil Engineering18 May 2009
5. Summary
• Will continue to try and ‘freeze’ CE layouts at monthly CES meeting. Next major issue is amount of space required for Power Converters.
• Martin Gastal is gathering input from other technical services for experimental hall (CV,EL etc)
• Costing for CDR required for all technical infrastructure by September with assistance from Amberg consultants (same CE consultants for ILC)
• Draft layout for CDR Chapter ‘Civil Engineering and Services’ has been submitted to Hermann
![Page 28: Report on behalf of CLIC Civil Engineering and Services (CES) WG](https://reader035.fdocuments.in/reader035/viewer/2022062811/56815ecc550346895dcd50ed/html5/thumbnails/28.jpg)
John Osborne : GS-SEM Civil Engineering18 May 2009
BACK-UP SLIDE
![Page 29: Report on behalf of CLIC Civil Engineering and Services (CES) WG](https://reader035.fdocuments.in/reader035/viewer/2022062811/56815ecc550346895dcd50ed/html5/thumbnails/29.jpg)
John Osborne : GS-SEM Civil Engineering18 May 2009
CTC 19 May 2009 Summary
• With a 4.5m diameter tunnel, it appears difficult to accommodate all equipment
• 5.6m recommended by CES working group• More TBM’s of this diameter available will help with Project planning• Reduction in other costs due to more additional working space ? Space for
future requests….• Additional CE cost in the region of 150M CHF
Barcelona Metro under construction 6.6m machine external, inner 5.8m. With 0.1m tolerance on radius = 5.6m internal diameter.