Report of Evaluations
17th Meeting of the Nuclear Structure and Decay Data NetworkPetersburg Nuclear Physics Institute-St. Petersburg, Russia
June 11 - 15 - 2007
Guillermo V. Martí
Department of Physics – Tandar LaboratoryCNEA – Buenos Aires - Argentina
1
First year (2003): A=193 Mass chain evaluation (under IAEA contract ARG-12480-R0, Mar03)
Lab. TANDAR, CNEA, Argentina: Evaluators: E.Achterberg, O.A.Capurro, G.V.Martí193At, 193Po, 193Bi, 193Pb, 193Tl, 193Hg.Instituto de Física, Universidade de Sao Paulo, Brazil:Evaluators: V.Vanin, R.M.Castro193Au, 193Pt, 193Ir, 193Os, 193Re.
In the last attended meeting the 16th Meeting of the NSDD network in Viena, November 10-14-2003:
Apr-2004 - Complete evaluated mass chain uploaded to the NNDC.Aug-2004 - Evaluation received by reviewer for processing.Nov-2004 - Receive reviewer's report from NNDC.Apr-2005 – The TANDAR part of the mass chain revised according to the reviewer's report and re-sent to the NNDC.Oct-2005 - Complete revised mass chain uploaded to the NNDC.Jan- 2006 - Publication as NDS 107, 1 (2006).
2
Second year (2004): A=191 Mass chain evaluation (under IAEA contract ARG-12480-R1, Apr04)
Lab. TANDAR, CNEA, Argentina: Evaluators: E.Achterberg, O.A.Capurro, G.V.Martí191At, 191Po, 191Bi, 191Pb, 191Tl, 191Hg.Instituto de Física, Universidade de Sao Paulo, Brazil:Evaluators: V.Vanin, N.L.Maidana, R.M.Castro191Au, 191Pt, 191Ir, 191Os,191Re.
Jul-2005-The TANDAR part of the revaluated mass chain sent to the NNDC.Jan-2007-Complete mass chain uploaded to the NNDC for review.May-2007-Reviewer's report received in Buenos Aires.Jun-2007-Reviewer's report received in Sao Paulo (V.Vanin).
3
4Third year (2005): A=178 Mass chain evaluation (under IAEA contract ARG-12480-R2, Apr05)
Tandar Laboratory, CNEA, Argentina: Evaluators: E.Achterberg, O.A.Capurro, G.V.Martí178Re, 178Os, 178Ir, 178Pt, 178Au, 178Hg, 178Tl,178Pb.
Mar-2006 - First half of the reevaluated mass chain sent to the NNDC.
Fourth year (2007): A=178 Mass chain evaluation (under renewal IAEA contract ARG-14244-R0-Mar-07)
Tandar Laboratory, CNEA, Argentina: Evaluators: E.Achterberg, O.A.Capurro, G.V.Martí178Yb, 178Lu, 178Hf, 178Ta, 178W.
5
Mar-2007 - Second half of A=178 mass chain evaluation begun.Jun-2007- 178Yb, 178Lu Ens-files first draft version ready. Feb-2008- Expected date to finish revision.