REPORT - City of Blacktown · 2017-11-22 · 25 WENTWORTH STREET, THE PONDS, NSW 23 SEPTEMBER 2016...

88
ENVIRONMENTAL INVESTIGATION SERVICES Postal Address: PO Box 976, North Ryde BC NSW 1670 Tel: 02 9888 5000 Fax: 9888 5004 EIS is a division of Jeffery and Katauskas Pty Ltd ABN 17 003 550 801 REPORT TO TKD ARCHITECTS PTY LTD ON PRELIMINARY STAGE 1 ENVIRONMENTAL SITE ASSESSMENT FOR PROPOSED RIVERBANK PRIMARY SCHOOL DEVELOPMENT AT 25 WENTWORTH STREET, THE PONDS, NSW 23 SEPTEMBER 2016 REF: E29696KDrpt

Transcript of REPORT - City of Blacktown · 2017-11-22 · 25 WENTWORTH STREET, THE PONDS, NSW 23 SEPTEMBER 2016...

Page 1: REPORT - City of Blacktown · 2017-11-22 · 25 WENTWORTH STREET, THE PONDS, NSW 23 SEPTEMBER 2016 REF: E29696KDrpt. Document Distribution Record ... (120mg/kg) was encountered in

ENVIRONMENTAL INVESTIGATION SERVICES

Postal Address: PO Box 976, North Ryde BC NSW 1670

Tel: 02 9888 5000 Fax: 9888 5004

EIS is a division of Jeffery and Katauskas Pty Ltd ABN 17 003 550 801

REPORT

TO

TKD ARCHITECTS PTY LTD

ON

PRELIMINARY STAGE 1 ENVIRONMENTAL SITE

ASSESSMENT

FOR

PROPOSED RIVERBANK PRIMARY SCHOOL

DEVELOPMENT

AT

25 WENTWORTH STREET, THE PONDS, NSW

23 SEPTEMBER 2016 REF: E29696KDrpt

Page 2: REPORT - City of Blacktown · 2017-11-22 · 25 WENTWORTH STREET, THE PONDS, NSW 23 SEPTEMBER 2016 REF: E29696KDrpt. Document Distribution Record ... (120mg/kg) was encountered in

Document Distribution Record

Report Reference

Distribution Report Date

E29696KDrpt TKD Architects Pty Ltd - 1 * e-copy 23 September 2016

Report prepared by:

Mitch Delaney Senior Environmental Scientist

Report reviewed by:

Adrian Kingswell Principal Environmental Scientist

Document Copyright of Environmental Investigation Services (EIS) This Report (which includes all attachments and annexures) has been prepared by EIS for the Client, and is intended for the use only by that Client. This Report has been prepared pursuant to a contract between EIS and the Client and is therefore subject to: a) EIS proposal in respect of the work covered by the Report; b) The limitations defined in the client’s brief to EIS; and c) The terms of contract between EIS and the Client, including terms limiting the liability of EIS.

If the Client, or any person, provides a copy of this Report to any third party, such third party must not rely on this Report, except with the express written consent of EIS which, if given, will be deemed to be upon the same terms, conditions, restrictions and limitations as apply by virtue of (a), (b), and (c) above. Any third party who seeks to rely on this Report without the express written consent of EIS does so entirely at their own risk and to the fullest extent permitted by law, EIS accepts no liability whatsoever, in respect of any loss or damage suffered by any such third party.

Page 3: REPORT - City of Blacktown · 2017-11-22 · 25 WENTWORTH STREET, THE PONDS, NSW 23 SEPTEMBER 2016 REF: E29696KDrpt. Document Distribution Record ... (120mg/kg) was encountered in

EXECUTIVE SUMMARY TKD Architects Pty Ltd (‘the client’) commissioned Environmental Investigation Services (EIS)1 to undertake a Preliminary Stage 1 Environmental Site Assessment (ESA) for the proposed Riverbank Primary School development at 25 Wentworth Street, The Ponds, NSW. The site location is shown on Figure 1 and the assessment was confined to the site boundaries as shown on Figure 2. The proposed development area is referred to as ‘the site’ in this report. A geotechnical investigation was undertaken in conjunction with this assessment by JK Geotechnics2. The results of the investigation are presented in a separate report (Ref. 29695ZHrpt, dated 20 September 2016). This report should be read in conjunction with the JK report. The assessment objectives are to: assess the potential for site contamination; assess the potential risk the contamination may pose to the site receptors; provide a preliminary waste classification for the off-site disposal of soil and comment on the suitability of the site for the proposed development. The scope of work included the following:

Review of site information including background and site history information; A site inspection to identify Areas of Environmental Concern (AEC); Preparation of a Conceptual Site Model (CSM); Design and implementation of a sampling, analysis and quality plan (SAQP); Interpretation of the analytical results against the adopted Site Assessment Criteria (SAC); Data Quality Assessment; Undertake a Tier 1 Risk Assessment and review of CSM; and Preparation of a report presenting the results of the assessment.

Samples for this investigation were obtained from nine (9) sampling points as shown on the attached Figure 2. This density is approximately 34% of the minimum sampling density recommended by the EPA. An elevated concentration of zinc (120mg/kg) was encountered in the fill soil sample BH4 (0-0.2m) above the EIL SAC of 94 mg/kg. EIS are of the opinion that the elevated zinc result poses a low risk to the receptors identified in the CSM and soil remediation is not required as a result of one soil sample above the EIL SAC. Based on the scope of work undertaken, EIS are of the opinion that the AEC identified in the CSM pose relatively low risk to the site receptors. The site is considered to be suitable for the proposed school development. A contingency plan should be prepared to address any unexpected finds during earthworks. In the event unexpected conditions are encountered during development, all works should stop and an environmental consultant should be engaged to inspect the site and address the issue. The conclusions and recommendations should be read in conjunction with the limitations presented in the body of the report.

1 Environmental consulting division of Jeffery & Katauskas Pty Ltd (J&K) 2 Geotechnical consulting division of J&K

Page 4: REPORT - City of Blacktown · 2017-11-22 · 25 WENTWORTH STREET, THE PONDS, NSW 23 SEPTEMBER 2016 REF: E29696KDrpt. Document Distribution Record ... (120mg/kg) was encountered in

TABLE OF CONTENTS

1 INTRODUCTION 1 1.1 Proposed Development Details 1 1.2 Objectives 1 1.3 Scope of Work 1

2 SITE INFORMATION 3 2.1 Background 3 2.2 Site Identification 4 2.3 Site Location and Regional Setting 4 2.4 Topography 4 2.5 Site Inspection 5 2.6 Surrounding Land Use 5 2.7 Underground Services 5 2.8 Regional Geology 6 2.9 Acid Sulfate Soil (ASS) Risk 6 2.10 Hydrogeology 6 2.11 Receiving Water Bodies 6

3 SITE HISTORY INFORMATION 7 3.1 Review of Historical Aerial Photographs 7 3.2 Review of Blacktown Council Information 8 3.3 NSW EPA Records 9 3.4 Summary of Site History Information 9 3.5 Integrity of Site History Information 9

4 CONCEPTUAL SITE MODEL (CSM) 10 5 SAMPLING, ANALYSIS AND QUALITY PLAN 11

5.1 Data Quality Objectives (DQO) 11 5.2 Soil Sampling Plan and Methodology 13 5.3 Analytical Schedule 15

6 SITE ASSESSMENT CRITERIA (SAC) 17 7 INVESTIGATION RESULTS 18

7.1 Subsurface Conditions 18 7.2 Field Screening 18 7.3 Soil Laboratory Results 19

8 DATA QUALITY ASSESSMENT 21 9 TIER 1 RISK ASSESSMENT AND REVIEW OF CSM 23 10 WASTE CLASSIFICATION OF SOIL FOR OFF-SITE DISPOSAL 24 11 CONCLUSION 25

11.1 Regulatory Requirement 26 12 LIMITATIONS 27 List of In-Text Tables

Important Information About The Site Assessment Report REPORT FIGURES: Figure 1: Site Location Plan Figure 2: Sample Location Plan LABORATORY SUMMARY TABLES: Table A: Soil Laboratory Results Compared to HILs Table B: Soil Laboratory Results Compared to HSLs Table C: Soil Laboratory Results Compared to Waste Classification Guidelines Table D: Soil Laboratory Results Compared to EILs and ESLs Table E: Soil Intra-Laboratory Duplicate Results & RPD Calculations

Page 5: REPORT - City of Blacktown · 2017-11-22 · 25 WENTWORTH STREET, THE PONDS, NSW 23 SEPTEMBER 2016 REF: E29696KDrpt. Document Distribution Record ... (120mg/kg) was encountered in

TABLE OF CONTENTS

APPENDICES: Appendix A: Site Information including Site History Appendix B: Borehole Logs Appendix C: Laboratory Reports & COC Documents Appendix D: Report Explanatory Notes

Page 6: REPORT - City of Blacktown · 2017-11-22 · 25 WENTWORTH STREET, THE PONDS, NSW 23 SEPTEMBER 2016 REF: E29696KDrpt. Document Distribution Record ... (120mg/kg) was encountered in

ABBREVIATIONS

Ambient Background Concentrations ABC

Added Contaminant Limits ACL

Asbestos Containing Material ACM

Australian Drinking Water Guidelines ADWG

Area of Environmental Concern AEC

Australian Height Datum AHD

Asbestos Health Screening Levels ASL

Acid Sulfate Soil ASS

Above Ground Storage Tank AST

Below Ground Level BGL

Bureau of Meteorology BOM

Benzene, Toluene, Ethylbenzene, Xylene, Naphthalene BTEXN

Cation Exchange Capacity CEC

Contaminated Land Management CLM

Construction Management Plan CMP

Chain of Custody COC

Contaminant of Primary Concern CoPC

Conceptual Site Model CSM

Data Quality Indicator DQI

Data Quality Objective DQO

Detailed Site Investigation DSI

Ecological Assessment Criteria EAC

Ecological Investigation Levels EILs

Ecological Screening Level ESL

Environmental Management Plan EMP

Excavated Natural Material ENM

Environmental Protection Agency EPA

Environmental Site Assessment ESA

Ecological Screening Level ESL

Fibre Cement Fragments FCF

General Approvals of Immobilisation GAI

General Solid Waste GSW

Health Investigation Level HILs

Hardness Modified Trigger Values HMTV

Health Screening Level HSLs

International Organisation of Standardisation ISO

Lab Control Spike LCS

Light Non-Aqueous Phase Liquid LNAPL

Local Government Authority LGA

Map Grid of Australia MGA

National Association of Testing Authorities NATA

National Environmental Protection Measure NEPM

Organochlorine Pesticides OCP

Organophosphate Pesticides OPP

Polycyclic Aromatic Hydrocarbons PAH

Page 7: REPORT - City of Blacktown · 2017-11-22 · 25 WENTWORTH STREET, THE PONDS, NSW 23 SEPTEMBER 2016 REF: E29696KDrpt. Document Distribution Record ... (120mg/kg) was encountered in

ABBREVIATIONS

Potential Contaminants of Concern PCC

Photo-ionisation Detector PID

Practical Quantitation Limit PQL

Preliminary Site Investigation PSI

Quality Assurance QA

Quality Control QC

Remediation Action Plan RAP

Relative Percentage Difference RPD

Restricted Solid Waste RSW

Site Assessment Criteria SAC

Sampling, Analysis and Quality Plan SAQP

Site Audit Statement SAS

Site Audit Report SAR

Specific Contamination Concentration SCC

Standard Penetration Test SPT

Semi-Volatile Organic Compounds sVOC

Standard Sampling Procedure SSP

Standard Water Level SWL

Standard Sampling Procedure SSP

Trip Blank TB

Toxicity Characteristic Leaching Procedure TCLP

Total Recoverable Hydrocarbons TRH

Trip Spike TS

Upper Confidence Limit UCL

United States Environmental Protection Agency USEPA

Underground Storage Tank UST

Virgin Excavated Natural Material VENM

Volatile Organic Compounds VOC

Volatile Organic Chlorinated Compound VOCC

Workplace, Health and Safety WHS

Page 8: REPORT - City of Blacktown · 2017-11-22 · 25 WENTWORTH STREET, THE PONDS, NSW 23 SEPTEMBER 2016 REF: E29696KDrpt. Document Distribution Record ... (120mg/kg) was encountered in

Preliminary Stage 1 Environmental Site Assessment Riverbank Primary School – 25 Wentworth Street, The Ponds, NSW EIS Ref: E29696KDrpt

P a g e 1

1 INTRODUCTION

TKD Architects Pty Ltd (‘the client’) commissioned EIS to undertake a Preliminary Stage 1 Environmental Site Assessment (ESA) for the proposed Riverbank Primary School development at 25 Wentworth Street, The Ponds, NSW. The site location is shown on Figure 1 and the assessment was confined to the site boundaries as shown on Figure 2. The proposed development area is referred to as ‘the site’ in this report. A geotechnical investigation was undertaken in conjunction with this assessment by JK Geotechnics. The results of the investigation are presented in a separate report (Ref. 29695ZHrpt, dated 20 September 2016). This report should be read in conjunction with the JK report.

1.1 Proposed Development Details

At this preliminary stage EIS understand that the proposed development includes the construction of a new school building and other facilities. Proposed excavation details have not been provided at this preliminary stage.

1.2 Objectives

The assessment objectives are to: Assess the potential for site contamination; Assess the potential risk the contamination may pose to the site receptors; Provide a preliminary waste classification for the off-site disposal of soil; and Comment on the suitability of the site for the proposed development.

1.3 Scope of Work

The assessment was undertaken generally in accordance with an EIS proposal (Ref: EP43116KD) of 10 August 2016 and written acceptance from the client of 17 August 2016. The scope of work included the following: Review of site information including background and site history information; A site inspection to identify Areas of Environmental Concern (AEC); Preparation of a Conceptual Site Model (CSM); Design and implementation of a sampling, analysis and quality plan (SAQP); Interpretation of the analytical results against the adopted Site Assessment Criteria (SAC); Data Quality Assessment; Undertake a Tier 1 Risk Assessment and review of CSM; and Preparation of a report presenting the results of the assessment.

Page 9: REPORT - City of Blacktown · 2017-11-22 · 25 WENTWORTH STREET, THE PONDS, NSW 23 SEPTEMBER 2016 REF: E29696KDrpt. Document Distribution Record ... (120mg/kg) was encountered in

Preliminary Stage 1 Environmental Site Assessment Riverbank Primary School – 25 Wentworth Street, The Ponds, NSW EIS Ref: E29696KDrpt

P a g e 2

The report was prepared with reference to regulations/guidelines outlined in the table below. Individual guidelines are also referenced within the text of the report.

Table 1-1: Guidelines

Guidelines/Regulations

Contaminated Land Management Act 19973 State Environmental Planning Policy No.55 – Remediation of Land 19984 Guidelines for Consultants Reporting on Contaminated Sites 20115 Guidelines for the NSW Site Auditor Scheme, 2nd Edition 20066 National Environmental Protection (Assessment of Site Contamination) Measure 1999 as amended 20137

3 NSW Government Legislation, (1997), Contaminated Land Management Act 1997. (referred to as CLM Act 1997) 4 NSW Government, (1998), State Environmental Planning Policy No. 55 – Remediation of Land. (referred to as SEPP55) 5 NSW Office of Environment and Heritage (OEH), (2011), Guidelines for Consultants Reporting on Contaminated Sites.

(referred to as Reporting Guidelines 2011) 6 NSW DEC, (2006), Guidelines for the NSW Site Auditor Scheme, 2nd ed. (referred to as Site Auditor Guidelines 2006) 7 National Environment Protection Council (NEPC), (2013), National Environmental Protection (Assessment of Site

Contamination) Measure 1999 (as amended 2013). (referred to as NEPM 2013)

Page 10: REPORT - City of Blacktown · 2017-11-22 · 25 WENTWORTH STREET, THE PONDS, NSW 23 SEPTEMBER 2016 REF: E29696KDrpt. Document Distribution Record ... (120mg/kg) was encountered in

Preliminary Stage 1 Environmental Site Assessment Riverbank Primary School – 25 Wentworth Street, The Ponds, NSW EIS Ref: E29696KDrpt

P a g e 3

2 SITE INFORMATION

2.1 Background

2.1.1 Contamination Investigation (NSW Public Works, July 20138)

NSW Public Works undertook a Contamination Investigation for the development of a new school at The Ponds. The NSW Public Works investigation area included part of the subject site area. The subject site area is referred to as the public school site within the NSW Public Works report. However, EIS note that the actual site area reserved for the current proposed public school development (EIS investigation area shown in Figure 2) is slightly different to that described in the NSW Public Works report. NSW Public Works indicated that the contamination investigation essentially combines the Stage 1 and Stage 2 site investigations, and was prepared generally in accordance with the guidelines for Consultants Reporting on Contaminated Sites (NSW OEH, 2011). The following potentially historically contaminating activities were identified within the investigation:

Stockpiling of material; Former above ground fuel storage tank (to the west of the subject site); and Former agricultural activity including market gardening and chicken farming.

NSW Public Works identified the following contaminants of potential concern (CoPC): heavy metals, TPH, BTEX, PAHs, OCPs, PCBs, Asbestos. Approximately twelve (12) boreholes or testpits were drilled/excavated within the proposed public school site area (the subject site). Fill material was encountered between the depths of approximately 0.2m and 1.1m below ground level. Elevated concentration of CoPC were not identified within the proposed public school development area. The following contamination issues were identified generally within north-west and west section of the NSW Public Works investigation area:

Asbestos Containing Materials (ACM) in the form of fibre cement fragments; Elevated concentrations of PAHs (including benzo(a)pyrene) above the adopted SAC; and Elevated concentrations of TRH associated with a former above ground fuel storage tank and

a small stockpile of fill material. NSW Public Works concluded that the site (High School and Public School) was suitable for the proposed development provided that a number of recommendations were implemented, including further investigation and removal of ACM.

8 EIS, (2013), Contamination investigation for The Ponds Public School and High School. (Report Ref: 13-GR31A, dated 24 July 2013) (referred to as NSW Public Works Report)

Page 11: REPORT - City of Blacktown · 2017-11-22 · 25 WENTWORTH STREET, THE PONDS, NSW 23 SEPTEMBER 2016 REF: E29696KDrpt. Document Distribution Record ... (120mg/kg) was encountered in

Preliminary Stage 1 Environmental Site Assessment Riverbank Primary School – 25 Wentworth Street, The Ponds, NSW EIS Ref: E29696KDrpt

P a g e 4

EIS have not been provided with additional reports/information that confirm the additional works recommended by NSW Public Works were undertaken.

2.2 Site Identification

Table 2-1: Site Identification

Current Site Owner:

Minister for Education

Site Address:

25 Wentworth Street, The Ponds, NSW. Also know as 180 Riverbank Drive, The Ponds, NSW.

Lot & Deposited Plan:

Lot 11 DP 1200915

Current Land Use:

Primary School

Proposed Land Use:

Primary School

Local Government Authority (LGA):

Blacktown City Council

Current Zoning:

R2 - Low Density Residential

Site Area (m2):

16,000

RL (AHD in m) (approx.):

55-60

Geographical Location (lat/long) (approx.):

S: -33°42’16.08” E: 150°53’55.99”

Site Location Plan:

Figure 1

Sample Location Plan:

Figure 2

2.3 Site Location and Regional Setting

The site is located in a predominantly residential area of The Ponds. The site is located at the north-west corner of the junction of Wentworth Street and Riverbank Drives.

2.4 Topography

The site is located within an area of slightly undulating topography. The immediate regional and site topography falls to the north-west at a slope of approximately 1° to 3°.

Page 12: REPORT - City of Blacktown · 2017-11-22 · 25 WENTWORTH STREET, THE PONDS, NSW 23 SEPTEMBER 2016 REF: E29696KDrpt. Document Distribution Record ... (120mg/kg) was encountered in

Preliminary Stage 1 Environmental Site Assessment Riverbank Primary School – 25 Wentworth Street, The Ponds, NSW EIS Ref: E29696KDrpt

P a g e 5

2.5 Site Inspection

A walkover inspection of the site was undertaken by EIS on 1 September 2016. The inspection was limited to accessible areas of the site and immediate surrounds. An internal inspection of buildings was not undertaken. Selected site photographs obtained during the inspection are attached in the appendices. At the time of the site inspection the site was primarily occupied by a relatively flat grass covered playing field. The playing field appeared to have been cut to a maximum depth of approximately 1.5m into the hillside in the south and west section of the site, creating a batter slope that fell to the playing field at a slope of between approximately 15° and 25°. The batter slopes were also covered by grass. An asphaltic concrete (AC) surfaced car park and concrete driveway was located in the east section of the site. An AC surfaced basketball court, AC surfaced outdoor play areas, several one and two storey brick and clad buildings as well as several demountable classroom buildings were located in the north section of the site. A number of small trees and shrubs were scattered along the perimeter of the site. The vegetation at this site appeared to be healthy and showed no visible signs of stress. Potential asbestos containing material (ACM) including fibre cement fragments were not observed on the surface of the site during the site inspection.

2.6 Surrounding Land Use

The immediate surrounds included the following landuses: North – Riverbank Public School; South – Residential, beyond Riverbank Drive; East – Residential, beyond Wentworth Street; and West – Residential, beyond Riverbank Drive.

2.7 Underground Services

The ‘Dial Before You Dig’ (DBYD) plans were reviewed for the assessment. Major services which could pose a potential migratory pathway were not identified at the site.

Page 13: REPORT - City of Blacktown · 2017-11-22 · 25 WENTWORTH STREET, THE PONDS, NSW 23 SEPTEMBER 2016 REF: E29696KDrpt. Document Distribution Record ... (120mg/kg) was encountered in

Preliminary Stage 1 Environmental Site Assessment Riverbank Primary School – 25 Wentworth Street, The Ponds, NSW EIS Ref: E29696KDrpt

P a g e 6

2.8 Regional Geology

A review of the regional geological map of Penrith (19919) indicates that the site is underlain by Bringelly Shale of the Wianamatta Group, which typically consists of shale, carbonaceous claystone, claystone, laminite, fine to medium grained lithic sandstone, rare coal and tuff.

2.9 Acid Sulfate Soil (ASS) Risk

The site is not located in an ASS risk area.

2.10 Hydrogeology

A review of groundwater bore records was undertaken by Lotsearch. The search indicated that there were two registered bore within a radius of approximately 1km of the site. Copies of the records are attached in the Lotsearch report in the appendices. A brief summary of relevant information is presented below: Table 2-2: Summary of Groundwater Bores

Reference Distance from

Site (m)

(approx.)

Direction &

Gradient

from Site

Final

Depth

(m)

Standing

Water Level

(SWL) (m)

Registered

Purpose

Potential

Receptor

GW100443 635 West, Cross and up

gradient

17.40 4.5 Monitoring No

GW108246 969 South-east, Cross and up

gradient

150 6.5 Monitoring No

A review of the regional geology and groundwater bore information indicates that the subsurface condition at the site is expected to consist of residual soils overlying relatively shallow bedrock. The occurrence of groundwater that could be utilised as a resource for beneficial use is considered to be relatively low under such conditions. A perched aquifer in the subsurface may be present.

2.11 Receiving Water Bodies

Surface water bodies were not identified in the immediate vicinity of the site. The closest surface water body is Bennett Creek located approximately 730m to the west of the site. This water body can be a potential receptor, however this is considered to be unlikely considering the distance from the site and regional geology.

9 Department of Mineral Resources, (1991), 1:100,000 Geological Map of Penrith (Series 9030).

Page 14: REPORT - City of Blacktown · 2017-11-22 · 25 WENTWORTH STREET, THE PONDS, NSW 23 SEPTEMBER 2016 REF: E29696KDrpt. Document Distribution Record ... (120mg/kg) was encountered in

Preliminary Stage 1 Environmental Site Assessment Riverbank Primary School – 25 Wentworth Street, The Ponds, NSW EIS Ref: E29696KDrpt

P a g e 7

3 SITE HISTORY INFORMATION

3.1 Review of Historical Aerial Photographs

Historical aerial photographs provided by Lotsearch were reviewed for the assessment. Copies of selected photographs are attached in the appendices within the Lotsearch report. A summary of the relevant information is presented in the following table: Table 3-1: Summary of Historical Aerial Photos

Year Details

1956

The site appeared to be vacant, grassed and most likely used for agricultural purposes (grazing). What appeared to be an agricultural fence was located in the west section of the site and extended from the north to the south. The immediate site surrounds appeared to be used for agricultural purposes (grazing). What appeared to be surface water dams were located approximately 150m to the south and to the north of the site.

1961

The site generally appeared similar to the 1956 aerial photograph. However, what appeared be an agricultural fence extended from the fence in the west section of the site, through the site and offsite to the east. The west section of the site appeared to be used as a market garden/cropping. The immediate site surrounds appeared similar to the 1956 aerial photograph. However, the immediate area appeared to be occupied by market garden/cropping.

1965

The site and immediate site surrounds generally appeared similar the 1961 aerial photograph.

1970

The site and immediate site surrounds generally appeared similar the 1965 aerial photograph.

1982

The site generally appeared similar to the 1970 aerial photograph. However, the agricultural fencing and market gardens/cropping appeared to have been removed from the site. What appeared to be an oval shaped horse race/training track crossed the site at the west site boundary. The immediate site surrounds generally appeared similar to the 1970 aerial photograph. However, the horse race/training track extended further to the west of the site. The track appeared to be associated with a number of sheds further to the west of the site. These sheds may have been used as horse stables.

1991

The site generally appeared similar the 1982 aerial photograph. However, native vegetation cover in the north-east of the site appeared to have increased. The immediate site surrounds generally appeared similar the 1982 aerial photograph.

Page 15: REPORT - City of Blacktown · 2017-11-22 · 25 WENTWORTH STREET, THE PONDS, NSW 23 SEPTEMBER 2016 REF: E29696KDrpt. Document Distribution Record ... (120mg/kg) was encountered in

Preliminary Stage 1 Environmental Site Assessment Riverbank Primary School – 25 Wentworth Street, The Ponds, NSW EIS Ref: E29696KDrpt

P a g e 8

Year Details

2004

The site and immediate site surrounds generally appeared similar to the 1991 aerial photograph. However, the horse race/training track appeared to have been removed. The density of market gardens to the south-west and west of the site appeared to have increased.

2009

The site and immediate site surrounds generally appeared similar to the 2004 aerial photograph.

2014

The site appeared to have been cleared of all vegetation including grass cover. The immediate site surrounds to the north, east and south appeared to have had all vegetation cleared and be a part of a large subdivision, primarily for residential purposes. A number of hardstand roads had been constructed.

3.2 Review of Blacktown Council Information

3.2.1 Publically Accessible Information

A search of council records is currently underway. The results will be summarised in a separate letter when received.

3.2.2 Section 149 Planning Certificate

The s149 (2 and 5) planning certificate was reviewed for the assessment. A copy of the certificate is attached in the appendices. A summary of the relevant information is outlined below: a) The site is not located in an area of ecological significance. b) The site is not deemed to be:

significantly contaminated; subject to a management order; subject of an approved voluntary management proposal; or subject to an on-going management order under the provisions of the CLM Act 1997;

c) The site is not subject to a Site Audit Statement (SAS); d) Council has not adopted a policy that restricts development of the subject land by reason of

likelihood of the occurrence of acid sulfate soils; and e) The site is identified as flood prone land. Council may require a more detailed flood study to be

undertaken by the applicant to confirm the extent on the flood affectation on the land. f) The site does not contain heritage items under the protection of an environmental planning

instrument.

Page 16: REPORT - City of Blacktown · 2017-11-22 · 25 WENTWORTH STREET, THE PONDS, NSW 23 SEPTEMBER 2016 REF: E29696KDrpt. Document Distribution Record ... (120mg/kg) was encountered in

Preliminary Stage 1 Environmental Site Assessment Riverbank Primary School – 25 Wentworth Street, The Ponds, NSW EIS Ref: E29696KDrpt

P a g e 9

3.3 NSW EPA Records

The NSW EPA records available online were reviewed for the assessment. Copies of relevant documents are attached in the appendices within the Lotsearch report. A summary of the relevant information is provided in the following table: Table 3-2: Summary of NSW EPA Online Records

Source Details

CLM Act 1997 There were no notices for the site under Section 58 of the Act.

NSW EPA List of Contaminated Sites

The site is not listed on the NSW EPA register.

POEO Register There were no current notices for the site on the POEO register.

3.4 Summary of Site History Information

Based on the information above the site appears to have been occupied for agricultural purposes including grazing and market gardens since prior to 1956 to approximately 2014.

3.5 Integrity of Site History Information

The majority of the site history information has been obtained from government organisations as outlined above. The veracity of the information from these sources is considered to be relatively high. A certain degree of information loss can be expected given the age of the development; gap between aerial photographs; and lack of detailed information prior to the 1900’s.

Page 17: REPORT - City of Blacktown · 2017-11-22 · 25 WENTWORTH STREET, THE PONDS, NSW 23 SEPTEMBER 2016 REF: E29696KDrpt. Document Distribution Record ... (120mg/kg) was encountered in

Preliminary Stage 1 Environmental Site Assessment Riverbank Primary School – 25 Wentworth Street, The Ponds, NSW EIS Ref: E29696KDrpt

P a g e 10

4 CONCEPTUAL SITE MODEL (CSM)

The AEC identified below are based on a review of the site and site history information outlined previously in this report. The AEC can either be a point source or widespread areas impacted by current or historical activities. Table 4-1: CSM

AEC / Extent CoPC Potential Exposure Pathway and Media

Potential Receptors

Fill Material – Entire Site The site appears to have been historically filled to achieve existing levels. The fill may have been imported from various sources and can contain elevated concentrations of contaminants. EIS have not been provided with additional reports/information that confirm the additional works recommended by NSW Public Works (see Section 2.1) were undertaken. What appeared to be a significant amount of earthworks have occurred at the site and within the immediate site surrounds since the preparation of the NSW Public Works Contamination Investigation report.

Heavy metals, TRH, BTEXN, PAHs, OCPs, OPPs, PCB and asbestos

Direct Contact – dermal contact; ingestion; and inhalation of dust, vapours and fibres. Media - soil, groundwater and vapour.

Human Receptors – Site occupants; visitors; development and maintenance workers; and off-site occupants. Environmental Receptors – Flora and fauna at the site and immediate surrounds; receiving water bodies; others identified in the above sections.

Use of Pesticides – The site has been used as market gardens or agricultural purposes between at least 1956 to approximately 2014. The use of pesticides during this period could have resulted in potential contamination.

Heavy metals, OCPs, and OPPs

Direct Contact – dermal contact; ingestion; and inhalation of dust. Media – soil and groundwater.

Human Receptors – As Above Environmental Receptors – As Above

Page 18: REPORT - City of Blacktown · 2017-11-22 · 25 WENTWORTH STREET, THE PONDS, NSW 23 SEPTEMBER 2016 REF: E29696KDrpt. Document Distribution Record ... (120mg/kg) was encountered in

Preliminary Stage 1 Environmental Site Assessment Riverbank Primary School – 25 Wentworth Street, The Ponds, NSW EIS Ref: E29696KDrpt

P a g e 11

5 SAMPLING, ANALYSIS AND QUALITY PLAN

5.1 Data Quality Objectives (DQO)

The NEPM 2013 defines the DQO process as a seven step iterative planning tool used to define the type, quantity and quality of data needed to inform decisions relating to the environmental condition of the site. The DQO process is detailed in the US EPA document Guidance on systematic planning using the data

quality process (200610) and the NSW DEC document The Guidelines for the NSW Site Auditor Scheme,

2nd Edition (200611). These seven steps are applicable to this assessment as summarised in the table below: Table 5-1: DQOs – Seven Steps

Step Input

State the Problem

The CSM has identified AEC at the site which may pose a risk to the site receptors. An intrusive investigation is required to assess the risk and comment on the suitability of the site for the proposed development or intended landuse. The EIS project team will include: project principal (PP) and/or project associate (PA); project engineer/scientist (PE); and field engineer/scientist (FE) as outlined in the quality recorded checklist maintained for the project in accordance with our ISO 9001 certification.

Identify the Decisions/ Goal of the Study

The data collection is project specific and has been designed based on the following information: Review of site information including site history; AEC, PCC, receptors, pathways and medium identified in the CSM; Development of Site Assessment Criteria (SAC) for each media; and The use of decision statements outlined below:

1. Are any of the results above the SAC? 2. Has the extent of the contamination been identified? 3. Do the contaminants pose a risk to the receptors? 4. Is further investigation required? 5. Is the site suitable for the proposed landuse?

The data will be assessed in the following manner: 1) Statistical analysis will be used to assess the laboratory data against the SAC. The following

criteria will be adopted: The 95% Upper Confidence Limit (UCL) value of the arithmetic mean concentration

of each contaminant should be less than the SAC; The standard deviation (SD) of the results must be less than 50% of the SAC; and

10 US EPA, (2006), Guidance on Systematic Planning using the Data Quality Objectives Process. (referred to as US EPA 2006) 11 NSW DEC, (2006), Guidelines for the NSW Site Auditor Scheme, 2nd ed. (referred to as Site Auditor Guidelines 2006)

Page 19: REPORT - City of Blacktown · 2017-11-22 · 25 WENTWORTH STREET, THE PONDS, NSW 23 SEPTEMBER 2016 REF: E29696KDrpt. Document Distribution Record ... (120mg/kg) was encountered in

Preliminary Stage 1 Environmental Site Assessment Riverbank Primary School – 25 Wentworth Street, The Ponds, NSW EIS Ref: E29696KDrpt

P a g e 12

Step Input

No single value exceeds 250% of the relevant SAC. 2) Statistical calculations will not be undertaken if all results are below the SAC; and 3) Statistical calculations will not be undertaken on the following:

Health Screening Levels (HSLs) – elevated point source contamination associated with petroleum hydrocarbons can pose a vapour risk to receptors.

Identify Information Inputs

The following information will be collected: Soil samples based on subsurface conditions; Fibre Cement Fragments (FCF) in the vicinity of the sampling points (if visible); The SAC will be designed based on the criteria outlined in NEPM 2013. Other criteria will

be used as required and detailed in this report; The samples will be analysed in accordance with the analytical methods outlined in NEPM

2013; Field screening information (i.e. PID data, presence of hydrocarbons etc.) will be taken into

consideration in selecting the analytical schedule; and Any additional information that may arise during the field work will also be used as data

inputs.

Define the Study Boundary

The sampling will be confined to the site boundaries as shown in Figure 2. Fill has been identified as an AEC. The source of fill has not been established. Fill is considered to be heterogeneous material with CoPC occurring in random pockets or layers. The presence of PCC in between sampling points cannot be measured. The areas excluded from the investigation are outlined in the data gaps.

Develop the analytical approach (or decision rule)

The following acceptable limits will be adopted for the data quality assessment: The following acceptance criteria will be used to assess the RPD results:

results > 10 times the practical quantitation limit (PQL), RPDs < 50% are acceptable; results between 5 and 10 times PQL, RPDs < 75% are acceptable; results < 5 times PQL, RPDs < 100% are acceptable; and An explanation is provided if RPD results are outside the acceptance criteria.

The following acceptance criteria will be used to assess the primary laboratory QA/QC results. Non-compliance to be documented: RPDs:

- Results that are < 5 times the PQL, any RPD is acceptable; and - Results > 5 times the PQL, RPDs between 0-50% are acceptable;

LCS recovery and matrix spikes: - 70-130% recovery acceptable for metals and inorganics; - 60-140% recovery acceptable for organics; and - 10-140% recovery acceptable for VOCs;

Surrogate spike recovery:

Page 20: REPORT - City of Blacktown · 2017-11-22 · 25 WENTWORTH STREET, THE PONDS, NSW 23 SEPTEMBER 2016 REF: E29696KDrpt. Document Distribution Record ... (120mg/kg) was encountered in

Preliminary Stage 1 Environmental Site Assessment Riverbank Primary School – 25 Wentworth Street, The Ponds, NSW EIS Ref: E29696KDrpt

P a g e 13

Step Input

- 60-140% recovery acceptable for general organics; and - 10-140% recovery acceptable for VOCs;

Blanks: All less than PQL.

Specify the performance or acceptance criteria

NEPM 2013 defines decision errors as ‘incorrect decisions caused by using data which is not

representative of site conditions’. This can arise from errors during sampling or analytical testing. A combination of these errors is referred to as ‘total study error’. The study error can be managed through the correct choice of sample design and measurement. Decision errors can be controlled through the use of hypothesis testing. The test can be used to show either that the baseline condition is false or that there is insufficient evidence to indicate that the baseline condition is false. The null hypothesis is an assumption that is assumed to be true in the absence of contrary evidence. In this case, for example, the CoPC identified in the CSM is considered to pose a risk to receptors unless proven not to. The null hypothesis has been adopted for this assessment.

Optimise the design for obtaining data

The most resource-effective design will be used in an optimum manner to achieve the assessment objectives.

5.2 Soil Sampling Plan and Methodology

The soil sampling plan and methodology adopted for this assessment is outlined in the table below: Table 5-2: Soil Sampling Plan and Methodology

Aspect Input

Sampling Density

The NSW EPA Contaminated Sites Sampling Design Guidelines (199512) recommend a sampling density for an environmental assessment based on the size of the investigation area. The guideline provides a minimum number of sampling points required for the investigation on a systematic sampling pattern. The guidelines recommend sampling from a minimum of twenty six (26) evenly spaced sampling points for this site with an area of approximately 16,000m2. Samples for this investigation were obtained from nine (9) sampling points as shown on the attached Figure 2. This density is approximately 34% of the minimum sampling density recommended by the EPA.

12 NSW EPA, (1995), Contaminated Sites Sampling Design Guidelines. (referred to as EPA Sampling Design Guidelines 1995)

Page 21: REPORT - City of Blacktown · 2017-11-22 · 25 WENTWORTH STREET, THE PONDS, NSW 23 SEPTEMBER 2016 REF: E29696KDrpt. Document Distribution Record ... (120mg/kg) was encountered in

Preliminary Stage 1 Environmental Site Assessment Riverbank Primary School – 25 Wentworth Street, The Ponds, NSW EIS Ref: E29696KDrpt

P a g e 14

Aspect Input

Sampling Plan The sampling locations were nominated by the structural engineer for the JK Geotechnics assessment.

Exclusion Areas (Data Gaps)

Sampling was not undertaken in inaccessible areas of the site such as beneath existing buildings. These areas have been excluded from the investigation.

Sampling Equipment

Soil samples were obtained on 27 August 2016 in accordance with the standard sampling procedure (SSP) attached in the appendices. Sampling locations were set out using a tape measure. In-situ sampling locations were cleared for underground services by an external contractor prior to sampling as outlined in the SSP. The sample locations were drilled using a hydraulically operated drill rig equipped with spiral flight augers. Soil samples were obtained from a Standard Penetration Test (SPT) sampler or directly from the auger when conditions did not allow use of the SPT sampler.

Sample Collection and Field QA/QC

Soil samples were collected from the fill and natural profiles based on field observations. The sampling depths are shown on the logs attached in the appendices. Additional samples were obtained when relatively deep fill (>0.5m) was encountered. Samples were also obtained when there was a distinct change in lithology or based on the observations made during the investigation. During sampling, soil at selected depths was split into primary and duplicate samples for field QA/QC analysis. Samples were placed in glass jars with plastic caps and teflon seals with minimal headspace. Samples for asbestos analysis were placed in zip-lock plastic bags. Sampling personnel used disposable nitrile gloves during sampling activities. The samples were labelled with the job number, sampling location, sampling depth and date in accordance with the SSP.

Field PID Screening for VOCs

A portable Photoionisation Detector (PID) was used to screen the samples for the presence of VOCs and to assist with selection of samples for hydrocarbon analysis. The sensitivity of the PID is dependent on the organic compound and varies for different mixtures of hydrocarbons. Some compounds give relatively high readings and some can be undetectable even though present in identical concentrations. The portable PID is best used semi-quantitatively to compare samples contaminated by the same hydrocarbon source. The PID is calibrated before use by measurement of an isobutylene standard gas. All the PID measurements are quoted as parts per million (ppm) isobutylene equivalents.

Page 22: REPORT - City of Blacktown · 2017-11-22 · 25 WENTWORTH STREET, THE PONDS, NSW 23 SEPTEMBER 2016 REF: E29696KDrpt. Document Distribution Record ... (120mg/kg) was encountered in

Preliminary Stage 1 Environmental Site Assessment Riverbank Primary School – 25 Wentworth Street, The Ponds, NSW EIS Ref: E29696KDrpt

P a g e 15

Aspect Input

PID screening for VOCs was undertaken on soil samples using the soil sample headspace method. VOC data was obtained from partly filled zip-lock plastic bags following equilibration of the headspace gases.

Decontami-nation and Sample Preservation

The decontamination procedure adopted during sampling is outlined in the SSP. Where applicable, the sampling equipment was decontaminated using a scrubbing brush and potable water and Decon 90 solution (phosphate free detergent) followed by rinsing with potable water. Soil samples were preserved by immediate storage in an insulated sample container with ice in accordance with the SSP. On completion of the fieldwork, the samples were delivered in the insulated sample container to a NATA registered laboratory for analysis under standard COC procedures.

5.3 Analytical Schedule

The analytical schedule is outlined in the following table: Table 5-3: Analytical Schedule

CoPC Fill Samples

Natural Soil Samples

Heavy Metals

9 6

TRH/BTEXN

9 6

PAHs

9 6

OCPs/OPPs

8 2

PCBs

8 2

Asbestos

9 1 (natural surface sample)

5.3.1 Laboratory Analysis

The samples were analysed by the NATA Accredited laboratory/s using the analytical methods detailed in Schedule B(3) of NEPM 2013. Reference should be made to the laboratory reports attached in the appendices for further details.

Page 23: REPORT - City of Blacktown · 2017-11-22 · 25 WENTWORTH STREET, THE PONDS, NSW 23 SEPTEMBER 2016 REF: E29696KDrpt. Document Distribution Record ... (120mg/kg) was encountered in

Preliminary Stage 1 Environmental Site Assessment Riverbank Primary School – 25 Wentworth Street, The Ponds, NSW EIS Ref: E29696KDrpt

P a g e 16

Table 5-4: Laboratory Details Samples Laboratory

Report Reference

All primary samples and field QA/QC samples including (intra-laboratory duplicates)

Envirolab Services Pty Ltd NSW, NATA Accreditation Number – 2901 (ISO/IEC 17025 compliance)

152640

Page 24: REPORT - City of Blacktown · 2017-11-22 · 25 WENTWORTH STREET, THE PONDS, NSW 23 SEPTEMBER 2016 REF: E29696KDrpt. Document Distribution Record ... (120mg/kg) was encountered in

Preliminary Stage 1 Environmental Site Assessment Riverbank Primary School – 25 Wentworth Street, The Ponds, NSW EIS Ref: E29696KDrpt

P a g e 17

6 SITE ASSESSMENT CRITERIA (SAC)

The SAC adopted for the assessment is outlined in the table below. The SAC has been derived from the NEPM 2013 and other guidelines as applicable. The guideline values for individual contaminants are presented in the attached report tables. Table 6-1: SAC Adopted for this Investigation

Guideline Applicability

Health Investigation Levels (HILs) (NEPM 2013)

The HIL-A criteria for ‘residential with accessible soil’ have been adopted for this assessment.

Health Screening Levels (HSLs) (NEPM 2013)

The HSL-A criteria for ‘residential with accessible soil’ have been adopted for this assessment.

Ecological Assessment Criteria (EAC) (NEPM 2013)

A preliminary screening of ecological risk has been undertaken based on the limited information available at this stage. The EAC criteria for ‘urban residential and public open space (URPOS)’ exposure setting have been adopted. The EILs for selected metals have been derived as follows: The ABC values for low traffic (25th percentiles) areas for old suburbs of NSW

published in Olszowy et. al. (199513) has been adopted for this assessment; and Soil parameters: pH; cation exchange capacity (CEC); and clay content have not

been analysed for the assessment. On this basis, the EIL and ESL calculations have taken the ‘worst case’ scenario in order to generate the EAC.

Management Limits for TRH & Direct Contact Limits for TRH (NEPM 2013)

These guidelines have only been used after considering the relevant HSLs and ESLs for adverse effects of TRH contamination where necessary.

Asbestos in Soil The ‘presence/absence’ of asbestos in soil has been adopted as the assessment criterion for the Preliminary Site Investigation (PSI).

13 Olszowy, H., Torr, P., and Imray, P., (1995), Trace Element Concentrations in Soils from Rural and Urban Areas of Australia.

Contaminated Sites Monograph Series No. 4. Department of Human Services and Health, Environment Protection Agency, and South Australian Health Commission.

Page 25: REPORT - City of Blacktown · 2017-11-22 · 25 WENTWORTH STREET, THE PONDS, NSW 23 SEPTEMBER 2016 REF: E29696KDrpt. Document Distribution Record ... (120mg/kg) was encountered in

Preliminary Stage 1 Environmental Site Assessment Riverbank Primary School – 25 Wentworth Street, The Ponds, NSW EIS Ref: E29696KDrpt

P a g e 18

7 INVESTIGATION RESULTS

7.1 Subsurface Conditions

A summary of the subsurface conditions encountered during the investigation is presented in the table below. Reference should be made to the borehole logs attached in the appendices for further details. Table 7-1: Summary of Subsurface Conditions

Profile Description (m in bgl)

Fill Fill material was encountered at the surface in all boreholes and extended to depths of approximately 0.1m (BH6) to 1.0m (BH1). The fill typically comprised of silty clay or silty sand and contained inclusions of igneous gravel in some boreholes.

Natural Soil

Natural silty clay was encountered beneath the fill material in boreholes BH1, BH3, BH6, BH7 and BH9.

Bedrock

Shale and/or sandstone bedrock was encountered beneath the natural clay or fill material in all boreholes at depths of between approximately 0.3m (BH2 and BH5) and 1.8m (BH9) on first contact.

Groundwater Groundwater seepage was not encountered in the boreholes during drilling. All boreholes remained dry on completion of drilling and a short time after.

7.2 Field Screening

A summary of the field screening results are presented in the table below. Table 7-2: Summary of Field Screening

Aspect Details (m in bgl)

PID Screening of Soil Samples for VOCs

PID soil sample headspace readings are presented in attached report tables and the COC documents attached in the appendices. All results were 0 ppm equivalent isobutylene which indicates a lack of PID detectable VOCs.

Page 26: REPORT - City of Blacktown · 2017-11-22 · 25 WENTWORTH STREET, THE PONDS, NSW 23 SEPTEMBER 2016 REF: E29696KDrpt. Document Distribution Record ... (120mg/kg) was encountered in

Preliminary Stage 1 Environmental Site Assessment Riverbank Primary School – 25 Wentworth Street, The Ponds, NSW EIS Ref: E29696KDrpt

P a g e 19

7.3 Soil Laboratory Results

The soil laboratory results are compared to the relevant SAC in the attached report tables. A summary of the results assessed against the SAC is presented below. Table 7-3: Summary of Soil Laboratory Results

Analyte Results Compared to SAC

Heavy Metals HILs:

All heavy metal results were below the HIL-A criteria. EILs:

An elevated concentration of zinc was encountered in one fill soil sample above the EIL-URPOS as outlined below:

Analyte Sample/Depth Description EIL Concentration

zinc BH4 (0-0.2m) Fill 94mg/kg 120mg/kg WC: All heavy metal results were less than the CT1 criteria.

TRH HSLs:

All TRH results were below the HSL-A criteria.

ESLs:

All TRH results were below the ESL-URPOS criteria. WC: All TRH results were less than the relevant SCC1 criteria.

BTEXN HSLs:

All BTEXN results were below the HSL-A criteria. ESLs:

All BTEXN results were below the ESL-URPOS criteria. WC: All BTEX results were less than the relevant CT1 criteria.

PAHs HILs:

All PAH results were below the HIL-A criteria. HSLs:

All naphthalene results were below the HSL-A criteria. ESLs:

All benzo(a)pyrene results were below the ESL-URPOS criteria.

Page 27: REPORT - City of Blacktown · 2017-11-22 · 25 WENTWORTH STREET, THE PONDS, NSW 23 SEPTEMBER 2016 REF: E29696KDrpt. Document Distribution Record ... (120mg/kg) was encountered in

Preliminary Stage 1 Environmental Site Assessment Riverbank Primary School – 25 Wentworth Street, The Ponds, NSW EIS Ref: E29696KDrpt

P a g e 20

Analyte Results Compared to SAC

EILs:

All naphthalene results were below the EIL-URPOS criteria. WC: All PAH results were less than the relevant CT1 and SCC1 criteria.

OCPs & OPPs HILs:

All OCP and OPP results were below the HIL-A criteria. EILs:

All DDT results were below the EIL-URPOS criteria. WC: All OCP and OPP results were less than the relevant CT1 and SCC1 criteria.

PCBs HILs:

All PCB results were below the HIL-A criterion. WC: All PCB results were less than the SCC1 criterion.

Asbestos Asbestos was not detected in the soil samples analysed for the investigation.

Page 28: REPORT - City of Blacktown · 2017-11-22 · 25 WENTWORTH STREET, THE PONDS, NSW 23 SEPTEMBER 2016 REF: E29696KDrpt. Document Distribution Record ... (120mg/kg) was encountered in

Preliminary Stage 1 Environmental Site Assessment Riverbank Primary School – 25 Wentworth Street, The Ponds, NSW EIS Ref: E29696KDrpt

P a g e 21

8 DATA QUALITY ASSESSMENT

As part of the data quality assessment the following data quality indicators (DQIs) were assessed: precision, accuracy, representativeness, completeness and comparability as outlined in the table below. Reference should be made to the appendices for an explanation of the individual DQI. Table 8-1: Assessment of DQIs

Completeness

Field Considerations: The investigation was designed as a preliminary screening and sampling was confined to accessible areas

of the site (see Figure 2); Samples were obtained from various depths based on the subsurface conditions encountered at the

sampling locations. All samples were recorded on the borehole logs. All sampling points are shown on the attached Figure 2;

The investigation was undertaken by trained staff in accordance with the SSP; and Documentation maintained during the field work is attached in the appendices where applicable.

Laboratory Considerations: Selected samples were analysed for a range of CoPC. For the preliminary screening samples were not

analysed for VOCs; All samples were analysed by a NATA registered laboratory in accordance with the analytical methods

outlined in NEPM 2013; Appropriate analytical methods and PQLs were used by the laboratory; and Appropriate sample preservation, handling, holding time and COC procedures were adopted for the

investigation.

Comparability

Field Considerations: The investigation was undertaken by trained staff in accordance with the SSP; The climate conditions encountered during the field work were noted on the site description record

maintained in the job file; and Consistency was maintained during sampling in accordance with the SSP.

Laboratory Considerations: All samples were analysed in accordance with the analytical methods outlined in NEPM 2013; Appropriate PQLs were used by the laboratory for all analysis (other than those outlined above); All primary, intra-laboratory duplicate and other QA/QC samples were analysed by the same laboratory;

and The same units were used by the laboratory for all of the analysis.

Representativeness

Field Considerations:

Page 29: REPORT - City of Blacktown · 2017-11-22 · 25 WENTWORTH STREET, THE PONDS, NSW 23 SEPTEMBER 2016 REF: E29696KDrpt. Document Distribution Record ... (120mg/kg) was encountered in

Preliminary Stage 1 Environmental Site Assessment Riverbank Primary School – 25 Wentworth Street, The Ponds, NSW EIS Ref: E29696KDrpt

P a g e 22

The investigation was designed to obtain appropriate media encountered during the field work as outlined in the SAQP. Dust and/or vapour sampling was outside the scope of this assessment; and

All media based on the subsurface conditions encountered during the field work was sampled. Laboratory Considerations: All samples were analysed in accordance with the SAQP.

Precision

Field Considerations: The investigation was undertaken in accordance with the SSP.

Laboratory Considerations: Analysis of field QA/QC samples including intra-laboratory duplicates; The field QA/QC frequency adopted for the investigation is outlined below; Calculation of the Relative Percentage Difference (RPD) from the primary and duplicate results (the RPD

calculation equation is outlined in the attached appendices); Assessment of RPD results against the acceptance criteria is outlined in Section 5.1.

Intra-laboratory RPD Results: Soil Samples at a frequency of 7% of the primary samples: Dup1 is a soil duplicate of primary sample BH9 (0-0.2m).

The intra-laboratory results are presented in the attached report tables. The results indicated that field precision was acceptable. Accuracy

Field Considerations: The investigation was undertaken in accordance with the SSP.

Laboratory Considerations: The analytical quality assessment adopted by the laboratory was in accordance with the NATA and NEPM

2013 requirements as outlined in the analytical reports; and A review of the report indicates that the analytical results were generally within the acceptance criteria

adopted by the laboratory.

Page 30: REPORT - City of Blacktown · 2017-11-22 · 25 WENTWORTH STREET, THE PONDS, NSW 23 SEPTEMBER 2016 REF: E29696KDrpt. Document Distribution Record ... (120mg/kg) was encountered in

Preliminary Stage 1 Environmental Site Assessment Riverbank Primary School – 25 Wentworth Street, The Ponds, NSW EIS Ref: E29696KDrpt

P a g e 23

9 TIER 1 RISK ASSESSMENT AND REVIEW OF CSM

For a contaminant to represent a risk to a receptor, the following three conditions must be present: 1. Source – The presence of a contaminant; 2. Pathway – A mechanism or action by which a receptor can become exposed to the contaminant;

and 3. Receptor – The human or ecological entity which may be adversely impacted following exposure

to contamination. If one of the above components is missing, the potential for adverse risks is relatively low. The assessment has identified the following contamination issues at the site: Table 9-1: Tier 1 Risk Assessment and Review of CSM

Contaminant of

Primary

Concern

(CoPC)

Receptor and Exposure

Pathway

Discussion and Risk Rating

Zinc Environmental Receptors: Direct exposure to plants and animals

Environmental Receptors: An elevated concentration of zinc (120mg/kg) was encountered in the fill soil sample BH4 (0-0.2m) above the EIL SAC of 94mg/kg. The elevated concentrations of zinc in BH4 is not considered to pose unacceptable ecological risk for the following reasons: The site is a school in an urban setting, therefore it would

be reasonable to assume there are no endangered species on site. Sensitive environmental receptors were not identified in the Section 149 (2 & 5) Planning certificate;

The existing flora does not show any significant signs of stress;

The elevated concentrations of zinc appears to be an isolated incidence and not a widespread occurrence across the site; and

Concentrations of zinc above EIL criteria are often encountered within surface soil samples and can commonly be attributed to runoff from zinc plated metal roofing.

EIS are of the opinion that the soil CoPC pose a low risk to the receptors identified in the CSM and soil remediation is not required as a result of one soil sample above the EIL SAC.

Page 31: REPORT - City of Blacktown · 2017-11-22 · 25 WENTWORTH STREET, THE PONDS, NSW 23 SEPTEMBER 2016 REF: E29696KDrpt. Document Distribution Record ... (120mg/kg) was encountered in

Preliminary Stage 1 Environmental Site Assessment Riverbank Primary School – 25 Wentworth Street, The Ponds, NSW EIS Ref: E29696KDrpt

P a g e 24

10 WASTE CLASSIFICATION OF SOIL FOR OFF-SITE DISPOSAL

The waste classification of soil for off-site disposal is summarised in the following table: Table 10-1: Waste Classification

Site Extent / Material

Type

Classification Disposal Option

Fill material General Solid Waste (non-putrescible) (GSW)

A NSW EPA landfill licensed to receive the waste stream. The landfill should be contacted to obtain the required approvals prior to commencement of excavation.

Natural silty clay soil and shale/sandstone bedrock

Virgin excavated natural material (VENM)

VENM is considered suitable for re-use on-site, or alternatively, the information included in this report may be used to assess whether the material is suitable for beneficial reuse at another site as fill material. Alternatively, the natural material can be disposed of as VENM to a facility licensed by the NSW EPA to receive the waste stream.

Page 32: REPORT - City of Blacktown · 2017-11-22 · 25 WENTWORTH STREET, THE PONDS, NSW 23 SEPTEMBER 2016 REF: E29696KDrpt. Document Distribution Record ... (120mg/kg) was encountered in

Preliminary Stage 1 Environmental Site Assessment Riverbank Primary School – 25 Wentworth Street, The Ponds, NSW EIS Ref: E29696KDrpt

P a g e 25

11 CONCLUSION

EIS consider that the report objectives outlined in Section 1.2 have been addressed. The decision statements listed in Section 5 are addressed in the table below: Table 11-1: Decision Statements

Decision Statements

Decision Results

1. Are any of the results above the SAC?

Yes (see Section 9). One zinc result in the fill soil was above the ecological criterion.

2. Has the extent of contamination been identified?

Yes.

3. Do the contaminants pose a risk to site receptors?

No (see Section 9).

4. Is further investigation required?

No.

5. Is the site suitable for the proposed landuse?

Based on the scope of work undertaken, EIS are of the opinion that the AEC identified in the CSM pose relatively low risk to the site receptors. The site is considered to be suitable for the proposed school development. A contingency plan should be prepared to address any unexpected finds during earthworks. In the event unexpected conditions are encountered during development, all works should stop and an environmental consultant should be engaged to inspect the site and address the issue.

Page 33: REPORT - City of Blacktown · 2017-11-22 · 25 WENTWORTH STREET, THE PONDS, NSW 23 SEPTEMBER 2016 REF: E29696KDrpt. Document Distribution Record ... (120mg/kg) was encountered in

Preliminary Stage 1 Environmental Site Assessment Riverbank Primary School – 25 Wentworth Street, The Ponds, NSW EIS Ref: E29696KDrpt

P a g e 26

11.1 Regulatory Requirement

The regulatory requirements applicable for the site are outlined in the following table: Table 11-2: Regulatory Requirement

Guideline Applicability

Duty to Report Contamination 201514

The requirement to notify the NSW EPA regarding site contamination should be assessed once the results of the additional investigation work have been reviewed and a remedial strategy (if necessary) has been selected. Please note that in the event the recommendations for additional work and remediation/management are not undertaken, there may be justification to notify the EPA. EIS can be contacted for further advice regarding notification.

POEO Act 1997 Section 143 of the POEO Act 1997 states that if waste is transported to a place that cannot lawfully be used as a waste facility for that waste, then the transporter and owner of the waste are each guilty of an offence. The transporter and owner of the waste have a duty to ensure that the waste is disposed of in an appropriate manner.

Dewatering Consent

In the event groundwater is intercepted during excavation works, dewatering may be required. Council, NSW Office of Water (NOW) and other relevant approvals (from discharge authorities like Sydney Water etc.) should be obtained prior to the commencement of dewatering.

14 NSW Department of Environment and Climate Change, (2015), Guidelines on the Duty to Report Contamination under the

Contaminated Land Management Act 1997. (referred to as Duty to Report Contamination 2015)

Page 34: REPORT - City of Blacktown · 2017-11-22 · 25 WENTWORTH STREET, THE PONDS, NSW 23 SEPTEMBER 2016 REF: E29696KDrpt. Document Distribution Record ... (120mg/kg) was encountered in

Preliminary Stage 1 Environmental Site Assessment Riverbank Primary School – 25 Wentworth Street, The Ponds, NSW EIS Ref: E29696KDrpt

P a g e 27

12 LIMITATIONS

The report limitations are outlined below: EIS accepts no responsibility for any unidentified contamination issues at the site. Any

unexpected problems/subsurface features that may be encountered during development works should be inspected by an environmental consultant as soon as possible;

Previous use of this site may have involved excavation for the foundations of buildings, services, and similar facilities. In addition, unrecorded excavation and burial of material may have occurred on the site. Backfilling of excavations could have been undertaken with potentially contaminated material that may be discovered in discrete, isolated locations across the site during construction work;

This report has been prepared based on site conditions which existed at the time of the investigation; scope of work and limitation outlined in the EIS proposal; and terms of contract between EIS and the client (as applicable);

The conclusions presented in this report are based on investigation of conditions at specific locations, chosen to be as representative as possible under the given circumstances, visual observations of the site and immediate surrounds and documents reviewed as described in the report;

Subsurface soil and rock conditions encountered between investigation locations may be found to be different from those expected. Groundwater conditions may also vary, especially after climatic changes;

The investigation and preparation of this report have been undertaken in accordance with accepted practice for environmental consultants, with reference to applicable environmental regulatory authority and industry standards, guidelines and the assessment criteria outlined in the report;

Where information has been provided by third parties, EIS has not undertaken any verification process, except where specifically stated in the report;

EIS has not undertaken any assessment of off-site areas that may be potential contamination sources or may have been impacted by site contamination, except where specifically stated in the report;

EIS accept no responsibility for potentially asbestos containing materials that may exist at the site. These materials may be associated with demolition of pre-1990 constructed buildings or fill material at the site;

EIS have not and will not make any determination regarding finances associated with the site; Additional investigation work may be required in the event of changes to the proposed

development or landuse. EIS should be contacted immediately in such circumstances; Material considered to be suitable from a geotechnical point of view may be unsatisfactory from

a soil contamination viewpoint, and vice versa; and This report has been prepared for the particular project described and no responsibility is

accepted for the use of any part of this report in any other context or for any other purpose.

Page 35: REPORT - City of Blacktown · 2017-11-22 · 25 WENTWORTH STREET, THE PONDS, NSW 23 SEPTEMBER 2016 REF: E29696KDrpt. Document Distribution Record ... (120mg/kg) was encountered in

Preliminary Stage 1 Environmental Site Assessment Riverbank Primary School – 25 Wentworth Street, The Ponds, NSW EIS Ref: E29696KDrpt

P a g e 28

LIST OF IN-TEXT TABLES Table 1-1: Guidelines 2 Table 2-1: Site Identification 4 Table 2-2: Summary of Groundwater Bores 6 Table 3-1: Summary of Historical Aerial Photos 7 Table 3-2: Summary of NSW EPA Online Records 9 Table 4-1: CSM 10 Table 5-1: DQOs – Seven Steps 11 Table 5-2: Soil Sampling Plan and Methodology 13 Table 5-3: Analytical Schedule 15 Table 5-4: Laboratory Details 16 Table 6-1: SAC Adopted for this Investigation 17 Table 7-1: Summary of Subsurface Conditions 18 Table 7-2: Summary of Field Screening 18 Table 7-3: Summary of Soil Laboratory Results 19 Table 8-1: Assessment of DQIs 21 Table 9-1: Tier 1 Risk Assessment and Review of CSM 23 Table 10-1: Waste Classification 24 Table 11-1: Decision Statements 25 Table 11-2: Regulatory Requirement 26

Page 36: REPORT - City of Blacktown · 2017-11-22 · 25 WENTWORTH STREET, THE PONDS, NSW 23 SEPTEMBER 2016 REF: E29696KDrpt. Document Distribution Record ... (120mg/kg) was encountered in

Preliminary Stage 1 Environmental Site Assessment Riverbank Primary School – 25 Wentworth Street, The Ponds, NSW EIS Ref: E29696KDrpt

P a g e 29

IMPORTANT INFORMATION ABOUT THIS REPORT

These notes have been prepared by EIS to assist with the assessment and interpretation of this report. The Report is based on a Unique Set of Project Specific Factors This report has been prepared in response to specific project requirements as stated in the EIS proposal document which may have been limited by instructions from the client. This report should be reviewed, and if necessary, revised if any of the following occur: The proposed land use is altered; The defined subject site is increased or sub-divided; The proposed development details including size, configuration, location, orientation of the structures

or landscaped areas are modified; The proposed development levels are altered, eg addition of basement levels; or Ownership of the site changes. EIS/J&K will not accept any responsibility whatsoever for situations where one or more of the above factors have changed since completion of the assessment. If the subject site is sold, ownership of the assessment report should be transferred by EIS to the new site owners who will be informed of the conditions and limitations under which the assessment was undertaken. No person should apply an assessment for any purpose other than that originally intended without first conferring with the consultant. Changes in Subsurface Conditions Subsurface conditions are influenced by natural geological and hydrogeological process and human activities. Groundwater conditions are likely to vary over time with changes in climatic conditions and human activities within the catchment (e.g. water extraction for irrigation or industrial uses, subsurface waste water disposal, construction related dewatering). Soil and groundwater contaminant concentrations may also vary over time through contaminant migration, natural attenuation of organic contaminants, ongoing contaminating activities and placement or removal of fill material. The conclusions of an assessment report may have been affected by the above factors if a significant period of time has elapsed prior to commencement of the proposed development. This Report is based on Professional Interpretations of Factual Data Site assessments identify actual subsurface conditions at the actual sampling locations at the time of the investigation. Data obtained from the sampling and subsequent laboratory analyses, available site history information and published regional information is interpreted by geologists, engineers or environmental scientists and opinions are drawn about the overall subsurface conditions, the nature and extent of contamination, the likely impact on the proposed development and appropriate remediation measures. Actual conditions may differ from those inferred, because no professional, no matter how qualified, and no subsurface exploration program, no matter how comprehensive, can reveal what is hidden by earth, rock and time. The actual interface between materials may be far more gradual or abrupt than an assessment indicates. Actual conditions in areas not sampled may differ from predictions. Nothing can be done to prevent the unanticipated, but steps can be taken to help minimise the impact. For this reason, site owners should retain the services of their consultants throughout the development stage of the project, to identify variances, conduct additional tests which may be needed, and to recommend solutions to problems encountered on site. Assessment Limitations Although information provided by a site assessment can reduce exposure to the risk of the presence of contamination, no environmental site assessment can eliminate the risk. Even a rigorous professional assessment may not detect all contamination on a site. Contaminants may be present in areas that were not surveyed or sampled, or may migrate to areas which showed no signs of contamination when sampled. Contaminant analysis cannot possibly cover every type of contaminant which may occur; only the most likely contaminants are screened. Misinterpretation of Site Assessments by Design Professionals

Page 37: REPORT - City of Blacktown · 2017-11-22 · 25 WENTWORTH STREET, THE PONDS, NSW 23 SEPTEMBER 2016 REF: E29696KDrpt. Document Distribution Record ... (120mg/kg) was encountered in

Preliminary Stage 1 Environmental Site Assessment Riverbank Primary School – 25 Wentworth Street, The Ponds, NSW EIS Ref: E29696KDrpt

P a g e 30

Costly problems can occur when other design professionals develop plans based on misinterpretation of an assessment report. To minimise problems associated with misinterpretations, the environmental consultant should be retained to work with appropriate professionals to explain relevant findings and to review the adequacy of plans and specifications relevant to contamination issues. Logs Should not be Separated from the Assessment Report Borehole and test pit logs are prepared by environmental scientists, engineers or geologists based upon interpretation of field conditions and laboratory evaluation of field samples. Logs are normally provided in our reports and these should not be re-drawn for inclusion in site remediation or other design drawings, as subtle but significant drafting errors or omissions may occur in the transfer process. Photographic reproduction can eliminate this problem, however contractors can still misinterpret the logs during bid preparation if separated from the text of the assessment. If this occurs, delays, disputes and unanticipated costs may result. In all cases it is necessary to refer to the rest of the report to obtain a proper understanding of the assessment. Please note that logs with the ‘Environmental Log’ header are not suitable for geotechnical purposes as they have not been peer reviewed by a Senior Geotechnical Engineer. To reduce the likelihood of borehole and test pit log misinterpretation, the complete assessment should be available to persons or organisations involved in the project, such as contractors, for their use. Denial of such access and disclaiming responsibility for the accuracy of subsurface information does not insulate an owner from the attendant liability. It is critical that the site owner provides all available site information to persons and organisations such as contractors. Read Responsibility Clauses Closely Because an environmental site assessment is based extensively on judgement and opinion, it is necessarily less exact than other disciplines. This situation has resulted in wholly unwarranted claims being lodged against consultants. To help prevent this problem, model clauses have been developed for use in written transmittals. These are definitive clauses designed to indicate consultant responsibility. Their use helps all parties involved recognise individual responsibilities and formulate appropriate action. Some of these definitive clauses are likely to appear in the environmental site assessment, and you are encouraged to read them closely. Your consultant will be pleased to give full and frank answers to any questions.

Page 38: REPORT - City of Blacktown · 2017-11-22 · 25 WENTWORTH STREET, THE PONDS, NSW 23 SEPTEMBER 2016 REF: E29696KDrpt. Document Distribution Record ... (120mg/kg) was encountered in

REPORT FIGURES

Page 39: REPORT - City of Blacktown · 2017-11-22 · 25 WENTWORTH STREET, THE PONDS, NSW 23 SEPTEMBER 2016 REF: E29696KDrpt. Document Distribution Record ... (120mg/kg) was encountered in

AERIAL IMAGE SOURCE: GOOGLE EARTH PRO 7.1.5.1557AERIAL IMAGE ©: 2015 GOOGLE INC.

PLO

T D

ATE

: 23/

09/2

016

1:15

:42

PM

D

WG

FIL

E: S

:\5 E

IS\5

C E

IS J

OB

S\2

9000

'S\E

2969

6KD

TH

E P

ON

DS

\CA

D\E

2969

6KD

.DW

G

SITE

SITE

E29696KD

This plan should be read in conjunction with the JK Geotechnics report.

Report No:

Location:

Title:

RIVERBANK PUBLIC SCHOOLRIVERBANK DRIVE, THE PONDS, NSW

E29696KD

ENVIRONMENTAL INVESTIGATION SERVICES

© EIS

This plan should be read in conjunction with the EIS report.

Figure No:

SITE LOCATION PLAN

1

SOURCE: http://www.whereis.com/

Page 40: REPORT - City of Blacktown · 2017-11-22 · 25 WENTWORTH STREET, THE PONDS, NSW 23 SEPTEMBER 2016 REF: E29696KDrpt. Document Distribution Record ... (120mg/kg) was encountered in

6

0

.

5

6

0

.

0

6

0

.

0

6

0

.

0

6

0

.

0

60.0

6

0

.

0

5

9

.

5

5

9

.

5

5

9

.

5

59.5

59.5

59.5

5

9

.

5

5

9

.

5

5

9

.

0

5

9

.

0

5

9

.

0

5

9

.

0

5

9

.

0

5

9

.

0

5

9

.

0

5

9

.

0

5

8

.

0

58.0

5

8

.

0

5

8

.

0

5

8

.

0

5

8

.

0

5

8

.

0

5

8

.

0

5

8

.

0

5

8

.

0

5

8

.

0

58.0

58.0

5

8

.

0

58.0

5

8

.

0

58.5

5

8

.

5

58.5

5

8

.

5

58.5

5

8

.

5

5

8

.

5

5

8

.

5

5

8

.

5

58.5

5

8

.

5

5

7

.

5

5

7

.

5

5

7

.

5

5

7

.

5

57.5

5

7

.

5

5

7

.

5

5

7

.

5 5

7

.

5

5

7

.

5

5

7

.

5

5

7

.

5

5

7

.

5

57.5

5

7

.

5

5

7

.

5

57.5

5

7

.

5

5

7

.

0

57.0

5

7

.

0

5

7

.

0

57.0

5

7

.

0

5

7

.

0

5

7

.

0

5

7

.

0

5

7

.

0

57.0

5

7

.

0

5

7

.

0

5

7

.

0

5

7

.

0

5

7

.

0

57.0

5

7

.

0

5

6

.

5

56.5

5

6

.

5

56.5

5

6

.

5

5

6

.

5

5

6

.

5

5

6

.

5

5

6

.

5

5

6

.

5

56.5

5

6

.

5

5

6

.

5

5

6

.

5

5

6

.

5

5

6

.

5

5

2

.

5

5

2

.

5

5

2

.

5

53.0

5

3

.

0

5

3

.

0

5

3

.

5

5

3

.

5

5

3

.

5

5

3

.

5

5

4

.

0

5

4

.

0

5

4

.

0

5

4

.

0

5

4

.

5

54.5

5

4

.

5

5

4

.

5

5

4

.

5

54.5

5

4

.

5

5

5

.

0

55.0

5

5

.

0

5

5

.

0

5

5

.

0

55.0

5

5

.

5

55.5

5

5

.

5

5

5

.

5

5

5

.

5

5

5

.

5

5

5

.

5

5

6

.

0

56.0

56.0

5

6

.

0

5

6

.

0

5

6

.

0

5

6

.

0

5

6

.

0

5

6

.

0

5

6

.

0

56.0

5

6

.

0

5

6

.

0

5

6

.

0

5

6

.

0

5

6

.

0

56.0

5

6

.

0

5

5

.

0

55.0

5

5

.

0

55.0

5

5

.

5

5

5

.

5

55.5

5

5

.

5

55.5

5

5

.

5

5

5

.

5

60.5

6

1

.

0

5

5

.

0

5

5

.

0

5

5

.

0

5

5

.

5

5

5

.

5

BH9(0.6)

BH8(0.4)

BH1(1.0)

BH5(0.3)

BH2(0.3)

BH3(0.4)

BH7(0.7)

BH6(0.1)

BH4(0.4)

PLO

T D

ATE

: 22/

09/2

016

1:41

:08

PM

D

WG

FIL

E: S

:\5 E

IS\5

C E

IS J

OB

S\2

9000

'S\E

2969

6KD

TH

E P

ON

DS

\CA

D\E

2969

6KD

.DW

G

0

SCALE @A3

10 20 30 40 50

1:1000 METRESReport No:

E29696KD

Location:

Title:

RIVERBANK PUBLIC SCHOOLRIVERBANK DRIVE, THE PONDS, NSW

E29696KD

ENVIRONMENTAL INVESTIGATION SERVICES

© EIS

Figure No:

This plan should be read in conjunction with the EIS report.

SAMPLE LOCATION PLAN

2

CONCRETESTAIRS

R

I

V

E

R

B

A

N

K

D

R

I

V

E

DEMOUNTABLE

CONCRETE

CONCRETE

CONCRETE

CONCRETEPERIMETERBEAM

CONCRETEPERIMETERBEAM

APPROXIMATE SITE BOUNDARY

LEGEND

BOREHOLE LOCATION, NUMBER AND DEPTH OF FILL (m)BH (Fill Depth)

AutoCAD SHX Text
invt
AutoCAD SHX Text
RIDGE
AutoCAD SHX Text
RIDGE
AutoCAD SHX Text
RIDGE
AutoCAD SHX Text
RIDGE
AutoCAD SHX Text
RIDGE
AutoCAD SHX Text
RIDGE
AutoCAD SHX Text
RIDGE
AutoCAD SHX Text
RIDGE
AutoCAD SHX Text
RIDGE
AutoCAD SHX Text
RIDGE
AutoCAD SHX Text
RIDGE
AutoCAD SHX Text
RIDGE
AutoCAD SHX Text
RIDGE
AutoCAD SHX Text
RIDGE
AutoCAD SHX Text
RIDGE
AutoCAD SHX Text
RIDGE
AutoCAD SHX Text
RIDGE
AutoCAD SHX Text
RIDGE
AutoCAD SHX Text
RIDGE
AutoCAD SHX Text
RIDGE
AutoCAD SHX Text
RIDGE
AutoCAD SHX Text
RIDGE
AutoCAD SHX Text
RIDGE
AutoCAD SHX Text
RIDGE
AutoCAD SHX Text
RIDGE
AutoCAD SHX Text
RIDGE
AutoCAD SHX Text
RIDGE
AutoCAD SHX Text
RIDGE
AutoCAD SHX Text
RIDGE
AutoCAD SHX Text
RIDGE
AutoCAD SHX Text
ROOF
AutoCAD SHX Text
RIDGE
AutoCAD SHX Text
RIDGE
AutoCAD SHX Text
RIDGE
AutoCAD SHX Text
RIDGE
AutoCAD SHX Text
RIDGE
AutoCAD SHX Text
RIDGE
AutoCAD SHX Text
RIDGE
AutoCAD SHX Text
RIDGE
AutoCAD SHX Text
RIDGE
AutoCAD SHX Text
RIDGE
AutoCAD SHX Text
RIDGE
AutoCAD SHX Text
RIDGE
AutoCAD SHX Text
RIDGE
AutoCAD SHX Text
RIDGE
AutoCAD SHX Text
RIDGE
AutoCAD SHX Text
RIDGE
AutoCAD SHX Text
RIDGE LINE
AutoCAD SHX Text
RIDGE LINE
AutoCAD SHX Text
RIDGE
AutoCAD SHX Text
RIDGE LINE
AutoCAD SHX Text
RIDGE LINE
AutoCAD SHX Text
TG
AutoCAD SHX Text
TG
AutoCAD SHX Text
TG
AutoCAD SHX Text
TG
AutoCAD SHX Text
TG
AutoCAD SHX Text
TG
AutoCAD SHX Text
TG
AutoCAD SHX Text
TG
AutoCAD SHX Text
TG
AutoCAD SHX Text
TG
AutoCAD SHX Text
TG
AutoCAD SHX Text
TG
AutoCAD SHX Text
TG
AutoCAD SHX Text
TG
AutoCAD SHX Text
TG
AutoCAD SHX Text
TG
AutoCAD SHX Text
TG
AutoCAD SHX Text
TG
AutoCAD SHX Text
TG
AutoCAD SHX Text
TG
AutoCAD SHX Text
TG
AutoCAD SHX Text
TG
AutoCAD SHX Text
HT
AutoCAD SHX Text
TG
AutoCAD SHX Text
TG
AutoCAD SHX Text
TG
AutoCAD SHX Text
TG
AutoCAD SHX Text
TG
AutoCAD SHX Text
TG
AutoCAD SHX Text
TG
AutoCAD SHX Text
TG
AutoCAD SHX Text
TG
AutoCAD SHX Text
TG
AutoCAD SHX Text
TG
AutoCAD SHX Text
TG
AutoCAD SHX Text
TG
AutoCAD SHX Text
TG
AutoCAD SHX Text
TG
AutoCAD SHX Text
TG
AutoCAD SHX Text
TG
AutoCAD SHX Text
TG
AutoCAD SHX Text
TG
AutoCAD SHX Text
TG
AutoCAD SHX Text
TG
AutoCAD SHX Text
TG
AutoCAD SHX Text
TG
AutoCAD SHX Text
UND
AutoCAD SHX Text
UND
AutoCAD SHX Text
UND
AutoCAD SHX Text
UND
AutoCAD SHX Text
MH
AutoCAD SHX Text
MH
AutoCAD SHX Text
FL
AutoCAD SHX Text
FL
AutoCAD SHX Text
FL
AutoCAD SHX Text
FL
AutoCAD SHX Text
FL
AutoCAD SHX Text
FL
AutoCAD SHX Text
FL
AutoCAD SHX Text
FL
AutoCAD SHX Text
FL
AutoCAD SHX Text
FL
AutoCAD SHX Text
GU
AutoCAD SHX Text
GU
AutoCAD SHX Text
GU
AutoCAD SHX Text
GU
AutoCAD SHX Text
GU
AutoCAD SHX Text
GU
AutoCAD SHX Text
GU
AutoCAD SHX Text
GU
AutoCAD SHX Text
GU
AutoCAD SHX Text
GU
AutoCAD SHX Text
GU
AutoCAD SHX Text
GU
AutoCAD SHX Text
GU
AutoCAD SHX Text
GU
AutoCAD SHX Text
SP
AutoCAD SHX Text
SP
AutoCAD SHX Text
SP
AutoCAD SHX Text
SP
AutoCAD SHX Text
SP
AutoCAD SHX Text
SP
AutoCAD SHX Text
SP
AutoCAD SHX Text
SP
AutoCAD SHX Text
SP
AutoCAD SHX Text
SP
AutoCAD SHX Text
SP
AutoCAD SHX Text
SP
AutoCAD SHX Text
SP
AutoCAD SHX Text
SP
AutoCAD SHX Text
SP
AutoCAD SHX Text
SP
AutoCAD SHX Text
SP
AutoCAD SHX Text
SP
AutoCAD SHX Text
SP
AutoCAD SHX Text
SP
AutoCAD SHX Text
SP
AutoCAD SHX Text
SP
AutoCAD SHX Text
SP
AutoCAD SHX Text
SP
AutoCAD SHX Text
SP
AutoCAD SHX Text
SP
AutoCAD SHX Text
SP
AutoCAD SHX Text
SP
AutoCAD SHX Text
SP
AutoCAD SHX Text
SP
AutoCAD SHX Text
SP
AutoCAD SHX Text
SP
AutoCAD SHX Text
LP
AutoCAD SHX Text
LP
AutoCAD SHX Text
LP
AutoCAD SHX Text
LP
AutoCAD SHX Text
LP
AutoCAD SHX Text
LP
AutoCAD SHX Text
LP
AutoCAD SHX Text
LP
AutoCAD SHX Text
LP
AutoCAD SHX Text
LP
AutoCAD SHX Text
LP
AutoCAD SHX Text
LP
AutoCAD SHX Text
LP
AutoCAD SHX Text
LP
AutoCAD SHX Text
LP
AutoCAD SHX Text
LP
AutoCAD SHX Text
LP
AutoCAD SHX Text
LP
AutoCAD SHX Text
LP
AutoCAD SHX Text
LP
AutoCAD SHX Text
LP
AutoCAD SHX Text
LP
AutoCAD SHX Text
LP
AutoCAD SHX Text
LP
AutoCAD SHX Text
LP
AutoCAD SHX Text
LP
AutoCAD SHX Text
LP
AutoCAD SHX Text
LP
AutoCAD SHX Text
GAS
AutoCAD SHX Text
HYDRANT
AutoCAD SHX Text
FH
AutoCAD SHX Text
FH
AutoCAD SHX Text
FH
AutoCAD SHX Text
FH
AutoCAD SHX Text
SV
AutoCAD SHX Text
SV
AutoCAD SHX Text
WM
AutoCAD SHX Text
GV
AutoCAD SHX Text
C/BX
AutoCAD SHX Text
F/P
AutoCAD SHX Text
POST
AutoCAD SHX Text
POST
AutoCAD SHX Text
POST
AutoCAD SHX Text
POST
AutoCAD SHX Text
POST
AutoCAD SHX Text
POST
AutoCAD SHX Text
POST
AutoCAD SHX Text
POST
AutoCAD SHX Text
POST
AutoCAD SHX Text
POST
AutoCAD SHX Text
POST
AutoCAD SHX Text
POST
AutoCAD SHX Text
POST
AutoCAD SHX Text
POST
AutoCAD SHX Text
GAS
AutoCAD SHX Text
GAS
AutoCAD SHX Text
BOL
AutoCAD SHX Text
BOL
AutoCAD SHX Text
BOL
AutoCAD SHX Text
BOL
AutoCAD SHX Text
BOL
AutoCAD SHX Text
BOL
AutoCAD SHX Text
BOL
AutoCAD SHX Text
BOL
AutoCAD SHX Text
BOL
AutoCAD SHX Text
BOL
AutoCAD SHX Text
BOL
AutoCAD SHX Text
BOL
AutoCAD SHX Text
BOL
AutoCAD SHX Text
BOL
AutoCAD SHX Text
BOL
AutoCAD SHX Text
BOL
AutoCAD SHX Text
BOL
AutoCAD SHX Text
BOL
AutoCAD SHX Text
BOL
AutoCAD SHX Text
BOL
AutoCAD SHX Text
BOL
AutoCAD SHX Text
BOL
AutoCAD SHX Text
PARA
AutoCAD SHX Text
PARA
AutoCAD SHX Text
PARA
AutoCAD SHX Text
PARA
AutoCAD SHX Text
PARA
AutoCAD SHX Text
PARA
AutoCAD SHX Text
PARA
AutoCAD SHX Text
PARA
AutoCAD SHX Text
PARA
AutoCAD SHX Text
PARA
AutoCAD SHX Text
PARA
AutoCAD SHX Text
PARA
AutoCAD SHX Text
PARA
AutoCAD SHX Text
PARA
AutoCAD SHX Text
TOW
AutoCAD SHX Text
FHT
AutoCAD SHX Text
HT
AutoCAD SHX Text
FHT
AutoCAD SHX Text
FHT
AutoCAD SHX Text
FHT
AutoCAD SHX Text
TOW
AutoCAD SHX Text
FHT
AutoCAD SHX Text
HT
AutoCAD SHX Text
HT
AutoCAD SHX Text
HT
AutoCAD SHX Text
HT
AutoCAD SHX Text
HT
AutoCAD SHX Text
HT
AutoCAD SHX Text
HT
AutoCAD SHX Text
HT
AutoCAD SHX Text
HT
AutoCAD SHX Text
HT
AutoCAD SHX Text
HT
AutoCAD SHX Text
ROOF
AutoCAD SHX Text
ROOF
AutoCAD SHX Text
ROOF
AutoCAD SHX Text
SIL
AutoCAD SHX Text
SIL
AutoCAD SHX Text
SIL
AutoCAD SHX Text
SIL
AutoCAD SHX Text
SIL
AutoCAD SHX Text
SIL
AutoCAD SHX Text
SIL
AutoCAD SHX Text
SIL
AutoCAD SHX Text
SIL
AutoCAD SHX Text
SIL
AutoCAD SHX Text
SIL
AutoCAD SHX Text
SIL
AutoCAD SHX Text
SIL
AutoCAD SHX Text
BALC
AutoCAD SHX Text
BALC
AutoCAD SHX Text
BALC
AutoCAD SHX Text
BALC
AutoCAD SHX Text
BALC
AutoCAD SHX Text
BALC
AutoCAD SHX Text
BALC
AutoCAD SHX Text
TAP
AutoCAD SHX Text
TAP
AutoCAD SHX Text
TAP
AutoCAD SHX Text
TAP
AutoCAD SHX Text
TAP
AutoCAD SHX Text
TAP
AutoCAD SHX Text
TAP
AutoCAD SHX Text
TAP
AutoCAD SHX Text
TAP
AutoCAD SHX Text
TAP
AutoCAD SHX Text
TAP
AutoCAD SHX Text
56.61
AutoCAD SHX Text
56.46
AutoCAD SHX Text
56.40
AutoCAD SHX Text
56.16
AutoCAD SHX Text
55.94
AutoCAD SHX Text
55.74
AutoCAD SHX Text
55.50
AutoCAD SHX Text
55.28
AutoCAD SHX Text
55.14
AutoCAD SHX Text
54.94
AutoCAD SHX Text
54.70
AutoCAD SHX Text
54.66
AutoCAD SHX Text
55.46
AutoCAD SHX Text
55.71
AutoCAD SHX Text
55.95
AutoCAD SHX Text
56.17
AutoCAD SHX Text
56.39
AutoCAD SHX Text
56.42
AutoCAD SHX Text
56.47
AutoCAD SHX Text
56.32
AutoCAD SHX Text
56.43
AutoCAD SHX Text
56.54
AutoCAD SHX Text
56.50
AutoCAD SHX Text
56.64
AutoCAD SHX Text
56.77
AutoCAD SHX Text
56.99
AutoCAD SHX Text
56.93
AutoCAD SHX Text
57.06
AutoCAD SHX Text
56.96
AutoCAD SHX Text
56.66
AutoCAD SHX Text
56.81
AutoCAD SHX Text
57.01
AutoCAD SHX Text
56.33
AutoCAD SHX Text
57.19
AutoCAD SHX Text
57.02
AutoCAD SHX Text
56.87
AutoCAD SHX Text
56.70
AutoCAD SHX Text
56.53
AutoCAD SHX Text
56.38
AutoCAD SHX Text
56.17
AutoCAD SHX Text
55.99
AutoCAD SHX Text
55.81
AutoCAD SHX Text
55.63
AutoCAD SHX Text
55.43
AutoCAD SHX Text
55.27
AutoCAD SHX Text
55.00
AutoCAD SHX Text
55.11
AutoCAD SHX Text
54.90
AutoCAD SHX Text
54.70
AutoCAD SHX Text
54.63
AutoCAD SHX Text
54.72
AutoCAD SHX Text
54.67
AutoCAD SHX Text
54.83
AutoCAD SHX Text
54.99
AutoCAD SHX Text
55.33
AutoCAD SHX Text
55.21
AutoCAD SHX Text
55.18
AutoCAD SHX Text
55.00
AutoCAD SHX Text
54.88
AutoCAD SHX Text
54.66
AutoCAD SHX Text
55.18
AutoCAD SHX Text
55.90
AutoCAD SHX Text
56.52
AutoCAD SHX Text
56.67
AutoCAD SHX Text
56.75
AutoCAD SHX Text
56.92
AutoCAD SHX Text
56.26
AutoCAD SHX Text
56.53
AutoCAD SHX Text
56.23
AutoCAD SHX Text
56.00
AutoCAD SHX Text
55.82
AutoCAD SHX Text
55.25
AutoCAD SHX Text
55.22
AutoCAD SHX Text
55.09
AutoCAD SHX Text
54.84
AutoCAD SHX Text
55.22
AutoCAD SHX Text
55.57
AutoCAD SHX Text
55.34
AutoCAD SHX Text
55.22
AutoCAD SHX Text
54.80
AutoCAD SHX Text
54.95
AutoCAD SHX Text
55.09
AutoCAD SHX Text
55.18
AutoCAD SHX Text
55.30
AutoCAD SHX Text
55.61
AutoCAD SHX Text
55.86
AutoCAD SHX Text
56.06
AutoCAD SHX Text
56.22
AutoCAD SHX Text
56.45
AutoCAD SHX Text
57.34
AutoCAD SHX Text
57.87
AutoCAD SHX Text
61.76
AutoCAD SHX Text
62.38
AutoCAD SHX Text
59.13
AutoCAD SHX Text
57.80
AutoCAD SHX Text
60.40
AutoCAD SHX Text
TW57.42
AutoCAD SHX Text
TW57.42
AutoCAD SHX Text
TW60.24
AutoCAD SHX Text
BW59.04
AutoCAD SHX Text
BW55.62
AutoCAD SHX Text
59.54
AutoCAD SHX Text
60.70
AutoCAD SHX Text
61.05
AutoCAD SHX Text
60.48
AutoCAD SHX Text
59.83
AutoCAD SHX Text
58.77
AutoCAD SHX Text
59.06
AutoCAD SHX Text
TD58.26
AutoCAD SHX Text
TD58.26
AutoCAD SHX Text
TW58.59
AutoCAD SHX Text
BW56.85
AutoCAD SHX Text
FL56.21
AutoCAD SHX Text
FL56.08
AutoCAD SHX Text
59.99
AutoCAD SHX Text
59.79
AutoCAD SHX Text
61.19
AutoCAD SHX Text
61.20
AutoCAD SHX Text
60.50
AutoCAD SHX Text
59.11
AutoCAD SHX Text
59.33
AutoCAD SHX Text
59.11
AutoCAD SHX Text
59.12
AutoCAD SHX Text
TW58.94
AutoCAD SHX Text
TW58.96
AutoCAD SHX Text
TD58.94
AutoCAD SHX Text
TD58.85
AutoCAD SHX Text
TD58.87
AutoCAD SHX Text
63.82
AutoCAD SHX Text
64.18
AutoCAD SHX Text
TDW59.18
AutoCAD SHX Text
TD59.18
AutoCAD SHX Text
TW62.03
AutoCAD SHX Text
TW62.04
AutoCAD SHX Text
BW60.84
AutoCAD SHX Text
BW60.83
AutoCAD SHX Text
56.48
AutoCAD SHX Text
56.33
AutoCAD SHX Text
56.27
AutoCAD SHX Text
56.03
AutoCAD SHX Text
55.81
AutoCAD SHX Text
55.61
AutoCAD SHX Text
55.37
AutoCAD SHX Text
55.15
AutoCAD SHX Text
55.01
AutoCAD SHX Text
54.81
AutoCAD SHX Text
54.57
AutoCAD SHX Text
54.52
AutoCAD SHX Text
55.33
AutoCAD SHX Text
55.57
AutoCAD SHX Text
55.81
AutoCAD SHX Text
56.04
AutoCAD SHX Text
56.19
AutoCAD SHX Text
56.26
AutoCAD SHX Text
56.34
AutoCAD SHX Text
56.92
AutoCAD SHX Text
56.82
AutoCAD SHX Text
56.51
AutoCAD SHX Text
55.08
AutoCAD SHX Text
54.95
AutoCAD SHX Text
54.69
AutoCAD SHX Text
60.39
AutoCAD SHX Text
58.96
AutoCAD SHX Text
56.90
AutoCAD SHX Text
57.03
AutoCAD SHX Text
57.16
AutoCAD SHX Text
57.41
AutoCAD SHX Text
57.61
AutoCAD SHX Text
57.81
AutoCAD SHX Text
58.04
AutoCAD SHX Text
58.01
AutoCAD SHX Text
57.82
AutoCAD SHX Text
57.58
AutoCAD SHX Text
57.45
AutoCAD SHX Text
57.34
AutoCAD SHX Text
57.11
AutoCAD SHX Text
56.83
AutoCAD SHX Text
56.81
AutoCAD SHX Text
57.00
AutoCAD SHX Text
57.18
AutoCAD SHX Text
57.31
AutoCAD SHX Text
57.44
AutoCAD SHX Text
57.63
AutoCAD SHX Text
57.76
AutoCAD SHX Text
57.85
AutoCAD SHX Text
57.95
AutoCAD SHX Text
57.83
AutoCAD SHX Text
57.91
AutoCAD SHX Text
57.99
AutoCAD SHX Text
58.15
AutoCAD SHX Text
58.29
AutoCAD SHX Text
58.51
AutoCAD SHX Text
58.20
AutoCAD SHX Text
57.93
AutoCAD SHX Text
57.71
AutoCAD SHX Text
57.60
AutoCAD SHX Text
57.13
AutoCAD SHX Text
57.54
AutoCAD SHX Text
57.74
AutoCAD SHX Text
57.95
AutoCAD SHX Text
57.83
AutoCAD SHX Text
57.76
AutoCAD SHX Text
57.90
AutoCAD SHX Text
57.82
AutoCAD SHX Text
57.67
AutoCAD SHX Text
57.62
AutoCAD SHX Text
57.74
AutoCAD SHX Text
57.58
AutoCAD SHX Text
57.45
AutoCAD SHX Text
57.34
AutoCAD SHX Text
57.17
AutoCAD SHX Text
57.53
AutoCAD SHX Text
57.38
AutoCAD SHX Text
TD59.08
AutoCAD SHX Text
64.09
AutoCAD SHX Text
63.61
AutoCAD SHX Text
61.02
AutoCAD SHX Text
64.56
AutoCAD SHX Text
64.94
AutoCAD SHX Text
64.43
AutoCAD SHX Text
62.94
AutoCAD SHX Text
62.91
AutoCAD SHX Text
60.58
AutoCAD SHX Text
TW60.01
AutoCAD SHX Text
BW57.90
AutoCAD SHX Text
TD59.92
AutoCAD SHX Text
FL57.77
AutoCAD SHX Text
FL57.67
AutoCAD SHX Text
TW59.98
AutoCAD SHX Text
TW62.77
AutoCAD SHX Text
TW62.76
AutoCAD SHX Text
BW61.23
AutoCAD SHX Text
BW61.23
AutoCAD SHX Text
BW57.90
AutoCAD SHX Text
66.65
AutoCAD SHX Text
62.26
AutoCAD SHX Text
61.51
AutoCAD SHX Text
TW61.08
AutoCAD SHX Text
TW64.00
AutoCAD SHX Text
BW62.83
AutoCAD SHX Text
BW59.04
AutoCAD SHX Text
63.43
AutoCAD SHX Text
64.28
AutoCAD SHX Text
63.29
AutoCAD SHX Text
62.87
AutoCAD SHX Text
TD61.56
AutoCAD SHX Text
FL59.12
AutoCAD SHX Text
61.92
AutoCAD SHX Text
56.68
AutoCAD SHX Text
56.79
AutoCAD SHX Text
56.87
AutoCAD SHX Text
57.05
AutoCAD SHX Text
57.18
AutoCAD SHX Text
57.30
AutoCAD SHX Text
57.50
AutoCAD SHX Text
57.63
AutoCAD SHX Text
57.72
AutoCAD SHX Text
57.82
AutoCAD SHX Text
58.00
AutoCAD SHX Text
58.14
AutoCAD SHX Text
58.36
AutoCAD SHX Text
57.75
AutoCAD SHX Text
57.68
AutoCAD SHX Text
57.61
AutoCAD SHX Text
57.44
AutoCAD SHX Text
57.31
AutoCAD SHX Text
57.20
AutoCAD SHX Text
57.03
AutoCAD SHX Text
TD59.83
AutoCAD SHX Text
64.22
AutoCAD SHX Text
62.92
AutoCAD SHX Text
58.21
AutoCAD SHX Text
58.37
AutoCAD SHX Text
58.55
AutoCAD SHX Text
58.75
AutoCAD SHX Text
58.94
AutoCAD SHX Text
59.16
AutoCAD SHX Text
59.40
AutoCAD SHX Text
59.65
AutoCAD SHX Text
59.87
AutoCAD SHX Text
60.19
AutoCAD SHX Text
60.36
AutoCAD SHX Text
60.75
AutoCAD SHX Text
60.82
AutoCAD SHX Text
60.44
AutoCAD SHX Text
60.24
AutoCAD SHX Text
60.10
AutoCAD SHX Text
60.23
AutoCAD SHX Text
60.12
AutoCAD SHX Text
60.01
AutoCAD SHX Text
59.87
AutoCAD SHX Text
59.75
AutoCAD SHX Text
59.64
AutoCAD SHX Text
59.60
AutoCAD SHX Text
59.52
AutoCAD SHX Text
59.40
AutoCAD SHX Text
59.56
AutoCAD SHX Text
59.38
AutoCAD SHX Text
59.29
AutoCAD SHX Text
59.41
AutoCAD SHX Text
59.26
AutoCAD SHX Text
59.12
AutoCAD SHX Text
58.96
AutoCAD SHX Text
58.89
AutoCAD SHX Text
59.02
AutoCAD SHX Text
58.84
AutoCAD SHX Text
58.68
AutoCAD SHX Text
58.63
AutoCAD SHX Text
58.70
AutoCAD SHX Text
58.54
AutoCAD SHX Text
58.76
AutoCAD SHX Text
58.69
AutoCAD SHX Text
58.51
AutoCAD SHX Text
58.37
AutoCAD SHX Text
58.31
AutoCAD SHX Text
58.38
AutoCAD SHX Text
58.22
AutoCAD SHX Text
58.16
AutoCAD SHX Text
58.30
AutoCAD SHX Text
58.12
AutoCAD SHX Text
57.99
AutoCAD SHX Text
58.12
AutoCAD SHX Text
58.47
AutoCAD SHX Text
58.74
AutoCAD SHX Text
58.95
AutoCAD SHX Text
59.14
AutoCAD SHX Text
59.40
AutoCAD SHX Text
59.46
AutoCAD SHX Text
59.17
AutoCAD SHX Text
58.90
AutoCAD SHX Text
58.64
AutoCAD SHX Text
58.40
AutoCAD SHX Text
58.15
AutoCAD SHX Text
58.78
AutoCAD SHX Text
58.90
AutoCAD SHX Text
59.05
AutoCAD SHX Text
59.34
AutoCAD SHX Text
59.64
AutoCAD SHX Text
59.82
AutoCAD SHX Text
59.99
AutoCAD SHX Text
59.48
AutoCAD SHX Text
59.01
AutoCAD SHX Text
58.84
AutoCAD SHX Text
58.90
AutoCAD SHX Text
TD60.90
AutoCAD SHX Text
TD61.32
AutoCAD SHX Text
FL58.93
AutoCAD SHX Text
62.25
AutoCAD SHX Text
61.51
AutoCAD SHX Text
65.74
AutoCAD SHX Text
64.22
AutoCAD SHX Text
61.92
AutoCAD SHX Text
TW61.41
AutoCAD SHX Text
BW59.63
AutoCAD SHX Text
66.65
AutoCAD SHX Text
65.69
AutoCAD SHX Text
TW61.67
AutoCAD SHX Text
TW64.26
AutoCAD SHX Text
BW62.91
AutoCAD SHX Text
BW59.70
AutoCAD SHX Text
TDW64.17
AutoCAD SHX Text
TD61.59
AutoCAD SHX Text
TD61.50
AutoCAD SHX Text
FL59.33
AutoCAD SHX Text
FL59.45
AutoCAD SHX Text
62.62
AutoCAD SHX Text
64.43
AutoCAD SHX Text
64.47
AutoCAD SHX Text
67.19
AutoCAD SHX Text
63.22
AutoCAD SHX Text
63.37
AutoCAD SHX Text
TD61.60
AutoCAD SHX Text
TD61.85
AutoCAD SHX Text
TW61.94
AutoCAD SHX Text
TW64.85
AutoCAD SHX Text
BW63.33
AutoCAD SHX Text
BW59.83
AutoCAD SHX Text
64.38
AutoCAD SHX Text
65.34
AutoCAD SHX Text
62.82
AutoCAD SHX Text
63.20
AutoCAD SHX Text
62.86
AutoCAD SHX Text
TD62.40
AutoCAD SHX Text
TW62.47
AutoCAD SHX Text
BW60.42
AutoCAD SHX Text
FL60.28
AutoCAD SHX Text
FL60.04
AutoCAD SHX Text
TD62.23
AutoCAD SHX Text
66.06
AutoCAD SHX Text
66.51
AutoCAD SHX Text
65.42
AutoCAD SHX Text
65.40
AutoCAD SHX Text
63.76
AutoCAD SHX Text
TD62.31
AutoCAD SHX Text
TD62.39
AutoCAD SHX Text
TD65.12
AutoCAD SHX Text
FL60.25
AutoCAD SHX Text
FL60.14
AutoCAD SHX Text
TW65.23
AutoCAD SHX Text
TW62.64
AutoCAD SHX Text
BW60.63
AutoCAD SHX Text
BW63.80
AutoCAD SHX Text
64.91
AutoCAD SHX Text
63.64
AutoCAD SHX Text
63.65
AutoCAD SHX Text
63.14
AutoCAD SHX Text
63.14
AutoCAD SHX Text
TW62.65
AutoCAD SHX Text
BW60.83
AutoCAD SHX Text
TD62.65
AutoCAD SHX Text
69.11
AutoCAD SHX Text
68.26
AutoCAD SHX Text
66.68
AutoCAD SHX Text
66.70
AutoCAD SHX Text
65.05
AutoCAD SHX Text
TW66.35
AutoCAD SHX Text
TW63.36
AutoCAD SHX Text
TW63.35
AutoCAD SHX Text
BW65.15
AutoCAD SHX Text
BW64.53
AutoCAD SHX Text
61.40
AutoCAD SHX Text
61.13
AutoCAD SHX Text
60.30
AutoCAD SHX Text
60.08
AutoCAD SHX Text
59.98
AutoCAD SHX Text
59.86
AutoCAD SHX Text
59.73
AutoCAD SHX Text
59.61
AutoCAD SHX Text
59.49
AutoCAD SHX Text
59.45
AutoCAD SHX Text
59.38
AutoCAD SHX Text
59.27
AutoCAD SHX Text
59.11
AutoCAD SHX Text
58.97
AutoCAD SHX Text
58.88
AutoCAD SHX Text
58.70
AutoCAD SHX Text
58.62
AutoCAD SHX Text
58.55
AutoCAD SHX Text
58.37
AutoCAD SHX Text
58.25
AutoCAD SHX Text
58.15
AutoCAD SHX Text
57.98
AutoCAD SHX Text
57.85
AutoCAD SHX Text
58.64
AutoCAD SHX Text
58.76
AutoCAD SHX Text
58.91
AutoCAD SHX Text
59.21
AutoCAD SHX Text
59.51
AutoCAD SHX Text
59.68
AutoCAD SHX Text
59.85
AutoCAD SHX Text
63.91
AutoCAD SHX Text
65.40
AutoCAD SHX Text
59.82
AutoCAD SHX Text
60.00
AutoCAD SHX Text
60.19
AutoCAD SHX Text
60.34
AutoCAD SHX Text
60.41
AutoCAD SHX Text
60.45
AutoCAD SHX Text
60.41
AutoCAD SHX Text
60.30
AutoCAD SHX Text
60.13
AutoCAD SHX Text
59.80
AutoCAD SHX Text
58.75
AutoCAD SHX Text
59.12
AutoCAD SHX Text
59.46
AutoCAD SHX Text
59.89
AutoCAD SHX Text
60.08
AutoCAD SHX Text
60.25
AutoCAD SHX Text
60.35
AutoCAD SHX Text
60.43
AutoCAD SHX Text
60.29
AutoCAD SHX Text
60.15
AutoCAD SHX Text
59.77
AutoCAD SHX Text
60.42
AutoCAD SHX Text
60.36
AutoCAD SHX Text
60.09
AutoCAD SHX Text
59.73
AutoCAD SHX Text
58.72
AutoCAD SHX Text
58.56
AutoCAD SHX Text
58.77
AutoCAD SHX Text
59.05
AutoCAD SHX Text
59.38
AutoCAD SHX Text
59.68
AutoCAD SHX Text
60.04
AutoCAD SHX Text
60.21
AutoCAD SHX Text
60.10
AutoCAD SHX Text
60.14
AutoCAD SHX Text
60.19
AutoCAD SHX Text
60.35
AutoCAD SHX Text
60.40
AutoCAD SHX Text
60.25
AutoCAD SHX Text
60.18
AutoCAD SHX Text
60.22
AutoCAD SHX Text
58.73
AutoCAD SHX Text
58.93
AutoCAD SHX Text
59.21
AutoCAD SHX Text
59.49
AutoCAD SHX Text
59.70
AutoCAD SHX Text
59.93
AutoCAD SHX Text
60.22
AutoCAD SHX Text
60.44
AutoCAD SHX Text
60.63
AutoCAD SHX Text
60.51
AutoCAD SHX Text
60.37
AutoCAD SHX Text
60.18
AutoCAD SHX Text
60.07
AutoCAD SHX Text
59.99
AutoCAD SHX Text
60.19
AutoCAD SHX Text
60.11
AutoCAD SHX Text
59.95
AutoCAD SHX Text
59.82
AutoCAD SHX Text
59.70
AutoCAD SHX Text
59.80
AutoCAD SHX Text
59.62
AutoCAD SHX Text
59.46
AutoCAD SHX Text
59.36
AutoCAD SHX Text
59.49
AutoCAD SHX Text
59.37
AutoCAD SHX Text
59.40
AutoCAD SHX Text
59.25
AutoCAD SHX Text
59.22
AutoCAD SHX Text
59.14
AutoCAD SHX Text
59.26
AutoCAD SHX Text
59.15
AutoCAD SHX Text
58.89
AutoCAD SHX Text
58.67
AutoCAD SHX Text
58.45
AutoCAD SHX Text
58.00
AutoCAD SHX Text
58.32
AutoCAD SHX Text
58.14
AutoCAD SHX Text
58.05
AutoCAD SHX Text
57.88
AutoCAD SHX Text
57.96
AutoCAD SHX Text
58.50
AutoCAD SHX Text
58.31
AutoCAD SHX Text
67.43
AutoCAD SHX Text
63.85
AutoCAD SHX Text
66.25
AutoCAD SHX Text
65.95
AutoCAD SHX Text
66.81
AutoCAD SHX Text
67.45
AutoCAD SHX Text
63.16
AutoCAD SHX Text
63.17
AutoCAD SHX Text
TD64.62
AutoCAD SHX Text
TW64.61
AutoCAD SHX Text
BW63.42
AutoCAD SHX Text
TD61.55
AutoCAD SHX Text
FL59.39
AutoCAD SHX Text
TW61.64
AutoCAD SHX Text
BW59.84
AutoCAD SHX Text
62.25
AutoCAD SHX Text
62.25
AutoCAD SHX Text
62.59
AutoCAD SHX Text
66.35
AutoCAD SHX Text
65.62
AutoCAD SHX Text
64.36
AutoCAD SHX Text
64.37
AutoCAD SHX Text
65.10
AutoCAD SHX Text
65.09
AutoCAD SHX Text
BW62.82
AutoCAD SHX Text
TW64.17
AutoCAD SHX Text
TD61.28
AutoCAD SHX Text
TD61.19
AutoCAD SHX Text
62.56
AutoCAD SHX Text
66.00
AutoCAD SHX Text
65.72
AutoCAD SHX Text
65.89
AutoCAD SHX Text
63.96
AutoCAD SHX Text
61.01
AutoCAD SHX Text
60.15
AutoCAD SHX Text
60.01
AutoCAD SHX Text
58.61
AutoCAD SHX Text
58.89
AutoCAD SHX Text
59.22
AutoCAD SHX Text
59.52
AutoCAD SHX Text
59.88
AutoCAD SHX Text
60.05
AutoCAD SHX Text
60.21
AutoCAD SHX Text
60.27
AutoCAD SHX Text
59.98
AutoCAD SHX Text
59.82
AutoCAD SHX Text
59.66
AutoCAD SHX Text
59.49
AutoCAD SHX Text
59.35
AutoCAD SHX Text
59.23
AutoCAD SHX Text
59.12
AutoCAD SHX Text
59.01
AutoCAD SHX Text
58.76
AutoCAD SHX Text
58.53
AutoCAD SHX Text
58.39
AutoCAD SHX Text
58.37
AutoCAD SHX Text
58.31
AutoCAD SHX Text
57.86
AutoCAD SHX Text
59.41
AutoCAD SHX Text
59.03
AutoCAD SHX Text
58.87
AutoCAD SHX Text
58.72
AutoCAD SHX Text
58.40
AutoCAD SHX Text
58.06
AutoCAD SHX Text
57.70
AutoCAD SHX Text
57.37
AutoCAD SHX Text
57.14
AutoCAD SHX Text
56.85
AutoCAD SHX Text
56.71
AutoCAD SHX Text
56.52
AutoCAD SHX Text
56.42
AutoCAD SHX Text
56.59
AutoCAD SHX Text
56.84
AutoCAD SHX Text
57.04
AutoCAD SHX Text
57.17
AutoCAD SHX Text
57.34
AutoCAD SHX Text
57.58
AutoCAD SHX Text
57.77
AutoCAD SHX Text
57.99
AutoCAD SHX Text
58.19
AutoCAD SHX Text
58.42
AutoCAD SHX Text
57.87
AutoCAD SHX Text
57.85
AutoCAD SHX Text
57.55
AutoCAD SHX Text
57.39
AutoCAD SHX Text
57.18
AutoCAD SHX Text
57.02
AutoCAD SHX Text
56.87
AutoCAD SHX Text
56.70
AutoCAD SHX Text
56.58
AutoCAD SHX Text
56.97
AutoCAD SHX Text
56.79
AutoCAD SHX Text
56.72
AutoCAD SHX Text
56.48
AutoCAD SHX Text
56.32
AutoCAD SHX Text
56.22
AutoCAD SHX Text
57.47
AutoCAD SHX Text
57.70
AutoCAD SHX Text
57.91
AutoCAD SHX Text
58.22
AutoCAD SHX Text
58.50
AutoCAD SHX Text
58.48
AutoCAD SHX Text
58.19
AutoCAD SHX Text
57.87
AutoCAD SHX Text
57.55
AutoCAD SHX Text
57.51
AutoCAD SHX Text
57.61
AutoCAD SHX Text
57.64
AutoCAD SHX Text
57.79
AutoCAD SHX Text
57.59
AutoCAD SHX Text
58.16
AutoCAD SHX Text
58.36
AutoCAD SHX Text
58.72
AutoCAD SHX Text
59.00
AutoCAD SHX Text
59.26
AutoCAD SHX Text
59.50
AutoCAD SHX Text
65.45
AutoCAD SHX Text
65.23
AutoCAD SHX Text
62.78
AutoCAD SHX Text
65.09
AutoCAD SHX Text
BW59.46
AutoCAD SHX Text
TW61.32
AutoCAD SHX Text
62.81
AutoCAD SHX Text
61.78
AutoCAD SHX Text
FL59.13
AutoCAD SHX Text
62.02
AutoCAD SHX Text
63.94
AutoCAD SHX Text
65.28
AutoCAD SHX Text
TW60.65
AutoCAD SHX Text
TW63.59
AutoCAD SHX Text
TW63.56
AutoCAD SHX Text
BW61.79
AutoCAD SHX Text
BW61.53
AutoCAD SHX Text
BW62.72
AutoCAD SHX Text
BW58.85
AutoCAD SHX Text
64.38
AutoCAD SHX Text
65.10
AutoCAD SHX Text
63.36
AutoCAD SHX Text
63.35
AutoCAD SHX Text
64.69
AutoCAD SHX Text
64.94
AutoCAD SHX Text
63.23
AutoCAD SHX Text
63.25
AutoCAD SHX Text
63.23
AutoCAD SHX Text
57.73
AutoCAD SHX Text
57.71
AutoCAD SHX Text
57.42
AutoCAD SHX Text
57.25
AutoCAD SHX Text
57.05
AutoCAD SHX Text
56.89
AutoCAD SHX Text
56.74
AutoCAD SHX Text
56.56
AutoCAD SHX Text
56.33
AutoCAD SHX Text
57.34
AutoCAD SHX Text
57.56
AutoCAD SHX Text
57.77
AutoCAD SHX Text
58.08
AutoCAD SHX Text
58.36
AutoCAD SHX Text
58.17
AutoCAD SHX Text
57.92
AutoCAD SHX Text
57.60
AutoCAD SHX Text
57.30
AutoCAD SHX Text
56.96
AutoCAD SHX Text
56.77
AutoCAD SHX Text
57.14
AutoCAD SHX Text
56.64
AutoCAD SHX Text
56.51
AutoCAD SHX Text
56.16
AutoCAD SHX Text
55.98
AutoCAD SHX Text
55.76
AutoCAD SHX Text
55.34
AutoCAD SHX Text
55.19
AutoCAD SHX Text
55.02
AutoCAD SHX Text
54.88
AutoCAD SHX Text
54.77
AutoCAD SHX Text
54.98
AutoCAD SHX Text
55.02
AutoCAD SHX Text
55.05
AutoCAD SHX Text
54.86
AutoCAD SHX Text
54.83
AutoCAD SHX Text
54.66
AutoCAD SHX Text
55.44
AutoCAD SHX Text
55.47
AutoCAD SHX Text
55.54
AutoCAD SHX Text
55.73
AutoCAD SHX Text
55.99
AutoCAD SHX Text
56.31
AutoCAD SHX Text
56.22
AutoCAD SHX Text
55.93
AutoCAD SHX Text
55.69
AutoCAD SHX Text
55.53
AutoCAD SHX Text
55.67
AutoCAD SHX Text
55.88
AutoCAD SHX Text
56.17
AutoCAD SHX Text
56.28
AutoCAD SHX Text
56.29
AutoCAD SHX Text
56.17
AutoCAD SHX Text
55.91
AutoCAD SHX Text
55.71
AutoCAD SHX Text
55.50
AutoCAD SHX Text
55.29
AutoCAD SHX Text
55.09
AutoCAD SHX Text
54.90
AutoCAD SHX Text
55.82
AutoCAD SHX Text
55.73
AutoCAD SHX Text
55.86
AutoCAD SHX Text
56.01
AutoCAD SHX Text
56.19
AutoCAD SHX Text
56.35
AutoCAD SHX Text
60.38
AutoCAD SHX Text
58.44
AutoCAD SHX Text
62.90
AutoCAD SHX Text
64.92
AutoCAD SHX Text
62.87
AutoCAD SHX Text
63.35
AutoCAD SHX Text
61.06
AutoCAD SHX Text
61.54
AutoCAD SHX Text
62.47
AutoCAD SHX Text
59.97
AutoCAD SHX Text
60.00
AutoCAD SHX Text
59.98
AutoCAD SHX Text
TD59.63
AutoCAD SHX Text
TD59.80
AutoCAD SHX Text
FL57.44
AutoCAD SHX Text
TW59.79
AutoCAD SHX Text
BW58.01
AutoCAD SHX Text
61.37
AutoCAD SHX Text
62.47
AutoCAD SHX Text
62.18
AutoCAD SHX Text
59.80
AutoCAD SHX Text
60.37
AutoCAD SHX Text
59.79
AutoCAD SHX Text
TD59.47
AutoCAD SHX Text
TD59.63
AutoCAD SHX Text
TW59.64
AutoCAD SHX Text
TW59.60
AutoCAD SHX Text
BW57.41
AutoCAD SHX Text
BW57.58
AutoCAD SHX Text
FL57.25
AutoCAD SHX Text
FL57.11
AutoCAD SHX Text
60.40
AutoCAD SHX Text
61.19
AutoCAD SHX Text
62.19
AutoCAD SHX Text
61.92
AutoCAD SHX Text
59.46
AutoCAD SHX Text
59.46
AutoCAD SHX Text
59.46
AutoCAD SHX Text
TD59.15
AutoCAD SHX Text
TD59.25
AutoCAD SHX Text
TW58.99
AutoCAD SHX Text
FL56.85
AutoCAD SHX Text
FL56.77
AutoCAD SHX Text
54.91
AutoCAD SHX Text
54.84
AutoCAD SHX Text
54.72
AutoCAD SHX Text
55.51
AutoCAD SHX Text
55.73
AutoCAD SHX Text
56.01
AutoCAD SHX Text
56.13
AutoCAD SHX Text
55.70
AutoCAD SHX Text
55.87
AutoCAD SHX Text
56.05
AutoCAD SHX Text
56.21
AutoCAD SHX Text
55.61
AutoCAD SHX Text
55.48
AutoCAD SHX Text
55.51
AutoCAD SHX Text
55.64
AutoCAD SHX Text
55.66
AutoCAD SHX Text
55.61
AutoCAD SHX Text
55.51
AutoCAD SHX Text
55.37
AutoCAD SHX Text
55.22
AutoCAD SHX Text
55.07
AutoCAD SHX Text
54.91
AutoCAD SHX Text
54.74
AutoCAD SHX Text
54.63
AutoCAD SHX Text
54.59
AutoCAD SHX Text
54.40
AutoCAD SHX Text
54.16
AutoCAD SHX Text
53.86
AutoCAD SHX Text
53.62
AutoCAD SHX Text
53.40
AutoCAD SHX Text
53.32
AutoCAD SHX Text
53.17
AutoCAD SHX Text
53.06
AutoCAD SHX Text
52.69
AutoCAD SHX Text
52.43
AutoCAD SHX Text
52.45
AutoCAD SHX Text
52.67
AutoCAD SHX Text
52.79
AutoCAD SHX Text
52.99
AutoCAD SHX Text
53.30
AutoCAD SHX Text
53.55
AutoCAD SHX Text
52.39
AutoCAD SHX Text
52.83
AutoCAD SHX Text
52.49
AutoCAD SHX Text
52.38
AutoCAD SHX Text
52.53
AutoCAD SHX Text
52.74
AutoCAD SHX Text
53.03
AutoCAD SHX Text
53.31
AutoCAD SHX Text
53.63
AutoCAD SHX Text
53.89
AutoCAD SHX Text
54.19
AutoCAD SHX Text
54.31
AutoCAD SHX Text
54.49
AutoCAD SHX Text
54.63
AutoCAD SHX Text
54.85
AutoCAD SHX Text
55.04
AutoCAD SHX Text
55.23
AutoCAD SHX Text
55.44
AutoCAD SHX Text
55.56
AutoCAD SHX Text
55.55
AutoCAD SHX Text
55.45
AutoCAD SHX Text
55.37
AutoCAD SHX Text
55.40
AutoCAD SHX Text
55.47
AutoCAD SHX Text
55.59
AutoCAD SHX Text
55.48
AutoCAD SHX Text
55.55
AutoCAD SHX Text
54.81
AutoCAD SHX Text
54.06
AutoCAD SHX Text
54.14
AutoCAD SHX Text
53.87
AutoCAD SHX Text
53.87
AutoCAD SHX Text
54.58
AutoCAD SHX Text
54.94
AutoCAD SHX Text
55.05
AutoCAD SHX Text
54.88
AutoCAD SHX Text
54.92
AutoCAD SHX Text
54.98
AutoCAD SHX Text
55.03
AutoCAD SHX Text
55.10
AutoCAD SHX Text
55.10
AutoCAD SHX Text
55.02
AutoCAD SHX Text
54.84
AutoCAD SHX Text
54.65
AutoCAD SHX Text
54.43
AutoCAD SHX Text
54.25
AutoCAD SHX Text
54.08
AutoCAD SHX Text
54.00
AutoCAD SHX Text
53.83
AutoCAD SHX Text
53.55
AutoCAD SHX Text
53.23
AutoCAD SHX Text
53.26
AutoCAD SHX Text
53.10
AutoCAD SHX Text
53.27
AutoCAD SHX Text
53.31
AutoCAD SHX Text
53.51
AutoCAD SHX Text
53.77
AutoCAD SHX Text
53.96
AutoCAD SHX Text
54.01
AutoCAD SHX Text
53.86
AutoCAD SHX Text
54.07
AutoCAD SHX Text
54.26
AutoCAD SHX Text
54.54
AutoCAD SHX Text
54.70
AutoCAD SHX Text
54.73
AutoCAD SHX Text
54.52
AutoCAD SHX Text
54.34
AutoCAD SHX Text
54.14
AutoCAD SHX Text
53.75
AutoCAD SHX Text
53.55
AutoCAD SHX Text
53.35
AutoCAD SHX Text
53.20
AutoCAD SHX Text
53.01
AutoCAD SHX Text
52.79
AutoCAD SHX Text
52.61
AutoCAD SHX Text
52.40
AutoCAD SHX Text
52.83
AutoCAD SHX Text
52.69
AutoCAD SHX Text
52.36
AutoCAD SHX Text
52.53
AutoCAD SHX Text
52.70
AutoCAD SHX Text
52.89
AutoCAD SHX Text
53.12
AutoCAD SHX Text
53.39
AutoCAD SHX Text
53.75
AutoCAD SHX Text
54.03
AutoCAD SHX Text
54.26
AutoCAD SHX Text
54.32
AutoCAD SHX Text
54.11
AutoCAD SHX Text
54.43
AutoCAD SHX Text
54.64
AutoCAD SHX Text
54.87
AutoCAD SHX Text
55.14
AutoCAD SHX Text
55.44
AutoCAD SHX Text
55.70
AutoCAD SHX Text
55.76
AutoCAD SHX Text
55.58
AutoCAD SHX Text
55.09
AutoCAD SHX Text
55.18
AutoCAD SHX Text
55.26
AutoCAD SHX Text
55.17
AutoCAD SHX Text
54.92
AutoCAD SHX Text
54.69
AutoCAD SHX Text
54.48
AutoCAD SHX Text
54.24
AutoCAD SHX Text
54.01
AutoCAD SHX Text
53.81
AutoCAD SHX Text
53.55
AutoCAD SHX Text
53.19
AutoCAD SHX Text
52.49
AutoCAD SHX Text
52.64
AutoCAD SHX Text
52.80
AutoCAD SHX Text
52.91
AutoCAD SHX Text
53.03
AutoCAD SHX Text
55.84
AutoCAD SHX Text
56.85
AutoCAD SHX Text
56.47
AutoCAD SHX Text
52.24
AutoCAD SHX Text
52.39
AutoCAD SHX Text
52.60
AutoCAD SHX Text
52.89
AutoCAD SHX Text
53.17
AutoCAD SHX Text
53.49
AutoCAD SHX Text
53.74
AutoCAD SHX Text
54.05
AutoCAD SHX Text
54.17
AutoCAD SHX Text
54.35
AutoCAD SHX Text
54.49
AutoCAD SHX Text
54.71
AutoCAD SHX Text
54.90
AutoCAD SHX Text
55.09
AutoCAD SHX Text
55.30
AutoCAD SHX Text
55.42
AutoCAD SHX Text
55.42
AutoCAD SHX Text
55.41
AutoCAD SHX Text
55.31
AutoCAD SHX Text
55.23
AutoCAD SHX Text
55.26
AutoCAD SHX Text
55.32
AutoCAD SHX Text
55.45
AutoCAD SHX Text
54.96
AutoCAD SHX Text
54.96
AutoCAD SHX Text
54.88
AutoCAD SHX Text
54.69
AutoCAD SHX Text
54.50
AutoCAD SHX Text
54.28
AutoCAD SHX Text
54.10
AutoCAD SHX Text
53.94
AutoCAD SHX Text
53.85
AutoCAD SHX Text
53.69
AutoCAD SHX Text
53.40
AutoCAD SHX Text
53.09
AutoCAD SHX Text
53.15
AutoCAD SHX Text
53.35
AutoCAD SHX Text
53.61
AutoCAD SHX Text
53.80
AutoCAD SHX Text
53.91
AutoCAD SHX Text
54.09
AutoCAD SHX Text
54.38
AutoCAD SHX Text
54.54
AutoCAD SHX Text
52.21
AutoCAD SHX Text
52.38
AutoCAD SHX Text
52.56
AutoCAD SHX Text
52.75
AutoCAD SHX Text
52.97
AutoCAD SHX Text
53.24
AutoCAD SHX Text
53.60
AutoCAD SHX Text
53.88
AutoCAD SHX Text
54.11
AutoCAD SHX Text
54.17
AutoCAD SHX Text
54.26
AutoCAD SHX Text
54.48
AutoCAD SHX Text
54.71
AutoCAD SHX Text
54.98
AutoCAD SHX Text
55.27
AutoCAD SHX Text
55.54
AutoCAD SHX Text
55.66
AutoCAD SHX Text
55.82
AutoCAD SHX Text
55.89
AutoCAD SHX Text
55.87
AutoCAD SHX Text
55.68
AutoCAD SHX Text
55.83
AutoCAD SHX Text
55.89
AutoCAD SHX Text
55.96
AutoCAD SHX Text
56.03
AutoCAD SHX Text
56.14
AutoCAD SHX Text
56.24
AutoCAD SHX Text
56.32
AutoCAD SHX Text
56.46
AutoCAD SHX Text
56.58
AutoCAD SHX Text
56.67
AutoCAD SHX Text
56.90
AutoCAD SHX Text
57.24
AutoCAD SHX Text
57.57
AutoCAD SHX Text
57.78
AutoCAD SHX Text
57.89
AutoCAD SHX Text
58.33
AutoCAD SHX Text
58.64
AutoCAD SHX Text
59.02
AutoCAD SHX Text
59.15
AutoCAD SHX Text
58.89
AutoCAD SHX Text
59.25
AutoCAD SHX Text
59.37
AutoCAD SHX Text
59.60
AutoCAD SHX Text
59.86
AutoCAD SHX Text
60.09
AutoCAD SHX Text
60.31
AutoCAD SHX Text
60.49
AutoCAD SHX Text
60.54
AutoCAD SHX Text
60.53
AutoCAD SHX Text
60.52
AutoCAD SHX Text
60.40
AutoCAD SHX Text
60.25
AutoCAD SHX Text
60.08
AutoCAD SHX Text
59.93
AutoCAD SHX Text
59.72
AutoCAD SHX Text
59.72
AutoCAD SHX Text
59.50
AutoCAD SHX Text
59.35
AutoCAD SHX Text
59.21
AutoCAD SHX Text
58.99
AutoCAD SHX Text
58.95
AutoCAD SHX Text
59.07
AutoCAD SHX Text
59.19
AutoCAD SHX Text
57.94
AutoCAD SHX Text
57.88
AutoCAD SHX Text
57.91
AutoCAD SHX Text
57.90
AutoCAD SHX Text
57.84
AutoCAD SHX Text
57.78
AutoCAD SHX Text
57.67
AutoCAD SHX Text
57.69
AutoCAD SHX Text
57.53
AutoCAD SHX Text
57.43
AutoCAD SHX Text
57.24
AutoCAD SHX Text
57.03
AutoCAD SHX Text
56.85
AutoCAD SHX Text
56.58
AutoCAD SHX Text
56.33
AutoCAD SHX Text
56.13
AutoCAD SHX Text
56.00
AutoCAD SHX Text
55.87
AutoCAD SHX Text
55.76
AutoCAD SHX Text
55.67
AutoCAD SHX Text
55.77
AutoCAD SHX Text
57.33
AutoCAD SHX Text
55.78
AutoCAD SHX Text
55.81
AutoCAD SHX Text
55.81
AutoCAD SHX Text
55.86
AutoCAD SHX Text
55.78
AutoCAD SHX Text
55.76
AutoCAD SHX Text
55.75
AutoCAD SHX Text
55.62
AutoCAD SHX Text
55.60
AutoCAD SHX Text
55.58
AutoCAD SHX Text
55.57
AutoCAD SHX Text
55.60
AutoCAD SHX Text
55.50
AutoCAD SHX Text
55.68
AutoCAD SHX Text
55.77
AutoCAD SHX Text
55.84
AutoCAD SHX Text
55.78
AutoCAD SHX Text
55.84
AutoCAD SHX Text
55.82
AutoCAD SHX Text
55.81
AutoCAD SHX Text
55.80
AutoCAD SHX Text
55.79
AutoCAD SHX Text
55.80
AutoCAD SHX Text
55.79
AutoCAD SHX Text
55.80
AutoCAD SHX Text
55.79
AutoCAD SHX Text
55.79
AutoCAD SHX Text
55.84
AutoCAD SHX Text
55.79
AutoCAD SHX Text
55.78
AutoCAD SHX Text
55.75
AutoCAD SHX Text
55.78
AutoCAD SHX Text
55.79
AutoCAD SHX Text
55.79
AutoCAD SHX Text
55.84
AutoCAD SHX Text
55.84
AutoCAD SHX Text
55.83
AutoCAD SHX Text
55.84
AutoCAD SHX Text
55.83
AutoCAD SHX Text
55.78
AutoCAD SHX Text
55.84
AutoCAD SHX Text
55.79
AutoCAD SHX Text
55.76
AutoCAD SHX Text
55.76
AutoCAD SHX Text
55.85
AutoCAD SHX Text
55.82
AutoCAD SHX Text
55.82
AutoCAD SHX Text
55.84
AutoCAD SHX Text
55.81
AutoCAD SHX Text
55.79
AutoCAD SHX Text
55.74
AutoCAD SHX Text
55.79
AutoCAD SHX Text
55.73
AutoCAD SHX Text
55.66
AutoCAD SHX Text
55.74
AutoCAD SHX Text
55.69
AutoCAD SHX Text
55.60
AutoCAD SHX Text
55.59
AutoCAD SHX Text
55.66
AutoCAD SHX Text
55.76
AutoCAD SHX Text
55.75
AutoCAD SHX Text
55.65
AutoCAD SHX Text
55.78
AutoCAD SHX Text
55.82
AutoCAD SHX Text
55.81
AutoCAD SHX Text
55.81
AutoCAD SHX Text
55.79
AutoCAD SHX Text
55.79
AutoCAD SHX Text
55.83
AutoCAD SHX Text
55.79
AutoCAD SHX Text
55.62
AutoCAD SHX Text
55.70
AutoCAD SHX Text
55.64
AutoCAD SHX Text
55.49
AutoCAD SHX Text
55.57
AutoCAD SHX Text
55.75
AutoCAD SHX Text
55.64
AutoCAD SHX Text
55.79
AutoCAD SHX Text
55.84
AutoCAD SHX Text
55.77
AutoCAD SHX Text
55.80
AutoCAD SHX Text
55.80
AutoCAD SHX Text
55.72
AutoCAD SHX Text
55.67
AutoCAD SHX Text
55.72
AutoCAD SHX Text
55.68
AutoCAD SHX Text
55.64
AutoCAD SHX Text
55.68
AutoCAD SHX Text
55.70
AutoCAD SHX Text
55.66
AutoCAD SHX Text
55.66
AutoCAD SHX Text
55.43
AutoCAD SHX Text
55.46
AutoCAD SHX Text
55.86
AutoCAD SHX Text
55.77
AutoCAD SHX Text
55.67
AutoCAD SHX Text
55.78
AutoCAD SHX Text
55.80
AutoCAD SHX Text
55.79
AutoCAD SHX Text
55.66
AutoCAD SHX Text
55.75
AutoCAD SHX Text
55.94
AutoCAD SHX Text
55.81
AutoCAD SHX Text
55.83
AutoCAD SHX Text
55.82
AutoCAD SHX Text
55.85
AutoCAD SHX Text
55.83
AutoCAD SHX Text
55.81
AutoCAD SHX Text
55.85
AutoCAD SHX Text
55.87
AutoCAD SHX Text
55.85
AutoCAD SHX Text
55.87
AutoCAD SHX Text
55.87
AutoCAD SHX Text
55.83
AutoCAD SHX Text
55.89
AutoCAD SHX Text
56.08
AutoCAD SHX Text
56.08
AutoCAD SHX Text
55.82
AutoCAD SHX Text
55.81
AutoCAD SHX Text
55.84
AutoCAD SHX Text
55.92
AutoCAD SHX Text
55.95
AutoCAD SHX Text
55.87
AutoCAD SHX Text
55.96
AutoCAD SHX Text
55.91
AutoCAD SHX Text
55.86
AutoCAD SHX Text
55.78
AutoCAD SHX Text
55.83
AutoCAD SHX Text
55.86
AutoCAD SHX Text
55.80
AutoCAD SHX Text
55.92
AutoCAD SHX Text
55.98
AutoCAD SHX Text
56.13
AutoCAD SHX Text
56.27
AutoCAD SHX Text
55.87
AutoCAD SHX Text
56.05
AutoCAD SHX Text
56.45
AutoCAD SHX Text
56.71
AutoCAD SHX Text
56.86
AutoCAD SHX Text
56.57
AutoCAD SHX Text
56.73
AutoCAD SHX Text
56.84
AutoCAD SHX Text
57.07
AutoCAD SHX Text
57.39
AutoCAD SHX Text
57.65
AutoCAD SHX Text
57.85
AutoCAD SHX Text
58.01
AutoCAD SHX Text
58.27
AutoCAD SHX Text
57.73
AutoCAD SHX Text
57.67
AutoCAD SHX Text
57.59
AutoCAD SHX Text
57.24
AutoCAD SHX Text
57.33
AutoCAD SHX Text
57.49
AutoCAD SHX Text
57.19
AutoCAD SHX Text
57.16
AutoCAD SHX Text
57.02
AutoCAD SHX Text
56.77
AutoCAD SHX Text
56.77
AutoCAD SHX Text
56.86
AutoCAD SHX Text
56.26
AutoCAD SHX Text
55.60
AutoCAD SHX Text
55.91
AutoCAD SHX Text
55.90
AutoCAD SHX Text
55.89
AutoCAD SHX Text
55.92
AutoCAD SHX Text
55.93
AutoCAD SHX Text
55.96
AutoCAD SHX Text
56.00
AutoCAD SHX Text
56.02
AutoCAD SHX Text
56.00
AutoCAD SHX Text
55.99
AutoCAD SHX Text
56.04
AutoCAD SHX Text
56.09
AutoCAD SHX Text
56.30
AutoCAD SHX Text
56.48
AutoCAD SHX Text
56.73
AutoCAD SHX Text
56.88
AutoCAD SHX Text
56.70
AutoCAD SHX Text
56.81
AutoCAD SHX Text
57.01
AutoCAD SHX Text
57.22
AutoCAD SHX Text
57.36
AutoCAD SHX Text
57.55
AutoCAD SHX Text
57.35
AutoCAD SHX Text
57.46
AutoCAD SHX Text
57.66
AutoCAD SHX Text
57.84
AutoCAD SHX Text
57.90
AutoCAD SHX Text
58.00
AutoCAD SHX Text
58.13
AutoCAD SHX Text
58.05
AutoCAD SHX Text
57.93
AutoCAD SHX Text
57.89
AutoCAD SHX Text
57.90
AutoCAD SHX Text
57.96
AutoCAD SHX Text
58.15
AutoCAD SHX Text
58.24
AutoCAD SHX Text
59.17
AutoCAD SHX Text
58.92
AutoCAD SHX Text
58.77
AutoCAD SHX Text
58.68
AutoCAD SHX Text
58.50
AutoCAD SHX Text
58.34
AutoCAD SHX Text
58.05
AutoCAD SHX Text
57.80
AutoCAD SHX Text
57.61
AutoCAD SHX Text
57.33
AutoCAD SHX Text
56.96
AutoCAD SHX Text
56.55
AutoCAD SHX Text
56.41
AutoCAD SHX Text
56.34
AutoCAD SHX Text
56.14
AutoCAD SHX Text
56.24
AutoCAD SHX Text
56.15
AutoCAD SHX Text
56.19
AutoCAD SHX Text
56.24
AutoCAD SHX Text
56.28
AutoCAD SHX Text
56.37
AutoCAD SHX Text
56.43
AutoCAD SHX Text
56.48
AutoCAD SHX Text
56.57
AutoCAD SHX Text
56.62
AutoCAD SHX Text
56.98
AutoCAD SHX Text
57.08
AutoCAD SHX Text
56.85
AutoCAD SHX Text
56.91
AutoCAD SHX Text
56.98
AutoCAD SHX Text
57.07
AutoCAD SHX Text
57.14
AutoCAD SHX Text
57.20
AutoCAD SHX Text
57.27
AutoCAD SHX Text
57.03
AutoCAD SHX Text
56.98
AutoCAD SHX Text
56.92
AutoCAD SHX Text
56.64
AutoCAD SHX Text
56.59
AutoCAD SHX Text
56.50
AutoCAD SHX Text
56.43
AutoCAD SHX Text
56.38
AutoCAD SHX Text
56.32
AutoCAD SHX Text
56.06
AutoCAD SHX Text
55.99
AutoCAD SHX Text
55.93
AutoCAD SHX Text
59.07
AutoCAD SHX Text
60.26
AutoCAD SHX Text
60.27
AutoCAD SHX Text
59.06
AutoCAD SHX Text
61.35
AutoCAD SHX Text
61.04
AutoCAD SHX Text
55.83
AutoCAD SHX Text
55.70
AutoCAD SHX Text
55.72
AutoCAD SHX Text
55.71
AutoCAD SHX Text
56.16
AutoCAD SHX Text
56.18
AutoCAD SHX Text
56.16
AutoCAD SHX Text
56.15
AutoCAD SHX Text
56.19
AutoCAD SHX Text
56.25
AutoCAD SHX Text
56.46
AutoCAD SHX Text
56.63
AutoCAD SHX Text
56.89
AutoCAD SHX Text
57.03
AutoCAD SHX Text
56.86
AutoCAD SHX Text
56.96
AutoCAD SHX Text
57.16
AutoCAD SHX Text
57.37
AutoCAD SHX Text
57.52
AutoCAD SHX Text
57.70
AutoCAD SHX Text
57.51
AutoCAD SHX Text
57.62
AutoCAD SHX Text
57.81
AutoCAD SHX Text
57.99
AutoCAD SHX Text
58.05
AutoCAD SHX Text
58.16
AutoCAD SHX Text
58.29
AutoCAD SHX Text
58.22
AutoCAD SHX Text
58.10
AutoCAD SHX Text
58.05
AutoCAD SHX Text
58.06
AutoCAD SHX Text
58.12
AutoCAD SHX Text
58.32
AutoCAD SHX Text
58.41
AutoCAD SHX Text
55.79
AutoCAD SHX Text
55.84
AutoCAD SHX Text
57.32
AutoCAD SHX Text
55.78
AutoCAD SHX Text
56.81
AutoCAD SHX Text
62.04
AutoCAD SHX Text
62.07
AutoCAD SHX Text
61.98
AutoCAD SHX Text
61.98
AutoCAD SHX Text
62.07
AutoCAD SHX Text
60.34
AutoCAD SHX Text
59.11
AutoCAD SHX Text
59.09
AutoCAD SHX Text
59.10
AutoCAD SHX Text
59.10
AutoCAD SHX Text
60.36
AutoCAD SHX Text
60.44
AutoCAD SHX Text
55.85
AutoCAD SHX Text
55.86
AutoCAD SHX Text
55.85
AutoCAD SHX Text
55.81
AutoCAD SHX Text
55.81
AutoCAD SHX Text
55.80
AutoCAD SHX Text
55.81
AutoCAD SHX Text
55.82
AutoCAD SHX Text
55.80
AutoCAD SHX Text
55.79
AutoCAD SHX Text
55.79
AutoCAD SHX Text
55.77
AutoCAD SHX Text
55.78
AutoCAD SHX Text
55.77
AutoCAD SHX Text
55.58
AutoCAD SHX Text
55.51
AutoCAD SHX Text
55.68
AutoCAD SHX Text
55.79
AutoCAD SHX Text
55.83
AutoCAD SHX Text
55.82
AutoCAD SHX Text
55.85
AutoCAD SHX Text
55.85
AutoCAD SHX Text
55.85
AutoCAD SHX Text
55.86
AutoCAD SHX Text
55.79
AutoCAD SHX Text
55.80
AutoCAD SHX Text
55.73
AutoCAD SHX Text
55.74
AutoCAD SHX Text
55.84
AutoCAD SHX Text
55.86
AutoCAD SHX Text
55.76
AutoCAD SHX Text
55.70
AutoCAD SHX Text
55.70
AutoCAD SHX Text
55.67
AutoCAD SHX Text
55.48
AutoCAD SHX Text
55.32
AutoCAD SHX Text
55.19
AutoCAD SHX Text
55.06
AutoCAD SHX Text
54.96
AutoCAD SHX Text
55.07
AutoCAD SHX Text
55.67
AutoCAD SHX Text
55.82
AutoCAD SHX Text
55.56
AutoCAD SHX Text
54.95
AutoCAD SHX Text
55.20
AutoCAD SHX Text
55.20
AutoCAD SHX Text
55.53
AutoCAD SHX Text
55.85
AutoCAD SHX Text
55.57
AutoCAD SHX Text
55.83
AutoCAD SHX Text
55.87
AutoCAD SHX Text
55.86
AutoCAD SHX Text
55.81
AutoCAD SHX Text
55.79
AutoCAD SHX Text
55.84
AutoCAD SHX Text
55.82
AutoCAD SHX Text
55.82
AutoCAD SHX Text
55.77
AutoCAD SHX Text
55.77
AutoCAD SHX Text
55.78
AutoCAD SHX Text
55.77
AutoCAD SHX Text
55.76
AutoCAD SHX Text
55.79
AutoCAD SHX Text
55.77
AutoCAD SHX Text
55.75
AutoCAD SHX Text
55.77
AutoCAD SHX Text
55.77
AutoCAD SHX Text
55.82
AutoCAD SHX Text
55.82
AutoCAD SHX Text
55.79
AutoCAD SHX Text
55.78
AutoCAD SHX Text
55.78
AutoCAD SHX Text
55.73
AutoCAD SHX Text
55.78
AutoCAD SHX Text
55.75
AutoCAD SHX Text
55.79
AutoCAD SHX Text
55.79
AutoCAD SHX Text
55.79
AutoCAD SHX Text
55.73
AutoCAD SHX Text
55.81
AutoCAD SHX Text
55.79
AutoCAD SHX Text
55.83
AutoCAD SHX Text
55.77
AutoCAD SHX Text
55.77
AutoCAD SHX Text
55.83
AutoCAD SHX Text
55.77
AutoCAD SHX Text
55.76
AutoCAD SHX Text
55.76
AutoCAD SHX Text
55.38
AutoCAD SHX Text
55.29
AutoCAD SHX Text
61.08
AutoCAD SHX Text
62.06
AutoCAD SHX Text
61.65
AutoCAD SHX Text
63.17
AutoCAD SHX Text
63.15
AutoCAD SHX Text
55.69
AutoCAD SHX Text
55.68
AutoCAD SHX Text
55.33
AutoCAD SHX Text
55.24
AutoCAD SHX Text
55.09
AutoCAD SHX Text
55.79
AutoCAD SHX Text
55.52
AutoCAD SHX Text
55.83
AutoCAD SHX Text
55.88
AutoCAD SHX Text
56.30
AutoCAD SHX Text
56.13
AutoCAD SHX Text
56.01
AutoCAD SHX Text
55.79
AutoCAD SHX Text
55.73
AutoCAD SHX Text
55.79
AutoCAD SHX Text
55.76
AutoCAD SHX Text
55.45
AutoCAD SHX Text
59.63
AutoCAD SHX Text
55.79
AutoCAD SHX Text
55.77
AutoCAD SHX Text
55.70
AutoCAD SHX Text
55.70
AutoCAD SHX Text
55.77
AutoCAD SHX Text
55.76
AutoCAD SHX Text
55.76
AutoCAD SHX Text
55.77
AutoCAD SHX Text
55.78
AutoCAD SHX Text
55.76
AutoCAD SHX Text
55.76
AutoCAD SHX Text
55.76
AutoCAD SHX Text
55.76
AutoCAD SHX Text
55.76
AutoCAD SHX Text
55.76
AutoCAD SHX Text
55.82
AutoCAD SHX Text
55.71
AutoCAD SHX Text
55.78
AutoCAD SHX Text
55.77
AutoCAD SHX Text
55.72
AutoCAD SHX Text
55.74
AutoCAD SHX Text
55.79
AutoCAD SHX Text
55.88
AutoCAD SHX Text
55.85
AutoCAD SHX Text
55.85
AutoCAD SHX Text
55.85
AutoCAD SHX Text
55.86
AutoCAD SHX Text
55.87
AutoCAD SHX Text
62.90
AutoCAD SHX Text
59.07
AutoCAD SHX Text
61.99
AutoCAD SHX Text
61.98
AutoCAD SHX Text
61.98
AutoCAD SHX Text
62.97
AutoCAD SHX Text
55.75
AutoCAD SHX Text
59.11
AutoCAD SHX Text
58.91
AutoCAD SHX Text
63.16
AutoCAD SHX Text
55.81
AutoCAD SHX Text
55.83
AutoCAD SHX Text
55.85
AutoCAD SHX Text
55.85
AutoCAD SHX Text
55.86
AutoCAD SHX Text
55.75
AutoCAD SHX Text
55.88
AutoCAD SHX Text
55.85
AutoCAD SHX Text
55.86
AutoCAD SHX Text
55.87
AutoCAD SHX Text
55.83
AutoCAD SHX Text
55.86
AutoCAD SHX Text
55.86
AutoCAD SHX Text
55.83
AutoCAD SHX Text
55.83
AutoCAD SHX Text
55.82
AutoCAD SHX Text
55.83
AutoCAD SHX Text
55.85
AutoCAD SHX Text
58.92
AutoCAD SHX Text
58.93
AutoCAD SHX Text
55.86
AutoCAD SHX Text
55.85
AutoCAD SHX Text
55.86
AutoCAD SHX Text
55.86
AutoCAD SHX Text
55.86
AutoCAD SHX Text
55.85
AutoCAD SHX Text
55.85
AutoCAD SHX Text
55.85
AutoCAD SHX Text
55.83
AutoCAD SHX Text
55.60
AutoCAD SHX Text
55.50
AutoCAD SHX Text
55.57
AutoCAD SHX Text
55.74
AutoCAD SHX Text
55.75
AutoCAD SHX Text
55.83
AutoCAD SHX Text
55.81
AutoCAD SHX Text
55.73
AutoCAD SHX Text
55.63
AutoCAD SHX Text
55.60
AutoCAD SHX Text
55.72
AutoCAD SHX Text
55.67
AutoCAD SHX Text
55.78
AutoCAD SHX Text
55.78
AutoCAD SHX Text
55.77
AutoCAD SHX Text
55.82
AutoCAD SHX Text
55.55
AutoCAD SHX Text
55.51
AutoCAD SHX Text
55.39
AutoCAD SHX Text
55.31
AutoCAD SHX Text
55.23
AutoCAD SHX Text
55.22
AutoCAD SHX Text
55.23
AutoCAD SHX Text
55.14
AutoCAD SHX Text
54.61
AutoCAD SHX Text
54.70
AutoCAD SHX Text
54.53
AutoCAD SHX Text
54.43
AutoCAD SHX Text
54.33
AutoCAD SHX Text
62.83
AutoCAD SHX Text
62.90
AutoCAD SHX Text
63.15
AutoCAD SHX Text
58.67
AutoCAD SHX Text
56.13
AutoCAD SHX Text
56.51
AutoCAD SHX Text
56.88
AutoCAD SHX Text
57.22
AutoCAD SHX Text
57.26
AutoCAD SHX Text
56.75
AutoCAD SHX Text
56.40
AutoCAD SHX Text
56.34
AutoCAD SHX Text
56.04
AutoCAD SHX Text
56.38
AutoCAD SHX Text
56.84
AutoCAD SHX Text
57.23
AutoCAD SHX Text
57.62
AutoCAD SHX Text
57.70
AutoCAD SHX Text
57.88
AutoCAD SHX Text
59.17
AutoCAD SHX Text
58.86
AutoCAD SHX Text
58.54
AutoCAD SHX Text
58.31
AutoCAD SHX Text
57.97
AutoCAD SHX Text
57.79
AutoCAD SHX Text
57.64
AutoCAD SHX Text
57.64
AutoCAD SHX Text
57.49
AutoCAD SHX Text
57.10
AutoCAD SHX Text
57.01
AutoCAD SHX Text
57.51
AutoCAD SHX Text
57.66
AutoCAD SHX Text
57.93
AutoCAD SHX Text
58.01
AutoCAD SHX Text
58.40
AutoCAD SHX Text
58.21
AutoCAD SHX Text
58.24
AutoCAD SHX Text
55.84
AutoCAD SHX Text
55.84
AutoCAD SHX Text
55.84
AutoCAD SHX Text
55.82
AutoCAD SHX Text
55.84
AutoCAD SHX Text
55.86
AutoCAD SHX Text
55.77
AutoCAD SHX Text
55.66
AutoCAD SHX Text
58.86
AutoCAD SHX Text
55.77
AutoCAD SHX Text
55.81
AutoCAD SHX Text
55.81
AutoCAD SHX Text
55.80
AutoCAD SHX Text
55.81
AutoCAD SHX Text
55.78
AutoCAD SHX Text
55.80
AutoCAD SHX Text
55.82
AutoCAD SHX Text
55.60
AutoCAD SHX Text
55.70
AutoCAD SHX Text
55.81
AutoCAD SHX Text
55.82
AutoCAD SHX Text
55.85
AutoCAD SHX Text
63.16
AutoCAD SHX Text
55.81
AutoCAD SHX Text
55.08
AutoCAD SHX Text
55.30
AutoCAD SHX Text
55.51
AutoCAD SHX Text
55.49
AutoCAD SHX Text
55.55
AutoCAD SHX Text
55.40
AutoCAD SHX Text
55.56
AutoCAD SHX Text
55.51
AutoCAD SHX Text
59.43
AutoCAD SHX Text
59.43
AutoCAD SHX Text
59.42
AutoCAD SHX Text
59.41
AutoCAD SHX Text
59.42
AutoCAD SHX Text
59.42
AutoCAD SHX Text
59.85
AutoCAD SHX Text
60.36
AutoCAD SHX Text
59.85
AutoCAD SHX Text
55.61
AutoCAD SHX Text
55.56
AutoCAD SHX Text
55.59
AutoCAD SHX Text
55.68
AutoCAD SHX Text
55.71
AutoCAD SHX Text
55.95
AutoCAD SHX Text
56.06
AutoCAD SHX Text
56.33
AutoCAD SHX Text
55.67
AutoCAD SHX Text
55.63
AutoCAD SHX Text
55.65
AutoCAD SHX Text
55.76
AutoCAD SHX Text
55.76
AutoCAD SHX Text
SEWER
AutoCAD SHX Text
SS
AutoCAD SHX Text
SS
AutoCAD SHX Text
SS
AutoCAD SHX Text
SEWER
AutoCAD SHX Text
E0.6
AutoCAD SHX Text
E0.5
AutoCAD SHX Text
SS
AutoCAD SHX Text
IC
AutoCAD SHX Text
POLY
AutoCAD SHX Text
E.8
AutoCAD SHX Text
E.5
AutoCAD SHX Text
TEL
AutoCAD SHX Text
W1.2
AutoCAD SHX Text
GAS.8
AutoCAD SHX Text
LP
AutoCAD SHX Text
SP
AutoCAD SHX Text
57.25
AutoCAD SHX Text
57.09
AutoCAD SHX Text
57.03
AutoCAD SHX Text
56.84
AutoCAD SHX Text
56.73
AutoCAD SHX Text
56.63
AutoCAD SHX Text
56.36
AutoCAD SHX Text
56.75
AutoCAD SHX Text
56.59
AutoCAD SHX Text
56.89
AutoCAD SHX Text
56.42
AutoCAD SHX Text
56.68
AutoCAD SHX Text
56.99
AutoCAD SHX Text
57.19
AutoCAD SHX Text
57.31
AutoCAD SHX Text
57.48
AutoCAD SHX Text
56.70
AutoCAD SHX Text
56.59
AutoCAD SHX Text
56.49
AutoCAD SHX Text
56.23
AutoCAD SHX Text
EMPTY
AutoCAD SHX Text
SS
AutoCAD SHX Text
IC
AutoCAD SHX Text
TEL
AutoCAD SHX Text
TEL
AutoCAD SHX Text
TEL
AutoCAD SHX Text
IC
AutoCAD SHX Text
IC
AutoCAD SHX Text
TEL
AutoCAD SHX Text
55.82
AutoCAD SHX Text
IC
AutoCAD SHX Text
TEL
AutoCAD SHX Text
IC
AutoCAD SHX Text
IC
AutoCAD SHX Text
IC
AutoCAD SHX Text
TEL
AutoCAD SHX Text
GU
AutoCAD SHX Text
TEL
AutoCAD SHX Text
STEPS
AutoCAD SHX Text
STEPS
AutoCAD SHX Text
STEPS
AutoCAD SHX Text
GU
AutoCAD SHX Text
POST
AutoCAD SHX Text
POST
AutoCAD SHX Text
POST
AutoCAD SHX Text
POST
AutoCAD SHX Text
POST
AutoCAD SHX Text
POST
AutoCAD SHX Text
POST
AutoCAD SHX Text
POST
AutoCAD SHX Text
POST
AutoCAD SHX Text
SIGN
AutoCAD SHX Text
TEL
AutoCAD SHX Text
SIGN
AutoCAD SHX Text
SIGN
AutoCAD SHX Text
GU
AutoCAD SHX Text
IC
AutoCAD SHX Text
TEL
AutoCAD SHX Text
IC (EMPTY)
AutoCAD SHX Text
GU
AutoCAD SHX Text
IC
AutoCAD SHX Text
TEL
AutoCAD SHX Text
55.73
AutoCAD SHX Text
IC
AutoCAD SHX Text
IC
AutoCAD SHX Text
TEL
AutoCAD SHX Text
GU
AutoCAD SHX Text
TEL
AutoCAD SHX Text
F/P
AutoCAD SHX Text
F/P
AutoCAD SHX Text
GU
AutoCAD SHX Text
IC
AutoCAD SHX Text
POST
AutoCAD SHX Text
POST
AutoCAD SHX Text
POST
AutoCAD SHX Text
BOL
AutoCAD SHX Text
IC
AutoCAD SHX Text
IC
AutoCAD SHX Text
IC
AutoCAD SHX Text
55.85
AutoCAD SHX Text
55.81
AutoCAD SHX Text
IC
AutoCAD SHX Text
IC
AutoCAD SHX Text
IC
AutoCAD SHX Text
TEL
AutoCAD SHX Text
TEL
AutoCAD SHX Text
STEPS
AutoCAD SHX Text
TEL
AutoCAD SHX Text
ELEC
AutoCAD SHX Text
IC
AutoCAD SHX Text
IC
AutoCAD SHX Text
55.85
AutoCAD SHX Text
STEPS
AutoCAD SHX Text
GU
AutoCAD SHX Text
MESH
AutoCAD SHX Text
FENCE
AutoCAD SHX Text
MESH
AutoCAD SHX Text
FENCE
AutoCAD SHX Text
MESH
AutoCAD SHX Text
FENCE
AutoCAD SHX Text
GARDEN
AutoCAD SHX Text
GARDEN
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
METAL
AutoCAD SHX Text
FENCE
AutoCAD SHX Text
GARDEN
AutoCAD SHX Text
GARDEN
AutoCAD SHX Text
METAL
AutoCAD SHX Text
FENCE
AutoCAD SHX Text
METAL
AutoCAD SHX Text
FENCE
AutoCAD SHX Text
METAL
AutoCAD SHX Text
FENCE
AutoCAD SHX Text
METAL
AutoCAD SHX Text
FENCE
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
GARDEN
AutoCAD SHX Text
GARDEN
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
METAL
AutoCAD SHX Text
FENCE
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
IC
AutoCAD SHX Text
MH
AutoCAD SHX Text
BASKETBALL
AutoCAD SHX Text
COURT
AutoCAD SHX Text
SOFT PLAY
AutoCAD SHX Text
SOFT PLAY
AutoCAD SHX Text
SOFT PLAY
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
GU
AutoCAD SHX Text
GU
AutoCAD SHX Text
GU
AutoCAD SHX Text
GU
AutoCAD SHX Text
GU
AutoCAD SHX Text
GU
AutoCAD SHX Text
GU
AutoCAD SHX Text
GU
AutoCAD SHX Text
GU
AutoCAD SHX Text
GU
AutoCAD SHX Text
GU
AutoCAD SHX Text
GU
AutoCAD SHX Text
GU
AutoCAD SHX Text
GU
AutoCAD SHX Text
GU
AutoCAD SHX Text
GU
AutoCAD SHX Text
GU
AutoCAD SHX Text
GU
AutoCAD SHX Text
GU
AutoCAD SHX Text
GU
AutoCAD SHX Text
TEL
AutoCAD SHX Text
GU
AutoCAD SHX Text
TEL
AutoCAD SHX Text
TEL
AutoCAD SHX Text
IC
AutoCAD SHX Text
IC
AutoCAD SHX Text
TEL
AutoCAD SHX Text
GU
AutoCAD SHX Text
GU
AutoCAD SHX Text
GARDEN
AutoCAD SHX Text
GARDEN
AutoCAD SHX Text
GARDEN
AutoCAD SHX Text
GARDEN
AutoCAD SHX Text
METAL
AutoCAD SHX Text
FENCE
AutoCAD SHX Text
METAL
AutoCAD SHX Text
FENCE
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
TEL
AutoCAD SHX Text
TEL
AutoCAD SHX Text
LP
AutoCAD SHX Text
GARDEN
AutoCAD SHX Text
METAL
AutoCAD SHX Text
FENCE
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
SOFT PLAY
AutoCAD SHX Text
SOFT PLAY
AutoCAD SHX Text
SIGNAL
AutoCAD SHX Text
NO
AutoCAD SHX Text
C.7
AutoCAD SHX Text
E.9
AutoCAD SHX Text
E1.0
AutoCAD SHX Text
C0MMS.9
AutoCAD SHX Text
E1.2
AutoCAD SHX Text
METAL
AutoCAD SHX Text
FENCE
AutoCAD SHX Text
METAL
AutoCAD SHX Text
FENCE
AutoCAD SHX Text
RENDERED
AutoCAD SHX Text
WALL
AutoCAD SHX Text
METAL
AutoCAD SHX Text
FENCE
AutoCAD SHX Text
METAL
AutoCAD SHX Text
FENCE
AutoCAD SHX Text
METAL
AutoCAD SHX Text
FENCE
AutoCAD SHX Text
METAL
AutoCAD SHX Text
FENCE
AutoCAD SHX Text
METAL
AutoCAD SHX Text
FENCE
AutoCAD SHX Text
METAL
AutoCAD SHX Text
FENCE
AutoCAD SHX Text
METAL
AutoCAD SHX Text
FENCE
AutoCAD SHX Text
METAL
AutoCAD SHX Text
FENCE
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
GARDEN
AutoCAD SHX Text
GARDEN
AutoCAD SHX Text
GARDEN
AutoCAD SHX Text
GARDEN
AutoCAD SHX Text
GARDEN
AutoCAD SHX Text
GARDEN
AutoCAD SHX Text
GARDEN
AutoCAD SHX Text
GARDEN
AutoCAD SHX Text
GARDEN
AutoCAD SHX Text
GARDEN
AutoCAD SHX Text
GARDEN
AutoCAD SHX Text
GARDEN
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
CONCRETE
AutoCAD SHX Text
GU
AutoCAD SHX Text
GU
AutoCAD SHX Text
GU
AutoCAD SHX Text
GU
AutoCAD SHX Text
GU
AutoCAD SHX Text
GU
AutoCAD SHX Text
R I V E R B A N K
AutoCAD SHX Text
W E N T W O R T H
AutoCAD SHX Text
S T R E E T
AutoCAD SHX Text
W E N T W O R T H
AutoCAD SHX Text
S T R E E T
AutoCAD SHX Text
W E N T W O R T H
AutoCAD SHX Text
S T R E E T
AutoCAD SHX Text
D R I V E
AutoCAD SHX Text
R I V E R B A N K
AutoCAD SHX Text
D R I V E
AutoCAD SHX Text
R I V E R B A N K
AutoCAD SHX Text
D R I V E
AutoCAD SHX Text
GARDEN
AutoCAD SHX Text
GARDEN
AutoCAD SHX Text
GARDEN
AutoCAD SHX Text
GARDEN
AutoCAD SHX Text
GARDEN
AutoCAD SHX Text
GARDEN
AutoCAD SHX Text
GARDEN
AutoCAD SHX Text
GARDEN
AutoCAD SHX Text
GARDEN
AutoCAD SHX Text
GARDEN
AutoCAD SHX Text
GARDEN
AutoCAD SHX Text
STEPS
AutoCAD SHX Text
STEPS
AutoCAD SHX Text
STEPS
AutoCAD SHX Text
METAL
AutoCAD SHX Text
FENCE
AutoCAD SHX Text
TW60.24
AutoCAD SHX Text
BW59.04
AutoCAD SHX Text
RIDGE
AutoCAD SHX Text
TW57.42
AutoCAD SHX Text
BW55.62
AutoCAD SHX Text
TG
AutoCAD SHX Text
TG
AutoCAD SHX Text
TG
AutoCAD SHX Text
TG
AutoCAD SHX Text
TG
AutoCAD SHX Text
TG
AutoCAD SHX Text
RIDGE
AutoCAD SHX Text
RIDGE
AutoCAD SHX Text
TW58.96
AutoCAD SHX Text
TG
AutoCAD SHX Text
TW58.94
AutoCAD SHX Text
RIDGE
AutoCAD SHX Text
60.51
AutoCAD SHX Text
PARA
AutoCAD SHX Text
TD58.85
AutoCAD SHX Text
RIDGE
AutoCAD SHX Text
RIDGE
AutoCAD SHX Text
TW59.98
AutoCAD SHX Text
TW62.77
AutoCAD SHX Text
BW61.23
AutoCAD SHX Text
BW57.90
AutoCAD SHX Text
TG
AutoCAD SHX Text
TG
AutoCAD SHX Text
TG
AutoCAD SHX Text
TW62.76
AutoCAD SHX Text
BW61.23
AutoCAD SHX Text
TW62.76
AutoCAD SHX Text
BW61.23
AutoCAD SHX Text
TW62.76
AutoCAD SHX Text
BW61.23
AutoCAD SHX Text
TDW62.76
AutoCAD SHX Text
TW64.00
AutoCAD SHX Text
BW62.83
AutoCAD SHX Text
TW64.02
AutoCAD SHX Text
BW62.84
AutoCAD SHX Text
TG
AutoCAD SHX Text
TG
AutoCAD SHX Text
RIDGE
AutoCAD SHX Text
RIDGE
AutoCAD SHX Text
RIDGE
AutoCAD SHX Text
TG
AutoCAD SHX Text
TW61.41
AutoCAD SHX Text
BW59.63
AutoCAD SHX Text
TW64.26
AutoCAD SHX Text
BW62.91
AutoCAD SHX Text
TW64.26
AutoCAD SHX Text
BW62.91
AutoCAD SHX Text
TW64.26
AutoCAD SHX Text
TW64.26
AutoCAD SHX Text
RIDGE
AutoCAD SHX Text
TW61.94
AutoCAD SHX Text
TW64.85
AutoCAD SHX Text
BW63.33
AutoCAD SHX Text
BW59.83
AutoCAD SHX Text
TW64.85
AutoCAD SHX Text
BW63.33
AutoCAD SHX Text
TW64.85
AutoCAD SHX Text
BW63.33
AutoCAD SHX Text
RIDGE
AutoCAD SHX Text
RIDGE
AutoCAD SHX Text
TG
AutoCAD SHX Text
TG
AutoCAD SHX Text
TG
AutoCAD SHX Text
TG
AutoCAD SHX Text
TW65.23
AutoCAD SHX Text
BW63.80
AutoCAD SHX Text
TW65.23
AutoCAD SHX Text
BW63.80
AutoCAD SHX Text
TG
AutoCAD SHX Text
TG
AutoCAD SHX Text
TD62.65
AutoCAD SHX Text
TW62.65
AutoCAD SHX Text
BW60.83
AutoCAD SHX Text
RIDGE
AutoCAD SHX Text
RIDGE
AutoCAD SHX Text
TW66.35
AutoCAD SHX Text
BW65.15
AutoCAD SHX Text
TW66.35
AutoCAD SHX Text
TW63.36
AutoCAD SHX Text
TW63.36
AutoCAD SHX Text
TW63.36
AutoCAD SHX Text
TG
AutoCAD SHX Text
TG
AutoCAD SHX Text
TW61.64
AutoCAD SHX Text
BW59.84
AutoCAD SHX Text
TW63.59
AutoCAD SHX Text
TG
AutoCAD SHX Text
TG
AutoCAD SHX Text
TG
AutoCAD SHX Text
TG
AutoCAD SHX Text
TW58.99
AutoCAD SHX Text
TG
AutoCAD SHX Text
TG
AutoCAD SHX Text
TG
AutoCAD SHX Text
TG
AutoCAD SHX Text
TG
AutoCAD SHX Text
TG
AutoCAD SHX Text
TG
AutoCAD SHX Text
TG
AutoCAD SHX Text
TG
AutoCAD SHX Text
TW59.79
AutoCAD SHX Text
BW58.01
AutoCAD SHX Text
TG
AutoCAD SHX Text
RIDGE
AutoCAD SHX Text
RIDGE
AutoCAD SHX Text
RIDGE
AutoCAD SHX Text
TW64.61
AutoCAD SHX Text
BW63.42
AutoCAD SHX Text
BW62.82
AutoCAD SHX Text
TW64.17
AutoCAD SHX Text
TG
AutoCAD SHX Text
TG
AutoCAD SHX Text
GM
AutoCAD SHX Text
E0.6
AutoCAD SHX Text
GAS1.6
AutoCAD SHX Text
FH0.7
AutoCAD SHX Text
FH0.9
AutoCAD SHX Text
FH0.9
AutoCAD SHX Text
GAS0.8
AutoCAD SHX Text
GAS1.0
AutoCAD SHX Text
GAS1.0
AutoCAD SHX Text
E0.6
AutoCAD SHX Text
E0.5
AutoCAD SHX Text
E0.9
AutoCAD SHX Text
E0.8
AutoCAD SHX Text
E0.5
AutoCAD SHX Text
E0.5
AutoCAD SHX Text
E0.8
AutoCAD SHX Text
E0.8
AutoCAD SHX Text
COMMS1.0
AutoCAD SHX Text
COMMS0.5
AutoCAD SHX Text
COMMS0.4
AutoCAD SHX Text
%%UDP%%U %%U1200915
AutoCAD SHX Text
%%U11
AutoCAD SHX Text
8.623ha
AutoCAD SHX Text
D
AutoCAD SHX Text
E
AutoCAD SHX Text
F
AutoCAD SHX Text
A
AutoCAD SHX Text
E
AutoCAD SHX Text
F
AutoCAD SHX Text
G
AutoCAD SHX Text
GU
AutoCAD SHX Text
E0.8
AutoCAD SHX Text
E0.6
AutoCAD SHX Text
E0.6
AutoCAD SHX Text
E0.6
AutoCAD SHX Text
COMMS0.5
AutoCAD SHX Text
COMMS0.7
AutoCAD SHX Text
E0.8
AutoCAD SHX Text
COMMS0.9
AutoCAD SHX Text
E0.4
AutoCAD SHX Text
E0.5
AutoCAD SHX Text
E0.5
AutoCAD SHX Text
E0.8
AutoCAD SHX Text
E0.8
AutoCAD SHX Text
E0.8
AutoCAD SHX Text
COMMS0.9
AutoCAD SHX Text
E0.8
AutoCAD SHX Text
E0.6
AutoCAD SHX Text
E0.4
AutoCAD SHX Text
W0.7
AutoCAD SHX Text
E0.5
AutoCAD SHX Text
E0.5
AutoCAD SHX Text
E0.5
AutoCAD SHX Text
COMMS0.7
AutoCAD SHX Text
COMMS0.6
AutoCAD SHX Text
TG
AutoCAD SHX Text
TG
AutoCAD SHX Text
UNDER
AutoCAD SHX Text
CONSTRUCTION
AutoCAD SHX Text
UNDER
AutoCAD SHX Text
CONSTRUCTION
AutoCAD SHX Text
UNDER
AutoCAD SHX Text
CONSTRUCTION
Page 41: REPORT - City of Blacktown · 2017-11-22 · 25 WENTWORTH STREET, THE PONDS, NSW 23 SEPTEMBER 2016 REF: E29696KDrpt. Document Distribution Record ... (120mg/kg) was encountered in

LABORATORY SUMMARY TABLES

Page 42: REPORT - City of Blacktown · 2017-11-22 · 25 WENTWORTH STREET, THE PONDS, NSW 23 SEPTEMBER 2016 REF: E29696KDrpt. Document Distribution Record ... (120mg/kg) was encountered in

Preliminary Stage 1 Environmental Site AssessmentRiverbank Primary School, 25 Wentworth Street, The Ponds, NSWE29696KDrpt

OP PESTICIDES (OPPs)

Total B(a)P HCB Endosulfan Methoxychlor Aldrin & Chlordane DDT, DDD Heptachlor Chlorpyrifos

PAHs TEQ 3 Dieldrin & DDE

4 0.4 1 1 1 0.1 1 1 - 0.5 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 100

100 20 100 6000 300 40 400 7400 300 3 10 270 300 6 50 240 6 160 1 Detected/Not Detected

Sample

Reference

Sample

DepthSample Description

BH1 0-0.2 Fill: Silty sand 8 LPQL 17 23 26 LPQL 11 71 1.1 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL No asbestos detected

BH1 1.1-1.3 Fill: Silty clay 10 LPQL 9 40 13 LPQL 15 79 LPQL LPQL NA NA NA NA NA NA NA NA NA NA

BH2 0-0.2 Fill: Silty sand LPQL LPQL 5 17 42 LPQL 3 55 2.2 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL No asbestos detected

BH3 0.1-0.3 Fill: Silty sand 12 LPQL 13 18 13 LPQL 9 43 0.05 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL No asbestos detected

BH3 0.4-0.5 Silty clay 11 LPQL 19 9 11 LPQL 4 17 LPQL LPQL NA NA NA NA NA NA NA NA NA NA

BH4 0-0.2 Silty sand LPQL LPQL 14 32 40 LPQL 11 120 1.3 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL No asbestos detected

BH4 0.4-0.6 Sandstone 11 LPQL 6 11 7 LPQL 3 24 LPQL LPQL NA NA NA NA NA NA NA NA NA NA

BH5 0-0.2 Fill: Silty sand LPQL LPQL 4 24 50 0.1 3 66 2.5 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL No asbestos detected

BH5 0.3-0.6 Laminite 8 LPQL 7 29 14 LPQL 15 53 4.4 LPQL NA NA NA NA NA NA NA NA NA NA

BH6 0.1-0.3 Silty clay 10 LPQL 8 15 11 LPQL 6 32 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL No asbestos detected

BH7 0-0.2 Fill: Silty sand 7 LPQL 13 18 30 LPQL 8 64 0.25 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL No asbestos detected

BH7 0.4-0.5 Fill: Silty sand 12 LPQL 18 17 21 LPQL 8 47 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL No asbestos detected

BH7 1.7-1.95 Sandstone 13 LPQL 21 16 15 LPQL 5 21 LPQL LPQL NA NA NA NA NA NA NA NA NA NA

BH8 0-0.2 Fill: Silty sand 4 LPQL 8 21 34 LPQL 8 75 0.26 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL No asbestos detected

BH9 0-0.2 Fill: Silty sand 17 LPQL 19 14 14 LPQL 6 32 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL No asbestos detected

15 15 15 15 15 15 15 15 15 15 10 10 10 10 10 10 10 10 10 1017 LPQL 21 40 50 0.1 15 120 4.4 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL NC

Explanation:

1 - Site Assessment Criteria (SAC): NEPM 2013, HIL-A: 'Residential with garden/accessible soils; children's day care centers; preschools; and primary schools'

2 - The results are for Total Chromium which includes Chromium III and VI. For initial screening purposes, we have assumed that the samples contain only Chromium VI unless demonstrated otherwise by additional analysis.

3 - B(a)P TEQ - Benzo(a)pyrene Toxicity Equivalence Quotient has been calculated based on 8 carcinogenic PAHs and their Toxic Equivalence Factors (TEFs) outlined in NEPM 2013

Concentration above the SAC VALUE

Abbreviations:

PAHs: Polycyclic Aromatic Hydrocarbons UCL: Upper Level Confidence Limit on Mean Value

B(a)P: Benzo(a)pyrene HILs: Health Investigation Levels

PQL: Practical Quantitation Limit NA: Not Analysed

LPQL: Less than PQL NC: Not Calculated

OPP: Organophosphorus Pesticides NSL: No Set Limit

OCP: Organochlorine Pesticides SAC: Site Assessment Criteria

PCBs: Polychlorinated Biphenyls NEPM: National Environmental Protection Measure

NickelMercuryChromium

VI 2ASBESTOS FIBRES

Arsenic Zinc

ORGANOCHLORINE PESTICIDES (OCPs)

Maximum Value

TABLE A

SOIL LABORATORY RESULTS COMPARED TO HILs

PQL - Envirolab Services

Site Assessment Criteria (SAC) 1

Total Number of Samples

All data in mg/kg unless stated otherwise

HEAVY METALS PAHs

TOTAL PCBsLeadCadmium Copper

Copyright Environmental Investigation Services

Page 43: REPORT - City of Blacktown · 2017-11-22 · 25 WENTWORTH STREET, THE PONDS, NSW 23 SEPTEMBER 2016 REF: E29696KDrpt. Document Distribution Record ... (120mg/kg) was encountered in

Preliminary Stage 1 Environmental Site AssessmentRiverbank Primary School, 25 Wentworth Street, The Ponds, NSWE29696KDrpt

C6-C10 (F1) >C10-C16 (F2) Benzene Toluene Ethylbenzene Xylenes Naphthalene PID 2

25 50 0.2 0.5 1 3 1

Sample

Reference

Sample

DepthSample Description

Depth

CategorySoil Category

BH1 0-0.2 Fill: Silty sand 0m to < 1m Sand LPQL LPQL LPQL LPQL LPQL LPQL LPQL 0

BH1 1.1-1.3 Fill: Silty clay 1m to <2m Clay LPQL LPQL LPQL LPQL LPQL LPQL LPQL 0

BH2 0-0.2 Fill: Silty sand 0m to < 1m Sand LPQL LPQL LPQL LPQL LPQL LPQL LPQL 0

BH3 0.1-0.3 Fill: Silty sand 0m to < 1m Sand LPQL LPQL LPQL LPQL LPQL LPQL LPQL 0

BH3 0.4-0.5 Silty clay 0m to < 1m Clay LPQL LPQL LPQL LPQL LPQL LPQL LPQL 0

BH4 0-0.2 Silty sand 0m to < 1m Sand LPQL LPQL LPQL LPQL LPQL LPQL LPQL 0

BH4 0.4-0.6 Sandstone 0m to < 1m Sand LPQL LPQL LPQL LPQL LPQL LPQL LPQL 0

BH5 0-0.2 Fill: Silty sand 0m to < 1m Sand LPQL LPQL LPQL LPQL LPQL LPQL LPQL 0

BH5 0.3-0.6 Laminite 0m to < 1m Sand LPQL LPQL LPQL LPQL LPQL LPQL LPQL 0

BH6 0.1-0.3 Silty clay 0m to < 1m Clay LPQL LPQL LPQL LPQL LPQL LPQL LPQL 0

BH7 0-0.2 Fill: Silty sand 0m to < 1m Sand LPQL LPQL LPQL LPQL LPQL LPQL LPQL 0

BH7 0.4-0.5 Fill: Silty sand 0m to < 1m Sand LPQL LPQL LPQL LPQL LPQL LPQL LPQL 0

BH7 1.7-1.95 Sandstone 1m to <2m Sand LPQL LPQL LPQL LPQL LPQL LPQL LPQL 0

BH8 0-0.2 Fill: Silty sand 0m to < 1m Sand LPQL LPQL LPQL LPQL LPQL LPQL LPQL 0

BH9 0-0.2 Fill: Silty sand 0m to < 1m Sand LPQL LPQL LPQL LPQL LPQL LPQL LPQL 0

15 15 15 15 15 15 15 15LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL

Explanation:

1 - Site Assessment Criteria (SAC): NEPM 20132 - Field PID values obtained during the investigation

Concentration above the SAC VALUE

The guideline corresponding to the elevated value is highlighted in grey in the Site Assessment Criteria Table below

Abbreviations:

UCL: Upper Level Confidence Limit on Mean Value NC: Not Calculated PQL: Practical Quantitation LimitHSLs: Health Screening Levels NL: Not Limiting LPQL: Less than PQLNA: Not Analysed SAC: Site Assessment Criteria NEPM: National Environmental Protection Measure

SITE ASSESSMENT CRITERIA

C6-C10 (F1) >C10-C16 (F2) Benzene Toluene Ethylbenzene Xylenes Naphthalene25 50 0.2 0.5 1 3 1

Sample

Reference

Sample

DepthSample Description

Depth

CategorySoil Category

BH1 0-0.2 Fill: Silty sand 0m to < 1m Sand 45 110 0.5 160 55 40 3BH1 1.1-1.3 Fill: Silty clay 1m to <2m Clay 90 NL 1 NL NL 310 NLBH2 0-0.2 Fill: Silty sand 0m to < 1m Sand 45 110 0.5 160 55 40 3BH3 0.1-0.3 Fill: Silty sand 0m to < 1m Sand 45 110 0.5 160 55 40 3BH3 0.4-0.5 Silty clay 0m to < 1m Clay 50 280 0.7 480 NL 110 5BH4 0-0.2 Silty sand 0m to < 1m Sand 45 110 0.5 160 55 40 3BH4 0.4-0.6 Sandstone 0m to < 1m Sand 45 110 0.5 160 55 40 3BH5 0-0.2 Fill: Silty sand 0m to < 1m Sand 45 110 0.5 160 55 40 3BH5 0.3-0.6 Laminite 0m to < 1m Sand 45 110 0.5 160 55 40 3BH6 0.1-0.3 Silty clay 0m to < 1m Clay 50 280 0.7 480 NL 110 5BH7 0-0.2 Fill: Silty sand 0m to < 1m Sand 45 110 0.5 160 55 40 3BH7 0.4-0.5 Fill: Silty sand 0m to < 1m Sand 45 110 0.5 160 55 40 3BH7 1.7-1.95 Sandstone 1m to <2m Sand 70 240 0.5 220 NL 60 NLBH8 0-0.2 Fill: Silty sand 0m to < 1m Sand 45 110 0.5 160 55 40 3BH9 0-0.2 Fill: Silty sand 0m to < 1m Sand 45 110 0.5 160 55 40 3

Total Number of Samples

Maximum Value

PQL - Envirolab ServicesRESIDENTIAL WITH ACCESSIBLE SOILHSL Land Use Category 1

PQL - Envirolab ServicesHSL Land Use Category 1 RESIDENTIAL WITH ACCESSIBLE SOIL

TABLE B

SOIL LABORATORY RESULTS COMPARED TO HSLs

All data in mg/kg unless stated otherwise

Copyright Environmental Investigation Services

Page 44: REPORT - City of Blacktown · 2017-11-22 · 25 WENTWORTH STREET, THE PONDS, NSW 23 SEPTEMBER 2016 REF: E29696KDrpt. Document Distribution Record ... (120mg/kg) was encountered in

Preliminary Stage 1 Environmental Site AssessmentRiverbank Primary School, 25 Wentworth Street, The Ponds, NSWE29696KDrpt

Total

Total B(a)P Total Chloropyrifos Total Moderately Total PCBs C6-C9 C10-C14 C15-C28 C29-C36 Total Benzene Toluene Ethyl Total

PAHs Endosulfans Harmful 2 Scheduled3 C10-C36 benzene Xylenes

4 0.4 1 1 1 0.1 1 1 - 0.05 0.1 0.1 0.1 0.1 0.1 25 50 100 100 250 0.2 0.5 1 3 100

100 20 100 NSL 100 4 40 NSL 200 0.8 60 4 250 <50 <50 650 10,000 10 288 600 1,000 -

500 100 1900 NSL 1500 50 1050 NSL 200 10 108 7.5 250 <50 <50 650 10,000 18 518 1,080 1,800 -

400 80 400 NSL 400 16 160 NSL 800 3.2 240 16 1000 <50 <50 2600 40,000 40 1,152 2,400 4,000 -

2000 400 7600 NSL 6000 200 4200 NSL 800 23 432 30 1000 <50 <50 2600 40,000 72 2,073 4,320 7,200 -

Sample

Reference

Sample

DepthSample Description

BH1 0-0.2 Fill: Silty sand 8 LPQL 17 23 26 LPQL 11 71 1.1 0.1 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL No asbestos detected

BH1 1.1-1.3 Fill: Silty clay 10 LPQL 9 40 13 LPQL 15 79 LPQL LPQL NA NA NA NA NA LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL NA

BH2 0-0.2 Fill: Silty sand LPQL LPQL 5 17 42 LPQL 3 55 2.2 0.2 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL No asbestos detected

BH3 0.1-0.3 Fill: Silty sand 12 LPQL 13 18 13 LPQL 9 43 0.05 0.05 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL No asbestos detected

BH3 0.4-0.5 Silty clay 11 LPQL 19 9 11 LPQL 4 17 LPQL LPQL NA NA NA NA NA LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL NA

BH4 0-0.2 Silty sand LPQL LPQL 14 32 40 LPQL 11 120 1.3 0.1 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL No asbestos detected

BH4 0.4-0.6 Sandstone 11 LPQL 6 11 7 LPQL 3 24 LPQL LPQL NA NA NA NA NA LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL NA

BH5 0-0.2 Fill: Silty sand LPQL LPQL 4 24 50 0.1 3 66 2.5 0.3 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL No asbestos detected

BH5 0.3-0.6 Laminite 8 LPQL 7 29 14 LPQL 15 53 4.4 0.3 NA NA NA NA NA LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL NA

BH6 0.1-0.3 Silty clay 10 LPQL 8 15 11 LPQL 6 32 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL No asbestos detected

BH7 0-0.2 Fill: Silty sand 7 LPQL 13 18 30 LPQL 8 64 0.25 0.05 LPQL LPQL LPQL LPQL LPQL LPQL LPQL 110 110 220 LPQL LPQL LPQL LPQL No asbestos detected

BH7 0.4-0.5 Fill: Silty sand 12 LPQL 18 17 21 LPQL 8 47 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL No asbestos detected

BH7 1.7-1.95 Sandstone 13 LPQL 21 16 15 LPQL 5 21 LPQL LPQL NA NA NA NA NA LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL NA

BH8 0-0.2 Fill: Silty sand 4 LPQL 8 21 34 LPQL 8 75 0.26 0.06 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL No asbestos detected

BH9 0-0.2 Fill: Silty sand 17 LPQL 19 14 14 LPQL 6 32 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL No asbestos detected

15 15 15 15 15 15 15 15 15 15 10 10 10 10 10 15 15 15 15 15 15 15 15 15 1017 LPQL 21 40 50 0.1 15 120 4.4 0.3 LPQL LPQL LPQL LPQL LPQL LPQL LPQL 110 110 220 LPQL LPQL LPQL LPQL NC

Explanation:1 - NSW EPA Waste Classification Guidelines (2014)2 - Assessment of Total Moderately Harmful pesticides includes: Dichlorovos, Dimethoate, Fenitrothion, Ethion, Malathion and Parathion3 - Assessment of Total Scheduled pesticides include: HBC, alpha-BHC, gamma-BHC, beta-BHC, Heptachlor, Aldrin, Heptachlor Epoxide, gamma-Chlordane, alpha-chlordane, pp-DDE, Dieldrin, Endrin, pp-DDD, pp-DDT, Endrin Aldehyde

Concentration above the CT1 VALUE

Concentration above SCC1 VALUE

Concentration above the SCC2 VALUE

Abbreviations:

PAHs: Polycyclic Aromatic Hydrocarbons UCL: Upper Level Confidence Limit on Mean Value CT: Contaminant Threshold

B(a)P: Benzo(a)pyrene NA: Not Analysed SCC: Specific Contaminant Concentration

PQL: Practical Quantitation Limit NC: Not Calculated HILs: Health Investigation Levels

LPQL: Less than PQL NSL: No Set Limit NEPM: National Environmental Protection Measure

PID: Photoionisation Detector SAC: Site Assessment Criteria BTEX: Monocyclic Aromatic Hydrocarbons

PCBs: Polychlorinated Biphenyls TRH: Total Recoverable Hydrocarbons

Total Number of samples

Maximum Value

General Solid Waste SCC1 1 NSL

Restricted Solid Waste CT2 1 NSL

Restricted Solid Waste SCC2 1 NSL

Copper Lead

TABLE C

SOIL LABORATORY RESULTS COMPARED TO WASTE CLASSIFICATION GUIDELINES (2014)

Mercury

PQL - Envirolab Services

General Solid Waste CT1 1 NSL

All data in mg/kg unless stated otherwise

HEAVY METALS PAHs

Nickel

TRH BTEX COMPOUNDSASBESTOS FIBRES

Arsenic ZincCadmium

OC/OP PESTICIDES

Chromium

Copyright Environmental Investigation Services

Page 45: REPORT - City of Blacktown · 2017-11-22 · 25 WENTWORTH STREET, THE PONDS, NSW 23 SEPTEMBER 2016 REF: E29696KDrpt. Document Distribution Record ... (120mg/kg) was encountered in

Preliminary Stage 1 Environmental Site AssessmentRiverbank Primary School, 25 Wentworth Street, The Ponds, NSWE29696KDrpt

- 1 - 4 1 1 1 1 1 0.1 0.1 25 50 100 100 0.2 0.5 1 3 0.05

Ambient Background Concentration (ABC) 2 - - - NSL 9 11 17 5 24 NSL NSL NSL NSL NSL NSL NSL NSL NSL NSL NSL

Sample

Reference

Sample

DepthSample Description Soil Texture

BH1 0-0.2 Fill: Silty sand Coarse NA NA NA 8 17 23 26 11 71 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL 0.1

BH1 1.1-1.3 Fill: Silty clay Fine NA NA NA 10 9 40 13 15 79 LPQL NA LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL

BH2 0-0.2 Fill: Silty sand Coarse NA NA NA LPQL 5 17 42 3 55 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL 0.2

BH3 0.1-0.3 Fill: Silty sand Coarse NA NA NA 12 13 18 13 9 43 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL 0.05

BH3 0.4-0.5 Silty clay Fine NA NA NA 11 19 9 11 4 17 LPQL NA LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL

BH4 0-0.2 Silty sand Coarse NA NA NA LPQL 14 32 40 11 120 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL 0.1

BH4 0.4-0.6 Sandstone Fine NA NA NA 11 6 11 7 3 24 LPQL NA LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL

BH5 0-0.2 Fill: Silty sand Coarse NA NA NA LPQL 4 24 50 3 66 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL 0.3

BH5 0.3-0.6 Laminite Coarse NA NA NA 8 7 29 14 15 53 LPQL NA LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL 0.3BH6 0.1-0.3 Silty clay Fine NA NA NA 10 8 15 11 6 32 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL

BH7 0-0.2 Fill: Silty sand Coarse NA NA NA 7 13 18 30 8 64 LPQL LPQL LPQL LPQL 190 LPQL LPQL LPQL LPQL LPQL 0.05

BH7 0.4-0.5 Fill: Silty sand Coarse NA NA NA 12 18 17 21 8 47 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL

BH7 1.7-1.95 Sandstone Fine NA NA NA 13 21 16 15 5 21 LPQL NA LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL

BH8 0-0.2 Fill: Silty sand Coarse NA NA NA 4 8 21 34 8 75 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL 0.06

BH9 0-0.2 Fill: Silty sand Coarse NA NA NA 17 19 14 14 6 32 LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL LPQL

0 0 0 15 15 15 15 15 15 15 10 15 15 15 15 15 15 15 15 15LPQL LPQL LPQL 17 21 40 50 15 120 LPQL LPQL LPQL LPQL 190 LPQL LPQL LPQL LPQL LPQL 0.3

Explanation:

1 - Site Assessment Criteria (SAC): NEPM 2013

2 - ABC Values for selected metals has been adopted from the published background concentrations presented in Olszowy et. al., (1995), Trace Element Concentrations in Soils from Rural and Urban New South Wales (the 25th percentile values for new suburbs with low traffic have been quoted)

Concentration above the SAC VALUE

The guideline corresponding to the elevated value is highlighted in grey in the EIL and ESL Assessment Criteria Table below

Abbreviations:

EILs: Ecological Investigation Levels UCL: Upper Level Confidence Limit on Mean Value LPQL: Less than PQL NC: Not Calculated

B(a)P: Benzo(a)pyrene ESLs: Ecological Screening Levels SAC: Site Assessment Criteria NSL: No Set Limit

PQL: Practical Quantitation Limit NA: Not Analysed NEPM: National Environmental Protection Measure ABC: Ambient Background Concentration

EIL AND ESL ASSESSMENT CRITERIA

- 1 - 4 1 1 1 1 1 0.1 0.1 25 50 100 100 0.2 0.5 1 3 0.05Ambient Background Concentration (ABC) 2 - - - NSL 9 11 17 5 24 NSL NSL NSL NSL NSL NSL NSL NSL NSL NSL NSL

Sample

Reference

Sample

DepthSample Description Soil Texture

BH1 0-0.2 Fill: Silty sand Coarse NA NA NA 100 199 71 1117 35 94 170 180 180 120 300 2800 50 85 70 105 0.7BH1 1.1-1.3 Fill: Silty clay Fine NA NA NA 100 199 71 1117 35 94 170 -- 180 120 1300 5600 60 105 125 45 0.7BH2 0-0.2 Fill: Silty sand Coarse NA NA NA 100 199 71 1117 35 94 170 180 180 120 300 2800 50 85 70 105 0.7BH3 0.1-0.3 Fill: Silty sand Coarse NA NA NA 100 199 71 1117 35 94 170 180 180 120 300 2800 50 85 70 105 0.7BH3 0.4-0.5 Silty clay Fine NA NA NA 100 199 71 1117 35 94 170 -- 180 120 1300 5600 60 105 125 45 0.7BH4 0-0.2 Silty sand Coarse NA NA NA 100 199 71 1117 35 94 170 180 180 120 300 2800 50 85 70 105 0.7BH4 0.4-0.6 Sandstone Fine NA NA NA 100 199 71 1117 35 94 170 -- 180 120 1300 5600 60 105 125 45 0.7BH5 0-0.2 Fill: Silty sand Coarse NA NA NA 100 199 71 1117 35 94 170 180 180 120 300 2800 50 85 70 105 0.7BH5 0.3-0.6 Laminite Coarse NA NA NA 100 199 71 1117 35 94 170 -- 180 120 300 2800 50 85 70 105 0.7BH6 0.1-0.3 Silty clay Fine NA NA NA 100 199 71 1117 35 94 170 180 180 120 1300 5600 60 105 125 45 0.7BH7 0-0.2 Fill: Silty sand Coarse NA NA NA 100 199 71 1117 35 94 170 180 180 120 300 2800 50 85 70 105 0.7BH7 0.4-0.5 Fill: Silty sand Coarse NA NA NA 100 199 71 1117 35 94 170 180 180 120 300 2800 50 85 70 105 0.7BH7 1.7-1.95 Sandstone Fine NA NA NA 100 199 71 1117 35 94 170 -- 180 120 1300 5600 60 105 125 45 0.7BH8 0-0.2 Fill: Silty sand Coarse NA NA NA 100 199 71 1117 35 94 170 180 180 120 300 2800 50 85 70 105 0.7BH9 0-0.2 Fill: Silty sand Coarse NA NA NA 100 199 71 1117 35 94 170 180 180 120 300 2800 50 85 70 105 0.7

PQL - Envirolab Services

Toluene Ethylbenzene Total Xylenes B(a)PC6-C10 (F1) >C10-C16 (F2) >C16-C34 (F3) >C34-C40 (F4) Benzene

Land Use Category 1 URBAN RESIDENTIAL AND PUBLIC OPEN SPACE

pH CEC (cmolc/kg) Clay Content (% clay)

AGED HEAVY METALS-EILs EILs ESLs

Arsenic Chromium Copper Lead Nickel Zinc Naphthalene DDT

Total Number of Samples

B(a)PZincLead Nickel Total Xylenes>C34-C40 (F4) Benzene Toluene EthylbenzenepH CEC (cmolc/kg)

DDT C6-C10 (F1) >C10-C16 (F2)

TABLE D

SOIL LABORATORY RESULTS COMPARED TO EILs AND ESLs

All data in mg/kg unless stated otherwise

EILs

Land Use Category 1 URBAN RESIDENTIAL AND PUBLIC OPEN SPACE

ESLs

Naphthalene

AGED HEAVY METALS-EILs

>C16-C34 (F3)

Maximum Value

PQL - Envirolab Services

Chromium CopperClay Content

(% clay) Arsenic

Copyright Environmental Investigation Services

Page 46: REPORT - City of Blacktown · 2017-11-22 · 25 WENTWORTH STREET, THE PONDS, NSW 23 SEPTEMBER 2016 REF: E29696KDrpt. Document Distribution Record ... (120mg/kg) was encountered in

Preliminary Stage 1 Environmental Site AssessmentRiverbank Primary School, 25 Wentworth Street, The Ponds, NSWE29696KDrpt

Envirolab INITIAL REPEAT MEAN RPD

PQL %

Sample Ref = BH9 (0-0.2m) Arsenic 4 17 12 14.5 34

Dup Ref = DUP1 Cadmium 0.4 LPQL LPQL NC NC

Chromium 1 19 18 18.5 5

Envirolab Report: 152640 Copper 1 14 14 14.0 0

Lead 1 14 15 14.5 7

Mercury 0.1 LPQL LPQL NC NC

Nickel 1 6 6 6.0 0

Zinc 1 32 33 32.5 3

Naphthalene 0.1 LPQL LPQL NC NC

Acenaphthylene 0.1 LPQL LPQL NC NC

Acenaphthene 0.1 LPQL LPQL NC NC

Fluorene 0.1 LPQL LPQL NC NC

Phenanthrene 0.1 LPQL LPQL NC NC

Anthracene 0.1 LPQL LPQL NC NC

Fluoranthene 0.1 LPQL LPQL NC NC

Pyrene 0.1 LPQL LPQL NC NC

Benzo(a)anthracene 0.1 LPQL LPQL NC NC

Chrysene 0.1 LPQL LPQL NC NC

Benzo(b,j+k)fluoranthene 0.2 LPQL LPQL NC NC

Benzo(a)pyrene 0.05 LPQL LPQL NC NC

Indeno(123-cd)pyrene 0.1 LPQL LPQL NC NC

Dibenzo(ah)anthracene 0.1 LPQL LPQL NC NC

Benzo(ghi)perylene 0.1 LPQL LPQL NC NC

Total OCPs 0.1 LPQL LPQL NC NC

Total OPPs 0.1 LPQL LPQL NC NC

Total PCBs 0.1 LPQL LPQL NC NCTRH C6-C10 (F1) 25 LPQL LPQL NC NC

TRH >C10-C16 (F2) 50 LPQL LPQL NC NC

TRH >C16-C34 (F3) 100 LPQL LPQL NC NC

TRH >C34-C40 (F4) 100 LPQL LPQL NC NC

Benzene 0.5 LPQL LPQL NC NC

Toluene 0.5 LPQL LPQL NC NC

Ethylbenzene 1 LPQL LPQL NC NC

m+p-xylene 2 LPQL LPQL NC NCo-xylene 1 LPQL LPQL NC NC

Explanation:

The RPD value is calculated as the absolute value of the difference between the initial and

repeat results divided by the average value expressed as a percentage. The following acceptance

criteria will be used to assess the RPD results:

Results > 10 times PQL = RPD value <= 50% are acceptable

Results between 5 & 10 times PQL = RPD value <= 75% are acceptable

Results < 5 times PQL = RPD value <= 100% are acceptable

If result is LPQL then 50% of the PQL is used for the calculation

RPD Results Above the Acceptance Criteria VALUE

Abbreviations:

PQL: Practical Quantitation Limit OCP: Organochlorine Pesticides

LPQL: Less than PQL OPP: Organophosphorus Pesticides

NA: Not Analysed PCBs: Polychlorinated Biphenyls

NC: Not Calculated TRH: Total Recoverable Hydrocarbons

SAMPLE ANALYSIS

All results in mg/kg unless stated otherwise

TABLE E

SOIL INTRA-LABORATORY DUPLICATE RESULTS & RPD CALCULATIONS

Copyright Environmental Investigation Services

Page 47: REPORT - City of Blacktown · 2017-11-22 · 25 WENTWORTH STREET, THE PONDS, NSW 23 SEPTEMBER 2016 REF: E29696KDrpt. Document Distribution Record ... (120mg/kg) was encountered in

Appendix A: Site Information including Site History

Page 48: REPORT - City of Blacktown · 2017-11-22 · 25 WENTWORTH STREET, THE PONDS, NSW 23 SEPTEMBER 2016 REF: E29696KDrpt. Document Distribution Record ... (120mg/kg) was encountered in

Selected Site Photos of 1 September 2016

Page 49: REPORT - City of Blacktown · 2017-11-22 · 25 WENTWORTH STREET, THE PONDS, NSW 23 SEPTEMBER 2016 REF: E29696KDrpt. Document Distribution Record ... (120mg/kg) was encountered in
Page 50: REPORT - City of Blacktown · 2017-11-22 · 25 WENTWORTH STREET, THE PONDS, NSW 23 SEPTEMBER 2016 REF: E29696KDrpt. Document Distribution Record ... (120mg/kg) was encountered in
Page 51: REPORT - City of Blacktown · 2017-11-22 · 25 WENTWORTH STREET, THE PONDS, NSW 23 SEPTEMBER 2016 REF: E29696KDrpt. Document Distribution Record ... (120mg/kg) was encountered in

Lotsearch Report

Page 52: REPORT - City of Blacktown · 2017-11-22 · 25 WENTWORTH STREET, THE PONDS, NSW 23 SEPTEMBER 2016 REF: E29696KDrpt. Document Distribution Record ... (120mg/kg) was encountered in

Lotsearch

Environmental Risk and Planning Report25 Wentworth Street, The Ponds, NSW 2769

Report Buffer: 1000m

17 Aug 2016 07:36:58Report Date:

Disclaimer:The purpose of this report is to provide an overview of some of the site history, environmental risk and planning information available, affecting an individual address or geographical area in which the property is located. It is not a substitute for an on-site inspection or review of other available reports and records. It is not intended to be, and should not be taken to be, a rating or assessment of the desirability or market value of the property or its features.You should obtain independent advice before you make any decision based on the information within the report.The detailed terms applicable to use of this report are set out at the end of this report.

Lotsearch Pty Ltd ABN 89 600 168 018 1

Page 53: REPORT - City of Blacktown · 2017-11-22 · 25 WENTWORTH STREET, THE PONDS, NSW 23 SEPTEMBER 2016 REF: E29696KDrpt. Document Distribution Record ... (120mg/kg) was encountered in

Table of Contents Location Confidences .............................................................................................................................................. 2

Dataset Listings ................................................................................................................................................... 3

Site Location Aerial ................................................................................................................................................. 5

Contaminated Land & Waste Management Facilities .............................................................................................. 6

EPA Current Licensed Activities.............................................................................................................................. 8

EPA Delicensed & Former Licensed Activities ...................................................................................................... 10

UPSS Sensitive Zones .......................................................................................................................................... 12

Historical Business Activities ................................................................................................................................. 13

Historical Aerial Imagery & Maps .......................................................................................................................... 15

Topographic Features ........................................................................................................................................... 24

Elevation Contours ................................................................................................................................................ 28

Hydrogeology & Groundwater ............................................................................................................................... 29

Geology ................................................................................................................................................................. 32

Naturally Occurring Asbestos Potential ................................................................................................................. 34

Soil Landscapes .................................................................................................................................................... 35

Acid Sulfate Soils .................................................................................................................................................. 37

Dryland Salinity ..................................................................................................................................................... 38

Mining Subsidence Districts .................................................................................................................................. 40

State Environmental Planning ............................................................................................................................... 41

Local Environmental Planning ............................................................................................................................... 43

Heritage ................................................................................................................................................................ 47

Natural Hazards .................................................................................................................................................... 48

Ecological Constraints ........................................................................................................................................... 50

Terms & Conditions ............................................................................................................................................... 55

Location Confidences Where Lotsearch has had to georeference features from supplied addresses, a location confidence has been assigned to the data record. This indicates a confidence to the positional accuracy of the feature. Where applicable, a code is given under the field heading “LC” or “LocConf”. These codes lookup to the following location confidences:

LC Code Location Confidence

1 Georeferenced to the site location / premise or part of site

2 Georeferenced with the confidence of the general/approximate area

3 Georeferenced to the road or rail

4 Georeferenced to the road intersection

5 Feature is a buffered point

6 Land adjacent to Georeferenced Site

7 Georeferenced to a network of features

Lotsearch Pty Ltd ABN 89 600 168 018 2

Page 54: REPORT - City of Blacktown · 2017-11-22 · 25 WENTWORTH STREET, THE PONDS, NSW 23 SEPTEMBER 2016 REF: E29696KDrpt. Document Distribution Record ... (120mg/kg) was encountered in

Dataset ListingDatasets contained within this report, detailing their source and data currency:

Dataset Name Custodian Supply Date

Currency Date

Update Frequency

No. Features Onsite

No. Features within 100m

No. Features withinBuffer

Cadastre Boundaries Land and Property Information 17/08/2016 17/08/2016 Daily - - -

Topographic Data Land and Property Information 10/04/2015 01/04/2015 As required - - -

List of NSW contaminated sites notified to EPA

Environment Protection Authority 15/08/2016 21/06/2016 Monthly 0 0 0

Contaminated Land: Records of Notice

Environment Protection Authority 09/08/2016 09/08/2016 Monthly 0 0 0

Former Gasworks Environment Protection Authority 09/08/2016 10/05/2013 Monthly 0 0 0

National Waste Management Site Database

Geoscience Australia 06/07/2016 15/11/2012 Quarterly 0 0 0

Licensed Activities under the POEO Act 1997

Environment Protection Authority 21/07/2016 21/07/2016 Monthly 0 0 1

Delicensed POEO Activities still Regulated by the EPA

Environment Protection Authority 21/07/2016 21/07/2016 Monthly 0 0 0

Former POEO Licenced Activities now revoked or surrendered

Environment Protection Authority 21/07/2016 21/07/2016 Monthly 0 0 6

UPSS Environmentally Sensitive Zones

Department of Environment, Climate Change and Water (NSW)

14/04/2015 12/01/2010 As required 0 0 1

UBD Business to Business Directory 1991

Hardie Grant Not required 0 0 0

UBD Business Directory 1991 Motor Garages/Service Stations

Hardie Grant Not required 0 0 0

UBD Business Directory 1970 Hardie Grant Not required 0 0 0

UBD Business Directory 1970 Drycleaners & Motor Garages/Service Stations

Hardie Grant Not required 0 0 0

UBD Business Directory 1950 Hardie Grant Not required 0 0 0

UBD Business Directory 1950 Drycleaners & Motor Garages/Service Stations

Hardie Grant Not required 0 0 0

Points of Interest Land and Property Information 10/04/2015 01/04/2015 Annually 0 0 8

Tanks (Areas) Land and Property Information 10/04/2015 01/04/2015 Annually 0 0 0

Tanks (Points) Land and Property Information 10/04/2015 01/04/2015 Annually 0 0 0

Easements Land and Property Information 11/06/2014 11/06/2014 As required 0 0 1

State Forest Land and Property Information 11/04/2016 23/01/2015 As required 0 0 0

NSW National Parks and Wildlife Service Reserves

NSW Office of Environment and Heritage 11/04/2016 31/12/2015 Annually 0 0 0

Hydrogeology Map of Australia Commonwealth of Australia (Geoscience Australia)

08/10/2014 17/03/2000 As required 1 1 1

Groundwater Boreholes NSW Department of Primary Industries - Office of Water / Water Administration Ministerial Corporation; Commonwealth of Australia (Bureau of Meteorology) 2015

21/03/2016 01/12/2015 Annually 0 0 8

Geological Units 1:100,000 NSW Department of Industry, Resources & Energy

20/08/2014 None planned 1 - 4

Geological Structures 1:100,000 NSW Department of Industry, Resources & Energy

20/08/2014 None planned 0 - 2

Naturally Occurring Asbestos Potential

NSW Department of Industry, Resources & Energy

04/12/2015 24/09/2015 Unknown 0 0 0

Soil Landscapes NSW Office of Environment and Heritage 12/08/2014 None planned 1 - 2

Acid Sulfate Soils NSW Planning and Environment 06/07/2016 19/09/2008 As required 0 - -

Dryland Salinity Assessment National Land and Water Resources Audit 18/07/2014 12/05/2013 None planned 0 0 1

Mining Subsidence Districts Land and Property Information 17/08/2016 17/08/2016 As required 0 0 0

SEPP 14 - Coastal Wetlands NSW Planning and Environment 17/12/2015 24/10/2008 Annually 0 0 0

Lotsearch Pty Ltd ABN 89 600 168 018 3

Page 55: REPORT - City of Blacktown · 2017-11-22 · 25 WENTWORTH STREET, THE PONDS, NSW 23 SEPTEMBER 2016 REF: E29696KDrpt. Document Distribution Record ... (120mg/kg) was encountered in

Dataset Name Custodian Supply Date

Currency Date

Update Frequency

No. Features Onsite

No. Features within 100m

No. Features withinBuffer

SEPP 26 - Littoral Rainforest NSW Planning and Environment 17/12/2015 05/02/1988 Annually 0 0 0

SEPP 71 - Coastal Protection NSW Planning and Environment 17/12/2015 01/08/2003 Annually 0 0 0

SEPP Major Developments 2005 NSW Planning and Environment 09/03/2013 25/05/2005 Under Review 0 0 0

SEPP Strategic Land Use Areas NSW Planning and Environment 06/07/2016 28/01/2014 Annually 1 1 1

Local Environmental Plan - Land Zoning

NSW Planning and Environment 15/08/2016 10/07/2016 Quarterly 1 3 45

Local Environmental Plan - Minimum Subdivision Lot Size

NSW Planning and Environment 15/08/2016 10/07/2016 Quarterly 0 - -

Local Environmental Plan - Height of Building

NSW Planning and Environment 15/08/2016 10/07/2016 Quarterly 1 - -

Local Environmental Plan - Floor Space Ratio

NSW Planning and Environment 15/08/2016 10/07/2016 Quarterly 0 - -

Local Environmental Plan - Land Application

NSW Planning and Environment 15/08/2016 10/07/2016 Quarterly 0 - -

Local Environmental Plan - Land Reservation Acquisition

NSW Planning and Environment 15/08/2016 10/07/2016 Quarterly 0 - -

State Heritage Items NSW Planning and Environment 15/08/2016 12/03/2015 Quarterly 0 0 0

Local Heritage Items NSW Planning and Environment 15/08/2016 10/07/2016 Quarterly 0 0 0

Bushfire Prone Land NSW Rural Fire Service 04/07/2016 08/06/2016 Quarterly 2 2 2

Remnant Vegetation of the Cumberland Plain

NSW Office of Environment and Heritage 07/10/2014 04/08/2011 Unknown 1 1 4

RAMSAR Wetlands Commonwealth of Australia Department of the Environment

08/10/2014 24/06/2011 As required 0 0 0

ATLAS of NSW Wildlife NSW Office of Environment and Heritage 17/08/2016 17/08/2016 Daily - - -

Lotsearch Pty Ltd ABN 89 600 168 018 4

Page 56: REPORT - City of Blacktown · 2017-11-22 · 25 WENTWORTH STREET, THE PONDS, NSW 23 SEPTEMBER 2016 REF: E29696KDrpt. Document Distribution Record ... (120mg/kg) was encountered in

150m

¯

0 50 10025Meters

Coordinate System:GDA 1994 MGA Zone 56

Aerial Imagery 201525 Wentworth Street, The Ponds, NSW 2769

Scale: Date: 16August, 2016Data Sources: Aerial Imagery © 2016 Google Inc, usedwith permission. Google and the Google logo areregistered trademarks of Google Inc.

LegendSite Boundary

Buffer 150m

Lotsearch Pty Ltd ABN 89 600 168 018 5

Page 57: REPORT - City of Blacktown · 2017-11-22 · 25 WENTWORTH STREET, THE PONDS, NSW 23 SEPTEMBER 2016 REF: E29696KDrpt. Document Distribution Record ... (120mg/kg) was encountered in

Contaminated Land & Waste Management Facilities25 Wentworth Street, The Ponds, NSW 2769

Records from the NSW EPA Contaminated Land list within the report buffer:

List of NSW contaminated sites notified to EPA

NSW EPA Contaminated Land List Data Source: Environment Protection Authority© State of New South Wales through the Environment Protection Authority

Map Id

Site Address Suburb Activity EPA site management class

Status Dist Direction LC

N/A No records in buffer

The values within the EPA site management class in the table above, are given more detailed explanations in the table below:

EPA site management class Explanation

Contamination being managed via the planning process (EP&A Act)

The EPA has completed an assessment of the contamination and decided that the contamination is significant enough to warrant regulation. The contamination of this site is managed by the consent authority under the Environmental Planning and Assessment Act 1979 (EP&A Act) planning approval process, with EPA involvement as necessary to ensure significant contamination is adequately addressed. The consent authority is typically a local council or the Department of Planning and Environment.

Contamination currently regulated under CLM Act

The EPA has completed an assessment of the contamination and decided that the contamination is significant enough to warrant regulation under the Contaminated Land Management Act 1997 (CLM Act). Management of the contamination is regulated by the EPA under the CLM Act. Regulatory notices are available on the EPA’s Contaminated Land Public Record of Notices.

Contamination currently regulated under POEO Act

The EPA has completed an assessment of the contamination and decided that the contamination is significant enough to warrant regulation. Management of the contamination is regulated under the Protection of the Environment Operations Act 1997 (POEO Act). The EPA’s regulatory actions under the POEO Act are available on the POEO public register.

Contamination formerly regulated under the CLM Act

The EPA has determined that the contamination is no longer significant enough to warrant regulation under the Contaminated Land Management Act 1997 (CLM Act). The contamination was addressed under the CLM Act.

Contamination formerly regulated under the POEO Act

The EPA has determined that the contamination is no longer significant enough to warrant regulation. The contamination was addressed under the Protection of the Environment Operations Act 1997 (POEO Act).

Contamination was addressed via the planning process (EP&A Act)

The EPA has determined that the contamination is no longer significant enough to warrant regulation. The contamination was addressed by the appropriate consent authority via the planning process under the Environmental Planning and Assessment Act 1979 (EP&A Act).

Ongoing maintenance required to manage residual contamination (CLM Act)

The EPA has determined that ongoing maintenance, under the Contaminated Land Management Act 1997 (CLM Act), is required to manage the residual contamination. Regulatory notices under the CLM Act are available on the EPA’s Contaminated Land Public Record of Notices.

Regulation being finalised The EPA has completed an assessment of the contamination and decided that the contamination is significant enough to warrant regulation under the Contaminated Land Management Act 1997. A regulatory approach is being finalised.

Regulation under the CLM Act not required

The EPA has completed an assessment of the contamination and decided that regulation under the Contaminated Land Management Act 1997 is not required.

Under assessment The contamination is being assessed by the EPA to determine whether regulation is required. The EPA may require further information to complete the assessment. For example, the completion of management actions regulated under the planning process or Protection of the Environment Operations Act 1997. Alternatively, the EPA may require information via a notice issued under s77 of the Contaminated Land Management Act 1997 or issue a Preliminary Investigation Order.

Lotsearch Pty Ltd ABN 89 600 168 018 6

Page 58: REPORT - City of Blacktown · 2017-11-22 · 25 WENTWORTH STREET, THE PONDS, NSW 23 SEPTEMBER 2016 REF: E29696KDrpt. Document Distribution Record ... (120mg/kg) was encountered in

Wate Management Facilities Data Source: Australian Governement Geoscience AustraliaCreative Commons 3.0 © Commonwealth of Australia http://creativecommons.org/licenses/by/3.0/au/deed.en

Site Id

Owner Name Address Suburb Postcode Landfill Reprocess Transfer Distance Direction LC

N/A No records in buffer

Sites on the National Waste Management Site Database within the report buffer:

Record of Notices within the report buffer:

Contaminated Land: Records of Notice

Map Id Area No Name Address Suburb Notices Distance Direction LC

N/A No records in buffer

Contaminated Land Records of Notice Data Source: Environment Protection Authority© State of New South Wales through the Environment Protection AuthorityTerms of use and disclaimer for Contaminated Land: Record of Notices, please visit http://www.epa.nsw.gov.au/clm/clmdisclaimer.htm

National Waste Management Site Database

Former Gasworks within the report buffer:

Former Gasworks

Map Id

Location Council Further Info Distance Direction LC

N/A No records in buffer

Former Gasworks Data Source: Environment Protection Authority© State of New South Wales through the Environment Protection Authority

Contaminated Land & Waste Management Facilities25 Wentworth Street, The Ponds, NSW 2769

Lotsearch Pty Ltd ABN 89 600 168 018 7

Page 59: REPORT - City of Blacktown · 2017-11-22 · 25 WENTWORTH STREET, THE PONDS, NSW 23 SEPTEMBER 2016 REF: E29696KDrpt. Document Distribution Record ... (120mg/kg) was encountered in

E

1 000

m

20388

¯

0 200 400100Meters

Scale: Coordinate System:GDA 1994 MGA Zone 56

Date: 17August 2016

Current EPA Licensed Activities25 Wentworth Street, The Ponds, NSW 2769

Data Sources: Property Boundaries & Topographic Data: © Land and Property Information (a division of the Department of Finance and Services) 2016

LegendE Site Centre

Site Boundary

Report Buffer

Property Boundary

Current Licences related to Other Activities on Waterways incl. Application of Herbicides

Current Licensed Activities under POEO Act

Lotsearch Pty Ltd ABN 89 600 168 018 8

Page 60: REPORT - City of Blacktown · 2017-11-22 · 25 WENTWORTH STREET, THE PONDS, NSW 23 SEPTEMBER 2016 REF: E29696KDrpt. Document Distribution Record ... (120mg/kg) was encountered in

Licensed activities under the Protection of the Environment Operations Act 1997, within the report buffer:

Licensed Activities under the POEO Act 1997

EPL Organisation Name Address Suburb Activity Loc Conf

Distance Direction

20388 OBRASCON HUARTE LAIN S.A

Schofields Road East, ROUSE HILL, NSW 2155

Land-based extractive activity, Land-based extractive activity, Road construction, Road construction,

3 835m North East

EPA Activities25 Wentworth Street, The Ponds, NSW 2769

POEO Licence Data Source: Environment Protection Authority© State of New South Wales through the Environment Protection Authority

Lotsearch Pty Ltd ABN 89 600 168 018 9

Page 61: REPORT - City of Blacktown · 2017-11-22 · 25 WENTWORTH STREET, THE PONDS, NSW 23 SEPTEMBER 2016 REF: E29696KDrpt. Document Distribution Record ... (120mg/kg) was encountered in

E

4261

10553

13078

1000

m

¯

0 200 400100Meters

Scale: Coordinate System:GDA 1994 MGA Zone 56

Date: 17August 2016

Delicensed & Former Licensed EPA Activities25 Wentworth Street, The Ponds, NSW 2769

Data Sources: Property Boundaries & Topographic Data: © Land and Property Information (a division of the Department of Finance and Services) 2016

LegendE Site Centre

Site Boundary

Report Buffer

Property Boundary

Delicensed Activities still Regulated by EPA

Surrendered Licences related to Other Activities on Waterways incl. Application of Herbicides

Former Licensed/Regulated Activities (revoked or surrendered)

Lotsearch Pty Ltd ABN 89 600 168 018 10

Page 62: REPORT - City of Blacktown · 2017-11-22 · 25 WENTWORTH STREET, THE PONDS, NSW 23 SEPTEMBER 2016 REF: E29696KDrpt. Document Distribution Record ... (120mg/kg) was encountered in

Delicensed activities still regulated by the EPA, within the report buffer:

Delicensed Activities still regulated by the EPA

Delicensed Activities Data Source: Environment Protection Authority© State of New South Wales through the Environment Protection Authority

Licence No

Organisation Name Address Suburb Activity Loc Conf

Distance Direction

N/A No records in buffer

Former Licensed activities under the Protection of the Environment Operations Act 1997, nowrevoked or surrendered, within the report buffer:

Former Licensed Activities under the POEO Act 1997, now revoked or surrendered

Licence No

Organisation Location Status Issued Date

Activity Loc Conf

Distance Direction

4653 LUHRMANN ENVIRONMENT MANAGEMENT PTY LTD

WATERWAYS THROUGHOUT NSW

Surrendered Other Activities / Non Scheduled Activity - Application of Herbicides

7 115m -

4838 Robert Orchard Various Waterways throughout New South Wales - SYDNEY NSW 2000

Surrendered Other Activities / Non Scheduled Activity - Application of Herbicides

7 115m -

6630 SYDNEY WEED & PEST MANAGEMENT PTY LTD

WATERWAYS THROUGHOUT NSW - PROSPECT, NSW, 2148

Surrendered Other Activities / Non Scheduled Activity - Application of Herbicides

7 115m -

10553 LEND LEASE ENGINEERING PTY LIMITED

ROUSE HILL DEVELOPMENT AREA, STAGE 2, KELLYVILLE, NSW 2155

Surrendered 27/11/2000 Miscellaneous licensed discharge to waters (at any time)

2 155m East

13078 REED CONSTRUCTIONS AUSTRALIA PTY LIMITED

NORTH WEST GROWTH CENTRE FIRST RELEASE PRECINCTS PACKAGE 1 - VARIOUS STREETS IN KELLYVILLE AND, SCHOFIELDS, NSW, 2762

Surrendered 23/06/2009 Sewage treatment processing by small plants

2 344m North

4261 JIMMY BUTTIGIEG

101 HAMBLEDON ROAD, SCHOFIELDS, NSW 2762

Surrendered 03/11/1999 1 407m North West

Former Licensed Activities Data Source: Environment Protection Authority© State of New South Wales through the Environment Protection Authority

EPA Activities

25 Wentworth Street, The Ponds, NSW 2769

Lotsearch Pty Ltd ABN 89 600 168 018 11

Pig accommodation

Page 63: REPORT - City of Blacktown · 2017-11-22 · 25 WENTWORTH STREET, THE PONDS, NSW 23 SEPTEMBER 2016 REF: E29696KDrpt. Document Distribution Record ... (120mg/kg) was encountered in

E

1 000

m

¯

0 200 400100Meters

Scale: Coordinate System:GDA 1994 MGA Zone 56

Date: 17August 2016

UPSS Sensitive Zones25 Wentworth Street, The Ponds, NSW 2769

UPSS Data Source: Environment Protection Authority© Dept of Environment, Climate Change & Water (NSW)

E Site Centre

Report Buffer

Legend

Site Boundary

UPSS Sensitive Zone

Lotsearch Pty Ltd ABN 89 600 168 018 12

Page 64: REPORT - City of Blacktown · 2017-11-22 · 25 WENTWORTH STREET, THE PONDS, NSW 23 SEPTEMBER 2016 REF: E29696KDrpt. Document Distribution Record ... (120mg/kg) was encountered in

Historical Business Directories

Records from the 1991 UBD Business to Business Directory within 150m of the site:

1991 Business to Business Directory Records

Business Activity Organisation Address Ref No. Location Confidence

Distance Direction

N/A No records in buffer

Business Directory Content Derived from Universal Business Directories (UBD) - Licensed from Hardie Grant

25 Wentworth Street, The Ponds, NSW 2769

Motor Garages & Service Stations from the 1991 UBD Business Directory within 1km of the site:

1991 Business Directory Motor Garages & Service Stations

Business Directory Content Derived from Universal Business Directories (UBD) - Licensed from Hardie Grant

Business Activity Organisation Address Ref No. Location Confidence

Distance Direction

N/A No records in buffer

Business Activity Organisation & Premise Ref No. Location Confidence

Distance Direction

N/A No records in buffer

1970 Business Directory Records

Records from the 1970 UBD Business Directory within 150m of the site:

Business Directory Content Derived from Universal Business Directories (UBD) - Licensed from Hardie Grant

Business Directory Content Derived from Universal Business Directories (UBD) - Licensed from Hardie Grant

1970 Business Directory Drycleaners & Service Stations

Drycleaners, Motor Garages & Service Stations from the 1970 UBD Business Directory within 1km of the site:

Business Activity Organisation & Premise Ref No. LocationConfidence

Distance Direction

N/A No records in buffer

Lotsearch Pty Ltd ABN 89 600 168 018 13

Page 65: REPORT - City of Blacktown · 2017-11-22 · 25 WENTWORTH STREET, THE PONDS, NSW 23 SEPTEMBER 2016 REF: E29696KDrpt. Document Distribution Record ... (120mg/kg) was encountered in

Historical Business Directories

Records from the 1950 UBD Business Directory within 150m of the site:

1950 Business Directory Records

Business Activity Organisation & Premise Ref No. Location Confidence

Distance Direction

N/A No records in buffer

25 Wentworth Street, The Ponds, NSW 2769

Business Directory Content Derived from Universal Business Directories (UBD) - Licensed from Hardie Grant

Business Directory Content Derived from Universal Business Directories (UBD) - Licensed from Hardie Grant

Activity Organisation & Premise Ref No. Location Confidence

Distance Direction

N/A No records in buffer

1950 Business Directory Drycleaners & Service Stations

Drycleaners, Motor Garages & Service Stations from the 1950 UBD Business Directory within 1km of the site:

Lotsearch Pty Ltd ABN 89 600 168 018 14

Page 66: REPORT - City of Blacktown · 2017-11-22 · 25 WENTWORTH STREET, THE PONDS, NSW 23 SEPTEMBER 2016 REF: E29696KDrpt. Document Distribution Record ... (120mg/kg) was encountered in

150m

© Land and Property Information 2015

¯

0 50 10025Meters

Coordinate System:GDA 1994 MGA Zone 56

Aerial Imagery 201425 Wentworth Street, The Ponds, NSW 2769

Scale: Date: 18August 2016Data Sources: Historical Aerials: © Land and PropertyInformation (a division of the Department of Financeand Services)

LegendSite Boundary

Buffer 150m

Lotsearch Pty Ltd ABN 89 600 168 018 15

Page 67: REPORT - City of Blacktown · 2017-11-22 · 25 WENTWORTH STREET, THE PONDS, NSW 23 SEPTEMBER 2016 REF: E29696KDrpt. Document Distribution Record ... (120mg/kg) was encountered in

150m

¯

0 50 10025Meters

Coordinate System:GDA 1994 MGA Zone 56

Aerial Imagery 200925 Wentworth Street, The Ponds, NSW 2769

Scale: Date: 16August, 2016Data Sources: Aerial Imagery © 2016 Google Inc, usedwith permission. Google and the Google logo areregistered trademarks of Google Inc.

LegendSite Boundary

Buffer 150m

Lotsearch Pty Ltd ABN 89 600 168 018 16

Page 68: REPORT - City of Blacktown · 2017-11-22 · 25 WENTWORTH STREET, THE PONDS, NSW 23 SEPTEMBER 2016 REF: E29696KDrpt. Document Distribution Record ... (120mg/kg) was encountered in

150m

¯

0 50 10025Meters

Coordinate System:GDA 1994 MGA Zone 56

Aerial Imagery 200425 Wentworth Street, The Ponds, NSW 2769

Scale: Date: 16August, 2016Data Sources: Aerial Imagery © 2016 Google Inc, usedwith permission. Google and the Google logo areregistered trademarks of Google Inc.

LegendSite Boundary

Buffer 150m

Lotsearch Pty Ltd ABN 89 600 168 018 17

Page 69: REPORT - City of Blacktown · 2017-11-22 · 25 WENTWORTH STREET, THE PONDS, NSW 23 SEPTEMBER 2016 REF: E29696KDrpt. Document Distribution Record ... (120mg/kg) was encountered in

150m

¯

0 50 10025Meters

Coordinate System:GDA 1994 MGA Zone 56

Aerial Imagery 199125 Wentworth Street, The Ponds, NSW 2769

Scale: Date: 16August 2016Data Sources: Historical Aerials: © Land and PropertyInformation (a division of the Department of Financeand Services)

LegendSite Boundary

Buffer 150m

Lotsearch Pty Ltd ABN 89 600 168 018 18

Page 70: REPORT - City of Blacktown · 2017-11-22 · 25 WENTWORTH STREET, THE PONDS, NSW 23 SEPTEMBER 2016 REF: E29696KDrpt. Document Distribution Record ... (120mg/kg) was encountered in

150m

¯

0 50 10025Meters

Coordinate System:GDA 1994 MGA Zone 56

Aerial Imagery 198225 Wentworth Street, The Ponds, NSW 2769

Scale: Date: 16August 2016Data Sources: Historical Aerials: © Land and PropertyInformation (a division of the Department of Financeand Services)

LegendSite Boundary

Buffer 150m

Lotsearch Pty Ltd ABN 89 600 168 018 19

Page 71: REPORT - City of Blacktown · 2017-11-22 · 25 WENTWORTH STREET, THE PONDS, NSW 23 SEPTEMBER 2016 REF: E29696KDrpt. Document Distribution Record ... (120mg/kg) was encountered in

150m

¯

0 50 10025Meters

Coordinate System:GDA 1994 MGA Zone 56

Aerial Imagery 197025 Wentworth Street, The Ponds, NSW 2769

Scale: Date: 16August 2016Data Sources: Historical Aerials: © Land and PropertyInformation (a division of the Department of Financeand Services)

LegendSite Boundary

Buffer 150m

Lotsearch Pty Ltd ABN 89 600 168 018 20

Page 72: REPORT - City of Blacktown · 2017-11-22 · 25 WENTWORTH STREET, THE PONDS, NSW 23 SEPTEMBER 2016 REF: E29696KDrpt. Document Distribution Record ... (120mg/kg) was encountered in

150m

¯

0 50 10025Meters

Coordinate System:GDA 1994 MGA Zone 56

Aerial Imagery 196525 Wentworth Street, The Ponds, NSW 2769

Scale: Date: 16August 2016Data Sources: Historical Aerials: © Land and PropertyInformation (a division of the Department of Financeand Services)

LegendSite Boundary

Buffer 150m

Lotsearch Pty Ltd ABN 89 600 168 018 21

Page 73: REPORT - City of Blacktown · 2017-11-22 · 25 WENTWORTH STREET, THE PONDS, NSW 23 SEPTEMBER 2016 REF: E29696KDrpt. Document Distribution Record ... (120mg/kg) was encountered in

150m

¯

0 50 10025Meters

Coordinate System:GDA 1994 MGA Zone 56

Aerial Imagery 196125 Wentworth Street, The Ponds, NSW 2769

Scale: Date: 16August 2016Data Sources: Historical Aerials: © Land and PropertyInformation (a division of the Department of Financeand Services)

LegendSite Boundary

Buffer 150m

Lotsearch Pty Ltd ABN 89 600 168 018 22

Page 74: REPORT - City of Blacktown · 2017-11-22 · 25 WENTWORTH STREET, THE PONDS, NSW 23 SEPTEMBER 2016 REF: E29696KDrpt. Document Distribution Record ... (120mg/kg) was encountered in

150m

¯

0 50 10025Meters

Coordinate System:GDA 1994 MGA Zone 56

Aerial Imagery 195625 Wentworth Street, The Ponds, NSW 2769

Scale: Date: 16August 2016Data Sources: Historical Aerials: © Land and PropertyInformation (a division of the Department of Financeand Services)

LegendSite Boundary

Buffer 150m

Lotsearch Pty Ltd ABN 89 600 168 018 23

Page 75: REPORT - City of Blacktown · 2017-11-22 · 25 WENTWORTH STREET, THE PONDS, NSW 23 SEPTEMBER 2016 REF: E29696KDrpt. Document Distribution Record ... (120mg/kg) was encountered in

E

1000m

170211304

WATERFALLBOULEVAR D

MALLARD DRIVE

WAKELY AVENUE

CORBIN AVENUE

GORDON ROAD

BARNIER DRIVE

BALI DRIVE

PADDOCK STREET

MEANDERCRESCENT

BENBURY S TREE

T

ARRO

WRO

OT STREET

RIDG

ELIN

E DRI

VE

H

A ST INGS

STRE

ET

ULMARA AVENUE

GREENVIEW PARADE

GWYDIR AVENUE

MORRELL CRESCENT

STANHOPE PARKWAY

MOSAIC AVENUE

CO OBOWIE DRIVE

PADDLES TREET

LEVY

CRESCENT

FAIRF

AXST

REET

JOCELYN BOULEVARD

EKALA AVENUE

CENTENN IAL DRIVE

TOMAH CRESCENT

VICEROY AVENUE

WIDGEON ROAD

EVER

GLAD

ESST

REET

ESTUARY CRESCENT

SPEA

RMINT STREET

TRAWL STREET

BLACKHEATH STREET

CALA

ND

RA AVENUE

VANILLA DRIVE

PAGODA CRESCENT

LAPSTONE STREET

TURON

C RESCEN T

SHI P

LEY

STRE

ET

CRIMSON CRESCENT

BELLINGER STREET

RIVERBANK DRIVE

CLINTON STREET

TANUNDA DRIVE

DONGOLA CIRCUIT

DRAGON

FLYS

TREE

T

IVORY

STRE

ET

GL

OVERAVENUE

HAMB

LEDO

N RO

AD

JEZE

BEL S

TREE

TCI

CADA

STRE

ET

MOUNTAIN STREET

ANGELWINGSTREET

COPPERSTREE T

WOLG

ANST

REET

ALKOOMIE STRE

ETBERAMBING STR EET

SAIL

STRE

ET

BURDEKIN ROAD

AMARCO CIRCUIT

PEBB

LECR

ESCENT

KASHMIRAVENUE

BOUNDARY ROAD

SCHOFIELDS ROAD

TALLAWONG ROAD

ALEX

AVEN

UE

THEPONDS

92656

92864

129039

158503

138869165804 165805

168643

¯

0 200 400100Meters

Scale: Coordinate System:GDA 1994 MGA Zone 56

Date: 17August 2016

Topographic Features25 Wentworth Street, The Ponds, NSW 2769

Data Sources: Property Boundaries & Topographic Data: © Land and Property Information (a division of the Department of Finance and Services) 2016

LegendE Site Centre

Place Name

# Points of Interest

") Tank Point

Report Buffer

Property Boundary

Water Area

State Forest

Tank Area

Watercourse

Pipeline

Major Road

Road

Pathway/Track/Lane

Heavy Rail

Light Rail

Underground Rail

Runway

Major Electricity Transmission Line

NPWS Reserve

Easement

Site Boundary

Lotsearch Pty Ltd ABN 89 600 168 018 24

Page 76: REPORT - City of Blacktown · 2017-11-22 · 25 WENTWORTH STREET, THE PONDS, NSW 23 SEPTEMBER 2016 REF: E29696KDrpt. Document Distribution Record ... (120mg/kg) was encountered in

Topographic Features

What Points of Interest exist within the report buffer?

Points of Interest

Topographic Data Source: © Land and Property Information (2015)Creative Commons 3.0 © Commonwealth of Australia http://creativecommons.org/licenses/by/3.0/au/deed.en

Map Id Feature Type Label Distance Direction

138869 High School TERRA SANCTA COLLEGE SCHOFIELDS CAMPUS 457m West

165805 Special School ASPECT WESTERN SYDNEY SCHOOL SCHOFIELDS 507m West

92864 Park KALINA RESERVE 768m North East

92656 Park PEEL RESERVE 872m East

158503 Park GATHERING PARK 923m South East

165804 Special School ASPECT WESTERN SYDNEY SCHOOL ST JOSEPH'S 945m West

129039 Primary School ST JOSEPH'S PRIMARY SCHOOL 964m West

168643 Community Facility THE PONDS COMMUNITY HUB 991m East

25 Wentworth Street, The Ponds, NSW 2769

Lotsearch Pty Ltd ABN 89 600 168 018 25

Page 77: REPORT - City of Blacktown · 2017-11-22 · 25 WENTWORTH STREET, THE PONDS, NSW 23 SEPTEMBER 2016 REF: E29696KDrpt. Document Distribution Record ... (120mg/kg) was encountered in

Tanks (Areas)

What are the Tank Areas located within the report buffer?

Tanks (Points)

What are the Tank Points located within the report buffer?

Map Id Tank Type Status Name Capture Method Feature Currency Distance Direction

N/A No records in buffer

Map Id Tank Type Status Name Capture Method Feature Currency Distance Direction

N/A No records in buffer

Tanks Data Source: © Land and Property Information (2015)Creative Commons 3.0 © Commonwealth of Australia http://creativecommons.org/licenses/by/3.0/au/deed.en

Easements Data Source: © Land and Property Information (2015)Creative Commons 3.0 © Commonwealth of Australia http://creativecommons.org/licenses/by/3.0/au/deed.en

Map Id Easement Class Easement Type Easement Width Distance Direction

170211304 Primary Right of way 8.5m, 8.3m 471m South

25 Wentworth Street, The Ponds, NSW 2769

Topographic Features

What Easements exist within the report buffer?

Easements

Lotsearch Pty Ltd ABN 89 600 168 018 26

Page 78: REPORT - City of Blacktown · 2017-11-22 · 25 WENTWORTH STREET, THE PONDS, NSW 23 SEPTEMBER 2016 REF: E29696KDrpt. Document Distribution Record ... (120mg/kg) was encountered in

State Forest

State Forest Data Source: © Land and Property Information (2015)Creative Commons 3.0 © Commonwealth of Australia http://creativecommons.org/licenses/by/3.0/au/deed.en

What State Forest exist within the report buffer?

National Parks and Wildlife Service Reserves

NPWS Data Source: © Land and Property Information (2015)Creative Commons 3.0 © Commonwealth of Australia http://creativecommons.org/licenses/by/3.0/au/deed.en

What NPWS Reserves exist within the report buffer?

State Forest Number State Forest Name Distance Direction

N/A No records in buffer

Reserve Number Reserve Type Reserve Name Gazetted Date Distance Direction

N/A No records in buffer

25 Wentworth Street, The Ponds, NSW 2769

Topographic Features

Lotsearch Pty Ltd ABN 89 600 168 018 27

Page 79: REPORT - City of Blacktown · 2017-11-22 · 25 WENTWORTH STREET, THE PONDS, NSW 23 SEPTEMBER 2016 REF: E29696KDrpt. Document Distribution Record ... (120mg/kg) was encountered in

E

1 000

m

61

5650484745

43

58565554

6240

39

5249

4746

48

47

6057

4342

5554

51

676460

67 64 63

6564

61

60

63

6161

59

66 6564

6362

7271

7069

60

58 56 54

5856

5856

60

5863

6261

5351

52 50

69

6867

5452

5250

45

43

62

61

55

54

54

52

41

39

59

58

58

55

56

54

53

53

53

53

52

51

50

49

50

49

49

49

46

46

45

45

44

43

41

57

66

66

62

6468

60

61

57

54

5450

50

61

57

58

57

49 49

4948

47

45

62

61

52

52

51

50

48

46

46

44

4340

60

52

¯

0 200 400100Meters

Scale: Coordinate System:GDA 1994 MGA Zone 56

Date: 17August 2016

Elevation Contours (m AHD)25 Wentworth Street, The Ponds, NSW 2769

Accuracy & Currency: This contour data can be up to 0.4 of the contour interval out in height and must therefore not be used for any design or engineering works, but only as a general guide to topography. Gaps may occur along contour lines due to vertical topography, obscured topography in the source photography such as buildings, dense vegetation or dead ground, or the fact that original buildings have been replaced in the intervening thirty years since the original contour capture.

Data Sources: Property Boundaries & Topographic Data: © Land and Property Information (a division of the Department of Finance and Services) 2016

LegendE Site Centre

Elevation Contour (m AHD)

Site Boundary

Property Boundary

Report Buffer

Lotsearch Pty Ltd ABN 89 600 168 018 28

Page 80: REPORT - City of Blacktown · 2017-11-22 · 25 WENTWORTH STREET, THE PONDS, NSW 23 SEPTEMBER 2016 REF: E29696KDrpt. Document Distribution Record ... (120mg/kg) was encountered in

E

2 000

m

GW108374GW108373GW108375

GW108376

GW047282

GW100443

GW108246

GW108372

¯

0 400 800200Meters

Scale: Coordinate System:GDA 1994 MGA Zone 56

Date: 17August 2016

Groundwater Boreholes25 Wentworth Street, The Ponds, NSW 2769

Data Sources: Property Boundaries & Topographic Data: © Land and Property Information (a division of the Department of Finance and Services) 2016

E Site Centre

Borehole Report Buffer

Property Boundary

LegendSite Boundary

Lotsearch Pty Ltd ABN 89 600 168 018 29

Page 81: REPORT - City of Blacktown · 2017-11-22 · 25 WENTWORTH STREET, THE PONDS, NSW 23 SEPTEMBER 2016 REF: E29696KDrpt. Document Distribution Record ... (120mg/kg) was encountered in

Hydrogeology & Groundwater25 Wentworth Street, The Ponds, NSW 2769

Groundwater Boreholes

Boreholes within the report buffer:

Borehole Data Source : NSW Department of Primary Industries - Office of Water / Water Administration Ministerial Corporation for all bores prefixed with GW. All other bores © Commonwealth of Australia (Bureau of Meteorology) 2015. Creative Commons 3.0 © Commonwealth of Australia http://creativecommons.org/licenses/by/3.0/au/deed.en

GW No. Licence No Work Type

Owner Type

Purpose Contractor Complete Date

Final Depth

Drilled Depth

Salinity SWL Yield Elev Dist Dir

GW100443 10BL157801 Bore Private Monitoring Intertec Drilling Services

06/11/1996 17.40 17.40 18500 4.50 0.100 635m West

GW108246 10BL601804 Bore Test Bore Intertec Drilling Services

01/06/2007 150.00 150.00 10000 6.50 0.700 969m South East

GW108372 10BL600727 Bore Monitoring Macquarie Drilling

06/09/2006 10.00 10.00 1666m South West

GW108374 10BL600727 Bore Monitoring Macquarie Drilling

12/09/2006 8.00 8.00 1681m South West

GW108376 10BL600727 Bore Monitoring Macquarie Drilling

06/09/2006 20.50 20.50 1689m South West

GW108373 10BL600727 Bore Monitoring Macquarie Drilling

08/09/2006 8.10 8.10 1711m South West

GW108375 10BL600727 Bore Monitoring Macquarie Drilling

12/09/2006 8.00 8.00 1716m South West

GW047282 10BL107370 Bore Private Irrigation 01/02/1979 152.00 152.00 1749m East

Hydrogeology

Hydrogeology Map of Australia : Commonwealth of Australia (Geoscience Australia)Creative Commons 3.0 © Commonwealth of Australia http://creativecommons.org/licenses/by/3.0/au/deed.en

Description of aquifers on-site:

Description of aquifers within the report buffer:

Description

Porous, extensive aquifers of low to moderate productivity

Description

Porous, extensive aquifers of low to moderate productivity

Lotsearch Pty Ltd ABN 89 600 168 018 30

Page 82: REPORT - City of Blacktown · 2017-11-22 · 25 WENTWORTH STREET, THE PONDS, NSW 23 SEPTEMBER 2016 REF: E29696KDrpt. Document Distribution Record ... (120mg/kg) was encountered in

Driller's Logs

Drill log data relevant to the boreholes within the report buffer:

Drill Log Data Source: NSW Department of Primary Industries - Office of Water / Water Administration Ministerial CorpCreative Commons 3.0 © Commonwealth of Australia http://creativecommons.org/licenses/by/3.0/au/deed.en

Groundwater No Drillers Log Distance Direction

GW100443 0.00m-4.00m SILTY CLAY4.00m-17.40m SILTSTONE/SHALE

635m West

GW108246 0.00m-3.50m CLAY AND SANDY CLAY,BROWN3.50m-4.50m CLAY GREY4.50m-7.00m SHALE GREY7.00m-7.50m SHALE SOFT7.50m-17.50m SHALE BLACK17.50m-18.00m SHALE SOFT18.00m-37.00m SHALE BLACK37.00m-45.00m SHALE,SOFT BANDS45.00m-64.00m SANDSTONE GREY64.00m-65.00m SANDSTONE,SHALE BEDDING65.00m-76.00m SANDSTONE GREY76.00m-80.00m SANDSTONE QUARTZ80.00m-101.00m SANDSTONE GREY101.00m-102.00m SANDSTONE,SHALE BEDDING102.00m-136.00m SANDSTONE GREY136.00m-137.00m SANDSTONE,SHALE BEDDING137.00m-140.00m SANDSTONE GREY140.00m-143.00m SANDSTONE QUARTZ143.00m-145.00m SANDSTONE,SHALE BEDDING145.00m-150.00m SANDSTONE GREY

969m South East

GW108372 0.00m-2.00m CONCRETE2.00m-4.80m SANDY,CLAYEY SILT,W/SHALE4.80m-5.40m SANDSTONE F/GRAINED5.40m-10.00m SHALE GREY

1666m South West

GW108374 0.00m-1.00m CONCRETE, SANDY CLAY1.00m-2.20m CLAY,RED/BROWN2.20m-3.20m SILTY CLAY/RED,SHALE3.20m-3.50m SANDSTONE3.50m-4.50m SANDY CLAY4.50m-5.70m WEATHERED SHALE5.70m-6.50m SILTY CLAY6.50m-8.00m SANDSTONE F/GRAINED

1681m South West

GW108376 0.00m-0.60m CONCRETE,SILTY SANDY FILL0.60m-1.70m SANDY SILT. BROWN,F/GRAINED1.70m-4.80m SILTY CLAY,BROWN M/PLASTICITY.4.80m-20.50m WEATHERED SHALE,GREY

1689m South West

GW108373 0.00m-0.30m CONCRETE, SILTY GRAVEL0.30m-0.60m SILTY SANDY FILL0.60m-0.90m SILTY GRAVELLY FILL0.90m-1.50m FILL WITH SAND, SANDSTONE1.50m-2.00m SILTY CLAY2.00m-3.50m CLAYEY SILT3.50m-5.50m SILTY CLAY,GREY,BROWN5.50m-6.70m SILTY CLAY, L/BROWN6.70m-8.10m SHALE,D/GREY

1711m South West

GW108375 0.00m-1.70m CONCRETE,CRUSHED SANDSTONE1.70m-2.40m SANDY CLAYEY,SOME GRAVEL2.40m-3.70m SILTY CLAY3.70m-4.70m SILTY CLAY BROWN4.70m-5.60m WEATHERED SHALE GREY5.60m-7.10m SILTY CLAY,DARK GREY7.10m-8.00m SHALE VERY HARD

1716m South West

GW047282 0.00m-0.40m Topsoil Dark0.40m-1.20m Clay1.20m-6.80m Shale Clay6.80m-60.30m Shale Water Supply60.30m-61.00m Shale Sandstone61.00m-83.80m Sandstone Grey83.80m-84.20m Shale Clay84.20m-137.00m Sandstone Grey Silty137.00m-138.60m Shale Clay138.60m-152.00m Sandstone Grey Silty

1749m East

Hydrogeology & Groundwater25 Wentworth Street, The Ponds, NSW 2769

Lotsearch Pty Ltd ABN 89 600 168 018 31

Page 83: REPORT - City of Blacktown · 2017-11-22 · 25 WENTWORTH STREET, THE PONDS, NSW 23 SEPTEMBER 2016 REF: E29696KDrpt. Document Distribution Record ... (120mg/kg) was encountered in

E

Rwm

Rwb

Qal

Rwa

1000

m

¯

0 200 400100Meters

Scale: Coordinate System:GDA 1994 MGA Zone 56

Date: 17August 2016

Geology 1:100,00025 Wentworth Street, The Ponds, NSW 2769

Data Sources: Property Boundaries & Topographic Data: © Land and Property Information (a division of the Department of Finance and Services) 2016

LegendE Site Centre

Report Buffer

Property Boundary

StructureFault

EEEEDyke

J Fold

Structure

Lineament

Site Boundary

Lotsearch Pty Ltd ABN 89 600 168 018 32

Page 84: REPORT - City of Blacktown · 2017-11-22 · 25 WENTWORTH STREET, THE PONDS, NSW 23 SEPTEMBER 2016 REF: E29696KDrpt. Document Distribution Record ... (120mg/kg) was encountered in

Geology25 Wentworth Street, The Ponds, NSW 2769

Geological Units

What are the Geological Units onsite?

Symbol Description Unit Name Group Sub Group Age Dom Lith Map Sheet Dataset

Rwb Shale, carbonaceous claystone,claystone, laminate, fine to medium-grained lithic sandstone, rare coal and tuff

Bringelly Shale Wianamatta Group (undifferentiated)

Middle Triassic

Penrith 1:100,000

What are the Geological Units within the report buffer?

Symbol Description Unit Name Group Sub Group Age Dom Lith Map Sheet Dataset

Qal Fine-grained sand, silt and clay

Quaternary Penrith 1:100,000

Rwa Dark-grey to black claystone-siltstone and fine sandstone -siltstone laminate

Ashfield Shale Wianamatta Group (undifferentiated)

Middle Triassic

Penrith 1:100,000

Rwb Shale, carbonaceous claystone,claystone, laminate, fine to medium-grained lithic sandstone, rare coal and tuff

Bringelly Shale Wianamatta Group (undifferentiated)

Middle Triassic

Penrith 1:100,000

Rwm Fine to medium-grained quartz-lithic sandstone

Minchinbury Sandstone

Wianamatta Group (undifferentiated)

Middle Triassic

Penrith 1:100,000

Geological Structures

What are the Geological Structures onsite?

Feature Name Description Map Sheet Dataset

No features 1:100,000

What are the Geological Structures within the report buffer?

Feature Name Description Map Sheet Dataset

Lineament Penrith 1:100,000

Lineament Penrith 1:100,000

Geological Data Source : NSW Department of Industry, Resources & Energy© State of New South Wales through the NSW Department of Industry, Resources & Energy

Lotsearch Pty Ltd ABN 89 600 168 018 33

Page 85: REPORT - City of Blacktown · 2017-11-22 · 25 WENTWORTH STREET, THE PONDS, NSW 23 SEPTEMBER 2016 REF: E29696KDrpt. Document Distribution Record ... (120mg/kg) was encountered in

Naturally Occurring Asbestos Potential25 Wentworth Street, The Ponds, NSW 2769

Naturally Occurring Asbestos Potential

Naturally Occurring Asbestos Potential within the report buffer?

Mining Subsidence District Data Source: © State of New South Wales through NSW Department of Industry, Resources & Energy

Potential Sym Strat Name Group Formation Scale Min Age Max Age Rock Type

Dom Lith Description Dist Dir

No records in buffer

Lotsearch Pty Ltd ABN 89 600 168 018 34

Page 86: REPORT - City of Blacktown · 2017-11-22 · 25 WENTWORTH STREET, THE PONDS, NSW 23 SEPTEMBER 2016 REF: E29696KDrpt. Document Distribution Record ... (120mg/kg) was encountered in

E

1000

m

ALsc

REbt

¯

0 200 400100Meters

Scale: Coordinate System:GDA 1994 MGA Zone 56

Date: 17August 2016

Soil Landscapes25 Wentworth Street, The Ponds, NSW 2769

Data Sources: Property Boundaries & Topographic Data: © Land and Property Information (a division of the Department of Finance and Services) 2016

LegendE Site Centre

Report Buffer

Site Boundary

Property Boundary

Lotsearch Pty Ltd ABN 89 600 168 018 35

Page 87: REPORT - City of Blacktown · 2017-11-22 · 25 WENTWORTH STREET, THE PONDS, NSW 23 SEPTEMBER 2016 REF: E29696KDrpt. Document Distribution Record ... (120mg/kg) was encountered in

Soils25 Wentworth Street, The Ponds, NSW 2769

Soil Landscapes

Soils Landscapes Data Source : NSW Office of Environment and HeritageCreative Commons 3.0 © Commonwealth of Australia http://creativecommons.org/licenses/by/3.0/au/deed.en

What are the onsite Soil Landscapes?

Soil Code Name Group Process Map Sheet Scale

REbt BLACKTOWN RESIDUAL Penrith 1:100,000

What are the Soil Landscapes within the report buffer?

Soil Code Name Group Process Map Sheet Scale

ALsc SOUTH CREEK ALLUVIAL Penrith 1:100,000

REbt BLACKTOWN RESIDUAL Penrith 1:100,000

Lotsearch Pty Ltd ABN 89 600 168 018 36

Page 88: REPORT - City of Blacktown · 2017-11-22 · 25 WENTWORTH STREET, THE PONDS, NSW 23 SEPTEMBER 2016 REF: E29696KDrpt. Document Distribution Record ... (120mg/kg) was encountered in

Acid Sulfate SoilsWhat is the on-site Acid Sulfate Soil Plan Class that presents the largest environmental risk?

Acid Sulfate Data Source Accessed 15/07/2016: NSW Crown Copyright - Planning and EnvironmentCreative Commons 3.0 © Commonwealth of Australia http://creativecommons.org/licenses/by/3.0/au/deed.en

If the on-site Soil Class is 5, what other soil classes exist within 500m?

Soil Class Description

N/A

Soil Class Description Distance Direction

N/A

Acid Sulfate Soils25 Wentworth Street, The Ponds, NSW 2769