Report about the meeting of the COSMO Steering Committee (STC) Moscow, 6 and 7 September 2010

34
Moscow, September 2010 Report about the meeting of the COSMO Steering Committee (STC) Moscow, 6 and 7 September 2010 Detlev Majewski, Head of STC Deutscher Wetterdienst, Offenbach, Germany

description

Report about the meeting of the COSMO Steering Committee (STC) Moscow, 6 and 7 September 2010. Detlev Majewski, Head of STC Deutscher Wetterdienst, Offenbach, Germany. COSMO, before and …. after. COSMO STC Meeting, 6 and 7 Sept. 2010. Participants: D. Majewski (Germany) - PowerPoint PPT Presentation

Transcript of Report about the meeting of the COSMO Steering Committee (STC) Moscow, 6 and 7 September 2010

Page 1: Report about the meeting of the COSMO Steering Committee (STC) Moscow, 6 and 7 September 2010

Moscow, September 2010

Report about the meeting of the

COSMO Steering Committee (STC)

Moscow, 6 and 7 September 2010

Detlev Majewski, Head of STCDeutscher Wetterdienst, Offenbach, Germany

Page 2: Report about the meeting of the COSMO Steering Committee (STC) Moscow, 6 and 7 September 2010

Moscow, September 2010

COSMO, before and …

Page 3: Report about the meeting of the COSMO Steering Committee (STC) Moscow, 6 and 7 September 2010

Moscow, September 2010

after

Page 4: Report about the meeting of the COSMO Steering Committee (STC) Moscow, 6 and 7 September 2010

Moscow, September 2010

COSMO STC Meeting, 6 and 7 Sept. 2010

Participants:D. Majewski (Germany)

T. Charantonis (Greece)

M. Ferri (Italy)

M. Ziemianski (Poland)

R. Dumitrache (for G. Stancalie, Romania)

D. Kiktev (Russia)

P. Steiner (Switzerland)

M. Arpagaus (SPM)

For VERSUS (after lunch break) : A. Raspanti, U. Damrath, V. Stauch

 

Page 5: Report about the meeting of the COSMO Steering Committee (STC) Moscow, 6 and 7 September 2010

Moscow, September 2010

COSMO Science Plan 2010 - 2014

• Presentation by M. Arpagaus

Page 6: Report about the meeting of the COSMO Steering Committee (STC) Moscow, 6 and 7 September 2010

Moscow, September 2010

COSMO Software, additional software

Current status; see COSMO contract

COSMO model including nudging data assimilation

Interpolation program int2lm

Proposal by P. Steiner

Additional programs: fieldextra, VERSUS

Requirements for COSMO-Software:

Portable, documented (internal + external), supported

Procedures for the proposal of new COSMO-Software

Page 7: Report about the meeting of the COSMO Steering Committee (STC) Moscow, 6 and 7 September 2010

Moscow, September 2010

COSMO Licence Issues, Part I

NCMS (United Arab Emirates) signed licence agreement in July 2010 Four more potential licence takers in the future: Brazil (INMET and DHN),

Oman, Catalunya Support of licence takers (see Licence Contract):

Installation of the COSMO software on customer‘s computer and second level support (by DWD only)Support of COSMO software for at least four years (all COSMO partners)

How to use the licence fees?Further development of COSMO, e.g. mutual short-term visits in the framework of PPs, invitation of experts; external software contracts; participation at a conference with an oral presentation about COSMO related scientific results

Page 8: Report about the meeting of the COSMO Steering Committee (STC) Moscow, 6 and 7 September 2010

Moscow, September 2010

COSMO Licence Issues, Part II

DWD asks for 50% of the licence fees for providing support to the customers and (usually) the initial/lateral boundary data based on analyses/forecasts of the global model GME.

How to apply for support funded from the licence fees?

1-page proposal to the COSMO SPM and Head of STC detailing aim of activity, persons involved and costs forseen. SPM and STC will decide on a propsal after consultation with the WG-Leader(s).

Page 9: Report about the meeting of the COSMO Steering Committee (STC) Moscow, 6 and 7 September 2010

Moscow, September 2010

Current Users of HRM

Page 10: Report about the meeting of the COSMO Steering Committee (STC) Moscow, 6 and 7 September 2010

Moscow, September 2010

COSMO model for developing countries

Goal: Provide a medium-term perspective for current HRM users in developing countries.

Proposal: Provide an old cycle (question: How old?) of the COSMO model without support to users in developing countries; see http://data.worldbank.org/about/country-classifications/country-and-lending-groups; here: Low-income economies ($995 or less) and Lower-middle-income economies ($996 to $3,945)

Decision of STC needed until end of 2010 because HRM has to be phased out until 2012 (GRIB2, ICON for lateral boundary values, grid spacing of 7 km or less)

Head of STC will prepare letter to be send to COSMO Directors. From developing countries viewpoint: COSMO model or WRF

(NOAA/NCAR) as replacement of HRM

Page 11: Report about the meeting of the COSMO Steering Committee (STC) Moscow, 6 and 7 September 2010

Moscow, September 2010

Status of PPs; New PP: POMPA; Status of VERSUS

STC discussed the status of all PPs and PTs

STC agreed to extend the following PPs: COLOBOC (by one year) CONSENS (by one year)

STC agreed to create the new PP POMPA “Performance on massively parallel architectures”

STC discussed the status and future development of PP VERSUS

Page 12: Report about the meeting of the COSMO Steering Committee (STC) Moscow, 6 and 7 September 2010

Moscow, September 2010

COSMO and important sport events

Sochi 2014 (Winter Olympic)

Brazil 2014 (Soccer World Cup)

Brazil 2016 (Summer Olympics)

Can the COSMO Partners offer some show pieces (FDPs, RDPs) to increase the visibility of COSMO?

Head of STC will write a letter to the Directors of the COSMO Partners.

Page 13: Report about the meeting of the COSMO Steering Committee (STC) Moscow, 6 and 7 September 2010

Moscow, September 2010

FTE 2009/2010/2011

What to do if a COSMO member cannot provide 2 FTEs for two or even three years?

Head of STC will ask the President of DWD to write a letter of concern to the Director of the COSMO Partner involved to ask for proposals of how to alleviate the situation.

Missing FTEs should not be due to a lack of focus at the service because of running other regional NWP models!

Page 14: Report about the meeting of the COSMO Steering Committee (STC) Moscow, 6 and 7 September 2010

Moscow, September 2010

Communication issues

How to improve communication within STC and with Head of STC?

Jour fixe SPM and head of STC once a month (phone call)

Once a year Head of STC and SPM will write a short (1-2 pages) paper about COSMO progress for Directors

Page 15: Report about the meeting of the COSMO Steering Committee (STC) Moscow, 6 and 7 September 2010

Moscow, September 2010

Next COSMO-GMs

COSMO-GM 2011 from 12 – 16 September in Rome (Italy)

COSMO-GM 2012 from 10 – 14 September in Lugano (Switzerland)

Page 16: Report about the meeting of the COSMO Steering Committee (STC) Moscow, 6 and 7 September 2010

Moscow, September 2010

Report of BRAC-Meeting 17 – 20 May 2010

Supetar, Brac Island, Croatia

D. Majewski, DWD, Head of STC

BRAC-HR

BRainstorming on Advanced Concepts on

High Resolution Modelling Workshop

NWP at scales of a few hundreds of meters to

a few kilometers

Page 17: Report about the meeting of the COSMO Steering Committee (STC) Moscow, 6 and 7 September 2010

Moscow, September 2010

Background

• General Assembly of ALADIN partners 2009 in Istanbul • Problems seen in HARMONIE/AROME integrations at

high resolutions detected by HIRLAM:

- Fireworks (precipitation, cold pools, wind gusts)

- Stability of integration• Concerns about scalability of HARMONIE on future

massively parallel computer systems• Strategic planning process for the next 5 – 10 years• Two-stage process:

Brainstorming meeting in Brac in May 2010

Scientific vision workshop in early 2011

Page 18: Report about the meeting of the COSMO Steering Committee (STC) Moscow, 6 and 7 September 2010

Moscow, September 2010

Known deficiencies

• Daily cycle of convection• Outflow (how to verify?)• Low level clouds• Strength of convection

by Sander Tijm

Page 19: Report about the meeting of the COSMO Steering Committee (STC) Moscow, 6 and 7 September 2010

Moscow, September 2010

Daily cycle of convection

by Sander Tijm

Page 20: Report about the meeting of the COSMO Steering Committee (STC) Moscow, 6 and 7 September 2010

Moscow, September 2010

Outflow: Temperature

Cold poolsas seen in the 2m-temperature

Page 21: Report about the meeting of the COSMO Steering Committee (STC) Moscow, 6 and 7 September 2010

Moscow, September 2010

Strength convection

by Sander Tijm

Page 22: Report about the meeting of the COSMO Steering Committee (STC) Moscow, 6 and 7 September 2010

Moscow, September 2010

Impact of horizontal diffusion

by Sander Tijm

Page 23: Report about the meeting of the COSMO Steering Committee (STC) Moscow, 6 and 7 September 2010

Moscow, September 2010

Future HPC challenges

• New computer architectures like multi-/many-core CPUs and GPUs (Graphics Processing Unit like NVIDIA)

• Massively parallel computer systems with > 100.000 cores.

• Mixed OpenMP / MPI parallelization.

• Portability of numerical model to different platforms.

• Scalability of numerical model on > 10.000 cores.

• Major challenges: Load balancing (e.g. physical processes) and efficient I/O on > 10.000 cores.

• Stability of operational runs using 100.000 cores (with a potential small mean time between interrupts!).

Page 24: Report about the meeting of the COSMO Steering Committee (STC) Moscow, 6 and 7 September 2010

Moscow, September 2010

Scalability of COSMO-EU on 512, 1024 and 2048 coresof an IBM Blue Gene (PowerPC 450, 850 MHz)

24-h forecast; 665 x 657 gridpoints, 40 layers (852, 426, 213 gridpoints/core)

Page 25: Report about the meeting of the COSMO Steering Committee (STC) Moscow, 6 and 7 September 2010

Moscow, September 2010

Workshop in Brac, Croatia

OrganisersJ. F. Geleyn (ALADIN), J. Onvlee (HIRLAM), D. Klaric (RC LACE),

P. Termonia (Belgium), C. Fisher (France)

ParticipantsAbout 23 particpants from ALADIN, AROME, HIRLAM, LACE groups

and

D. Majewski (COSMO)

T. Davies (UKMO)

E. Kallen (ECMWF)

Page 26: Report about the meeting of the COSMO Steering Committee (STC) Moscow, 6 and 7 September 2010

Moscow, September 2010

Organisation of BRAC-HR

Monday: Plenary with several key note lectures

Tuesday and Wednesday: Working group meetings• WG1: Dynamical cores‘ development• WG2: Upper air physics• WG3: Physics – dynamics interface• WG4: Validation and verification• WG5: Nesting, LBC, coupling• WG6: Surface modelling

Thursday: Reports of WGs and draft of standpoints

Page 27: Report about the meeting of the COSMO Steering Committee (STC) Moscow, 6 and 7 September 2010

Moscow, September 2010

Outcome of BRAC-HR

• „Official“ 12+6 page report by the organizing committee (probably mainly written by J. F. Geleyn) dated 20/08/2010

• This report distinguishes between:

- areas of broad consensus (6 pages)

- areas of divergence of opions (5 ½ pages)

- attempt of a synthesis for future steps (1 page)

Page 28: Report about the meeting of the COSMO Steering Committee (STC) Moscow, 6 and 7 September 2010

Moscow, September 2010

Areas of broad consensus

• At high resolution, stochastic point of view more and more important

• Increased sophistication for process description primarily for microphysics of precipitation and cloud-determination scheme(s)

• Some 3D-effects of radiation like slope and shadow of clouds

• Improvements of physics-dynamics interface needed• For verification: Radar and satellite data• Onset of (airmass) convection is one of the most

fundamental problems to be solved

Page 29: Report about the meeting of the COSMO Steering Committee (STC) Moscow, 6 and 7 September 2010

Moscow, September 2010

Areas with divergence of opinions

• Detailed priorities for the necessary evolutions of the diagnostic – validation – verification toolkit

• Evolution or substitution of the current AROME spectral SI/SL dycore; two extreme solutions: Spectral SI/SL vs. gridpoint RK (like WRF, COSMO)

• Relative priority to be asigned to the dynamical core issues (Météo France participants (F. Bouttier and C. Lac; see also paper by P. Benard and C. Lac) argue that the current dycore is the cause of the problems; J. F. Geleyn and many other participants (but not the COSMO representative) blame missing lateral mixing.

Page 30: Report about the meeting of the COSMO Steering Committee (STC) Moscow, 6 and 7 September 2010

Moscow, September 2010

Summary and outlook

• Deep internal controversy between Météo France, ALADIN and HIRLAM about the cause of the problems of the current AROME and how to tackle them.

• To shed some light on the problem:

- Run Weisman/Klemp (1982) test with AROME and COSMO-Model.

- Compare operational forecasts of AROME and COSMO for common areas (Southwestern Germany, Netherlands, Belgium).

Page 31: Report about the meeting of the COSMO Steering Committee (STC) Moscow, 6 and 7 September 2010

Moscow, September 2010

Orography (m) AROME (2.5 km) COSMO (2.8 km)

Page 32: Report about the meeting of the COSMO Steering Committee (STC) Moscow, 6 and 7 September 2010

Moscow, September 2010

Temperature (°C) at 2m and wind at 10m 12 July 2010 00 UTC +12h

AROME (2.5 km) COSMO (2.8 km)

Page 33: Report about the meeting of the COSMO Steering Committee (STC) Moscow, 6 and 7 September 2010

Moscow, September 2010

Wind gusts (km/h) at 10m 12 July 2010 00 UTC +12h

AROME (2.5 km) COSMO (2.8 km)

Page 34: Report about the meeting of the COSMO Steering Committee (STC) Moscow, 6 and 7 September 2010

Moscow, September 2010

Temperature (°C) at 2m and wind at 10m 12 July 2010 00 UTC +14h

AROME (2.5 km) COSMO (2.8 km)