Replacing High-Bleed Pneumatic Devices

Lessons Learned

from Natural Gas STAR Partners

NiSource and

EPA’s Natural Gas STAR Program

June 3, 2003

Page 2: Replacing High-Bleed Pneumatic Devices · PDF fileEvaluate all pneumatics to identify candidates for replacement and retrofit ... Microsoft PowerPoint - pneumatics_merrillville2003.ppt

Page 2Reducing Emissions, Increasing Efficiency, Maximizing Profits

Pneumatic Devices

Pneumatic devices are found in every gas production, processing, transmission and distribution facility

Most pneumatic devices leak gas by design

Losses from pneumatic devices are the largest source of methane emissions

Replacing, retrofitting, or maintaining high-bleed devices saves gas and money

These methods can be highly cost-effective

Page 3: Replacing High-Bleed Pneumatic Devices · PDF fileEvaluate all pneumatics to identify candidates for replacement and retrofit ... Microsoft PowerPoint - pneumatics_merrillville2003.ppt

Page 3Reducing Emissions, Increasing Efficiency, Maximizing Profits

Location of Pneumatic Devices at Compression Stations

PC PC

SOVSOV

LC

SOV

Liquid Knockout

Dehydrator Unit

CompressorsTo

Pipeline

SOV = Shut-off Valve (Unit Isolation)LC = Level Control (Knockout, Contactor, TEG

Regenerator)TC = Temperature Control (Regenerator Fuel Gas)FC = Flow Control (TEG Circulation, Compressor

Bypass)PC = Pressure Control (FTS Pressure, Compressor

Suction/Discharge)

FCLC TC FC PC

From

Pipeline

Page 4: Replacing High-Bleed Pneumatic Devices · PDF fileEvaluate all pneumatics to identify candidates for replacement and retrofit ... Microsoft PowerPoint - pneumatics_merrillville2003.ppt

Page 4Reducing Emissions, Increasing Efficiency, Maximizing Profits

Pneumatic Device Schematic

Pneumatic Controller

Process Measurement

Liquid LevelPressure

TemperatureFlow

Weak Signal Bleed(Continuous)

Strong Signal Vent(Intermittent)

Process Flow Control Valve

Valve Actuator

Strong Pneumatic Signal

Weak Pneumatic

Signal (3 - 15 psi)

Regulator

100+ psi

Gas

Regulated Gas Supply

20 psi

Page 5: Replacing High-Bleed Pneumatic Devices · PDF fileEvaluate all pneumatics to identify candidates for replacement and retrofit ... Microsoft PowerPoint - pneumatics_merrillville2003.ppt

Page 5Reducing Emissions, Increasing Efficiency, Maximizing Profits

Sources of Methane Losses

As part of normal operations, pneumatic devices release natural gas into the atmosphere

High-bleed devices bleed in excess of 6 scf per hourEquates to >50 Mcf per yearTypical high-bleed pneumatic devices bleed an

average of 140 Mcf per year

The actual bleed rate is largely dependent on the device’s design

Page 6: Replacing High-Bleed Pneumatic Devices · PDF fileEvaluate all pneumatics to identify candidates for replacement and retrofit ... Microsoft PowerPoint - pneumatics_merrillville2003.ppt

Page 6Reducing Emissions, Increasing Efficiency, Maximizing Profits

Magnitude of Methane Losses

Major source of methane losses from the natural gas industry

Pneumatic devices are used throughout the natural gas industry

Between 90,000 to 130,000 in the transmission sector

Over 250,000 in the production sector

In the distribution sector most pneumatic devices are non-bleeding pressure regulators

Page 7: Replacing High-Bleed Pneumatic Devices · PDF fileEvaluate all pneumatics to identify candidates for replacement and retrofit ... Microsoft PowerPoint - pneumatics_merrillville2003.ppt

Page 7Reducing Emissions, Increasing Efficiency, Maximizing Profits

Losses from Pneumatic Devices

Gas Industry Oil Industry

Production 31 Bcf 22 BcfProcessing 16 ---Transmission 14 ---

Total 61 Bcf 22 Bcf

Total Gas/Oil 83 Bcf/yr

Page 8: Replacing High-Bleed Pneumatic Devices · PDF fileEvaluate all pneumatics to identify candidates for replacement and retrofit ... Microsoft PowerPoint - pneumatics_merrillville2003.ppt

Page 8Reducing Emissions, Increasing Efficiency, Maximizing Profits

Three Options for Reducing Losses

Option 1: Replace high-bleed devices with low-bleed devices

Option 2: Retrofit controller with bleed reduction kits

Option 3: Maintenance aimed at reducing losses

Page 9: Replacing High-Bleed Pneumatic Devices · PDF fileEvaluate all pneumatics to identify candidates for replacement and retrofit ... Microsoft PowerPoint - pneumatics_merrillville2003.ppt

Page 9Reducing Emissions, Increasing Efficiency, Maximizing Profits

Option 1: Replace High-Bleed Devices

Most applicable to:

Controllers: liquid-level and pressure

Positioners and Transducers

Suggested Action: Evaluate replacements

Replace at end of device’s useful life

Early replacement

Page 10: Replacing High-Bleed Pneumatic Devices · PDF fileEvaluate all pneumatics to identify candidates for replacement and retrofit ... Microsoft PowerPoint - pneumatics_merrillville2003.ppt

Page 10Reducing Emissions, Increasing Efficiency, Maximizing Profits

Option 1: Replace High-Bleed (cont’d)

Costs vary with size

Typical costs range from $700 to $3,000 per device

Incremental costs of low-bleed devices are modest ($150 to $250)

Gas savings often pay for replacement costs in short periods of time

Page 11: Replacing High-Bleed Pneumatic Devices · PDF fileEvaluate all pneumatics to identify candidates for replacement and retrofit ... Microsoft PowerPoint - pneumatics_merrillville2003.ppt

Page 11Reducing Emissions, Increasing Efficiency, Maximizing Profits

Option 2: Retrofit with Bleed Reduction Kits

Most applicable to:

High-bleed controllers

Suggested Action: Evaluate retrofits

As alternative to early replacement

Retrofit kit costs approximately $250-$500

Page 12: Replacing High-Bleed Pneumatic Devices · PDF fileEvaluate all pneumatics to identify candidates for replacement and retrofit ... Microsoft PowerPoint - pneumatics_merrillville2003.ppt

Page 12Reducing Emissions, Increasing Efficiency, Maximizing Profits

Option 3: Maintenance to Reduce Losses

Applies to all pneumatic devices

Suggested Action: Modify routine maintenance procedures

Field survey of installed controllers

Where process allows, tune controllers to minimize bleed

Page 13: Replacing High-Bleed Pneumatic Devices · PDF fileEvaluate all pneumatics to identify candidates for replacement and retrofit ... Microsoft PowerPoint - pneumatics_merrillville2003.ppt

Page 13Reducing Emissions, Increasing Efficiency, Maximizing Profits

Option 3: Maintenance (cont’d)

Suggested Action (cont’d)

Re-evaluate the need for pneumatic positioners

Repair/replace airset regulators

Reduce regulated gas supply pressure to minimum

Routine maintenance should include repairing/replacing leaking components

Cost is low

Page 14: Replacing High-Bleed Pneumatic Devices · PDF fileEvaluate all pneumatics to identify candidates for replacement and retrofit ... Microsoft PowerPoint - pneumatics_merrillville2003.ppt

Page 14Reducing Emissions, Increasing Efficiency, Maximizing Profits

Summary of Decision Process

Locate and inventorythe high-bleed devices

Establish technical feasibility of alternatives

Evaluate economics of alternatives

Develop an implementation plan

Measure & record bleed rates, use vendor specifications, or use EPA defaults

Page 15: Replacing High-Bleed Pneumatic Devices · PDF fileEvaluate all pneumatics to identify candidates for replacement and retrofit ... Microsoft PowerPoint - pneumatics_merrillville2003.ppt

Page 15Reducing Emissions, Increasing Efficiency, Maximizing Profits

Economics of Replacement

Early Replacements

Implementationa

Replace at End of

Life Level

Control Pressure Control

Cost ($) 150 – 250b 380 1,340

Annual Gas Savings (Mcf)

50 – 200 166 228

Annual Value of Saved Gas ($)c 150 – 600 498 684

Payback (months)

5 – 12 9 23

IRR (%) 97 – 239 129 42

a All data based on Partners’ experiences. See Lessons Learned for more information.b Range of incremental costsc Gas price is assumed to be $3/Mcf.

Page 16: Replacing High-Bleed Pneumatic Devices · PDF fileEvaluate all pneumatics to identify candidates for replacement and retrofit ... Microsoft PowerPoint - pneumatics_merrillville2003.ppt

Page 16Reducing Emissions, Increasing Efficiency, Maximizing Profits

Economics of Retrofit

a On high-bleed controllersb All data based on Partners’ experiences. See Lessons Learned for more informationc Gas price is assumed to be $3/Mcf

Retrofit a

Implementation cost b $250-500

Bleed rate reduction (Mcf/device/year)

219

Value of gas saved ($/year) c 657

Payback (months) 9

IRR 129%

Page 17: Replacing High-Bleed Pneumatic Devices · PDF fileEvaluate all pneumatics to identify candidates for replacement and retrofit ... Microsoft PowerPoint - pneumatics_merrillville2003.ppt

Page 17Reducing Emissions, Increasing Efficiency, Maximizing Profits

Economics of Maintenance

a All data based on Partners’ experiences. See Lessons Learned for more informationb Gas price is assumed to be $3/Mcf

Reduce supply

pressure

Repair & retune

Change settings

Remove valve

positionersImplementation Cost ($)a 153 23 0 0

Gas savings (Mcf/yr)

175 44 88 158

Value of gas saved ($/yr) b 525 132 264 474

Payback (months)

3.5 2 <1 <1

IRR 343% 574% -- --

Page 18: Replacing High-Bleed Pneumatic Devices · PDF fileEvaluate all pneumatics to identify candidates for replacement and retrofit ... Microsoft PowerPoint - pneumatics_merrillville2003.ppt

Page 18Reducing Emissions, Increasing Efficiency, Maximizing Profits

Recommendations

Evaluate all pneumatics to identify candidates for replacement and retrofit

Choose lower bleed models at change-out where feasible

Identify candidates for early replacement and retrofits by doing economic analysis

Improve maintenance

Develop an implementation plan

Page 19: Replacing High-Bleed Pneumatic Devices · PDF fileEvaluate all pneumatics to identify candidates for replacement and retrofit ... Microsoft PowerPoint - pneumatics_merrillville2003.ppt

Page 19Reducing Emissions, Increasing Efficiency, Maximizing Profits

Discussion Questions

To what extent are you implementing this technology?

How can this technology be improved upon or altered for use in your operation(s)?

What are the barriers (technological, economic, lack of information, regulatory, etc.) that are preventing you from implementing this technology?