REPLACEMENT PROPOSAL OF CURRENT CONTROL COMMUNICATION SYSTEM WITH CONTROL COMMUNICATION EQUIPMENT FOR OFC (C.C.E.O.) SOHIL V VOHRA (APP. SSE/T/BRC (WR)

description

Report prepared for the project done in First Phase of Initial Apprentice Training at IRISET, Secunderabad

Transcript of Replacement Proposal of Current Control Communication System with Control Communication Equipment...

Page 1: Replacement Proposal of Current Control Communication System with Control Communication Equipment for OFC (CCEO)

REPLACEMENT PROPOSAL OF

CURRENT CONTROL COMMUNICATION SYSTEM

WITH CONTROL

COMMUNICATION EQUIPMENT FOR OFC

(C.C.E.O.)SOHIL V VOHRA (APP. SSE/T/BRC

(WR)

Page 2: Replacement Proposal of Current Control Communication System with Control Communication Equipment for OFC (CCEO)

SOHIL V VOHRAAPP SSE / TELE / WR (BRC)ITGI2/0027 – ROLL NO: 45

PROJECT GUIDES:AT BRC DIVISION:

1. Shri M.L.Makwana, Sr. DSTE/BRC2. Shri S.K. Shukla, DSTE – 1/BRC3. Shri Ajay Shah, SSE/T/ANND4. Smt Soma Dutta – SSE/TestRoom/BRC5. All Staff Members of Test Room, Vadodara6. All Section Controllers and TPCs.

AT IRISET, SC:7. Prof. C.K. Prasad, PT, IRISET, SC8. Prof. Vivek Chakravarty, APT, SC9. Shri Vishu Murthy, LT3, IRISET, SC10. Shri Raju, ICT1, IRISET, SC11. Shri Jayarajan Nair, ICT2, IRISET, SC

Page 3: Replacement Proposal of Current Control Communication System with Control Communication Equipment for OFC (CCEO)

VADODARA DIVISIONWESTERN RAILWAY

AN INTRODUCTION

Page 4: Replacement Proposal of Current Control Communication System with Control Communication Equipment for OFC (CCEO)

BRC – GDA SECTION

BRC – GER SECTION

PRTN – CTD SECTION

BRC – ST SECTION

Page 5: Replacement Proposal of Current Control Communication System with Control Communication Equipment for OFC (CCEO)

SECTIONS IN VADODARA DIVISION

VADODARA – SURAT

(BRC – ST) VADODARA – SURAT BHARUCH – DAHEJ ANKLESHWAR – RAJPIPLA SURAT - HAZIRA

VADODARA – GODHRA

(BRC – GDA) VADODARA – GODHRA ANAND – GODHRA

• VADODARA – GERATPUR (BRC – GET)

– VADODARA – GERATPUR– ANAND – KHAMBHAT (CAMBAY)– ANAND – VADTAL– NADIAD – PETLAD (NG)– NADIAD – MODASA(NG)

• PRATAPNAGAR – CHHOTA UDAIPUR

(PRTN – CTD)

Page 6: Replacement Proposal of Current Control Communication System with Control Communication Equipment for OFC (CCEO)

CURRENT CONTROL COMMUNICATION SYSTEM

VADODARA DIVISION

Page 7: Replacement Proposal of Current Control Communication System with Control Communication Equipment for OFC (CCEO)

DIFFERENT CONTROLS IN BRC DIVISION

SECTION / TRAIN CONTROLLER (TC) TRACTION POWER CONTROLLER (TPC) REMOTE CONTROL EMERGENCY CONTROL (EC) ENGG CONTROL S & T CONTROL TRACTION LOCO CONTROLLER (TLC)

Page 8: Replacement Proposal of Current Control Communication System with Control Communication Equipment for OFC (CCEO)

ROLE OF S & T DEPARTMENT

S&T Department provides the telephone communication facility required between

the control office and all track side Stations and other agencies connected

with train working. This speech communication system between the

Control Office and track side stations is known as Control Communication

System.

Page 9: Replacement Proposal of Current Control Communication System with Control Communication Equipment for OFC (CCEO)

COMMUNICATION ARRANGEMENTS

CIRCUITS ARE WORKING ON 6 QUAD CABLE RE MAIN CABLE OPTICAL FIBER CABLE MICROWAVE

(MAINLY USED WHEN THERE IS PROBLEM IS OFC COMMUNICATION)

• REPEATER STATIONS ARE LOCATED AT EVERY 40 KMS (APPROX) AT– BRC – GER SECTION

• ANAND JUNCTION• MAHEMDABAD

– BRC – ST SECTION• PALEJ • PANOLI• SURAT

– BRC – GDA SECTION• CHAMPANER• GODHRA JUNCTION• THASRA (ANND – GDA SUB SECTION)

– PRTN – CTD SECTION• DABHOI Note : Underlined station have microwave installations too.

Page 10: Replacement Proposal of Current Control Communication System with Control Communication Equipment for OFC (CCEO)

CONTROL EQUIPMENTS USED

CONTROL OFFICE EQUIPMENT / TEST ROOM EQUIPMENT

WAY STATION EQUIPMENT

VF REPEATERS / EQUILISER AMPLIFIER SYSTEM

ISLOATION TRANSFERS

MICROWAVE STATION SKIP

Page 11: Replacement Proposal of Current Control Communication System with Control Communication Equipment for OFC (CCEO)

CONTROL OFFICE EQUIPMENT

RDSO SPN: IRS TC: 60-2007

WAY STATION EQUIPMENT

RDSO SPN: IRS TC: 60-2007

Page 12: Replacement Proposal of Current Control Communication System with Control Communication Equipment for OFC (CCEO)

VF REPEATERS (RDSO Spec - IRS TC: 50-90)

EQUILISER AMP SYSTEM

(RDSO/SPN/TC/34/2002)

ISOLATION TRANFERS

RDSO SPN : IRS TC: 22-76

MICROWAVE STATIONS

Page 13: Replacement Proposal of Current Control Communication System with Control Communication Equipment for OFC (CCEO)

PROBLEMS FACED IN CURRENT CONTROL

SYSTEM

Page 14: Replacement Proposal of Current Control Communication System with Control Communication Equipment for OFC (CCEO)

PROBLEMS FACED IN CURRENT CONTROL SYSTEM

RING FAIL

NO TRANS TO WAY STATION

S

NO RECEIVE

FROM WAY

STATIONS

NO RING BACK TONE

INDUCTION IN

CIRCUIT

CROSS RINGS

Page 15: Replacement Proposal of Current Control Communication System with Control Communication Equipment for OFC (CCEO)

PROBLEMS FACED IN MICROWAVE STATIONS / REPEATERS

MICROWAVE

PATCHING O

F

CIRCUIT

CANNOT BE

DONE

PROPERLY /

TIMELY

Microwave Stations are been attended by Helper / Less Efficient staff member as all Microwave stations are to be eliminated. These helpers are not so qualified or learned that they can patch the circuit.

POWER

CUT

PROBLEM

S

In case of blocks taken by TPC for maintenance purpose.

Lightening “ATTACK” on the microwave station.

Page 16: Replacement Proposal of Current Control Communication System with Control Communication Equipment for OFC (CCEO)

OTHER DISADVANTAGES OF CURRENT CONTROL SYSTEM

AND

REQUIREMENT OF NEW

CONTROL COMMUNICATION SYSTEM

Page 17: Replacement Proposal of Current Control Communication System with Control Communication Equipment for OFC (CCEO)

ADI / RJT / RTM division have already implemented this system as a part of Technical Upgradation.

The way station equipment are normally costlier than the 2-Wire Telephone and the need to set using DIP switches.

Some way station equipment (Benetron Make) adds humming in the line which causes induction in the line. (source: Repair Center, PRTN)

As since, whole system is working on the 4-Wire, all the equipment required in this communication system are needed to be of 4-Wires.

Page 18: Replacement Proposal of Current Control Communication System with Control Communication Equipment for OFC (CCEO)

No remote monitoring or remote maintenance.

Manual Patching is only option when any breakage of cable occurs which sometimes leads to increased MTBF due to less skilled person available at patching station.

Each way side equipment requires equipment and a telephone.

Skilled staff is required for the maintenance.

Page 19: Replacement Proposal of Current Control Communication System with Control Communication Equipment for OFC (CCEO)

INTRODUCTION TO CONTROL COMMUNICATION

EQUIPMENT FOR OFC(C.C.E.O.)

Page 20: Replacement Proposal of Current Control Communication System with Control Communication Equipment for OFC (CCEO)

CCEO ARRANGEMENT

Page 21: Replacement Proposal of Current Control Communication System with Control Communication Equipment for OFC (CCEO)

ADVANTAGES OF CCEO

THE REASONS OF PROPOSAL OF THE SYSTEM

Page 22: Replacement Proposal of Current Control Communication System with Control Communication Equipment for OFC (CCEO)

Robust system with minimum average failure.

MEAN TIME BETWEEN FAILURE (MTBF) is much better than the former system.

Almost maintenance free.

Remote monitoring and operations possible.

Suitable for OFC installations.

Controller needs to press only one button to call a way station.

Page 23: Replacement Proposal of Current Control Communication System with Control Communication Equipment for OFC (CCEO)

Easy to program the Control Room Equipment. Easy to operate the Test Room Equipment.

Inbuilt Test Tone generator is provided in TRE which enables the easy process of testing of Way stations. As 2-Wire Auto telephones can be used, the use of comparatively costlier Way Station Equipment is eliminated.

Requirement of Radio Patching is eased now as Remote Patching can be done by simply pressing a button.

Using a single Radio Patching Unit, 9 units per circuit can be utilized with help to lessen the MTBF.

RPU can work on multiple channels viz on MW / BSNL Link / OFC Protection path.

Page 24: Replacement Proposal of Current Control Communication System with Control Communication Equipment for OFC (CCEO)

Using a single MTWE, four stations telephones can be equipped. So for maintenance purpose, only a single site is to be attended.

System used DTMF signaling.

As three dialing modes are available in the system, the system can support for primitive way station equipments along with one supported by this equipment.

Local Telephone Interface has minimum Leak Effect which provides better quality of Voice Frequency.

No local power for local telephone is required as power is provided by LTE only.

If any Way station telephone fails, then the replacement is very convenient as Auto Telephone Equipments are needed to be replaced.

Page 25: Replacement Proposal of Current Control Communication System with Control Communication Equipment for OFC (CCEO)

DISADVANTAGES OF CCEO

Page 26: Replacement Proposal of Current Control Communication System with Control Communication Equipment for OFC (CCEO)

Works on -48V DC. Higher than one required by primitive system. Thus, this system require larger battery backup.

Costlier than primitive system.

Maximum 80 way stations can be called. Primitive system supports 99 stations to be called.

If a single MWTE fails, chances are there that all the way stations connected to this equipment will be disconnected until and unless MWTE is repaired / replaced.

Being new technology, the staff may not repair as early as possible due to new internal motherboards and other component. So there is definite requirement of providing AMC if the warrantee period is over.

The CRE of CCEO needs to be programmed for the allotment of the numbers of the way stations to the push buttons. The current system doesn’t require such type of programming.

Page 27: Replacement Proposal of Current Control Communication System with Control Communication Equipment for OFC (CCEO)

FEASIBILITY FOR INSTALLATION

OF C.C.E.O.

HURDLES TO ITS IMPLEMENTATION

Page 28: Replacement Proposal of Current Control Communication System with Control Communication Equipment for OFC (CCEO)

PRIMARY TRAFFIC HURDLES

Vadodara being the most busiest station in Gujarat. 6 Rajdhani Expresses 2 Shatabdi Express 6 Garib Raths 2 Double Deckers 6 Duronto Express (passing by / service

stoppage) Largest junction for goods transport.

Page 29: Replacement Proposal of Current Control Communication System with Control Communication Equipment for OFC (CCEO)

ECONOMICAL FEASIBILITY

The system is more expensive than the current communication system in terms of purchasing and installation.

But again the cost can be recovered when the system is installed in following ways: The cost of way station equipments in current systems are much

higher than the 2-Wire Auto telephones to be used in current system.

The staff engaged in the maintenance is reduced, which will again help in paying salaries to those excess staff members.

The amount of travelling allowance claimed by the line staff for maintenance will also be reduced as this system provides the facility of remote maintenance and remote monitoring.

Less maintenance of the system will definitely help in reduced man power or transfer of manpower in other field.

Page 30: Replacement Proposal of Current Control Communication System with Control Communication Equipment for OFC (CCEO)

Technical Feasibility

Advanced Technical Features Remote maintenance and Remote

Monitoring necessary in time of Failures. Remote patching remove problems faced

in manual patching. Easy programming of way station

equipment and control equipment. Works on classic and Dasffo mode.

Page 31: Replacement Proposal of Current Control Communication System with Control Communication Equipment for OFC (CCEO)

Operational Feasibility

Controller need to press one button only for calling a station.

Manual patching is eliminated due to RPU. Thus reduced MTBF and smooth working of Train traffic.

Remote monitoring and remote maintenance is possible.

Way station equipment is 2-W and can be programmatically configured.

Easy to learn how to operate the system.

Page 32: Replacement Proposal of Current Control Communication System with Control Communication Equipment for OFC (CCEO)

CONCLUSIONThe Control Communication Equipment for OFC (CCEO) is

new technological and improved facility equipment developed for the efficient control communication in the Indian Railway.

This system is also specified for implementation by RDSO. This type of system is already employed in Mumbai Division, Rajkot Division and Ratlam Division and is in active consideration for implementation in other divisions too.

In order to cop up with advanced technology and for improving the efficiency of control communication and for reducing the Mean Time Between Failure (MTBF), it is highly recommended to implement this new system in the Vadodara Division.

Page 33: Replacement Proposal of Current Control Communication System with Control Communication Equipment for OFC (CCEO)

QUESTIONS???QUERIES????DOUBTS???

Page 34: Replacement Proposal of Current Control Communication System with Control Communication Equipment for OFC (CCEO)

THANK YOU AND

HAVE A NICE DAY