Replacement Clinical Tower

31
Replacement Clinical Tower Nicole C. Jenkins Construction Management April 15, 2008 Mercy Medical Center- Replacement Tower

description

Nicole C. Jenkins Construction Management April 15, 2008. Replacement Clinical Tower. AGENDA Project Overview Women in Construction ICRA Research Mat Foundation Re-design Reflection. Project Overview: Owner: Mercy Medical Center Location: Downtown, Baltimore, Maryland - PowerPoint PPT Presentation

Transcript of Replacement Clinical Tower

Page 1: Replacement Clinical Tower

Mer

cy M

edic

al C

ente

r- Re

plac

emen

t Tow

er

Replacement Clinical Tower

Nicole C. JenkinsConstruction ManagementApril 15, 2008

Page 2: Replacement Clinical Tower

Mer

cy M

edic

al C

ente

r- Re

plac

emen

t Tow

er

AGENDAProject OverviewWomen in ConstructionICRA ResearchMat Foundation Re-designReflection

Page 3: Replacement Clinical Tower

Mer

cy M

edic

al C

ente

r- Re

plac

emen

t Tow

er

Project Overview:Owner: Mercy Medical CenterLocation: Downtown, Baltimore, MarylandBuilding Use: Acute CareBuilding Size: 681,265 SQ.FTConstruction dates: May 2007- December 2010Contractor: Whiting-TurnerA/E Firm: Ellerbe BecketCost: $ 219,812,043

Page 4: Replacement Clinical Tower

Mer

cy M

edic

al C

ente

r- Re

plac

emen

t Tow

er

Women in Construction

Page 5: Replacement Clinical Tower

Mer

cy M

edic

al C

ente

r- Re

plac

emen

t Tow

er

Women In ConstructionWhat are ways more women can be recruited in the construction Industry?

Page 6: Replacement Clinical Tower

Mer

cy M

edic

al C

ente

r- Re

plac

emen

t Tow

er

Women in Construction

Click icon to add picture

Construction Employment

Page 7: Replacement Clinical Tower

Mer

cy M

edic

al C

ente

r- Re

plac

emen

t Tow

er

Women in Construction

Click icon to add picture

Trend of Employment

Page 8: Replacement Clinical Tower

Mer

cy M

edic

al C

ente

r- Re

plac

emen

t Tow

er

Women in Construction

Click icon to add picture

Men and Women Employees

Page 9: Replacement Clinical Tower

Mer

cy M

edic

al C

ente

r- Re

plac

emen

t Tow

er

Women in Construction

Click icon to add picture

Methodology

Page 10: Replacement Clinical Tower

Mer

cy M

edic

al C

ente

r- Re

plac

emen

t Tow

er

Response

Page 11: Replacement Clinical Tower

Mer

cy M

edic

al C

ente

r- Re

plac

emen

t Tow

er

Solution

• Women in Construction Workshop– ESTABLISHING INTEREST• Through establishing interest there is a more likely

chance that more females will enter into a construction related field.

– CREATING THE OPPORTUNITY• The workshops main purpose is to create and show

the opportunities available within the construction industry.

– FOLLOW-THROUGH FROM BOTH PARTIES

Page 12: Replacement Clinical Tower

Mer

cy M

edic

al C

ente

r- Re

plac

emen

t Tow

er

ICRA Research

Page 13: Replacement Clinical Tower

Mer

cy M

edic

al C

ente

r- Re

plac

emen

t Tow

er

ICRA Research

• How can cross-contamination be reduced or eliminated?

Page 14: Replacement Clinical Tower

Mer

cy M

edic

al C

ente

r- Re

plac

emen

t Tow

er

Page 15: Replacement Clinical Tower

Mer

cy M

edic

al C

ente

r- Re

plac

emen

t Tow

er

X-rays one-month apart

Page 16: Replacement Clinical Tower

Mer

cy M

edic

al C

ente

r- Re

plac

emen

t Tow

er

ICRA Research

Click icon to add picture

Met

hodo

loy

Identified Risk Category

Referenced ICRA Chart To

determine Steps to reduce

Risk

Applied Those steps to the Site

Page 17: Replacement Clinical Tower

Mer

cy M

edic

al C

ente

r- Re

plac

emen

t Tow

er

ICRA Research

Click icon to add picture

Page 18: Replacement Clinical Tower

Mer

cy M

edic

al C

ente

r- Re

plac

emen

t Tow

er

ICRA Research

Click icon to add picture

Page 19: Replacement Clinical Tower

Mer

cy M

edic

al C

ente

r- Re

plac

emen

t Tow

er

ICRA Research

Click icon to add picture

ICRA Team•ICRA Team needs to be established•The team should include the owner, contractor, and a ICRA specialist•All responsibilities should be divided

Ventilation •On site temporary ventilation•HEPA filters and vacuums are shown to be the most effective.

Monitoring System •Safety Surveillor•A system which monitors the number of infections in a hospital during a particular time frame.

Page 20: Replacement Clinical Tower

Mer

cy M

edic

al C

ente

r- Re

plac

emen

t Tow

er

ICRA Research

Page 21: Replacement Clinical Tower

Mer

cy M

edic

al C

ente

r- Re

plac

emen

t Tow

er

ICRA Research

Click icon to add picture

Page 22: Replacement Clinical Tower

Mer

cy M

edic

al C

ente

r- Re

plac

emen

t Tow

er

ICRA Research

Click icon to add picture

Safety Surveillor

Page 23: Replacement Clinical Tower

Mer

cy M

edic

al C

ente

r- Re

plac

emen

t Tow

er

Foundation Re-design

Page 24: Replacement Clinical Tower

Mer

cy M

edic

al C

ente

r- Re

plac

emen

t Tow

er

Foundation Re-design

Identify advantages and disadvantages

of both systems

Re-design foundation using

knowledge gained in CE

397A and AE 402

Compare the costs and

schedules of both systems

Page 25: Replacement Clinical Tower

Mer

cy M

edic

al C

ente

r- Re

plac

emen

t Tow

er

Foundation Re-design

Drilled Shaft Foundation Vs. Mat Foundation

Page 26: Replacement Clinical Tower

Mer

cy M

edic

al C

ente

r- Re

plac

emen

t Tow

er

Foundation Re-design

Advantages of Mat Foundation

•Cost (affordable)• Construction Procedure (simple) • Materials (mostly concrete) •Labor (does not need expertise)

Disadvantages of Mat Foundation

•Settlement•Limit Capacity * Soil * Structure•Irregular ground surface (slope, retaining wall)Foundation subjected to pullout, torsion, moment

Page 27: Replacement Clinical Tower

Mer

cy M

edic

al C

ente

r- Re

plac

emen

t Tow

er

Foundation Re-design

RESULTS

Mercy Medical Center Calculations:•AREA CALCULATIONS: 41,520 SQ FT•LIVE LOAD :101,761 kips•DEAD LOAD :104,767 kips•CRITICAL COLUMN LOAD:6,935 kips•MAT SLAB THICKNESS: 74 INCHES•REINFORCEMENT: No. 11 bars @ 6 ½ inches apart•Reinforcement : 883 Tons

Page 28: Replacement Clinical Tower

Mer

cy M

edic

al C

ente

r- Re

plac

emen

t Tow

er

Foundation Re-design

Mat Foundation Schedule

Drilled Shaft Foundation Schedule

Page 29: Replacement Clinical Tower

Mer

cy M

edic

al C

ente

r- Re

plac

emen

t Tow

er

Foundation Re-design

Cost Savings

Original Foundation Costs: $ 3,804,477

Mat Foundation Costs: $2,289,163

Total Savings: $ 1,515,314

Page 30: Replacement Clinical Tower

Mer

cy M

edic

al C

ente

r- Re

plac

emen

t Tow

er

Foundation Re-design

Schedule Reductions: 22 day difference between the foundation types

Page 31: Replacement Clinical Tower

Mer

cy M

edic

al C

ente

r- Re

plac

emen

t Tow

er

Acknowledgements

Ellerbe BecketAdrian Hagerty, AIAHani Wahbi, PE, ElectricalPaula Gillette, PE, LEEDWhiting-Turner Contracting CompanyKate Edwards, Project ManagerBob Moore, Project ManagerSouthland Industries,Mike McLaughlin, PE LVIBrian Kline, PE

Survey Participants

Balfour Beatty ConstructionVivian Arnold, Project EngineerBibi Ukoli, E.I.TRebecca NordbyBrown ContractingMichelle WytheWhiting-Turner Contracting CompanyKate Edwards, Project ManagerLisa DeckerKate Craigmile, Project EngineerAtlantic Risk ManagementStephanie FreemanRTKL

Robert BerrySchnabel EngineeringDavid Carpenter, P.E, Project Engineer

Schnabel EngineeringDavid Carpenter, P.E, Project Engineer

Penn State UniversityDavid R. RileyWalter G. M SchniederKevin ParfittRobert Holland

X-thAri Tinkoff, P.E, Project Engineer

Safety SurveillorVanessa Hermann