This document was adopted from API
3.1 General
3.1.1 Performance and NPSH testscentrifugal pumps) or HI 2.6 (for ve
not rating. Performance tolerances
3.1.2 If specified, at least 6 weeks
purchaser, for his review and com
optionaltests (3.4), including accep
3.1.3 Mechanical seals shall not be
or performance tests.
3.2 Hydrostatic test
3.2.1 All pressure-casing compone
times the maximum allowable wor
a) Double-casing pumps, horizontal
5.3.6), andother special design pu
b) Cooling passages and componen
coolers, shall be tested at a minim
c) Steam, cooling-water and lubric
maximum operating gauge pressur
d) The test liquid shall be at a temp
material being tested.
e) Gaskets used during hydrostatic
the same design as those to be sup
f) Hydrotesting is permitted withou
gland plate or seal chamber is usedrequirements as the pressure casin
,
UMP TEST PROCEDURE)
1
61 s
shall be conducted using the methods of ISO 9rtical pumps), except that efficiency shall be fo
shall be in accordance with Table 14.
efore the first scheduled running test, the ven
ent, detailed procedures for all running tests
tance criteria for all monitored parameters.
used during the hydrostatic test but shall be us
ts shall be hydrostatically tested with liquid at
ing pressure, with the special provisions speci
multistage pumps, integral-gear pumps (as de
ps as approved by the purchaser may be segm
ts, including jackets for bearings, seal chamber
m gauge pressure of 1 000 kPa (10 bar) (150 p
ting-oil piping, if fabricated by welding, shall b
e or 1 000 kPa (10 bar) (150 psi), whichever is g
erature higher than the nil-ductility transition t
testing of an assembled pressure casing, less s
plied with the pump.
t the seal gland plate or seal chamber installed
, it shall be separately hydrotested to the sameg.
abzevariR023
06 grade 1, HI 1.6 (for information only and
or shall submit to the
nd all specified
ed during all running
a minimum of 1,5
ied below.
scribed inAPI-610 para
entally tested.
, oil coolers and seal
i).
tested at 1,5 times
reater.
emperature of the
al glands, shall be of
. If a cast material
pressure
-
7/25/2019 REP-3
2/7
(
This document was adopted from API
T
3.2.2 If the part tested is to operat
strength of that material at the tes
a factor obtained by dividing the althat at the rated operating temper
API 610 para5.3.4. For piping, the s
then be the minimum pressure at
list actual hydrostatic test pressure
NOTE For the purpose of this provi
3.2.3 The chloride content of liquid
mg/kg. To prevent deposition of ch
removed from tested parts at the c
NOTE Chloride content is limited in
3.2.4 Tests shall be maintained for
under pressure. The hydrostatic te
the pressure-containing parts are o
may require a longer testing period
Condition
Rated differential head:
0 m to 150 m (0 ft to 500 ft)
151 m to 300 m (501 ft to 1 0
> 300 m (1 000 ft)
Rated power
Rated NPSH
NOTE Efficiency is not a rating v
a If a rising head flow curve is speci
if the test curve still shows a rising c
b Under any combination of the abo
,
UMP TEST PROCEDURE)
2
61 s
ble 14 Performance tolerances
at a temperature at which the strength of a m
ing temperature, the hydrostatic test pressure
lowable working stress for the material at the tture. The stress values used shall be determin
tress shall conform to ISO 15649. The pressure
hich the hydrostatic test shall be performed.
s.
ion, ASME B31.3 is equivalent to ISO 15649.
s used to test austenitic stainless steel material
lorides as a result of evaporative drying, all resi
onclusion of the test.
order to prevent stress-corrosion cracking.
a sufficient period of time to permit complete
t shall be considered satisfactory if neither lea
bserved for at least 30 min. Large, heavy press
to be agreed upon by the purchaser and the v
Rated point
%
2
+ 5
00 ft) 2
+ 3
2
+ 2
+ 4
0
lue.
fied (see 5.1.13), the negative tolerance specified here sh
haracteristic.
ve (cumulative tolerances are not acceptable)
abzevariR023
aterial is below the
shall be multiplied by
sting temperature by d in accordance with
thus obtained shall
he data sheets shall
s shall not exceed 50
dual liquid shall be
xamination of parts
s nor seepage through
re-containing parts
ndor. Seepage past
Shutoff
%
+ 10
10a
+ 8
8a
+ 5
5a
all be allowed only
-
7/25/2019 REP-3
3/7
(
This document was adopted from API
internal closures required for testi
pressure are acceptable. Piping sys
ISO 15649. Gaskets used during hy
supplied with the casing.
NOTE For the purpose of this provi
3.2.5 The hydrostatic test liquid sh
the following conditions exists.
a) The liquid pumped has a relative
temperature.
b) The pumping temperature is hig
c) The casing is cast from a new or
d) The materials are known to hav
3.2.6 Austenitic or duplex stainless
an additional amount of material o
required. The additional amount o
minimum allowable wall thickness,
Any areas which are machined afte
NOTE Because of the residual stres
proportional limits inherent in thes
critical dimensions during hydrosta
critical areas during hydrostatic tes
dimensions after hydrotest is avoid
3.3 Performance test
3.3.1 Unless otherwise specified, e
be performed using water at a tem
3.3.2 The requirements of a) throu
stand and before the performance
a) The contract seals and bearings
,
UMP TEST PROCEDURE)
3
61 s
g of segmented cases and operation of a test p
tems fabricated by welding shall be hydroteste
rotest of an assembled casing shall be of the s
ion, ASME B31.3 is equivalent to ISO 15649.
ll include a wetting agent to reduce surface te
density (specific gravity) of less than 0,7 at the
er than 260 C (500 F).
ltered pattern.
poor castability.
steel pressure-casing components may be hyd
n areas where machining to critical dimensions
material shall not exceed 1 mm (0,040 in) mat
whichever is less.
r hydrostatic testing shall be identified on the
ses resulting from final liquid quenching and re
e materials, small amounts of permanent defo
tic testing. By allowing a small amount of mate
ting, the need to add material by welding to re
ed.
ch pump shall be given a performance test. Pe
perature less than 65 C (150 F).
h h) below shall be met while the pump is ope
test is performed.
hall be used in the pump for the performance
abzevariR023
ump to maintain
in accordance with
me design as those
sion if one or more of
pumping
ostatically tested with
and tolerances is
rial stock or 5 % of
ydrotest report.
atively low
mation can occur at
rial to remain at these
tore close-toleranced
rformance tests shall
rating on the test
est.
-
7/25/2019 REP-3
4/7
(
This document was adopted from API
b) If approved by the purchaser, su
prevent damage to the contract se
c) The seal (or seals) shall not have
is in excess of that specified in ISO
unacceptable leakage during the p
If the seal is disassembled or remo
criteria defined in 3.3.5 d).
When the pump is on the test stan
water shall exhibit no visible signs
confirm that a zero-visible-leakage
NOTE For the purpose of this provi
d) If specified, seal leakage during t
demonstrate satisfactory seal perf
e) All lubricating oil pressures, visc
recommended in the vendors ope
f) Bearings specified to be normall
performance testing using a suitabl
g) All joints and connections shall b
h) All warning, protective and cont
required.
3.3.3 Unless otherwise specified, t
below.
a) The vendor shall take test data, i
and vibration at a minimum of five
1) shutoff (no vibration data requir
2) minimum continuous stable flo
3) midway between minimum and
4) rated flow, and
,
UMP TEST PROCEDURE)
4
61 s
bstitute seals may be used during the perform
ls or if the contract seals are not compatible w
a leakage rate during any phase of the pump p
1049 or as otherwise agreed by the vendor an
mp performance test requires a disassembly a
ed, the seal shall be retested with an air test o
and water is used as the test fluid, liquid seal
f leakage. ISO 21049:2004, Annex A.1.3, shoul
criterion is appropriate for the seals being test
ion, API 682 is equivalent to ISO 21049.
est shall require the assembled pump and seal
rmance.
sities and temperatures shall be within the ran
ating instructions for the specified unit being t
lubricated from a pure oil-mist system shall b
e hydrocarbon oil.
e checked for tightness, and any leaks shall be
ol devices used during the test shall be checke
e performance test shall be conducted as spec
ncluding head, flowrate, power, appropriate b
points. These points will normally be
ed),
,
rated flow,
abzevariR023
nce test if needed to
ith the test fluid.
rformance test that
d purchaser. Any
nd repair to the seal.
the pump using the
suitable for testing on
be reviewed to
d.
to be rerun to
ge of operating values
sted.
prelubricated prior to
orrected.
and adjusted as
ified in a) through d)
aring temperature(s)
-
7/25/2019 REP-3
5/7
(
This document was adopted from API
5) maximum allowable flow (as a
b) The test point for rated flow sha
In the case of high-energy pumps (
not be feasible to test at shutoff. S
c) Unless otherwise agreed, the tes
data sheet (see example in Annex
speed.
d) The vendor shall maintain a com
number of copies, certified for corr
performance data compared to gu
M).
e) If specified, in addition to formal
curves and test data (corrected for
after completion of performance t
shipment.
3.3.4 During the performance test,
a) Vibration values shall be recorde
values shall not exceed those given
b) Pumps shall operate within bear
not display signs of unfavourable o
c) When operated at rated speed,
d) If specified, true peak bearing-h
3.3.5 The requirements of a) throu
a) If it is necessary to dismantle a p
impellers to meet the tolerances fo
diameter exceeds 5 % of the origin
well as the final diameter of the im
operating characteristics after the
,
UMP TEST PROCEDURE)
5
61 s
inimum, 120 % of Best Efficiency Point).
ll be within a tolerance band of 5 % of rated fl
eeAPI 610 Para 5.1.18), integral-gear and mult
me low specific-speed pumps cannot achieve
t speed shall be within 3 % of the rated speed
). Test results shall be converted to anticipate
plete, detailed log of all final tests and shall pre
ectness. Data shall include test curves and a su
rantee points (see API 610 Para 9.2.4, 9.3.2.2
submittal of final data in accordance with API
speed, specific gravity and viscosity) shall be s
sting for purchaser's engineering review and a
the requirements of a) through d) below shall
d during the test in accordance withAPI 610 P
in 5.9.3.6.
ing temperature limits as defined in API 610 PA
peration, such as noise caused by cavitation.
umps shall perform within the tolerances give
using velocities shall also be recorded for infor
h d) below shall be met after the performance
ump after the performance test for the sole pu
r differential head, no retest is required unless
l diameter. The diameter of the impeller at th
peller, shall be recorded on a certified shop tes
iameter of the impeller has been reduced.
abzevariR023
ow.
istage pumps, it may
20 % BEP flow.
hown on the pump
results at the rated
pare the required
mary of test
nd example in Annex
10 PARA 9.3.2.2,
bmitted within 24 h
ceptance prior to
e met.
RA 5.9.3.2. Vibration
RA 5.10.2.4 and shall
in Table 14.
mation only.
test is completed.
rpose of machining
the reduction in
time of shop test, as
t curve that shows the
-
7/25/2019 REP-3
6/7
(
This document was adopted from API
b) If specified, disassembly of multi
diameter change) after test, shall b
c) If it is necessary to dismantle a p
ormechanical operation, the initial
run after the correction is made.
d) If it is necessary to disturb the m
seal faces are replaced with the job
1) pressurize each sealing section i
bar) (25 psi);
2) isolate the test set-up from the
or 5 min per 30 l (1 ft3) of test volu
3) the maximum allowable pressur
3.4 Optional tests
3.4.1 General
If specified, the shop tests describe
agreed upon by the purchaser and
3.4.2 NPSHR test
3.4.2.1 If specified, NPSHR shall be
3.4.2.2 A 3 % drop in head (first sta
performance impairment. The first
using a separate connection to the
first stage onlyshould be considere
3.4.2.3 NPSHR at the rated point sh
NPSHR requires a retest (see 3.3.5
3.4.3 Complete unit test
,
UMP TEST PROCEDURE)
6
61 s
stage pumps for any head adjustment (includin
e cause for retest.
ump for any other correction, such as improve
test shall not be acceptable, and the final perfo
echanical seal assembly following the perform
seal faces, the final seal assembly shall be air-
dependently with clean air to a test gauge pre
ressurizing source and maintain the pressure f
me, whichever is greater;
drop during the test shall be 15 kPa (0,15 bar)
d in 3.4.2 through 3.4.6 shall be performed. Te
the vendor.
determined at each test point [3.3.3 a)] except
ge head on multistage pumps) shall be interpre
stage head of pumps with two or more stages
first stage discharge if possible. If this is not fe
d.
all not exceed the quoted value (see Table 14).
nd 4.3.1).
abzevariR023
g less than 5 %
ent of power, NPSH
rmance test shall be
nce test, or if the test
ested as follows:
ssure of 175 kPa (1,75
r a minimum of 5 min,
(2 psi).
t details shall be
shut-off.
ted as indicating
hall be measured
sible, testing of the
Dismantling tocorrect
-
7/25/2019 REP-3
7/7
(
This document was adopted from API
If specified, the pump and driver tr
together. If specified, torsional vibr
The complete-unit test shall be per
components specified by the purch
3.4.4 Sound level test
If specified, sound level tests shall
NOTE ISO 3740, ISO 3744, and ISO
3.4.5 Auxiliary equipment test
If specified, auxiliary equipment su
vendorsshop. Details of the auxilia
the vendor.
3.4.6 Bearing housing resonance te
If a resonance test is specified, the
withthe pump unpiped, and the na
separation marginshall exist betwe
frequencies:
a) multiples of running speed (r/mi
b) multiples of vane passing freque
Test acceptance criteria shall be ag
3.4.7 Mechanical run test
3.4.7.1 If specified, the pump shall
PARA 5.10.2.4)has been achieved.
3.4.7.2 If specified, the pump shall
run shall be performed at rated flo
3.4.7.3 If specified, the beginning o
havestabilized.
,
UMP TEST PROCEDURE)
7
61 s
ain, complete with all auxiliaries that make up t
ation measurements shall be made to verify th
formed in place of or in addition to separate te
aser.
e performed as agreed between the purchase
746 may be consulted for guidance.
h as oil systems, gears and control systems sh
ry equipment test(s) shall be developed jointly
st
bearing housing(s) shall be excited by impact o
tural frequency(ies) shall be determined from t
en the natural frequency(ies) and the following
n): 1,0; 2,0; 3,0;
ncy: 1,0; 2,0.
reed upon between the purchaser and the ven
be run on the test stand until oil temperature s
be mechanically run for 4 h. Unless otherwise s
.
f the mechanical run test shall not occur until o
abzevariR023
he unit, shall be tested
e vendors analysis.
sts of individual
and the vendor.
ll be tested in the
by the purchaser and
other suitable means
he response. A
excitation
or.
tabilization (API 610
pecified or agreed, this
il temperatures