    This document was adopted from API

    3.1 General

    3.1.1 Performance and NPSH testscentrifugal pumps) or HI 2.6 (for ve

    not rating. Performance tolerances

    3.1.2 If specified, at least 6 weeks

    purchaser, for his review and com

    optionaltests (3.4), including accep

    3.1.3 Mechanical seals shall not be

    or performance tests.

    3.2 Hydrostatic test

    3.2.1 All pressure-casing compone

    times the maximum allowable wor

    a) Double-casing pumps, horizontal

    5.3.6), andother special design pu

    b) Cooling passages and componen

    coolers, shall be tested at a minim

    c) Steam, cooling-water and lubric

    maximum operating gauge pressur

    d) The test liquid shall be at a temp

    material being tested.

    e) Gaskets used during hydrostatic

    the same design as those to be sup

    f) Hydrotesting is permitted withou

    gland plate or seal chamber is usedrequirements as the pressure casin

    ,

    UMP TEST PROCEDURE)

    1

    61 s

    shall be conducted using the methods of ISO 9rtical pumps), except that efficiency shall be fo

    shall be in accordance with Table 14.

    efore the first scheduled running test, the ven

    ent, detailed procedures for all running tests

    tance criteria for all monitored parameters.

    used during the hydrostatic test but shall be us

    ts shall be hydrostatically tested with liquid at

    ing pressure, with the special provisions speci

    multistage pumps, integral-gear pumps (as de

    ps as approved by the purchaser may be segm

    ts, including jackets for bearings, seal chamber

    m gauge pressure of 1 000 kPa (10 bar) (150 p

    ting-oil piping, if fabricated by welding, shall b

    e or 1 000 kPa (10 bar) (150 psi), whichever is g

    erature higher than the nil-ductility transition t

    testing of an assembled pressure casing, less s

    plied with the pump.

    t the seal gland plate or seal chamber installed

    , it shall be separately hydrotested to the sameg.

    abzevariR023

    06 grade 1, HI 1.6 (for information only and

    or shall submit to the

    nd all specified

    ed during all running

    a minimum of 1,5

    ied below.

    scribed inAPI-610 para

    entally tested.

    , oil coolers and seal

    i).

    tested at 1,5 times

    reater.

    emperature of the

    al glands, shall be of

    . If a cast material

    pressure

  • 7/25/2019 REP-3

    2/7

    (

    This document was adopted from API

    T

    3.2.2 If the part tested is to operat

    strength of that material at the tes

    a factor obtained by dividing the althat at the rated operating temper

    API 610 para5.3.4. For piping, the s

    then be the minimum pressure at

    list actual hydrostatic test pressure

    NOTE For the purpose of this provi

    3.2.3 The chloride content of liquid

    mg/kg. To prevent deposition of ch

    removed from tested parts at the c

    NOTE Chloride content is limited in

    3.2.4 Tests shall be maintained for

    under pressure. The hydrostatic te

    the pressure-containing parts are o

    may require a longer testing period

    Condition

    Rated differential head:

    0 m to 150 m (0 ft to 500 ft)

    151 m to 300 m (501 ft to 1 0

    > 300 m (1 000 ft)

    Rated power

    Rated NPSH

    NOTE Efficiency is not a rating v

    a If a rising head flow curve is speci

    if the test curve still shows a rising c

    b Under any combination of the abo

    ,

    UMP TEST PROCEDURE)

    2

    61 s

    ble 14 Performance tolerances

    at a temperature at which the strength of a m

    ing temperature, the hydrostatic test pressure

    lowable working stress for the material at the tture. The stress values used shall be determin

    tress shall conform to ISO 15649. The pressure

    hich the hydrostatic test shall be performed.

    s.

    ion, ASME B31.3 is equivalent to ISO 15649.

    s used to test austenitic stainless steel material

    lorides as a result of evaporative drying, all resi

    onclusion of the test.

    order to prevent stress-corrosion cracking.

    a sufficient period of time to permit complete

    t shall be considered satisfactory if neither lea

    bserved for at least 30 min. Large, heavy press

    to be agreed upon by the purchaser and the v

    Rated point

    %

    2

    + 5

    00 ft) 2

    + 3

    2

    + 2

    + 4

    0

    lue.

    fied (see 5.1.13), the negative tolerance specified here sh

    haracteristic.

    ve (cumulative tolerances are not acceptable)

    abzevariR023

    aterial is below the

    shall be multiplied by

    sting temperature by d in accordance with

    thus obtained shall

    he data sheets shall

    s shall not exceed 50

    dual liquid shall be

    xamination of parts

    s nor seepage through

    re-containing parts

    ndor. Seepage past

    Shutoff

    %

    + 10

    10a

    + 8

    8a

    + 5

    5a

    all be allowed only

  • 7/25/2019 REP-3

    3/7

    (

    This document was adopted from API

    internal closures required for testi

    pressure are acceptable. Piping sys

    ISO 15649. Gaskets used during hy

    supplied with the casing.

    NOTE For the purpose of this provi

    3.2.5 The hydrostatic test liquid sh

    the following conditions exists.

    a) The liquid pumped has a relative

    temperature.

    b) The pumping temperature is hig

    c) The casing is cast from a new or

    d) The materials are known to hav

    3.2.6 Austenitic or duplex stainless

    an additional amount of material o

    required. The additional amount o

    minimum allowable wall thickness,

    Any areas which are machined afte

    NOTE Because of the residual stres

    proportional limits inherent in thes

    critical dimensions during hydrosta

    critical areas during hydrostatic tes

    dimensions after hydrotest is avoid

    3.3 Performance test

    3.3.1 Unless otherwise specified, e

    be performed using water at a tem

    3.3.2 The requirements of a) throu

    stand and before the performance

    a) The contract seals and bearings

    ,

    UMP TEST PROCEDURE)

    3

    61 s

    g of segmented cases and operation of a test p

    tems fabricated by welding shall be hydroteste

    rotest of an assembled casing shall be of the s

    ion, ASME B31.3 is equivalent to ISO 15649.

    ll include a wetting agent to reduce surface te

    density (specific gravity) of less than 0,7 at the

    er than 260 C (500 F).

    ltered pattern.

    poor castability.

    steel pressure-casing components may be hyd

    n areas where machining to critical dimensions

    material shall not exceed 1 mm (0,040 in) mat

    whichever is less.

    r hydrostatic testing shall be identified on the

    ses resulting from final liquid quenching and re

    e materials, small amounts of permanent defo

    tic testing. By allowing a small amount of mate

    ting, the need to add material by welding to re

    ed.

    ch pump shall be given a performance test. Pe

    perature less than 65 C (150 F).

    h h) below shall be met while the pump is ope

    test is performed.

    hall be used in the pump for the performance

    abzevariR023

    ump to maintain

    in accordance with

    me design as those

    sion if one or more of

    pumping

    ostatically tested with

    and tolerances is

    rial stock or 5 % of

    ydrotest report.

    atively low

    mation can occur at

    rial to remain at these

    tore close-toleranced

    rformance tests shall

    rating on the test

    est.

  • 7/25/2019 REP-3

    4/7

    (

    This document was adopted from API

    b) If approved by the purchaser, su

    prevent damage to the contract se

    c) The seal (or seals) shall not have

    is in excess of that specified in ISO

    unacceptable leakage during the p

    If the seal is disassembled or remo

    criteria defined in 3.3.5 d).

    When the pump is on the test stan

    water shall exhibit no visible signs

    confirm that a zero-visible-leakage

    NOTE For the purpose of this provi

    d) If specified, seal leakage during t

    demonstrate satisfactory seal perf

    e) All lubricating oil pressures, visc

    recommended in the vendors ope

    f) Bearings specified to be normall

    performance testing using a suitabl

    g) All joints and connections shall b

    h) All warning, protective and cont

    required.

    3.3.3 Unless otherwise specified, t

    below.

    a) The vendor shall take test data, i

    and vibration at a minimum of five

    1) shutoff (no vibration data requir

    2) minimum continuous stable flo

    3) midway between minimum and

    4) rated flow, and

    ,

    UMP TEST PROCEDURE)

    4

    61 s

    bstitute seals may be used during the perform

    ls or if the contract seals are not compatible w

    a leakage rate during any phase of the pump p

    1049 or as otherwise agreed by the vendor an

    mp performance test requires a disassembly a

    ed, the seal shall be retested with an air test o

    and water is used as the test fluid, liquid seal

    f leakage. ISO 21049:2004, Annex A.1.3, shoul

    criterion is appropriate for the seals being test

    ion, API 682 is equivalent to ISO 21049.

    est shall require the assembled pump and seal

    rmance.

    sities and temperatures shall be within the ran

    ating instructions for the specified unit being t

    lubricated from a pure oil-mist system shall b

    e hydrocarbon oil.

    e checked for tightness, and any leaks shall be

    ol devices used during the test shall be checke

    e performance test shall be conducted as spec

    ncluding head, flowrate, power, appropriate b

    points. These points will normally be

    ed),

    ,

    rated flow,

    abzevariR023

    nce test if needed to

    ith the test fluid.

    rformance test that

    d purchaser. Any

    nd repair to the seal.

    the pump using the

    suitable for testing on

    be reviewed to

    d.

    to be rerun to

    ge of operating values

    sted.

    prelubricated prior to

    orrected.

    and adjusted as

    ified in a) through d)

    aring temperature(s)

  • 7/25/2019 REP-3

    5/7

    (

    This document was adopted from API

    5) maximum allowable flow (as a

    b) The test point for rated flow sha

    In the case of high-energy pumps (

    not be feasible to test at shutoff. S

    c) Unless otherwise agreed, the tes

    data sheet (see example in Annex

    speed.

    d) The vendor shall maintain a com

    number of copies, certified for corr

    performance data compared to gu

    M).

    e) If specified, in addition to formal

    curves and test data (corrected for

    after completion of performance t

    shipment.

    3.3.4 During the performance test,

    a) Vibration values shall be recorde

    values shall not exceed those given

    b) Pumps shall operate within bear

    not display signs of unfavourable o

    c) When operated at rated speed,

    d) If specified, true peak bearing-h

    3.3.5 The requirements of a) throu

    a) If it is necessary to dismantle a p

    impellers to meet the tolerances fo

    diameter exceeds 5 % of the origin

    well as the final diameter of the im

    operating characteristics after the

    ,

    UMP TEST PROCEDURE)

    5

    61 s

    inimum, 120 % of Best Efficiency Point).

    ll be within a tolerance band of 5 % of rated fl

    eeAPI 610 Para 5.1.18), integral-gear and mult

    me low specific-speed pumps cannot achieve

    t speed shall be within 3 % of the rated speed

    ). Test results shall be converted to anticipate

    plete, detailed log of all final tests and shall pre

    ectness. Data shall include test curves and a su

    rantee points (see API 610 Para 9.2.4, 9.3.2.2

    submittal of final data in accordance with API

    speed, specific gravity and viscosity) shall be s

    sting for purchaser's engineering review and a

    the requirements of a) through d) below shall

    d during the test in accordance withAPI 610 P

    in 5.9.3.6.

    ing temperature limits as defined in API 610 PA

    peration, such as noise caused by cavitation.

    umps shall perform within the tolerances give

    using velocities shall also be recorded for infor

    h d) below shall be met after the performance

    ump after the performance test for the sole pu

    r differential head, no retest is required unless

    l diameter. The diameter of the impeller at th

    peller, shall be recorded on a certified shop tes

    iameter of the impeller has been reduced.

    abzevariR023

    ow.

    istage pumps, it may

    20 % BEP flow.

    hown on the pump

    results at the rated

    pare the required

    mary of test

    nd example in Annex

    10 PARA 9.3.2.2,

    bmitted within 24 h

    ceptance prior to

    e met.

    RA 5.9.3.2. Vibration

    RA 5.10.2.4 and shall

    in Table 14.

    mation only.

    test is completed.

    rpose of machining

    the reduction in

    time of shop test, as

    t curve that shows the

  • 7/25/2019 REP-3

    6/7

    (

    This document was adopted from API

    b) If specified, disassembly of multi

    diameter change) after test, shall b

    c) If it is necessary to dismantle a p

    ormechanical operation, the initial

    run after the correction is made.

    d) If it is necessary to disturb the m

    seal faces are replaced with the job

    1) pressurize each sealing section i

    bar) (25 psi);

    2) isolate the test set-up from the

    or 5 min per 30 l (1 ft3) of test volu

    3) the maximum allowable pressur

    3.4 Optional tests

    3.4.1 General

    If specified, the shop tests describe

    agreed upon by the purchaser and

    3.4.2 NPSHR test

    3.4.2.1 If specified, NPSHR shall be

    3.4.2.2 A 3 % drop in head (first sta

    performance impairment. The first

    using a separate connection to the

    first stage onlyshould be considere

    3.4.2.3 NPSHR at the rated point sh

    NPSHR requires a retest (see 3.3.5

    3.4.3 Complete unit test

    ,

    UMP TEST PROCEDURE)

    6

    61 s

    stage pumps for any head adjustment (includin

    e cause for retest.

    ump for any other correction, such as improve

    test shall not be acceptable, and the final perfo

    echanical seal assembly following the perform

    seal faces, the final seal assembly shall be air-

    dependently with clean air to a test gauge pre

    ressurizing source and maintain the pressure f

    me, whichever is greater;

    drop during the test shall be 15 kPa (0,15 bar)

    d in 3.4.2 through 3.4.6 shall be performed. Te

    the vendor.

    determined at each test point [3.3.3 a)] except

    ge head on multistage pumps) shall be interpre

    stage head of pumps with two or more stages

    first stage discharge if possible. If this is not fe

    d.

    all not exceed the quoted value (see Table 14).

    nd 4.3.1).

    abzevariR023

    g less than 5 %

    ent of power, NPSH

    rmance test shall be

    nce test, or if the test

    ested as follows:

    ssure of 175 kPa (1,75

    r a minimum of 5 min,

    (2 psi).

    t details shall be

    shut-off.

    ted as indicating

    hall be measured

    sible, testing of the

    Dismantling tocorrect

  • 7/25/2019 REP-3

    7/7

    (

    This document was adopted from API

    If specified, the pump and driver tr

    together. If specified, torsional vibr

    The complete-unit test shall be per

    components specified by the purch

    3.4.4 Sound level test

    If specified, sound level tests shall

    NOTE ISO 3740, ISO 3744, and ISO

    3.4.5 Auxiliary equipment test

    If specified, auxiliary equipment su

    vendorsshop. Details of the auxilia

    the vendor.

    3.4.6 Bearing housing resonance te

    If a resonance test is specified, the

    withthe pump unpiped, and the na

    separation marginshall exist betwe

    frequencies:

    a) multiples of running speed (r/mi

    b) multiples of vane passing freque

    Test acceptance criteria shall be ag

    3.4.7 Mechanical run test

    3.4.7.1 If specified, the pump shall

    PARA 5.10.2.4)has been achieved.

    3.4.7.2 If specified, the pump shall

    run shall be performed at rated flo

    3.4.7.3 If specified, the beginning o

    havestabilized.

    ,

    UMP TEST PROCEDURE)

    7

    61 s

    ain, complete with all auxiliaries that make up t

    ation measurements shall be made to verify th

    formed in place of or in addition to separate te

    aser.

    e performed as agreed between the purchase

    746 may be consulted for guidance.

    h as oil systems, gears and control systems sh

    ry equipment test(s) shall be developed jointly

    st

    bearing housing(s) shall be excited by impact o

    tural frequency(ies) shall be determined from t

    en the natural frequency(ies) and the following

    n): 1,0; 2,0; 3,0;

    ncy: 1,0; 2,0.

    reed upon between the purchaser and the ven

    be run on the test stand until oil temperature s

    be mechanically run for 4 h. Unless otherwise s

    .

    f the mechanical run test shall not occur until o

    abzevariR023

    he unit, shall be tested

    e vendors analysis.

    sts of individual

    and the vendor.

    ll be tested in the

    by the purchaser and

    other suitable means

    he response. A

    excitation

    or.

    tabilization (API 610

    pecified or agreed, this

    il temperatures