Renewables - Offshore Wind - Royal IHC · Renewables - Offshore Wind Extending boundaries in the...

8
Renewables - Offshore Wind Extending boundaries in the pursuit of cost reducons In the offshore wind market, the mutual aim is to reduce the total cost of energy to make this a compeve sector, while increasing the level of security. This covers everyone involved in a wind farm project, from developers to design agencies, and contractors to financers. To achieve cost reducons – while migang risk – offshore wind contractors need to minimise the number of interfaces and suppliers, and increase efficiency and flexibility. IHC IQIP contributes to this goal by providing a complete range of equipment and services on a project-by-project basis, which increases efficiency and flexibility, while reducing risk. In addion, our extensive track record with offshore wind projects shows that we can guarantee an effortless and posive result for our customers. Close cooperaon We support the growth of our customers through the delivery of innovave equipment, consultaon and addional services, during the installaon and decommissioning of wind farms, substaons and met masts. Through our integrated and professional approach, we provide a secure and cost-effecve service based on our proven track record. By working closely together with our customers – all well- known offshore wind contractors – we are able to ensure a maximum installaon window and migaon of risk during the lifeme of a project and beyond. Advisory Pile posioning Pile driving Noise migaon Handling & Liſting

Transcript of Renewables - Offshore Wind - Royal IHC · Renewables - Offshore Wind Extending boundaries in the...

Renewables - Offshore Wind Extending boundaries in the pursuit of cost reductionsIn the offshore wind market, the mutual aim is to reduce the total cost of energy to make this a competitive sector, while increasing the level of security. This covers everyone involved in a wind farm project, from developers to design agencies, and contractors to financers. To achieve cost reductions – while mitigating risk – offshore wind contractors need to minimise the number of interfaces and suppliers, and increase efficiency and flexibility. IHC IQIP contributes to this goal by providing a complete range of equipment and services on a project-by-project basis, which increases efficiency and flexibility, while reducing risk. In addition, our extensive track record with offshore wind projects shows that we can guarantee an effortless and positive result for our customers. Close cooperationWe support the growth of our customers through the delivery of innovative equipment, consultation and additional services, during the installation and decommissioning of wind farms, substations and met masts. Through our integrated and professional approach, we provide a secure and cost-effective service based on our proven track record. By working closely together with our customers – all well-known offshore wind contractors – we are able to ensure a maximum installation window and mitigation of risk during the lifetime of a project and beyond.

Advisory Pile positioning Pile driving Noise mitigation Handling & Lifting

NL

BE

UK

2016 Galloper Wind Farm Hydrohammer S-4000, FPUT: 1600t 6,3 GeoSea Monopile UK2016 Rampion OSS Hydrohammer S-1400, ILT: 60"x96" 2,2 Volker Staal en Funderingen OSS Jacket UK2016 Rampion OSS Levelling tools 800t 2,2 Scaldis OSS Jacket UK2016 Race Bank Hydrohammer S-3000, Driveability analyses 5,7 GeoSea Monopile UK2016 Nobelwind Hydrohammer S-1400, FPUT: 1600t, TPLT: 400t 4,5 Jan De Nul Group Monopile BE 2016 DolWin 3 OSS Jacket pile grippers 2,5 Nordic yards OSS Jacket DE2016 DolWin 3 OSS Leveling tool: 3000t 2,5 Heerema OSS Jacket DE2016 Nordergründe Hydrohammer S-1800, FPUT: 750t Driveability analyses/ HiLo piling method 5,5 Bilfinger Construction Monopile DE2016 Dudgeon Hydrohammer S-3000, Upending tool: 1400t 5,7 Seaway Heavy Lifting Monopile UK2016 Wikinger Upending tool: 700t, ILT: 60"x96" 3,7 VBMS Jacket DE2016 Dan Tysk OSS Levelling tools 400t Seaway Heavy Lifting OSS Jacket DE2016 Nordsee One OSS Hydrohammer S-1400, ILT: 60"x96" 2,4 Volker Staal en Funderingen OSS Jacket DE

Year Project Name IHC IQIP Equipment, Noise Mitigation and Advisory Top pileØ (m)

Contractor Application Country

Europe

DK

SE

DE

NL

2016 Nordsee One OSS Levelling tools 800t 2,4 Scaldis OSS Jacket DE2016 Hywind Scotland Pilot Park Tooling design and method for flange connection N/A Saipem Floating UK2016 Walney 3 and 4 Extension OSS Jacket pile grippers 2,1 Iemants N.V. OSS Jacket UK2016 Race Bank 01 OSS Jacket pile grippers 2,4 Iemants N.V. OSS Jacket UK2016 Burbo Bank OSS Jacket pile grippers 1,8 Iemants N.V. OSS Jacket UK2016 Veja Mate Hydrohammer S-4000, MP Flange design/ HiLo piling method 6,5 Offshore WindForce Monopile DE2016 Veja Mate OSS Jacket pile grippers 2,4 Iemants N.V. Monopile DE2016 Rampion Hydrohammer S-2500, HiLo piling method 5,0 E.On Monopile UK2015 Gode Wind 1 and 2 OSS Jacket pile grippers 2,4 Iemants N.V. OSS Jacket DE2015 Gode Wind 1 and 2 Hydrohammer S-2000, Upending tool: 1000t, TPLT: 600t, Noise Mitigation

System, HiLo piling method5,7 GeoSea Monopile DE

2015 Nordsee One Hydrohammer S-4000, FPUT: 1200t, TPLT: 600t, MP Flange design/ HiLo piling method/ Noise Mitigation System

5,5 GeoSea Monopile DE

Year Project Name IHC IQIP Equipment, Noise Mitigation and Advisory Top pileØ (m)

Contractor Application Country

Hydrohammer

Handling equipment

Noise Mitigation

Advisory

2015 Gemini OSS Hydrohammer S-1400, ILT: 60"x96" 2,4 Volker Staal en Funderingen OSS Jacket NL2016 Gemini OSS Leveling tools 800t 2,4 Scaldis OSS Jacket NL2015 Gemini Hydrohammer S-2000 2x 5,5 Van Oord Monopile NL2015 Westermeerwind Hydrohammer S-800 5 Ballast Nedam Offshore Monopile NL2015 Race Bank 02 OSS Jacket pile grippers 2,1 Iemants N.V. OSS Jacket UK2014 Amrumbank West OSS Hydrohammer S-1200, ILT: 60"x96" 2,4 Volker Staal en Funderingen OSS Jacket DE2014 Amrumbank West OSS Levelling tools 800t 2,4 Scaldis OSS Jacket DE2014 Borkum Riffgrund I Hydrohammer S-2000, Guiding tool, Upending tool: 1000t, HiLo piling

method/ Noise Mitigation System4,8 GeoSea Monopile DE

2014 Butendiek Hydrohammer S-2000, ILT: 60"x96", HiLo piling method/ Noise Mitigation System

5,2 Ballast Nedam Offshore Monopile DE

2014 Butendiek OSS Hydrohammer S-1200, ILT: 60"x96" 2,4 Volker Staal en Funderingen OSS Jacket DE2014 Butendiek OSS Leveling tools 800t 3,4 Scaldis OSS Jacket DE2014 EnBW Baltic 2 OSS Hydrohammer S-2500 5,5 Seaway Heavy Lifting Jacket DE2014 EnBW Baltic 2 OSS Leveling tools 800t 5,5 Scaldis Jacket DE2014 Sylwin Hydrohammer S-1200 2,5 Seaway Heavy Lifting Jackets DE2014 Taggan Met Mast Hydrohammer S-200 1,8 Per Aarsleff Met Mast SE2014 Eneco Luchterduinen Hydrohammer S-1400 4,5 Van Oord Monopile NL2014 Kentish Flats Extension Hydrohammer S-1200, FPUT: 750t 4,5 GeoSea Monopile UK2013 Northwind Hydrohammer S-1400, Upending tool: 700t 4,2 GeoSea Monopile BE 2013 Northwind OSS Upending tool: 700t, HRS GeoSea OSS Jacket BE 2013 Amrumbank West Hydrohammer S-2000, FPUT: 750t, ILT: 60"-96", HiLo piling method/ Noise

Mitigation System5,2 Ballast Nedam Offshore Monopile DE

2013 Borkum Riffgrund OSS Hydrohammer S-800, ILT: 60"x96", Leveling tool: 1200t 2,1 Volker Staal en Funderingen OSS Jacket DE2013 Borwin Hydrohammer S-1200 2,5 Seaway Heavy Lifting Jacket DE2013 DanTysk Hydrohammer S-2000 6 ABjV DanTysk Monopile DE2013 EnBW Baltic 2 Hydrohammer S-1200 3 ArGe Baltic 2 Foundations Jackets DE2013 EnBW Baltic 2 Hydrohammer S-2000 4,6 Ballast Nedam Offshore Monopile DE2013 Global Tech I Hydrohammer S-1400, Upending Frame: 600t, Leveling tool: 800t 3 HGO InfraSea Solutions Tripod DE2013 Global Tech I OSS Upending Frame: 600t 3 Hochtief Solutions OSS Jacket DE2013 HelWin & BorWin Jacket Pile Grippers 3,2 SeaRenergy Offshore Projects OSS Jacket DE2013 HelWin & BorWin Upending tool: 450t 3,2 Seaway Heavy Lifting OSS Jacket DE2013 SylWin Alpha OSS Hydrohammer S-1200, Upending Frame: 600t 2,5 Seaway Heavy Lifting Jacket DE2013 East Anglia Metmast Hydrohammer S-1200 3,2 Seaway Heavy Lifting Monopile UK

Year Project Name IHC IQIP Equipment, Noise Mitigation and Advisory Top pileØ (m)

Contractor Application Country

Europe

2013 Gwynt y Môr Hydrohammer S-1800, Upending tool: 630t 4,6 Seaway Heavy Lifting Monopile UK2013 Gwynt y Môr OSS Upending tool: 700t Seaway Heavy Lifting OSS Jacket UK2013 Humber Gateway FPUT: 750t 4,5 MPI Offshore Monopile UK2013 West of Duddon Sands Hydrohammer S-1400/ S-2000, Upending tool: 516t, ILT: 60"x96", TPLT:375t 4,8 Volker Staal en Funderingen Monopile UK2013 Westermost Rough Hydrohammer S-2000, Upending tool: 1000t, Realtime fatigue analyses 5,8 GeoSea Monopile UK2012 Meerwind Ost/Sud Hydrohammer S-2000, Pile Guide and Positioning Frame,

Upending tool: 670t5,5 Seajacks International Monopile DE

2012 Nordsee Ost Hydrohammer S-1200, Upending Frame: 600t, Leveling tool: 800t, Jacket pile grippers, MP Flange design

3 RWE Innogy Jacket DE

2012 Riffgat Hydrohammer S-1800, Noise Mitigation System 4,7 Seaway Heavy Lifting Monopile DE2012 Gunfleet Sands 3 Hydrohammer S-1400 4,7 Ballast Nedam Offshore Monopile UK2012 London Array Hydrohammer S-800/ S-1400, Upending tool: 645t 4,7 Bilfinger Berger & Per Aarsleff Monopile UK2012 Rampion Metmast Hydrohammer S-800 2,5 Fugro Seacore Monopile UK2012 Teesside Hydrohammer S-1400, Upending tool: 500t 3,9 Van Oord Monopile UK2012 West of Duddon Sands OSS Leveling tool: 800t 2,1 Scaldis OSS Jacket UK2013 West of Duddon Sands OSS Jacket pile grippers 2,1 Fabricon SA/NV OSS Jacket UK2011 Thornton Bank phase III Hydrohammer S-800 1,8 GeoSea Jacket BE 2011 Anholt Hydrohammer S-2000, Upending tool 4,7 Ballast Nedam Offshore Monopile DK2011 Borkum West II phase I Hydrohammer S-1200, ILT: 60"x96", 1200t 2,5 GeoSea Tripod DE2011 EnBW Baltic 2 testpile Hydrohammer S-1200 1,8 GeoSea & hochtief Testpile DE2011 NordSee Ost Metmast Hydrohammer S-800, Noise Mitigation System 2,1 Van Oord Monopile DE2011 RWE Ijmuiden Metmast Hydrohammer S-800, Noise Mitigation System 2,1 Van Oord Monopile NL2011 Horn Sea Metmast Jacket pile grippers 1,1 Hochtief Solutions Twisted jacket UK2011 Lincs Upending tool: 392t 4,7 MPI Offshore Monopile UK2011 Lincs OSS Hydrohammer S-600 1,4 Fugro Seacore OSS Jacket UK2011 Lincs OSS ILT: 42"x60" Volker Staal & Funderingen OSS Jacket UK2011 Sheringham Shoal part II Hydrohammer S-1800, Upending tool: 700t 4,7 Seaway Heavy Lifting Monopile UK2011 Walney Phase 2 Hydrohammer S-2000, ILT: 60"x96" 5,2 Ballast Nedam Offshore Monopile UK2011 Walney phase 2 OSS Hydrohammer S-600 1,8 Volker Staal en Funderingen OSS Jacket UK2010 Thornton Bank phase II Hydrohammer S-800 1,8 GeoSea Jacket BE 2010 BARD Offshore 1 Upending tool: 430t BARD Building Tripile DE2010 EnBW Baltic 1 Hydrohammer S-1200, Upending tool: 240t 4,3 Ballast Nedam Offshore Monopile DE2010 Greater Gabbard Hydrohammer S-1200/S-1800 5,1 Seaway Heavy Lifting Monopile UK2010 Ormonde Hydrohammer S-500, Piling template GeoSea Jacket UK

Year Project Name IHC IQIP Equipment, Noise Mitigation and Advisory Top pileØ (m)

Contractor Application Country

Europe Template for pile positioningand pre-piling for jackets

1000t Upending tool lifting monopile for Gode Wind

2010 Sheringham Shoal part I Hydrohammer S-1400, Upending tool: 700t 4,7 MT Højgaard Monopile UK2010 Walney Phase 1 Hydrohammer S-1400, Upending tool: 552t, Pile plug: 4680 - 6000mm 4,7 GeoSea Monopile UK2010 Walney trafo station ILT: 60"x96" Volker Staal en Funderingen Trafo station UK2009 Belwind Hydrohammer S-1200, Upending tool: 600t 4 Van Oord Monopile BE 2009 Thanet Hydrohammer S-1400, Upending tool: 600t 4,9 Thanet Offshore Wind Monopile UK2008 Horns Rev 2 Hydrohammer S-1200, Upending tool: 280t 3,9 Bilfinger Berger & Per Aarsleff Monopile DK2008 Alpha Ventus Hydrohammer S-500, 72" Slotted frame (60") 2,5 GeoSea Tripod + Jacket DE2008 Gunfleet Sands Hydrohammer S-1400, Upending tool: 335t, Pile plugs: 4700mm 4,7 MT Højgaard Monopile UK2008 Rhyl Flats Upending tool: 280t, Pile plugs: 4740mm Ballast Nedam Offshore Monopile UK2007 Lynn Upending tool: 266t 4,7 MPI Offshore Monopile UK2007 Robin Rigg Hydrohammer S-800, Upending tool: 263t 4,3 MPI Offshore Monopile UK2006 Fino II Measure pile Hydrohammer S-500 2,7 F+Z & Per Aarsleff Measurepile DE2006 Egmond aan Zee Hydrohammer S-1200 4,6 Ballast Nedam Offshore Monopile NL2006 Prinses Amaliawindpark Upending tool: 500t 4 Mammoet van Oord Monopile NL2006 Beatrice Demonstration Hydrohammer S-500 1,8 Volker Staal en Funderingen Jacket UK2006 Burbo Bank Upending tool: 237t 5 Mammoet van Oord Monopile UK2005 Barrow Hydrohammer S-1200 4,8 MPI Offshore Monopile UK2005 Race Bank & Docking Shoal Hydrohammer S-500 Mammoet van Oord Met Mast UK2004 Kentish Flats Hydrohammer S-600, Upending tool: 200t, FPUT: 750t 4,3 MPI Offshore Monopile UK2003 Arklow Bank Phase 1 Hydrohammer S-1200, Upending tool: 281t 5,1 Mammoet van Oord Monopile IE2003 Scroby Sands Hydrohammer S-1200, FPUT: 230t 4,2 Mammoet van Oord Monopile UK2002 Horns Rev 1 Hydrohammer S-500/S-600, Upending tool: 150t 4 Ballast Nedam Offshore Monopile DK2000 Middelgrunden Hydrohammer S-500 Eide Contracting Gravity-Base DK1995 Irene Vorrink Hydrohammer SC-150 3,5 Ballast Nedam Offshore Monopile NL1994 Nordsee One OSS Hydrohammer S-1400, ILT: 60"x96" 2,4 Volker Staal en Funderingen OSS Jacket DE1994 Lely Hydrohammer SC-150 3,7 Ballast Nedam Offshore Monopile NL

Year Project Name IHC IQIP Equipment, Noise Mitigation and Advisory Top pileØ (m)

Contractor Application Country

Asia

CN

JP

TW

Year Project Name Pile driving Top pile Ø (m)

Contractor Application Country

2016 Huaneng Rudong Offshore Wind Farm 300MW Project

Hydrohammer S-800 + S-1800

5,4-6,5 Jiangsu Longyuan Zhenhua Marine Engineering Co+CCCC Third Harbor Engineering Co., Ltd

High-Rise Pile Cap/ Monopiles

CN

2016 Shanghai Lingang offshore wind farm demonstration project (phase 1)

Hydrohammer S-600 CCCC Third Harbor Engineering Co., Ltd High-Rise Pile Cap CN

2016 Formosa 1 OWF Phase 1 Hydrohammer S-2000 4,8 Jiangsu Longyuan Zhenhua Marine Engineering Co Monopile TW

2015 CGN Rudong offshore demonstration project Hydrohammer S-1800 5,8-6,7 CCCC Third Harbor Engineering Co., Ltd Monopile CN

2015 Putian Pinghai bay offshore demonstration project phase A

Hydrohammer S-800 CCCC Third Harbor Engineering Co., Ltd High-Rise Pile Cap CN

2015 Xiangshui Offshore Demonstation Project Hydrohammer S-600 CCCC Third Harbor Engineering Co., Ltd High-Rise Pile Cap CN

2015 Taiwan Power Met Mast Hydrohammer S-280 2,9 Hung Hua Monopile TW

2015 Fuhai Met Mast Hydrohammer S-600 CSBC Monopile TW

2014 Rudong Offshore Wind Farm Demonstration Project - Expansion Project (200MW)

Hydrohammer S-800 Jiangsu Longyuan Zhenhua Marine Engineering Co Monopile CN

2012 Jiangsu Rudong 150MW Offshore (Intertidal)Demonstration Wind Farm - extension

Hydrohammer S-800 Jiangsu Longyuan Zhenhua Marine Engineering Co Monopile CN

2012 Jiangsu Rudong 150MW Offshore (Intertidal)Demonstration Wind Farm - phase II

Hydrohammer S-800 Jiangsu Longyuan Zhenhua Marine Engineering Co Monopile CN

2012 Kamisu Nearshore Wind Farm - phase 2 Hydrohammer S-500 3,5 Moricho Corporation Monopile JP

2011 Da Feng Intertidal ConCession Project Hydrohammer S-800 4,3 Jangsu Longyuan Zhenhua Marine Eng. Co.,Ltd Monopile CN

2010 Kamisu Nearshore Wind Farm - phase 1 Hydrohammer S-500 3,5 Moricho Corporation Monopile JP

Seaway Heavy Lifting’ s Oleg Strashnov installing monopiles