Renewable Energy in North Sulawesi
-
Upload
septian-anggoro -
Category
Documents
-
view
224 -
download
0
description
Transcript of Renewable Energy in North Sulawesi
PT PLN (Persero)WILAYAH SULUTTENGGO
Renewable Energy in
North SulawesiManado, September 25th 2013
PT. PLN (Persero)Wilayah Sulawesi Utara, Sulawesi Tengah, & Gorontalo
PLN SULUTTENGGO OPERATIONAL COVERAGE
AREA TAHUNA
AREA MANADO
SEKTOR MINAHASA
AP2B MINAHASA
AREA KOTAMOBAGU
AREA GORONTALO
AREA TOLITOLI
AREA PALU
AREA LUWUK
Lopana
Poso Energi3x65 MW, 2011/2013
Botupingge
Tasikria
G
Minahasa Turbine Gas2x25 MW, 2017, 2018
MFO Likupang20 MW, 2011
KotamobaguBoroko
Isimu
Marisa
Lolak
D Bitung56 MWU
A
Sawangan2x8 MW, 2015
IPP Kema2x25 MW, 20113U U
P
Minahasa Turbine Gas1x25 MW, 2017
Sulut II (Perpres)2x25 MW, 2011
PLTU IPP2x55 MW, 2014
LahendongLahendong IV, 1x20 MW, 2011Lahendong V, 1x20 MW, 2013Lahendong VI, 1x20 MW, 2013
G
PA
Poigar 22x16 MW, 2015
F
Kotamobagu4x20 MW, 2014
D
127 km, 2011
G
Anggrek2x25 MW, 2013
Tenaga Listrik Gtlo2x10 MW, 2013
U UGorontalo Energi12 MW, 2013
45 km, 2011
Gorontalo1x25 MW, 2017
D
DU
Randangan35 MW, 2013
UGI Leok, 20 MVA
83 km, 2013
110 km, 2013
108 km, 2013
128 km, 2013
GI Moutong20 MVA
UP
U FD U
A
U
U
GG
PLTU IPP Palu1x30 MW, 2014
DD
D
D
D
D
Senoro2x10 MW, 2013, 2014
IPP Luwuk2x120 MW, 2014
IPP Luwuk2x10 MW, 2013
Silae
Palu Baru
Tentena
Poso
Ampana
Bungku
Luwuk
25 km, 2014
119 km, 2011
27 km, 2011
82 km, 2019190 km, 2014
124 km, 2017
80km
GI Siboa20 MVA
GI Tolitoli30 MVA
Leok2x10 MW
A
P
PT PLN (Persero)WILAYAH SULUTTENGGO
RENCANA PENGEMBANGAN SISTEM TRANSMISI SISTEM SULUT, GORONTALO & SULTENG
BIDANG PERENCANAAN
PLTD
PLTA Kit Eksisting
Kit RencanaPLTP
D
A
P
Edisi Maret 2011
Transmisi 275 kV
Transmisi 150 kV
Trans Eksisting
Trans Rencana
Transmisi 70 kV
PLTU
PLTG
Gardu Induk
U
G
P
141 km, 2017
102 km, 2017
PLTP Masaingi1x20 MW, 2014
PLTU PJPP 3 & 42x14 MW, 2013 Ampana
2x6 MW, 2013/2014
2013
PLTU TOLI TOLI2x10 MW
SULUTTENGGO TRANSMISSION PLAN
SPP CAPACITY(kWp)
BATTERY(kWh)
INVERTER(kW) Type COD
BUNAKEN 335 900 200 Hybrid Feb, 9th 2011
MIANGAS 85 550 75 Hybrid Oct, 14th 2011
MARAMPIT 125 720 75 Hybrid Jun, 8th 2012
MARORE 120 600 75 Hybrid Mar, 23rd 2013
MAKALEHI 260 1000 120 Hybrid Jun, 22nd 2013
ROOFTOP TAHUNA 50 - 5 x 10 On-Grid Feb, 23rd 2013
Solar Power Plant Operating in North Sulawesi (SPP)
Next Solar Power Plant Project in North Sulawesi
SPP CAPACITY(kWp) LOCATION PROVINCE PROGRESS
Bunaken Extension 400 Bunaken SULUT Waiting Approval
Mantehage 300 P. Mantehage SULUT Waiting Approval
Manado Tua 400 P. Manado Tua SULUT Waiting Approval
Nain 350 P. Nain SULUT Waiting Approval
Gangga 380 P. Gangga SULUT Waiting Approval
Talise 350 P. Talise SULUT Waiting Approval
Dapalan 120 P. Dapalan SULUT Waiting Approval
Karatung 500 P. Karatung SULUT Waiting Approval
Nanedakele 330 P. Nanedakele SULUT Waiting Approval
Biaro 550 P. Biaro SULUT Waiting Approval
Total 3.630
Power Plant Type LocationAvailable Capacity
(MW)
Tonsealama HPP Minahasa Induk 13
Tanggari I HPP Minahasa Induk 16,3Tanggari II HPP Minahasa Induk 19
Lahendong I - IV GPP Tomohon 80
Amurang SCPP Minahasa Selatan 50
Poigar MHPP Kotamobagu 2,4
Lobong MHPP Kotamobagu 1,3
Mobuya IPP MHPP Kotamobagu 3
Ulung Peliang MHPP Tahuna 1
TOTAL AVAILABLE CAPACITY 186
Renewable Energy Power Plant Operating in North Sulawesi
HPP : Hydro Power Plant MHPP : Mini Hydro Power Plant SCPP : Steam Coal Power Plant GPP : Geothermal Power Plant
Renewable Energy Project in North SulawesiNO Project Name Owner Type Installed Capacity
(MW) COD Progress
1 Sulut II (FTP 1) / Amurang PLN SCPP 2 x 25 2012 Operating
2 Talaud PLN SCPP 2 x 3 2013 / 2014 On-Going
3 Sulut I (FTP I) PLN SCPP 2 x 25 2014 Planning
4 Lelipang/Belengan PLN MHPP 2 x 0,6 2014 Planning
5 Minahsa Peaker PLN GMPP 3 x 25 2015/16 Planning
17 Sulut 3 (IPP) IPP SCPP 2 x 50 2018 Planning
Total Capacity 675
6 Duminanga PLN MHPP 1 x 0,5 2014 Planning
7 Sawangan PLN HPP 2 x 8 2015 Planning
8 Kotamobagu I (FTP 2) PLN Gas PP 2 x 20 2016 Planning
9 Kotamobagu II (FTP 2) PLN SCPP 2 x 20 2016 Rencana
10 Minahasa GT (Peaking) PLN Gas PP 3 x 25 2017 / 2019 Planning
11 Amurang Rental SCPP 2 x 25 2013 On-Going
12 Sulut I - Kema IPP SCPP 2 x 25 2014 / 2015 Planning
13 Tahuna (FTP 2) IPP SCGPP 8 2013 Planning
14 Lahendong V (FTP 2) IPP GPP 20 2014 Planning
15 Lahendong VI (FTP 2) IPP GPP 20 2015 Planning
16 Tahuna 2 IPP SCPP 3 2017 Planning
SCPP : Steam Coal Power Plant SCGPP : Steam Coal Gasification PP.
MHPP : Mini Hydro Power Plant HPP : Hydro Power Plant
GPP : Geothermal Power Plant GMPP : Gas Machine Power Plant
FUEL MIX in North Sulawesi
HSD 40,63%
COAL10,19%
HYDRO
18,34%
GEOTHERMAL30,81
%
SOLAR0,03%
Primary Energy Source in 2012
FUEL MIX 40,63 %
ELECTICAL MAP OF NORTH SULAWESI
2013
10
Thank You“SUCCESS SULUTTENGGO”