Renewable Energy in North Sulawesi

10
PT PLN (Persero) WILAYAH SULUTTENGGO Renewable Energy in North Sulawesi Manado, September 25 th 2013 PT. PLN (Persero) Wilayah Sulawesi Utara, Sulawesi Tengah, & Gorontalo

description

Electrical

Transcript of Renewable Energy in North Sulawesi

Page 1: Renewable Energy in North Sulawesi

PT PLN (Persero)WILAYAH SULUTTENGGO

Renewable Energy in

North SulawesiManado, September 25th 2013

PT. PLN (Persero)Wilayah Sulawesi Utara, Sulawesi Tengah, & Gorontalo

Page 2: Renewable Energy in North Sulawesi

PLN SULUTTENGGO OPERATIONAL COVERAGE

AREA TAHUNA

AREA MANADO

SEKTOR MINAHASA

AP2B MINAHASA

AREA KOTAMOBAGU

AREA GORONTALO

AREA TOLITOLI

AREA PALU

AREA LUWUK

Page 3: Renewable Energy in North Sulawesi

Lopana

Poso Energi3x65 MW, 2011/2013

Botupingge

Tasikria

G

Minahasa Turbine Gas2x25 MW, 2017, 2018

MFO Likupang20 MW, 2011

KotamobaguBoroko

Isimu

Marisa

Lolak

D Bitung56 MWU

A

Sawangan2x8 MW, 2015

IPP Kema2x25 MW, 20113U U

P

Minahasa Turbine Gas1x25 MW, 2017

Sulut II (Perpres)2x25 MW, 2011

PLTU IPP2x55 MW, 2014

LahendongLahendong IV, 1x20 MW, 2011Lahendong V, 1x20 MW, 2013Lahendong VI, 1x20 MW, 2013

G

PA

Poigar 22x16 MW, 2015

F

Kotamobagu4x20 MW, 2014

D

127 km, 2011

G

Anggrek2x25 MW, 2013

Tenaga Listrik Gtlo2x10 MW, 2013

U UGorontalo Energi12 MW, 2013

45 km, 2011

Gorontalo1x25 MW, 2017

D

DU

Randangan35 MW, 2013

UGI Leok, 20 MVA

83 km, 2013

110 km, 2013

108 km, 2013

128 km, 2013

GI Moutong20 MVA

UP

U FD U

A

U

U

GG

PLTU IPP Palu1x30 MW, 2014

DD

D

D

D

D

Senoro2x10 MW, 2013, 2014

IPP Luwuk2x120 MW, 2014

IPP Luwuk2x10 MW, 2013

Silae

Palu Baru

Tentena

Poso

Ampana

Bungku

Luwuk

25 km, 2014

119 km, 2011

27 km, 2011

82 km, 2019190 km, 2014

124 km, 2017

80km

GI Siboa20 MVA

GI Tolitoli30 MVA

Leok2x10 MW

A

P

PT PLN (Persero)WILAYAH SULUTTENGGO

RENCANA PENGEMBANGAN SISTEM TRANSMISI SISTEM SULUT, GORONTALO & SULTENG

BIDANG PERENCANAAN

PLTD

PLTA Kit Eksisting

Kit RencanaPLTP

D

A

P

Edisi Maret 2011

Transmisi 275 kV

Transmisi 150 kV

Trans Eksisting

Trans Rencana

Transmisi 70 kV

PLTU

PLTG

Gardu Induk

U

G

P

141 km, 2017

102 km, 2017

PLTP Masaingi1x20 MW, 2014

PLTU PJPP 3 & 42x14 MW, 2013 Ampana

2x6 MW, 2013/2014

2013

PLTU TOLI TOLI2x10 MW

SULUTTENGGO TRANSMISSION PLAN

Page 4: Renewable Energy in North Sulawesi

SPP CAPACITY(kWp)

BATTERY(kWh)

INVERTER(kW) Type COD

BUNAKEN 335 900 200 Hybrid Feb, 9th 2011

MIANGAS 85 550 75 Hybrid Oct, 14th 2011

MARAMPIT 125 720 75 Hybrid Jun, 8th 2012

MARORE 120 600 75 Hybrid Mar, 23rd 2013

MAKALEHI 260 1000 120 Hybrid Jun, 22nd 2013

ROOFTOP TAHUNA 50 - 5 x 10 On-Grid Feb, 23rd 2013

Solar Power Plant Operating in North Sulawesi (SPP)

Page 5: Renewable Energy in North Sulawesi

Next Solar Power Plant Project in North Sulawesi

SPP CAPACITY(kWp) LOCATION PROVINCE PROGRESS

Bunaken Extension 400 Bunaken SULUT Waiting Approval

Mantehage 300 P. Mantehage SULUT Waiting Approval

Manado Tua 400 P. Manado Tua SULUT Waiting Approval

Nain 350 P. Nain SULUT Waiting Approval

Gangga 380 P. Gangga SULUT Waiting Approval

Talise 350 P. Talise SULUT Waiting Approval

Dapalan 120 P. Dapalan SULUT Waiting Approval

Karatung 500 P. Karatung SULUT Waiting Approval

Nanedakele 330 P. Nanedakele SULUT Waiting Approval

Biaro 550 P. Biaro SULUT Waiting Approval

Total 3.630

Page 6: Renewable Energy in North Sulawesi

Power Plant Type LocationAvailable Capacity

(MW)

Tonsealama HPP Minahasa Induk 13

Tanggari I HPP Minahasa Induk 16,3Tanggari II HPP Minahasa Induk 19

Lahendong I - IV GPP Tomohon 80

Amurang SCPP Minahasa Selatan 50

Poigar MHPP Kotamobagu 2,4

Lobong MHPP Kotamobagu 1,3

Mobuya IPP MHPP Kotamobagu 3

Ulung Peliang MHPP Tahuna 1

TOTAL AVAILABLE CAPACITY 186

Renewable Energy Power Plant Operating in North Sulawesi

HPP : Hydro Power Plant MHPP : Mini Hydro Power Plant SCPP : Steam Coal Power Plant GPP : Geothermal Power Plant

Page 7: Renewable Energy in North Sulawesi

Renewable Energy Project in North SulawesiNO Project Name Owner Type Installed Capacity

(MW) COD Progress

1 Sulut II (FTP 1) / Amurang PLN SCPP 2 x 25 2012 Operating

2 Talaud PLN SCPP 2 x 3 2013 / 2014 On-Going

3 Sulut I (FTP I) PLN SCPP 2 x 25 2014 Planning

4 Lelipang/Belengan PLN MHPP 2 x 0,6 2014 Planning

5 Minahsa Peaker PLN GMPP 3 x 25 2015/16 Planning

17 Sulut 3 (IPP) IPP SCPP 2 x 50 2018 Planning

Total Capacity 675

6 Duminanga PLN MHPP 1 x 0,5 2014 Planning

7 Sawangan PLN HPP 2 x 8 2015 Planning

8 Kotamobagu I (FTP 2) PLN Gas PP 2 x 20 2016 Planning

9 Kotamobagu II (FTP 2) PLN SCPP 2 x 20 2016 Rencana

10 Minahasa GT (Peaking) PLN Gas PP 3 x 25 2017 / 2019 Planning

11 Amurang Rental SCPP 2 x 25 2013 On-Going

12 Sulut I - Kema IPP SCPP 2 x 25 2014 / 2015 Planning

13 Tahuna (FTP 2) IPP SCGPP 8 2013 Planning

14 Lahendong V (FTP 2) IPP GPP 20 2014 Planning

15 Lahendong VI (FTP 2) IPP GPP 20 2015 Planning

16 Tahuna 2 IPP SCPP 3 2017 Planning

SCPP : Steam Coal Power Plant SCGPP : Steam Coal Gasification PP.

MHPP : Mini Hydro Power Plant HPP : Hydro Power Plant

GPP : Geothermal Power Plant GMPP : Gas Machine Power Plant

Page 8: Renewable Energy in North Sulawesi

FUEL MIX in North Sulawesi

HSD 40,63%

COAL10,19%

HYDRO

18,34%

GEOTHERMAL30,81

%

SOLAR0,03%

Primary Energy Source in 2012

FUEL MIX 40,63 %

Page 9: Renewable Energy in North Sulawesi

ELECTICAL MAP OF NORTH SULAWESI

2013

Page 10: Renewable Energy in North Sulawesi

10

Thank You“SUCCESS SULUTTENGGO”