RENEWABLE ENERGY DEVELOPMENT IN THE PHILIPPINES · 2019. 3. 27. · Department of Energy Empowering...

12
Department of Energy Empowering the Filipinos RENEWABLE ENERGY DEVELOPMENT IN THE PHILIPPINES 52 nd EGNRET Meeting 18-22 March 2019, Hong Kong, China

Transcript of RENEWABLE ENERGY DEVELOPMENT IN THE PHILIPPINES · 2019. 3. 27. · Department of Energy Empowering...

Page 1: RENEWABLE ENERGY DEVELOPMENT IN THE PHILIPPINES · 2019. 3. 27. · Department of Energy Empowering the Filipinos Additional Capacity Year Biodiesel Potential Annual Rated Capacity

Department of EnergyEmpowering the Filipinos

RENEWABLE ENERGY DEVELOPMENT

IN THE PHILIPPINES

52nd EGNRET Meeting18-22 March 2019, Hong Kong, China

Page 2: RENEWABLE ENERGY DEVELOPMENT IN THE PHILIPPINES · 2019. 3. 27. · Department of Energy Empowering the Filipinos Additional Capacity Year Biodiesel Potential Annual Rated Capacity

Department of EnergyEmpowering the Filipinos

BIODIESEL

11 Accredited Biodiesel Producers

574.9 Million Liters Production Capacity

Feedstock CNO

BIOETHANOL

10 Accredited Bioethanol Producers

282.12 Million Liters Production

Capacity

Feedstock Sugarcane and

Molasses

BIOFUEL PRODUCERS

2% Biodiesel 10% Bioethanol

Page 3: RENEWABLE ENERGY DEVELOPMENT IN THE PHILIPPINES · 2019. 3. 27. · Department of Energy Empowering the Filipinos Additional Capacity Year Biodiesel Potential Annual Rated Capacity

Department of EnergyEmpowering the Filipinos

Actual Annual Biofuel Report

Registered with Notice to Proceed Construction Accredited

2016(in million liters)

2017(in million liters)

# of Projects

Annual Capacity

# of Projects

Annual Capacity

Production Sales Production Sales

Biodiesel 2 165 11 574.9 225.87 217.70 222.13 203.48

Bioethanol 3 149 10 282.12 230.18 226.88 234.65 234.90

54 ML Green Future Innovation Inc., Bioethanol Plant

(San Mariano, Isabela)

90 ML Chemrez Technologies Inc., Biodiesel Plant

(Bagumbayan, Quezon City)

Page 4: RENEWABLE ENERGY DEVELOPMENT IN THE PHILIPPINES · 2019. 3. 27. · Department of Energy Empowering the Filipinos Additional Capacity Year Biodiesel Potential Annual Rated Capacity

Department of EnergyEmpowering the Filipinos

Additional Capacity

Year Biodiesel

Potential Annual

Rated Capacity

(in million liters)

2018 Greentech Biodiesel Inc. 100

2019 Archemicals Corporation 15

BIOREV 150

Year Bioethanol

Potential Annual

Rated Capacity

(in million liters)

2018

1st Emperador Distillers, Inc. 66

2nd Victorias Milling Company, Inc. 16.5

3rd Cavite Biofuel Producer, Inc. 38

Kooll Company, Inc. 15.88

2020 Canlaon Alcogreen Agro Industrial Corporation 45

Page 5: RENEWABLE ENERGY DEVELOPMENT IN THE PHILIPPINES · 2019. 3. 27. · Department of Energy Empowering the Filipinos Additional Capacity Year Biodiesel Potential Annual Rated Capacity
Page 6: RENEWABLE ENERGY DEVELOPMENT IN THE PHILIPPINES · 2019. 3. 27. · Department of Energy Empowering the Filipinos Additional Capacity Year Biodiesel Potential Annual Rated Capacity

Department of EnergyEmpowering the Filipinos

43.7%

12.3 MTOE

10.9%

3.1 MTOE

41.9%

11.8 MTOE

3.4%

1.0 MTOE

28.2MTOE

(48.6% of TPES)

TOTAL

coal

RE

TOTAL PRIMARY

ENERGY SUPPLY

(TPES) MIX

26.7%

15.5 MTOE

5.6%

3.2 MTOE

33.8%

19.6 MTOE

33.9%

19.7 MTOE

57.9MTOE

10.6%

3.2 MTOE

0.5%

0.1 MTOE

26.1%

7.8 MTOE

62.8%

18.7 MTOE

29.8MTOE

(51.4% of TPES)

GENERATION MIX(OUTPUT)

2017 Philippine Energy Situation

49.6%

4.0 MTOE

(46,847 GWh)

21.8%

1.8 MTOE

(20,547 GWh)

24.6%

2.0 MTOE

(23,189 GWh)

4.0%

0.3 MTOE

(3,787 GWh)

8.1MTOE

(94,370GWh)

NON-POWER MIX POWER MIX(INPUT)

Page 7: RENEWABLE ENERGY DEVELOPMENT IN THE PHILIPPINES · 2019. 3. 27. · Department of Energy Empowering the Filipinos Additional Capacity Year Biodiesel Potential Annual Rated Capacity

Department of EnergyEmpowering the Filipinos

RESOURCES 2009 2010 2011 2012 2013 2014 2015 2016 2017 Total

Biomass29.33 35.90 27.00 19.00 0.876 28.00 131.35 35.80 17.50 324.75

Geothermal- - - - - 50.00 10.00 60.00

Solar- - - - - 22.00 141.77 728.58 - 892.35

Hydro Power- 2.00 2.10 11.80 16.65 14.82 10.00 8.50 57.37

Ocean Energy- - - - - - -

Wind- - - - - 303.90 90.00 393.90

TOTAL 29.33 37.90 29.10 30.80 0.88 420.55 387.94 774.38 26.00 1,728.36

Renewable Energy Additional Capacity Installations under RA 9513

Page 8: RENEWABLE ENERGY DEVELOPMENT IN THE PHILIPPINES · 2019. 3. 27. · Department of Energy Empowering the Filipinos Additional Capacity Year Biodiesel Potential Annual Rated Capacity

Department of EnergyEmpowering the Filipinos

-

200.00

400.00

600.00

800.00

1,000.00

1,200.00

1,400.00

1,600.00

1,800.00

2,000.00

2009 2010 2011 2012 2013 2014 2015 2016 2017 Total

Wind Ocean Energy Hydro Power Solar Geothermal Biomass

Renewable Energy Additional Capacity Installations under RA 9513

Page 9: RENEWABLE ENERGY DEVELOPMENT IN THE PHILIPPINES · 2019. 3. 27. · Department of Energy Empowering the Filipinos Additional Capacity Year Biodiesel Potential Annual Rated Capacity

Department of EnergyEmpowering the Filipinos

Energy Supply Outlook 2017 – 2040

2040 TPES = 137.8 MTOE

Ave. Annual Growth Rate (2017 – 2040) = 4.0%

Page 10: RENEWABLE ENERGY DEVELOPMENT IN THE PHILIPPINES · 2019. 3. 27. · Department of Energy Empowering the Filipinos Additional Capacity Year Biodiesel Potential Annual Rated Capacity

Department of EnergyEmpowering the Filipinos

Milestones: RA 9513

2008 2009-2010 2011 2012-2013 2014-2018

Enacted the R.A. 9513:

Renewable Energy Act of 2008

• Issued the Implementing Rules and Regulations

• Administrative Frameworks for Awarding RE Service Contracts,

Accreditations

• Establishment of Renewable Energy Management Bureau

(REMB)

• Creation of DOE’s RE-Review and Evaluation Committee

• Initial awards of RE Contracts under the RE Law

• Convening of National Renewable Energy Board (NREB)

• ERC Issued Feed-in-Tariff (FIT) Rules (August 2010)

• Published the National

Renewable Energy

Program (NREP) 2010-

2030

• The ERC approved the FIT Rates (July 2012)

• DOE issued Guidelines for the Selection Process of RE Projects under FIT System

and Award of Certificate for FIT Eligibility under Department Circular No. 2013-05-

0009 (May 2013)

• Implementation of the Net-Metering Program (July 2013)

• ERC issued FIT Allowance (FIT-ALL) Payment and Collection Guidelines (December

2013)

• ERC approved FIT-All Rates 0.0406 Php/kWh (2014-2015), October 2014 and effective

January 2015

• Amendment of DOE’s Installation Target

• April 2014, 50 MW to 500 MW for Solar

• April 2015, 200 MW to 400 MW for Wind

• ERC issued new FIT Rates for Solar (March 2015) and Wind (October 2015)

• DC2017-12-0015 (RPS Rules for On-Grid Areas/22 Dec. 2017)

• DOE endorsed to ERC the FIT Installation Target completion for Biomass and

ROR Hydro until EO Dec. 2019

• DC2018-07-0019 (GEOP Rules/18 July 2018).

• DC2018-08-0024 (RPS Rules for Off-Grid/24 August 2018).

Page 11: RENEWABLE ENERGY DEVELOPMENT IN THE PHILIPPINES · 2019. 3. 27. · Department of Energy Empowering the Filipinos Additional Capacity Year Biodiesel Potential Annual Rated Capacity

Department of EnergyEmpowering the Filipinos

Challenges and Way Forward

o Awareness and social acceptance

o Streamlining of Administrative Process

o Bringing down power cost thru RE

o Post Harvest Use

o Grid congestions/geographical boundaries

o Climate resiliency

Page 12: RENEWABLE ENERGY DEVELOPMENT IN THE PHILIPPINES · 2019. 3. 27. · Department of Energy Empowering the Filipinos Additional Capacity Year Biodiesel Potential Annual Rated Capacity

Department of EnergyEmpowering the Filipinos

[email protected]

Philippines Renewable Energy Development

Thank you!