Page 2: RENEW MY CHURCH RENUEVA MI IGLESIA

Today’s AgendaIntroduce Committee

Describe Renew My Church ProcessOverview of Parish data

What We Can ExpectTake Questions

Agenda Para Esta ReuniónIntroducir el Comite

Explicar el Proceso de Renueva Mi IglesiaQue Podamos Esperar

Preguntas

Page 3: RENEW MY CHURCH RENUEVA MI IGLESIA

Renew My Church CommitteeComite de Renueva Mi Iglesia

Rita AlbizuresGabriel Delgado

Bob JanegaRigo NavasBen Walters

Page 4: RENEW MY CHURCH RENUEVA MI IGLESIA

C

RENEW MY CHURCH PROCESS

PROCESO DE RENUEVAMI IGLESIA

Page 5: RENEW MY CHURCH RENUEVA MI IGLESIA

Overview of Parish dataOverview of Parish data

Descripcion General de los Datos Parroquiales

Descripcion General de los Datos Parroquiales

Kedzie ElstonCorridor Grouping

Page 6: RENEW MY CHURCH RENUEVA MI IGLESIA

Kedzie ElstonCorridor GroupingMASS ATTENDANCE BY MASS TIME AND LOCATION:

AVERAGE BY MASS AS REPORTED IN OCTOBER 2019 COUNT

Mass Details St. Edward Immaculate Heart of Mary

OL-Mercy Resurrection

Church Capacity:Total Attendance:

600642

1,000505

1,2003,311

450601

Mass SaturdayEnglish

5:30pCount: 133

5:00pCount: 58

5:00pCount: 180

4:30pCount: 50

Mass SaturdaySpanish

- - 6:15pCount: 344

-

Mass Sunday English-Morning

8:00aCount: 108

8:45aCount: 87

7:45aCount: 189

8:00aCount: 53

Mass SundaySpanish-Morning

- 10:30aCount: 291

9:15aCount: 1,057

9:30aCount: 219

Mass Sunday English-Morning

9:30aCount: 204

- - -

Mass SundayEnglish-Morning /Afternoon

11:00aCount: 198

12:15pCount: 69

11:15aCount: 328

-

Mass Sunday Spanish-Afternoon

- - 1:00pCount: 951

12:30pCount: 170

Mass SundayEvening

- - 7:00p (Bil)Count: 262

7:00p (Span)Count: 110

Page 7: RENEW MY CHURCH RENUEVA MI IGLESIA
Page 8: RENEW MY CHURCH RENUEVA MI IGLESIA
Page 9: RENEW MY CHURCH RENUEVA MI IGLESIA

In Fiscal Year 2019 (July 1, 2018, to June 30, 2019), Parish reported:o Sunday / Holy Day / Christmas / Easter collections of $633,695o Other income: $346,362o Rent income: $363,255.

Weekly Average 2019 vs 2020March 15 to September 6 $11.262.84 $5,611.60July 1 to September 6 $10,503.89 $7,817.03

Financial information

Page 10: RENEW MY CHURCH RENUEVA MI IGLESIA

Sacraments and Funerals July 1, 2018 to June 30, 2019

Parish Median in diocese (2018-19)

Highest 25% in diocese (2018-19)

Baptisms < 7 yrs oldAdult Baptisms

14128

46-

81-

First Communions < 18 yrsAdult First Communions

18019

46-

82-

Confirmations <18 yrsAdult Confirmations

14524

42-

80-

Weddings 16 8 15

Funerals 48 29 48

Page 11: RENEW MY CHURCH RENUEVA MI IGLESIA

Kedzie ElstonCorridor Area Demographics

Demographic Data

St. Edward

OL-Mercy Resurrection Total Grouping area

Total Archdiocese

Age

20102020

34.936.6

31.131.1

32.034.3

32.234.1

35.437.1

Page 12: RENEW MY CHURCH RENUEVA MI IGLESIA
Page 13: RENEW MY CHURCH RENUEVA MI IGLESIA

C

WHAT WE CAN EXPECT

LO QUE SE PUEDA ESPERAR

Page 14: RENEW MY CHURCH RENUEVA MI IGLESIA

QUESTIONS?¿PREGUNTAS?

ANSWERS!(AS BEST WE CAN)

¡RESPUESTAS! (COMO MEJOR SE PUEDA)

Page 15: RENEW MY CHURCH RENUEVA MI IGLESIA

Next StepsProximos

Pasos

Page 16: RENEW MY CHURCH RENUEVA MI IGLESIA

Our Lady of Mercy Parish is comprised of three structures. The overall condition of the parish buildings varies from average to above average. Additional investigations are recommended to address the deflection of the second floor at the rectory and the leakage at the west elevation of the lower level of the school. Several recent repairs have been performed at the church including roof repairs to address damage that occurred during a 2016 storm, select repointing at the east elevation and bell tower, window sealant replacement, asbestos floor removal at the bridge to the rectory, and select plumbing work. Similarly, repairs have been performed at the rectory within the last three years including roof replacements, select repointing, plumbing work, door hardware replacement, and re-sealing of the north parking lot. On-going repairs include bell tower gutter and drain repairs and interior repairs to the kitchen at the rectory. Terrazzo floor repairs have been performed by the tenant of the school.