Functional Test IP OF 747-8 Interpret Revise Modify
Version 8.2 Select an Airplane
Model Airplane Programs
747; 737 767;777;747-LCF
E
E
WHEELS AND TIRES NLGFOR 747-8 INSTALLATION RC502,RC521 AND
RC522 FC ROLLS AND REF
FTWS INTERPETATION AND
MODIFICATIONS ON FLIGHT TEST
FUNCTIONAL TESTS
SMOKE DETECTORS 747-8 INSTALLATION FLIGHT
TEST RESTRICTED SMOKE DETECTORS IPs.
CREATIONS OF SMOKE DETECTORS FUNCTIONAL TEST IPS.
CREATIONS OF REFURB FLIGHT TEST REMOVAL RESTRICTED SMOKE DETECTORS IPS.
Creation of rolls of FCs and IPs.
SHIP SIDE SUPPORT CREATES NCO
REPORTS CREATES PARTS IN DWR CREATES RFA
REDLINE OPERATION AND STEPS IN OWI
SHIP SIDE SUPPORTFACTORY PRODUCTION OF 747-8
SUPPORTS AND IMPLEMENT FLIGHT TEST IPs.
COLLABORATES WITH PRODUCTIONS AND PRODUCTION IPs.
Modify, Redline, audit and trouble shoot production and flight test issues.
Supports Genx Engine Shake Supports Flight test
shops. Coordinates with General Electric Field
Engineers Design Engineer Test Integrations.
CREATES IPs Installing and removing load
pins on inboard flap wing on 747- 8.
Implement instructions on installing and removing photoelectric smoke detectors in upper deck of crew
Developing information for preparation, maintenance and implementing Production Plan
FLIGHT TEST DELIVERY SUPPORTS Everett Flight Line
Delivery Operation of 747-8 to aid in preparing plane in first flight take-off
747-4 RC501,RC521 AND RC522..FLIGHT TEST DELIVERY Coordinates meeting
with design engineer, Flight test shop and Flight Test Validation.
Communicates design issues and concerns with engineering.
Orders, tracks and monitor Flight test
restricted parts.
COORDINATION Engineering changes,
and spares and retrofit activity for 777, 747-8, VA511, 737
Coordinates activity between three planes at one time, RC501,RC521and RC522
SUPPORTS ELECTRICAL INSTALLATIONS OF FOLLOWING 747-8 ROSS WIRING AND M-
RACKS FOR RC501,RC521 AND RC522
INSTALLATION OF ROSS WIRING EMERGENCY CARGO INSTALLATION.
INTERPETS FLIGHT DELIVERY MILESTONE OF DELIVERY
TROUBLE-SHOOT ELECTRICAL DESIGN ISSUES OF 747-8
Coordinates instrumentation engineers, ground operation engineers
Trace and trouble-shoot design issues on Ross Wire application
Modify and redline IPs to adhere design issues.
ME Liaison/Flight Operation Delivery Supports Refurbs of 777
WFOO1 AND WFOO2 freighter .
Restoration of 777/F to production configuration.
Genx-2B-strut module test configuration procedures. 747-8
Freighter 737 static tests. and carbon
wheels and Brakes
TOC BARG SUPPORT for 737, YH122
PARTICIPATES In development of the
Build-to /Buy-off packages.
Ordering of all special tooling and special test equipment.
Creation and maintenance of work instructions,
SUPOPORTS FLIGHT READINESS SUPPORTS FLIGHT
TEST OF RC501FLIGHT ENGINEERS
RESOLVES FLIGHT SQUAWS
SUPPORTS GROUND OPERATIONS.
CREATES AND COORDINATE MANUAL FOR INSTALLING TR FOR AMERICAN AIRLINES BOEING 777
American Airlines Inc. and other airlines have received word from Boeing Co. that they should begin replacing thrust reversers on wide-body 777 jets, a spokeswoman from Boeing confirmed Friday.
The thrust reversers are attached to 777s with Rolls-Royce engines. Lynn Lunsford, a spokesman for the Federal Aviation Administration, describes the thrust reversers as an engine attachment that helps slow jets on landing by redirecting the plane’s thrust and alleviating some of the burden placed on the aircraft’s brakes. The main issue concerning Boeing is the potential for excessive heat damage to the inner wall of the the reversers.
SUPPORTS 747 BARGE AND SHIPSIDE SUPPORT
CREATES EMERGENCE IP
CORDINATES WITH FLIGHT TEST PERSONNEL
SUPPORT DWR MODIFY AND RED-
LINE IP CREATE AND MODIFY
NCR.
CREATE 5s NEWSLETTER/MEETING NOTES
Volunteer to take meeting notes
Created news letter of 5s
Activities and meeting Send notice of 5s
meetings
COORDINATES GRP FLIGHT TEST IN-BOX
CREATES FOLDERS TPPRS FOR FC INPUT NEW FC IN
DATABASE INPUT NEW FC IN DWR CREATE/ STEP-UP
MODULES FOR NEW FC.