CERAMIC FUEL CELL 1 KW System
System description:
Gas supply max 0.2Nm3/h NG (2kW)Electric power DC 1.24kW
AC 1kWHeat recovery up to 500W (depends on coolant temperature)Efficiency (on NG) Electrical 50% net
Overall 70% typicalTechnology Stack Ceramic Fuel Cell (planar, not
pressurized, internal steam-reforming)System Ceramic Fuel Cell
References (field trials) Powerco, Szencorp and EWEState of art Product developmentFuture market Residential / small commercial up to 20kW
Chris WilcoxBusiness Development ManagerCFC Europe [email protected]
TECHNICAL ADVICE
Technology
Advantages:- Large experience- High electrical efficiency (better energy quality)- Steam-reforming before stack (in the case of biogas can work as a fuse in electrical circuits, and
protect the stack, the most expensive part of the SOFC system)- "non-binding" letter of intent showing the customer (or one of the partners) intends to make a
business out of using our units for biogas (or other) applications- Factory in Europe, although they still look for collaboration with other companies
Disadvantages:- Planar geometry, worse performance under thermal stresses- Cost per kW high - System development for system up to 5 kW, never over 20kW
Experience SOFC systems
4 units delivered to the field (Powerco, Szencorp and EWE), 10 for EWE in 2007
Experience with biogas
They can run a known composition through a test station
System suitable for demo yes
ITEM COST / TIME INCLUDED NOT INCLUDED
DELIVERY COST EVALUATION
System 70.000€
“out-of-pocket” expenses (including travel, accommodation and living expenses) incurred in providing the Products or Services.
Freight rate CFCL will arrange and pay for freight and
CFCL will on-charge customs duties and
transit insurance to the Site
taxes to Customer
Insurances
Delivery Time
Net~Gen system test (without stack) Q3 2007
Stack Q4 2007
Terms of payment
Little negotiable (significant percentage up front)
Typical (from the total of €140 000): pay around 33% on contract, 33% on hand-over and 34% at the end
OPERATION COSTS EVALUATION
Start-up yes
Monitoring yes
Operation costs
Training a technician
Telephone and e-mail support
Insure the Net~Gen unit against loss or damage to the value of €70 000
Maintenance
Repair or replace any part of the NetGen unit which fails to perform according to the Technical Specification under normal conditions
If the unit fails repeatedly such that it is not commercially viable for CFCL to continue to repair or replace it, both parties will discuss and in good faith attempt to agree an appropriate alternative
Warranty 70.000€
1 year support package
Unlimited replacement stacks, installation, commissioning and manuals in spanish
Additional costs (including delay) due to customer’s delay or failure to comply with its obligations, or events outside the CFCL Party’s reasonable control
After-sales service (logistics)
£500 per day plus taxes