Remove network from Prod_gdb.mdb
Reproject Prod_gdb.mdb to albers, rename to Prod_alb.mdb
After all edits complete, renameProd_geo.mdb to Prod_geo_load.mdb.This file forwarded to upload.
Editing Process – find and fix all errors in Prod_alb.mdb.Upload Process - proceed to Reproject step with latest version of Prod_alb.mdb.
Download NHD data in .zip format a) from NHD Viewer b) from Subregion FTP site
Reproject Prod_alb.mdbto geographic, renameto Prod_geo.mdb.
XMLExtract - status tablefrom Prod_geo.mdb.
XML2PGDB - XMLExtractfrom Prod_geo.mdb to copyof original Prod_gdb.mdb,renamed to Prod_sqc(n).mdb
Self Quality Control Checksby cooperator on Prod_sqc(n).mdb.
Notify Team Lead that project has been forwarded to upload.
editing required
More editing required, notifycooperator via email
Editing complete
Once all self QC edits complete, rename to Prod_fqc(n).mdb.
Editing complete, notify cooperator
QC editing required
Legend: Editing Process Self QC Process Final QC Process Upload Process(n) Number of iterations
NHD Maintenance Process Flow Diagram
Final Quality Control Checks – by USGS Steward on Prod_fqc(n).mdb
EditingSelf QC
Final QC
Editing
Self QC
Final QC
Upload Upload
Upload
Upload
Editing Self QC Final QC
Self QC
Final QC
Final QC
Final QC
EditingEditing
Upload
Remove network from Prod_gdb.mdb
Reproject Prod_gdb.mdb to albers, rename to Prod_alb.mdb
After all edits complete, renameProd_geo.mdb to Prod_geo_load.mdb.This file forwarded to upload.
Editing Process – find and fix all errors in Prod_alb.mdb.Upload Process – proceed to Reprojection step with latest version of Prod_alb.mdb.
Download NHD data in .zip format a) from NHD Viewer b) from Subregion FTP site
Reproject Prod_alb.mdb to geographic, rename to Prod_geo.mdb
XMLExtract - status tablefrom Prod_geo.mdb
XML2PGDB - XMLExtractfrom Prod_geo.mdb to copyof original Prod_gdb.mdb,renamed to Prod_sqc(n).mdb
Self Quality Control Checksby compiler on Prod_sqc(n).mdb.
Notify Team Lead that project has been forwarded to upload.
Fixes Required
Fixes Required, notifycompiler via email
No Fixes Required
Once all self QC edits complete,rename to Prod_fqc(n).mdb.
No Fixes Required, notify compiler via email
More QC editing required
NHD In-House Maintenance Process Flow Diagram
Final Review on Prod_fqc(n).mdb
Legend: Editing Process Self QC Process Final QC Process Upload Process(n) Number of iterations
Upload
Final QC
Editing
Self QC
Self QCSelf QC
Editing
Editing
Upload
Upload
UploadUpload
Final QC
Final QC
Final QC
Editing Self QC Final QC
Final QC
Editing