Remote Tower Press Briefing Farnborough 2014

22
Remotely Operated Tower - Breaking the thought barrier- Per Ahl Vice President Head of Commercial Aerostructure, Civil Security, and Traffic Management Market Area Europe and Greater Middle East

description

Presentation from Per Ahl, Vice President, Head of Commercial, Civil Security and Traffic Management, Market Area Europe & Greater Middle East at Farnborough 2014. Read more about Saab's Remote Tower solutions here: http://www.saabgroup.com/Civil-security/Air-Transportation-and-Airport-Security/Air-Traffic-Management-Solutions/Remote-Tower-Pre/

Transcript of Remote Tower Press Briefing Farnborough 2014

Page 1: Remote Tower Press Briefing Farnborough 2014

Remotely Operated Tower - Breaking the thought barrier-

Per Ahl

Vice President

Head of Commercial Aerostructure, Civil Security, and Traffic Management

Market Area Europe and Greater Middle East

Page 2: Remote Tower Press Briefing Farnborough 2014

AIR TRAFFIC MANAGEMENT History

Page 3: Remote Tower Press Briefing Farnborough 2014

Today’s operation is not that different - maybe little more complex….

Page 4: Remote Tower Press Briefing Farnborough 2014
Page 5: Remote Tower Press Briefing Farnborough 2014

TIME FOR A NEW BUSINESS MODEL ???

Page 6: Remote Tower Press Briefing Farnborough 2014

Controlling

Ängelholm Airport

from Malmö-Sturup

Airport, distance

100km

REMOTELY OPERATED TOWER Test system in Sweden since 2008

Page 7: Remote Tower Press Briefing Farnborough 2014

400 Mb/s

Compression

2-4 Mb/s

Decompression

Delay 0,3 sec

32 Mb/s

End-to-end delay < 1 sec

Airport

RTC

REMOTELY OPERATED TOWER The technical challenge

Page 8: Remote Tower Press Briefing Farnborough 2014

2006 2007 2008 2009 2010 2011 2012 2013

Saab ATM - long time r-TWR experience

r-TWR proof

of concept

project start

ART project

start

r-TWR

installed at

Ängelholm

airport

Shadow

mode

validations

at Sturup

ATC Global

2009 & r-TWR

rollout

ART

validations

at Sturup

Start of

SESAR r-TWR

projects

The second

remote tower

symposium

SESAR

validation 1

single

SESAR

validation 2

single

Delivery of 1st

operational

r-TWR system

SESAR

validation AFIS

Værøy - Bodø

Delivery of

r-TWR test

system to

Airservices

Delivery of

SESAR r-TWR

prototype

Værøy - Bodø

Start of

operational

certification

in Sweden

Page 9: Remote Tower Press Briefing Farnborough 2014

Environmentally-Protected Remote Sensor Housing

14 high-definition cameras

Pan/tilt/zoom (PTZ) cameras…

optical and infrared (IR)

Signal light gun

Acoustic sensor

Saab Sensis Corporation Proprietary Data – See Title Page

© Saab Sensis Corporation 2012

9

Page 10: Remote Tower Press Briefing Farnborough 2014
Page 11: Remote Tower Press Briefing Farnborough 2014

SWEDEN

Contract rewarded in January 2011

Two airports Sundsvall and Örnsköldsvik

The RTC will be located in Sundsvall

Delivered December 2013

Final Validation report February, 2014

Operation - Q3 2014 – first in the world !!!

Page 12: Remote Tower Press Briefing Farnborough 2014
Page 13: Remote Tower Press Briefing Farnborough 2014
Page 14: Remote Tower Press Briefing Farnborough 2014

AUSTRALIA Contract signed with Airservices Australia, AsA, June 2011

Remotely control Alice Springs airport from Adelaide (1500 km)

Based on the Swedish implementation + visual tracking

Installed Q4 2013

Validation finished June, 2014

Page 15: Remote Tower Press Briefing Farnborough 2014

NORWAY

Contract signed 2012

Værøy heliport, RTC in Bodø

Based on the Swedish

implementation + IR camera

SESAR Trials in Dec 2012

Röst airport installed December

2013 – RTC in Bodø

Page 16: Remote Tower Press Briefing Farnborough 2014
Page 17: Remote Tower Press Briefing Farnborough 2014

Remote Tower Market Segments

Product complexity

Regional & Local

airports

Larger airports

(Contingency

operation)

Oil &

Gas

Airport

Movements

< 5´

5´-10´

10´-20´

20´-50´

> 50´

AFIS &

Small

airports

Page 18: Remote Tower Press Briefing Farnborough 2014

A module that feeds ordinary r-TWR CWP position(s) with

all necessary data for 1-N airports

1-M pilot positions

r-TWR Training & Simulation

Page 19: Remote Tower Press Briefing Farnborough 2014
Page 20: Remote Tower Press Briefing Farnborough 2014

Survival opportunity for smaller airports with low traffic density

More efficient and cost effective TWR service

• Large scale operation

• Difficult to recruit to distant airports

• Ability to sequenced control of small airports

• Multi airport control

• Possible shared use of the APP-resources

Increase ATC operation by utilizing the staff in a more cost effective way

• Lack of educated or trained people when expanding the operation

• Multi airport control – one controller will be able to control up to 3 airports

The ability to have 7/24 SAR operation

• Flexibility to open up airfields

Alternatives to new construction or refurbishment of the tower

> 30 customers in queue…..

SUMMARY:

Driving forces for Remote TWR

Page 21: Remote Tower Press Briefing Farnborough 2014

TIME FOR A NEW BUSINESS MODEL ??? - ATC ON DEMAND –

Page 22: Remote Tower Press Briefing Farnborough 2014