Remote testing of ETCS Operational Scenarios · Train Motion Simulator RMS EVC Test Bench...
Transcript of Remote testing of ETCS Operational Scenarios · Train Motion Simulator RMS EVC Test Bench...
![Page 1: Remote testing of ETCS Operational Scenarios · Train Motion Simulator RMS EVC Test Bench (Subset-094) BSG LSG Speedand position TIU Brakes, main switch.. RBC A real RBC+ IxL (or](https://reader034.fdocuments.in/reader034/viewer/2022050411/5f87e8275668a6532e56f355/html5/thumbnails/1.jpg)
Remote testing of ETCS Operational Scenarios
Michael Meyer zu Hörste Dr.-Ing. DLRIgnacio Jorge Iglesias Dr.- Ing. CEDEX
![Page 2: Remote testing of ETCS Operational Scenarios · Train Motion Simulator RMS EVC Test Bench (Subset-094) BSG LSG Speedand position TIU Brakes, main switch.. RBC A real RBC+ IxL (or](https://reader034.fdocuments.in/reader034/viewer/2022050411/5f87e8275668a6532e56f355/html5/thumbnails/2.jpg)
Summary
1. How testing ETCS to place in service?.
2. How integrating the “real world” (real EVC and RBC) at lab
3. Remote testing
4. Cost and time saved by testing at lab
5. Conclusions.
![Page 3: Remote testing of ETCS Operational Scenarios · Train Motion Simulator RMS EVC Test Bench (Subset-094) BSG LSG Speedand position TIU Brakes, main switch.. RBC A real RBC+ IxL (or](https://reader034.fdocuments.in/reader034/viewer/2022050411/5f87e8275668a6532e56f355/html5/thumbnails/3.jpg)
How did we test proprietary systems?
Component
functional testsComponent
functional tests
Compatibility
Functional Tests
(Operational tests)
Final “installationchecking” On site (real
train/track)
TracksideSubsystem
OnBoardSubsystem
Very few days testing on site
APS issued1. How testing ETCS to place in service?
![Page 4: Remote testing of ETCS Operational Scenarios · Train Motion Simulator RMS EVC Test Bench (Subset-094) BSG LSG Speedand position TIU Brakes, main switch.. RBC A real RBC+ IxL (or](https://reader034.fdocuments.in/reader034/viewer/2022050411/5f87e8275668a6532e56f355/html5/thumbnails/4.jpg)
How did we test ERTMS for the first APS ?
Interoperability
Functional Tests
(Operational tests)
Operational tests on site
TracksideSubsystem
OnBoardSubsystem
Long time
testing onsite
APS
Partial Component
certification tests
(SS085-103)
Accredited lab B
Componentcertification tests
(SS076-094)
Accredited lab A
1. How testing ETCS to place in service?
![Page 5: Remote testing of ETCS Operational Scenarios · Train Motion Simulator RMS EVC Test Bench (Subset-094) BSG LSG Speedand position TIU Brakes, main switch.. RBC A real RBC+ IxL (or](https://reader034.fdocuments.in/reader034/viewer/2022050411/5f87e8275668a6532e56f355/html5/thumbnails/5.jpg)
How should we test ERTMS for APS ?
Interoperability
Functional Tests
(Operational tests)
TracksideSubsystem
OnBoardSubsystem
APS
Partial Component
certification tests
(SS085-103)
Accredited lab BComponent
certification tests
(SS076-094)
Accredited lab A
Accredited lab C
Final “installation checking”
On site (real train/track)
Very few days
testing on site
This is the role of
the ERTMS
accredited labsOperational tests on site
These tests can be run remotely
between two different labs (in one
the EVC and in the other the RBC)
1. How testing ETCS to place in service?
![Page 6: Remote testing of ETCS Operational Scenarios · Train Motion Simulator RMS EVC Test Bench (Subset-094) BSG LSG Speedand position TIU Brakes, main switch.. RBC A real RBC+ IxL (or](https://reader034.fdocuments.in/reader034/viewer/2022050411/5f87e8275668a6532e56f355/html5/thumbnails/6.jpg)
2. How integrating the “real world” (real EVC and RBC) at lab
![Page 7: Remote testing of ETCS Operational Scenarios · Train Motion Simulator RMS EVC Test Bench (Subset-094) BSG LSG Speedand position TIU Brakes, main switch.. RBC A real RBC+ IxL (or](https://reader034.fdocuments.in/reader034/viewer/2022050411/5f87e8275668a6532e56f355/html5/thumbnails/7.jpg)
RBCs + IxLLocal operationposts (LOP): …
Trackside simulators: Track layout, switches, track circuits, signals
EVC+DMI+JRU
Train simulator+ TIU
ETCS N1+ N2 ETCS N1
ETCS N1+ N2 ETCS N1
Trans to L1
Cond. Trans (L2-L1-L0)
Trans to L1 + radio session
Trans to L0
Radio cancel
EID
EID1
Radio session
• Integration of both RBC and IxL (or IxL simulator) makes easier the interface between RBC ( or IxL in this case) and the lab. ( track circuits occupancy, aspect of the signals and status of the switches)
• In remote testing one lab integrates the trackside (RBC, IxL, LOP, trackside simulator and remote testing tool) ananother lab integrates the on board ( EVC, DMI, JRU, TIU , Train Motion Simulator and robot)
• HO between different RBC suppliers have been succesfully tested
Settingroutes, TSR Track layout
2. How integrating the “real world” (real EVC and RBC) at lab
Remotetesting tool
Real train antennafor balise messages
CEDEX LAB
DLR LAB
![Page 8: Remote testing of ETCS Operational Scenarios · Train Motion Simulator RMS EVC Test Bench (Subset-094) BSG LSG Speedand position TIU Brakes, main switch.. RBC A real RBC+ IxL (or](https://reader034.fdocuments.in/reader034/viewer/2022050411/5f87e8275668a6532e56f355/html5/thumbnails/8.jpg)
3. Remote Testing
![Page 9: Remote testing of ETCS Operational Scenarios · Train Motion Simulator RMS EVC Test Bench (Subset-094) BSG LSG Speedand position TIU Brakes, main switch.. RBC A real RBC+ IxL (or](https://reader034.fdocuments.in/reader034/viewer/2022050411/5f87e8275668a6532e56f355/html5/thumbnails/9.jpg)
DLR DMI Robot controlled from CEDEX lab
3. Remote Testing
![Page 10: Remote testing of ETCS Operational Scenarios · Train Motion Simulator RMS EVC Test Bench (Subset-094) BSG LSG Speedand position TIU Brakes, main switch.. RBC A real RBC+ IxL (or](https://reader034.fdocuments.in/reader034/viewer/2022050411/5f87e8275668a6532e56f355/html5/thumbnails/10.jpg)
3. Remote Testing
DLR EVC test bench (Braunschweig)
CEDEX RBC test bench (Madrid)
![Page 11: Remote testing of ETCS Operational Scenarios · Train Motion Simulator RMS EVC Test Bench (Subset-094) BSG LSG Speedand position TIU Brakes, main switch.. RBC A real RBC+ IxL (or](https://reader034.fdocuments.in/reader034/viewer/2022050411/5f87e8275668a6532e56f355/html5/thumbnails/11.jpg)
Train MotionSimulator
RMSEVC Test Bench
(Subset-094)
BSG LSG
Speed and position
TIU
Brakes, mainswitch..
RBC
A real RBC+ IxL (or IxLsimulator) with
specific project data
SIM-IXL
Field Elements
Simul (FES)
State:• Signals• Switches• Track circuits
Command:• Signals• Switches
PLORoute selection
MySQL DDBB
Data Base Manager
L2 messagesTrain position
RDSI –PRI conection
Track gradient
DLREVC test bench (Braunschweig)
CEDEX RBC test bench
(Madrid)
GNS
L1 messages
Robot Remote
Control DMI
RRCDMI
RC
EVC
DMI3. Remote Testing
DrivingDesk
Train traction
Remotetesting
tool
DMI actions
![Page 12: Remote testing of ETCS Operational Scenarios · Train Motion Simulator RMS EVC Test Bench (Subset-094) BSG LSG Speedand position TIU Brakes, main switch.. RBC A real RBC+ IxL (or](https://reader034.fdocuments.in/reader034/viewer/2022050411/5f87e8275668a6532e56f355/html5/thumbnails/12.jpg)
Remote testing tool located at CEDEX lab (Driving desk)
3. Remote Testing
![Page 13: Remote testing of ETCS Operational Scenarios · Train Motion Simulator RMS EVC Test Bench (Subset-094) BSG LSG Speedand position TIU Brakes, main switch.. RBC A real RBC+ IxL (or](https://reader034.fdocuments.in/reader034/viewer/2022050411/5f87e8275668a6532e56f355/html5/thumbnails/13.jpg)
4. Cost and duration reduction by
performing Operational Tests on lab
Scenario . Test campaign with 3 OBUs Cost (k€) Duration(months)
Duration afterconstruction end
1.- Test campaign only on track 1,328 10,5 10,5
2.-Test campaign only at lab 180 (13%) 3 0
3.- Test campaign first in the lab(debugging) and later on track
824 (62%) 5 2
![Page 14: Remote testing of ETCS Operational Scenarios · Train Motion Simulator RMS EVC Test Bench (Subset-094) BSG LSG Speedand position TIU Brakes, main switch.. RBC A real RBC+ IxL (or](https://reader034.fdocuments.in/reader034/viewer/2022050411/5f87e8275668a6532e56f355/html5/thumbnails/14.jpg)
5. Conclusions
1. Operational tests are needed to place in service a new ETCS train and/or line.
2. Performing those Operational tests at lab is the only way of saving time and approaching the process of ETCS placing in service to the process followed with old proprietary systems.
3. Remote tests allow testing together onboard and trackside subsystems located in different labs.
4. DLR and CEDEX performed these tests in 2015 with the OBU at DLR and the trackside L2 at CEDEX. Tests were totally operated from CEDEX premises in Madrid.
5. At the end of this year these remote operational tests will be used to check the backwards compatibility of EVCs BL3 running over L2 and L1 BL2 (2.3.0.d) lines.
![Page 15: Remote testing of ETCS Operational Scenarios · Train Motion Simulator RMS EVC Test Bench (Subset-094) BSG LSG Speedand position TIU Brakes, main switch.. RBC A real RBC+ IxL (or](https://reader034.fdocuments.in/reader034/viewer/2022050411/5f87e8275668a6532e56f355/html5/thumbnails/15.jpg)
Thank you very much for your kind attention Michael Meyer zu Hörste Dr.-Ing. DLR
Ignacio Jorge Iglesias Dr.-Ing. CEDEX