Remeha Gas 350 S - EGWegw.ba/images/kotlovi/tehnicki_350s.pdf · Remeha Gas 350 S 2 TABLE OF...

12
1 Remeha Gas 350 S Technical information Remeha Gas 350 S • Atmospheric gas boiler 45 - 188 kW

Transcript of Remeha Gas 350 S - EGWegw.ba/images/kotlovi/tehnicki_350s.pdf · Remeha Gas 350 S 2 TABLE OF...

Page 1: Remeha Gas 350 S - EGWegw.ba/images/kotlovi/tehnicki_350s.pdf · Remeha Gas 350 S 2 TABLE OF CONTENT Preface 3 1 Boiler description 3 2 Constructions 3 2.1 General 3 2.2 Burners 3

1

Re

me

ha

G

as

3

50

S

Technical information

Remeha Gas 350 S

• Atmospheric gas boiler

45 - 188 kW

Page 2: Remeha Gas 350 S - EGWegw.ba/images/kotlovi/tehnicki_350s.pdf · Remeha Gas 350 S 2 TABLE OF CONTENT Preface 3 1 Boiler description 3 2 Constructions 3 2.1 General 3 2.2 Burners 3

Remeha Gas 350 S

2

TABLE OF CONTENT

Preface 3

1 Boiler description 3

2 Constructions 3 2.1 General 3 2.2 Burners 3 2.3 Boiler floor 3 2.4 Delivery 3

3 Technical information and dimensions 4

4 Application 5 4.1 L.P.H.W. system 5 4.1.1 Water temperature 5 4.1.2 Water pressure 5 4.1.3 Water flow 5 4.1.4 Water treatment 5 4.1.5 Noise level 5 4.2 Chimneys 5

5 Typical boiler installations 6

6 Regulation and safety equipement 7 6.1 General 7 6.2 Instrument panel 7 6.3 Standard electronic gas train High/Low 8 6.3.1 Schematic 8 6.3.2 Specification 8 6.3.3 Control panel behind front panel 8 6.4 Functions 8 6.4.1 Flame protection 8 6.4.2 Down draught thermostat 8 6.4.3 Thermostats 8

7 Assembling and installation guidelines 9 7.1 General 9 7.2 Boiler assembly 9 7.3 Water connections 9 7.4 Pocket for instrument panel 9 7.5 Water pressure 9

8 Gas supply 9 8.1 General 9 8.2 Gas pressure 9

9 Electrical supply 9 9.1 General 9 9.2 Control panel 9 9.3 Electrical connections 9 9.4 Electrical data 9 9.5 Wiring diagram boiler 10

10 Commissioning 11 10.1 Technical information 11 10.2 Commissioning the boiler 11 10.3 Switching off the boiler 11

11 Maintenance 11 11.1 General 11 11.2 Maintaining the boiler 11

Page 3: Remeha Gas 350 S - EGWegw.ba/images/kotlovi/tehnicki_350s.pdf · Remeha Gas 350 S 2 TABLE OF CONTENT Preface 3 1 Boiler description 3 2 Constructions 3 2.1 General 3 2.2 Burners 3

3

PREFACE

These technical instructions contain useful and impor-tant information for the proper operation and maintenan-ce of the Remeha central heating boiler, model Gas 350 S. Further it contains important directions to prevent accidents and serious damage before putting it into ser-vice and during operation of the boiler, to allow as far as possible a safe and trouble free operation. Read these instructions carefully before putting the boiler into opera-tion, familiarize yourself with its operation and control and strictly observe the directions given.

1 BOILER DESCRIPTION

The Remeha Gas 350 S boiler is a cast iron sectional boiler with atmospheric burners.Suitable for all qualities of natural gas, cat. I 2H

The Remeha Gas 350 S central heating boiler is appro-ved according to the following European directives:- Gas appliance directive no. 90/396/EEC- Efficiency directive no. 92/42/EEC- E.M.C. directive no. 89/336/EECand complies with the following directive:- Low voltage directive no. 73/23/EEC

If you have any questions, or if you want more informa-tion about specific items relating to this boiler, please do not hesitate to contact us.The data published in these technical instructions is based on the most recent information and is given sub-ject to later revisions.We reserve the right to modify the construction and/or design of our products at any moment, without obligation to update earlier supplies accordingly.

Classification type for evacuation of the combustion pro-ducts: B11, B11BS.

2 CONSTRUCTIONS

2.1 General- Boiler block of cast iron sections nippled together with

conical nipples.- Gas and water connections are at the rear of the

boiler.- Instrument panel is fitted in the front casing.- Cleaning of the cast iron block from top of the boiler.- The control and safety equipment is fitted behind the

front casings.- The boiler is entirely prewired.

2.2 BurnersThe burners are stainless steel, atmospheric burners.They guarantee a low noise level.

2.3 Boiler floorThe Remeha Gas 350 S boiler is supplied as standard with reflecting floor plates with ventilation underneath.

2.4 DeliveryUp to 118 kW the boiler can be delivered pre-assem-bled. The total range can be delivered in parts for site assembly.

Page 4: Remeha Gas 350 S - EGWegw.ba/images/kotlovi/tehnicki_350s.pdf · Remeha Gas 350 S 2 TABLE OF CONTENT Preface 3 1 Boiler description 3 2 Constructions 3 2.1 General 3 2.2 Burners 3

Remeha Gas 350 S

4

3 TECHNICAL INFORMATION AND DIMENSIONS

Front view Side view Rear viewFlow R2”return R2”Gas connection 4 - 6 sections R1”

7 - 9 sections R1¼”Fig. 01 Dimensions00.03F.79.00002

Table 01 Dimensions

Dimensions

A B C Ø D E F

Numberof

sections mm mm mm mm mm mm

4 640 280 905 200 1030 165

5 740 330 905 200 1030 165

6 840 380 905 200 1030 165

7 940 430 930 200 1080 215

8 1040 480 930 250 1080 215

9 1140 530 930 250 1080 215

Water

resistance

Heat

output

Heat

input

Hi ∆t =10°C ∆t =20°C

Water

content

Boiler

weight

Flue

gas

mass

Number

of

sections

kW kW mbar mbar l kg kg/h

4 45-70 50-78 6 2 45 335 205

5 61-94 67-105 16 4 51 390 234

6 76-118 84-132 25 6 58 445 252

7 90-141 101-158 36 9 65 500 271

8 105-164 118-184 48 12 71 555 333

9 119-188 134-210 61 15 78 610 402

Table 02 Technical information

Page 5: Remeha Gas 350 S - EGWegw.ba/images/kotlovi/tehnicki_350s.pdf · Remeha Gas 350 S 2 TABLE OF CONTENT Preface 3 1 Boiler description 3 2 Constructions 3 2.1 General 3 2.2 Burners 3

5

4 APPLICATION

4.1 L.P.H.W. system

4.1.1 Water temperatureMaximum water temperature is 110°C (high limit ther-mostat).Highest boiler water temperature is 95°C (control ther-mostat).Minimum return water temperature is 20°C at a flowra-te related to a ∆t of 20°C (flow/return temperature).

4.1.2 Water pressureBoiler sections pressure test at 10 bar.Maximum pressure test boiler block is 8 bar.Maximum working pressure is 6 bar.Minimum working pressure boiler is 0.8 bar.Optional a water pressure switch set at 0.8 bar can be supplied with the boiler.

4.1.3 Water flowThe minimum water flow through the boiler is:

Output boiler in kW = m3/h93

This minimum flow must be maintained for 5 minutes after the burners stops firing to avoid high temperature shut-down due to residuel heat gain.Due to the design and manufacture of the boiler no specific minimum water flow requirement exists other than high-temperature protection.

4.1.4 Water treatmentWater treatment under normal circumstances is not necessary (see our water quality recommendations).

4.1.5 Noise levelThe noise level measured around the boiler depending on boiler room construction is about 50 dBA. (noise level taken at 1 meter from the boiler).

4.2 ChimneysThe chimney must be in accordance with the local direc-tives and installation standards.

Page 6: Remeha Gas 350 S - EGWegw.ba/images/kotlovi/tehnicki_350s.pdf · Remeha Gas 350 S 2 TABLE OF CONTENT Preface 3 1 Boiler description 3 2 Constructions 3 2.1 General 3 2.2 Burners 3

Remeha Gas 350 S

6

5 TYPICAL BOILER INSTALLATIONS

V = min. length 0.5 m before elbow, thus avoiding down-draughtW = min. 150 mm with vertical flue outletW = min. 0.5D + 50 mm with horizontal flue outlet

Fig. 02 1 boiler in boiler room00.03F.79.00005

Fig. 03 2 boilers in boiler room 00.03F.79.00005

Page 7: Remeha Gas 350 S - EGWegw.ba/images/kotlovi/tehnicki_350s.pdf · Remeha Gas 350 S 2 TABLE OF CONTENT Preface 3 1 Boiler description 3 2 Constructions 3 2.1 General 3 2.2 Burners 3

7

Table 03 Dimensions

6 REGULATION AND SAFETY EQUIPEMENT

6.1 GeneralThe Remeha Gas 350 S is supplied with electronic con-trol and safety equipment with ionisation flame detec-tion.

6.2 Instrument panelThe Remeha Gas 350 S is supplied with an instrument panel that is fitted in the front of the boiler. The standard

instrument panel can be extended with the fitting of the following options: hour run meters, water pressure switch, down draught thermostat, no volt contacts and/or rema-tic® control.All connections are pre-wired and fitted with plugs. The capillaries from the control panel should be fitted in the pocket of the boiler, which is fitted in the flow connection of the boiler.

Fig. 04 Layout of the instrument panel, extended with hour counters00.03F.79.00004

Dimensions

A B C Ø D E

Numberof

Sections mm mm mm mm mm

4 640 280 905 200 1030

5 740 330 905 200 1030

6 840 380 905 200 1030

7 940 430 930 200 1080

8 1040 480 930 250 1080

9 1140 530 930 250 1080

The instrument panel contains:1. Operating switch (On/Off);2. Control thermostat On/Off, range 35°C-95°C;3. Control thermostat High-Low, range 35°C-95°C; 4. Hour run meter total running hours (option);5. Hour run meter full load hours (option);6. Analogue thermometer for flow temperature;7. High – limit thermostat preset to 110°C;8. Lock out warning lamp;9. Option for rematic® weather compensator.

9

1 2 3 6

4 5 7 8

Page 8: Remeha Gas 350 S - EGWegw.ba/images/kotlovi/tehnicki_350s.pdf · Remeha Gas 350 S 2 TABLE OF CONTENT Preface 3 1 Boiler description 3 2 Constructions 3 2.1 General 3 2.2 Burners 3

Remeha Gas 350 S

8

6.3 Standard electronic gas train High/Low

6.3.1 Schematic

Fig. 05 Gas train04.03F.AP.00003

LegendA Gas cockAB Pilot burnerDR Gas pressure regulatorF Gas filterHB BurnersMB Gas multiblocOT Ignition transformerPGV Pilot gas valveMP Measuring pointSSV Safety shut off valveVB Ionisation probe - - - - Not supplied.

6.3.2 SpecificationGas Multi-Bloc contains:- 2 Safety shut off valves- 1 Gas governor - 1 Gas filterPilot gas valvePilot burner with ionisation probe and ignition probe.

6.3.3 Control panel behind front panelControl box SatronicIgnition transformer 16 kV.

6.4 Functions

6.4.1 Flame protectionFlame protection by means of ionisation flame detection.

6.4.2 Down draught thermostatOptional the boiler can be fitted with a down draught thermostat. When there is down draught of the flue gases this thermostat will switch off the boiler. Fixed setpoint is 70°C.

6.4.3 ThermostatsControl thermostat On/Off 35°-95°C.Control thermostat High/Low 35°-95°C.High-Limit thermostat locks out at 110°C.

Page 9: Remeha Gas 350 S - EGWegw.ba/images/kotlovi/tehnicki_350s.pdf · Remeha Gas 350 S 2 TABLE OF CONTENT Preface 3 1 Boiler description 3 2 Constructions 3 2.1 General 3 2.2 Burners 3

9

7 ASSEMBLING AND INSTALLATION GUIDELINES

7.1 GeneralThe boiler is suitable for operating at a maximum wor-king pressure of 6 bar and a minimum pressure of 0.8 bar. Boiler can be installed in open or closed systems.

7.2 Boiler assemblyYour supplier can provide special tools on loan, for the boiler assembly when the boiler is being delivered in parts, with detailed building instructions. However, buil-ding supervision and/or actual boiler erection services can be provided by your supplier or an approved boiler erection engineer.

7.3 Water connectionsThe boiler water connections (2” male thread) are fitted at the rear of the boiler (right hand connections only). The two sections have a 3/4” BSP tapping, the right hand end section to accept a drain/off cock and the left hand end sectiond to accept a plug.

7.4 Pocket for instrument panelThe pocket is fitted in the flow connection of the boiler.

7.5 Water pressureEach section is hydraulically tested to at least 10 bar. Maximum test pressure for the assembled boiler block is 8 bar. Operating pressure between 0.8 bar and 6 bar.Optional the boiler can be fitted with a water pressure switch, set at 0.8 bar.

8 GAS SUPPLY

8.1 GeneralThe gas train is fitted behind the front casing.The local Gas authority should be consulted to ensure that an adequate pressure and supply is available at the boilers maximum output. To minimise risk of sediment or foreign particles entering the control valves, an approved filter may be fitted into the pipe work downstream. The gas supply must be in accordance with the local directives and installation standards.

8.2 Gas pressureMaximum gas pressure at inlet 100 mbar.Burner pressure- full load : 14.8 mbar - part load : 6.1 mbar - injector size : Ø 4.0 mm

9 ELECTRICAL SUPPLY

9.1 GeneralThe electrical installation must conform to the IEE regulations and also to local authority requirements.

9.2 Control panelA control panel is fitted behind the front casing.

9.3 Electrical connections The boiler is pre wired. Only the main supply should be wired to the control panel.

9.4 Electrical dataMain supply : 230 V-50Hz (L/N).Running current : 110 W.Installed fuse : 6.3 Amp. (slow acting).

Page 10: Remeha Gas 350 S - EGWegw.ba/images/kotlovi/tehnicki_350s.pdf · Remeha Gas 350 S 2 TABLE OF CONTENT Preface 3 1 Boiler description 3 2 Constructions 3 2.1 General 3 2.2 Burners 3

Remeha Gas 350 S

10

9.5 Wiring diagram boiler

Fig. 06 Wiring diagram04.03F.SC.00004

Page 11: Remeha Gas 350 S - EGWegw.ba/images/kotlovi/tehnicki_350s.pdf · Remeha Gas 350 S 2 TABLE OF CONTENT Preface 3 1 Boiler description 3 2 Constructions 3 2.1 General 3 2.2 Burners 3

11

10 COMMISSIONING

Note: Commissioning to only be carried out by a quali-fied engineer with the relevant training and certification and a commissioning data sheet completed on site for issue of owner.

10.1 Technical informationControl box : Satronic DKG972.Main supply : 230 V-50 Hz.Minimum ionisation current : 3 µA.Reaction time flame protection : 1 sec.Safety time : < 10 sec.Maximum ambient temperature : 60°C.Injector size pilot burner : Ø 0.5 mm.Injector size main burner : Ø 4.0 mm.Burner pressure full load : 14.8 mbar.Burner pressure part load : 6.1 mbar.Start repetition : 5x.

Warning:Control box is phase neutral sensitive.

10.2 Commissioning the boiler1. Check gas connections.2. Check electrical supply (L/N and earth).3. Check water connections and if installation is filled.4. Switch on circulation pump and check rotation direc-

tion.5. Open main gas cock (release air in gas pipe work).6. Switch on electrical supply.7. Set the control thermostats at about 85°C.8. After a waiting time of about 3 seconds you will get

ignition. At a minimum ionisation current of 3 µAmp the safety gas valve will open. The boiler is on.

9. Let the boiler run for a couple of minutes to get rid of air in the gas pipe.

10. Set the correct burner pressure.11. Check the thermostats for correct operation.12. Check the flame protection, by starting the ionisation

probe disconnected.13. Send the commissioning reports to your supplier.

10.3 Switching off the boiler1. Set boiler controls to off.2. Allow system to cool.3. Switch off the electrical supply.4. Turn off the gas cock.

11 MAINTENANCE

11.1 GeneralIt is essential for efficient operation, to clean the boiler, the gas train and boiler room once a year.

11.2 Maintaining the boiler1. Remove the front casing of the boiler.2. Remove the top casing and the top of the flue hood.3. Clean the internal flue ways of the boiler with a steel

cleaning brush (available from your supplier).4. Clean the boiler room and the floor underneath the

boiler.5. Clean the burners internally and externally. 6. Clean the boiler casings.7. Clean the gas train, ignition, pilotburner, thermostats

and wiring.8. Check the gas train and pipe for gas leakage.9. Check the start program, ignition time and safety

times.10. Check flame protection and thermostats.11. Check the boiler input at full load and part load.12. Make a combustion efficiency calculation.13. Check the boiler and installation for water leakage.

Page 12: Remeha Gas 350 S - EGWegw.ba/images/kotlovi/tehnicki_350s.pdf · Remeha Gas 350 S 2 TABLE OF CONTENT Preface 3 1 Boiler description 3 2 Constructions 3 2.1 General 3 2.2 Burners 3

Remeha B.V.

Postbus 32 7300 AA Apeldoorn

Tel.: (055) 549 69 69

Fax: (055) 549 64 96

Email: [email protected]

Internet: www.remeha.com

Re

me

ha

G

as

3

50

S

Broag Ltd.Remeha HouseMolly Millars Lane GB - Wokingham, BerksRG41 2QPTel. 0118 9783434Fax 0118 9786977E-mail: [email protected]

Remeha France S.A.38, Parc Club du GolfZI Les MillesF - 13856 Aix-en-Provence Cedex 03Tél. 04 42 24 59 70Fax 04 42 24 59 79Département ServicesUrbaparcBâtiment G 36 / 8 Bd. de la LibérationF - 93284 St. Denis CedexTél. 01 48 131 190Fax 01 48 130 673

J.L. Mampaey BVBAUitbreidingstraat 54B - 2600 AntwerpenTel. (03) 230 71 06Fax (03) 230 11 53E-mail: [email protected]://www.mampaey.beThema S.A.Av. de l'Expansion, 6B - 4460 Grace-HollogneTel. (04) 2469575Fax (04) 2469576E-mail: [email protected]

Termibarna S.A.Zamora 55-59E - 08005 BarcelonaTel. 03 3000204Fax 03 3009558Cuatrocesa, S.A.Aragoneses, 14Poligono Industrial de AlcobendasE - 28100 Alcobendas (Madrid)Tel. (01) 661 27 86Fax (01) 661 00 23D.A.C., S.A.Tomás A. Edison, 29Poligono CogulladaE - 50014 ZaragozaTel. (076) 46 40 76Fax (076) 47 13 11Norte Comercial Organización S.A. Puerto Real Buedo, 3E - 48016 LOIU (Vizcaya)Tel. (94) 471 03 33Fax (94) 471 11 52

Cipag S.A.Zone IndustrielleLe VerneyCH - 1604 Puidoux-GareTél. 021 926 66 66Fax 021 926 66 33 021 926 66 00

Paradigma S.r.l.Via Europa, 38I - 25070 Ponte Caffaro BSTel. 0365 90 50 03Fax 0365 90 50 04

B

E

CH

I

SK

RO

A

PL

TR

H

BIH

GR

D

PRC

S

GB

F

Remeha Wärmetechnik GmbH. Bischofstrasse 96D - 47809 Krefeld Tel. 02151 5587-0Fax 02151 542445

Technotherm S.A.35, Grigoriou Lampraki str.GR - 546 38 ThessalonikiTel. 031 948-972Fax 031 943-207

Brugman BH d.o.o.Blazujski drum bb71215 Blazuj - SarajevoBosnia and HerzegovinaTel. 00387 33 658 568Fax 00387 33 658 568

Marketbau Remeha KFtH - 1138 Budapest, Népfürdö u.19/eTel. 0135 92993Fax 0135 92591

Emas Makina Sanayi A.S.Organize Sanayi BölgesiKore sehitleri caddesi No 40Zicirlikuyu- IstanbulTel. +90-212-274 4400Fax +90-212-212 3473

Brugman Polska Sp. Z o.o.ul. Minska 54-56PL - 54-610 WroclawTel. 071-373 79 54 071-373 79 73Fax 071-373 79 68

Heizbösch Walter Bösch KGGrüttstrasse 11A - 6890 LustenauTel. 5577-8131-0Fax 5577-8131250

D.D. Promoterm SRLStr. Splaiul Independetei 17Bloc 101 Izvor, Sc 3, Et. 1, Ap.39-40Sector 5 cod 70637 BucurestiTel. 40 1 335 79 77 40 1 335 96 93Fax 40 1 335 01 34E-mail: [email protected]

Tess Trencin Spol. s r.o.Nam.Sv.Anny 3SK - 91101 TrencinSlovakiaTel. 0831 527353Fax 0831 525057

China East Heating Apparatus Co. Ltd.No. 1 Deweibeishatan, Box: No. 28Postcode: 100083, Chaoyang DistrictBejingTel. 10 6487 8391Fax 10 6488 3553

Osby Parca ABRadiatorvägen 4S - 283 22 OsbyTel. +46 479 153 00Fax +46 479 133 88E-mail [email protected]

© Copyright

All technical and technological information contained in these technical instructions,

as well as any drawings and technical descriptions furnished by us remain our property and shall

not be copied in part or whole without our prior consent in writing.

Subject to alterations56754/100/1101/Ap.