Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial...

101
Remedial Investigation/ Alternatives Analysis Report 3 Gates Circle Site BCP Site No. C915272 Buffalo, New York Prepared By: B nvironme tal ngineering c ence, i n February 2015 0309-014-001 2558 Hamburg Turnpike, Suite 300, Buffalo, New York 14218 | phone: (716) 856-0599 | fax: (716) 856-0583 Prepared For: Gates Circle Holdings, LLC

Transcript of Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial...

Page 1: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,

Remedial Investigation/ Alternatives Analysis Report

3 Gates Circle Site BCP Site No. C915272 Buffalo, New York

Prepared By:

Bn v i ronme talng i neeri n gc ence,i

n

February 2015

0309-014-001

2558 Hamburg Turnpike, Suite 300, Buffalo, New York 14218 | phone: (716) 856-0599 | fax: (716) 856-0583

Prepared For: Gates Circle Holdings, LLC

Page 2: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,

BROWNFIELD CLEANUP PROGRAM

REMEDIAL INVESTIGATION/

ALTERNATIVES ANALYSIS REPORT

3 GATES CIRCLE SITE BCP SITE NO. C915272 BUFFALO, NEW YORK

February 2015 0309-014-001

Prepared for:

Gates Circle Holdings, LLC

Prepared By:

Benchmark Environmental Engineering & Science, PLLC 2558 Hamburg Turnpike, Suite 300

Buffalo, NY 14218 (716)856-0599

Page 3: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,

BROWNFIELD CLEANUP PROGRAM REMEDIAL INVESTIGATION/ALTERNATIVE ANALYSIS REPORT

3 Gates Circle Site BCP Site No. C915272

Table of Contents

0309-014-001

ii

1.0 INTRODUCTION ........................................................................................................................... 1 1.1 Background ........................................................................................................................ 1 1.2 Historic Investigations ..................................................................................................... 2

1.2.1 March 2008 No. 6 Fuel Oil Spill ......................................................................... 2 1.2.2 July 2012 Hazardous Materials Assessment ...................................................... 3 1.2.3 November 2012 Phase I/II Environmental Site Assessment ....................... 4

1.3 Report Organization ......................................................................................................... 5

2.0 INVESTIGATION APPROACH ..................................................................................................... 7 2.1 Remedial Investigation Field Activities ......................................................................... 8

2.1.1 Subsurface Soil/Fill Investigation (October 2014) .......................................... 8 2.1.2 Groundwater Investigation ................................................................................ 11 2.1.3 Radiological Survey Investigation (November 2014) .................................... 14 2.1.4 Field Specific Quality Assurance/Quality Control Sampling ...................... 14

2.2 Site Mapping .................................................................................................................... 15 2.3 Decontamination & Investigation-Derived Waste Management ........................... 15

3.0 SITE PHYSICAL CHARACTERISTICS ......................................................................................... 16 3.1 General Site Features ...................................................................................................... 16 3.2 Geology ............................................................................................................................ 16

3.2.1 Overburden .......................................................................................................... 16 3.2.2 Bedrock ................................................................................................................. 17

3.3 Hydrogeology .................................................................................................................. 18 3.3.1 Hydraulic Gradients ............................................................................................ 18

4.0 INVESTIGATION RESULTS BY MEDIA .................................................................................... 19 4.1 Soil/Fill ............................................................................................................................. 21

4.1.1 Surface Soil/Fill ................................................................................................... 22 4.1.2 Subsurface Soil/Fill ............................................................................................. 22

4.2 Groundwater .................................................................................................................... 27 4.2.1 VOCs ..................................................................................................................... 28 4.2.2 SVOCs ................................................................................................................... 28 4.2.3 Metals .................................................................................................................... 29 4.2.4 PCBs ...................................................................................................................... 30 4.2.5 Pesticides ............................................................................................................... 30 4.2.6 Herbicides ............................................................................................................. 30 4.2.7 Total Cyanide ....................................................................................................... 30

Page 4: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,

BROWNFIELD CLEANUP PROGRAM REMEDIAL INVESTIGATION/ALTERNATIVE ANALYSIS REPORT

3 Gates Circle Site BCP Site No. C915272

Table of Contents

0309-014-001

iii

4.3 Radiological Survey Results ........................................................................................... 30 4.3.1 RI Location Soil/Fill Screening ........................................................................ 31 4.3.2 Site Walkover Survey .......................................................................................... 31

4.4 Summary of Historic Investigation and RI Findings ................................................ 31 4.5 Data Usability Summary ................................................................................................ 35 4.6 Constituents of Concern (COCs) ................................................................................. 36

5.0 FATE AND TRANSPORT OF COCS .......................................................................................... 37 5.1 Fugitive Dust Generation .............................................................................................. 37 5.2 Volatilization .................................................................................................................... 37 5.3 Surface Water Runoff ..................................................................................................... 37 5.4 Leaching ............................................................................................................................ 38 5.5 Groundwater Transport ................................................................................................. 38 5.6 Exposure Pathways ......................................................................................................... 38

6.0 QUALITATIVE EXPOSURE ASSESSMENT ................................................................................ 40 6.1 Human Health Exposure Assessment ........................................................................ 40

6.1.1 Potential Receptors ............................................................................................. 41 6.1.2 Contaminant Source ........................................................................................... 41 6.1.3 Contaminant Release and Transport Mechanisms ........................................ 41 6.1.4 Point of Exposure ............................................................................................... 41 6.1.5 Route of Exposure .............................................................................................. 42 6.1.6 Exposure Assessment Summary ....................................................................... 42

6.2 Potential Ecological Risks ............................................................................................. 42

7.0 PLANNED INTERIM REMEDIAL MEASURES .......................................................................... 44

8.0 REMEDIAL ALTERNATIVES EVALUATION ............................................................................ 46 8.1 Remedial Action Objectives .......................................................................................... 46 8.2 Future Land Use Evaluation ......................................................................................... 48 8.3 Alternatives Evaluation .................................................................................................. 48

8.3.1 Alternative #1- No Further Action .................................................................. 49 8.3.2 Alternative #2- Track 4 Restricted Residential Soil Cleanup: Fill Soil Excavation and Cover System ...................................................................................... 50 8.3.3 Alternative #3 - Track 2 Restricted Residential Soil Cleanup: Fill Material Excavation ....................................................................................................................... 54 8.3.4 Alternative #4 - Unrestricted Use Alternative ............................................... 57

8.4 Recommended Remedial Measure ............................................................................... 59

Page 5: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,

BROWNFIELD CLEANUP PROGRAM REMEDIAL INVESTIGATION/ALTERNATIVE ANALYSIS REPORT

3 Gates Circle Site BCP Site No. C915272

Table of Contents

0309-014-001

iv

9.0 FINDINGS AND CONCLUSIONS ............................................................................................... 63 9.1 Remedial Investigation ................................................................................................... 63 9.2 Remedial Alternatives Analysis ..................................................................................... 67

10.0 REFERENCES .............................................................................................................................. 68

LIST OF TABLES

Table 1A Summary of RI Sampling and Analysis Program Table 1B Summary of Investigation Soil Type and RRSCO Exceedances Table 2A Summary of Historical Subsurface Soil/Fill Analytical Results (Stohl) Table 2B Summary of Historical Subsurface Soil/Fill Analytical Results (Benchmark) Table 3 Summary of Remedial Investigation Subsurface Soil/Fill Analytical Results Table 4 Summary of Remedial Investigation Groundwater Analytical Results Table 5 Summary of Remedial Alternative Costs Table 6 Alternative 2 – Track 4 Restricted Residential Cost Estimate Table 7 Alternative 3 – Track 2 Restricted Residential Cost Estimate Table 8 Alternative 4 – Unrestricted Use Cleanup Cost Estimate

Page 6: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,

BROWNFIELD CLEANUP PROGRAM REMEDIAL INVESTIGATION/ALTERNATIVE ANALYSIS REPORT

3 Gates Circle Site BCP Site No. C915272

Table of Contents

0309-014-001

v

LIST OF FIGURES

Figure 1 Site Location and Vicinity Map Figure 2 Aerial Site Plan Figure 3 Historic Investigation Locations Figure 4 Remedial Investigation and Historic Investigation Locations Figure 5 Groundwater Isopotential Map – November 2014 Figure 6 Areas of RRSCO Exceedances & No. 6 Fuel Oil Figure 7 Alternative 2 – Track 4 Restricted Residential Cleanup Figure 8 Alternative 3 – Track 2 Restricted Residential Cleanup Figure 9 Alternative 4 - Unrestricted Use Cleanup Figure 10 Location of Acceptable Soil Samples and RRSCO Exceedances

Figure 11 RRSCO Exceedances

Figure 12 Cross-Section

Figure 13 Site Cover System

APPENDICES

Appendix A Historic Investigation Laboratory Reports Appendix B Field Borehole Logs & Well Completion Details Appendix C Field Sampling Forms Appendix D Radiological Survey Reports Appendix E Groundwater Calculation Appendix F Laboratory Analytical Data Packages Appendix G Data Usability Summary Reports (DUSRs) Appendix H Land Use Evaluation Appendix I Electronic Copy of Report

Page 7: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,
Page 8: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,

REMEDIAL INVESTIGATION/ALTERNATIVES ANALYSIS REPORT 3 GATES CIRCLE SITE

BCP SITE NO. C915272

0309-014-001 1

1.0 INTRODUCTION

Benchmark Environmental Engineering & Science, PLLC (Benchmark) has prepared this Remedial Investigation and Alternatives Analysis (RI-AA) Report on behalf of Gates Circle Holdings, LLC (GCH). GCH owns the subject property (Site) located at 3 Gates Circle in the City of Buffalo, New York (see Figures 1 and 2).

The RI work was completed under the New York State Department of Environmental Conservation (NYSDEC) Brownfield Cleanup Program (BCP) and executed Brownfield Cleanup Agreement (BCA, Index # C915272-02-13) dated March 19, 2013. The BCA was amended in October 2014, prior to the start of the RI, to identify GCH as the BCA entity. The BCA was initially established between the NYSDEC and Chapin Place MAR, LLC. In June 2014, Chapin Place MAR, LLC was purchased by TMMontante and required to change the name of the entity as part of the sale agreement. In July 2014, the company formerly known as Chapin Place MAR, LLC was changed to Lancaster Avenue Development, LLC. Because Lancaster Avenue Development, LLC does not own the property and the ownership of 3 Gates Circle Site (former Millard Fillmore Gates Hospital) was transferred from Kalieda Health to GCH (Chapin Place MAR, LLC never took ownership), GCH was identified as the sole party to the BCA with NYSDEC.

The RI activities discussed in this report were completed under approved NYSDEC work plans and Benchmark provided engineering oversight. The RI Work Plan (Ref. 1) was approved in October 2013 and the RI Work Plan Addendum (Ref. 2) was approved on October 8, 2014. The RI activities were completed between October 2014 and November 2014.

Interpretations presented within this report are based on historic investigations (see Section 1.2) completed by others prior to the Site entering into the BCP and subsequent to RI activities. The analytical data generated as part of the other investigations are included within this report and compared to the current applicable cleanup regulations.

1.1 Background

The Site consists of a single parcel (SBL# 89.79-4-1) 6.9 acres, located at 3 Gates Circle in the City of Buffalo, Erie County, New York. The property is now unoccupied but formerly operated as a commercial/medical facility with 13 interconnecting buildings

Page 9: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,

REMEDIAL INVESTIGATION/ALTERNATIVES ANALYSIS REPORT 3 GATES CIRCLE SITE

BCP SITE NO. C915272

0309-014-001 2

covering most of the Site (see Figure 2). These buildings were primarily used for patient care and hospital administration operations, but included other supporting facilities (i.e., laboratories, research facilities, staff housing, auditorium, and a kitchen). The Power Plant located on the southeast corner of the property contains boilers, cooling towers, backup generators, and a maintenance area for buildings and grounds equipment. The Power Plant is connected to the main campus via an underground tunnel. Current and historic backup generator and boiler fuel storage tanks are located proximate to the Power Plant.

A collection and treatment system is present and adjacent to a sump in the basement of the Power Plant. The system was designed to collect and pretreat perched groundwater impacted by No. 6 fuel oil from a historic underground storage tank (UST) failure (NYSDEC Spill No. 0751494) on the western side of the Power Plant. The USTs and accessible impacted soils were removed in August 2008. The presence of residual impacts beneath the Power Plant foundation necessitated installation of the collection and treatment system. Section 1.2 contains a summary of the previous investigations completed at the Site.

Site redevelopment will consist of a residential assisted-living facility, amenities to support the assisted-living facility, and other miscellaneous uses (residential and commercial). Physical modifications to the existing Site will include demolition, existing building renovation, and new building construction.

1.2 Historic Investigations

A summary of the investigations that have been completed at the Site are presented below. Appendix A includes the laboratory data from these investigations and Figure 3 shows the approximate locations of the historic investigations. We note that NYSDEC Spill No. 0751494, discussed below, was closed on May 20, 2013 when the Site was accepted into the BCP. Residual impacts from this spill will be addressed under the BCP by the NYSDEC Division of Environmental Remediation.

1.2.1 March 2008 No. 6 Fuel Oil Spill

As described in the July 2012 Hazardous Materials Assessment report and November 2012 Phase I/II Environmental Assessment (see Sections 1.2.2 and 1.2.3), a No. 6 fuel oil spill associated with two (2) former 12,000-gallon USTs adjacent to the Power Plant was reported to the NYSDEC in March 2008 (NYSDEC Spill No. 0751494). The spill was

Page 10: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,

REMEDIAL INVESTIGATION/ALTERNATIVES ANALYSIS REPORT 3 GATES CIRCLE SITE

BCP SITE NO. C915272

0309-014-001 3

reportedly discovered when suspect oil was noted migrating through a basement wall within the boiler room area of the Power Plant. The Environmental Service Group (NY), Inc. (ESG) was contacted and attempted to tightness test the two (2) former 12,000 gallon No. 6 fuel oil USTs; both tanks failed the test. Subsequently, the following studies/remedial efforts were completed:

Soil borings completed around the former tanks confirmed the presence of No. 6 fuel oil in the backfill. Impacts did not appear to extend significantly into the surrounding clay (native) soils. Approximately 18 inches of oil was noted in a well installed in the tank backfill.

In May 2008 six (6) test borings were completed through the approximate 2-foot thick concrete floor of the Power Plant boiler room in several locations. The data suggested that the oil migrated through the stone fill beneath the floor, resulting in an approximate 2-foot layer of contaminated sub-slab fill that extended over much of the boiler room basement.

The two USTs were excavated in August 2008 and found to be significantly deteriorated, suggesting that there was a release of the No. 6 fuel oil from the tanks.

Following removal of the USTs, approximately 962 tons of contaminated soil was removed from the excavation and shipped off-site for disposal.

To address the remaining residual oil, including that which had flowed beneath the building, an approximate 8-inch diameter perforated pipe was placed in the bottom of the excavation and surrounded by gravel. The perforated pipe was plumbed into a manhole that pumped collected material to a sump southern portion in the boiler room. A pump at the bottom of the sump then pumps the oil/water mixture into an oil/water separator adjacent to the sump within the Power Plant. The oil is containerized and shipped off-site for disposal. The water is filtered and eventually discharged to the municipal sewer system.

Changes to the system have been required due to the viscosity of the No. 6 fuel oil, specifically related to heating the oil/water separator to allow the oil to flow.

1.2.2 July 2012 Hazardous Materials Assessment

Stohl Environmental (Stohl) completed a “Hazardous Materials Assessment” in July 2012 (Ref. 3). In general, Stohl’s report was structured, in terms of both content and organization, in a manner similar to a Phase I Environmental Site Assessment (ESA). Accordingly, it contains historical research, site reconnaissance observations, and related

Page 11: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,

REMEDIAL INVESTIGATION/ALTERNATIVES ANALYSIS REPORT 3 GATES CIRCLE SITE

BCP SITE NO. C915272

0309-014-001 4

information, as well as the results of a Phase II soil boring program completed in Areas of Concern (AOCs) designated by Stohl. Findings of the Hazardous Materials Assessment are listed below:

Several hazardous materials were observed in the vacated hospital buildings including: cleaning supplies; medical wastes; paints; thinners; epoxy; and large quantities of laboratory chemicals (e.g., chlorinated solvents, acids, aromatic, glycols, and x-ray developer fluid).

Stohl reports that documentation related to open Spill No. 0751494 indicates that impacts to the upper two feet of material beneath the boiler room concrete floor pad are likely extensive.

Stohl observed an apparent historic fill port near the northeast corner of the Power Plant and evidence of a historic contractor’s yard on the west side of the Site.

Several records of historic UST installations were identified but did not correlate with UST removal records.

A Phase II investigation completed by Stohl involved advancement of test borings at 21 locations across the Site and one test pit near the apparent fill port at the northeast corner of the Power Plant. One temporary monitoring well was installed north of the former 12,000-gallon USTs but did not produce sufficient water for sampling. Nineteen soil samples were submitted for analysis of various parameters, primarily NYSDEC Spills Technology and Remediation Series (STARS) List volatile organic compounds (VOCs); STARS List semi-volatile organic compounds (SVOCs); and polychlorinated biphenyls (PCBs). Some sample locations were expanded to include Resource Conservation and Recovery Act (RCRA) metals analysis and Target Compound List (TCL) VOCs and SVOCs. Key observations and results recorded by Stohl include:

o Elevated PID readings at Stohl soil borings SB-2 and SB-15. o Evidence of petroleum globules in the soil and petroleum sheen on the

groundwater interface at soil boring SB-7. o Evidence of several SVOC compounds above 6NYCRR Part 375 Soil

Cleanup Objectives (SCOs) and/or NYSDEC CP-51 spill cleanup criteria. In particular, soil boring SB-17 and SB-18 exhibited concentrations of SVOCs above restricted-residential SCOs.

1.2.3 November 2012 Phase I/II Environmental Site Assessment

Benchmark performed a Phase I ESA in October 2012 (Ref. 4). Based on Benchmark’s findings, which were similar to those documented by Stohl in its July 2012

Page 12: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,

REMEDIAL INVESTIGATION/ALTERNATIVES ANALYSIS REPORT 3 GATES CIRCLE SITE

BCP SITE NO. C915272

0309-014-001 5

Hazardous Materials Assessment, a limited Phase II Site investigation was performed on October 11-15, 2012. The limited Phase II investigation involved a direct push soil boring program with collection of one shallow groundwater sample from a temporary on-site monitoring well (TMW-1). Ten soil borings, identified as SB-1 through SB-10, were advanced at locations outside the known petroleum spill cleanup to check for evidence of impact in other areas of the Site. Key findings of Benchmark’s limited Phase II investigation are listed below:

All soil borings analyzed for SVOCs exhibited detectable concentrations; soil boring SB-6 exhibited concentrations of benzo(a)pyrene and dibenzo(a,h)anthracene above Commercial SCOs; benzo(a)anthracene, benzo(b)fluoranthene and indeno(1,2,3-cd)pyrene above Restricted Residential SCOs; and chrysene and benzo(k)fluoranthene above Unrestricted Use SCOs.

RCRA metals were detected above analytical detection limits at all sampling locations. Lead concentrations were detected above Unrestricted SCOs at SB-5 and SB-8. Total mercury concentrations were detected above Commercial SCOs at SB-5 and Unrestricted Use SCOs at SB-8 and SB-9.

Temporary monitoring well TMW-1 was installed at direct-push (Geoprobe®) borehole SB-4 since overburden groundwater was encountered. VOCs were not detected in the sample from TMW-1.

1.3 Report Organization

This report contains the following ten (10) sections:

Section 1.0 provides an introduction to the project, Site background and previous investigation information.

Section 2.0 presents the investigation approach.

Section 3.0 describes the Site physical characteristics as they pertain to the investigation findings.

Section 4.0 presents the investigation results by media.

Section 5.0 describes the planned interim remedial measure.

Section 6.0 describes the fate and transport of the COCs.

Section 7.0 describes the proposed Interim Remedial Measure to be completed.

Page 13: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,

REMEDIAL INVESTIGATION/ALTERNATIVES ANALYSIS REPORT 3 GATES CIRCLE SITE

BCP SITE NO. C915272

0309-014-001 6

Section 8.0 presents the qualitative risk assessment.

Section 9.0 evaluates remedial alternatives for the Site.

Section 10.0 presents the project summary and conclusions.

Section 11.0 provides a list of references for this report.

Page 14: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,

REMEDIAL INVESTIGATION/ALTERNATIVES ANALYSIS REPORT 3 GATES CIRCLE SITE

BCP SITE NO. C915272

0309-014-001 7

2.0 INVESTIGATION APPROACH The Remedial Investigation (RI) scope of work focused on further defining the

nature and extent of contamination, identifying the source of contamination, defining chemical constituent migration pathways, qualitatively assessing human health and ecological risks (if necessary), and obtaining data of sufficient quantity and quality to perform the remedial alternatives evaluation in accordance with NYSDEC DER-10 (Ref. 5).

The RI was performed to supplement previous investigation data and to better characterize surface and subsurface soil materials, groundwater, and overburden stratigraphy within the Site boundaries. The RI tasks were performed in accordance with the RI/AA Work Plan and RI Work Plan Addendum. The RI tasks consisted of the following:

Completion of 13 interior soil probes within the footprint of the existing Site buildings to facilitate subsurface soil/fill sampling and to assess site stratigraphy. The soil probes were completed in access areas of the basements of the buildings.

Completion of five (5) soil borings to facilitate subsurface soil/fill sampling, to assess site stratigraphy and delineate/assess previously identified contamination.

Complete one (1) hand core to assess subsurface soil/fill in a court yard area that was not accessible with conventional drilling equipment (i.e. drill rig).

Completion of four (4) soil borings to facilitate the collection of soil samples and installation of four (4) permanent overburden groundwater monitoring wells.

Submittal of 46 subsurface soil/fill samples (excluding QA/QC) for analytical testing to better characterize the Site overburden chemistry.

Submittal of four (4) groundwater samples (excluding QA/QC) for analytical testing to better characterize the Site overburden groundwater chemistry.

Completion of a radiological survey at the Site. The survey consisted of a site walkover/gamma scan of the accessible exterior portions of the Site and an alpha/beta and gamma field screening of representative soil samples retained from the soil probes, soil borings and hand core.

Groundwater level gauging and hydraulic conductivity testing were completed to further assess flow directions Site hydrogeologic conditions.

Site-specific Quality Assurance/Quality Control (QA/QC) samples were collected to assist in evaluating the usability of the data in accordance with the RI/AA Work Plan.

Page 15: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,

REMEDIAL INVESTIGATION/ALTERNATIVES ANALYSIS REPORT 3 GATES CIRCLE SITE

BCP SITE NO. C915272

0309-014-001 8

Field team personnel collected environmental samples (i.e., sub-surface soil, water and groundwater) in accordance with the rationale and protocols described in the Sampling and Analysis Plan (SAP) of the Quality Assurance Project Plan (QAPP, Section 4.0 of the RI/AA Work Plan). Representative environmental samples were collected during the RI using dedicated sampling devices and were placed in pre-cleaned laboratory provided sample containers, cooled to 4ºC in the field (if necessary), and transported under chain-of-custody command to Alpha Analytical, Inc. (Alpha), located in Westborough, Massachusetts, a New York State Department of Health (NYSDOH) ELAP-certified analytical laboratory.

Samples for chemical analysis were analyzed in accordance with USEPA SW-846 methodologies to meet the definitive-level data requirements. A Category B deliverable package was provided for each sample delivery group to allow independent third-party data validation and provide defensible data. Analytical results were evaluated by a third-party data validation expert in accordance with provisions described in the QAPP. The scope of work completed for is RI was performed between October and November 2014, as described below.

2.1 Remedial Investigation Field Activities

2.1.1 Subsurface Soil/Fill Investigation (October 2014)

2.1.1.1 Soil Probe Investigation

A subsurface soil/fill investigation was completed to supplement the previous environmental data collected, collect soil samples and assess the conditions beneath the existing Site buildings.

Thirteen (13) soil probes were advance into the subsurface beneath the existing Site buildings through holes cored in the concrete basement slab. These soil probes were designated TP(SB)-1 through TP(SB)-13, as shown on Figure 4. The soil probe logs are provided in Appendix B. We note that these locations were initially proposed to be completed as test pits after the buildings were demolished. However, to expedite the completion of the RI/AA Report, soil probes were used in lieu of test pits, prior to building demolition. The TP-(SB) designation will also differentiate the RI soil probes/borings from those completed by Benchmark as part of the 2013 Phase II investigation.

Page 16: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,

REMEDIAL INVESTIGATION/ALTERNATIVES ANALYSIS REPORT 3 GATES CIRCLE SITE

BCP SITE NO. C915272

0309-014-001 9

The RI soil probes were completed in accessible portions of the building basements, as follows.

TP(SB)-1, through -4 and -5 were completed in the Medical Services Building. TP(SB)-2 and -6 were completed in the Admissions Building. TP(SB)-3 was completed in the East Building. TP(SB)-7 was completed in the Auditorium Building. TP(SB)-8 was completed in the South Nurses Home Building. TP(SB)-9 and -10 were completed in the eastern portion of the Power Plant. TP(SB)-11 was completed in the East Wing Building. TP(SB)-12 was completed in the North Nurses Home Building. TP(SB)-13 was completed in the Center Building.

Soil probes were advanced using direct push methodology via hydraulic hammer on a

track-mounted probe rig. Soil samples were collected with a macrocore sampler which contained a 2-inch outer diameter by 48-inch long acetate liner. A new acetate liner was used for each 4-foot sample run. Probes were pushed through fill materials and native overburden soils to depths which ranged from approximately 11 feet below the basement floor slab (TP(SB)-11) to 20 feet below the basement floor slab (TP(SB)-8). We note that the elevations of the building basement floor slabs are lower on the southeastern portion of the Site (Power Plant) relative to the northern (East Building and East Wing). The basement floor in the Power Plant is approximately 12 to 13 feet below the exterior surface grade, the basement floor in the Medical Services Building, Auditorium and South Nurses Home are approximately 8 feet below the existing surface grade, and the basement floor in the East Building and/or East Wing (northern portion of the Site) are 4 feet below the exterior surface grade.

The soil/fill samples retrieved from the probes allowed for visual, olfactory, photo ionization detector (PID) and radiological assessment of subsurface conditions. Soil/fill samples were collected from the probes for laboratory analysis (see Table 1). Elevated PID readings above background levels (less than 1 part per million (ppm) were not measured at the 13 interior soil probes locations.

Page 17: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,

REMEDIAL INVESTIGATION/ALTERNATIVES ANALYSIS REPORT 3 GATES CIRCLE SITE

BCP SITE NO. C915272

0309-014-001 10

Representative soil/fill samples were placed in pre-cleaned laboratory provided sample jars, cooled to 4ºC in the field, and transported under chain-of-custody command to TestAmerica for analysis. The subsurface surface soil/fill sample analysis from the probe included TCL VOCs, TCL SVOCs, SVOCs Base-Neutral list (BNs), TAL Metals, RCRA 8 Metals, PCBs, pesticides and herbicides. The radiological screening of the soil/fill retrieved from the soil borings are further discussed in Section 2.1.3.

The subsurface conditions encountered are presented on the Soil Boring Logs in Appendix B.

2.1.1.2 Soil Boring Investigation

Five (5) soil borings (SB-105 through SB-109) were completed to further assess the extent of contamination identified during historic investigation activities. SB-105 through SB-108 were completed to assess/delineate the horizontal extent of SVOCs identified at previous boring SB-6 (Benchmark Phase II ESA). SB-109 was completed to assess/delineate the vertical extents of the SVOCs identified at previous borings 17 and 18 (Stohl).

Soil borings were advanced through the overburden soil/fill using a truck-mounted rotary drill rig and 6-5/8 inch inside diameter (I.D.) hollow stem augers (HSA). Overburden soil samples were continuously collected ahead of the HSA by driving a 1-3/8 inch I.D. by 2-foot long split spoon sampler ahead of the lead HSA. Soil borings were advanced to depths of 13 feet below ground surface (fbgs; SB-109) to 20 fbgs (SB-107). Auger cuttings from each borehole were containerized for reuse at the Site pending analytical sample results and/or disposal.

The soil/fill samples retrieved from the borings allowed for visual, olfactory, photo ionization detector (PID) and radiological assessment of subsurface conditions. Soil/fill samples were collected from the probes for laboratory analysis (see Table 1). Elevated PID readings above background levels (less than 1 part per million (ppm)) were not measured at these five (5) exterior soil boring locations, nor were any odors or staining indicative of impact encountered.

Representative soil/fill samples were placed in pre-cleaned laboratory provided sample jars, cooled to 4ºC in the field, and transported under chain-of-custody command to TestAmerica for analysis. The subsurface surface soil/fill sample analysis from the probe

Page 18: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,

REMEDIAL INVESTIGATION/ALTERNATIVES ANALYSIS REPORT 3 GATES CIRCLE SITE

BCP SITE NO. C915272

0309-014-001 11

included SVOCs Base-Neutral list (BNs) and RCRA 8 Metals. The radiological screening of the soil/fill retrieved from the soil borings are further discussed in Section 2.1.3.

The subsurface conditions encountered are presented on the Soil Boring Logs in Appendix B.

2.1.1.3 Hand Cores Soil/Fill Investigation

One (1) hand core (SB-110) was completed to assess subsurface soil/fill in the open court yard in the vicinity of in the northeastern portion of the Site (see Figure 4). The soil/fill samples from the hand core was collected from a pre-cleaned stainless steel barrel auger. The soil/fill sample was collected from the 2-foot interval of soil/fill beneath the topsoil present in the court yard.

The soil/fill samples retrieved from the hand core allowed for visual, olfactory, photo ionization detector (PID) and radiological assessment of subsurface conditions. Soil/fill sample was collected for laboratory analysis (see Table 1). Elevated PID readings above background levels (less than 1 part per million (ppm)) were not measured at the court yard hand core location, nor were any odors or staining indicative of impact encountered.

The representative soil/fill sample was placed in pre-cleaned laboratory provided sample jars, cooled to 4ºC in the field, and transported under chain-of-custody command to Alpha for analysis. The subsurface surface soil/fill sample analysis from the hand core included SVOCs BNs and RCRA Metals. The radiological screening of the soil/fill retrieved from the soil borings are further discussed in Section 2.1.3.

The subsurface conditions encountered are presented on the Soil Boring Logs in Appendix B.

2.1.2 Groundwater Investigation

2.1.2.1 Soil Borings for Monitoring Well Installation (October 2014)

Four (4) soil borings (SB-101 through SB-104) were completed to facilitate the installation of four (4) 2-inch diameter groundwater monitoring wells (MW-1 through MW-4) to investigate groundwater flow direction and quality (see Figure 4), as well as collect soil samples and assess subsurface conditions. Monitoring well installation, well development, and groundwater sample collection are discussed in Sections 2.1.2.2 through 2.1.2.4.

Page 19: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,

REMEDIAL INVESTIGATION/ALTERNATIVES ANALYSIS REPORT 3 GATES CIRCLE SITE

BCP SITE NO. C915272

0309-014-001 12

Soil borings were advanced through the overburden soil/fill using a truck-mounted rotary drill rig and 6-5/8 inch inside diameter (I.D.) hollow stem augers (HSA). Overburden soil samples were continuously collected ahead of the HSA by driving a 1-3/8 inch I.D. by 2-foot long split spoon sampler continuously to the bottom of the soil borings ranging from at approximately 22 to 24 fbgs. The soil borings were advanced to approximately 5 to 7 feet below the first sign of a water bearing zone based on field observations. Auger cuttings from each borehole were containerized for reuse at the Site or proper disposal pending the analytical sample results.

The soil/fill samples retrieved from the soil borings allowed for visual, olfactory, photo ionization detector (PID) and radiological assessment of subsurface conditions. Soil/fill sample was collected for laboratory analysis (see Table 1). Elevated PID readings above background levels (less than 1 part per million (ppm)) were not measured at these four (4) exterior soil boring locations, nor were any odors or staining indicative of impact encountered.

The representative soil/fill sample was placed in pre-cleaned laboratory provided sample jars, cooled to 4ºC in the field, and transported under chain-of-custody command to Alpha for analysis. The subsurface surface soil/fill sample analysis from the monitoring well soil borings included TCL VOCs, TAL SVOCs, SVOCs Base-Neutral list (BNs), TAL Metals, RCRA 8 Metals, PCBs, pesticides and herbicides. The radiological screening of the soil/fill retrieved from the soil borings are further discussed in Section 2.1.3.

The subsurface conditions encountered are presented on the Soil Boring Logs in Appendix B.

2.1.2.2 Monitoring Well Installation (October 2014)

After completion of the four (4) soil borings, 2-inch inner diameter (ID) flush-joint Schedule 40 PVC monitoring wells were installed at the boring locations. Each well was constructed with a flush-joint Schedule 40 PVC, 0.010-inch machine slotted well screen. The screen lengths used for the well installation were 10 feet. Each well screen and attached riser was placed at the bottom of each borehole and a silica sand filter pack (size #00N) was installed from the base of the well to approximately 2 feet above the top of the screen. A bentonite chip seal was installed and hydrated to mitigate the potential for downhole contamination. The monitoring wells were completed with lockable J-plug, and a steel flush

Page 20: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,

REMEDIAL INVESTIGATION/ALTERNATIVES ANALYSIS REPORT 3 GATES CIRCLE SITE

BCP SITE NO. C915272

0309-014-001 13

mounted road box. The monitoring well construction details are presented on the Soil Boring Logs in Appendix B.

2.1.2.3 Monitoring Well Development

The newly installed monitoring wells were developed prior to sampling to remove residual sediments and ensure hydraulic connection within the water-bearing zone. The newly installed monitoring wells were developed after installation, in accordance with Benchmark and NYSDEC protocols. Development of the monitoring wells was completed with dedicated disposable polyethylene bailers via surge and purge methodology. Field parameters including pH, temperature, turbidity, dissolved oxygen and specific conductance were measured every well volume during development until they became relatively stable. The well development logs are included in Appendix C.

Stability was defined as variation between measurements of approximately 10 percent or less with no overall upward or downward trend in the measurements; or a minimum of three well volumes. Development water from the monitoring wells was containerized and staged on-site. Pending the results of the groundwater sample analysis, the water will be discharged to ground surface at the Site or properly disposed.

2.1.2.4 Monitoring Well Groundwater Sample Collection

Benchmark personnel sampled the four (4) monitoring wells using a down-hole pump and dedicated tubing following low-flow/minimal drawdown purge and sample collection procedures. Field measurements for pH, specific conductance, temperature, turbidity, and water level as well as visual and olfactory field observations were periodically recorded and monitored for stabilization. Purging was considered complete when pH, specific conductivity, and temperature stabilized, and when turbidity measurements fell below 50 Nephelometric Turbidity Units (NTU) or became stable above 50 NTU. Upon stabilization of field parameters, groundwater samples were collected. The groundwater sampling forms are included in Appendix C.

The collected groundwater samples were placed in pre-cleaned, pre-preserved (if required) laboratory provided sample bottles, cooled to 4 C in the field, and transported under chain-of-custody command to Test America for analysis. The groundwater sample analysis from permanent wells included TCL VOCs, SVOCs BNs, TAL Metals (total and dissolved), RCRA 8 Metals (total and dissolved), PCBs, pesticides and herbicides.

Page 21: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,

REMEDIAL INVESTIGATION/ALTERNATIVES ANALYSIS REPORT 3 GATES CIRCLE SITE

BCP SITE NO. C915272

0309-014-001 14

Water generated from the monitoring well sampling was containerized and staged on-site. Pending the results of the groundwater sample analysis, the water will be discharged to ground surface at the Site or properly disposed.

2.1.3 Radiological Survey Investigation (November 2014)

A radiological survey was completed at the Site to assess if radioactive materials formerly used at the Site were released to the environment and/or improperly disposed of. Benchmark subcontracted with Greater Radiological Dimensions, Inc. (GRD) to perform a radiological survey to screen the soil/fill from the RI locations and the screen the accessible portions of the Site for alpha, beta and gamma radiation. The survey was completed in two (2) phases. The first phase was to screen soil/fill samples retained from the 23 RI locations (soil probes, soil borings and hand core) completed as part of the RI. The second phase consisted of a Site walkover of the accessible portions of the Site.

The first phase consisted of field screening representative soil/fill retained from each investigation location. The gamma screening survey was completed with a 2-inch by 2-inch sodium iodide detector coupled with a Ludlum 2221 digital rate meter. The alpha and beta screening survey were completed with a Ludlum Model 43-93 Alpha-Beta Phoswich. Representative soil/fill from the each investigation location was placed in a one-gallon plastic bag and screened with both detectors. The results are discussed in Section 4.3.1 and the reports provided by GRD are included in Appendix D.

The second phase of the radiological survey consisted of the gamma Site walkover which was performed with the 2-inch by 2-inch sodium iodide detector coupled with a Ludlum 2221 digital rate meter. The survey was completed by walking the accessible portions of the Site in a serpentine pattern at a speed no faster than 1 meter per second. The results are discussed in Section 4.3.2 and the reports provided by GRD are included in Appendix D.

2.1.4 Field Specific Quality Assurance/Quality Control Sampling

In addition to the soil/fill and groundwater samples described above, field-specific quality assurance/quality control (QA/QC) samples were collected and analyzed to ensure the reliability of the generated data as described in the QAPP and to support the required

Page 22: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,

REMEDIAL INVESTIGATION/ALTERNATIVES ANALYSIS REPORT 3 GATES CIRCLE SITE

BCP SITE NO. C915272

0309-014-001 15

third-party data usability assessment effort. Site-specific QA/QC samples included matrix spikes, matrix spike duplicates, blind duplicates, and trip blanks.

2.2 Site Mapping

A Site map was developed during the RI field investigation. The exterior investigation locations and relevant Site features were located on the map. Benchmark used existing Site features to identify the exterior investigation locations, as the majority of the Site is covered with building footprints.

Monitoring well monitoring point elevations were measured by Benchmark and used as the basis for the groundwater isopotential map showing the general direction of groundwater flow based on water level measurements (see Figure 5).

Benchmark was provided a basement floor plan that identified the various interior features such as hallways, rooms, elevators and doorways. This basement floor plan was used to locate the interior soil probe locations based on the interior features and was overlain onto the various investigation location figures via AutoCad.

2.3 Decontamination & Investigation-Derived Waste Management

Every attempt was made to utilize dedicated sampling equipment during the RI, however, non-dedicated equipment was required and/or used (hand cores, spilt spoons) and was decontaminated with a non-phosphate detergent (i.e., Alconox®) and potable water mixture, rinsed with distilled water, and air-dried before each use in accordance with Benchmark’s field operating procedures (FOPs).

RI generated drilling spoils and groundwater development water were containerized and staged on-site. Pending the results of the analytical samples, the soil/fill and water may be reused or discharged to the ground surface at the Site or properly disposed.

IDW will be reused, recycled, and/or disposed off-Site, in accordance with the approved remedial activities.

Page 23: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,

REMEDIAL INVESTIGATION/ALTERNATIVES ANALYSIS REPORT 3 GATES CIRCLE SITE

BCP SITE NO. C915272

0309-014-001 16

3.0 SITE PHYSICAL CHARACTERISTICS The physical characteristics of the Site observed during the RI are described in the

following sections.

3.1 General Site Features

The Site consists of a single parcel (SBL# 89.79-4-1) 6.9 acres, located at 3 Gates Circle in the City of Buffalo, Erie County, New York. The Site is located on the southeast end of Gates Circle and is bound by Lafayette Avenue to the north, Delaware Avenue to the west, Linwood Avenue to the east, and a municipal-owned parking ramp and office building to the south. The Site is largely comprised of large multi-story buildings, asphalt parking areas and concrete walkways with a small portion of the Site covered with vegetation (see Figure 2).

The property is now unoccupied but formerly operated as a commercial/medical facility with 13 interconnecting buildings covering most of the Site (see Figure 2). These buildings were primarily used for patient care and hospital administration operations, but included other supporting facilities (i.e., laboratories, research facilities, staff housing, auditorium, and a kitchen). The Power Plant located on the southeast corner of the property contains boilers, cooling towers, backup generators, and a maintenance area for buildings and grounds equipment. The Power Plant is connected to the main campus via an underground tunnel.

The Site is generally flat lying with limited topographic features. The surface elevation is about 630 feet above meal sea level. The area surrounding the Site generally dips from south to north towards Scajaquada Creek.

3.2 Geology

3.2.1 Overburden

The U.S. Department of Agriculture Soil Conservation Service soil survey map of Erie County (Ref. 6) describes the general soil type at the Site as Urban Land (Ud). This is indicative of level to gently sloping land with at least 40 percent of the soil surface covered

Page 24: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,

REMEDIAL INVESTIGATION/ALTERNATIVES ANALYSIS REPORT 3 GATES CIRCLE SITE

BCP SITE NO. C915272

0309-014-001 17

by asphalt, concrete, buildings, or other impervious structures typical of an urban environment.

RI activities investigated subsurface soil/fill at both exterior and interior locations of the Site. In both instances the subsurface generally consisted of non-native soil/fills overlying native soil.

At the exterior investigation locations, the fill materials were generally granular and non-cohesive consisting of varying amounts of sands, gravels and silts overlying lean clay with fill characteristics (cinders, brick fragments, slag) and the non-native soil/fill materials were generally present in the upper 4 feet. We note that at SB-104 and SB-109 located in the northern central portion of the Site, the fill materials extended to depths of 14 fbgs and 9 fbgs, respectively.

Underlying the fill materials, native soils generally consisted of cohesive soil, variations of brown lean clays with varying amounts of sands, silts and gravels with inter-bedded layers of sands, silts and gravels. Appendix B includes the Soil Boring Logs.

At the interior investigation locations, the fill materials encountered beneath the buildings were generally granular and non-cohesive consisting of varying amounts of gravels, sands, and silts overlying lean clay with fill characteristics (cinders, brick fragments, slag). The depth of the fill materials beneath the building generally range from about 1 to 6 feet beneath the basement slabs. However, at TP(SB)-3 and TP(SB)-13 located in the northern central portion of the Site, the fill materials extended to depth of 8 feet below the building basement. The depth of the fill materials are consistent with those identified on the exterior portion of the Site at SB-9 and SB-104. Underlying the fill materials, native soils generally consisted of cohesive soil, variations of brown lean clays with varying amounts of sands, silts and gravels with inter-bedded layers of sands, silts and gravels. Appendix B includes the Soil Boring Logs. A cross-section of the general subsurface soil/fill conditions has been included as Figure 12.

3.2.2 Bedrock

Based on the bedrock geologic map of Erie County (Ref. 3), the Site is situated over the Onondaga Formation of the Middle Devonian Series. The Onondaga Formation is comprised of a varying texture from coarse to very finely crystalline with a dark gray to tan color and chert and fossils within. The unit has an approximate thickness of 110 to 160 feet.

Page 25: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,

REMEDIAL INVESTIGATION/ALTERNATIVES ANALYSIS REPORT 3 GATES CIRCLE SITE

BCP SITE NO. C915272

0309-014-001 18

Depth to and type of bedrock below the Site was not been determined by drilling as part of the RI. However, a geotechnical investigation (Ref. 8) was conducted by others, prior to the RI and bedrock was encountered and cored at two (2) locations. It was encountered at a depth of about 26 to 30 fbgs in the northwestern portion of the Site. It was described as a gray cherty limestone, consistent with the bedrock geology map of Eire County.

3.3 Hydrogeology

Groundwater elevation data was collected during the RI, which included water levels measurements on November 3, 2014 from the four (4) permanent monitoring wells, and used to evaluate Site hydrogeology. Monitoring well construction logs are provided in Appendix B.

Depth to groundwater ranged from approximately 11 fbgs (MW-1) to 19 fbgs (MW-4). In general, groundwater flow direction was estimated to be northerly as shown on Figure 5, which presents an overburden groundwater isopotential map.

3.3.1 Hydraulic Gradients

Hydraulic properties of the saturated overburden at the Site were determined from data collected during the RI groundwater sampling gauging performed in November 2014.

The gradients were determined from the highest elevation at MW-1 to the north at MW-2 through MW-4. The horizontal gradient for overburden groundwater was calculated to range from 0.007 ft/ft (MW-1 to MW-2) to 0.018 ft/ft (MW-1 to MW04). The hydraulic gradient calculations are included in Appendix E.

Page 26: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,

REMEDIAL INVESTIGATION/ALTERNATIVES ANALYSIS REPORT 3 GATES CIRCLE SITE

BCP SITE NO. C915272

0309-014-001 19

4.0 INVESTIGATION RESULTS BY MEDIA The nature and extent of contamination at the Site was further characterized using

soil and groundwater samples collected and analyzed as part of the RI. As described in Section 2, soil and groundwater samples collected during previous investigations were used to supplement this RI. Sampling protocols and methodologies for samples collected during the RI investigation were performed in accordance with the NYSDEC-approved RI Work Plan which included Benchmark’s FOPs and were previously described in Section 2.0 of this report.

The soil and groundwater samples collected during the RI sampling events were submitted for analyses under chain-of-custody to Alpha Analytical, Inc. (Alpha) located in Westborough, Massachusetts. Analytical services were performed in accordance with the most current SW-846 analytical methods and protocols. Appendix F contains raw analytical data (Form 1 packages) for samples analyzed from the RI investigation. Tabulated analytical data discussed in this section includes results from prior investigations as well as the RI data collected by Benchmark personnel. Tabulated analytical results are shown only for those parameters for which a value greater than the laboratory method detection limit was detected at a minimum of one (1) sample location.

Figure 3 shows the sampling locations for soil and groundwater samples collected during historic investigations and Figure 4 shows both the historic and RI investigations. Table 1A summarizes the sampling and analysis program of the RI.

The objective of the sampling program summarized on Table 1A was to utilize previously collected data and that collected as part of the RI to characterize both the fill materials and native soils present at the Site. Table 1B expands upon Table 1A and provides sample information regarding the ‘Soil Type’ (fill material or native soil) which was analyzed at the various locations as well as provides the analysis completed. This table also includes the previous Stohl investigation, ESG UST removal, and the Benchmark Phase II samples.

The table below is a breakdown of the number of samples collected as part of the previous investigations and the RI, by Soil Type and analysis completed.

Page 27: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,

REMEDIAL INVESTIGATION/ALTERNATIVES ANALYSIS REPORT 3 GATES CIRCLE SITE

BCP SITE NO. C915272

0309-014-001 20

Analysis Total Number of Samples

Number of Fill Samples

Number of Fill Samples Exceeding RRSCOs

Number of Native Samples

Number of Native Samples Exceeding RRSCOs

VOC 40 18 0 22 0 SVOC 70 32 6 (19%) 38 0 Metals 56 27 2 (7%) 29 0 PCBs 16 11 0 5 0 Pesticides 6 2 0 4 0 Herbicides 6 2 0 4 0

Table 1B is also color coded to identify the fill material samples that were analyzed.

Fill material samples that did not exceed their respective RRSCOs for the parameters tested are highlighted in green. The locations of fill material that were analyzed and had compounds or analytes concentrations exceed their respective RRSCO are highlighted in orange. This is graphically depicted in Figures 10 and 11.

Both historic and RI investigation analytical results were used for site contaminant characterization purposes. Summaries of the historic subsurface soil samples are summarized in Tables 2A and 2B. Table 2A is a summary of the Stohl investigation (July 2012) analytical results and Table 2B is a summary of the Benchmark investigation (October 2012) analytical results. As only one (1) groundwater sample was collected by Benchmark as part of the previous historic investigation and having non-detect results for VOCs, no summary table was developed.

For discussion purposes, analytical results for the investigation were compared with the following Standards, Criteria, and Guidance values (SCGs).

Subsurface Soil:

Soil Cleanup Objectives (SCOs) per 6 New York Code Rules and Regulation (6 NYCRR) Part 375 Environmental Remediation Programs, Subparts 375-12 to 375-4 & 375-6, effective December 14, 2006.

Specifically, the Restricted Residential Soil Cleanup Objectives (RRSCOs) are the Soil Cleanup Objectives that are most applicable to the planned redevelopment of the Site

Page 28: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,

REMEDIAL INVESTIGATION/ALTERNATIVES ANALYSIS REPORT 3 GATES CIRCLE SITE

BCP SITE NO. C915272

0309-014-001 21

(mixed-use residential (apartment) and commercial capacity) and are considered to be the most applicable health risk-based comparative criteria.

Groundwater

Class GA Groundwater Quality Standards and Guidance Values (GWQS/GVs) per NYSDEC’s Division of Water, Technical and Operational Guidance Series (TOGS 1.1.1), June 1998, amended April 2000.

Sample results compared to the above criteria are described below according to media and contaminant class.

4.1 Soil/Fill

Forty-six (46) subsurface soil/fill samples were collected and analyzed as part of the RI and 29 subsurface soil samples were collected as part of historic investigations, of which four (4) are confirmatory samples associated with the removal of the two (2) 12,000 gallon No. 6 fuel oil USTs completed in 2008. The results from the four (4) UST confirmatory samples which were analyzed for STARS1 list VOCs and SVOCs were reported as non-detect for these parameters. No data table was developed to summarize these non-detect results.

Tables 2A (Stohl Investigation), 2B (Benchmark Phase II), and 3 (RI) compare the soil/fill data to a range of health risk-based SCOs as published in 6NYCRR Part 375, including Unrestricted SCOs (USCOs) and Restricted Residential SCOs (RRSCOs).

The RRSCOs are the most applicable to the planned redevelopment of the Site and deemed protective of human health under a scenario whereby site use and associated exposure pathways are assumed to be similar to those under a single family home setting, excluding those that might occur from consumption of foods grown in a home vegetable garden. Based upon the reasonably anticipated future use of the Site in a mixed-use residential (apartment) and commercial capacity, the RRSCOs are conservatively considered to be the most applicable health risk-based comparative criteria. Nevertheless, the following

1 Spill Technology and Remediation Series (STARS) Memo #1, Petroleum-Contaminated Soil Guidance Policy, New

York State Department of Environmental Conservation, August 1992.

Page 29: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,

REMEDIAL INVESTIGATION/ALTERNATIVES ANALYSIS REPORT 3 GATES CIRCLE SITE

BCP SITE NO. C915272

0309-014-001 22

sections discuss the surface and subsurface soil results relative to the range of health-based SCO criteria to provide a comprehensive summary of the data.

4.1.1 Surface Soil/Fill

No surface soil/fill samples were collected as part of the RI, as the majority of the Site is covered by buildings, asphalt parking or concrete walkways. The small amount of existing surface soil that is present is covered with topsoil and vegetation and will likely be disturbed during redevelopment.

4.1.2 Subsurface Soil/Fill

Forty-six (46) subsurface soil samples (excluding QA/QC samples) were collected from the 13 interior soil probes (designated TP(SB)-1 through TP(SB)-13), nine (9) exterior soil borings (designated SB-101 through SB-110) and one (1) hand cores (designated SB-110) as part of the RI.

Of the 46 subsurface soil samples collected as part of the RI: Eight (8) were analyzed for TCL VOCs via SW-846 8260C; Six (6) were analyzed for TCL plus CP-51 VOCs via SW-846 8260C; Four (4) were analyzed for TCL SVOCs (Base Neutral & Acid Extractable Compounds) via SW-846 8270D; Thirty-eight (38) were analyzed for SVOCs Base Neutral via SW-846 8270D; Thirty-eight (38) were analyzed for RCRA 8 Metals via SW-846 6010C/7471B; Four (4) were analyzed for TAL Metals via SW-846 6010C/7471B; Four (4) were analyzed for Total Cyanide via SW-846 9010C/9012B; Six (6) were analyzed for PCBs via SW-846 8280A; Six (6) were analyzed for pesticides via SW-846 8081B; and Six (6) were analyzed for herbicides via SW-846 8151A.

As part of the historic investigation activities and/or UST removal/remedial activities, the following subsurface soil samples were also collected for analysis:

Page 30: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,

REMEDIAL INVESTIGATION/ALTERNATIVES ANALYSIS REPORT 3 GATES CIRCLE SITE

BCP SITE NO. C915272

0309-014-001 23

Fourteen (14) were analyzed for TCL VOCs plus STARS VOCs via SW-846 8260; Fourteen (14) were analyzed for STARS VOCs via SW-846 8260; Fourteen (10) were analyzed for STARS SVOCs via SW-846 8270; Fourteen (14) were analyzed for TCL SVOCs (Base Neutral & Acid Extractable Compounds) via SW-846 8270; Fourteen (14) were analyzed for RCRA 8 Metals via SW-846 6010/7471; and Ten (10) were analyzed for PCBs via SW-846 8082.

Tables 2 summarize the previous investigation activities results and Table 3 summarizes the results of the RI subsurface soil samples. The results are discussed below as they compare to the respective Part 375 SCOs.

4.1.2.1 VOCs

VOCs were detected above MDLs in 16 of 41 samples analyzed as part of the historic investigations and RI. Of the VOCs detected above method detection limits (MDLs) only one (1) compound, naphthalene (generally considered to be a SVOC) was detected above its Unrestricted SCO (USCO). This detection was in soil boring 18, completed by Stohl during their July 2012 investigation at a depth of 4 to 9 fbgs. No other VOCs were detected above method detection limits in the two (2) samples collected at this location.

None of the remaining VOCs detected above MDLs were detected at concentrations above their respective USCOs. VOCs are not considered to be a concern at the Site.

4.1.2.2 SVOCs

SVOCs were detected above MDLs in the 33 of the 66 samples analyzed for SVOCs as part of the historic investigations and RI. Compounds detected above their respective RRSCOs were limited to benzo(b)fluoranthene, benzo(a)pyrene, benzo(a)anthracene, benzo(k)fluoranthene, chrysene, dibenzo(ah)anthracene, and indeno((1,2,3-cd)pyrene). The exceedances were identified at the following six (6) locations:

Stohl Investigation: 12, 0 to 4 fbgs; 17, 4 to 8 fbgs, and 18, 4 to 9 fbgs. Benchmark Phase II: SB-6, 0.5 to 4 fbgs. RI: TP(SB)-13, 2 to 4 fbgs and SB-109, 0.5 to 4 fbgs.

Page 31: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,

REMEDIAL INVESTIGATION/ALTERNATIVES ANALYSIS REPORT 3 GATES CIRCLE SITE

BCP SITE NO. C915272

0309-014-001 24

The SVOCs detected in Stohl samples from 17, 18 and the RI sample from SB-109

are related to the same area in the central portion of the Site (see Figure 4). Subsurface conditions documented by Stohl and Benchmark during the RI indicate there is approximately 9 feet of fill present in this area. Two (2) SVOCs were detected in the Stohl sample from location 17, 4 to 8.5 ft, benzo(a)anthracene (1.05 mg/kg) and benzo(b)fluoranthene (1.01 mg/kg), which slightly exceeded their respective RRSCO of 1 mg/kg. Seven (7) SVOCs were detected in the Stohl sample from location 18, 4 to 9 ft, benzo(b)fluoranthene (5.69 mg/kg), benzo(a)pyrene (4.43 mg/kg), benzo(a)anthracene (5.83 mg/kg), benzo(k)fluoranthene (2.25 mg/kg), chrysene (4.93 mg/kg), dibenzo(ah)anthracene (0.918 mg/kg), and indeno((1,2,3-cd)pyrene (2.56 mg/kg) above their respective RRSCOs. The total SVOCs detected in this sample is about 58 mg/kg.

As part of the RI, the extent of the elevated SVOC detections, discussed above, was assessed. Two (2) samples were collected at SB-109, from 0.5 to 4 fbgs and from 4 to 8 fbgs. The sample results from 0.5 to 4 fbgs indicated that three (3) SVOCs were detected slightly above their respective RRSCOs of 1 mg/kg (benzo(b)fluoranthene (1.8 mg/kg), benzo(a)pyrene (1.3 mg/kg), benzo(a)anthracene (1.7 mg/kg)). However, the samples from 4 to 8 fbgs did not have detections of SVOCs above their respective USCOs and native soil was encountered at below 9 fbgs. The native soil samples analyzed as part of the RI did contain SVOCs, other compounds and/or metal analytes above their respective USCOs. Accordingly the SVOCs detected in this area are likely associated with some of the fill material in this area. The SVOC impacts in this area are not considered significant.

Five (5) SVOCs were detected above their respective RRSCOs in the sample collected from SB-6, 0 to 4 fbgs (Benchmark Phase II) [benzo(a)pyrene (2.8 mg/kg), benzo(a)anthracene (1.7 mg/kg), benzo(b)fluoranthene (2.8 mg/kg), dibenzo(ah)anthracene (0.65 mg/kg), and indeno((1,2,3-cd)pyrene (2 mg/kg)]. These detected concentrations slightly exceed their respective RRSCOs as shown on Table 2B. As part of the RI, four (4) soil borings (SB-105 through SB-108) were completed 25 feet from and in the four cardinal directions around the area of elevated SVOCs identified in soil boring SB-6 in the southern portion of the Site (see Figure 4). No SVOCs were detected above their respective USCOs in the fill or native soil samples analyzed from each of the four (4) soil borings. The

Page 32: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,

REMEDIAL INVESTIGATION/ALTERNATIVES ANALYSIS REPORT 3 GATES CIRCLE SITE

BCP SITE NO. C915272

0309-014-001 25

detections of SVOCs above their RRSCOs in SB-6 appear to be limited to a small area around SB-6.

Benzo(b)fluoranthene was the only SVOC detected above its RRSCO in sample SB-12, 0 to 4 fbgs completed by Stohl. The detected concentration was 1.01 microgram per kilogram (mg/kg) and its RRSCO is 1.00 mg/kg. This exceedance is not considered to be significant as other fill sample analyzed as part of the Stohl Investigation and RI from this area did not indicate SVOCs are present above their respective USCOs and/or RRSCOs.

Five (5) SVOCs were detected at RI location TP(SB)-13, 2 to 4 feet below the basement floor of the East Building located in the northern central portion of the Site above their respective RRSCOs [benzo(b)fluoranthene (20 mg/kg), benzo(a)pyrene (15 mg/kg), benzo(a)anthracene (20 mg/kg), benzo(k)fluoranthene (8.1 mg/kg), and chrysene (18 mg/kg). The total SVOCs detected in this sample was about 339 mg/kg. Based on a basement floor depth of approximately 4 fbgs, the sample depth is actually about 6 to 8 fbgs. The sample was collected from fill material present in this area. A second sample was also collected and analyzed from the fill material present from 4 to 6 feet below the basement floor (8 to 10 fbgs). The fill material extends to depth of around 9 below the basement floor (13 fbgs). The SVOC sample results for TP(SB)-13 4 to 6 feet were below their respective USCOs. The exceedances in this area appear to be limited to shallow fill material. We note that sample description for the 2 to 4 foot sample indicated that coal pieces were present and may likely be the cause of the elevated SVOCs.

As shown on Table 1B, of the 32 fill materials samples analyzed for SVOCs as part of the previous investigations and RI, six (6) samples (19% of the fill material samples) exceeded their respective RRSCOs. This does not indicate that the SVOCs impacts are wide spread at the Site and appear to be limited to the fill material present in a few select locations, central (SB-109), northern-central TP(SB)-13 and small area in the southern portion of the Site (SB-6). In all instances total SVOC concentrations were present at levels well below 500 mg/kg. It is not uncommon to detect SVOCs in the urban fill materials within the City of Buffalo. The locations of the acceptable fill soil (below RRSCOs) and fill samples that had exceedances of the RRSCOs is provided on Figure 10. Figure 11 identifies the location of fill material exceedances with RRSCO exceedance data.

As discussed in Section 1.2.1, six (6) test borings were completed through the approximate 2-foot thick concrete floor in May 2008 by ESG at several locations on the

Page 33: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,

REMEDIAL INVESTIGATION/ALTERNATIVES ANALYSIS REPORT 3 GATES CIRCLE SITE

BCP SITE NO. C915272

0309-014-001 26

north and western portions of the Power House (see Figure 3). It appears that the No. 6 fuel oil from the former-leaking USTs has migrated through the stone fill beneath the floor, resulting in an approximate two-foot layer of contaminated sub-base fill beneath the concrete floor in the basement of the Power Plant. The two (2) soil probes completed as part of the RI in the eastern portion of the Power Plant did not encounter oil in the sub-base material (see Figure 5). However, the remaining No. 6 fuel oil will require remedial action.

4.1.2.3 Metals

Metal analytes were detected above MDLs in the 56 samples analyzed for metals as part of the historic investigations and RI. Of the metal analytes detected above MDLs, only one (1) analyte, mercury was detected above its respective RRSCOs at two locations: SB-5, 2 to 4 fbgs (Benchmark Phase II) at a concentration of 4.2 mg/kg, and TP(SB)-3, 0.6 to 4 feet below the basement floor (5 to 8 fbgs) at a concentration of 2.2 mg/kg, collected during the RI from the East Building located in the northern central portion of the Site. Both samples were collected from fill material present in their respective areas.

As shown on Table 1B, of those 27 fill materials samples analyzed for metal analytes as part of the previous investigations and RI, two (2) samples (7% of the fill material samples analyzed) had an exceedance of the RRSCOs. In both samples the analyte which exceeded the RRSCO was mercury only. No other analytes were detected in the 27 fill material samples above their respective RRSCO. The twenty-nine (29) native soil samples collected and analyzed as part of previous investigation and the RI, and did not contain contaminants above their respective USCOs. The locations of the acceptable fill soil (below RRSCOs) and fill samples that had exceedances of the RRSCOs is provided on Figure 10. Figure 11 identifies the location of fill material exceedances with RRSCO exceedance data.

The metal analyte impacts are not significant at the Site and appear limited to the two (2) isolated locations, one in the northern-central (TP(SB)-3) and a small area in the southern portion of the Site (SB-5). Sample analysis from around these location to not indicate other metals impacts. It is not uncommon to detect metals in the urban fill materials within the City of Buffalo.

Page 34: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,

REMEDIAL INVESTIGATION/ALTERNATIVES ANALYSIS REPORT 3 GATES CIRCLE SITE

BCP SITE NO. C915272

0309-014-001 27

4.1.2.4 PCBs

No PCBs were detected above MDLs in the 16 samples analyzed for PCBs as part of the historic investigations or RI. PCBs are not considered to be a concern at the Site.

4.1.2.5 Pesticides

Pesticides were detected above MDLs in the three (3) of the six (6) samples analyzed for pesticides as part of the RI. One compound, 4,4’-DDT was detected above its USCO at one location (SB-102, 0 to 4 fbgs) but well below its RRSCO. Pesticides are not considered to be a concern at the Site.

4.1.2.6 Herbicides

No herbicides were detected above MDLs in the six (6) samples analyzed for herbicides as part of the RI. Herbicides are not considered to be a concern at the Site.

4.1.2.7 Total Cyanide

Cyanide was not detected above MDLs in the four (4) samples analyzed for total cyanide as part of the RI and is not considered to be a concern at the Site.

4.2 Groundwater

Four (4) groundwater samples (excluding QA/QC samples) were collected from the four (4) monitoring wells installed as part of the RI activities (see Figure 4). The permanent monitoring wells are designated MW-1 through MW-4.

Of the four (4) groundwater samples collected as part of the RI: • Three (3) were analyzed for TCL VOCs via SW-846 8260C; • One (1) was samples for TCL VOCs plus CP-51 via SW-846 8260C • Three (3) were analyzed for SVOC Base Neutrals via SW-846 8270D; • One (1) was analyzed for TCL SVOCs (Base Neutral & Acid Extractable

Compounds) via SW-846 8270D; • Three (3) were analyzed for both total and dissolved RCRA 8 Metals via SW-

846 6010C/7471B; • One (1) was analyzed for both total and dissolved TAL Metals via SW-846

6010C/7471B; • One (1) was analyzed for Total Cyanide via SW-846 9012B;

Page 35: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,

REMEDIAL INVESTIGATION/ALTERNATIVES ANALYSIS REPORT 3 GATES CIRCLE SITE

BCP SITE NO. C915272

0309-014-001 28

• One (1) was analyzed for PCBs via SW-846 8280A; • One (1) was analyzed for pesticides via SW-846 8081B; and • One (1) was analyzed for herbicides via SW-846 8151A. One (1) groundwater sample was also collected as part of the Benchmark Phase II

from TMW-1 installed at SB-4 (see Figures 3 and 4). It was sampled for VOCs only. Because the analytical results sample were non-detect, no table was generated.

Table 4 summarizes the results of the groundwater samples collected as part of the RI. The groundwater and water sample results from the RI and previous investigations were compared to the NYS Class “GA” Groundwater Quality Standards and Guidance Values (GWQS/GVs) and discussed below.

4.2.1 VOCs

VOCs were detected above MDLs in two (2) of the five (5) groundwater samples analyzed as part of the previous investigations and RI, in which two (2) different VOCs were detected. Of the two (2) VOCs (benzene and tetrachloroethene (PCE)) detected above MDLs, benzene (2.5 microgram per liter (ug/l)) was detected slightly above its respective GWQS/GV (1 ug/l). The detected concentration of PCE was below its respective GWQS/GV.

The location of the benzene detection, MW-2, is on the western portion of the Site, approximately 25 feet from Delaware Avenue. The detected concentration, although above its GWQS/GV is not considered significant and VOCs are not considered to a concern in the Site groundwater. Benzene was detected above MDL, but below its USCO, in one (1) of the 40 samples analyzed for VOC as part of the previous investigation and RI work.

4.2.2 SVOCs

SVOCs were not detected above MDLs in the groundwater samples analyzed as part of the RI. SVOCs in groundwater are not a concern at the Site.

Page 36: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,

REMEDIAL INVESTIGATION/ALTERNATIVES ANALYSIS REPORT 3 GATES CIRCLE SITE

BCP SITE NO. C915272

0309-014-001 29

4.2.3 Metals

Groundwater samples collected during the RI were analyzed for both total metals and dissolved metals. The dissolved metals analysis was completed on samples that were collected and filtered at the laboratory due to the elevated turbidity in the groundwater samples collected.

Total metals detected above their respective GWQS/GVs were limited to cobalt (1 location), iron (4 locations), lead (1 location), magnesium (4 locations), manganese 2 locations), sodium 4 locations), and vanadium (1 location) see Table 4.

The detected concentrations of cobalt (10.7 ug/l), lead (40.9 ug/l), magnesium (368.5 ug/l and 441.7 ug/l) and vanadium (20.6 ug/l) slightly exceeded their respective GWQS/GVs and were not wide spread with limited detections. The elevated concentrations of iron are likely associated with the turbidity levels in the groundwater samples. The turbidity of monitoring wells MW-1, -2 and -3 were greater than 1,000 NTUs with iron concentrations ranging from 4,500 ug/l to 15,000 ug/l. The turbidity at MW-4 was approximately 500 NTUs and the concentration of iron detected was 355 ug/l, slightly above its GWQS/GV of 300 ug/l. The detection of magnesium and sodium in the four (4) monitoring well locations is likely associated with road salt use at the former hospital and city streets surrounding the Site.

Due to the high turbidity discussed above, additional sample volume was collected and filtered at the laboratory and also analyzed for metals. In the dissolved metal samples analyzed, only two (2) analytes, magnesium (60,020 ug/l) and sodium (794,000 ug/l) were detected at one (1) location, MW-2, at concentrations above their respective GWQS/GVs.

The difference in the number of analyte detections that exceed their respective GWQS/GV (seven analytes at multiple locations) in the total metal versus the number of analyte detections that exceed their respective GWQS/GV (two analytes at one location) in the dissolved metal analysis is due to the turbidity of the total metal analysis samples. The two (2) analytes detected in the dissolved metal sample from MW-2 are likely associated with road salt used along Delaware Avenue in the winter months, which is about 25 feet from the well location.

Based on RI groundwater data, there are minor metal analyte impacts to the groundwater. The analytes detected above their respective GWQS/GV, with the exception magnesium and sodium in the dissolved sample from MW-4, were for total metals in

Page 37: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,

REMEDIAL INVESTIGATION/ALTERNATIVES ANALYSIS REPORT 3 GATES CIRCLE SITE

BCP SITE NO. C915272

0309-014-001 30

unfiltered samples with high turbidity, and the results are likely biased high due to sediment present within those groundwater samples. Because the Site and surrounding area are on public water supply and the dissolved phase samples indicated only two (2) analytes, magnesium and sodium, common to road salt, exceeded their respective GWQS/GV, the metal analytes detected are not considered to be of concern at the Site.

4.2.4 PCBs

No PCBs were detected above MDLs in the groundwater sample analyzed for PCBs as part of the RI.

4.2.5 Pesticides

No pesticides were detected above MDLs in the groundwater sample analyzed for PCBs as part of the RI.

4.2.6 Herbicides

No herbicides were detected above MDLs in the groundwater sample analyzed for herbicides as part of the RI.

4.2.7 Total Cyanide

Cyanide was not detected above MDLs in the groundwater sample analyzed for total cyanide as part of the RI.

4.3 Radiological Survey Results

As discussed in Section 2.1.3, the radiological survey was completed in two (2) phases. The first phase was to screen soil/fill samples retained from the 23 RI locations (soil probes, soil borings and hand core) completed as part of the RI. The second phase consisted of a Site walkover of the accessible portions of the Site. The radiological survey reports are included in Appendix D.

Page 38: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,

REMEDIAL INVESTIGATION/ALTERNATIVES ANALYSIS REPORT 3 GATES CIRCLE SITE

BCP SITE NO. C915272

0309-014-001 31

4.3.1 RI Location Soil/Fill Screening

The results of alpha beta survey did not identify alpha or beta radiation at elevated levels within the individual soil/fill samples retained from the RI location that would indicate release of radioactive contaminants to the Site soil/fill.

Similarly the results of the gamma survey did not identify gamma radiation at elevated levels within the individual soil/fill samples retained from the RI location that would indicate release of radioactive contaminants to the Site soil/fill.

4.3.2 Site Walkover Survey

The results of the gamma Site walkover survey did not identified gamma radiation on the exterior accessible portions of the Site.

Three (3) locations were identified where naturally occurring radioactive materials were recorded within building construction materials:

• The yellow bricks used on the outside of the Site buildings. • The granite used for landscaping on the southern side of the Medical Services

building. • The base of the Power Plant Smoke Stack, also constructed of yellow brick.

It is not uncommon to find radiological activity in granite and/or construction brick.

4.4 Summary of Historic Investigation and RI Findings

The following is a summary of the Historic Investigations and RI findings. Surface Soils: No samples were collected from surface soils as the majority of the Site is covered by buildings, asphalt parking or concrete walkways. The small amount of existing surface soil that is present is covered with topsoil and current vegetation will likely be disturbed during redevelopment.

Page 39: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,

REMEDIAL INVESTIGATION/ALTERNATIVES ANALYSIS REPORT 3 GATES CIRCLE SITE

BCP SITE NO. C915272

0309-014-001 32

Subsurface Soils: VOCs are not considered to be a concern at the Site. One (1) VOC, naphthalene (generally considered to be a SVOC) was detected above its USCO in one (1) sample analyzed from the previous investigations and RI. SVOCs detected above their respective RRSCOs were limited to benzo(b) fluoranthene, benzo(a)pyrene, benzo(a)anthracene, benzo(k)fluoranthene, chrysene, dibenzo(ah)anthracene, and indeno((1,2,3-cd)pyrene). The exceedances were identified at the following six (6) locations:

• Stohl Investigation: 12, 0 to 4 fbgs; 17, 4 to 8 fbgs, and 18, 4 to 9 fbgs. • Benchmark Phase II: SB-6, 0.5 to 4 fbgs. • RI: TP(SB)-13, 2 to 4 fbgs and SB-109, 0.5 to 4 fbgs.

The SVOCs detected at the Site at the locations identified above, are from fill material at these respective locations. In these instances the compound concentrations detected, slightly exceeded their respective RRSCOs and the total SVOC concentrations were well below 500 mg/kg. As shown on Table 1B, of the 32 fill materials samples analyzed for SVOCs as part of the previous investigations and RI, six (6) samples (19% of the fill material samples) exceeded their respective RRSCOs. This does not indicate that the SVOCs impacts are wide spread at the Site and appear to be limited to the fill material present in a few select locations, central (SB-109), northern-central TP(SB)-13 and small area in the southern portion of the Site (SB-6). It is not uncommon to detect SVOCs in the urban fill materials within the City of Buffalo. Native soil samples collected and analyzed as part of the RI did not contain contaminants above their respective USCOs. One (1) metal analyte, mercury, was detected above its respective RRSCOs at two (2) locations: SB-5, 2 to 4 fbgs (Benchmark Phase II) and TP(SB)-3, 0.6 to 4 feet below the basement floor collected during the RI. Both sample locations were collected from fill material present in their respective area. As shown on Table 1B, of those 27 fill material samples analyzed for metal analytes as part of the previous investigations and RI, two (2) samples (7% of the fill material samples analyzed) had an exceedance

Page 40: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,

REMEDIAL INVESTIGATION/ALTERNATIVES ANALYSIS REPORT 3 GATES CIRCLE SITE

BCP SITE NO. C915272

0309-014-001 33

of the RRSCOs for mercury only. No other analytes were detected in the 27 fill material samples above their respective RRSCO. It is not uncommon to detect metals in the urban fill materials within the City of Buffalo. Twenty-nine (29) native soil samples were collected and analyzed as part of previous investigation and the RI, and did not contain contaminants above their respective USCOs. PCBs were not detected above MDLs as part of the historic investigations or RI. PCBs are not considered to be a concern at the Site. One (1) pesticide compound, 4,4’-DDT, was detected above its USCOs at one (1) location (SB-102, 0 to 4 fbgs) but well below its RRSCO. Pesticides are not considered to be a concern at the Site. Herbicides were not detected above MDLs as part of the RI. Herbicides are not considered to be a concern at the Site. Cyanide was not detected above MDLs as part of the RI and is not considered to be a concern at the Site. Groundwater:

Two (2) VOCs (benzene and tetrachloroethene) were detected above MDLs in the groundwater samples collected as part of the RI. Benzene (2.5 ug/l) was the only compound detected above its respective GWQS/GV at MW-2, which is located on the western portion of the Site, approximately 25 feet from Delaware Avenue. The detected concentration, although above its GWQS/GV is not considered significant and VOCs are not considered to a concern in the Site groundwater. SVOCs were not detected above MDLs in the groundwater samples analyzed as part of the RI. SVOCs in groundwater are not a concern at the Site. The groundwater samples collected during the RI were analyzed for both total metals and dissolved metals due to the high turbidity in the groundwater samples collected.

Page 41: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,

REMEDIAL INVESTIGATION/ALTERNATIVES ANALYSIS REPORT 3 GATES CIRCLE SITE

BCP SITE NO. C915272

0309-014-001 34

Seven (7) analytes (cobalt, iron, lead, magnesium, manganese, sodium, and vanadium) were detected above their respective GWQS/GVs in the total metals (unfiltered) groundwater monitoring wells at the Site. However, only two (2) analytes (magnesium and sodium) were detected at one (1) location, MW-2, at concentrations above their respective GWQS/GVs in the dissolved metal samples. The analytes detected in the dissolved metal sample from MW-2 are likely associated with road salt used along Delaware Avenue, which is about 25 feet from the well location. Because the Site and surrounding area are on public water supply and the dissolved phase samples indicated only two (2) analytes, magnesium and sodium, common to road salt had exceedances of their respective GWQS/GV, metal analytes in groundwater are not considered a concern at the Site. No PCBs were detected above MDLs in the groundwater sample analyzed for PCBs as part of the RI. PCBs in groundwater are not a concern at the Site. No pesticides were detected above MDLs in the groundwater sample analyzed for pesticides as part of the RI. Pesticides in groundwater are not a concern at the Site. No herbicides were detected above MDLs in the groundwater sample analyzed for herbicides as part of the RI. Herbicides in groundwater are not a concern at the Site. Cyanide was not detected above MDLs in the groundwater samples analyzed for total cyanide as part of the RI and is not a concern at the Site. It appears that No. 6 fuel oil from the former-leaking USTs has migrated through the stone fill beneath the floor, resulting in an approximate two-foot layer of contaminated sub-base fill beneath the concrete floor in the basement of the Power Plant based on historic investigation activities. The two (2) soil probes completed as part of the RI in the eastern portion of the Power Plant did not encounter oil in the sub-base material (see Figure 5). However, the No. 6 fuel oil remaining beneath and proximate to the western portion of the building will require remedial action.

Page 42: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,

REMEDIAL INVESTIGATION/ALTERNATIVES ANALYSIS REPORT 3 GATES CIRCLE SITE

BCP SITE NO. C915272

0309-014-001 35

Radiological Survey:

The survey did not identify alpha, beta or gamma radiation at elevated levels within the individual soil/fill samples retained from the RI locations. The results of the gamma walkover survey did not identify gamma radiation at elevated levels on the exterior accessible portions of the Site.

4.5 Data Usability Summary

In accordance with the RI Work Plan, the laboratory analytical data was independently assessed and, as required, submitted for independent review. Ms. Judy Harry of Data Validation Services located in North Creek, New York performed the data usability summary assessment for the soil vapor, soil/fill and groundwater samples, which involved a review of the summary form information and sample raw data, and a limited review of associated QC raw data. Specifically, the following items were reviewed:

Laboratory Narrative Discussion Custody Documentation Holding Times Surrogate and Internal Standard Recoveries Matrix Spike Recoveries/Duplicate Recoveries Field Duplicate Correlation Preparation/Calibration Blanks Control Spike/Laboratory Control Samples Instrumental IDLs Calibration/CRI/CRA Standards ICP Interference Check Standards ICP Serial Dilution Correlations Sample Results Verification

The Data Usability Summary Reports (DUSRs) were conducted using guidance from the USEPA Region 2 validation Standard Operating Procedures, the USEPA National Functional Guidelines for Data Review, as well as professional judgment. Appendix G includes the DUSRs for the September 2010 and May 2011 analytical data, which were

Page 43: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,

REMEDIAL INVESTIGATION/ALTERNATIVES ANALYSIS REPORT 3 GATES CIRCLE SITE

BCP SITE NO. C915272

0309-014-001 36

prepared in accordance with Appendix 2B of NYSDEC’s DER-10 guidance. Those items listed above that demonstrated deficiencies are discussed in detail in the DUSR narrative sections. Analytical results were edited or qualified per the DUSR with changes reflected on the summary tables. In general, most sample results are usable either as reported or with minor qualification or edit. The following issues were noted in the DUSR:

Phenolic results were rejected in one (1) soil field duplicated (Blind Dup#2)); Results for the four (4) filtered groundwater samples for metals analysis are qualified as estimated; and Several sample detections are considered external contamination are were edited to non-detect.

The findings of the DUSR do not significantly impact the analytical data for the Site. The rejected data were in one (1) duplicate sample, for acid compounds (phenolics), which were not detected above method detection limits in other soil/fill samples at the Site. The sample detections which were considered “external contamination” and were edited to non-detect were acetone (6 soil samples), 1,2,4-trimethylbenzene (1 soil sample), selenium (13 soil samples), 4,4’-DDD (1 soil sample) and benzene (1 groundwater sample). The initial results for these compounds or analytes which were edited to non-detect, were below their respective USCOs or GWQS/GVs and do not affect the findings of the RI.

4.6 Constituents of Concern (COCs)

Based on historical investigation and the RI findings to date, the Constituents of Concern (COCs) for a restricted residential development are presented by media below:

Subsurface Soil/Fill: SVOCs, metals (specifically mercury) at select locations in the fill material present on the Site (see Figure 6). No. 6 fuel oil present beneath the Power Plant basement slab (See Figure 6).

Page 44: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,

REMEDIAL INVESTIGATION/ALTERNATIVES ANALYSIS REPORT 3 GATES CIRCLE SITE

BCP SITE NO. C915272

0309-014-001 37

5.0 FATE AND TRANSPORT OF COCS The soil/fill and groundwater sample analytical results associated with historic

investigation and the RI were incorporated with the physical characterization of the Site to evaluate the fate and transport of COCs in Site media. The mechanisms by which the COCs can migrate to other areas or media are briefly outlined below.

5.1 Fugitive Dust Generation

Volatile and non-volatile chemicals present in soil/fill can be released to ambient air as a result of fugitive dust generation. Fugitive dust generation during excavations related to construction and Site redevelopment is considered a relevant potential short-term migration pathway.

Particulate monitoring in accordance with an approved Community Air Monitoring Plan (CAMP) would be implemented during intrusive activities and, if required, dust mitigation measures will be employed during future remediation and redevelopment (if not addressed during remedial actions) minimize the potential exposure.

5.2 Volatilization

Volatile chemicals present in soil/fill and groundwater may be released to ambient air through volatilization. At this time, VOCs were not identified in soil/fill or groundwater at concentrations that would be of concern. Therefore, volatilization is not considered a relevant migration pathway.

5.3 Surface Water Runoff

Erosion and transport of surface soils and associated sorbed chemicals in surface water runoff is a potential migration pathway. The potential for soil particle transport with surface water runoff is low as the Site is predominantly covered by a structure, concrete walks and asphalt parking lot. As such, surface water runoff is not considered a relevant migration pathway.

Surface water generated during remedial excavation activities would be managed under a management plan, which would minimize or eliminate the potential of contaminated sediment particles from migrating from the Site.

Page 45: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,

REMEDIAL INVESTIGATION/ALTERNATIVES ANALYSIS REPORT 3 GATES CIRCLE SITE

BCP SITE NO. C915272

0309-014-001 38

5.4 Leaching

Chemicals present in soil have the ability to migrate downward to groundwater or deeper soils as a result of infiltration of precipitation. The Site is predominantly covered by a structures, concrete walks and asphalt parking lot that mitigates infiltration of precipitation.

The analytical results collected from the Site, indicates some SVOC impact and mercury at select locations. The samples collected from native soils and groundwater does not indicate that leaching has occurred. Therefore, leaching is not considered a relevant migration pathway.

5.5 Groundwater Transport

Overburden groundwater underlying the Site flows in a northerly direction. As described in Section 4.2, groundwater data indicates that one (1) compound, benzene, was detected slightly above its GWQS/GVs at one (1) location, MW-2. Analytical results from soil/fill samples did not detect benzene above MDLs at the Site. The close proximity of this well location (approximately 25 feet) to Delaware Avenue, a major thoroughfare in the City of Buffalo, may explain this low-level detection.

In addition, the Site and surrounding area are serviced by municipal (supplied) water. Therefore, it does not appear that groundwater is a relevant migration pathway.

5.6 Exposure Pathways

Based on the analysis of chemical fate and transport provided above, the pathways through which Site COCs could reach receptors at significant exposure point concentrations are: incidental contact with impacted Site soil/fill; fugitive dust generated from impacted fill; and surface water runoff.

Remedial activities completed in accordance with a soil/fill management plan will significantly minimize or eliminate the potential exposure associated with:

• direct contact with impacted soil/fill, • impacted soil/fill particles migration from the Site in the form of fugitive dust

and/or surface runoff.

Page 46: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,

REMEDIAL INVESTIGATION/ALTERNATIVES ANALYSIS REPORT 3 GATES CIRCLE SITE

BCP SITE NO. C915272

0309-014-001 39

During remedial action or redevelopment, the use of proper personal protective equipment (PPE) will significantly minimize or eliminate the potential exposure associated with direct contact with impacted soil/fill.

A Community Air Monitoring Program (CAMP), along with erosion and sediment control strategies will be implemented to mitigate the potential for off-site exposure.

Page 47: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,

REMEDIAL INVESTIGATION/ALTERNATIVES ANALYSIS REPORT 3 GATES CIRCLE SITE

BCP SITE NO. C915272

0309-014-001 40

6.0 QUALITATIVE EXPOSURE ASSESSMENT

6.1 Human Health Exposure Assessment

A qualitative exposure assessment consists of characterizing the exposure setting (including the physical environment and potentially exposed human populations), identifying exposure pathways, and evaluating contaminant fate and transport.

An exposure pathway describes the means by which an individual may be exposed to contaminants originating from a site. An exposure pathway has five elements:

A receptor population A contaminant source Contaminant release and transport mechanism A point of exposure A route of exposure

The receptor population is the person or group of people who are or may be exposed to contaminants at a point of exposure. The source of contamination is defined as either the source of contaminant release to the environment (e.g., a waste disposal area or point of discharge), or the impacted environmental medium (i.e., soil, air, biota, water) at the point of exposure. Contaminant release and transport mechanisms carry contaminants from the source to points where people may be exposed. The point of exposure is a location where actual or potential human contact with a contaminated medium may occur. The route of exposure is the manner in which a contaminant actually enters or contacts the body (i.e., ingestion, inhalation, dermal absorption).

An exposure pathway is complete when all five elements of an exposure pathway are documented; a potential exposure pathway exists when any one or more of the five elements comprising an exposure pathway is not documented but could reasonably occur. An exposure pathway may be eliminated from further evaluation when any one of the five elements comprising an exposure pathway does not exist in the present and will not exist in the future.

Page 48: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,

REMEDIAL INVESTIGATION/ALTERNATIVES ANALYSIS REPORT 3 GATES CIRCLE SITE

BCP SITE NO. C915272

0309-014-001 41

6.1.1 Potential Receptors

The identification of potential human receptors is based on the characteristics of the Site, the surrounding land uses, and the probable future land uses. The Site is a former commercial/medical facility primarily used for patient care and hospital administration operations, but included other supporting facilities (i.e., laboratories, research facilities, staff housing, auditorium, and a kitchen).

The Site is not currently and/or consistently occupied, but some construction/building activities are underway. The Site is located in a mixed commercial and residential area of the City of Buffalo.

Under current Site conditions, human contact with Site-related soil COCs can occur via exposure to subsurface soil by construction workers who may encounter impacted subsurface soil or airborne particulate during construction and/or servicing of utilities, if working in COC-impacted areas and not utilizing the appropriate personal protective equipment. The use of proper protective equipment will significantly reduce exposure.

6.1.2 Contaminant Source

The COCs present in Site media at elevated concentrations are generally limited to: SVOCs and mercury identified in subsurface fill/soil present in the northern-central and southern portions of the Site. No specific sources of these contaminants were identified.

6.1.3 Contaminant Release and Transport Mechanisms

Contaminant release and transport mechanisms are specific to the type of impacted media. For the current use and future (unremediated) commercial/residential use scenario, contaminant release and transport mechanisms are listed below by receptor:

Construction/Maintenance Worker: Direct contact with Site soil/fill

6.1.4 Point of Exposure

SVOCs and mercury were detected above their respective RRSCOs in soil/fill at the Site. The SVOCs and mercury were detected in subsurface soil/fill could be a point of

Page 49: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,

REMEDIAL INVESTIGATION/ALTERNATIVES ANALYSIS REPORT 3 GATES CIRCLE SITE

BCP SITE NO. C915272

0309-014-001 42

exposure by construction workers in certain areas of the property if the Site remains unremediated.

6.1.5 Route of Exposure

Based on the types of receptors and points of exposure identified above, potential routes of exposure are listed below:

Current Use Scenario

Construction Worker (short-term) – Skin contact and incidental ingestion of SVOC, No. 6 fuel oil and/or mercury impacted subsurface soils.

Future Use Scenario (Unremediated)

Construction Worker or Maintenance Worker (short-term) – Skin contact and incidental ingestion of SVOC, No. 6 fuel oil and/or mercury impacted subsurface soils.

6.1.6 Exposure Assessment Summary

Based on the above assessment of potential exposure receptors, sources, transport mechanisms, exposure points, and routes of exposure, potential exposure pathways exist if the Site is left unremediated.

Construction worker or maintenance worker contact with SVOCs, No. 6 fuel oil and/or mercury-impacted subsurface soil/fill in the northern-central and southern portions of the Site could occur. Contact could occur through direct contact with impacted soil/fill or from airborne particulate during construction and/or servicing of utilities and workers do not employ appropriate PPE.

6.2 Potential Ecological Risks

The Site is currently vacant, and was formerly used as a former commercial/medical facility with the building footprints, asphalt parking lots and concrete sidewalks covering a majority of the Site. Accordingly, the Site provides little or no wildlife habitat or food value. No natural waterways are present on or adjacent to the Site. The reasonably anticipated future use is residential/commercial within a substantial redevelopment via demolition and

Page 50: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,

REMEDIAL INVESTIGATION/ALTERNATIVES ANALYSIS REPORT 3 GATES CIRCLE SITE

BCP SITE NO. C915272

0309-014-001 43

construction of new Site buildings. As such, no unacceptable ecological risks are anticipated under the current or reasonably anticipated future use scenario.

Page 51: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,

REMEDIAL INVESTIGATION/ALTERNATIVES ANALYSIS REPORT 3 GATES CIRCLE SITE

BCP SITE NO. C915272

0309-014-001 44

7.0 PLANNED INTERIM REMEDIAL MEASURES GCH intends to address the No. 6 fuel oil impacts and residual contamination in the

vicinity of the Power Plant as an Interim Remedial Measure (IRM) based upon the presumptive nature of the cleanup (excavation and off-site disposal). As discussed in Section 1.2.1, six (6) test borings were completed through the approximate 2-foot thick concrete floor in May 2008 at several locations on the north and western portions of the Power House (see Figure 3). It appears that the No. 6 fuel oil from the former-leaking USTs has migrated through the stone fill beneath the floor, resulting in an approximate two-foot layer of contaminated sub-base fill beneath the concrete floor in the basement level of the Power Plant. The two (2) soil probes completed as part of the RI in the eastern portion of the Power Plant basement did not encounter oil in the sub-base material (see Figure 5).

The No. 6 fuel oil and petroleum-impacted soil/fill around and beneath the Power Plant on the southeastern portion of the Site are proposed to be addressed as an IRM to coincide with demolition of that structure.

A revised IRM work plan was prepared and submitted to NYSDEC for review and comment on January 29, 2015. The assumed area of the No. 6 fuel oil to be address as part of the IRM is included on Figure 6. Post excavation confirmatory samples will be collected from the excavation, with bias toward material exhibiting evidence of visual, olfactory, and/or elevated PID readings, if remaining. Sample locations from excavated areas will include samples from excavation sidewalls and bottom. One sample per 30 linear feet of sidewall and one sample for each 900 square feet of excavation bottom will be collected in accordance with DER-10.

Samples from the excavation will be analyzed for TCL VOCs plus CP-51 List VOCs via EPA Method 8260 and Part 375 and CP-51 list SVOCs via EPA Method 8270. Three (3) samples from the bottom of the excavation will also be analyzed for Part 375 list Metals via EPA Method 6010/7471 and polychlorinated biphenyls (PCBs) via EPA Method 8082. Post excavation sample results will be compared to the RRSCOs.

Although not considered environmental contaminants in their current form, GCH also intends to remove certain solid and other potential regulated waste materials that are present within the Power Plant from prior owners/occupants (e.g., oils, coolants, miscellaneous chemicals, fluorescent lamps, etc.) before the building is demolished.

Page 52: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,

REMEDIAL INVESTIGATION/ALTERNATIVES ANALYSIS REPORT 3 GATES CIRCLE SITE

BCP SITE NO. C915272

0309-014-001 45

NYSDEC approval will be obtained prior to implementing the IRM. The IRM work plan presents the scope of the planned IRM, including preparation tasks, post-demolition soil/fill handling, groundwater management, community air monitoring, post-excavation confirmatory sampling, backfill criteria, and reporting. It was prepared in general accordance with NYSDEC DER-10. In addition to the No. 6 fuel oil area, GCH is proposing to excavate the four (4) exterior areas shown on Figures 6 and 7, and further discussed in Section 8.3.2 in order to expedite the remedial efforts. These four (4) exterior areas contain SVOCs (3 areas) and mercury (1 area) in shallow fill material present in these areas. Fill materials removed from the four (4) areas will be taken to a permitted landfill facility for disposal. Prior to backfill with material compliant with the DER-10 requirements, a demarcation layer will be placed at the bottom of the excavation and the excavation will be backfilled to surface grade. It is estimated that approximately 545 cubic yards (cy) of soil/fill will be removed to a depth of 2 fbgs from these four (4) areas. The excavation work will be monitored by a qualified environmental professional under Benchmark’s employ. The lateral extent of the excavations will be based on the post- excavation sample analytical results. Post-excavation samples will be collected from the sidewalls and bottom of the excavation for analytical testing. One sample per 30 linear feet of sidewall and one sample for each 900 square feet of excavation bottom will be collected in accordance with DER-10. Confirmatory samples from the three (3) SVOC-impacted excavation areas will be analyzed for Part 375 list SVOCs via EPA Method 8270. Confirmatory samples from the one (1) mercury excavation area will be analyzed for mercury via EPA Method 7471. The Part 375 SVOC and mercury RRSCOs will be the remedial goals.

Page 53: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,

REMEDIAL INVESTIGATION/ALTERNATIVES ANALYSIS REPORT 3 GATES CIRCLE SITE

BCP SITE NO. C915273

0309-014-001

46

8.0 REMEDIAL ALTERNATIVES EVALUATION

8.1 Remedial Action Objectives

The final remedial measures for the Site must satisfy Remedial Action Objectives (RAOs). Remedial Action Objectives are site-specific statements that convey the goals for minimizing or eliminating substantial risks to public health and the environment. Per DER-10, generic RAOs associated with the Site include:

1. Groundwater: a. Public Health Protection

i. Prevent ingestion of groundwater with contaminant levels exceeding drinking water standards.

ii. Prevent contact with, or inhalation of volatiles, from contaminated groundwater.

b. Environmental Protection i. Restore ground water aquifer to pre-disposal/pre-release

conditions, to the extent practicable. 2. Soil:

a. Public Health Protection i. Prevent ingestion/direct contact with contaminated soil. ii. Prevent inhalation of or exposure from contaminants volatilizing

from contaminants in soil. b. Environmental Protection

i. Prevent migration of contaminants that would result in groundwater contamination.

ii. Prevent impacts to biota from ingestion/direct contact with soil causing toxicity or impacts from bioaccumulation through the terrestrial food chain.

3. Soil Vapor: a. Public Health Protection

i. Mitigate impacts to public health resulting from existing, or the potential for, soil vapor intrusion into buildings at a site.

In addition to achieving RAOs, NYSDEC’s Brownfield Cleanup Program calls for remedy evaluation in accordance with DER-10 Technical Guidance for Site Investigation and Remediation. Specifically, the guidance states “When proposing an appropriate remedy,

Page 54: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,

REMEDIAL INVESTIGATION/ALTERNATIVES ANALYSIS REPORT 3 GATES CIRCLE SITE

BCP SITE NO. C915273

0309-014-001

47

the person responsible for conducting the investigation and/or remediation should identify and develop a remedial action that is based on the following criteria..:”

Overall Protectiveness of Public Health and the Environment. This criterion is an evaluation of the remedy’s ability to protect public health and the environment, assessing how risks posed through each existing or potential pathway of exposure are eliminated, reduced, or controlled through removal, treatment, engineering controls, or institutional controls.

Standards, Criteria, and Guidance (SCGs). Compliance with SCGs addresses whether a remedy will meet applicable environmental laws, regulations, standards, and guidance.

Long-Term Effectiveness and Permanence. This criterion evaluates the long-term effectiveness of the remedy after implementation. If wastes or treated residuals remain on-site after the selected remedy has been implemented, the following items are evaluated: (i) the magnitude of the remaining risks (i.e., will there be any significant threats, exposure pathways, or risks to the community and environment from the remaining wastes or treated residuals), (ii) the adequacy of the engineering and institutional controls intended to limit the risk, (iii) the reliability of these controls, and (iv) the ability of the remedy to continue to meet RAOs in the future.

Reduction of Toxicity, Mobility, or Volume of Contamination through Treatment. This criterion evaluates the remedy’s ability to reduce the toxicity, mobility, or volume of Site contamination. Preference is given to remedies that permanently and significantly reduce the toxicity, mobility, or volume of the wastes at the Site.

Short-Term Impact and Effectiveness. Short-term effectiveness is an evaluation of the potential short-term adverse impacts and risks of the remedy upon the community, the workers, and the environment during construction and/or implementation. This includes a discussion of how the identified adverse impacts and health risks to the community or workers at the Site will be controlled, and the effectiveness of the controls. This criterion also includes a discussion of engineering controls that will be used to mitigate short term impacts (i.e., dust control measures), and an estimate of the length of time needed to achieve the remedial objectives.

Implementability. The implementability criterion evaluates the technical and administrative feasibility of implementing the remedy. Technical feasibility includes the difficulties associated with the construction and the ability to monitor the effectiveness of the remedy. For administrative feasibility, the availability of

Page 55: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,

REMEDIAL INVESTIGATION/ALTERNATIVES ANALYSIS REPORT 3 GATES CIRCLE SITE

BCP SITE NO. C915273

0309-014-001

48

the necessary personnel and material is evaluated along with potential difficulties in obtaining specific operating approvals, access for construction, etc.

Cost Effectiveness. Capital, operation, maintenance, and monitoring costs are estimated for the remedy and presented on a present worth basis.

Community Acceptance. This criterion evaluates the public’s comments, concerns, and overall perception of the remedy.

8.2 Future Land Use Evaluation

In developing and screening remedial alternatives, NYSDEC’s Part 375 regulations require that the reasonableness of the anticipated future land be factored into the evaluation. The regulations identify 16 criteria that must be considered. These criteria and the resultant outcome for the Site are presented in Appendix H. As indicated, this evaluation supports a mixed residential and commercial use as the reasonably anticipated future use of the Site. The proposed redevelopment of the Site for a mixed residential and commercial use is consistent with the City of Buffalo’s Buffalo Green Code (Ref. 10). Accordingly, remedial alternatives to clean up the Site to restricted residential end use are identified and evaluated herein.

Although the Site is intended to be used for mixed residential and commercial purposes, evaluating a more restricted-use scenario is a requirement of the BCP. Therefore, Tables 2A, 2B and 3 also shows historic data and RI characterization soil/fill analytical data compared to Part 375 USCOs. Per NYSDEC DER-10, evaluation of a “no-action” alternative is also required to provide a baseline for comparison against other alternatives. The remedial alternatives discussed in greater detail in Section 8.3 below include:

No Further Action

Track 4 Restricted Residential Soil Cleanup Track 2 Restricted Residential Soil Cleanup Unrestricted Use Cleanup

8.3 Alternatives Evaluation

The following sections include a series of remedial action alternatives that could potentially be implemented at the Site, which are compared to the criteria listed in Section

Page 56: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,

REMEDIAL INVESTIGATION/ALTERNATIVES ANALYSIS REPORT 3 GATES CIRCLE SITE

BCP SITE NO. C915273

0309-014-001

49

8.1. The remedial alternatives are evaluated in order of least comprehensive to most comprehensive. Table 5 provides a cost summary of for each alternative evaluated below.

For purposes of developing the remedial alternatives, it has been assumed that the No. 6 fuel oil contamination associated with the Power Plant will addressed as an IRM as discussed in Section 7.0. Therefore, this remedial action and the associated costs to address the No. 6 fuel oil have not been included in the remedial alternative evaluations discussed below.

8.3.1 Alternative #1- No Further Action

Under this alternative, the Site would remain in its current state, with no controls in-place.

Overall Protection of Public Health and the Environment – This alternative does

not reduce the risk of exposure for human health and the environment. The Site as it exists is not fully protective of human health and the environment due to the presence of SVOCs and mercury in the subsurface fill, and the absence of institutional controls to prevent more restrictive forms of future Site use (e.g., unrestricted, residential). Uncontrolled access to the Site could lead to potential exposure to impacted fill soil if intrusive work were performed at the Site and workers are unaware or untrained regarding the contaminants.

Compliance with SCGs – Under the current and reasonably anticipated future

restricted residential use scenario, elevated concentrations of SVOCs and mercury are present in subsurface fill soil which should be addressed considering the residential redevelopment planned.

Long-Term Effectiveness and Permanence – The no further action alternative

involves no additional remediation, engineering or institutional controls, and provides no long-term effectiveness toward achieving the RAOs.

Reduction of Toxicity, Mobility, or Volume – The no further action alternative

does not reduce the toxicity, mobility, or volume of fill soil contaminants present; therefore, no further action does not fully satisfy the RAOs for a restricted residential redevelopment.

Page 57: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,

REMEDIAL INVESTIGATION/ALTERNATIVES ANALYSIS REPORT 3 GATES CIRCLE SITE

BCP SITE NO. C915273

0309-014-001

50

Short-Term Impact and Effectiveness – No potential short-term adverse

environmental impacts and human exposures are anticipated during the implementation of this alternative since there are no remedial activities involved.

Implementability – No technical or administrative implementability issues are

associated with the no further action alternative. Cost – There would be no capital or long-term operation, maintenance, or

monitoring costs associated with the no further action alternative (see Table 6).

Community Acceptance – Community acceptance will be evaluated based on comments to be received from the public in response to Fact Sheets and other planned Citizen Participation activities.

8.3.2 Alternative #2- Track 4 Restricted Residential Soil Cleanup: Fill Soil

Excavation and Cover System

The alternative includes the following components: Soil Excavation Activities to address impacted fill material areas containing SVOCs above their respective RRSCOs in the upper 2 feet on the exterior portions of the Site (see Figure 7). Detections of SVOCs and mercury detected beneath the existing buildings are at depths greater than 2 fbgs, given the basement floor grades of the Site building vary from about 4 fbgs (northern portion of the Site) to 12 fbgs (southern portion) and would not require excavation action under a Track 4 cleanup scenario. A cover system, as discussed below, would be used to cover the materials above the RRSCO remaining on-Site. Cover System consisting of building footprint/foundations, asphalt parking lots, concrete walkways, NYSDEC acceptable backfill, and vegetative cover would be utilized at the Site. Based on the analytical data from the previous investigations and the RI, soil/fill for the cover system would only need to the installed in the areas proposed to be excavated under this scenario. Shallow surface soils (upper 2 feet) or existing cover (building foundations, concrete sidewalks, and asphalt cover) are suitable to be used as part of the cover system. As shown on Table 1B and the table provided in Section 4, only 19%

Page 58: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,

REMEDIAL INVESTIGATION/ALTERNATIVES ANALYSIS REPORT 3 GATES CIRCLE SITE

BCP SITE NO. C915273

0309-014-001

51

of the fill samples submitted for SVOC analysis and 7% of the fill samples submitted for metals analysis had exceedances of their respective RRSCOs. The locations of the acceptable fill soil (below RRSCOs) and fill samples that had exceedances of the RRSCOs is provided on Figure 10. Figure 11 identifies the location of fill material exceedances with RRSCO exceedance data. The cover system is depicted on Figure 13. Implementation of a Site Management Plan (SMP). The fill/soil that has exceedances of the RRSCOs and is deeper than 2 fbgs (TP(SB)-3, TP(SB)-13, and SB-109) that will remain in place as well, as the cover system, will be managed in accordance with the SMP. The SMP will include:

o Institutional Controls and Engineering Controls (IC/EC) Plan. Engineering controls include any physical barrier or method employed to actively or passively contain, stabilize, or monitor contaminants; restrict the movement of contaminants; or eliminate potential exposure pathways to contaminants. Institutional controls at the site will include groundwater use restrictions and use restrictions of the Site to restricted residential use;

o Operation and Maintenance Plan that describes the measures necessary to operate, monitor, and maintain the soil cover;

o Excavation Work Plan to assure that future intrusive activities and soil/fill handling at the Site are completed in a safe and environmentally responsible manner;

o Site Monitoring Plan that includes: provisions for Site-wide inspection program to assure that the IC/ECs have not been altered and remain effective; and,

o Environmental Easement filed with Erie County. As discussed in Section 7.0, the No. 6 fuel oil impacts and residual contamination in

the vicinity of the Power Plant will be addressed as an IRM based upon the presumptive nature of the cleanup (excavation and off-site disposal). Post excavation soil samples will be compared to the Part 375 RRSCOs for VOCs, SVOCs and metals as discussed in the IRM work plan. Therefore the No. 6 fuel oil impacted soil/fill are not included in the evaluations below.

Overall Protection of Public Health and the Environment – The Site as it exists is not fully protective of human health and the environment for a residential redevelopment due to the presence of elevated SVOCs and mercury in subsurface fill material present in the

Page 59: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,

REMEDIAL INVESTIGATION/ALTERNATIVES ANALYSIS REPORT 3 GATES CIRCLE SITE

BCP SITE NO. C915273

0309-014-001

52

upper 2 fbgs, and the absence of institutional controls to prevent more restrictive forms of future site use (e.g., unrestricted). This alternative would be protective of public health and the environment as it would reduce the potential exposure to subsurface fill material contamination. The fill/soil that has exceedances of the RRSCOs and is deeper than 2 fbgs (TP(SB)-3, TP(SB)-13, and SB-109) that will remain in place will be managed in accordance with the SMP. The SMP will include appropriate plans, controls and measures and an environmental easement to ensure the restricted use remedy is protective of human health and the environment. Therefore, this alternative meets the RAOs.

Compliance with SCGs – Compliance with the SCGs would be achieved by excavation of the SVOCs and mercury-impacted areas in the fill material present in the upper 2 feet at the Site and replacement with soils meeting RRSCOs, and/or construction of other acceptable forms of cover to assure that the site is covered by at least 2 feet of clean soil or 6 inches of hardscape (building, asphalt, concrete). The clean cover will mitigate contact with underlying soils where RRSCO exceedances remain.

The fill/soil that has exceedances of the RRSCOs and is deeper than 2 fbgs (TP(SB)-3, TP(SB)-13, and SB-109) that will remain in place will be managed in accordance with the SMP. The SMP will include appropriate plans, controls, and measures and an environmental easement to ensure that the cover is maintained and that the restricted use remedy remains protective of human health and the environment. This would achieve compliance with a restricted residential Track 4 cleanup.

Long-Term Effectiveness and Permanence – This alternative is expected to

provide long-term effectiveness by addressing SVOC and mercury-impacted areas in the fill material in the upper 2 feet present at the Site and by maintenance of the cover system to prevent exposure to any remaining subsurface soils below that depth.

The fill/soil that has exceedances of the RRSCOs and is deeper than 2 fbgs (TP(SB)-3, TP(SB)-13, and SB-109) that will remain in place will be managed in accordance with the SMP. The SMP will include appropriate plans, controls, and measures and an environmental easement to ensure the restricted use remedy is protective of human health and the environment. The SMP will be followed by the current Site owner as well as future Site

Page 60: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,

REMEDIAL INVESTIGATION/ALTERNATIVES ANALYSIS REPORT 3 GATES CIRCLE SITE

BCP SITE NO. C915273

0309-014-001

53

owners. As such, this alternative is expected to provide long-term effectiveness and permanence.

Reduction of Toxicity, Mobility, or Volume – Reduction of toxicity, mobility or

volume would be achieved by excavation and offsite disposal of the SVOC and mercury-impacted areas in the fill material present in the upper 2 feet present at the Site. The fill/soil that has exceedances of the RRSCOs and is deeper than 2 fbgs (TP(SB)-3, TP(SB)-13, and SB-109) that will remain in place will be managed in accordance with the SMP. The SMP will include appropriate plans, controls, and measures and an environmental easement to ensure the restricted use remedy is protective of human health and the environment. Accordingly, this alternative satisfies this criterion.

Short-Term Impact and Effectiveness – There are potential short-term impacts

associated with this alternative.

There is potential for impacts to human health (workers and construction personnel) due to direct contact with impacted soil and particulate releases. This alternative would require the preparation of a health and safety plan (HASP) to identify proper personal protective equipment required as well as the proper site and community air monitoring, as outlined in the NYSDOH Generic Community Air Monitoring Plan (CAMP), in order to mitigate potential adverse conditions.

Contamination of equipment used for excavation purposes could carry contamination off-site. Therefore, equipment will be decontaminated prior to leaving the Site, as necessary, in order to avoid the transport of contaminants.

Field personnel would wear appropriate personal protective equipment during excavation in order to limit health risks due to exposure to contaminants and physical hazards.

Page 61: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,

REMEDIAL INVESTIGATION/ALTERNATIVES ANALYSIS REPORT 3 GATES CIRCLE SITE

BCP SITE NO. C915273

0309-014-001

54

Human health and the environment would be protected under this alternative if the HASP and CAMP are properly implemented. This alternative is expected to meet the soil remedial action objectives at completion of the excavations, because the impacted soil will be removed from the Site. Confirmatory soil sampling would be performed to verify the alternatives effectiveness.

This alternative would have short term effectiveness. The removal of impacted fill material would remove the contaminants above their respective RRSCOs.

Implementability – Implementation of the fill material excavations and cover

system alternative would not be subject to special technical implementability issues. No action-specific administrative implementability issues are associated with this alternative.

Cost – The capital costs for this alternative are estimated at approximately $129,000

and the annual certification reporting is estimated at approximately $2,500 per year. Table 6 provides a summary of costs for this alternative.

Community Acceptance – Community acceptance will be evaluated based on

comments to be received from the public in response to Fact Sheets and other planned Citizen Participation activities.

8.3.3 Alternative #3 - Track 2 Restricted Residential Soil Cleanup: Fill

Material Excavation

The alternative includes the following components: Soil Excavation Activities to address impacted fill material impacted with SVOCs and mercury that exceed their respective RRSCOs in the upper 15 fbgs at the Site (see Figure 8). Environmental Easement filed with Erie County.

Page 62: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,

REMEDIAL INVESTIGATION/ALTERNATIVES ANALYSIS REPORT 3 GATES CIRCLE SITE

BCP SITE NO. C915273

0309-014-001

55

Overall Protection of Public Health and the Environment – The Site as it exists is not fully protective of human health and the environment for a residential redevelopment due to the presence of elevated SVOCs and mercury in subsurface fill materials, and the absence of institutional controls to prevent more restrictive forms of future site use (e.g., unrestricted). This alternative would be protective of public health and the environment as it would be expected to reduce the potential exposure to subsurface fill contamination. The environmental easement will ensure the restricted use remedy is protective of human health and the environment. Therefore, this alternative meets the RAOs.

Compliance with SCGs – Compliance with the SCGs would be achieved by excavation of the SVOCs and metals-impacted fill material exceeding the RRSCOs present in the upper 15 fbgs at the Site.

The environmental easement to ensure the restricted use remedy is protective of human health and the environment. This would achieve compliance with a restricted residential Track 2 cleanup.

Long-Term Effectiveness and Permanence – This alternative is expected to

provide long-term effectiveness by addressing SVOC and mercury-impacted areas present in fill material in the upper 15 feet present at the Site. The environmental easement will ensure the restricted use remedy is protective of human health and the environment. As such, this alternative is expected to provide long-term effectiveness and permanence.

Reduction of Toxicity, Mobility, or Volume – Reduction of toxicity, mobility or

volume would be achieved by excavation of the SVOCs and mercury-impacted fill material above the RRSCOs present in the upper 15 fbgs of the Site. The environmental easement will ensure the restricted use remedy is protective of human health and the environment. Accordingly, this alternative satisfies this criterion.

Short-Term Impact and Effectiveness – There are potential short-term impacts

associated with this alternative.

Page 63: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,

REMEDIAL INVESTIGATION/ALTERNATIVES ANALYSIS REPORT 3 GATES CIRCLE SITE

BCP SITE NO. C915273

0309-014-001

56

There is potential for impacts to human health (workers and construction personnel) due to direct contact with impacted soil and particulate releases. This alternative would require the preparation of a health and safety plan (HASP) to identify proper personal protective equipment required as well as the proper site and community air monitoring, as outlined in the NYSDOH Generic Community Air Monitoring Plan (CAMP), in order to mitigate potential adverse conditions.

Contamination of equipment used for excavation purposes could carry contamination off-site. Therefore, equipment will be decontaminated prior to leaving the Site, as necessary, in order to avoid the transport of contaminants.

Field personnel would wear appropriate personal protective equipment during excavation in order to limit health risks due to exposure to contaminants and physical hazards.

Human health and the environment would be protected under this alternative if the HASP and CAMP are properly implemented. This alternative is expected to meet the soil remedial action objectives at completion of the excavations, because the impacted soil will be removed from the Site. Confirmatory soil sampling would be performed to verify the alternatives effectiveness.

This alternative would have short term effectiveness. The removal of impacted soil/fill would remove the potential exposure.

Implementability – Implementation of the fill material excavations would not be

subject to special technical implementability issues. No action-specific administrative implementability issues are associated with this alternative.

Page 64: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,

REMEDIAL INVESTIGATION/ALTERNATIVES ANALYSIS REPORT 3 GATES CIRCLE SITE

BCP SITE NO. C915273

0309-014-001

57

Cost – The capital costs for this alternative are estimated at approximately $472,000 and the annual certification reporting is estimated at approximately $2,500 per year. Table 8 provides a summary of costs for this alternative.

Community Acceptance – Community acceptance will be evaluated based on

comments to be received from the public in response to Fact Sheets and other planned Citizen Participation activities.

8.3.4 Alternative #4 - Unrestricted Use Alternative

An Unrestricted Use alternative would necessitate remediation of all soil/fill where concentrations exceed the 6NYCRR Part 375 Unrestricted Use SCOs. For Unrestricted Use scenarios, excavation and off-site disposal of impacted soil/fill is generally regarded as the most applicable remedial measure, because institutional controls cannot be used to supplement the remedy. As such, the Unrestricted Use alternative assumes that those areas with constituents above Unrestricted Use SCOs would be excavated and disposed at an off-Site commercial solid waste landfill. Following removal and confirmatory sampling of the excavation, the areas would be backfilled with clean soil/fill that meet the requirements of NYSDEC DER-10 to match the surrounding grade.

Subsurface soil/fill samples indicate concentrations of VOCs, SVOCs, metals, and pesticides are present in unsaturated soil above Unrestricted Use SCOs. It is likely that a significant portion of the fill material present in the eastern and northern-central portion of the Site would require excavation and off-site disposal. These areas of the Site and the estimated excavation depths are shown on Figure 9.

Overall Protection of Public Health and the Environment – The Unrestricted

Use alternative would achieve the corresponding Part 375 USCOs, which are designed to be protective of human health under any reuse scenario.

Compliance with SCGs – The Unrestricted Use alternative would be performed in

accordance with applicable, relevant, and appropriate standards, guidance, and criteria.

Page 65: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,

REMEDIAL INVESTIGATION/ALTERNATIVES ANALYSIS REPORT 3 GATES CIRCLE SITE

BCP SITE NO. C915273

0309-014-001

58

Long-Term Effectiveness and Permanence – The Unrestricted Use alternative would involve removal of all impacted soil/fill; therefore, no soil/fill exceeding the Unrestricted Use SCOs would remain on the Site.

Reduction of Toxicity, Mobility, or Volume with Treatment – Through removal

of impacted soil/fill, the Unrestricted Use alternative would permanently and significantly reduce the toxicity, mobility, and volume of Site contamination.

Short-Term Impact and Effectiveness – There are several potential short-term

impacts associated with this alternative.

There is potential for impacts to human health (workers and construction personnel) due to direct contact with impacted soil and particulate releases. This alternative would require the preparation of a health and safety plan (HASP) to identify proper personal protective equipment required as well as the proper site and community air monitoring, as outlined in the NYSDOH Generic Community Air Monitoring Plan (CAMP), in order to mitigate potential adverse conditions.

Contamination of equipment used for excavation purposes could carry contamination off-site. Therefore, equipment will be decontaminated prior to leaving the Site, as necessary, in order to avoid the transport of contaminants.

Field personnel would wear appropriate personal protective equipment during excavation in order to limit health risks due to exposure to contaminants and physical hazards.

Human health and the environment would be protected under this alternative if the HASP and CAMP are properly implemented. This

Page 66: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,

REMEDIAL INVESTIGATION/ALTERNATIVES ANALYSIS REPORT 3 GATES CIRCLE SITE

BCP SITE NO. C915273

0309-014-001

59

alternative is expected to meet the soil remedial action objectives at completion of the excavations, because the impacted soil will be removed from the Site. Confirmatory soil sampling would be performed to verify the alternatives effectiveness.

This alternative would have short term effectiveness. The removal of impacted soil/fill would remove the potential exposure.

Implementability – Implementation of the soil/fill excavations at the Site would not

be subject to special technical implementability issues. However, excavation activities would have to occur after building demolition.

No action-specific administrative implementability issues are associated with this alternative.

Cost – The capital costs for Unrestricted Use Cleanup is approximately $1,786,000,

which includes costs of soil/fill removal and disposal. Table 8 provides a summary of costs for this alternative.

Community Acceptance – Community acceptance will be evaluated based on comments to be received from the public in response to Fact Sheets and other planned Citizen Participation activities.

8.4 Recommended Remedial Measure

Based on the Remedial Alternatives Analysis evaluation, Alternative #2, Track 4 Restricted Residential Soil Cleanup consisting of fill/soil excavations and cover system fully satisfies the remedial action objectives. This alternative includes the following components:

Soil Excavation Activities to address the fill/soil material impacted with SVOCs and metals that exceed their respective RRSCOs in the upper 2 fbgs at the Site (see Figure 7). Cover System consisting of building footprints, asphalt parking lots, concrete walkways and NYSDEC acceptable backfill and vegetative cover would be utilized at the Site.

Page 67: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,

REMEDIAL INVESTIGATION/ALTERNATIVES ANALYSIS REPORT 3 GATES CIRCLE SITE

BCP SITE NO. C915273

0309-014-001

60

Site Management Plan implementation. The fill/soil that has exceedances of the RRSCOs and is deeper than 2 fbgs (TP(SB)-3, TP(SB)-13, and SB-109) that will remain in place will be managed in accordance with the SMP. Environmental Easement filed with Erie County.

This alternative was selected based on following: Overall Protection of Public Health and the Environment – This alternative would be protective of public health and the environment as it would reduce the potential exposure to subsurface fill material contamination. The SMP will include appropriate plans, controls and measures and an environmental easement to ensure the restricted use remedy is protective of human health and the environment. Therefore, this alternative meets the RAOs. Compliance with SCGs – Compliance with the SCGs would be achieved by excavation of the SVOCs and mercury-impacted areas in the fill material present in the upper 2 feet at the Site exceeding the RRSCOs and replacement with soils meeting RRSCOs, and/or construction of other acceptable forms of cover to assure that the site is covered by at least 2 feet of clean soil or 6 inches of hardscape (building, asphalt, concrete). The clean cover will mitigate contact with underlying soils where RRSCO exceedances remain. The fill/soil that has exceedances of the RRSCOs and is deeper than 2 fbgs (TP(SB)-3, TP(SB)-13, and SB-109) that will remain in place will be managed in accordance with the SMP. A SMP will be implemented that will include appropriate plans, controls, and measures and an environmental easement to ensure that the cover is maintained and that the restricted use remedy remains protective of human health and the environment. This would achieve compliance with a restricted residential Track 4 cleanup. Long-Term Effectiveness and Permanence – This alternative is expected to provide long-term effectiveness by addressing SVOC and mercury-impacted areas in the fill material present in the upper 2 feet at the Site exceeding the RRSCOs and by

Page 68: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,

REMEDIAL INVESTIGATION/ALTERNATIVES ANALYSIS REPORT 3 GATES CIRCLE SITE

BCP SITE NO. C915273

0309-014-001

61

maintaining the cover system to prevent exposure to any remaining subsurface soils below that depth.

The fill/soil that has exceedances of the RRSCOs and is deeper than 2 fbgs (TP(SB)-3, TP(SB)-13, and SB-109) that will remain in place will be managed in accordance with the SMP. A SMP will be implemented that will include appropriate plans, controls, and measures and an environmental easement to ensure the restricted use remedy is protective of human health and the environment. The SMP will be followed by the current Site owner as well as future Site owners. As such, this alternative is expected to provide long-term effectiveness and permanence.

Reduction of Toxicity, Mobility, or Volume – Reduction of toxicity, mobility or volume would be achieved by excavation and offsite disposal of the SVOC and metals-impacted areas in the fill material present in the upper 2 feet present at the Site. The fill/soil that has exceedances of the RRSCOs and is deeper than 2 fbgs (TP(SB)-3, TP(SB)-13, and SB-109) that will remain in place will be managed in accordance with the SMP. A SMP will be implemented that will include appropriate plans, controls, and measures and an environmental easement to ensure the restricted use remedy is protective of human health and the environment. Accordingly, this alternative satisfies this criterion.

Short-Term Impact and Effectiveness – There are several potential short-term impacts associated with this alternative that can be addressed through proper health and safety and community monitoring. This alternative would have short term effectiveness as the removal of impacted soil/fill would remove the potential exposure.

Implementability – Implementation of this alternative would not be subject to special technical or action specific implementability issues.

Page 69: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,

REMEDIAL INVESTIGATION/ALTERNATIVES ANALYSIS REPORT 3 GATES CIRCLE SITE

BCP SITE NO. C915273

0309-014-001

62

Cost – The capital costs for this alternative are estimated at approximately $129,000 and the annual certification reporting is estimated at approximately $2,500 per year. Table 6 provides a summary of costs for this alternative.

Based on the above analysis, Alternative #2- Track 4 Restricted Residential Soil Cleanup: Fill Material Excavation, Cover System, SMP and Environmental Easement is the recommended final remedial approach for the Site.

Page 70: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,

REMEDIAL INVESTIGATION/ALTERNATIVES ANALYSIS REPORT 3 GATES CIRCLE SITE

BCP SITE NO. C915273

0309-014-001

63

9.0 FINDINGS AND CONCLUSIONS

9.1 Remedial Investigation

Based on the data collected during historic investigations and the NYSDEC-approved RI presented in the preceding sections, we offer the following summary and conclusions.

Surface Soils: No samples were collected from surface soils as the majority of the Site is covered by buildings, asphalt parking or concrete walkways. The small amount of existing surface soil that is present is covered with topsoil and current vegetation will likely be disturbed during redevelopment. Subsurface Soils: VOCs are not considered to be a concern at the Site. One (1) VOC, naphthalene (generally considered to be a SVOC) was detected above its USCO in one (1) sample analyzed from the previous investigations and RI. SVOCs detected above their respective RRSCOs were limited to benzo(b) fluoranthene, benzo(a)pyrene, benzo(a)anthracene, benzo(k)fluoranthene, chrysene, dibenzo(ah)anthracene, and indeno((1,2,3-cd)pyrene). The exceedances were identified at the following six (6) locations:

• Stohl Investigation: 12, 0 to 4 fbgs; 17, 4 to 8 fbgs, and 18, 4 to 9 fbgs. • Benchmark Phase II: SB-6, 0.5 to 4 fbgs. • RI: TP(SB)-13, 2 to 4 fbgs and SB-109, 0.5 to 4 fbgs.

The SVOCs detected at the Site, as identified above, are from fill material at a few select locations. As shown on Table 1B and Figure 10, of the 32 fill materials samples analyzed for SVOCs as part of the previous investigations and RI, six (6) samples (19% of the fill material samples) exceeded their respective RRSCOs. This

Page 71: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,

REMEDIAL INVESTIGATION/ALTERNATIVES ANALYSIS REPORT 3 GATES CIRCLE SITE

BCP SITE NO. C915273

0309-014-001

64

does indicates that the SVOCs impacts are not wide spread at the Site and appear to be limited to the fill material present in a few select locations, northern-central (SB-109), northern-central TP(SB)-13 and small area in the southern portion of the Site (SB-6). In all instances total SVOC concentrations were present at levels well below 500 mg/kg. It is not uncommon to detect SVOCs in the urban fill materials within the City of Buffalo. Native soil samples collected and analyzed as part of the RI did not contain contaminants above their respective USCOs. One (1) metal analyte, mercury, was detected above its respective RRSCOs at two (2) locations: SB-5, 2 to 4 fbgs (Benchmark Phase II) and TP(SB)-3, 0.6 to 4 feet below the basement floor collected during the RI. Both sample locations were collected from fill material present in their respective area. As shown on Table 1B, of the 27 fill materials samples analyzed for metal analytes as part of the previous investigations and RI, two (2) samples (7% of the fill material samples analyzed) had an exceedance of the RRSCOs and in both samples the analyte was mercury only. No other analytes were detected in the 27 fill material samples above their respective RRSCO. The twenty-nine (29) native soil samples collected and analyzed as part of previous investigation and the RI, and did not contain contaminants above their respective USCOs. The metal analyte impacts are not significant at the Site and appear to be limited to the two (2) isolated locations, one in the northern-central (TP(SB)-3) and a small area in the southern portion of the Site (SB-5). It is not uncommon to detect metals in the urban fill materials within the City of Buffalo. Native soil samples collected and analyzed as part of the RI did not contain contaminants above their respective USCOs. PCBs were not detected above MDLs as part of the historic investigations or RI. PCBs are not considered to be a concern at the Site.

Page 72: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,

REMEDIAL INVESTIGATION/ALTERNATIVES ANALYSIS REPORT 3 GATES CIRCLE SITE

BCP SITE NO. C915273

0309-014-001

65

One (1) pesticide compound, 4,4’-DDT, was detected above its USCOs at one (1) location (SB-102, 0 to 4 fbgs) but well below its RRSCO. Pesticides are not considered to be a concern at the Site. Herbicides were not detected above MDLs as part of the RI. Herbicides are not considered to be a concern at the Site. Cyanide was not detected above MDLs as part of the RI and is not considered to be a concern at the Site.

Groundwater:

Two (2) VOCs (benzene and tetrachloroethene) were detected above MDLs in the groundwater samples collected as part of the RI. Benzene (2.5 ug/l) was the only compound detected above its respective GWQS/GV at MW-2, which is located on the western portion of the Site, approximately 25 feet from Delaware Avenue. The detected concentration, although above its GWQS/GV is not considered significant and VOCs are not considered to a concern in the Site groundwater. SVOCs were not detected above MDLs in the groundwater samples analyzed as part of the RI. SVOCs in groundwater are not a concern at the Site. The groundwater samples collected during the RI were analyzed for both total metals and dissolved metals. Seven (7) analytes (cobalt, iron, lead, magnesium, manganese, sodium, and vanadium) were detected above their respective GWQS/GVs in the total metals (unfiltered) groundwater monitoring wells at the Site. The detected concentrations of cobalt (10.7 ug/l), lead (40.9 ug/l), magnesium (368.5 ug/l and 441.7 ug/l) and vanadium (20.6 ug/l) slightly exceeded their respective GWQS/GVs and were not wide spread with limited detections. The elevated concentrations of iron are likely associated with the turbidity levels in the groundwater samples. The turbidity of monitoring wells MW-1, -2 and -3 were greater than 1,000 NTUs with iron concentrations ranging from 4,500 ug/l to 15,000

Page 73: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,

REMEDIAL INVESTIGATION/ALTERNATIVES ANALYSIS REPORT 3 GATES CIRCLE SITE

BCP SITE NO. C915273

0309-014-001

66

ug/l. The turbidity at MW-4 was approximately 500 NTUs and the concentration of iron detected was 355 ug/l, slightly above its GWQS/GV of 300 ug/l. The detection of magnesium and sodium in the four (4) monitoring well locations is likely associated with road salt use at the former hospital and city streets surrounding the Site. Due to the high turbidity discussed above, additional sample volume was collected and filtered at the laboratory and also analyzed for metals. The analytes (sodium and magnesium) detected in the dissolved metal sample from MW-2 is likely associated with road salt used along Delaware Avenue, which is about 25 feet from the well location. Metal analytes in groundwater are not a concern at the Site. No PCBs were detected above MDLs in the groundwater sample analyzed for PCBs as part of the RI. PCBs in groundwater are not a concern at the Site. No pesticides were detected above MDLs in the groundwater sample analyzed for pesticides as part of the RI. Pesticides in groundwater are not a concern at the Site. No herbicides were detected above MDLs in the groundwater sample analyzed for herbicides as part of the RI. Herbicides in groundwater are not a concern at the Site. Cyanide was not detected above MDLs in the groundwater samples analyzed for total cyanide as part of the RI and is not a concern at the Site. It appears that No. 6 fuel oil from the former-leaking USTs has migrated through the stone fill beneath the floor, resulting in an approximate two-foot layer of contaminated sub-base fill beneath the concrete floor in the basement of the Power Plant based on historic investigation activities. The two (2) soil probes completed as part of the RI in the eastern portion of the Power Plant did not encounter oil in the sub-base material (see Figure 5). However, the No. 6 fuel oil remaining beneath and proximate to the western portion of the building will require remedial action. Radiological Survey:

Page 74: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,

REMEDIAL INVESTIGATION/ALTERNATIVES ANALYSIS REPORT 3 GATES CIRCLE SITE

BCP SITE NO. C915273

0309-014-001

67

The survey did not identify alpha, beta or gamma radiation at elevated levels within the individual soil/fill samples retained from the RI locations. The results of the gamma walkover survey did not identify gamma radiation at elevated levels on the exterior accessible portions of the Site.

9.2 Remedial Alternatives Analysis

An Alternatives Analysis was completed to evaluate potential remedial alternatives that satisfy site-specific remedial action objectives. Based on that analysis, the selected remedy Alternative #2 - Track 4 Restricted Residential Soil Cleanup, includes fill material excavation, cover system, SMP and an Environmental Easement, which fully satisfies the remedial action objectives. This alternative includes the following components:

Soil Excavation Activities to address the fill/soil material impacted with SVOCs and metals that exceed their respective RRSCOs in the upper 2 fbgs at the Site (see Figure 7). The fill/soil that has exceedances of the RRSCOs and is deeper than 2 fbgs (TP(SB)-3, TP(SB)-13, and SB-109) that will remain in place, as well as the cover system, will be managed in accordance with the SMP. Cover System consisting of building footprints, asphalt parking lots, concrete walkways, NYSDEC acceptable backfill, and vegetative cover would be utilized at the Site. Site Management Plan implementation. Environmental Easement filed with Erie County.

The selected remedial alternative fully satisfies the remedial action objectives and is

protective of human health and the environment under the Track 4 cleanup requirements. Therefore, this alternative is the recommended final remedial approach for the 3 Gates Circle Site.

An electronic copy of this report is presented in Appendix I.

Page 75: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,

REMEDIAL INVESTIGATION/ALTERNATIVES ANALYSIS REPORT 3 GATES CIRCLE SITE

BCP SITE NO. C915273

0309-014-001

68

10.0 REFERENCES

1. Benchmark Environmental Engineering & Science, PLLC. Remedial Investigation / Alternative Analysis Work Plan, 3 Gates Circle Site, BCP Site No. C915272, Buffalo, New York, prepared for Chapin Place MAR, LLC, Revised October 2013.

2. Benchmark Environmental Engineering & Science, PLLC. Remedial Investigation Work Plan Addendum, 3 Gates Circle Site (BCP Site No. C915272) prepared for NYSDEC, October 7, 2014.

3. Stohl Environmental. Hazardous Materials Assessment, Millard Fillmore Gates Hospital, 3 Gates Circle, Buffalo, New York 14209, prepared for Architectural Resources, July 20, 2012.

4. Benchmark Environmental Engineering & Science, PLLC. Phase I/II Environmental Site Assessment, Former Millard Fillmore Hospital, Buffalo, New York, prepared for Chason Affinity Companies, LLC, November 2012.

5. New York State Department of Environmental Conservation. DER-10 - Technical Guidance for Site Investigation and Remediation, dated May 2010.

6. United States Department of Agriculture, Soil Conservation Services, Soil Survey of Erie County, New York, dated December 1986.

7. New York State Department of Health, Final Guidance for Evaluating Soil Vapor Intrusion in the State of New York, dated October 2006.

8. Edward J. Buehler and Irving H. Tesmer, Geologic Map of Erie County, New York Bedrock Geology, dated 1963.

9. Professional Services Industries Engineering, PLLC. Geotechnical Engineering Services Report, Proposed Canterbury Woods Six-Story Retirement Home Facility, 3 Gates Circle, Buffalo, Erie County, New York, 14209, prepared for Canterbury Woods, July 22, 2014.

10. Camiros. Buffalo Green Code, Unified Development Ordinance, Public Review Draft. Prepared for The City of Buffalo, Mayor’s Office of Strategic Planning, May 2014.

Page 76: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,

REMEDIAL INVESTIGATION/ALTERNATIVES ANALYSIS REPORT 3 GATES CIRCLE

BCP SITE NO. C915272

0309-014-001

TABLES

Page 77: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,

TABLE 1

SUMMARY OF REMEDIAL INVESTIGATION SAMPLING AND ANALYSIS PROGRAM

REMEDIAL INVESTIGATION / ALTERNATIVE ANALYSIS REPORT

TCL

VOC

s +

CP-

51

TCL

VOC

s

TCL

SVO

Cs

SVO

Cs

Bas

e N

eutr

als

PCB

s

Pest

icid

es

Her

bici

des

RC

RA

8 M

etal

s

RC

RA

8 M

etal

s (D

isso

lved

)

TAL

Met

als

TAL

Met

als

(Dis

solv

ed)

Tota

l Cya

nide

Subsurface Soil/Fill TP(SB)-1 0.7-4 X X 10/24/2014 DuplicateTP(SB)-1 8-10 X X 10/24/2014TP(SB)-2 0.7-2 X X 10/24/2014TP(SB)-2 8-10 X X 10/24/2014TP(SB)-3 0.6-4 X X X X X X 10/27/2014 MS/MSDTP(SB)-3 14-16 X X X X X X 10/27/2014TP(SB)-4 0.7-2.0 X X 10/24/2014TP(SB)-4 4-6 X X 10/24/2014TP(SB)-5 0.7-2 X X 10/24/2014TP(SB)-5 4-6 X X 10/24/2014TP(SB)-6 0.7-2 X X 10/27/2014TP(SB)-6 14-15.5 X X 10/27/2014TP(SB)-7 0.7-2 X X 10/23/2014TP(SB)-7 8-10 X X 10/23/2014TP(SB)-8 0.7-2 X X 10/23/2014TP(SB)-8 6-8 X X 10/23/2014TP(SB)-9 0.7-2 X X X X X X 10/24/2014TP(SB)-9 6-8 X X X X X X 10/24/2014 DuplicateTP(SB)-10 0.7-4 X X 10/27/2014 MS/MSDTP(SB)-10 14-16 X X 10/27/2014TP(SB)-11 0.5-2 X X X 10/27/2014TP(SB)-11 6 - 8 X X 10/27/2014TP(SB)-11 10-11.3 X X X 10/27/2014TP(SB)-12 0.7-2 X X 10/24/2014TP(SB)-12 8-10 X X 10/24/2014TP(SB)-13 2-4 X X 10/23/2014TP(SB)-13 4-6 X X 10/23/2014SB-101/MW-1 2-4 X X X 10/28/2014SB-101/MW-1 12-16 X X X 10/28/2014SB-102/MW-2 0-4 X X X X X X X 10/27/2014SB-102/MW-2 10-12 X X X X X X X 10/27/2014SB-103/MW-3 2-4 X X X 10/27/2014SB-103/MW-3 10-16 X X X 10/27/2014SB-104/MW-4 0-4 X 10/28/2014SB-104/MW-4 4-6 X 10/28/2014SB-105 0.4-4 X X 10/22/2014SB-105 8-12 X X 10/22/2014SB-106 0.4-4 X X 10/22/2014SB-106 12-16 X X 10/22/2014SB-107 0.5-4 X X 10/30/2014 MS/MSDSB-107 8-12 X X 10/30/2014SB-108 0.3-4 X X 10/30/2014 DuplicateSB-108 6-10 X X 10/30/2014SB-109 0.5-4 X X 10/22/2014SB-109 4-8 X X 10/22/2014SB-110 0-2 X X 10/30/2014GroundwaterMW-1 -- X X X X 11/03/2014MW-2 -- X X X X X X X X 11/03/2014 MS/MSD & DuplicateMW-3 -- X X X X 11/03/2014MW-4 -- X X X X 11/03/2014

3 GATES CIRCLE SITE

BUFFALO, NEW YORK

SampleIdentifier

DepthSampled/ Screened

(fbgs)

DateSampled Notes

Analysis

Bn v i r o n m e t a ln g i n ee r i n gc e n c e,i

n

Page 78: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,

TABLE 1B

SUMMARY OF INVESTIGATION SOIL TYPE AND RRSCO EXCEEDANCES

REMEDIAL INVESTIGATION / ALTERNATIVE ANALYSIS REPORT

VOC

STA

RS

TCL

VOC

s +

CP-

51

TCL

VOC

s

SVO

C S

TAR

S

TCL

SVO

Cs

SVO

Cs

Bas

e N

eutr

als

PCB

s

Pest

icid

es

Her

bici

des

RC

RA

8 M

etal

s

TAL

Met

als

Tota

l Cya

nide

REMEDIAL INVESTIGATION TP(SB)-1 0.7-4 1 FILL X X 10/24/2014 DuplicateTP(SB)-1 8-10 1 NATIVE X X 10/24/2014TP(SB)-2 0.7-2 1 FILL X X 10/24/2014TP(SB)-2 8-10 1 NATIVE X X 10/24/2014TP(SB)-3 0.6-4 1 FILL X X X X X X 10/27/2014 MS/MSDTP(SB)-3 14-16 1 NATIVE X X X X X X 10/27/2014TP(SB)-4 0.7-2 1 FILL X X 10/24/2014TP(SB)-4 4-6 1 NATIVE X X 10/24/2014TP(SB)-5 0.7-2 1 FILL X X 10/24/2014TP(SB)-5 4-6 1 NATIVE X X 10/24/2014TP(SB)-6 0.7-2 1 FILL X X 10/27/2014TP(SB)-6 14-15.5 1 NATIVE X X 10/27/2014TP(SB)-7 0.7-2 1 FILL X X 10/23/2014TP(SB)-7 8-10 1 NATIVE X X 10/23/2014TP(SB)-8 0.7-2 1 FILL X X 10/23/2014TP(SB)-8 6-8 1 NATIVE X X 10/23/2014TP(SB)-9 0.7-2 1 FILL/NATIVE X X X X X X 10/24/2014TP(SB)-9 6-8 1 NATIVE X X X X X X 10/24/2014 DuplicateTP(SB)-10 0.7-4 1 FILL/NATIVE X X 10/27/2014 MS/MSDTP(SB)-10 14-16 1 NATIVE X X 10/27/2014TP(SB)-11 0.5-2 1 FILL X X X 10/27/2014TP(SB)-11 6 - 8 1 NATIVE X X 10/27/2014TP(SB)-11 10-11.3 1 NATIVE X X X 10/27/2014TP(SB)-12 0.7-2 1 NATIVE X X 10/24/2014TP(SB)-12 8-10 1 NATIVE X X 10/24/2014TP(SB)-13 2-4 1 FILL X X 10/23/2014TP(SB)-13 4-6 1 FILL X X 10/23/2014SB-101/MW-1 2-4 NATIVE X X X 10/28/2014SB-101/MW-1 12-16 NATIVE X X X 10/28/2014SB-102/MW-2 0-4 FILL X X X X X X X 10/27/2014SB-102/MW-2 10-12 NATIVE X X X X X X X 10/27/2014SB-103/MW-3 2-4 NATIVE X X X 10/27/2014SB-103/MW-3 10-16 NATIVE X X X 10/27/2014SB-104/MW-4 0-4 FILL X 10/28/2014SB-104/MW-4 4-6 FILL X 10/28/2014SB-105 0.4-4 FILL X X 10/22/2014SB-105 8-12 NATIVE X X 10/22/2014SB-106 0.4-4 FILL X X 10/22/2014SB-106 12-16 NATIVE X X 10/22/2014SB-107 0.5-4 FILL X X 10/30/2014 MS/MSDSB-107 8-12 NATIVE X X 10/30/2014SB-108 0.3-4 FILL/NATIVE X X 10/30/2014 DuplicateSB-108 6-10 NATIVE X X 10/30/2014SB-109 0.5-4 FILL X X 10/22/2014SB-109 4-8 FILL X X 10/22/2014SB-110 0-2 FILL X X 10/30/2014STOHL INVESATIGATION - JULY 20121 8-12 NATIVE X X 07/23/20122 2-4 FILL X X 07/23/20124 8-9 NATIVE X X 07/23/20125 4-7 NATIVE X X 07/23/20127 12-20 NATIVE X X X 07/23/20128 8-9 NATIVE X X X 07/23/20129 0-12 FILL X X X 07/23/201210 4-8 NATIVE X X X 07/23/201211 4-8 NATIVE X X X 07/23/201212 0-4 FILL X X X X 07/23/201213 0-4 FILL X X X 07/23/201214 0-4 FILL X X X X 07/23/201215 0-4 FILL X 07/24/201215 4-8 FILL X X 07/24/201216 4-8 FILL X X 07/24/201217 4-8.5 FILL X X 07/24/201218 4-9 FILL X X X 07/24/201219 8-10 FILL X X 07/24/201221 4-7 NATIVE X X 07/24/2012BENCHMARK PHASE II INVESTIGATION - 0CTOBER 2012SB-2 0.5 - 2 FILL X X X X 10/11/2012SB-4 0.5 - 2 FILL/NATIVE X X X X 10/11/2012SB-5 2-4 FILL X X X X 10/11/2012SB-6 0.5-4 FILL X X X 10/11/2012SB-8 1-3 FILL X X X 10/11/2012SB-9 0.5-2 FILL X X X X 10/11/2012ENVIRONMENTAL SERVICE GROUP UST REMOVAL SAMPLING - JUNE 2008South Wall NATIVE X X 6/2008North Wall NATIVE X X 6/2008West Wall NATIVE X X 6/2008Bottom NATIVE X X 6/2008

Totals: Totals: 14 18 8 14 18 38 16 6 6 52 4 6Notes:1 - Soil probed were completed in building basements. Sample depth provided are from below basement floor.

Fill Sample Results Below RRSCOsFill Sample Results Exceeding RRSCOS

Total # VOC Samples 40 # of Fill Samples for VOCs 18 0 % VOC Samples Exceeding RRSCOsTotal # SVOC Samples 70 # of Fill Samples for SVOCs 32 19 % SVOC Samples Exceeding RRSCOs

Total # METALS Samples 56 # of Fill Samples for Metals 27 7 % Metals Exceeding RRSCOsTotal # PCB Samples 16 # of Fill Samples for PCBs 11 0 % PCBs Exceeding RRSCOs

Pesticides Samples 6 # of Fill Samples for Pesticides 2 0 % Pesticides Exceeding RRSCOsHerbicides Samples 6 # of Fill Samples for Herbicides 2 0 % Herbicides Exceeding RRSCOs

3 GATES CIRCLE SITE

BUFFALO, NEW YORK

SampleIdentifier Soil Type Date

Sampled NotesDepth (feet)

Bn v i r o n m e t a ln g i n ee r i n gc e n c e,i

n

Page 79: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,

TAB

LE 2

A

SUM

MAR

Y O

F H

ISTO

RIC

AL S

OIL

/FIL

L SA

MPL

E AN

ALYS

IS R

ESU

LTS

(STO

HL)

REM

EDIA

L IN

VEST

IGAT

ION

/ AL

TER

NAT

IVE

ANAL

YSIS

REP

OR

T

3 G

ATES

CIR

CLE

BU

FFAL

O, N

EW Y

OR

K

Vola

tile

Org

anic

Com

poun

ds (V

OC

s) -

mg/

Kg

3

Nap

htha

lene

----

ND

ND

ND

ND

ND

ND

ND

ND

ND

ND

ND

ND

--N

DN

DN

D44

8N

DN

DSe

mi-V

olat

ile O

r gan

ic C

ompo

unds

(SVO

Cs)

- m

g/K

g3

Acen

apht

hene

2010

0N

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

D--

ND

ND

ND

0.88

4N

DN

DAn

thra

cene

100

100

ND

ND

ND

ND

ND

ND

ND

ND

ND

ND

ND

ND

--0.

224

ND

0.24

82

ND

ND

Benz

o(a)

anth

race

ne1

1N

D0.

269

ND

ND

ND

ND

ND

ND

ND

0.80

9N

DN

D--

0.87

80.

331

1.05

5.83

122

J--

Benz

o(a)

pyre

ne1

1N

D0.

221

ND

ND

ND

ND

ND

ND

ND

0.84

6N

DN

D--

0.66

50.

242

0.84

4.43

ND

ND

Benz

o(b)

fluor

anth

ene

11

ND

0.29

4N

DN

DN

DN

DN

DN

DN

D1.

01N

DN

D--

0.88

30.

362

1.01

5.69

125

JN

DBe

nzo(

ghi)p

eryl

ene

100

100

ND

0.15

4N

DN

DN

DN

DN

DN

DN

DN

DN

DN

D--

0.40

50.

159

0.48

72.

58N

DN

DBe

nzo(

k)flu

oran

then

e0.

83.

9N

D0.

104

ND

ND

ND

ND

ND

ND

ND

ND

ND

ND

--0.

376

0.14

10.

393

2.25

ND

ND

Chr

ysen

e1

3.9

ND

0.22

2N

DN

DN

DN

DN

DN

DN

D0.

724

ND

ND

--0.

735

0.30

60.

859

4.93

121

JN

DD

iben

zo(a

,h)a

nthr

acen

e0.

330.

33N

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

D--

0.13

ND

0.15

60.

918

ND

ND

Fluo

rant

hene

100

100

ND

0.46

1N

DN

DN

DN

DN

DN

DN

D1.

36N

DN

D--

1.52

0.60

51.

648.

9827

6 J

ND

Fluo

rene

3010

0N

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

D--

ND

ND

ND

0.88

5N

DN

DIn

deno

(1,2

,3-c

d)py

rene

0.5

0.5

ND

0.13

7N

DN

DN

DN

DN

DN

DN

DN

DN

DN

D--

0.39

10.

147

0.45

92.

56N

DN

DN

apht

hale

ne12

100

ND

ND

ND

ND

ND

ND

ND

ND

ND

ND

ND

ND

--N

DN

DN

D0.

577

ND

ND

Phen

anth

rene

100

100

ND

0.30

3N

DN

DN

DN

DN

DN

DN

D0.

978

ND

ND

--0.

929

0.29

80.

879

7.14

162

JN

DPy

rene

100

100

ND

0.38

3N

DN

DN

DN

D0.

114

ND

ND

1.29

ND

ND

--1.

260.

499

1.63

820

1 J

ND

PCB

s - m

g/K

g 3

Tota

l PC

Bs0.

11

----

----

----

----

--N

D--

ND

ND

----

--N

D--

--R

CR

A 8

Met

als

A

rsen

ic13

16--

----

--2.

82.

23.

23.

34.

53.

55.

63.

1--

----

----

----

B

ariu

m35

040

0--

----

--72

.572

.515

.812

311

693

.598

.622

.3--

----

----

----

C

hrom

ium

3018

0--

----

--10

102.

821

.619

.918

.919

8.2

----

----

----

--

Lea

d63

400

----

----

12.3

12.3

23.4

11.2

15.7

33.6

8.9

20.7

----

----

----

--

Mer

cury

0.18

0.81

----

----

ND

ND

ND

ND

ND

0.07

3N

D0.

11--

----

----

----

Not

es:

1. O

nly

thos

e pa

ram

eter

s de

tect

ed a

t a m

inim

um o

f one

sam

ple

loca

tion

are

pres

ente

d in

this

tabl

e; a

ll ot

her c

ompo

unds

wer

e re

porte

d as

non

-det

ect.

2. V

alue

s pe

r NYS

DE

C P

art 3

75 S

oil C

lean

up O

bjec

tives

(SC

Os)

.3.

Sam

ple

resu

lts w

ere

repo

rted

by th

e la

bora

tory

in u

g/kg

and

con

verte

d to

mg/

kg fo

r com

paris

ons

to S

CO

s.

Def

initi

ons:

ND

= P

aram

eter

not

det

ecte

d ab

ove

labo

rato

r y d

etec

tion

limit.

"--"

= N

o va

lue

avai

labl

e fo

r the

par

amet

er; P

aram

eter

not

ana

lyse

d fo

r.B

old

= R

esul

t exc

eeds

Unr

estri

cted

Use

SC

Os.

Bol

d=

Res

ult e

xcee

ds R

estri

cted

Res

iden

tial U

se S

CO

s.

7/24

/201

2 (S

TOH

L)

SB-2

1

(4-7

')SB

-12

(0-4

')SB

-15

(4-8

')SB

-16

(4-8

')SB

-15

(0-4

')SB

-17

(4

-8.5

')SB

-18

(4

-9')

SB-1

9

(8-1

0')

SB-5

(4-7

')

7/23

/201

2 (S

TOH

L)

SB-9

(0-1

2')

SB-4

(8-9

')SB

-2(2

-4')

SB-7

(12-

20')

SB-8

(8-9

')SB

-14

(0-4

')SB

-11

(4-8

')SB

-13

(0-7

')PA

RA

MET

ER1

SB-1

0(4

-8')

Res

tric

ted

Res

iden

tial U

se

SCO

s 2

Unr

estr

icte

d U

se

SCO

s2

SB-1

(8-1

2')

SAM

PLE

LOC

ATI

ON

(DEP

TH)

SAM

PLE

LOC

ATI

ON

(DEP

TH)

Page 80: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,

TAB

LE 2

B

SU

MM

ARY

OF

HIS

TOR

ICAL

SO

IL/F

ILL

SAM

PLE

ANAL

YTIC

AL R

ESU

LTS

(BEN

CH

MAR

K)

REM

EDIA

L IN

VEST

IGAT

ION

/ AL

TER

NAT

IVE

ANAL

YSIS

REP

OR

T

3 G

ATES

CIR

CLE

BU

FFAL

O, N

EW Y

OR

K

Sam

ple

Loca

tions

SB-2

(0.5

-2)

SB-4

(0.5

-2)

SB-5

(2-4

)SB

-6

(0

.5-4

)SB

-8

(1

-3)

SB-9

(0.5

-2)

10/1

1/20

1210

/12/

2012

Vola

tile

Org

anic

Com

poun

ds (V

OC

s) -

mg/

kg

Acet

one

0.05

100

ND

ND

0.03

1N

AN

A0.

0093

JM

ethy

lene

chl

orid

e0.

0510

00.

0078

ND

0.01

5N

AN

A0.

0077

JTr

ichl

oroe

then

e0.

4721

0.00

23N

D0.

0048

NA

NA

0.00

32 J

1,2,

4-Tr

imet

hylb

enze

ne3.

652

0.00

12N

DN

DN

AN

AN

DSe

mi-V

olat

ile O

rgan

ic C

ompo

unds

(SVO

Cs)

- m

g/kg

Acen

apht

hene

2010

0N

DN

D0.

031

0.05

9N

DN

DAn

thra

cene

100

100

ND

0.01

0.06

50.

140.

025

ND

Benz

o(a)

anth

race

ne1

10.

049

0.04

20.

181.

70.

087

0.02

1 J

Benz

o(b)

fluor

anth

ene

11

0.13

0.04

40.

162.

80.

074

0.01

5 J

Benz

o(k)

fluor

anth

ene

0.8

3.9

ND

0.02

50.

097

1.2

0.05

4N

DBe

nzo(

g,h,

i)per

ylen

e10

010

00.

110.

029

0.14

2.4

0.09

60.

019

JBe

nzo(

a)py

rene

11

0.08

90.

046

0.19

2.8

0.1

0.01

9 J

Car

bazo

le--

--N

DN

D0.

025

0.15

ND

ND

Chr

ysen

e1

3.9

0.06

30.

043

0.22

2.2

0.08

80.

024

JD

iben

zo(a

,h)a

nthr

acen

e0.

330.

33N

DN

D0.

037

0.65

0.02

ND

Fluo

rant

hene

100

100

0.07

40.

086

0.37

2.4

0.12

0.04

2 J

Fluo

rene

3010

0N

DN

D0.

034

0.03

2N

DN

DIn

deno

(1,2

,3-c

d)py

rene

0.5

0.5

0.09

20.

032

0.11

20.

071

ND

2-M

ethy

lnap

htha

lene

----

ND

ND

0.02

30.

049

0.01

3N

DN

apht

hale

ne12

100

ND

ND

0.02

80.

031

ND

ND

Phen

anth

rene

100

100

ND

0.06

30.

30.

790.

079

0.02

9 J

Pyre

ne10

010

00.

067

0.07

30.

331.

90.

130.

031

JTo

tal S

VO

Cs

----

0.67

40.

493

2.34

21.3

010.

957

0.2

JPC

Bs

- mg/

kg

PCBs

ND

ND

ND

ND

ND

ND

Met

als

- mg/

kgAr

seni

c13

165.

14.

84.

34.

98.

53.

7 J

Cad

miu

m2.

54.

3N

DN

D0.

270.

581.

10.

31 J

Chr

omiu

m30

180

16.5

14.1

10.6

16.6

15.8

10.8

JLe

ad63

400

1418

.310

334

.812

424

.4 J

Mer

cury

0.18

0.81

0.03

6N

D4.

20.

034

0.75

0.4

JBa

rium

350

400

62.3

86.8

5512

315

678

.9 J

Def

initi

ons:

N

A =

Par

amet

er is

not

app

licab

leN

D =

Par

amet

er n

ot d

etec

ted

abov

e la

bora

tory

det

ectio

n lim

it."-

-" =

Sam

ple

not a

naly

zed

for p

aram

eter

or n

o S

CO

ava

ilabl

e fo

r the

par

amet

er.

J =

Est

imat

ed v

alue

; res

ult i

s le

ss th

an th

e sa

mpl

e qu

antit

atio

n lim

it bu

t gre

ater

than

zer

o.

Bol

d=

Res

ult e

xcee

ds 6

NYC

RR

Par

t 375

Unr

estri

cted

SC

O.

Bol

d=

Res

ult e

xcee

ds 6

NYC

RR

Par

t 375

Res

trict

ed R

esid

entia

l SC

O.

Note

s:1.

Val

ues

per N

YSD

EC

Par

t 375

Indu

stria

l Soi

l Cle

anup

Obj

ectiv

es (D

ecem

ber 2

006)

2. L

ab d

ata

colle

cted

in u

g/K

g an

d co

nver

ted

to m

g/K

g3.

Any

resu

lt th

at e

xcee

ds C

omm

erci

al S

CO

s al

so e

xcee

ds R

estri

cted

Res

iden

tial a

nd U

nres

trict

ed S

CO

s4.

Any

resu

lt th

at e

xcee

ds R

estri

cted

Res

iden

tial a

lso

exce

eds

Unr

estri

cted

SC

Os

Unr

estr

icte

d

SCO

s 2

Res

tric

ted

R

esid

entia

l SC

Os

2Pa

ram

eter

1

B nv

iro

nm

et

al

ng

ine

er

ing

ce

nc

e,

i

n

Page 81: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,

TAB

LE 3

SUM

MA

RY

OF

REM

EDIA

L IN

VEST

IGA

TIO

N S

UB

SUR

FAC

E SO

IL/F

ILL

SAM

PLE

AN

ALY

SIS

RES

ULT

S

REM

EDIA

L IN

VEST

IGA

TIO

N /

ALT

ERN

ATI

VE A

NA

LYSI

S R

EPO

RT

3 G

ATE

S C

IRC

LEB

UFF

ALO

, NEW

YO

RK

Vola

tile

Org

anic

Com

poun

ds (V

OC

s) -

mg/

Kg

3

1,2,

4-Tr

imet

hylb

enze

ne3.

652

----

----

ND

ND

----

----

----

----

----

ND

ND

----

ND

--N

D1,

3,5-

Trim

ethy

lben

zene

8.4

52--

----

--N

DN

D--

----

----

----

----

--N

DN

D--

--N

D--

ND

Ace

tone

0.05

100

----

----

0.00

6 J

ND

----

----

----

----

----

ND

ND

----

0.00

52 J

--N

DB

enze

ne0.

064.

8--

----

--N

DN

D--

----

----

----

----

--N

DN

D--

--N

D--

ND

Cyc

lohe

xane

----

----

----

ND

ND

----

----

----

----

----

ND

ND

----

ND

--N

DE

thyl

benz

ene

141

----

----

ND

ND

----

----

----

----

----

ND

ND

----

ND

--N

DM

ethy

l ter

t but

yl e

ther

(MTB

E)

0.93

100

----

----

ND

ND

----

----

----

----

----

0.00

099

J0.

0011

J--

--N

D--

ND

Met

hylc

yclo

hexa

ne--

----

----

--N

DN

D--

----

----

----

----

--N

DN

D--

--N

D--

ND

Met

hyle

ne c

hlor

ide

0.05

100

----

----

ND

ND

----

----

----

----

----

ND

0.00

39 J

----

ND

--N

DTe

trach

loro

ethe

ne1.

319

----

----

ND

ND

----

----

----

----

----

ND

ND

----

ND

--N

DTo

luen

e0.

710

0--

----

--N

DN

D--

----

----

----

----

--N

DN

D--

--0.

0003

7 J

--0.

0014

Jm

&p-

X yle

neS

ee T

otal

Xyl

ene

See

Tota

l Xyl

ene

----

----

ND

0.00

054

J--

----

----

----

----

--0.

0002

2 J

0.00

05 J

----

0.00

032

J--

0.00

18 J

o-Xy

lene

sS

ee T

otal

Xyl

ene

See

Tota

l Xyl

ene

----

----

ND

ND

----

----

----

----

----

----

ND

--N

DTo

tal X

ylen

es0.

2610

0N

D0.

0005

4--

----

----

----

----

--0.

0002

20.

0005

----

0.00

032

--0.

0018

Sem

i-Vol

atile

Org

anic

Com

poun

ds (S

VOC

s) -

mg/

Kg

3

2-M

ethy

lnap

htha

lene

----

ND

ND

ND

ND

----

ND

ND

ND

ND

ND

ND

0.34

ND

ND

ND

ND

ND

ND

ND

0.15

JN

DN

DA

cena

phth

ene

2010

0N

DN

DN

DN

D--

--N

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

D0.

051

JN

DN

DA

nthr

acen

e10

010

0N

DN

DN

DN

D--

--N

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

D0.

21N

DN

DB

enzo

(a)a

nthr

acen

e1

1N

DN

DN

DN

D--

--N

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

D0.

67N

DN

DB

enzo

(a)p

yren

e1

1N

DN

DN

DN

D--

--N

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

D0.

47N

DN

DB

enzo

(b)fl

uora

nthe

ne1

1N

DN

DN

DN

D--

--N

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

D0.

87N

DN

DB

enzo

(ghi

)per

ylen

e10

010

0N

DN

DN

DN

D--

--N

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

D0.

36N

DN

DB

enzo

(k)fl

uora

nthe

ne0.

83.

9N

DN

DN

DN

D--

--N

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DB

is(2

-eth

ylhe

xyl)

phth

alat

e--

--0.

22N

DN

D0.

078

J--

--N

DN

D0.

05 J

ND

ND

ND

ND

ND

ND

ND

ND

ND

ND

ND

0.18

ND

0.07

8 J

But

yl b

enzy

l pht

hala

te--

--N

DN

DN

DN

D--

--N

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DC

arba

zole

----

ND

ND

ND

ND

----

ND

ND

ND

ND

ND

ND

ND

ND

ND

ND

ND

ND

ND

ND

0.16

JN

DN

DC

hrys

ene

13.

9N

DN

DN

DN

D--

--N

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

D0.

86N

DN

DD

iben

zo(a

,h)a

nthr

acen

e0.

330.

33N

DN

DN

DN

D--

--N

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

D0.

12N

DN

DD

iben

zofu

ran

759

ND

ND

ND

ND

----

ND

ND

ND

ND

ND

ND

0.09

2 J

ND

ND

ND

ND

ND

ND

ND

0.06

2 J

ND

ND

Fluo

rant

hene

100

100

ND

ND

0.05

3 J

ND

----

ND

ND

ND

ND

ND

ND

0.03

7 J

ND

0.07

3 J

ND

ND

ND

ND

ND

1.6

ND

ND

Fluo

rene

3010

0N

DN

DN

DN

D--

--N

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DIn

deno

(1,2

,3-c

d)py

rene

0.5

0.5

ND

ND

ND

ND

----

ND

ND

ND

ND

ND

ND

ND

ND

ND

ND

ND

ND

ND

ND

0.41

ND

ND

Nap

htha

lene

1210

0N

DN

DN

DN

D--

--N

DN

DN

DN

DN

DN

D0.

24N

D0.

21N

DN

DN

DN

DN

D0.

1 J

ND

ND

Nitr

oben

zene

----

ND

ND

ND

ND

----

ND

ND

ND

ND

ND

ND

ND

ND

ND

ND

ND

ND

ND

ND

ND

ND

ND

Phe

nant

hren

e10

010

0N

DN

DN

DN

D--

--N

DN

DN

DN

DN

DN

D0.

18N

D0.

095

JN

DN

DN

DN

DN

D1.

5N

DN

DP

yren

e10

010

0N

DN

D0.

042

JN

D--

--N

DN

DN

DN

DN

DN

DN

DN

D0.

053

JN

DN

DN

DN

DN

D1

ND

ND

Tota

l Met

als

- mg/

Kg

Alu

min

um

----

----

----

5000

J19

00--

----

----

----

----

----

----

----

----

Ant

imon

y--

--N

DN

DN

DN

D1.

1 J

ND

----

----

----

----

----

----

--A

rsen

ic

1316

2.3

1.7

3.2

1.8

91.

63.

32.

12.

61.

93.

82

5.3

1.6

3.1

1.8

----

2.4

2.4

3.8

2.4

2.4

Bar

ium

35

040

013

5182

9011

011

5456

5240

4717

9143

9347

----

57 J

3323

1022

Ber

ylliu

m

7.2

72--

----

--0.

31 J

ND

----

----

----

----

----

----

----

----

--C

adm

ium

2.5

4.3

ND

ND

ND

ND

ND

0.19

JN

DN

DN

DN

DN

D0.

07 J

ND

ND

ND

ND

----

ND

0.04

JN

D0.

04 J

0.06

JC

alci

um

----

----

----

5300

0 J

1100

00--

----

----

----

----

----

----

----

----

Chr

omiu

m

3018

04.

16.

69.

98.

99.

83.

99.

811

8.3

8.5

9.3

4.1

137

168.

3--

--10

5.8

63.

85.

4C

obal

t --

----

----

--5.

61.

5 J

----

----

----

----

----

----

----

----

--C

oppe

r 50

270

----

----

49 J

8.3

----

----

----

----

----

----

----

----

--Iro

n --

----

----

--14

000

J56

00--

----

----

----

----

----

----

----

----

Lead

6340

04.

99.

732

1023

0 J

6.3

1111

129.

910

6.5

318

129.

6--

--8.

6 J

7.7

147.

26.

7M

agne

sium

--

----

----

--98

00 J

5200

0--

----

----

----

----

----

----

----

----

Man

gane

se

1600

2000

----

----

250

J29

0--

----

----

----

----

----

----

----

----

Mer

cury

0.

180.

81N

DN

D0.

27N

D2.

20.

02 J

ND

ND

ND

ND

ND

ND

0.03

JN

D0.

02 J

ND

----

ND

ND

0.03

JN

DN

DN

icke

l 30

310

----

----

134

----

----

----

----

----

----

----

----

--P

otas

sium

--

----

----

--57

034

0--

----

----

----

----

----

----

----

----

Sel

eniu

m

3.9

180

ND

ND

ND

ND

ND

ND

ND

ND

ND

ND

ND

ND

ND

ND

ND

ND

----

ND

ND

ND

ND

ND

Silv

er

218

0N

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

D--

--N

DN

DN

DN

DN

DS

odiu

m--

----

----

--25

018

0--

----

----

----

----

----

----

----

----

Van

adiu

m

----

----

----

167.

1--

----

----

----

----

----

----

----

----

Zinc

10

910

000

----

----

120

J50

----

----

----

----

----

----

----

----

--Po

lych

lorin

ated

bip

heny

ls (P

CB

s) -

mg/

Kg

3

Tota

l PC

Bs

0.1

1--

----

--N

DN

D--

----

----

----

----

--N

DN

D--

----

----

Pest

icid

es a

nd H

erbi

cide

s - m

g/K

g3

`4,

4'-D

DD

0.00

3313

----

----

ND

ND

----

----

----

----

----

ND

ND

----

----

--4,

4'-D

DE

0.00

338.

9--

----

--N

DN

D--

----

----

----

----

--N

DN

D--

----

----

4,4'

-DD

T0.

0033

7.9

----

----

0.00

256

NJ

ND

----

----

----

----

----

ND

ND

----

----

--ci

s-C

hlor

dane

----

----

----

ND

ND

----

----

----

----

----

ND

ND

----

----

--D

ield

rin--

----

----

--N

DN

D--

----

----

----

----

--N

DN

D--

----

----

Not

es:

1. O

nly

thos

e pa

ram

eter

s de

tect

ed a

t a m

inim

um o

f one

sam

ple

loca

tion

are

pres

ente

d in

this

tabl

e; a

ll ot

her c

ompo

unds

wer

e re

porte

d as

non

-det

ect.

2. V

alue

s pe

r NY

SD

EC

Par

t 375

Soi

l Cle

anup

Obj

ectiv

es (S

CO

s).

3. S

ampl

e re

sults

wer

e re

porte

d by

the

labo

rato

ry in

ug/

kg a

nd c

onve

rted

to m

g/kg

for c

ompa

rison

s to

SC

Os.

Def

initi

ons:

ND

= P

aram

eter

not

det

ecte

d ab

ove

labo

rato

ry d

etec

tion

limit.

"--"

= N

o va

lue

avai

labl

e fo

r the

par

amet

er; P

aram

eter

not

ana

lyse

d fo

r.J

= E

stim

ated

val

ue; r

esul

t is

less

than

the

sam

ple

quan

titat

ion

limit

but g

reat

er th

an z

ero.

B

= C

ompo

und

was

foun

d in

the

blan

k an

d sa

mpl

e.B

old

= R

esul

t exc

eeds

Unr

estri

cted

Use

SC

Os.

Bol

d=

Res

ult e

xcee

ds R

estri

cted

Res

iden

tial U

se S

CO

s.

TP(S

B)-4

(4-6

')TP

(SB

)-11

(6-8

')U

nres

tric

ted

Use

SC

Os2

TP(S

B)-6

(0.7

-2')

TP(S

B)-6

(14-

15.5

')TP

(SB

)-1

(0.7

-4')

TP(S

B)-1

(8-1

0')

TP(S

B)-2

(0.7

-2')

TP(S

B)-2

(8-1

0')

TP(S

B)-3

(0.6

-4')

TP(S

B)-4

(0

.7-2

')TP

(SB

)-11

(10-

11.3

')TP

(SB

)-5

(0.7

-2')

TP(S

B)-5

(4-6

')TP

(SB

)-3

(14-

16')

TP(S

B)-1

1(0

.5-2

.0')

PAR

AMET

ER1

Res

tric

ted

Res

iden

tial U

se

SCO

s 2

TP(S

B)-9

(6-8

')TP

(SB

)-10

(0.7

-4')

TP(S

B)-7

(0.7

-2')

TP(S

B)-7

(8-1

0')

TP(S

B)-8

(0

.7-2

.0')

TP(S

B)-8

(6

-8')

TP(S

B)-9

(0

.7-2

')TP

(SB

)-10

(14-

16')

B nv

iro

nm

et

al

ng

ine

er

ing

ce

nc

e,

i

n

Page 82: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,

TAB

LE 3

SUM

MA

RY

OF

REM

EDIA

L IN

VEST

IGA

TIO

N S

UB

SUR

FAC

E SO

IL/F

ILL

SAM

PLE

AN

ALY

SIS

RES

ULT

S

REM

EDIA

L IN

VEST

IGA

TIO

N /

ALT

ERN

ATI

VE A

NA

LYSI

S R

EPO

RT

3 G

ATE

S C

IRC

LEB

UFF

ALO

, NEW

YO

RK

Vola

tile

Org

anic

Com

poun

ds (V

OC

s) -

mg/

Kg

3

1,2,

4-Tr

imet

hylb

enze

ne3.

652

1,3,

5-Tr

imet

h ylb

enze

ne8.

452

Ace

tone

0.05

100

Ben

zene

0.06

4.8

Cyc

lohe

xane

----

Eth

ylbe

nzen

e1

41M

eth y

l ter

t but

yl e

ther

(MTB

E)

0.93

100

Met

h ylc

yclo

hexa

ne--

--M

ethy

lene

chl

orid

e0.

0510

0Te

trach

loro

ethe

ne1.

319

Tolu

ene

0.7

100

m&

p-X y

lene

See

Tot

al X

ylen

eSe

e To

tal X

ylen

eo-

X yle

nes

See

Tot

al X

ylen

eSe

e To

tal X

ylen

eTo

tal X

ylen

es0.

2610

0Se

mi-V

olat

ile O

r gan

ic C

ompo

unds

(SVO

Cs)

- m

g/K

g3

2-M

ethy

lnap

htha

lene

----

Ace

naph

then

e20

100

Ant

hrac

ene

100

100

Ben

zo(a

)ant

hrac

ene

11

Ben

zo(a

)pyr

ene

11

Ben

zo(b

)fluo

rant

hene

11

Ben

zo(g

hi)p

eryl

ene

100

100

Ben

zo(k

)fluo

rant

hene

0.8

3.9

Bis

(2-e

thyl

hexy

l) ph

thal

ate

----

But

yl b

enzy

l pht

hala

te--

--C

arba

zole

----

Chr

ysen

e1

3.9

Dib

enzo

(a,h

)ant

hrac

ene

0.33

0.33

Dib

enzo

fura

n7

59Fl

uora

nthe

ne10

010

0Fl

uore

ne30

100

Inde

no(1

,2,3

-cd)

pyre

ne0.

50.

5N

apht

hale

ne12

100

Nitr

oben

zene

----

Phe

nant

hren

e10

010

0P

yren

e10

010

0To

tal M

etal

s - m

g/K

g A

lum

inum

--

--A

ntim

ony

----

Ars

enic

13

16B

ariu

m

350

400

Ber

ylliu

m

7.2

72C

adm

ium

2.5

4.3

Cal

cium

--

--C

hrom

ium

30

180

Cob

alt

----

Cop

per

5027

0Iro

n --

--Le

ad63

400

Mag

nesi

um

----

Man

gane

se

1600

2000

Mer

cury

0.

180.

81N

icke

l 30

310

Pot

assi

um

----

Sel

eniu

m

3.9

180

Silv

er

218

0S

odiu

m--

--V

anad

ium

--

--Zi

nc

109

1000

0Po

lych

lorin

ated

bip

heny

ls (P

CB

s) -

mg/

Kg

3

Tota

l PC

Bs

0.1

1Pe

stic

ides

and

Her

bici

des

- mg/

Kg

3

4,4'

-DD

D0.

0033

134,

4'-D

DE

0.00

338.

94,

4'-D

DT

0.00

337.

9ci

s-C

hlor

dane

----

Die

ldrin

----

Not

es:

1. O

nly

thos

e pa

ram

eter

s de

tect

ed a

t a m

inim

um o

f one

sam

ple

loca

tion

are

pres

ente

d in

this

tabl

e; a

ll ot

her c

ompo

unds

wer

e re

porte

d as

non

-det

ect.

2. V

alue

s pe

r NY

SD

EC

Par

t 375

Soi

l Cle

anup

Obj

ectiv

es (S

CO

s).

3. S

ampl

e re

sults

wer

e re

porte

d by

the

labo

rato

ry in

ug/

kg a

nd c

onve

rted

to m

g/kg

for c

ompa

rison

s to

SC

Os.

Def

initi

ons:

ND

= P

aram

eter

not

det

ecte

d ab

ove

labo

rato

ry d

etec

tion

limit.

"--"

= N

o va

lue

avai

labl

e fo

r the

par

amet

er; P

aram

eter

not

ana

lyse

d fo

r.J

= E

stim

ated

val

ue; r

esul

t is

less

than

the

sam

ple

quan

titat

ion

limit

but g

reat

er th

an z

ero.

B

= C

ompo

und

was

foun

d in

the

blan

k an

d sa

mpl

e.B

old

= R

esul

t exc

eeds

Unr

estri

cted

Use

SC

Os.

Bol

d=

Res

ult e

xcee

ds R

estri

cted

Res

iden

tial U

se S

CO

s.

Unr

estr

icte

d U

se

SCO

s2PA

RAM

ETER

1R

estr

icte

d R

esid

entia

l Use

SC

Os

2

B nv

iro

nm

et

al

ng

ine

er

ing

ce

nc

e,

i

n

----

----

ND

ND

ND

ND

ND

0.00

18 J

ND

ND

----

----

----

----

----

----

----

--N

DN

DN

DN

DN

D0.

0007

3 J

ND

ND

----

----

----

----

----

----

----

--N

DN

DN

DN

DN

D0.

0043

JN

DN

D--

----

----

----

----

----

----

----

ND

ND

ND

ND

ND

0.00

11 J

ND

ND

----

----

----

----

----

----

----

--N

DN

DN

DN

DN

D0.

0007

2 J

0.00

039

NJ

0.09

8 N

J--

----

----

----

----

----

----

----

ND

ND

ND

ND

ND

0.00

085

JN

DN

D--

----

----

----

----

----

----

----

ND

ND

ND

ND

ND

ND

ND

ND

----

----

----

----

----

----

----

--N

DN

DN

DN

DN

D0.

004

J0.

0008

4 J

0.32

0 J

----

----

----

----

----

----

----

--N

D0.

002

JN

DN

DN

DN

D0.

0032

JN

D--

----

----

----

----

----

----

----

ND

ND

ND

ND

ND

0.00

11 J

ND

ND

----

----

----

----

----

----

----

--N

DN

DN

DN

DN

D0.

0043

JN

DN

D--

----

----

----

----

----

----

----

0.00

027

JN

DN

D0.

0003

JN

D0.

0037

0.00

053

JN

D--

----

----

----

----

----

----

----

ND

ND

ND

ND

ND

0.00

11 J

ND

ND

----

----

----

----

----

----

----

--0.

0002

7N

DN

D0.

0003

ND

0.00

480.

0005

3N

D--

----

----

----

----

----

ND

ND

4.2

JN

DN

DN

DN

DN

DN

DN

D--

--N

DN

DN

DN

DN

DN

D0.

1 J

ND

0.13

0 J

ND

ND

ND

ND

7.0

J0.

0087

JN

DN

DN

DN

DN

DN

D--

--N

DN

DN

DN

D0.

068

JN

DN

DN

D0.

270.

084

JN

DN

DN

D19

J0.

28N

DN

D0.

055

JN

DN

DN

D--

--N

DN

DN

DN

D0.

25N

D0.

053

JN

D0.

690.

19 J

0.04

9 J

ND

ND

200.

67N

DN

D0.

19N

DN

DN

D--

--0.

042

JN

DN

DN

D0.

47N

D0.

17N

D1.

70.

480.

13N

DN

D15

0.58

ND

ND

0.21

ND

ND

ND

----

ND

ND

ND

ND

0.38

ND

0.16

ND

1.3

0.44

0.1

JN

DN

D20

0.31

ND

ND

0.29

ND

ND

ND

----

0.04

9 J

ND

ND

ND

0.48

ND

0.25

ND

1.8

0.4

0.14

ND

ND

0.82

0.32

ND

ND

0.2

ND

ND

ND

----

ND

ND

ND

ND

0.2

ND

0.14

JN

D0.

710.

25 J

0.06

JN

DN

D8.

1N

DN

DN

D0.

22N

DN

DN

D--

--N

DN

DN

DN

D0.

18N

D0.

068

JN

DN

D0.

410.

058

JN

DN

DN

DN

DN

DN

D0.

410.

075

JN

DN

D--

--N

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

D--

--N

DN

DN

DN

DN

DN

DN

DN

D0.

55N

DN

DN

DN

D11

0.16

JN

DN

DN

DN

DN

DN

D--

--N

DN

DN

DN

D0.

042

JN

DN

DN

D0.

480.

078

JN

DN

DN

D18

0.62

ND

ND

ND

ND

ND

ND

----

ND

ND

ND

ND

0.44

ND

0.18

ND

1.6

ND

0.13

ND

ND

2.2

J0.

086

JN

DN

DN

DN

DN

DN

D--

--N

DN

DN

DN

D0.

06 J

ND

ND

ND

0.22

0.07

1 J

ND

ND

ND

110.

092

JN

DN

DN

DN

DN

DN

D--

--N

DN

DN

DN

DN

DN

DN

DN

D0.

27N

DN

DN

DN

D56

1.3

ND

ND

0.36

ND

0.05

6 J

ND

----

0.08

0 J

ND

ND

ND

1N

D0.

39N

D4

1.1

0.26

ND

ND

100.

097

JN

DN

DN

DN

DN

DN

D--

--N

DN

DN

DN

D0.

073

JN

DN

DN

D0.

22N

DN

DN

DN

D9.

70.

34N

DN

D0.

17N

DN

DN

D--

--N

DN

DN

DN

D0.

25N

D0.

12 J

ND

0.86

0.27

0.06

9 J

ND

ND

12N

DN

DN

DN

DN

DN

DN

D--

--N

DN

DN

DN

DN

DN

DN

DN

D0.

2N

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

DN

D--

--N

DN

DN

DN

DN

DN

DN

DN

DN

DN

D0.

052

JN

DN

D75

1.2

ND

ND

0.23

ND

ND

ND

----

0.05

8 J

ND

ND

ND

0.86

JN

D0.

27N

D3.

30.

690.

2N

DN

D40

1N

DN

D0.

32N

D0.

12 J

ND

----

0.06

5 J

ND

ND

ND

0.82

JN

D0.

3N

D3

0.84

0.2

----

----

----

7400

2800

----

----

----

----

----

----

----

--N

DN

D--

--2.

11.

64.

53.

61.

80.

486.

61.

75.

83.

8--

--4.

51.

52

1.4

4.5

2.6

6.5

2.6

2.5

2.4

5.6

5130

76 J

150

120

3371

2021

012

----

6337

5394

63 J

5473

6410

7.5

76--

----

----

--0.

29 J

0.11

J--

----

----

----

----

----

----

----

ND

ND

1.1

JN

D0.

16 J

0.12

J0.

13 J

ND

ND

ND

----

0.26

J0.

15 J

0.15

J0.

15 J

0.17

J0.

13 J

0.48

J0.

13 J

0.03

J0.

04 J

0.26

J--

----

----

--22

000

5000

0--

----

----

----

----

----

----

----

96.

95.

99.

517

6.8

145.

226

12--

--13

1010

9.4

1210

1112

3.1

4.1

15--

----

----

--5.

22.

2--

----

----

----

----

----

----

----

----

----

----

217.

1--

----

----

----

----

----

----

----

----

----

----

1600

072

00--

----

----

----

----

----

----

----

109.

461

J76

167.

632

7.3

9.4

6.4

----

300

1030

1012

1074

114.

53.

645

----

----

----

8400

2200

0--

----

----

----

----

----

----

----

----

----

----

330

280

----

----

----

----

----

----

----

--N

DN

D0.

090.

260.

005

J0.

03 J

0.06

JN

D0.

03 J

0.02

J--

--0.

18N

D0.

16N

D0.

05 J

ND

0.05

J0.

02 J

0.02

J0.

110.

076

J--

----

----

--12

4.5

----

----

----

----

----

----

----

----

----

----

--66

047

0--

----

----

----

----

----

----

----

ND

ND

ND

ND

ND

ND

ND

ND

ND

ND

----

ND

ND

ND

ND

ND

ND

ND

ND

ND

ND

ND

ND

ND

ND

0.1

JN

DN

DN

DN

DN

DN

D--

--N

D0.

09 J

ND

ND

ND

ND

0.16

JN

DN

DN

DN

D--

----

----

--87

J22

0--

----

----

----

----

----

----

----

----

----

----

1710

----

----

----

----

----

----

----

----

----

----

--82

44--

----

----

----

----

----

----

----

----

----

----

ND

ND

----

----

----

----

----

----

----

--

----

----

----

ND

ND

----

----

----

----

----

----

----

----

----

----

--0.

0023

4N

D--

----

----

----

----

----

----

----

----

----

----

0.00

352

ND

----

----

----

----

----

----

----

----

----

----

--0.

0027

5 J

ND

----

----

----

----

----

----

----

----

----

----

--0.

0133

0.00

104

J--

----

----

----

----

----

----

----

TP(S

B)-1

3

(4-6

')

SB-1

02/M

W-2

(0

-4')

SB-1

02/M

W-2

(10-

12')

SB-1

03/M

W-3

(2-4

')SB

-103

/MW

-3

(1

0-16

')SB

-101

/MW

-1

(2

-4')

TP(S

B)-1

2(0

.7-2

')TP

(SB

)-12

(8-1

0')

TP(S

B)-1

3 (2

-4')

SB-1

10

(0-

2')

SB-1

04/M

W-4

(0-4

')SB

-104

/MW

-4

(4

-6')

SB-1

07

(0.5

-4')

SB-1

07 (

8 -12

')SB

-101

/MW

-1

(1

2-16

')SB

-106

(1

2-16

')SB

-105

(0

.4-4

')SB

-105

(8-

12')

SB-1

06

(0.4

-4')

SB-1

09

(0.5

-4')

SB-1

09 (

4 -8'

)SB

-108

(0

.3-4

')SB

-108

(6

-10'

)

Page 83: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,

TABLE 4

SUMMARY OF REMEDIAL INVESTIGATION GROUNDWATER ANALYTICAL RESULTS

REMEDIAL INVESTIGATION / ALTERNATIVE ANALYSIS REPORT

3 GATES CIRCLE SITE

BUFFALO, NEW YORK

Sample Location

MW-1 MW-2 MW-3 MW-4

Volatile Organic Compounds (VOCs) - ug/L Benzene 1 ND 2.5 ND NDTetrachloroethene 5 ND ND ND 0.72

Semi-Volatile Organic Compounds (SVOCs) - ug/LND ND ND ND

Total Metals - ug/LAluminum -- 5,120 573 J 7,580 142Antimony 3 0.9 J 1.2 0.6 J 1.3Arsenic 25 1.7 2.5 6.9 0.9Barium 1000 380 120 193.5 157.1Beryllium 3 0.2 J ND 0.3 J NDCadmium 5 0.1 J ND 0.7 0.1 JCalcium -- 135,000 192,000 203,000 144,000Chromium 50 7.7 J 2.4 16.3 1.2Cobalt 5 4 1.3 10.7 1Copper 200 8.9 3.2 34.7 2.6Cyanide 200 -- 3.0 J -- --Iron 300 8,990 4500 J 15,000 355Lead 25 10.6 2.4 40.9 0.8 JMagnesium 35000 71,600 74,300 91,600 49,700Manganese 300 368.5 255.8 441.7 202.2Mercury 0.7 ND ND 0.07 J NDNickel 100 9 3.5 22.8 2.9Potassium -- 3,180 5,500 7,580 10,600Selenium 10 ND ND 2 J 1 JSilver 50 ND ND 0.1 J 0.1 JSodium 20000 207,000 773,000 245,000 397,000Thallium -- 0.1 ND 0.2 NDVanadium 14 9 1.7 J 20.6 0.6 JZinc 2000 36.2 17.4 330.8 18.5 J

Dissolved Metals - ug/LAluminum -- -- 8 J -- --Antimony 3 -- 1.4 J -- --Arsenic 25 0.6 J 1.4 J 0.7 J 0.8 JBarium 1000 328.9 J 94.7 120.5 J 173.8 JCadmium 5 0.1 J ND 0.2 J NDCalcium -- -- 205000 J -- --Chromium 50 1.7 J 1.4 J 1.1 J 1.2 JCobalt 5 -- 1.4 J -- --Copper 200 -- 0.3 J -- --Iron 300 -- 102 J -- --Lead 25 0.2 J ND 0.2 J NDMagnesium 35000 -- 60020 J -- --Manganese 300 -- 237 J -- --Mercury 0.7 ND ND ND NDNickel 100 -- 2.3 J -- --Potassium -- -- 4880 J -- --Selenium 10 ND ND 1 J 2 JSodium 20000 -- 794000 J -- --Zinc 2000 -- 3.1 J --

PCB (ug/L)Total PCBs 0.09 -- ND -- --

Pesticides and Herbicides - ug/L-- ND -- --

Notes:1. Only those parameters detected at a minimum of one sample location are presented in this table; all other compounds or analytes were reported as non-detect.2. Values per NYSDEC Division of Water Ambient Water Quality Standards and Guidance Values and Groundwater Effluent Limitations - Class GA (TOGS 1.1.1)

Definitions:ND = Parameter not detected above laboratory detection limit."--" = No value available for the parameter; Parameter not analysed for.J = Estimated value; result is less than the reporting limit but greater than zero.

BOLD = Result exceeds GWQS.

PARAMETER 1 GWQS 2

11/04/14

Bn v i r o n m e t a ln g i n ee r i n gc e n c e,i

n

Page 84: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,

TABLE 5

SUMMARY OF REMEDIAL ALTERNATIVES COSTS

REMEDIAL INVESTIGATION / ALTERNATIVE ANALYSIS REPORT

3 GATES CIRCLE SITE

BUFFALO, NEW YORK

Remedial Alternative Estimated Capital Cost

Estimated Annual OM&MCost

No Further Action$0 $0

Alternative #2- Track 4 Restricted Residential CleanupFill Material Excavation, Cover System & Implementation of a SMP

$129,000 $2,500

Alternative #3- Track 2 Restricted Residential CleanupFill Material Excavation, Environmental Easement

$472,000 $2,500

Alternative #4- Unrestricted Use Cleanup$1,786,000 $0

Bn v i ronme t alng i neeri n gc ence,i

n

Page 85: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,

TABLE 6

ALTERNATIVE 2 - TRACK 4 RESTRICTED RESIDENTIAL COST ESTIMATEImpacted Fill Material Excavation, Cover System & Implementation of a SMP

REMEDIAL INVESTIGATION / ALTERNATIVE ANALYSIS REPORT

3 GATES CIRCLE SITE

BUFFALO, NEW YORK

Item Quantity Units UnitCost

TotalCost

Impacted Soil/Fill RemovalWaste Characterization 3 EA 750$ 2,250$Soil/Fill Excavation 872 TON 15$ 13,080$Transportation & Disposal of Exterior Soil/Fill (Use as Daily Cover) 872 TON 35$ 30,520$Groundwater Handling and Treatment 1 EST 5,000$ 5,000$Verification Sampling 50 EA 300$ 15,000$

63,600$Site Restoration

Cover System - Part 375 2 Compliant Backfill, Place & Compact 545 CY 15$ 8,175$2" Stone, compacted 55 SY 5$ 273$

8,448$

Subtotal: 72,048$

Final Engineering Report/Site Management Plan $ 30,000

Subtotal Capital Cost 102,048$

Health and Safety (2%) 1,441$Engineering/Contingency (35%) 25,217$

Total Capital Cost 128,710$

Annual Periodic Review Report per SMP:Annual Certification 1 Yr 2,500$ 2,500$

Total Annual OM&M Cost 2,500$

Capital Cost 129,000$

Notes:1. Assumes SVOC and metals-impacted soil/fill can be disposed of as non-hazardous waste. TCLP waste characterization will be required;2. Per 6NYCRR 375-6.7(d)(ii)(b)

Bn v i ron me t aln g i neeri n gc en ce,i

n

Page 86: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,

TABLE 7

ALTERNATIVE 3 - TRACK 2 RESTRICTED RESIDENTIAL COST ESTIMATEImpacted Fill Material Excavation & Environmental Easement

REMEDIAL INVESTIGATION / ALTERNATIVE ANALYSIS REPORT

3 GATES CIRCLE SITE

BUFFALO, NEW YORK

Item Quantity Units UnitCost

TotalCost

Impacted Soil/Fill RemovalWaste Characterization 7 EA 750$ 5,250$Soil/Fill Excavation 4856 TON 15$ 72,840$Transportation & Disposal of Exterior Soil/Fill (Use as Daily Cover) 4856 TON 35$ 169,960$Groundwater Handling and Treatment 1 EST 10,000$ 10,000$Verification Sampling 75 EA 300$ 22,500$

275,300$Site Restoration

Part 375 2 Compliant Backfill, Place & Compact 3035 CY 15$ 45,525$2" Stone, compacted 304 SY 5$ 1,518$

47,043$

Subtotal: 322,343$

Final Engineering Report/Site Management Plan $ 30,000

Subtotal Capital Cost 352,343$

Health and Safety (2%) 6,447$Engineering/Contingency (35%) 112,820$

Total Capital Cost 471,610$

Annual Periodic Review Report per SMP:Annual Certification 1 Yr 2,500$ 2,500$

Total Annual OM&M Cost 2,500$

Capital Cost 472,000$

Notes:1. Assumes SVOC and metals-impacted soil/fill can be disposed of as non-hazardous waste. TCLP waste characterization will be required;2. Per 6NYCRR 375-6.7(d)(ii)(b)

Bn v i ron me t aln g i neeri n gc en ce,i

n

Page 87: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,

TABLE 8

ALTERNATIVE 4 - UNRESTRICTED USE CLEANUP COST ESTIMATEImpacted Fill Material Excavation

REMEDIAL INVESTIGATION / ALTERNATIVE ANALYSIS REPORT

3 GATES CIRCLE SITE

BUFFALO, NEW YORK

Item Quantity Units UnitCost

TotalCost

Impacted Soil/Fill RemovalWaste Characterization 21 EA 750$ 15,750$Soil/Fill Excavation 19632 TON 15$ 294,480$Transportation & Disposal of Exterior Soil/Fill (Use as Daily Cover) 19632 TON 35$ 687,120$Groundwater Handling and Treatment 1 EST 20,000$ 20,000$Verification Sampling 200 EA 500$ 100,000$

1,101,600$Site Restoration

Part 375 2 Compliant Backfill, Place & Compact 12270 CY 15$ 184,050$184,050$

Subtotal: 1,285,650$

Final Engineering Report $ 25,000

Subtotal Capital Cost 1,310,650$

Health and Safety (2%) 25,713$Engineering/Contingency (35%) 449,978$

Total Capital Cost 1,786,340$

Capital Cost 1,786,000$

Notes:1. Assumes SVOC and metals-impacted soil/fill can be disposed of as non-hazardous waste. TCLP waste characterization will be required;2. Per 6NYCRR 375-6.7(d)(ii)(b)

Bn v i ron me t aln g i neeri n gc en ce,i

n

Page 88: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,

REMEDIAL INVESTIGATION/ALTERNATIVES ANALYSIS REPORT 3 GATES CIRCLE

BCP SITE NO. C915272

0309-014-001

FIGURES

Page 89: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,

SITE

DRAFTED BY:

PROJECT NO.:

DATE:

eo

nr

ng i

Bn v i

en

irme

ce,nc ein g

n alt

PREPARED FOR

DISCLAIMER:PROPERTY OF BENCHMARK ENVIRONMENTAL ENGINEERING & SCIENCE, PLLC. IMPORTANT: THIS DRAWING PRINT IS LOANED FOR MUTUAL ASSISTANCE AND AS SUCHIS SUBJECT TO RECALL AT ANY TIME. INFORMATION CONTAINED HEREON IS NOT TO BE DISCLOSED OR REPRODUCED IN ANY FORM FOR THE BENEFIT OF PARTIESOTHER THAN NECESSARY SUBCONTRACTORS & SUPPLIERS WITHOUT THE WRITTEN CONSENT OF BENCHMARK ENVIRONMENTAL ENGINEERING & SCIENCE, PLLC.

SITE LOCATION AND VICINITY MAP

REMEDIAL INVESTIGATION / ALTERNATIVE ANALYSIS REPORT

GATES CIRCLE HOLDINGS, LLC

BROWNFIELD CLEANUP PROGRAM3 GATES CIRCLE SITEBUFFALO, NEW YORK

FIGURE 1

BLR

JANUARY 2015

0309-014-001

F:\C

AD

\Ben

chm

ark\

Gat

es C

ircle

Ass

ocia

tes\

RI-

AA

R\F

igur

e 1,

Site

Loc

atio

n &

Vic

inity

.dw

g

Page 90: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,

AP

PR

OX

IMA

TE P

RO

PE

RTY

BO

UN

DA

RY

0' SC

ALE

IN F

EE

T(a

ppro

xim

ate)

100'

100'

200'

SC

ALE

: 1 IN

CH

= 1

00 F

EE

T

DRAFTED BY:DATE:

PREPARED FORJOB NO.:

t i v n

B

ie ci gn

l a

n

ne mn orree n, e c

g ni

DISCLAIMER:PROPERTY OF BENCHMARK ENVIRONMENTAL ENGINEERING & SCIENCE, PLLC. IMPORTANT: THIS DRAWING PRINT IS LOANED FOR MUTUAL ASSISTANCE AND AS SUCH IS SUBJECT TO RECALL AT ANY TIME. INFORMATION CONTAINED HEREON IS NOTTO BE DISCLOSED OR REPRODUCED IN ANY FORM FOR THE BENEFIT OF PARTIES OTHER THAN NECESSARY SUBCONTRACTORS & SUPPLIERS WITHOUT THE WRITTEN CONSENT OF BENCHMARK ENVIRONMENTAL ENGINEERING & SCIENCE, PLLC.

JANUARY 2015BLR

FIG

UR

E 2

GATES CIRCLE HOLDINGS, LLC

BROWNFIELD CLEANUP PROGRAM3 GATES CIRCLE SITEBUFFALO, NEW YORK

REMEDIAL INVESTIGATION / ALTERNATIVE ANALYSIS REPORT

SITE PLAN

0309-014-001

F:\CAD\Benchmark\Gates Circle Associates\RI-AAR\Figure 2; Site Plan.dwg

Page 91: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,

SB

-7

SB

-3

1923

20

14

56

13

7

9

10

1214

8

11

1718 16

15

B-1

B-2

B-1

B-3

B-4

B-5

B-6

LEG

EN

D:

PR

OP

ER

TY B

OU

ND

AR

Y

SB

-8 1

BE

NC

HM

AR

K B

OR

ING

S (O

CTO

BE

R 2

012)

STO

HL

BO

RIN

GS

(JU

LY 2

012)

ES

G B

OR

ING

S (M

AY

200

8)B

-2

0' SC

ALE

IN F

EE

T(a

ppro

xim

ate)

100'

100'

200'

SC

ALE

: 1 IN

CH

= 1

00 F

EE

T

DRAFTED BY:DATE:

PREPARED FORJOB NO.:

t i v n

B

ie ci gn

l a

n

ne mn orree n, e c

g ni

DISCLAIMER:PROPERTY OF BENCHMARK ENVIRONMENTAL ENGINEERING & SCIENCE, PLLC. IMPORTANT: THIS DRAWING PRINT IS LOANED FOR MUTUAL ASSISTANCE AND AS SUCH IS SUBJECT TO RECALL AT ANY TIME. INFORMATION CONTAINED HEREON IS NOTTO BE DISCLOSED OR REPRODUCED IN ANY FORM FOR THE BENEFIT OF PARTIES OTHER THAN NECESSARY SUBCONTRACTORS & SUPPLIERS WITHOUT THE WRITTEN CONSENT OF BENCHMARK ENVIRONMENTAL ENGINEERING & SCIENCE, PLLC.

JANUARY 2015BLR

FIG

UR

E 3

GATES CIRCLE HOLDINGS, LLC

BROWNFIELD CLEANUP PROGRAM3 GATES CIRCLE SITEBUFFALO, NEW YORK

REMEDIAL INVESTIGATION / ALTERNATIVE ANALYSIS REPORT

PREVIOUS INVESTIGATION LOCATIONS

0309-014-001

F:\CAD\Benchmark\Gates Circle Associates\RI-AAR\Figure 3; Previous Investigation Locations.dwg

Page 92: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,

SB

-7

SB

-3

1923

20

14

56

13

7

9

10

1214

8

11

1718 16

15

B-1

B-2

B-1

B-3

B-4

B-5

B-6

TP(S

B)-

9

TP(S

B)-

10

SB

-104

/MW

-4

SB

-102

/MW

-2

SB

-101

/MW

-1

TP(S

B)-

3

TP(S

B)-

2

TP(S

B)-

4TP

(SB

)-1

TP(S

B)-

6

TP(S

B)-

7TP

(SB

)-8

TP(S

B)-

5

SB

-110

SB-1

09

SB

-108

SB

-103

/MW

-3

TP(S

B)-

11

TP(S

B)-

12

TP(S

B)-

13

LEG

EN

D:

PR

OP

ER

TY B

OU

ND

AR

Y

SB

-8 1

BE

NC

HM

AR

K B

OR

ING

S (O

CTO

BE

R 2

012)

STO

HL

BO

RIN

GS

(JU

LY 2

012)

TP(S

B)-

6

SB

-103

/MW

-3

AP

PR

OX

IMA

TE S

OIL

PR

OB

E L

OC

ATI

ON

AP

PR

OX

IMA

TE S

OIL

BO

RIN

G L

OC

ATI

ON

AP

PR

OX

IMA

TE B

OR

ING

/MO

NIT

OR

ING

WE

LL L

OC

ATI

ON

SB

-106

ES

G B

OR

ING

S (M

AY

200

8)B

-3

0' SC

ALE

IN F

EE

T(a

ppro

xim

ate)

100'

100'

200'

SC

ALE

: 1 IN

CH

= 1

00 F

EE

T

DRAFTED BY:DATE:

PREPARED FORJOB NO.:

t i v n

B

ie ci gn

l a

n

ne mn orree n, e c

g ni

DISCLAIMER:PROPERTY OF BENCHMARK ENVIRONMENTAL ENGINEERING & SCIENCE, PLLC. IMPORTANT: THIS DRAWING PRINT IS LOANED FOR MUTUAL ASSISTANCE AND AS SUCH IS SUBJECT TO RECALL AT ANY TIME. INFORMATION CONTAINED HEREON IS NOTTO BE DISCLOSED OR REPRODUCED IN ANY FORM FOR THE BENEFIT OF PARTIES OTHER THAN NECESSARY SUBCONTRACTORS & SUPPLIERS WITHOUT THE WRITTEN CONSENT OF BENCHMARK ENVIRONMENTAL ENGINEERING & SCIENCE, PLLC.

JANUARY 2015BLR

FIG

UR

E 4

GATES CIRCLE HOLDINGS, LLC

BROWNFIELD CLEANUP PROGRAM3 GATES CIRCLE SITEBUFFALO, NEW YORK

REMEDIAL INVESTIGATION / ALTERNATIVE ANALYSIS REPORT

REMEDIAL INVESTIGATION ACTIVITIES

0309-014-001

F:\CAD\Benchmark\Gates Circle Associates\RI-AAR\Figure 4; Remedial Investigation Activities.dwg

Page 93: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,

SB

-104

/MW

-4

SB

-102

/MW

-2

SB

-101

/MW

-1

SB

-103

/MW

-3

85.1

84.3

78.0

89.0

88

8684

82

80

LEG

EN

D:

PR

OP

ER

TY B

OU

ND

AR

Y

MW

-3A

PP

RO

XIM

ATE

BO

RIN

G/M

ON

ITO

RIN

G W

ELL

LO

CA

TIO

N

85.1

86G

RO

UN

DW

ATE

R E

LEV

ATI

ON

GR

OU

ND

WA

TER

CO

NTO

UR

GR

OU

ND

WA

TER

FLO

W D

IRE

CTI

ON

0' SC

ALE

IN F

EE

T(a

ppro

xim

ate)

100'

100'

200'

SC

ALE

: 1 IN

CH

= 1

00 F

EE

T

DRAFTED BY:DATE:

PREPARED FORJOB NO.:

t i v n

B

ie ci gn

l a

n

ne mn orree n, e c

g ni

DISCLAIMER:PROPERTY OF BENCHMARK ENVIRONMENTAL ENGINEERING & SCIENCE, PLLC. IMPORTANT: THIS DRAWING PRINT IS LOANED FOR MUTUAL ASSISTANCE AND AS SUCH IS SUBJECT TO RECALL AT ANY TIME. INFORMATION CONTAINED HEREON IS NOTTO BE DISCLOSED OR REPRODUCED IN ANY FORM FOR THE BENEFIT OF PARTIES OTHER THAN NECESSARY SUBCONTRACTORS & SUPPLIERS WITHOUT THE WRITTEN CONSENT OF BENCHMARK ENVIRONMENTAL ENGINEERING & SCIENCE, PLLC.

JANUARY 2015BLR

FIG

UR

E 5

GATES CIRCLE HOLDINGS, LLC

BROWNFIELD CLEANUP PROGRAM3 GATES CIRCLE SITEBUFFALO, NEW YORK

REMEDIAL INVESTIGATION / ALTERNATIVE ANALYSIS REPORT

GROUNDWATER ISOPOTENTIAL MAP

0309-014-001

F:\CAD\Benchmark\Gates Circle Associates\RI-AAR\Figure 5; Groundwater Isopotential Map.dwg

Page 94: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,

SB

-7

SB

-3

1923

20

14

56

13

7

9

10

1214

8

11

1718 16

15

B-1

B-2

B-1

B-3

B-4

B-5

B-6

TP(S

B)-

9

TP(S

B)-

10

SB

-104

/MW

-4

SB

-102

/MW

-2

SB

-101

/MW

-1

TP(S

B)-

3

TP(S

B)-

2

TP(S

B)-

4TP

(SB

)-1

TP(S

B)-

6

TP(S

B)-

7TP

(SB

)-8

TP(S

B)-

5

SB

-110

SB-1

09

SB

-108

SB

-103

/MW

-3

TP(S

B)-

11

TP(S

B)-

12

TP(S

B)-

13

AP

PR

OX

IMA

TE L

IMIT

S O

F P

OTE

NTI

AL

NO

.6FU

EL

OIL

IMP

AC

TS T

O B

E A

DD

RE

SS

ED

AS

PA

RT

OF

IRM

SV

OC

- IM

PA

CTE

D F

ILL

IN S

AM

PLE

FRO

M 0

.5 T

O 4

FB

GS

SV

OC

- IM

PA

CTE

D F

ILL

IN S

AM

PLE

S F

RO

M0.

5 TO

4 F

BG

S A

ND

4 T

O 9

FB

GS

ME

RC

UR

Y -

IMP

AC

TED

FIL

L IN

SA

MP

LE0.

6 TO

4 F

T B

ELO

W B

UIL

DIN

GB

AS

EM

EN

T

SV

OC

- IM

PA

CTE

D F

ILL

IN S

AM

PLE

2 TO

4 F

EE

T B

ELO

W B

UIL

DIN

G B

AS

EM

EN

T

SV

OC

- IM

PA

CTE

D F

ILL

IN S

AM

PLE

FRO

M 0

TO

4 F

BG

S

ME

RC

UR

Y IM

PA

CTE

D F

ILL

IN S

AM

PLE

FRO

M 0

.5 T

O 4

FB

GS

LEG

EN

D:

PR

OP

ER

TY B

OU

ND

AR

Y

SB

-8 1

BE

NC

HM

AR

K B

OR

ING

S (O

CTO

BE

R 2

012)

STO

HL

BO

RIN

GS

(JU

LY 2

012)

TP(S

B)-

6

SB

-103

/MW

-3

AP

PR

OX

IMA

TE S

OIL

PR

OB

E L

OC

ATI

ON

AP

PR

OX

IMA

TE S

OIL

BO

RIN

G L

OC

ATI

ON

AP

PR

OX

IMA

TE B

OR

ING

/MO

NIT

OR

ING

WE

LL L

OC

ATI

ON

SB

-106

ES

G B

OR

ING

S (M

AY

200

8)B

-3

0' SC

ALE

IN F

EE

T(a

ppro

xim

ate)

100'

100'

200'

SC

ALE

: 1 IN

CH

= 1

00 F

EE

T

DRAFTED BY:DATE:

PREPARED FORJOB NO.:

t i v n

B

ie ci gn

l a

n

ne mn orree n, e c

g ni

DISCLAIMER:PROPERTY OF BENCHMARK ENVIRONMENTAL ENGINEERING & SCIENCE, PLLC. IMPORTANT: THIS DRAWING PRINT IS LOANED FOR MUTUAL ASSISTANCE AND AS SUCH IS SUBJECT TO RECALL AT ANY TIME. INFORMATION CONTAINED HEREON IS NOTTO BE DISCLOSED OR REPRODUCED IN ANY FORM FOR THE BENEFIT OF PARTIES OTHER THAN NECESSARY SUBCONTRACTORS & SUPPLIERS WITHOUT THE WRITTEN CONSENT OF BENCHMARK ENVIRONMENTAL ENGINEERING & SCIENCE, PLLC.

JANUARY 2015BLR

FIG

UR

E 6

GATES CIRCLE HOLDINGS, LLC

BROWNFIELD CLEANUP PROGRAM3 GATES CIRCLE SITEBUFFALO, NEW YORK

REMEDIAL INVESTIGATION / ALTERNATIVE ANALYSIS REPORT

AREAS OF RRSCO EXCEEDANCES & NO.6 FUEL OIL

0309-014-001

F:\CAD\Benchmark\Gates Circle Associates\RI-AAR\Figure 6; Areas of RRSCO Exceedances & No.6 Fuel Oil.dwg

Page 95: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,

SB

-7

SB

-3

1923

20

14

56

13

7

9

10

1214

8

11

1718 16

15

B-1

B-2

B-1

B-3

B-4

B-5

B-6

TP(S

B)-

9

TP(S

B)-

10

SB

-104

/MW

-4

SB

-102

/MW

-2

SB

-101

/MW

-1

TP(S

B)-

3

TP(S

B)-

2

TP(S

B)-

4TP

(SB

)-1

TP(S

B)-

6

TP(S

B)-

7TP

(SB

)-8

TP(S

B)-

5

SB

-110

SB-1

09

SB

-108

SB

-103

/MW

-3

TP(S

B)-

11

TP(S

B)-

12

TP(S

B)-

13

AP

PR

OX

IMA

TE L

IMIT

S O

F P

OTE

NTI

AL

NO

.6 F

UE

LO

IL IM

PA

CTS

TO

BE

AD

DR

ES

SE

D A

S P

AR

T O

F IR

M

40'x

40'x

2'H

g12

0 C

Y

40'x

40'x

2'S

VO

Cs

120

CY

40'x

40'x

2'S

VO

Cs

120

CY

50'x

50'x

2'S

VO

Cs

185

CY

LEG

EN

D:

PR

OP

ER

TY B

OU

ND

AR

Y

SB

-8 1

BE

NC

HM

AR

K B

OR

ING

S (O

CTO

BE

R 2

012)

STO

HL

BO

RIN

GS

(JU

LY 2

012)

TP(S

B)-

6

SB

-103

/MW

-3

AP

PR

OX

IMA

TE S

OIL

PR

OB

E L

OC

ATI

ON

AP

PR

OX

IMA

TE S

OIL

BO

RIN

G L

OC

ATI

ON

AP

PR

OX

IMA

TE B

OR

ING

/MO

NIT

OR

ING

WE

LL L

OC

ATI

ON

SB

-106

ES

G B

OR

ING

S (M

AY

200

8)B

-3

0' SC

ALE

IN F

EE

T(a

ppro

xim

ate)

100'

100'

200'

SC

ALE

: 1 IN

CH

= 1

00 F

EE

T

DRAFTED BY:DATE:

PREPARED FORJOB NO.:

t i v n

B

ie ci gn

l a

n

ne mn orree n, e c

g ni

DISCLAIMER:PROPERTY OF BENCHMARK ENVIRONMENTAL ENGINEERING & SCIENCE, PLLC. IMPORTANT: THIS DRAWING PRINT IS LOANED FOR MUTUAL ASSISTANCE AND AS SUCH IS SUBJECT TO RECALL AT ANY TIME. INFORMATION CONTAINED HEREON IS NOTTO BE DISCLOSED OR REPRODUCED IN ANY FORM FOR THE BENEFIT OF PARTIES OTHER THAN NECESSARY SUBCONTRACTORS & SUPPLIERS WITHOUT THE WRITTEN CONSENT OF BENCHMARK ENVIRONMENTAL ENGINEERING & SCIENCE, PLLC.

JANUARY 2015BLR

FIG

UR

E 7

GATES CIRCLE HOLDINGS, LLC

BROWNFIELD CLEANUP PROGRAM3 GATES CIRCLE SITEBUFFALO, NEW YORK

REMEDIAL INVESTIGATION / ALTERNATIVE ANALYSIS REPORT

ALTERNATIVE 2 - TRACK 4 RESTRICTED RESIDENTIAL CLEANUP

0309-014-001

F:\CAD\Benchmark\Gates Circle Associates\RI-AAR\Figure 7; Alternative #2 - Track 4 Restricted Residential Cleanup.dwg

Page 96: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,

SB

-7

SB

-3

1923

20

14

56

13

7

9

10

1214

8

11

1718 16

15

B-1

B-2

B-1

B-3

B-4

B-5

B-6

TP(S

B)-

9

TP(S

B)-

10

SB

-104

/MW

-4

SB

-102

/MW

-2

SB

-101

/MW

-1

TP(S

B)-

3

TP(S

B)-

2

TP(S

B)-

4TP

(SB

)-1

TP(S

B)-

6

TP(S

B)-

7TP

(SB

)-8

TP(S

B)-

5

SB

-110

SB-1

09

SB

-108

SB

-103

/MW

-3

TP(S

B)-

11

TP(S

B)-

12

TP(S

B)-

13

AP

PR

OX

IMA

TE L

IMIT

S O

F P

OTE

NTI

AL

NO

.6 F

UE

LO

IL IM

PA

CTS

TO

BE

AD

DR

ES

SE

D A

S P

AR

T O

F IR

M

40'x

40'x

4'H

g24

0 C

Y

40'x

40'x

4'S

VO

Cs

240

CY

40'x

40'x

4'S

VO

Cs

240

CY

50'x

50'x

9'S

VO

Cs

835

CY

50'x

50'x

8'H

g74

0 C

Y

50'x

50'x

8'S

VO

Cs

740

CY

LEG

EN

D:

PR

OP

ER

TY B

OU

ND

AR

Y

SB

-8 1

BE

NC

HM

AR

K B

OR

ING

S (O

CTO

BE

R 2

012)

STO

HL

BO

RIN

GS

(JU

LY 2

012)

TP(S

B)-

6

SB

-103

/MW

-3

AP

PR

OX

IMA

TE S

OIL

PR

OB

E L

OC

ATI

ON

AP

PR

OX

IMA

TE S

OIL

BO

RIN

G L

OC

ATI

ON

AP

PR

OX

IMA

TE B

OR

ING

/MO

NIT

OR

ING

WE

LL L

OC

ATI

ON

SB

-106

ES

G B

OR

ING

S (M

AY

200

8)B

-3

0' SC

ALE

IN F

EE

T(a

ppro

xim

ate)

100'

100'

200'

SC

ALE

: 1 IN

CH

= 1

00 F

EE

T

DRAFTED BY:DATE:

PREPARED FORJOB NO.:

t i v n

B

ie ci gn

l a

n

ne mn orree n, e c

g ni

DISCLAIMER:PROPERTY OF BENCHMARK ENVIRONMENTAL ENGINEERING & SCIENCE, PLLC. IMPORTANT: THIS DRAWING PRINT IS LOANED FOR MUTUAL ASSISTANCE AND AS SUCH IS SUBJECT TO RECALL AT ANY TIME. INFORMATION CONTAINED HEREON IS NOTTO BE DISCLOSED OR REPRODUCED IN ANY FORM FOR THE BENEFIT OF PARTIES OTHER THAN NECESSARY SUBCONTRACTORS & SUPPLIERS WITHOUT THE WRITTEN CONSENT OF BENCHMARK ENVIRONMENTAL ENGINEERING & SCIENCE, PLLC.

JANUARY 2015BLR

FIG

UR

E 8

GATES CIRCLE HOLDINGS, LLC

BROWNFIELD CLEANUP PROGRAM3 GATES CIRCLE SITEBUFFALO, NEW YORK

REMEDIAL INVESTIGATION / ALTERNATIVE ANALYSIS REPORT

ALTERNATIVE 3 - TRACK 2 RESTRICTED RESIDENTIAL CLEANUP

0309-014-001

F:\CAD\Benchmark\Gates Circle Associates\RI-AAR\Figure 8; Alternative #3 - Track 2 Restricted Residential Cleanup.dwg

Page 97: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,

SB

-7

SB

-3

1923

20

14

56

13

7

9

10

1214

8

11

1718 16

15

B-1

B-2

B-1

B-3

B-4

B-5

B-6

TP(S

B)-

9

TP(S

B)-

10

SB

-104

/MW

-4

SB

-102

/MW

-2

SB

-101

/MW

-1

TP(S

B)-

3

TP(S

B)-

2

TP(S

B)-

4TP

(SB

)-1

TP(S

B)-

6

TP(S

B)-

7TP

(SB

)-8

TP(S

B)-

5

SB

-110

SB-1

09

SB

-108

SB

-103

/MW

-3

TP(S

B)-

11

TP(S

B)-

12

TP(S

B)-

13

AP

PR

OX

IMA

TE L

IMIT

S O

F P

OTE

NTI

AL

NO

.6 F

UE

LO

IL IM

PA

CTS

TO

BE

AD

DR

ES

SE

D A

S P

AR

T O

F IR

M

40'x

40'x

4'H

g24

0 C

Y

40'x

40'x

4'S

VO

Cs

240

CY

ME

TALS

/ P

ES

T. /

SV

OC

s8,

400

CY

ME

TALS

& S

VO

Cs

6,37

0 C

Y

70'x

20'x

4'H

g21

0 C

Y

LEG

EN

D:

PR

OP

ER

TY B

OU

ND

AR

Y

SB

-8 1

BE

NC

HM

AR

K B

OR

ING

S (O

CTO

BE

R 2

012)

STO

HL

BO

RIN

GS

(JU

LY 2

012)

TP(S

B)-

6

SB

-103

/MW

-3

AP

PR

OX

IMA

TE S

OIL

PR

OB

E L

OC

ATI

ON

AP

PR

OX

IMA

TE S

OIL

BO

RIN

G L

OC

ATI

ON

AP

PR

OX

IMA

TE B

OR

ING

/MO

NIT

OR

ING

WE

LL L

OC

ATI

ON

SB

-106

ES

G B

OR

ING

S (M

AY

200

8)B

-3

0' SC

ALE

IN F

EE

T(a

ppro

xim

ate)

100'

100'

200'

SC

ALE

: 1 IN

CH

= 1

00 F

EE

T

DRAFTED BY:DATE:

PREPARED FORJOB NO.:

t i v n

B

ie ci gn

l a

n

ne mn orree n, e c

g ni

DISCLAIMER:PROPERTY OF BENCHMARK ENVIRONMENTAL ENGINEERING & SCIENCE, PLLC. IMPORTANT: THIS DRAWING PRINT IS LOANED FOR MUTUAL ASSISTANCE AND AS SUCH IS SUBJECT TO RECALL AT ANY TIME. INFORMATION CONTAINED HEREON IS NOTTO BE DISCLOSED OR REPRODUCED IN ANY FORM FOR THE BENEFIT OF PARTIES OTHER THAN NECESSARY SUBCONTRACTORS & SUPPLIERS WITHOUT THE WRITTEN CONSENT OF BENCHMARK ENVIRONMENTAL ENGINEERING & SCIENCE, PLLC.

JANUARY 2015BLR

FIG

UR

E 9

GATES CIRCLE HOLDINGS, LLC

BROWNFIELD CLEANUP PROGRAM3 GATES CIRCLE SITEBUFFALO, NEW YORK

REMEDIAL INVESTIGATION / ALTERNATIVE ANALYSIS REPORT

ALTERNATIVE 4 - UNRESTRICTED USE CLEANUP

0309-014-001

F:\CAD\Benchmark\Gates Circle Associates\RI-AAR\Figure 9; Alternative #4 - Unrestricted Use Cleanup.dwg

Page 98: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,

SB

-7

SB

-3

1923

20

14

56

13

7

9

10

1214

8

11

1718 16

15

B-1

B-2

B-1

B-3

B-4

B-5

B-6

TP(S

B)-

9

TP(S

B)-

10

SB

-104

/MW

-4

SB

-102

/MW

-2

SB

-101

/MW

-1

TP(S

B)-

3

TP(S

B)-

2

TP(S

B)-

4TP

(SB

)-1

TP(S

B)-

6

TP(S

B)-

7TP

(SB

)-8

TP(S

B)-

5

SB

-110

SB-1

09

SB

-108

SB

-103

/MW

-3

TP(S

B)-

11

TP(S

B)-

12

TP(S

B)-

13

SB

-104

/MW

-4FI

LL S

AM

PLE

DE

PTH

0-4

FTA

NA

LYS

IS:

VO

CD

EP

TH4-

6'A

NA

LYS

IS:

VO

C

TP(S

B)-

11FI

LL S

AM

PLE

DE

PTH

0.5-

2 FT

AN

ALY

SIS

:V

OC

SV

OC

ME

TALS

SB

-110

FILL

SA

MP

LED

EP

TH0-

2 FT

AN

ALY

SIS

:S

VO

CM

ETA

LS

TP(S

B)-

2FI

LL S

AM

PLE

DE

PTH

0.7-

2 FT

AN

ALY

SIS

:S

VO

CM

ETA

LS

TP(S

B)-

6FI

LL S

AM

PLE

DE

PTH

0.7-

2 FT

AN

ALY

SIS

:S

VO

CM

ETA

LS

16FI

LL S

AM

PLE

DE

PTH

4-8

FTA

NA

LYS

IS:

VO

CS

VO

C

15FI

LL S

AM

PLE

DE

PTH

0-4

FTA

NA

LYS

IS:

PC

Bs

DE

PTH

4-8

FTA

NA

LYS

IS:

VO

CS

VO

C

SB

-102

/MW

-2FI

LL S

AM

PLE

DE

PTH

0-4

FTA

NA

LYS

IS:

VO

CS

VO

CM

ETA

LSP

CB

sP

ES

TH

ER

B

TP(S

B)-

5FI

LL S

AM

PLE

DE

PTH

0.7-

2 FT

AN

ALY

SIS

:S

VO

CM

ETA

LS

TP(S

B)-

7FI

LL S

AM

PLE

DE

PTH

0.7-

2 FT

AN

ALY

SIS

:S

VO

CM

ETA

LS

TP(S

B)-

8FI

LL S

AM

PLE

DE

PTH

0.7-

2 FT

AN

ALY

SIS

:S

VO

CM

ETA

LS

2FI

LL S

AM

PLE

DE

PTH

2-4

FTA

NA

LYS

IS:

VO

CS

VO

C

19FI

LL S

AM

PLE

DE

PTH

8-10

FT

AN

ALY

SIS

:V

OC

SV

OC

SB

-108

FILL

SA

MP

LED

EP

TH0.

3-4

FTA

NA

LYS

IS:

SV

OC

ME

TALS

13FI

LL S

AM

PLE

DE

PTH

0-4

FTA

NA

LYS

IS:

VO

CS

VO

CM

ETA

LS

14FI

LL S

AM

PLE

DE

PTH

0-4

FTA

NA

LYS

IS:

VO

CS

VO

CP

CB

ME

TALS

9FI

LL S

AM

PLE

DE

PTH

0-12

FT

AN

ALY

SIS

:V

OC

SV

OC

ME

TALS

TP(S

B)-

1FI

LL S

AM

PLE

DE

PTH

0.7-

4 FT

AN

ALY

SIS

:S

VO

CM

ETA

LS

A

A'

LEG

EN

D:

PR

OP

ER

TY B

OU

ND

AR

Y

SB

-8 1

BE

NC

HM

AR

K B

OR

ING

S (O

CTO

BE

R 2

012)

STO

HL

BO

RIN

GS

(JU

LY 2

012)

TP(S

B)-

6

SB

-103

/MW

-3

AP

PR

OX

IMA

TE S

OIL

PR

OB

E L

OC

ATI

ON

AP

PR

OX

IMA

TE S

OIL

BO

RIN

G L

OC

ATI

ON

AP

PR

OX

IMA

TE B

OR

ING

/MO

NIT

OR

ING

WE

LL L

OC

ATI

ON

SB

-106

ES

G B

OR

ING

S (M

AY

200

8)B

-3

DE

NO

TES

IMP

AC

TED

FIL

L

DE

NO

TES

FIL

L B

ELO

W R

RS

CO

0' SC

ALE

IN F

EE

T(a

ppro

xim

ate)

100'

100'

200'

SC

ALE

: 1 IN

CH

= 1

00 F

EE

T

DRAFTED BY:DATE:

PREPARED FORJOB NO.:

t i v n

B

ie ci gn

l a

n

ne mnorree n, e c

g ni

DISCLAIMER:PROPERTY OF BENCHMARK ENVIRONMENTAL ENGINEERING & SCIENCE, PLLC. IMPORTANT: THIS DRAWING PRINT IS LOANED FOR MUTUAL ASSISTANCE AND AS SUCH IS SUBJECT TO RECALL AT ANY TIME. INFORMATION CONTAINED HEREON IS NOTTO BE DISCLOSED OR REPRODUCED IN ANY FORM FOR THE BENEFIT OF PARTIES OTHER THAN NECESSARY SUBCONTRACTORS & SUPPLIERS WITHOUT THE WRITTEN CONSENT OF BENCHMARK ENVIRONMENTAL ENGINEERING & SCIENCE, PLLC.

FEBRUARY 2015BLR

FIG

UR

E 10

GATES CIRCLE HOLDINGS, LLC

BROWNFIELD CLEANUP PROGRAM3 GATES CIRCLE SITEBUFFALO, NEW YORK

REMEDIAL INVESTIGATION / ALTERNATIVE ANALYSIS REPORTSAMPLING LOCATION AND PARAMETERS

SUMMARY OF ACCEPTABLE FILL MATERIAL ANALYTICAL

0309-014-001

F:\CAD\Benchmark\Gates Circle Associates\RI-AAR\Figure 10; Summary of Acceptable Fill Material Analytical Sampling Location and Parameters.dwg

Page 99: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,

SB

-7

SB

-3

1923

20

14

56

13

7

9

10

1214

8

11

1718 16

15

B-1

B-2

B-1

B-3

B-4

B-5

B-6

TP(S

B)-

9

TP(S

B)-

10

SB

-104

/MW

-4

SB

-102

/MW

-2

SB

-101

/MW

-1

TP(S

B)-

3

TP(S

B)-

2

TP(S

B)-

4TP

(SB

)-1

TP(S

B)-

6

TP(S

B)-

7TP

(SB

)-8

TP(S

B)-

5

SB

-110

SB-1

09

SB

-108

SB

-103

/MW

-3

TP(S

B)-

11

TP(S

B)-

12

TP(S

B)-

13

11111111111118181818181818 000111111111118

B10188888 00010111111

BBBBBBSBSBSBSBSBSBSBSBSBBBBBBBBBSBSBSBSSB7777777777777777777

SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS17

SSSSSSSSSSSS777777777777777

SSSSSSSSSSSSSSSSSSSSSS

SB

SB

SB

SB

SB

SB

SB

)S

B)

S)

SB

)(

))((

)(S

B)

BS

BS

BS

BS

BS

BS

BS

B)

SB

)S

)S

)(

))(

SSB

SB

SB

(SB

(SB

(SB

(SB

(S(SB

((((P

(SB

SSSB

SB

SB

SB

(SB

(SB

(SB

(SB

(SB

(

22222222221221212121212121212121212222221111114404/

04/

04/

04/

04/

0444004//

000S

BS

BS

BS

BS

BS

BS

B)

SB

)S

B)

S)

SB

)(

))((

)(S

B)

BS

BS

BS

BS

BS

BS

BS

)S

B)

SB

)S

B)

())

(

B1111

B11

B111111111

B1111

BB11

B11

B111111111

66))))

6666)))

SSB

SB

SB

(SB

(SB

(SB

(SB

(SB

(SB

((((P

(SB

SSSB

SB

SB

SB

(SB

(SB

(SB

(SB

(SB

(

2/2/2/22/2/M

22/M

202/M

02/M

02/

002/M

02/M

0222/2/2/222/222M

02M

0M

0

SSB

SB

SB

(SB

(SB

(SB

(SB

(SB

(SB

((((P

(SB

)SSS

BS

BS

BS

B(S

B(S

B(S

B(S

B(S

B(

1661616161616161616616666161111116666615515151515151515151515115111555555555151111

SSSB

SB

SB

(SB

(SB

(SB

(SB

(S(SB

((((P

(SB

SSSB

SB

SB

SB

(SB

(SB

(SB

(SB

(SB

(SSS

BS

BS

B(S

B(S

B(S

B(S

B(S(S

B((((

P(S

BSSS

BS

BS

BS

B(S

B(S

B(S

B(S

B(S

B(

SSSB

SB

SB

(SB

(SB

(SB

(SB

(SB

(SB

(((((P

(SB

)SSS

BS

BS

BS

B(S

B(S

B(S

B(S

B(S

B((

B1010

B10

B1010101011

B1000

BB10

B10

B1010101111

44444444444444444444444444444444

3333333333333333333333333333333

B

9999999999999999999

BBBB

9999999

222222222222222222222222222222222 199191919191919191919191919991911111919919999

A

A'

12 (0

-4')

RR

SC

OR

ES

ULT

Ben

zo(b

)fluo

rant

hene

11.

01

SB

-109

(0.5

-4')

RR

SC

OR

ES

ULT

Ben

zo(a

)ant

hrac

ene

11.

7B

enzo

(a)p

yren

e1

1.3

Ben

zo(b

)fluo

rant

hene

11.

8

17 (4

-8.5

')R

RS

CO

RE

SU

LTB

enzo

(a)a

nthr

acen

e1

1.05

Ben

zo(b

)fluo

rant

hene

11.

01

SB

-6 (0

.5-4

')R

RS

CO

RE

SU

LTB

enzo

(a)a

nthr

acen

e1

1.7

Ben

zo(a

)pyr

ene

12.

8B

enzo

(b)fl

uora

nthe

ne1

2.8

Dib

enzo

(a,h

)ant

hrac

ene

0.33

0.65

Inde

no(1

,2,3

-cd)

pyre

ne0.

50.

5

18 (4

-9')

RR

SC

OR

ES

ULT

Ben

zo(a

)ant

hrac

ene

15.

83B

enzo

(a)p

yren

e1

4.43

Ben

zo(b

)fluo

rant

hene

15.

69B

enzo

(k)fl

uora

nthe

ne3

2.25

Chr

ysen

e3

4.93

Dib

enzo

(a,h

)ant

hrac

ene

0.33

0.91

8In

deno

(1,2

,3-c

d)py

rene

0.5

2.56

TP(S

B)-

3 (0

.6-4

')R

RS

CO

RE

SU

LTM

ercu

ry0.

812.

2 J

TP(S

B)1

3 (2

-4')

RR

SC

OR

ES

ULT

Ben

zo(a

)ant

hrac

ene

120

Ben

zo(a

)pyr

ene

115

Ben

zo(b

)fluo

rant

hene

120

Ben

zo(k

)fluo

rant

hene

38.

1C

hrys

ene

318

LEG

EN

D:

PR

OP

ER

TY B

OU

ND

AR

Y

SB

-8 1

BE

NC

HM

AR

K B

OR

ING

S (O

CTO

BE

R 2

012)

STO

HL

BO

RIN

GS

(JU

LY 2

012)

TP(S

B)-

6

SB

-103

/MW

-3

AP

PR

OX

IMA

TE S

OIL

PR

OB

E L

OC

ATI

ON

AP

PR

OX

IMA

TE S

OIL

BO

RIN

G L

OC

ATI

ON

AP

PR

OX

IMA

TE B

OR

ING

/MO

NIT

OR

ING

WE

LL L

OC

ATI

ON

SB

-106

ES

G B

OR

ING

S (M

AY

200

8)B

-3

DE

NO

TES

IMP

AC

TED

FIL

L

DE

NO

TES

FIL

L B

ELO

W R

RS

CO

0' SC

ALE

IN F

EE

T(a

ppro

xim

ate)

100'

100'

200'

SC

ALE

: 1 IN

CH

= 1

00 F

EE

T

DRAFTED BY:DATE:

PREPARED FORJOB NO.:

t i v n

B

ie ci gn

l a

n

ne mnorree n, e c

g ni

DISCLAIMER:PROPERTY OF BENCHMARK ENVIRONMENTAL ENGINEERING & SCIENCE, PLLC. IMPORTANT: THIS DRAWING PRINT IS LOANED FOR MUTUAL ASSISTANCE AND AS SUCH IS SUBJECT TO RECALL AT ANY TIME. INFORMATION CONTAINED HEREON IS NOTTO BE DISCLOSED OR REPRODUCED IN ANY FORM FOR THE BENEFIT OF PARTIES OTHER THAN NECESSARY SUBCONTRACTORS & SUPPLIERS WITHOUT THE WRITTEN CONSENT OF BENCHMARK ENVIRONMENTAL ENGINEERING & SCIENCE, PLLC.

FEBRUARY 2015BLR

FIG

UR

E 11

GATES CIRCLE HOLDINGS, LLC

BROWNFIELD CLEANUP PROGRAM3 GATES CIRCLE SITEBUFFALO, NEW YORK

REMEDIAL INVESTIGATION / ALTERNATIVE ANALYSIS REPORTSAMPLING LOCATION AND RESULTS

SUMMARY OF IMPACTED FILL ANALYTICAL

0309-014-001

F:\CAD\Benchmark\Gates Circle Associates\RI-AAR\Figure 11; Summary of Impacted Fill Analytical Sampling Location and Results.dwg

Page 100: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,

0'10

0'

HO

RIZ

ON

TAL

DIS

TAN

CE

(FE

ET)

AW

EST

SC

ALE

: 10V

:1H

A'

EAST

200'

300'

400'

500'

600'

700'

800'

0'

-10'

-20'

0' -10'

-20'

BU

ILD

ING

BA

SE

ME

NT

FILL

FILL

RE

DD

ISH

BR

OW

N C

LAY

RE

DD

ISH

BR

OW

N S

ILTY

SA

ND

SB-9

TP(SB)-1

TP(SB)-5

TP(SB)-6

17SB-10918

TP(SB)-11

FOU

ND

ATI

ON

BA

CK

FILL

MA

TER

IAL

(TY

P)

PA

VE

ME

NT

/ SU

B-B

AS

E

CO

NC

RE

TE /

SU

B-B

AS

E

BU

ILD

ING

BA

SE

ME

NT

BU

ILD

ING

BA

SE

ME

NT

SB-106

TP(SB)-3

TP(SB)-12

DRAFTED BY:DATE:

PREPARED FORJOB NO.:

t i v n

B

ie ci gn

l a

n

ne mnorree n, e c

g ni

DISCLAIMER:PROPERTY OF BENCHMARK ENVIRONMENTAL ENGINEERING & SCIENCE, PLLC. IMPORTANT: THIS DRAWING PRINT IS LOANED FOR MUTUAL ASSISTANCE AND AS SUCH IS SUBJECT TO RECALL AT ANY TIME. INFORMATION CONTAINED HEREON IS NOTTO BE DISCLOSED OR REPRODUCED IN ANY FORM FOR THE BENEFIT OF PARTIES OTHER THAN NECESSARY SUBCONTRACTORS & SUPPLIERS WITHOUT THE WRITTEN CONSENT OF BENCHMARK ENVIRONMENTAL ENGINEERING & SCIENCE, PLLC.

FEBRUARY 2015BLR

FIG

UR

E 12

GATES CIRCLE HOLDINGS, LLC

BROWNFIELD CLEANUP PROGRAM3 GATES CIRCLE SITEBUFFALO, NEW YORK

REMEDIAL INVESTIGATION / ALTERNATIVE ANALYSIS REPORT

CROSS SECTION A-A'

0309-014-001

F:\CAD\Benchmark\Gates Circle Associates\RI-AAR\Figure 12; Cross Section A-A'.dwg

Page 101: Remedial Investigation/ Alternatives Analysis Report · brownfield cleanup program remedial investigation/ alternatives analysis report 3 gates circle site bcp site no. c915272 buffalo,

SB

-7

SB

-3

1923

20

14

56

13

7

9

10

1214

8

11

1718 16

15

B-1

B-2

B-1

B-3

B-4

B-5

B-6

TP(S

B)-

9

TP(S

B)-

10

SB

-104

/MW

-4

SB

-102

/MW

-2

SB

-101

/MW

-1

TP(S

B)-

3

TP(S

B)-

2

TP(S

B)-

4TP

(SB

)-1

TP(S

B)-

6

TP(S

B)-

7TP

(SB

)-8

TP(S

B)-

5

SB

-110

SB-1

09

SB

-108

SB

-103

/MW

-3

TP(S

B)-

11

TP(S

B)-

12

TP(S

B)-

13

04/M

W04

/

TP(S

B)-

3TP

(SB

)-13

SB

-7

/MW

-44/

MW

-4TP

(SB

)-11

MW

-3M

W

SB

)-12

TP(S

B)-

2TP

(SB

)2

TP(S

B)-

2

1TP

(SB

)-6

1TP

(SB

)-6

1717(S

)6

8

15

09

TP(S

B)-

517

166

TP(S

B)

5

SB

)-7

TP(S

B)-

88TP

(SB

)-7

TP(S

B)-

4TP

(SB

)-1

SB

-B

-B

-

66

04/M

W-4

MW

4/M

W4

044/M

W4

MW

6

B-

SB

-110

TPTPTP(S

02/M

W-2

02/

2

99

S

S

S

(S

0202

B)

19B

)-9

9999

EX

ISTI

NG

TO

PS

OIL

AN

D V

EG

ETA

TED

CO

VE

R

LEG

EN

D:

PR

OP

ER

TY B

OU

ND

AR

Y

SB

-8 1

BE

NC

HM

AR

K B

OR

ING

S (O

CTO

BE

R 2

012)

STO

HL

BO

RIN

GS

(JU

LY 2

012)

TP(S

B)-

6

SB

-103

/MW

-3

AP

PR

OX

IMA

TE S

OIL

PR

OB

E L

OC

ATI

ON

AP

PR

OX

IMA

TE S

OIL

BO

RIN

G L

OC

ATI

ON

AP

PR

OX

IMA

TE B

OR

ING

/MO

NIT

OR

ING

WE

LL L

OC

ATI

ON

SB

-106

ES

G B

OR

ING

S (M

AY

200

8)B

-3

0' SC

ALE

IN F

EE

T(a

ppro

xim

ate)

100'

100'

200'

SC

ALE

: 1 IN

CH

= 1

00 F

EE

T

DRAFTED BY:DATE:

PREPARED FORJOB NO.:

t i v n

B

ie ci gn

l a

n

ne mnorree n, e c

g ni

DISCLAIMER:PROPERTY OF BENCHMARK ENVIRONMENTAL ENGINEERING & SCIENCE, PLLC. IMPORTANT: THIS DRAWING PRINT IS LOANED FOR MUTUAL ASSISTANCE AND AS SUCH IS SUBJECT TO RECALL AT ANY TIME. INFORMATION CONTAINED HEREON IS NOTTO BE DISCLOSED OR REPRODUCED IN ANY FORM FOR THE BENEFIT OF PARTIES OTHER THAN NECESSARY SUBCONTRACTORS & SUPPLIERS WITHOUT THE WRITTEN CONSENT OF BENCHMARK ENVIRONMENTAL ENGINEERING & SCIENCE, PLLC.

FEBRUARY 2015BLR

FIG

UR

E 13

GATES CIRCLE HOLDINGS, LLC

BROWNFIELD CLEANUP PROGRAM3 GATES CIRCLE SITEBUFFALO, NEW YORK

REMEDIAL INVESTIGATION / ALTERNATIVE ANALYSIS REPORT

SITE COVER SYSTEM

0309-014-001

F:\CAD\Benchmark\Gates Circle Associates\RI-AAR\Figure 13; Site Cover System.dwg