Remarks by Secretary and FHWA Updatesp.bridges.transportation.org/Documents/2011 SCOBS... ·...

32
Remarks by Secretary and FHWA Update AASHTO Highway Subcommittee on Bridges and Structures Norfolk, Virginia May 15 - 19, 2011 and FHWA Update M. Myint Lwin Secretary, AASHTO SCOBS Director, Office of Bridge Technology Federal Highway Administration

Transcript of Remarks by Secretary and FHWA Updatesp.bridges.transportation.org/Documents/2011 SCOBS... ·...

Page 1: Remarks by Secretary and FHWA Updatesp.bridges.transportation.org/Documents/2011 SCOBS... · National Bridge Inspection Program Oversight Process FHWA bridge staff trained and State

Remarks by Secretaryand FHWA Update

AASHTO Highway Subcommittee on Bridges and StructuresNorfolk, VirginiaMay 15 - 19, 2011

and FHWA Update

M. Myint Lwin

Secretary, AASHTO SCOBS

Director, Office of Bridge Technology

Federal Highway Administration

Page 2: Remarks by Secretary and FHWA Updatesp.bridges.transportation.org/Documents/2011 SCOBS... · National Bridge Inspection Program Oversight Process FHWA bridge staff trained and State

Remarks by Secretary

Page 3: Remarks by Secretary and FHWA Updatesp.bridges.transportation.org/Documents/2011 SCOBS... · National Bridge Inspection Program Oversight Process FHWA bridge staff trained and State

Remarks by the Secretary

�Mid-Year Tech Committee Meetings

�Updated and published Manual on Bridge Evaluation to include LRFR

Focused on improving bridge design, �Focused on improving bridge design, construction, inspection, evaluation, preservation and management

�Other Ballot Items

Page 4: Remarks by Secretary and FHWA Updatesp.bridges.transportation.org/Documents/2011 SCOBS... · National Bridge Inspection Program Oversight Process FHWA bridge staff trained and State

FHWA Updates

�Examples of Successful Partnership�FY-2012 Budget and the Reauthorization�National Bridge Inspection Program

OversightOversight�Solicitation of Applications for NHCBP

and IBRD Programs

Page 5: Remarks by Secretary and FHWA Updatesp.bridges.transportation.org/Documents/2011 SCOBS... · National Bridge Inspection Program Oversight Process FHWA bridge staff trained and State

Working Together in Advancing Technology

Ice forming on cablesIce forming on cables

Ice meter measuresIce meter measuresIce conditionIce condition

U of Toledo +U of Toledo +U of CincinnatiU of Cincinnati

Page 6: Remarks by Secretary and FHWA Updatesp.bridges.transportation.org/Documents/2011 SCOBS... · National Bridge Inspection Program Oversight Process FHWA bridge staff trained and State

FRP/Plastic Bridges

Page 7: Remarks by Secretary and FHWA Updatesp.bridges.transportation.org/Documents/2011 SCOBS... · National Bridge Inspection Program Oversight Process FHWA bridge staff trained and State

Bridge Management Peer Exchanges2008 - 2011

Fredericksburg, VA 2008Fredericksburg, VA 2008Lakewood, CO Lakewood, CO

20092009

Portland, OR 2010Portland, OR 2010 Indy, IN 2010Indy, IN 2010 Manchester, NH 2011Manchester, NH 2011

DCDC

No East No East

PRPR

EastEastSo WestSo West So EastSo East

Atlanta, GA 2009Atlanta, GA 2009

N WestN West MidwestMidwest Did not participateDid not participate

Page 8: Remarks by Secretary and FHWA Updatesp.bridges.transportation.org/Documents/2011 SCOBS... · National Bridge Inspection Program Oversight Process FHWA bridge staff trained and State

FHWA Updates

� Innovative Bridge Technology Deployment –Lou Triandafilou

�Long Term Bridge Performance Program Hamid Ghasemi

�FHWA Research Update – Ian Friedland�FHWA Research Update – Ian Friedland�TOMIE Tunnel Manual – Brian Leshko�Other Updates at Tech Committee Meetings�Just published “Bridge Preservation Manual”

Page 9: Remarks by Secretary and FHWA Updatesp.bridges.transportation.org/Documents/2011 SCOBS... · National Bridge Inspection Program Oversight Process FHWA bridge staff trained and State

President’s FY-2012 Budget

� Provides $556 billion, six-year proposal to improve the Country’s highways, transit, and rail infrastructure and to ensure that these systems are safe.safe.

� Includes $50 billion “Up-Front” economic boost that would foster job creation.

9

Page 10: Remarks by Secretary and FHWA Updatesp.bridges.transportation.org/Documents/2011 SCOBS... · National Bridge Inspection Program Oversight Process FHWA bridge staff trained and State

FHWA FY -2012 Budget

� Surface transportation reauthorization proposal is:

- $336 billion from FY 2012-2017 for highway programs

- 48% increase over SAFETEA-LU- 48% increase over SAFETEA-LU

� FHWA FY 2012 budget request is $70.5 billion

- $42.8 billion plus $27.7 billion “up front” funding

10

Page 11: Remarks by Secretary and FHWA Updatesp.bridges.transportation.org/Documents/2011 SCOBS... · National Bridge Inspection Program Oversight Process FHWA bridge staff trained and State

National Highway Program

• Targets investment to maintain state of good repair and operational performance on roads critical to national interest.• Provides flexibility to the States for making

transportation investment decisions on the larger

11

transportation investment decisions on the larger system of Federal-aid eligible highways.• Streamlines and consolidates portions of several

existing programs including Interstate Maintenance, National Highway System, Highway Bridge, Surface Transportation Program.

Page 12: Remarks by Secretary and FHWA Updatesp.bridges.transportation.org/Documents/2011 SCOBS... · National Bridge Inspection Program Oversight Process FHWA bridge staff trained and State

Enhanced National Highway System

• Redefines the NHS as 220,000-mile network that includes:- Interstate System.- All principal arterials.- Intermodal connectors.

12

- Intermodal connectors.- Other roads important to strategic defense policy.• Expands network that would carry 55% of all traffic

and 97% of all truck-borne freight.• Supports interstate commerce and economic

competitiveness.

Page 13: Remarks by Secretary and FHWA Updatesp.bridges.transportation.org/Documents/2011 SCOBS... · National Bridge Inspection Program Oversight Process FHWA bridge staff trained and State

Highway Infrastructure Performance Program

• Establishes formula and performance based program ($16.75 billion)

-Maintains infrastructure condition and performance on the expanded NHS network.

13

on the expanded NHS network.

- Performance focus on pavement and bridge conditions, and safety.

Page 14: Remarks by Secretary and FHWA Updatesp.bridges.transportation.org/Documents/2011 SCOBS... · National Bridge Inspection Program Oversight Process FHWA bridge staff trained and State

Flexible Investment Program

• Establishes formula-based program ($15.6 billion)

• Provides flexibility to the States to replace or improve highway infrastructure, improve operational performance, and build or expand needed

14

performance, and build or expand needed transportation facilities

• Funds can be used on any Federal-aid eligible highways (~995,000 miles) and off-system bridges.

Page 15: Remarks by Secretary and FHWA Updatesp.bridges.transportation.org/Documents/2011 SCOBS... · National Bridge Inspection Program Oversight Process FHWA bridge staff trained and State

Bridges

• Replace, rehabilitate, preserve and protect bridges.

• Bridge activities eligible under new programs

-NHS bridges under the HIPP

- All bridges under the FIP

15

- All bridges under the FIP

• Inspection and evaluation of bridges, tunnels and other infrastructure assets; including inspector training.

• Set-aside 1% of HIPP and FIP funds for bridge and tunnel inspections.

Page 16: Remarks by Secretary and FHWA Updatesp.bridges.transportation.org/Documents/2011 SCOBS... · National Bridge Inspection Program Oversight Process FHWA bridge staff trained and State

Research, Technology & Education

• Provides $641 million for a comprehensive, nationally-coordinated research, technology, and education program.

• Addresses current and emerging challenges – safety, reliability, state of good repair, livability, sustainability – through accelerated innovation delivery and technology

16

accelerated innovation delivery and technology implementation.

• Restructures existing FHWA programs into three programs:- Highway Research & Development Program ($200 million)

- The Technology & Innovation Deployment Program ($144 million)

- The Training & Education Program ($40 million)

Page 17: Remarks by Secretary and FHWA Updatesp.bridges.transportation.org/Documents/2011 SCOBS... · National Bridge Inspection Program Oversight Process FHWA bridge staff trained and State

Performance Management Process

• Establishes a performance-based Federal-aid highway program.

• Focuses initially on safety, pavement and bridge conditions.

17

conditions.

• Requires the Secretary to establish quantifiable performance measures and national performance goals.

Page 18: Remarks by Secretary and FHWA Updatesp.bridges.transportation.org/Documents/2011 SCOBS... · National Bridge Inspection Program Oversight Process FHWA bridge staff trained and State

Performance Management Process

• States to work in partnership with FHWA to set state targets.- Safety – incorporates State Strategic

Highway Safety Plans.- Pavements/Bridges – requires risk-based

18

- Pavements/Bridges – requires risk-based management plan for enhanced NHS.

• Provides additional flexibility when targets are met.• Requires performance improvement plan

when targets not met.

Page 19: Remarks by Secretary and FHWA Updatesp.bridges.transportation.org/Documents/2011 SCOBS... · National Bridge Inspection Program Oversight Process FHWA bridge staff trained and State

Office of Program Performance Management

�An office to lead, guide, coordinate and develop cross-cutting aspects of program

�An office to ensure consistency in philosophy

�An office for implementation of performance elements across various program areas

Page 20: Remarks by Secretary and FHWA Updatesp.bridges.transportation.org/Documents/2011 SCOBS... · National Bridge Inspection Program Oversight Process FHWA bridge staff trained and State

Reorganization of Office of Infrastructure

�Office of Program Administration (HIPA)

�Office of Bridge Technology (HIBT)

�Office of Pavement Technology (HIPT)

�Office of Asset Management (HIAM)

�Office of Program Performance Management

Page 21: Remarks by Secretary and FHWA Updatesp.bridges.transportation.org/Documents/2011 SCOBS... · National Bridge Inspection Program Oversight Process FHWA bridge staff trained and State

National Bridge Inspection Program Oversight

�Concerns by the States: Level of oversight not consistent across the nation.

�OIG recommendations: Implement a data-driven, risk-based oversight of FHWA’s driven, risk-based oversight of FHWA’s Annual NBIP review

�Congressional Direction: FHWA shall make significant improvement in its oversight of bridge condition and safety

Page 22: Remarks by Secretary and FHWA Updatesp.bridges.transportation.org/Documents/2011 SCOBS... · National Bridge Inspection Program Oversight Process FHWA bridge staff trained and State

New Bridge Safety Engineers

�Barry Brecto

�Tom Drda

�Jon NekritzJon Nekritz

�John Thiel

Page 23: Remarks by Secretary and FHWA Updatesp.bridges.transportation.org/Documents/2011 SCOBS... · National Bridge Inspection Program Oversight Process FHWA bridge staff trained and State

National Bridge Inspection Program Oversight Team

�Barry Brecto

�Tom Drda

�Jon Nekritz

�John Thiel

�Gary Moss

Page 24: Remarks by Secretary and FHWA Updatesp.bridges.transportation.org/Documents/2011 SCOBS... · National Bridge Inspection Program Oversight Process FHWA bridge staff trained and State

National Bridge Inspection Program Oversight Team

�Barry Brecto

�Tom Drda

(NBIPOT)(NBIPOT)

�Jon Nekritz

�John Thiel

�Gary Moss

Page 25: Remarks by Secretary and FHWA Updatesp.bridges.transportation.org/Documents/2011 SCOBS... · National Bridge Inspection Program Oversight Process FHWA bridge staff trained and State

National Bridge Inspection Program Oversight Process

�February 2011 - FHWA put in place a data-driven, risk-based process for oversight of the National Bridge Inspection Program.– Assessment of compliance of 23 individual – Assessment of compliance of 23 individual

metrics derived directly from the National Bridge Inspection Standards (NBIS) regulation.

– Based on objective data, statistical sampling of data and inspection records, and defined criteria for compliance for each metric.

Page 26: Remarks by Secretary and FHWA Updatesp.bridges.transportation.org/Documents/2011 SCOBS... · National Bridge Inspection Program Oversight Process FHWA bridge staff trained and State

National Bridge Inspection Program Oversight Process

� FHWA bridge staff trained and State DOT bridge staff briefed.

� This change needs to happen for many reasons

� There are gaps and inconsistencies in both FHWA’s level of compliance oversight andthe level of compliance by the States.– magnitude of the gaps varies, and in some cases,

the variations and gaps are significant.

Page 27: Remarks by Secretary and FHWA Updatesp.bridges.transportation.org/Documents/2011 SCOBS... · National Bridge Inspection Program Oversight Process FHWA bridge staff trained and State

National Bridge Inspection Program Oversight Process

�FHWA and the States need to work together�Non-compliance at the end of 2011 should

be a rare occurrence for any metric– If compliance deficiencies exist, the goal is to – If compliance deficiencies exist, the goal is to

either get them corrected, or get a plan of corrective actions in place to avoid non-compliance

�FHWA and AASHTO SCOBS joint task force

Page 28: Remarks by Secretary and FHWA Updatesp.bridges.transportation.org/Documents/2011 SCOBS... · National Bridge Inspection Program Oversight Process FHWA bridge staff trained and State

Division Bridge EngineersDivision Bridge Engineers

Page 29: Remarks by Secretary and FHWA Updatesp.bridges.transportation.org/Documents/2011 SCOBS... · National Bridge Inspection Program Oversight Process FHWA bridge staff trained and State

Barry BrectoJon Nekritz

Tom Drda

John Thiel

Tom Drda

Page 30: Remarks by Secretary and FHWA Updatesp.bridges.transportation.org/Documents/2011 SCOBS... · National Bridge Inspection Program Oversight Process FHWA bridge staff trained and State

NHCBP and IBRD Programs

�Solicitation for the programs out May 6

�Application closes June 3, 2011

�Please apply through the FHWA Division �Please apply through the FHWA Division Offices

�For more information, please visit:– http://www.fhwa.dot.gov/discretionary

– http://www.fhwa.dot.gov/bridge/ibrd

Page 31: Remarks by Secretary and FHWA Updatesp.bridges.transportation.org/Documents/2011 SCOBS... · National Bridge Inspection Program Oversight Process FHWA bridge staff trained and State

Hoover Dam and the New Bridge

Page 32: Remarks by Secretary and FHWA Updatesp.bridges.transportation.org/Documents/2011 SCOBS... · National Bridge Inspection Program Oversight Process FHWA bridge staff trained and State

Working Together

Keep Our Roads, Bridges & Tunnelsin a “State of Good Repair” and

Keep America MovingSafely, Reliably, Efficiently

and Sustainably