Relocation Reference Projects Rev.2

5
Relocation Reference Projects Relocation Needle Coker Plant Relocation engineering, Dismantling, Packing, Transportation and Re- assembly of a Needle Coker Plant from Shell - The Netherlands to Shell - Argentina. 66.000 Freight tons 7.000 Metric tons 30 Modules Execution: 1993 / 1994 Relocation Melamine Plant Relocation engineering, Dismantling, Packing, Transportation and Re- assembly of a Melamine Plant from DSM- The Netherlands to Kaltim - Indonesia. 14.000 Freight tons 3.000 Metric tons Execution: 1994 / 1995 Relocation Extruder Production Lines Relocation engineering, Dismantling, Packing, Transportation and Re- assembly of Extruder Production Lines incl. Bagging and Packing lines from DSM / Dupont - Geleen to Dupont du Nemours - Dordrecht. 800 Freight tons 120 Metric tons Execution: 1995

description

Relocation of Industrial installations

Transcript of Relocation Reference Projects Rev.2

Page 1: Relocation Reference Projects Rev.2

Relocation Reference Projects

Relocation Needle Coker Plant

Relocation engineering, Dismantling, Packing, Transportation and Re-assembly of a Needle Coker Plant from Shell - The Netherlands to Shell - Argentina. 66.000 Freight tons 7.000 Metric tons 30 Modules Execution: 1993 / 1994

Relocation Melamine Plant

Relocation engineering, Dismantling, Packing, Transportation and Re-assembly of a Melamine Plant from DSM-The Netherlands to Kaltim - Indonesia. 14.000 Freight tons 3.000 Metric tons Execution: 1994 / 1995

Relocation Extruder Production Lines

Relocation engineering, Dismantling, Packing, Transportation and Re-assembly of Extruder Production Lines incl. Bagging and Packing lines from DSM / Dupont - Geleen to Dupont du Nemours - Dordrecht. 800 Freight tons 120 Metric tons Execution: 1995

Page 2: Relocation Reference Projects Rev.2

Relocation Reference Projects

Relocation Steel Plant Hoogoven 4 / 5

Consultancy for Relocation engineering, Dismantling and Packing for a Blast Furnace from Corus IJmuiden -The Netherlands to Gunawan Iron and Steel - Malaysia Execution: 1996

Relocation Fokker Services Equipment

Relocation engineering, Dismantling, Packing , Transportation and Re-assembly of Workshop Equipment from several Fokker Aircraft Services locations in the Netherlands to a central Workshop at Papendrecht Execution: 1998

Relocation Complete Mobil Oil Refinery

Relocation engineering, Dismantling, Packing and Transportation of a complete Oil Refinery from Mobil - Germany to NOCL - India. 300.000 Freight tons 58.000 Metric tons 85 Modules Execution: 1998 / 1999

Page 3: Relocation Reference Projects Rev.2

Relocation Reference Projects

Relocation Shell TIP-unit

Relocation engineering, Dismantling, Packing, Tranportation and Re- assembly of a TIP Unit and SWT Unit from Shell - Norway to BRC - Antwerpen 13.000 Freight/tons 1.400 Metric/tons 2 Modules Execution: Dismantling 2001

Re-assembly 2004

Relocation Philips Test Modules

Relocation engineering, Dismantling, Packing, Transportation of Test Modules from Philips MDS - Heerlen to Philips Shanghai and Shenzen 350 Freight tons 60 Metric tons Execution: 2004

Relocation Grolsch Brewery Equipment

Relocation engineering, Dismantling and Tranportation of Brewery Equipment incl. Auxiliary equipment from Grolsch - Groenlo to Saudi Arabia on behalf of Pennington U.K. 2.500 Freight tons 700 Metric tons 8 modules

Execution: 2004 / 2005

Page 4: Relocation Reference Projects Rev.2

Relocation Reference Projects

Relocation DuPont Extruder and Packing Line

Relocation engineering, Dismantling, Packing and Transportation of Extruder Production lines incl. Bagging and Packing lines from DuPont - Rozenburg to DuPont - China. 1.100 Freight tons 180 Metric tons

Execution: 2004 / 2005

Relocation DuPont Extruder and Packing Line

Relocation engineering, Dismantling, Packing and Transportation of a Extruder Production lines incl. Begging and Packing lines from DuPont - Rozenburg to DuPont - Argentina. 1.000 Freight tons 190 Metric tons

Execution: 2004 / 2005

Relocation Fokker 50 Flight Simulator

Relocation engineering, Dismantling, Packing, Tranportation and Re- assembly of a Flight Simulator incl. all auxiliary equipment from Fokker Services- Schiphol to Fokker Services - Nieuw Vennep. 200 Freight tons 50 Metric tons 1 Module and equipment Execution: 2005

Page 5: Relocation Reference Projects Rev.2

Relocation Reference Projects

Relocation Production Facilities

Relocation engineering, Dismantling, Packing, Tranportation and Re- assembly of Complete Production facilities from H.J. Heinz-Sneek and Baarn to H.J.Heinz-Maarssen 2.500 Freight tons 350 Metric tons Several modules and loose equipment Execution: 2006 / 2007

Relocation Production Facilities

Relocation engineering, Dismantling, Packing, Tranportation and Re- assembly of Production lines from Paper Projects-Dinxperlo to Doetichem 1250 Freight tons 65 Metric tons Loose equipment and Utilities Execution: 2007