Equipment ReliabilityJon Hamilton
![Page 2: Reliability Presentation to Board of Directors](https://reader033.fdocuments.in/reader033/viewer/2022052606/58ee0b6a1a28abfe358b468b/html5/thumbnails/2.jpg)
2
PM 6 Reliability 2014 YTD PPPC Efficiency
Rank Mill & PM % 1 SP FIBER TECHNOLOGIES NEWBERG OR 6 93.40 2 PAPIERS STADACONA QC 4 93.35 3 NORSKE SKOG PISA BRAZIL 1 93.03 4 PAPIER MASSON MASSON QC 3 92.68 5 KRUGER INC. TROIS-RIVIERES QC 7 92.65 6 F.F. SOUCY INC. RIV. DU LOUP QC 2N 92.55 7 HAINDL SCHONGAU GERMANY 6 92.27
2013 PPPC Efficiency Rank Mill & PM %
1 F.F. SOUCY INC. RIV. DU LOUP QC 1 93.65 2 BOISE CASCADE DERIDDER LA USA 3 92.72 3 PAPIERS STADACONA QC 4 92.29 4 F.F. SOUCY INC. RIV. DU LOUP QC 2N 92.18 5 SP FIBER TECHNOLOGIES NEWBERG OR 6 92.13 6 PAPIERS STADACONA QC 3 92.02 7 RESOLUTE BAIE COMEAU QC 1 91.86
2012 PPPC Efficiency Rank Mill & PM %
1 F.F. SOUCY INC. RIV. DU LOUP QC 2N 94.26 2 F.F. SOUCY INC. RIV. DU LOUP QC 1 94.20 3 HAINDL SCHONGAU GERMANY 7 92.88 4 NORSKE SKOG PISA BRAZIL 1 92.84 ... ... ... 30 RESOLUTE THOROLD ON 7 88.45 31 RESOLUTE BAIE COMEAU QC 4 88.43 32 RESOLUTE BAIE COMEAU QC 3 87.87 33 NORSKE SKOG GOLBEY FRANCE 2 87.72 34 SP FIBER TECHNOLOGIES NEWBERG OR 6 87.60
![Page 3: Reliability Presentation to Board of Directors](https://reader033.fdocuments.in/reader033/viewer/2022052606/58ee0b6a1a28abfe358b468b/html5/thumbnails/3.jpg)
3
Equipment Reliability – Focused Efforts1) Power Transmission
• Preventative Maintenance• Predictive Maintenance• Upgrade & standardization
2) Electric Motors• Testing• Cooling upgrade• Spares
3) Predictive Technology• Vibration monitoring• Thermography
4) Planning & Scheduling• Coordination between Operations & Maintenance• Efficient use of resources
![Page 4: Reliability Presentation to Board of Directors](https://reader033.fdocuments.in/reader033/viewer/2022052606/58ee0b6a1a28abfe358b468b/html5/thumbnails/4.jpg)
4
PdM Thermography
• IR (Infra Red) scan found 293 deg F conductor with damaged insulation• Conductor was failing and would have likely caused a fire and PM6
unscheduled downtime• Equipment was isolated and repaired while PM6 continued to run• Conduct 2,700 IR reports per year
![Page 5: Reliability Presentation to Board of Directors](https://reader033.fdocuments.in/reader033/viewer/2022052606/58ee0b6a1a28abfe358b468b/html5/thumbnails/5.jpg)
5
PdM Vibration Monitoring
• Accelerometer readings found failing bearing
• Would have catastrophically failed if not changed
• Avoided 12 hours of unscheduled downtime• Check over 3,000 points per month