March 13, 2014 Members, Reliability Coordinating Committee and Members, Task Force on Coordination of Operation Members, Task Force on Coordination of Planning Members, Task Force on Infrastructure Security and Technology Members, Task Force on System Protection Members, Task Force on System Studies Re: Minutes of the December 3, 2013 RCC Meeting Sir / Madam: Attached are minutes of the December 3, 2013 meeting of the NPCC Reliability Coordinating Committee, as approved at the February 26, 2014 meeting. Sincerely, Phil Fedora Philip A. Fedora Assistant Vice President-Reliability Services cc: NPCC Staff

Transcript of Reliability Coordinating Committee...2013/12/03  · David Conroy (Alternate) Consolidated Edison...

Page 1: Reliability Coordinating Committee...2013/12/03  · David Conroy (Alternate) Consolidated Edison Company Mike Forte of New York, Inc. Hydro One Networks Inc. Paul Tremblay Long Island

March 13, 2014 Members, Reliability Coordinating Committee and Members, Task Force on Coordination of Operation Members, Task Force on Coordination of Planning Members, Task Force on Infrastructure Security and Technology Members, Task Force on System Protection Members, Task Force on System Studies Re: Minutes of the December 3, 2013 RCC Meeting Sir / Madam: Attached are minutes of the December 3, 2013 meeting of the NPCC Reliability Coordinating Committee, as approved at the February 26, 2014 meeting.

Sincerely,

Phil Fedora

Philip A. Fedora Assistant Vice President-Reliability Services

cc: NPCC Staff

Page 2: Reliability Coordinating Committee...2013/12/03  · David Conroy (Alternate) Consolidated Edison Company Mike Forte of New York, Inc. Hydro One Networks Inc. Paul Tremblay Long Island

NORTHEAST POWER COORDINATING COUNCIL Reliability Coordinating Committee Minutes

December 3, 2013

December 3, 2013 2

Mr. Briggs called the meeting of the Reliability Coordinating Committee (RCC), held at the Seaport Hotel and World Trade Center, Boston, MA on December 3, 2013 to order at 10:00 am.

Attendance Officers of the Reliability Coordinating Committee Alden Briggs, Chair New Brunswick Power Michael Schiavone, Co-Vice Chair National Grid USA Brian Evans-Mongeon, Co-Vice Chair Utility Services, Inc. Sector 1 - Transmission Owners Central Hudson Gas & Electric Corp. Tom Duffy Central Maine Power Company Brian Conroy

David Conroy (Alternate) Consolidated Edison Company Mike Forte of New York, Inc. Hydro One Networks Inc. Paul Tremblay Long Island Power Authority (proxy to Anie Philip – via phone) National Grid USA Michael Schiavone New Brunswick Power Transmission Randy MacDonald (via phone) Corporation New York Power Authority (proxy to Randy Crissman) New York State Electric & Gas Corp. Ray Kinney Northeast Utilities Brad Bentley Nova Scotia Power Incorporated Paul Casey David Stanford (Alternate) Rochester Gas & Electric Corporation John Allen (Alternate - via phone) The United Illuminating Company Jonathan Appelbaum (via phone) Vermont Transco (proxy to Kim Moulton) Sector 2 – Reliability Coordinators Hydro-Québec TransÉnergie Pierre Paquet Independent Electricity System Operator Mike Falvo (Alternate) ISO-New England, Inc. Mike Henderson New Brunswick Power Corporation Alden Briggs New York Independent System Operator Henry Chao Sector 3 – Transmission Dependent Utilities, Distribution Companies and Load Serving Entities Hydro-Québec Distribution Stephane Dufrense (via phone) New York Power Authority (proxy to Randy Crissman) Long Island Power Authority Anie Philip (Alternate – via phone)

Page 3: Reliability Coordinating Committee...2013/12/03  · David Conroy (Alternate) Consolidated Edison Company Mike Forte of New York, Inc. Hydro One Networks Inc. Paul Tremblay Long Island

NORTHEAST POWER COORDINATING COUNCIL Reliability Coordinating Committee Minutes

December 3, 2013

December 3, 2013 3

Northeast Utilities Dwayne Basler Sector 4 Generation Owners Dominion Energy Marking, Inc. Mike Garton (via phone) Dynegy, Inc. Jim Watson (via phone) Entergy Nuclear Northeast Tom Czerniewski Long Island Power Authority (proxy to Anie Philip – via phone) New York Power Authority Randy Crissman NextEra Energy Resources (via written proxy) Northeast Utilities Randy Rudolph (Alternate) Ontario Power Generation, Inc. David Ramkalawan Sector 5 – Marketers, Brokers, and Aggregators Constellation Energy Commodities Group (via written proxy) Long Island Power Authority (proxy to Anie Philip – via phone) New York Power Authority (proxy to Randy Crissman – via phone) PPL EnergyPlus, LLC Elizabeth Davis (Alternate - via phone) Utility Services Brian Evans-Mongeon Sector 6 – State and provincial Regulatory and/or Governmental Authorities New York Power Authority Bruce Metruck New York State Department Ed Schrom (Alternate - via phone) of Public Service Sector 7 – Sub-Regional Reliability Councils, Customers, other Regional Entities and Interested Entities New York State Reliability Council, LLC (via written proxy) NPCC Staff Sal Buffamante (part-time) Assistant Vice President Compliance Audits

and Investigations Gerry Dunbar Manager of Reliability Criteria

Requirements Javier Echevarria Information Technology Specialist Phil Fedora Assistant Vice President, Reliability

Services Brian Hogue Information Systems & Security Management Donal Kidney Manager, System Studies Stanley Kopman Assistant Vice President of Compliance

Registration & Enforcement Quoc Le Manager, System Planning and Protection Mike Lombardi Senior Engineer of Reliability Standards Jennifer Mattiello Vice President & Chief Operating Officer

Page 4: Reliability Coordinating Committee...2013/12/03  · David Conroy (Alternate) Consolidated Edison Company Mike Forte of New York, Inc. Hydro One Networks Inc. Paul Tremblay Long Island

NORTHEAST POWER COORDINATING COUNCIL Reliability Coordinating Committee Minutes

December 3, 2013

December 3, 2013 4

John Mosier, Jr. Assistant Vice President of System Operations

Andrey Oks Manager, Reliability Performance Criteria Assessment

Frantz Roc Manager, Information Technologies Paul Roman Manager, Operations Planning Ralph Rufrano Manager, Event Analysis Edward Schwerdt President & Chief Executive Officer Henry Tsai Reliability Assessment and Performance

Analysis Engineer Guy Zito Assistant Vice President of Standards Guests Paul DiFilippo (via phone) Chair, Task Force on System Protection Ron Falsetti ASI Jeff Fenn SGC Engineering, LLC Gregory Goodrich Chair, Task Force on Infrastructure Security & Technology Jim McCloskey Central Hudson Gas & Electric John Norden Chair, Task Force on Coordination of

Operation Fred Plett MA Attorney General Daren Verner (via phone) Chair, Task Force on System Protection Isen Widjaja (via phone) Chair, Load Modeling Working Group

Quorum Statement Mr. Fedora indicated that a quorum had been achieved, by member attendance, proxy or alternate designation. He also noted having received the following written proxies: Sector 4 – Generator Owners Allen D. Schriver - NextEra Energy Resources Sector 5 – Marketers, Brokers, and Aggregators Glenn McCartney - Constellation Energy Commodities Group, Inc. Sector 7 – Sub-Regional Reliability Councils, Customers, other Regional Entities and Interested Entities Roger Clayton – New York State Reliability Council, LLC.

Page 5: Reliability Coordinating Committee...2013/12/03  · David Conroy (Alternate) Consolidated Edison Company Mike Forte of New York, Inc. Hydro One Networks Inc. Paul Tremblay Long Island

NORTHEAST POWER COORDINATING COUNCIL Reliability Coordinating Committee Minutes

December 3, 2013

December 3, 2013 5

Antitrust Guidelines for NPCC Meetings Mr. Fedora reviewed the NPCC Antitrust Guidelines in the Agenda package, and suggested contacting NPCC Inc.’s Secretary, Andrianne S. Payson, at (212) 424-8218 for further information.

President & CEO Report Mr. Schwerdt reported on the following items: Bulk Electric System (BES) Definition Implementation The NERC Board of Trustees during its November 21, 2013 teleconference meeting unanimously approved a BES Phase 2 Definition which had earlier that week received a 74% affirmative vote from the industry ballot body. It is anticipated that NERC will file the revised definition with regulatory authorities shortly, with an expected effective date of the BES definition in the U.S. of July 1, 2014.

The BES Exception Process ERO-wide IT tool has successfully undergone representative end-to-end testing by NERC and the Regional Entity staffs; the development of guidance documentation for stakeholder users is underway, with an expected release in early 2014.

NERC Communications Standard The NERC Board of Trustees at its November 6, 2013 meeting passed a resolution directing the development of a combined COM-002 and COM-003 standard that draws on the NERC Operating Committee Guideline for good communication practice; and includes an essential set of communications protocols to be used by all entities that, at a minimum, require the use of three-part communications for emergency and alert communications, as well as non-emergency communications that change or preserve the state, status, output, or input of Bulk Electric System asset. The standard should also require each entity to (1) train its operating personnel regarding proper communications; (2) periodically self-assess its effectiveness in implementing the communications protocols, (3) self-identify any necessary changes to the entity’s protocols based upon experience and the results of periodic review, and (4) provide feedback to its operators regarding their adherence to the protocols. The Board of Trustees further resolved that the draft combined standard should consider the following compliance/enforcement approach: (1) maintain the current requirement that entities should be accountable for incorrect use of communication protocols in connection with Emergency Communications, without exception; and (2) for all other use of communication protocols in connection with Non-Emergency Communications, the standard should provide that compliance with the standard should assess an entity’s internal processes and controls around its protocol.

Page 6: Reliability Coordinating Committee...2013/12/03  · David Conroy (Alternate) Consolidated Edison Company Mike Forte of New York, Inc. Hydro One Networks Inc. Paul Tremblay Long Island

NORTHEAST POWER COORDINATING COUNCIL Reliability Coordinating Committee Minutes

December 3, 2013

December 3, 2013 6

Risk-Informed, Cost-Effective Reliability Initiatives NERC and the eight Regional Entities are currently in the process of developing an ERO Enterprise Strategic Plan for 2014 through 2017. The draft to date includes some six strategic goals, including: (1) Develop unambiguous, technically sound reliability standards in a timely and efficient manner; (2) Be a strong, objective and fair enforcement authority; (3) Promote a culture of reliability excellence; (4) Identify significant risks to reliability; (5) Be accountable for mitigating risks; and (6) Operate transparently and consistently as a collaborative organization, improving efficiencies and cost effectiveness. A working draft of this strategic plan is scheduled to be shared with the industry for input and comment in the near future. Mr. Schwerdt then responded to questions raised by Mr. Duffy, clarifying aspects of the risk-informed, cost-effective reliability initiative.

Chair Report Meeting Agenda Mr. Briggs reviewed the meeting Agenda. He noted that the Task Force on System Protection Scope has been moved from the Consent Agenda for consideration under the Approval Items, and that a discussion regarding Task Force follow-up activities related to the July 3, 2013 Quebec Event will be added under the Status Report Items. The RCC then approved the Agenda. New Brunswick Update Mr. Briggs provided an update regarding the October 1, 2013 legislation in New Brunswick creating a new Electricity Act. The Act re-integrates the New Brunswick Power group of companies into one main company and one subsidiary. Also, the New Brunswick System Operator was amalgamated into the new, vertically integrated Crown utility called the New Brunswick Power Corporation. The function of the New Brunswick System Operator has been integrated into New Brunswick Power Corp. Mr. Briggs responded to questions regarding the roles and responsibilities of the new organization. He stated that New Brunswick Power Corporation, through agreement with Nova Scotia Power, assumes the role of Reliability Coordinator for the Maritimes. Events Analysis “Lessons Learned” Template Mr. Briggs refereed to the Events Analysis “Lessons Learned” Template provided in the Agenda package, and called for Task Force and RCC review with comments to Mr. Fedora by February 1, 2014.

Page 7: Reliability Coordinating Committee...2013/12/03  · David Conroy (Alternate) Consolidated Edison Company Mike Forte of New York, Inc. Hydro One Networks Inc. Paul Tremblay Long Island

NORTHEAST POWER COORDINATING COUNCIL Reliability Coordinating Committee Minutes

December 3, 2013

December 3, 2013 7

Mr. Duffy stressed the need to expedite dissemination of the ‘lessons learned,’ stating they should be distributed to the industry as soon as possible. Mr. Rufrano responded that his presentation later in the meeting will address this concern. Mr. Schwerdt distinguished the difference between sharing the ‘lessons learned’ versus the sharing of actionable data concerning the event. Mr. Duffy agreed that NPCC is one of the leading groups regarding this effort, but said more can be done to improve the process. Mr. Schwerdt stated that the focus of the Events Analysis program is operational excellence through the confidential sharing of actionable data, not just the release of the generic ‘lessons learned.’ Mr. Dave Conroy suggested a reminder for template comments be sent to the Task Forces and RCC prior to the next meeting. 2014-2015 Work Plan Mr. Fedora indicated that the RCC 2014-2015 Work Plan would be considered for approval later in the meeting following RCC approval of the Task Force 2014-2105 Work Plans. 2014 Roster Mr. Fedora noted two changes received for the 2014 RCC Roster following the notice in the Agenda package: Sector 4 – Generator Owners Mr. Rudolph of Northeast Utilities succeeds Mr. O’Keefe, formerly of Northeast Utilities, as alternate. Removal of Ms. Adelson of the Long Island Power Authority, as alternate.

Consent Agenda The Reliability Coordinating Committee unanimously approved the following Consent Agenda items (all written proxies in favor): September 11, 2013 Meeting Minutes The Draft-For-Approval Minutes of the September 11, 2013 Reliability Coordinating Committee were approved, with corrections noted. RCC Membership Changes The following changes to RCC Membership were approved: Sector 1, Transmission Owners Mr. Ajay Garg of Hydro One Networks, Inc. to succeed Mr. John Sabiston, (formerly

retired) as alternate.

Page 8: Reliability Coordinating Committee...2013/12/03  · David Conroy (Alternate) Consolidated Edison Company Mike Forte of New York, Inc. Hydro One Networks Inc. Paul Tremblay Long Island

NORTHEAST POWER COORDINATING COUNCIL Reliability Coordinating Committee Minutes

December 3, 2013

December 3, 2013 8

Mr. Tim Lynch of New York State Electric & Gas Corp. to succeed Mr. Joseph Fleury as alternate.

Sector 4, Generator Owners Mr. Dan Roethemeyer of Dynegy Inc. to succeed Mr. Dean Ellis as alternate. Mr. Randy Rudolph of Northeast Utilities succeeds Mr. Drew O’Keefe, formerly of

Northeast Utilities, as alternate. Removal of Ms. Polina Adelson of the Long Island Power Authority, as alternate.

Task Force Roster Changes The following changes to Task Force and Working Group memberships were approved: Task Force on Coordination of Planning Mr. Ajay Garg to replace Ms. Alessia Dawes as alternate. Mr. Alain Pageau representing Hydro-Québec TransÉnergie as a member. Mr. Gabriel Adam to replace Mr. Khaqan Khan as member. Both of the Ontario

Independent Electric System Operator. Task Force on System Studies Mr. Rajee Mustafa representing Orange and Rockland Utilities as a member. Mr. Hamid Hamadani to replace Mr. Ibrahim El-Nahas as member. Ms. Alessia

Dawes to replace Mr. Hamid Hamadani as alternate. Both of Hydro One Networks, Inc. Task Force on System Protection Mr. Ovidiu Vasilachi succeeds Mr. Ioan Agavriloai both of the Ontario Independent

Electricity System Operator as a member. Mr. Ioan Agavriloai will remain as an alternate member.

CO-1 Control Performance Working Group Mr. Petar Novakovic of the Ontario Independent Electricity System Operator to replace

Mr. Jim Piper as chairman. Mr. Piper will continue as the NYISO member. CO-2 System Operator Training Working Group Mr. Todd Banks to replace Ms. Sabine Richter as a member. Ms. Richter will serve as

alternate. Both of Nova Scotia Power, Inc. CO-08 System Operations Managers Working Group Mr. Jon Sawyer succeeds Mr. John Ravalli as the primary representative for the New

York ISO.

CO-11 Restoration Working Group Mr. Rick Johnson succeeds Mr. Peter Wrixon as the primary representative for Hydro

One Inc.

Page 9: Reliability Coordinating Committee...2013/12/03  · David Conroy (Alternate) Consolidated Edison Company Mike Forte of New York, Inc. Hydro One Networks Inc. Paul Tremblay Long Island

NORTHEAST POWER COORDINATING COUNCIL Reliability Coordinating Committee Minutes

December 3, 2013

December 3, 2013 (rev) 9

Mr. Mike Lawson succeeds Mr. Rick Johnson as the alternate representative for Hydro One Inc.

Mr. Patrick Toner succeeds Mr. Amr Abdellaoui as the primary representative for Hydro-Québec TransÉnergie.

Mr. John Antonakos succeeds Mr. Paul Patenaude as the primary representative for the Ontario Independent Electricity System Operator.

Mr. Glenn E. Pelkey succeeds Mr. Edward Rappold as Chair. Mr. Robert Golen succeeds Mr. Glenn E. Pelkey as Vice Chair.

CO-12 System Assessment Working Group Mr. Matthieu Labbé to replace Mr. Paul Metsa as the HQ-TransÉnergie member.

CP-8 Working Group on Review of Resource and Transmission Adequacy Mr. Dragan Pecurica to replace Ms. Kamala Rangaswamy as member. Ms. Kamala

Rangaswamy to replace Mr. Dragan Pecurica as alternate. Both of Nova Scotia Power, Inc.

Mr. Rob Vance representing New Brunswick Power Corporation (formerly known as New Brunswick System Operator) as member.

SP-7 Working Group on Protection System Misoperation Review Mr. Alex L. Echevarria of New York Power Authority to serve as alternate.

SS-37 Working Group on Base Case Development Mr. Hung Huynh to replace Mr. Jay Nair as member. Mr. Jay Nair to replace Mr. Hung

Huynh as alternate. Both of Nova Scotia Power, Inc. Mr. Kirpal Bahra to replace Ms. Nicole Taylor as member. Mr. Kennan Ip to replace Mr.

Gene Ng as alternate. Both of Hydro One Networks, Inc. SS-38 Working Group on Inter-Area Dynamic Analysis Mr. Jay Nair to replace Ms. Lynda Ozere as member. Ms. Lynda Ozere will serve as

alternate. Both of Nova Scotia Power, Inc. Interim Review of Resource Adequacy Approved as provided in the Agenda package. Mr. Bentley noted corrections to his transmittal letters. Interim Transmission Reviews Approved as provided in the Agenda package. TFSS Scope Approved as provided in the Agenda package. VPPSA and Green Mountain Power Coordinated UFLS Exception Request Approved as provided in the Agenda package.

Page 10: Reliability Coordinating Committee...2013/12/03  · David Conroy (Alternate) Consolidated Edison Company Mike Forte of New York, Inc. Hydro One Networks Inc. Paul Tremblay Long Island

NORTHEAST POWER COORDINATING COUNCIL Reliability Coordinating Committee Minutes

December 3, 2013

December 3, 2013 10

Reliability Coordinating Committee Actions TFSP Scope Mr. Briggs described the issues regarding including the reference to the bulk electric system in the Statement of Purpose, as proposed in the Task Force on System Protection (TFSP) Scope provided in the Agenda package. Mr. Evans-Mongeon then made a motion to approve the TFSP Scope as provided in the Agenda package with the words ‘and the bulk electric system’ removed from the ‘Statement of Purpose,’ and authorize the RCC to develop a generic ‘Statement of Purpose’ on the bulk electric system that would apply to all NPCC Task Forces. Mr. Brian Conroy seconded the motion. The motion carried. The RCC then approved the TFSP Scope as provided in the Agenda package with the words ‘and the bulk electric system’ removed from the ‘Statement of Purpose,’ and authorized the RCC to develop a generic ‘Statement of Purpose’ on the bulk electric system that would apply to all NPCC Task Forces. Mr. Briggs asked the Task Forces to develop such a consistent ‘Statement of Purpose’ for their respective Scopes addressing the issue for consideration at the next RCC meeting. 2013 -2014 NPCC Winter Reliability Assessment Mr. Roman presented the “2013 -2014 NPCC Winter Reliability Assessment” provided in the Agenda package. He explained that the NPCC CO‐12 Seasonal Assessment Working Group focused on the assessment of reliability within NPCC for the 2013‐14 Winter Operating Period. The report summarizes the reliability and adequacy of NPCC for the winter of 2013‐14 period, discussed in detail in the specific report sections. Based on projections of electric demand requirements, available resources and transmission configurations, the report evaluated NPCC’s and the associated Balancing Authority areas’ ability to deal with the differing resource and transmission configurations within NPCC and the associated Balancing Authority areas’ preparations to deal with the possible uncertainties identified in this report. In addition, the NPCC CP‐8 Working Group provided a multi‐area probabilistic reliability assessment regarding the estimated use of operating procedures designed to mitigate resource shortages for the same period. Mr. Fedora explained this portion of the assessment was approved by the RCC at its June 3, 2013 meeting. He provided the RCC with an updated weather projection for the 2013-2014 winter period.

Page 11: Reliability Coordinating Committee...2013/12/03  · David Conroy (Alternate) Consolidated Edison Company Mike Forte of New York, Inc. Hydro One Networks Inc. Paul Tremblay Long Island

NORTHEAST POWER COORDINATING COUNCIL Reliability Coordinating Committee Minutes

December 3, 2013

December 3, 2013 11

The RCC then approved (all written proxies in favor) 2013 -2014 NPCC Winter Reliability Assessment. Maritimes Comprehensive Review of Resource Adequacy Mr. Briggs presented the ‘2013 Maritimes Area Comprehensive Review of Resource Adequacy’, covering the period of January 2014 through December 2018. The guidelines for this review are specified in the NPCC Regional Reliability Directory No. 1 Appendix D (Adopted: December 1, 2009). The review supplants the previous Comprehensive Review that was performed in 2010 and approved by the RCC on September 9, 2010. Mr. Bentley indicated that the Task Force on Coordination of Planning reviewed the report and agrees with its conclusion that the Maritimes Area will comply with the NPCC Resource Adequacy Criterion that requires a loss of load expectation (LOLE) value of no more than 0.1 days/year for all years from 2014 to 2018 and will be in conformance with the NPCC Regional Reliability Reference Directory No. 1 – ‘Design and Operation of the Bulk Power System.’ The RCC then unanimously approved (all written proxies in favor) the 2013 Maritimes Comprehensive Review of Resource Adequacy. 2014 NPCC Criteria Compliance Enforcement Program Implementation Plan Mr. Kopman stated that on September 13, 2013, the Compliance Committee (CC) approved the revised CCEP-1 Process Document, the five revised Certification Forms and the newly developed Directory 1 – Resource Adequacy Review Certification Form. The revised CCEP-1 Process Document directs the CC to endorse an annual CCEP Implementation Plan, for the following year, and then present that plan to the RCC for approval. On September 13, 2013, the CC endorsed the 2014 CCEP Implementation Plan. The CC is presenting the 2014 CCEP Implementation Plan at the December 2013 RCC meeting for approval. The RCC approved the 2014 NPCC Criteria Compliance Enforcement Program Implementation Plan provided in the Agenda package (Mr. Schriver - NextEra Energy Resources (Sector 4 – Generator Owners), and Mr. Clayton - New York State Reliability Council, LLC (Sector 7 – Sub-Regional Reliability Councils, Customers, and Other Regional Entities and Interested Entities), in favor; one abstention – Mr. McCartney – Sector 5 – Markets, Broker, & Aggregators.) 2014-2015 Task Force Work Plans The Task Force chairs highlighted their respective 2014-2015 Task Force Work Plans provided in the Agenda Package, with corrections noted.

Page 12: Reliability Coordinating Committee...2013/12/03  · David Conroy (Alternate) Consolidated Edison Company Mike Forte of New York, Inc. Hydro One Networks Inc. Paul Tremblay Long Island

NORTHEAST POWER COORDINATING COUNCIL Reliability Coordinating Committee Minutes

December 3, 2013

December 3, 2013 12

The RCC the unanimously approved (all written proxies in favor) the 2014-2015 Task Force Work Plans provided in the Agenda package, with corrections noted. 2014-2015 RCC Work Plan The RCC then reviewed the RCC 2014 – 2015 Work Plan for NPCC Board approval; the RCC activities planned for 2014 – 2015 are consistent with the NPCC 2014 Business Plan & Budget, the respective 2014-2015 Task Force Plans, and the RCC Scope of activities. The RCC unanimously approved (all written proxies in favor) the RCC 2014 – 2015 Work Plan for NPCC Board consideration.

Status Reports Mr. Briggs referred the RCC to the materials provided in the Agenda package; the RCC discussed the following Agenda items: NPCC Regional Standards Committee (RSC) Report Mr. Zito highlighted NPCC support of the following NERC initiatives further described in the Agenda package: The NPCC Regional Standard Processes Manual posting; The development of the continent-wide Disturbance Monitoring Standard PRC-

002-02, and the related Cost Effective Analysis Process (CEAP); and, The COM 3 Standards, expected to be brought to the NERC Board of Trustees in

February 2014. NPCC Reliability Directory Status Report Mr. Dunbar highlighted the following items from the materials provided in the Agenda package: the Directory Development and Revision Manual; and, the Directory No. 1 revision.

NPCC Compliance Committee Mr. Kopman provided a brief summary of the key regional issues, enforcement trends, self- reports, and other significant events related to NPCC Compliance Committee activities materials provided in the Agenda package, including: Compliance Monitoring Development of the Auditors Handbook and completion of the Auditors

Checklist; and, Pilot programs evaluating Registered Entities internal control programs.

Page 13: Reliability Coordinating Committee...2013/12/03  · David Conroy (Alternate) Consolidated Edison Company Mike Forte of New York, Inc. Hydro One Networks Inc. Paul Tremblay Long Island

NORTHEAST POWER COORDINATING COUNCIL Reliability Coordinating Committee Minutes

December 3, 2013

December 3, 2013 13

Enforcement Minimal Risk Violations aggregation pilot program; Enforcement discretion program; Triage process; and, Treatment of registered Entities in multiple Regions.

SS-38 Update Mr. Widjaja stated that the SS-38 Load Modeling Working Group (LMWG) held its first meeting on October 30, 2013. The LMWG reviewed background information on past load modeling efforts and software tools that are available which can be used to conduct simulations of various dynamic load models available. The LMWG has also developed a detailed work plan based on the earlier Scope document approved by the RCC in June 2013. The detailed work plan has been incorporated into the overall Task Force on System Studies 2014-15 Work Plan. Mr. Le reported that the SS-38 Working Group on Inter-Area Dynamic Analysis continues to make good progress on the Underfrequency Loadshedding (UFLS) Adequacy Assessment Study. The SS-38 Working Group has completed the initial phase of the Study including the development of the ‘Governor Response Calibration Procedure for Dynamics Simulations.’ This procedure has been posted and shared with the SS-37 Working Group on Model Development for their information and use as appropriate. The SS-38 Working Group continues work on identification of islands to be studied by performing coherent generation analysis including the use of multiple methods of forming islands. During the first Quarter of 2014, each Area is expected to complete the preliminary assessment of the NPCC UFLS program and initiate sensitivity analysis. TFCO/TFCP Phase 2 revision of Directory No. 1 Mr. Bentley reported that the Task Force on Coordination of Planning (TFCP) and the Task Force on Coordination of Operation (TFCO) conducted a collaborative review of the Phase 2 draft of Directory No. 1 by their respective Working Groups, CP-11 and CO-7. The Working Groups reviewed the draft as an integrated planning and operational document examined all aspects of the criteria. Highlights of their review include: The development of Planning and Operation criteria ‘Tables’ that contain

contingency events, fault types and performance requirements from the criteria section of the Directory to present the criteria with added clarity;

A review of the criteria pertaining to Reliability Coordinator operations and their impact on other Reliability Coordinator Areas;

Consideration of the criteria surrounding operations under high risk conditions, reclosing operations, Special Protection Systems and load shedding;

Page 14: Reliability Coordinating Committee...2013/12/03  · David Conroy (Alternate) Consolidated Edison Company Mike Forte of New York, Inc. Hydro One Networks Inc. Paul Tremblay Long Island

NORTHEAST POWER COORDINATING COUNCIL Reliability Coordinating Committee Minutes

December 3, 2013

December 3, 2013 14

A review of the criteria pertaining to extreme contingencies, extreme system conditions and actions after a contingency including the use of available resources; and,

The inclusion of a ‘boiler plate’ Section to address the applicability of the NPCC criteria.

The initial NPCC Open Process posting of the document ends January 25, 2014; the CO-7 and CP-11 Working Groups will then reconvene to address the comments received after the close of the comment period. 2013 LRAO Status Mr. Fedora indicated that the ‘NPCC Long Range Adequacy Overview’ (LRAO) is expected to be presented to the RCC for review and approval following the release of NERC’s corresponding ‘2013 Long-Term Reliability Assessment’ and NPCC’s Task Force on Coordination of Planning review. The LRAO evaluates the near term and long-range (five year) adequacy of NPCC Areas, reflecting neighboring regional plans proposed to meet their respective resource adequacy planning criteria, including estimates of probabilistic metrics approved by the NERC Planning Committee for consideration in future NERC Long-Term Reliability Assessments. TFIST Cyber Update Mr. Goodrich highlighted the following items provided in the Agenda package: Cross-Border Emergency Telecommunications Report; and, FERC approval of CIP version 5.

TFCO SouthWest Outage Report Mr. Norden reported that the Task Force on Coordination of Operation, together with their Working Groups CO-08, CO-10 and CO-12, were charged to address the operational recommendations presented in the report, ‘Arizona-Southern California Outages on September 8, 2011-Causes and Recommendations-Prepared by the Staffs of the Federal Energy Regulatory Commission and the North American Electric Reliability Corporation’ and determine whether actions were required within the NPCC Region to meet the intent of these recommendations. He indicated that their assessment has been completed and has concluded that NPCC either meets or exceeds the intent of the operational recommendations, or have enhanced processes to achieve the same.

Page 15: Reliability Coordinating Committee...2013/12/03  · David Conroy (Alternate) Consolidated Edison Company Mike Forte of New York, Inc. Hydro One Networks Inc. Paul Tremblay Long Island

NORTHEAST POWER COORDINATING COUNCIL Reliability Coordinating Committee Minutes

December 3, 2013

December 3, 2013 15

July 3rd Quebec Event Mr. Paquet provided a report to the RCC regarding Hydro-Quebec’s investigation of the event; Mr. Norden and Mr. Bentley updated the RCC on their respective Task Force’s related activities. NPCC Reliability Assessment Program (NRAP) Highlights Report Mr. Fedora indicated that the ‘NPCC Reliability Assessment Program Highlights Report’ has been updated as of November 29, 2013 and is posted on the NPCC website. 2013-2014 Task Force Work Plan Progress Mr. Briggs referred the RCC to the respective 2013-2014 Task Force Work Plan Progress reports provided in the Agenda package.

NERC Agenda Items Operating Committee (OC) Mr. Mosier reviewed the following December 2013 NERC Operating Committee Agenda items: Approval (for posting) of the Draft ‘Reliability Guideline: Generating Unit

Operations during Complete Loss of Communications;’ Approval of the ‘Peak Reliability Reliability Plan;’ and, Involvement of the NERC Operating Committee in the NERC Alerts process.

Planning Committee (PC) No Report. Critical Infrastructure Protection Committee (CIPC) Mr. Hogue highlighted the following December 2013 NERC Critical Infrastructure Committee Agenda items: Update on the FERC Final Rule on CIP Version 5 and Directives; Update on GridEX II; and, Presentation of the Bulk Electric System Security Metrics Working Group: Metrics

Dashboard. Informational Items

Mr. Briggs referred the RCC to the materials included in the Agenda package. The following Informational Items were discussed at the meeting: GridEx II Post Exercise Update The presentation provided in the Agenda package was given by Mr. Goodrich. Executive Order and Presidential Policy Directive 21/NIPP/NIST Update Mr. Goodrich continued with an overview of the material provided in the Agenda package.

Page 16: Reliability Coordinating Committee...2013/12/03  · David Conroy (Alternate) Consolidated Edison Company Mike Forte of New York, Inc. Hydro One Networks Inc. Paul Tremblay Long Island

NORTHEAST POWER COORDINATING COUNCIL Reliability Coordinating Committee Minutes

December 3, 2013

December 3, 2013 16

Events Analysis Program – Overview and Status Mr. Rufrano providing a status and overview of the Events Analysis program provided in the Agenda package. Eastern Interconnection Frequency Response Activities Mr. Roman provided an update on the Eastern Interconnection Frequency Response activities provided in the Agenda package.

Other Matters Having no other items to consider, the RCC meeting was then adjourned. Next RCC Meeting Date Location February 26, 2014

New York Times Square Residence Inn by the Marriott

Distribution of Approved Minutes NPCC Full & General Member Representatives and Alternates Members, NPCC Board of Directors Members, NPCC Reliability Coordinating Committee Members, NPCC Public Information Committee Members, NPCC Compliance Committee Members, NPCC Regional Standards Committee Members, NPCC Task Force on Coordination of Operation Members, NPCC Task Force on Coordination of Planning Members, NPCC Task Force on Infrastructure Security and Technology Members, NPCC Task Force on System Protection Members, NPCC Task Force on System Studies NPCC Officers NPCC Staff Andrew J. Fawbush, Esq. Andrianne S. Payson, Esq. and Federal Energy Regulatory Commission – Mike Bardee, David O’Connor, Juan Villar La Régie de L’Énergie – Daniel Soulier Ontario Energy Board – Peter Fraser United States Department of Energy – David Meyer New Brunswick Department of Energy and Mines – David Sallows Nova Scotia Utility & Review Board – S. Bruce Outhouse, Q.C.