Release Stamp ENGINEERING CHANGE NOTICEENGINEERING CHANGE NOTICE ECN No: ECN-715015 Rev. 00 2...
Transcript of Release Stamp ENGINEERING CHANGE NOTICEENGINEERING CHANGE NOTICE ECN No: ECN-715015 Rev. 00 2...
1 SPF-002 (Rev. F1)
ENGINEERING CHANGE NOTICEPrepared For the U.S. Department of Energy, Assistant Secretary for Environmental ManagementBy Washington River Protection Solutions, LLC., PO Box 850, Richland, WA 99352Contractor For U.S. Department of Energy, Office of River Protection, under Contract DE-AC27-08RV14800
TRADEMARK DISCLAIMER: Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise, does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States government or any agency thereof or its contractors or subcontractors. Printed in the United States of America.
Release Stamp
1a. ECN No: ECN-715015 Rev. 00 1b. Project Number:T1P207
☐N/A
2. Title:AW-02A PUMP PIT MECHANICAL EQUIPMENT REMOVAL
3. WA or Redline ECN:
☐ WA ☐ REDLINE ☒ N/A
4. Temporary Modification:
☐ Yes ☒ No5. Design Type:I
6. Design Verification Required:
☒Yes ☐No
7. Safety Classification:
☐SC ☐SS ☒GS ☐N/A
Clearance Review Restriction Type:undefined
8. USQ Number: ☐ N/A 9. PrHA Number Rev. ☐ N/APrHA-57384 00
10. Trend Codes
Cause Commodity Discipline Driver
Initial Design Release
Mechanical Equipment
Mechanical
11. Design Authority Designator
PRJ - 242-A TRANSFER LINE REPLACEMENT PROJECT
12. Approvals
Title Name Signature DateDesign Authority Engeman, Jason KDesign Verifier Harrington, James P Harrington, James P 08/13/2019Checker Harrington, James P Harrington, James P 08/13/2019Environmental Protection Klages, Deanna LOriginator Elsen, John Elsen, John 08/13/2019Radiological Control Franz, James AResponsible Engineering Manager Smith, Gregory EWaste Transfer Engineering Moss, Hannah C Moss, Hannah C 08/22/2019
13. Problem
Recent pneumatic testing on the encasement of SL-167 has determined that it cannot maintain pressure, and therefore cannot be used to compliantly transfer waste. Recent visual inspection of SL-168 (the back-up slurry line) and pneumatic testing have identified additional work to be performed in order to attempt to place the line back into service. Until new slurry transfer lines have been installed and placed into service, the 242-A Evaporator cannot slurry out concentrated waste to tank farms to allow waste volume reduction. To ensure long-term success of the evaporator, a replacement feed line will also be installed. New transfer lines are to be installed to the AW-02A Central Pump Pit. Prior to the installation of the new transfer lines, the existing jumpers and electrical support equipment at AW-02A are to be removed in order to support laser scanning of the wall and Air Lift Circulator nozzles.
14. Solution
The removal of existing equipment to support the future upgrades at AW-02A are divided into two separate electrical and mechanical change notices. This ECN captures the changes for the removal of the existing AW-02A mechanical equipment (Six existing Jumpers assemblies and the Dummy Pump Head).
15. Analysis
None required.
16. Description of Change
Design verification performed in accordance with Columbia Energy & Environmental Services Procedure CE-ES-3.3.
H-2-90731 Sheet 1; Update Plan View to reflect the removal of six jumper assemblies (J-L-V-Q, Q-X, H-N-U-X, A-DP, I-Z and W-Y) and Pump Dummy Head, Add Riser Cover call out to 12-inch Riser-005, Add weeping isolation blank to wall nozzle A (SN-262) and isolation blanks to other nozzles seen in Plan view, changes as shown on pages 5 and 6. H-2-90731 Sheet 2; Update Sections A and C to reflect the removal of six jumper assemblies (J-L-V-Q, Q-X, H-N-U-X, A-DP, I-Z and W-Y), Pump Dummy Head, Add isolation blanks to nozzles seen in Section views, changes as shown on pages 7 and 8.
ECN-715015 Rev.00 9/10/2019 - 9:14 AM 1 of 14
ENGINEERING CHANGE NOTICE ECN No: ECN-715015 Rev. 00
2 SPF-002 (Rev. D1)
16. Description of Change
H-2-90731 Sheet 3; Update Sections B to reflect the removal of six jumper assemblies (J-L-V-Q, Q-X, H-N-U-X, A-DP, I-Z and W-Y), Pump Dummy Head, Add isolation blanks to nozzle seen in Section view, changes as shown on pages 9 and 10. H-14-020802 Sheet 2; Update to reflect the disconnection and removal of waste transfer jumper assemblies (note: the existing K-G jumper is to remain in place), changes as shown on pages 11 and 12. H-14-107346 Sheet 3; Update to reflect the removal of jumper assemblies and revised transfer details, add isolation blank and weeping blank to wall nozzle A (SN-262), changes as shown on pages 13 and 14.
17. Work Package Number(s)
TBD
18. TBDs or Holds ☒N/A
19. Related Structures, Systems, and Components
a. Related Building/Facilities ☐N/A b. Related Systems ☐N/A c. Related Equipment ID Nos. (EIN) ☐N/A
241-AW241-AW-02A
241-WT AW02A-WT-FMJ-[FLEX Q-X]AW02A-WT-J-[A-DP]AW02A-WT-J-[H-N-U-X]AW02A-WT-J-[I-Z]AW02A-WT-J-[J-L-V-Q]AW02A-WT-J-[W-Y]AW02A-WT-LDE-164AW02A-WT-TBX-101AW02A-WT-TBX-102AW02A-WT-V-101AW02A-WT-V-102AW02A-WT-V-103AW02A-WT-V-104AW02A-WT-V-105AW02A-WT-V-106
20. Engineering Drawings to be Changed Does change affect the Electronic Routing Board? ☒
Drawing Number Rev. TitleH-14-020802 SH 002 31 WASTE TRANSFER SYSTEM (WT) O&M SYSTEM P&IDH-14-107346 SH 003 39 DST WASTE TRANSFER PIPING DIAGRAMH-2-90731 SH 001 04 JUMPER ARRANGEMENT CENTRAL PUMP PIT 241-AW-02AH-2-90731 SH 002 00 JUMPER ARRANGEMENT CENTRAL PUMP PIT 241-AW-02A SECTIONSH-2-90731 SH 003 00 JUMPER ARRANGEMENT CENTRAL PUMP PIT 241-AW-02A SECTIONS
21. Related Modification Traveler ☐N/A
MT-50400
22. Related Documents ☐N/A
Document Number Rev. TitleECN-715014 00 AW-02A PUMP PIT ELECTRICAL EQUIPMENT REMOVAL
23. Distribution
Name OrganizationAnderson, Ladd L ELECTRICAL ENGINEERINGAtterbury, Brittney M WASTE STORAGE & TECH SUPPORTBecker, Brent T COGNIZANT SYSTEM ENGINEERINGBlaak, Todd M WASTE TRANSFER ENGINEERINGConner, John M PROD OPERATIONS PROCESS ENGRNGElsen, John JEngeman, Jason K TANK FARM PROJECTS ENGINEERINGFranz, James A TFP RADCONGriffin, Peter W TANK FARM PROJECTS ENGINEERINGHarrington, James PHuntington, Matthew R TANK FARM PROJECTS ENGINEERINGHuntington, Nikki L COGNIZANT SYSTEM ENGINEERING
ECN-715015 Rev.00 9/10/2019 - 9:14 AM 2 of 14
ENGINEERING CHANGE NOTICE ECN No: ECN-715015 Rev. 00
3 SPF-002 (Rev. D1)
23. Distribution
Name OrganizationKlages, Deanna L RETRVL & CLOSURE/PROJ ENV CMPLMay, Dustin R TFP PROJECT MANAGEMENTMoss, Hannah C WASTE TRANSFER ENGINEERINGSmith, Gregory E TANK FARM PROJECTS ENGINEERING
ECN-715015 Rev.00 9/10/2019 - 9:14 AM 3 of 14
Columbia Energy Design Verification Checklist
ECN-715015 00 AW-02A Pump Pit Mechanical EquipmentRemoval
Doc. Number Rev. Title
Verification Method (Check One)
Review LII AhemateCalculation
Verification Results
LI Qualification Testing
Yes No NA
El El Design inputs correctly selected and cited and correctly incorporated.
El El Input data were checked for consistency with original source information.
El El Design inputs for interfacing organizations are specified
El El Necessary assumptions are explicit, adequately described and supported.
El El LJ Unverified assumptions (requiring verification) are clearly identified.
El El I Analytical and technical approaches and results are reasonable and appropriate.
El El The version or revision of each reference is cited
El El Design output is reasonable for design inputs
El 0 Results and conclusions address all points in the purpose.
El El Conclusions are consistent with analytical results and applicable limits.
Eli El Suitable materials, parts, processes, and inspection and testing criteria specified
El El All comments have been adequately addressed and dispositioned
El El 41 Calculations are sufficiently detailed such that a technically qualified person could reproducethe calc.
El El Lj Design method(s) are appropriately used and documented.
El El Computer Program(s) are appropriately used and results support design.
El El r- For pre-verified computer programs the V&V document is referenced and specific computerused for the calculation is identified
Ensure calculations that use software include a paper printout, microfiche, CD-ROM, or other electronic file of the inputdata and identification to the computer, computer codes, and versions used, or provide alternate documentation touniquely and clearly identify the exact coding and execution process.
JP Harrington
Checker Name Date r /CE-ES-3.3-F1, 10/20/14
ECN-715015 Rev.00 9/10/2019 - 9:14 AM 4 of 14
ENGINEERING CHANGE NOTICECONTINUATION SHEET
NORTH
PIT SPRAY
42" RISER
12" RISERcqIIL
a IW.
z<U
z(n]
T
ii III - k111111 I[I III III I
IttJIiItj - --, ii
-
-
III
I [I
JUMPER ASSEMBLY P-R
JUMPER ASSEMBLY K-G,H-2-70449
_________ 2'PW-472-M25________________ ____________________ FROM ANNULUS PUMP
prr241 -AW-A
H-14-106303
A L R V-101
-
ASSEMBLY Q-X
JR TO 16" 2 --
AIRUFT
JUMPER ASSEMBLY
N4O704.00 REF
H-2-90779
JUMPERASSEMBLY 1 1 Z]
l-3-N-U-X
2" PW-462-M25
H-14-1O6301 N
0
3" SN-268-M2S _______
FROM VALVE rr FROM DETEC11ON PIT241 -AW-B =
V1O4
RUCIRCULATOR
H-2-70b4O REF B A3
] - B
L -
- t1 Ff1
- - - I _____
I
I]i-1111111
11111
11111 ft EEOORDRNSCAL
111111111
H-14-107429-01O11111 SPLIT SHIELD PLUC
H-14-1O7429-17Ocn>
TO CIRCULATOR / AWO2A--PB-8O1SEE NOTE 6SEE H-2-9O734 ANDH-14-101160 FOR4X 1/2" TUBES
C1 CONTINUA11ONoI
CjI I B:
C'4
PLAN - PUMP PIT 241 -AW-02ASCALE: 1"COVER BLOCKS REMOVED FOR CLARITY
la. ECN-715015
lb. Proj. 11P207
0B JUNCTION BOX
FOR CON11NUA11ONSEE H-2--90734
> AND H-2-90468
JB# TBX-CT-AW-1SEE NOTE 3
ABANDON IN PLACE
1" RW
1"
JUMPER ASSEMBLY J-L-V-QH-14-106300
JUMPER ASSEMBLY S-TH-2-7O474 REF
ECN-715015 Rev.00 9/10/2019 - 9:14 AM 5 of 14
ENGINEERING CHANGE NOTICECONTINUATION SHEET
IS:
NORTH
a. ECN-71505
b. Proj. T P207
0
JUMPER ASSEMBLY P—R
iii
JUNCI1ON BOXFOR CONTINUA11ONSEE H-2-9O734AND H-2-9O468
JB# TBX—GT—AW-1SEE NOTE 3
ABANDON IN PLACE
1" RW -
JUMPER ASSEMBLY S—IH-2-7O474 REF
3" SN-267—M25 5 —: —
FROM VALVE rr -
241—AW—A ----------fluA TL
1" JR TO 16" - 2 ___
L
N4O704.00 REF - - - -
3" HORIZ NOZZLEISOLA11ON BLANK ASSEMBLYH-2-73453-020, 5 PLCS
H
- NFROM VALVE PIT
241—AW—B
3" VERT NOZZLEISOLAI1ON BLANK ASSEMBLYH-2-73453—O6O. 2 PLCS
2" VERT NOZZLEISOLA110N BLANK ASSEMBLY
1-1-2-73453-070
M
It,1'1
I1j. 0"
It_It_ Z(I)]
-
Cy
rr SPRAY
42" RISER
12" RISER
c10t1j HwcJ
C
Ii III II
--
iii IiiJUMPER ASSEMBLY K—G.-1-2-70449
D2" HORIZ NOZZLEISOLA110N BLANKH-2-73453-03O, 4 PLACES
2 PW-472—M25FROM ANNULUS PTh
II - 1111
-
IftOO
/ —l4-10l160 FOR
107429-010 ISPUT SHIELD PLUG I
107429-170
AWO——PB-8O1SEE NOTE 6SEE H-2-90734 AND
1/2" TUBESCIRCULATOR
I CON11NUATION
01
zl<<
PLAN - PUMP PIT 241-AW-02ASCALE: 1"COVER BLOCKS REMOVED FOR CLARFIY
RISER COVER,H-2-7O549
II
3" HORIZ NOZZLEISOLATION BLANKASSEMBLYH-2-73453—O20W/DRAIN HOLE
ECN-715015 Rev.00 9/10/2019 - 9:14 AM 6 of 14
ENGINEERING CHANGE NOTICECONTINUATION SHEET
H-i
la. ECN-715015
1 b. Proj. 11 P207
•
H.
683'-73/8"
SECTIONSCALE: 1 =i -0
z .
4-106304-2
H-i 4-106304-i
H-i 4-i 06304-
IJ LL - ..
_U=-,L \\ -_J I
:: .H: <••.. . •
• H • .
H. H.H. . •
,-COVER BLOCKSH-2-90455
• . \\' \'H
/ E 68-i /6
H
/\/>
c SECTIONSH 1 SCALE: i'=i'-O'
(FOR CLAR1V'. DUMMY PUMP HEAD.LEAK DErECTORS, DRAIN VALVE, ANDSEAL ASSEMBLY, AND JUMPERS S-TAND P-R NOT SHOWN)
GRADE
/\\ \\
L6M5
ECN-715015 Rev.00 9/10/2019 - 9:14 AM 7 of 14
ENGINEERING CHANGE NOTICECONTINUATION SHEET
IS:
H-2-90845 DETAIL Y
TOC-PIT-241 -AW-02AEL 687-O" REF
GRADE -
H-4-1O63O4-1
la. ECN-715015
1 b. Proj. Ti P207
H-14-106304-2
683-73/8" /
U
z .
SECTIONSCALE: ='-O'
FOR CLARITT' LEAK DETECTOR AND TUDING TOAJR LIFT CIRCULATOR NOT SHOWN.
GRADE
C EL 684-5 / ///
H-14-D63D4-I
H-14-D63D4-2
J-...J.L -
. . • . .H
,-COVER BLOCKSH-2-90455
/1 •/
. \\/\\/\
68-1 3I8
• • .< •. . . • • . • (
/1 • • • •. • ..
SECTION
ECN-715015 Rev.00 9/10/2019 - 9:14 AM 8 of 14
ENGINEERING CHANGE NOTICECONTINUATION SHEET
TOC-PIT 241 -AW-02AEL 687'-lO" REF
H-2-9DEE
GRADE L
L683'-7 -
- -
-7
a. ECN-7505
b. Proj. Th P207
• • • H ELII I]
B SECTIONSH 1 SCALE: 1"=1'-O"
(FOR CLARflI, JUMPERS J-L-V-Q, P-R, S-T, Q-X,LEAK DEFECTOR, AND TUBING TO AIR LIFT CIRCULATORNOT SHOWN)
• - LI II - •
••-
• EE EE
-7,
ECN-715015 Rev.00 9/10/2019 - 9:14 AM 9 of 14
ENGINEERING CHANGE NOTICECONTINUATION SHEET
IS:
TOO-PIT 241 -AW-O2AEL 687'-lO" REF
H-2-9DEL
GRADE
L683' -7 3/8"
-7
a. ECN-75O5
b. Proj. Ti P207
H []
FOR CLARITh', JUMPERS P-R, S-T, LEAK DEFECTORTUBING TO AIR LIFT CIRCULATOR NOT SHOWN.
ECN-715015 Rev.00 9/10/2019 - 9:14 AM 10 of 14
ENGINEERING CHANGE NOTICECONTINUATION SHEET
3"SN-268—M25
2"SL—1 62—M25
3 "SN —262— M 25
IIII 2
LI\t\IJI\Lç /) /
' - DRL APVP—WT—V-609
MONITORING
CENTRAL /TR-105 1 —020803SH5
> ZA8PUMP L
TANK PIT 02A __ DRL
/ P APVP—WT—V-610
241 AW1O2 w —020803SH5
3SN_272_M2 117 A H Z A80 0
I I rul i / FROM AW241—P—SP-101
la. ECN-715015
1 b. Proj. Ti P207
I I 1I
J LEAKDET I
I LDE-166 PIT 020 L__FROM AW241—WT—ENCL—lli
TR-110 2"PW 462 M25 I 020802 SH
ZN A/6P —006 DR L
w_472_MI-
_H —14—
LDE-164 EHRP-005
I_01 _____________LD E —1 65 2 "G- I
- 0 FDP-101 EHR-610
IV 104FD
V-102
U
2" __/ / TR —106
C
U)TEKADEDATI ID
ECN-715015 Rev.00 9/10/2019 - 9:14 AM 11 of 14
ECN-715015 Rev.00 9/10/2019 - 9:14 AM 12 of 14
DR
-3
69
DCP
S
C
A
B
H G F
AW-102
PW-472
A
E
F
B
SN
-2
62
A
SL
-1
62
L
K
SN-272
G
J
HSN-268
U
V
SN
-6
10
SN-609
DR-371
C
D
DR-361
PW-462H
LDE-165
H
H
DR-362
E D
DR
-3
69
V-404
V-403
LD
E-1
88
WT-LDE-224
LDE-223
SN-267
LDE-183
LDE-182
2*
ALC AIR
ALC AIR
3
YW
V-1
01
V-102
ZS-105A,B
AW-02A
AW-02B
AW-02E
H H
3 3
HC HC
H HC
FC
V-1
60
FL
US
H
DRAIN
V-402
V-401
N
M
Q
X
V-103
Z
V-104
I
ZS-106A,B
3*LDE-192A/B
LDE-198A/B
DP
E
P
V-107
PPB-016
ENGINEERING CHANGE NOTICECONTINUATION SHEET
)
L! H • L
-of ..
_ .
LI LIl. .__ 0
la. ECN-715015
1 b. Proj. Ti P207
n
0/
ECN-715015 Rev.00 9/10/2019 - 9:14 AM 13 of 14
DR
-3
69
DCP
S
C
A
B
H G F
AW-102
PW-472
A
E
F
B
SN
-2
62
A
SL
-1
62
K
SN-272
G
J
HSN-268
U
V
SN
-6
10
SN-609
DR-371
C
D
DR-361
PW-462H
LDE-165
H
H
DR-362
E D
DR
-3
69
V-404
V-403
LD
E-1
88
WT-LDE-224
SN-267
LDE-183
LDE-182
2*
ALC AIR
ALC AIR
3
AW-02A
AW-02B
AW-02E
H H
3 3
HC HC
3
H HC
FC
V-1
60
FL
US
H
DRAIN
V-402
V-401
3*LDE-192A/B
LDE-198A/B
E
P
V-107
PPB-016
W
N
M
L
ENGINEERING CHANGE NOTICECONTINUATION SHEET
IS:
la. ECN-715015
1 b. Proj. Ti P207
)
-
-)
__ II3
U-
oo
0/
ECN-715015 Rev.00 9/10/2019 - 9:14 AM 14 of 14