Release for Grouting
-
Upload
umair-awan -
Category
Documents
-
view
253 -
download
1
description
Transcript of Release for Grouting
-
1 The following items have been checked: Yes No Not Req.
1.1 Location and Orientation Correct
1.1.1 As per Drawing N _______ E _________
1.1.2 Actual N _______ E _________
1.2 Top of Elevation Correct
1.2.1 As per Drawing _______ Actual _______
1.3 Embendent Parts Correct
1.3.1 Top of Shims ___________ Top of Anchor Bolts _____________
1.4 Anchor Bolt Size & Type Correct
Project: Certificate No.:
System: Area:Foundation No.:
Reference Drawings:
Customer Logo RELEASE FOR GROUTING
1.5 Equipments/Column Aligned and Leveled
1.6 Type of Grout ______________ Grout Stage _________________________
Remarks
NAME: NAME: NAME:
DATE:
SIGNATURE:
DATE:
SIGNATURE:
DATE:
SIGNATURE:
CUSTOMERETIMAAD QA&QCPREPARED BY
Date: May 22, 2007Page: 1 of 1
Doc. No. QA&QC/FRM-93Rev.: 00
This document is the intellectual property of ETIMAAD. Any unauthorized use, including modification and reproduction of the content is strictly prohibited. Copyrights Ordinance 2006, All rights reserved.