Reinforcement to The North Shropshire Electricity ... · Reinforcement to The North Shropshire...

16
Reinforcement to The North Shropshire Electricity Distribution Network: 132kV Electrical Circuit from Oswestry to Wem Works Plans November 2017

Transcript of Reinforcement to The North Shropshire Electricity ... · Reinforcement to The North Shropshire...

Page 1: Reinforcement to The North Shropshire Electricity ... · Reinforcement to The North Shropshire Electricity Distribution Network: 132kV Electrical Circuit from Oswestry to Wem Works

Reinforcement to The North Shropshire Electricity Distribution Network: 132kV Electrical Circuit from Oswestry to Wem

Works Plans

November 2017

Page 2: Reinforcement to The North Shropshire Electricity ... · Reinforcement to The North Shropshire Electricity Distribution Network: 132kV Electrical Circuit from Oswestry to Wem Works

!(

!(

KC

0 2 41

Kilometres

ZF SE

CheckedDrawn Approved

PREFERRED LINE ROUTE (OF THE132 kV OVERHEAD LINE)

PROPOSED 132 kV UNDERGROUNDCABLE

!( SUBSTATION

DescriptionDateRev

Works Plan13/11/20171

Scheme Name:

Title:

REINFORCEMENT TO THE NORTH SHROPSHIREELECTRICITY DISTRIBUTION NETWORK:

132 kV ELECTRICAL CIRCUIT FROMOSWESTRY TO WEM

LOCATION PLAN

Scale: Rev:Sheet Size:Sheet:SHEET 1 of 1 11:50,000 A1 (594 mm x 841 mm)

COVENTRY

STOKE-ON-TRENT

SHEFFIELD

LEEDS

HUDDERSFIELD

CA

MB

RI

AN

MO

UN

TA

IN

S

A N G L E SE Y / Y N

Y S M O N

LIVERPOOL

BACKGROUND MAPPING INFORMATION HAS BEEN REPRODUCED FROM THE ORDNANCE SURVEY MAP BY

PERMISSION OF ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONERY OFFICE.

CROWN COPYRIGHT AND DATABASE RIGHTS 2017. ORDNANCE SURVEY 0100031673. CONTAINS OS DATA © CROWN COPYRIGHT AND DATABASE RIGHT 2017.

Document Path: R:\P10787-00 001 NSRP Dec 2016\Figures\GIS\Layouts\Works Plans\P10787_NSRP_Works_Plan_Location_Plan.mxd

LOCATION PLAN

KEY

°

NOTES

This drawing is scaled at an A1 paper size, therefore any prints made at a smaller size will affect the accuracy of measurement units and should not be scaled against.

Shropshire Council

WrexhamCouncil

PowysCouncil

OSWESTRY SUBSTATION WEM

SUBSTATION

MANCHESTER

CARDIGAN BAY / BAE

CEREDIGION BIRMINGHAM

GLOUCESTER

CHELTENHAM

WORCESTER

TELFORD

DERBY

YORK

PRESTON

Page 3: Reinforcement to The North Shropshire Electricity ... · Reinforcement to The North Shropshire Electricity Distribution Network: 132kV Electrical Circuit from Oswestry to Wem Works

!(

!(

KC

0 1 20.5

Kilometres

ZF SE

CheckedDrawn Approved

PREFERRED LINE ROUTE (OF THE132 kV OVERHEAD LINE)

PROPOSED 132 kV UNDERGROUNDCABLE

!( SUBSTATION

DescriptionDateRev

Works Plan13/11/20171

Scheme Name:

Title:

REINFORCEMENT TO THE NORTH SHROPSHIREELECTRICITY DISTRIBUTION NETWORK:

132 kV ELECTRICAL CIRCUIT FROMOSWESTRY TO WEM

WORKS PLANSHEET KEY PLAN

Scale: Rev:Sheet Size:Sheet:SHEET 1 of 1 11:30,000 A1 (594 mm x 841 mm)

BACKGROUND MAPPING INFORMATION HAS BEEN REPRODUCED FROM THE ORDNANCE SURVEY MAP BY

PERMISSION OF ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONERY OFFICE.

CROWN COPYRIGHT AND DATABASE RIGHTS 2017. ORDNANCE SURVEY 0100031673. CONTAINS OS DATA © CROWN COPYRIGHT AND DATABASE RIGHT 2017.

Document Path: R:\P10787-00 001 NSRP Dec 2016\Figures\GIS\Layouts\Works Plans\P10787_NSRP_Works_Plan_Key_Plan.mxd

LOCATION PLAN

KEY

°

NOTES

This drawing is scaled at an A1 paper size, therefore any prints made at a smaller size will affect the accuracy of measurement units and should not be scaled against.

SHEET 01SHEET 02 SHEET 03 SHEET 04

SHEET 05SHEET 06

SHEET 07

SHEET 08SHEET 09 SHEET 10

SHEET 11

SHEET 12

SHEET 13

Wrexham

Shropshire

WALES

ENGLAND

Page 4: Reinforcement to The North Shropshire Electricity ... · Reinforcement to The North Shropshire Electricity Distribution Network: 132kV Electrical Circuit from Oswestry to Wem Works

1 2 3 4 5 6 7 871

2

18

63

12

11

10

1

79

92

71

15

9

1 11

67

11 5a

23

5

81

2

16

87

11

37

2

31

11

10

111

11

5

17

14

47

20

21

60

2

2

26

25

35

1a

3

1

15

27

12

12

5

7

78

40

11

Oakfield

Cott

5

2 6

1

TheHollies

19

60

20

19

5

11

86

16

59

12

Greenacres

152

178

715

30

70

l ll

28

1

83

5

3

22

2

20

30

1

11

20

12

26

80

61

21

4

24

16

22

9

16

2824

26

88

11

15

25

37

39

53

6

1

2

5

5878

2

66

11

37

16

20

14

17

4

3a

2

33

10

3

1

4

8

2

11

29

11

32

3l

38

37

68

48

44

2

3

375

15 5

18

8

332 36 1

2

4238

16

78

15

77

2b

29

72

85

12

48

15

84

68

3

12

18

11

62

2

302

10

14

1

2

163

1

147

26

143101115

24

2

100

129

18

171

29

7

l03

7

158

23

15

9

153

l0l

144

114

132

108

1

11

2

90

164

3

94

20

12

174

11l

160

14

121

127

113

14

137

145

79

4

26

Top HouseFarm

Cabin HouseFarm

36

9 7

34

45

1115

44

1

46

41

24

5553

47

56

6 810

2

4

1

180178

7

9

14

7

4

6

14

2

3

6664

2

1

101

97

3

1

7

84

514

7

1926

20

1a

El SubSta

16

22

CO

NTI

NU

ES O

N S

HEE

T 2

KC

0 100 20050

Metres

ZF SE

CheckedDrawn Approved

PROPOSED 132 kV POLE POSITIONS

PREFERRED LINE ROUTE (OF THE132 kV OVERHEAD LINE)

CONSTRUCTION AND OPERATIONSCORRIDOR

40m CONSULTATION BOUNDARY

PROPOSED 132 kV UNDERGROUNDCABLE

SPEN 11 kV OVERHEAD LINE

SPEN 33 kV OVERHEAD LINE

SPEN 132 kV OVERHEAD LINE

NATIONAL GRID 400 kV OVERHEAD LINE

EXISTING LOWER VOLTAGE OVERHEADLINE TO BE REMOVED

EXISTING LOWER VOLTAGE OVERHEADLINE TO BE REPLACED WITH NEWUNDERGROUND CABLE ON SAMEALIGNMENT

PROPOSED UNDERGROUND ROUTE OFEXISTING LOWER VOLTAGE OVERHEADLINE BEING REMOVED

PROPOSED TEMPORARY ACCESS

PROPOSED TEMPORARY LAYDOWNAREAS

The Draft Order Limits comprises the construction and operations corridor, temporary access, laydown areas, undergrounding ofthe new 132 kV cable, and the undergrounding of existing lower voltage overhead line where indicated.

The Construction and Operations corridor generally has a widthof 25m in total, centred on the Preferred Line Route. In general, the corridor width for undergrounding is 10m and the corridor for access routes is 5m.

DescriptionDateRev

Works Plan13/11/20171

Scheme Name:

Title:

REINFORCEMENT TO THE NORTH SHROPSHIREELECTRICITY DISTRIBUTION NETWORK:

132 kV ELECTRICAL CIRCUIT FROMOSWESTRY TO WEM

WORKS PLANSHEET 1 of 13

Scale: Rev:Sheet Size:Sheet:SHEET 1 of 13 11:2,500 A1 (594 mm x 841 mm)

2 3 4 5 6 78 9 10

11 1213

1

BACKGROUND MAPPING INFORMATION HAS BEEN REPRODUCED FROM THE ORDNANCE SURVEY MAP BY

PERMISSION OF ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONERY OFFICE.

CROWN COPYRIGHT AND DATABASE RIGHTS 2017. ORDNANCE SURVEY 0100031673. CONTAINS OS DATA © CROWN COPYRIGHT AND DATABASE RIGHT 2017.

Document Path: R:\P10787-00 001 NSRP Dec 2016\Figures\GIS\Layouts\Works Plans\P10787_NSRP_Works_Plan.mxd

LOCATION PLAN

KEY

°

NOTES

This drawing is scaled at an A1 paper size, therefore any prints made at a smaller size will affect the accuracy of measurement units and should not be scaled against.

Page 5: Reinforcement to The North Shropshire Electricity ... · Reinforcement to The North Shropshire Electricity Distribution Network: 132kV Electrical Circuit from Oswestry to Wem Works

7 8

9

1011

12

13

14

15

16

17

18

19

20

21

16

BellaVista

Heniarth

NewBungalow

The Oaks

Goodison

FieldsFarm

Broadway

Roseway

PennwoodCottage

Shelter

Jasmine

TheBreiddens

WalnutCottage

TheCroft

8

6

31

LaurelBank

20

20

1

17

2

Wesley Cottage

Hawthorn

Cottage

25

22

8

Crown

Dugdale

1

Rose

36

10

SweetBriar

24

4

OakfieldHouse

Fairview

PoultryHouse

The OldChurch

Bryn-y-plentyn

Farm

CoppiceHouse

FieldCorner

RoseCottage

VineCottage

CO

NTI

NU

ES O

N S

HEE

T 1

CO

NTI

NU

ES O

N S

HEE

T 3

KC

0 100 20050

Metres

ZF SE

CheckedDrawn Approved

PROPOSED 132 kV POLE POSITIONS

PREFERRED LINE ROUTE (OF THE132 kV OVERHEAD LINE)

CONSTRUCTION AND OPERATIONSCORRIDOR

40m CONSULTATION BOUNDARY

PROPOSED 132 kV UNDERGROUNDCABLE

SPEN 11 kV OVERHEAD LINE

SPEN 33 kV OVERHEAD LINE

SPEN 132 kV OVERHEAD LINE

NATIONAL GRID 400 kV OVERHEAD LINE

EXISTING LOWER VOLTAGE OVERHEADLINE TO BE REMOVED

EXISTING LOWER VOLTAGE OVERHEADLINE TO BE REPLACED WITH NEWUNDERGROUND CABLE ON SAMEALIGNMENT

PROPOSED UNDERGROUND ROUTE OFEXISTING LOWER VOLTAGE OVERHEADLINE BEING REMOVED

PROPOSED TEMPORARY ACCESS

PROPOSED TEMPORARY LAYDOWNAREAS

The Draft Order Limits comprises the construction and operations corridor, temporary access, laydown areas, undergrounding ofthe new 132 kV cable, and the undergrounding of existing lower voltage overhead line where indicated.

The Construction and Operations corridor generally has a widthof 25m in total, centred on the Preferred Line Route. In general, the corridor width for undergrounding is 10m and the corridor for access routes is 5m.

DescriptionDateRev

Works Plan13/11/20171

Scheme Name:

Title:

REINFORCEMENT TO THE NORTH SHROPSHIREELECTRICITY DISTRIBUTION NETWORK:

132 kV ELECTRICAL CIRCUIT FROMOSWESTRY TO WEM

WORKS PLANSHEET 2 of 13

Scale: Rev:Sheet Size:Sheet:SHEET 2 of 13 11:2,500 A1 (594 mm x 841 mm)

1 3 4 5 6 78 9 10

11 1213

2

BACKGROUND MAPPING INFORMATION HAS BEEN REPRODUCED FROM THE ORDNANCE SURVEY MAP BY

PERMISSION OF ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONERY OFFICE.

CROWN COPYRIGHT AND DATABASE RIGHTS 2017. ORDNANCE SURVEY 0100031673. CONTAINS OS DATA © CROWN COPYRIGHT AND DATABASE RIGHT 2017.

Document Path: R:\P10787-00 001 NSRP Dec 2016\Figures\GIS\Layouts\Works Plans\P10787_NSRP_Works_Plan.mxd

LOCATION PLAN

KEY

°

NOTES

This drawing is scaled at an A1 paper size, therefore any prints made at a smaller size will affect the accuracy of measurement units and should not be scaled against.

Page 6: Reinforcement to The North Shropshire Electricity ... · Reinforcement to The North Shropshire Electricity Distribution Network: 132kV Electrical Circuit from Oswestry to Wem Works

20

21

2223

2425

26

27

28

29 30 31 32 33 34

The Oaks

BabbinswoodFarm

PerrymoorFarm

PerryFarm

DecoyFarm

CO

NTI

NU

ES O

N S

HEE

T 2

CO

NTI

NU

ES O

N S

HEE

T 4

KC

0 100 20050

Metres

ZF SE

CheckedDrawn Approved

PROPOSED 132 kV POLE POSITIONS

PREFERRED LINE ROUTE (OF THE132 kV OVERHEAD LINE)

CONSTRUCTION AND OPERATIONSCORRIDOR

40m CONSULTATION BOUNDARY

PROPOSED 132 kV UNDERGROUNDCABLE

SPEN 11 kV OVERHEAD LINE

SPEN 33 kV OVERHEAD LINE

SPEN 132 kV OVERHEAD LINE

NATIONAL GRID 400 kV OVERHEAD LINE

EXISTING LOWER VOLTAGE OVERHEADLINE TO BE REMOVED

EXISTING LOWER VOLTAGE OVERHEADLINE TO BE REPLACED WITH NEWUNDERGROUND CABLE ON SAMEALIGNMENT

PROPOSED UNDERGROUND ROUTE OFEXISTING LOWER VOLTAGE OVERHEADLINE BEING REMOVED

PROPOSED TEMPORARY ACCESS

PROPOSED TEMPORARY LAYDOWNAREAS

The Draft Order Limits comprises the construction and operations corridor, temporary access, laydown areas, undergrounding ofthe new 132 kV cable, and the undergrounding of existing lower voltage overhead line where indicated.

The Construction and Operations corridor generally has a widthof 25m in total, centred on the Preferred Line Route. In general, the corridor width for undergrounding is 10m and the corridor for access routes is 5m.

DescriptionDateRev

Works Plan13/11/20171

Scheme Name:

Title:

REINFORCEMENT TO THE NORTH SHROPSHIREELECTRICITY DISTRIBUTION NETWORK:

132 kV ELECTRICAL CIRCUIT FROMOSWESTRY TO WEM

WORKS PLANSHEET 3 of 13

Scale: Rev:Sheet Size:Sheet:SHEET 3 of 13 11:2,500 A1 (594 mm x 841 mm)

1 2 4 5 6 78 9 10

11 1213

3

BACKGROUND MAPPING INFORMATION HAS BEEN REPRODUCED FROM THE ORDNANCE SURVEY MAP BY

PERMISSION OF ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONERY OFFICE.

CROWN COPYRIGHT AND DATABASE RIGHTS 2017. ORDNANCE SURVEY 0100031673. CONTAINS OS DATA © CROWN COPYRIGHT AND DATABASE RIGHT 2017.

Document Path: R:\P10787-00 001 NSRP Dec 2016\Figures\GIS\Layouts\Works Plans\P10787_NSRP_Works_Plan.mxd

LOCATION PLAN

KEY

°

NOTES

This drawing is scaled at an A1 paper size, therefore any prints made at a smaller size will affect the accuracy of measurement units and should not be scaled against.

Page 7: Reinforcement to The North Shropshire Electricity ... · Reinforcement to The North Shropshire Electricity Distribution Network: 132kV Electrical Circuit from Oswestry to Wem Works

33 34 35 36 37 38 39 40 41 4243

4445

46

47

Berrywood

WoodhouseHall

WoodhouseBungalow

WoodhouseFarm

CO

NTI

NU

ES O

N S

HEE

T 3

CO

NTI

NU

ES O

N S

HEE

T 5

KC

0 100 20050

Metres

ZF SE

CheckedDrawn Approved

PROPOSED 132 kV POLE POSITIONS

PREFERRED LINE ROUTE (OF THE132 kV OVERHEAD LINE)

CONSTRUCTION AND OPERATIONSCORRIDOR

40m CONSULTATION BOUNDARY

PROPOSED 132 kV UNDERGROUNDCABLE

SPEN 11 kV OVERHEAD LINE

SPEN 33 kV OVERHEAD LINE

SPEN 132 kV OVERHEAD LINE

NATIONAL GRID 400 kV OVERHEAD LINE

EXISTING LOWER VOLTAGE OVERHEADLINE TO BE REMOVED

EXISTING LOWER VOLTAGE OVERHEADLINE TO BE REPLACED WITH NEWUNDERGROUND CABLE ON SAMEALIGNMENT

PROPOSED UNDERGROUND ROUTE OFEXISTING LOWER VOLTAGE OVERHEADLINE BEING REMOVED

PROPOSED TEMPORARY ACCESS

PROPOSED TEMPORARY LAYDOWNAREAS

The Draft Order Limits comprises the construction and operations corridor, temporary access, laydown areas, undergrounding ofthe new 132 kV cable, and the undergrounding of existing lower voltage overhead line where indicated.

The Construction and Operations corridor generally has a widthof 25m in total, centred on the Preferred Line Route. In general, the corridor width for undergrounding is 10m and the corridor for access routes is 5m.

DescriptionDateRev

Works Plan13/11/20171

Scheme Name:

Title:

REINFORCEMENT TO THE NORTH SHROPSHIREELECTRICITY DISTRIBUTION NETWORK:

132 kV ELECTRICAL CIRCUIT FROMOSWESTRY TO WEM

WORKS PLANSHEET 4 of 13

Scale: Rev:Sheet Size:Sheet:SHEET 4 of 13 11:2,500 A1 (594 mm x 841 mm)

1 2 3 5 6 78 9 10

11 1213

4

BACKGROUND MAPPING INFORMATION HAS BEEN REPRODUCED FROM THE ORDNANCE SURVEY MAP BY

PERMISSION OF ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONERY OFFICE.

CROWN COPYRIGHT AND DATABASE RIGHTS 2017. ORDNANCE SURVEY 0100031673. CONTAINS OS DATA © CROWN COPYRIGHT AND DATABASE RIGHT 2017.

Document Path: R:\P10787-00 001 NSRP Dec 2016\Figures\GIS\Layouts\Works Plans\P10787_NSRP_Works_Plan.mxd

LOCATION PLAN

KEY

°

NOTES

This drawing is scaled at an A1 paper size, therefore any prints made at a smaller size will affect the accuracy of measurement units and should not be scaled against.

Page 8: Reinforcement to The North Shropshire Electricity ... · Reinforcement to The North Shropshire Electricity Distribution Network: 132kV Electrical Circuit from Oswestry to Wem Works

46

4748

49

5051

5253

54 55 56 57 58 59 60 61 62 63

LowerLees

Hawkswood

RednalMill

MistyMeadows

RednalMillCottage

MillBarn

195

196

LeesBungalow

The Lees

200

205

199

CO

NTI

NU

ES O

N S

HEE

T 6

CO

NTI

NU

ES O

N S

HEE

T 4

KC

0 100 20050

Metres

ZF SE

CheckedDrawn Approved

PROPOSED 132 kV POLE POSITIONS

PREFERRED LINE ROUTE (OF THE132 kV OVERHEAD LINE)

CONSTRUCTION AND OPERATIONSCORRIDOR

40m CONSULTATION BOUNDARY

PROPOSED 132 kV UNDERGROUNDCABLE

SPEN 11 kV OVERHEAD LINE

SPEN 33 kV OVERHEAD LINE

SPEN 132 kV OVERHEAD LINE

NATIONAL GRID 400 kV OVERHEAD LINE

EXISTING LOWER VOLTAGE OVERHEADLINE TO BE REMOVED

EXISTING LOWER VOLTAGE OVERHEADLINE TO BE REPLACED WITH NEWUNDERGROUND CABLE ON SAMEALIGNMENT

PROPOSED UNDERGROUND ROUTE OFEXISTING LOWER VOLTAGE OVERHEADLINE BEING REMOVED

PROPOSED TEMPORARY ACCESS

PROPOSED TEMPORARY LAYDOWNAREAS

The Draft Order Limits comprises the construction and operations corridor, temporary access, laydown areas, undergrounding ofthe new 132 kV cable, and the undergrounding of existing lower voltage overhead line where indicated.

The Construction and Operations corridor generally has a widthof 25m in total, centred on the Preferred Line Route. In general, the corridor width for undergrounding is 10m and the corridor for access routes is 5m.

DescriptionDateRev

Works Plan13/11/20171

Scheme Name:

Title:

REINFORCEMENT TO THE NORTH SHROPSHIREELECTRICITY DISTRIBUTION NETWORK:

132 kV ELECTRICAL CIRCUIT FROMOSWESTRY TO WEM

WORKS PLANSHEET 5 of 13

Scale: Rev:Sheet Size:Sheet:SHEET 5 of 13 11:2,500 A1 (594 mm x 841 mm)

1 2 3 4 6 78 9 10

11 1213

5

BACKGROUND MAPPING INFORMATION HAS BEEN REPRODUCED FROM THE ORDNANCE SURVEY MAP BY

PERMISSION OF ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONERY OFFICE.

CROWN COPYRIGHT AND DATABASE RIGHTS 2017. ORDNANCE SURVEY 0100031673. CONTAINS OS DATA © CROWN COPYRIGHT AND DATABASE RIGHT 2017.

Document Path: R:\P10787-00 001 NSRP Dec 2016\Figures\GIS\Layouts\Works Plans\P10787_NSRP_Works_Plan.mxd

LOCATION PLAN

KEY

°

NOTES

This drawing is scaled at an A1 paper size, therefore any prints made at a smaller size will affect the accuracy of measurement units and should not be scaled against.

Page 9: Reinforcement to The North Shropshire Electricity ... · Reinforcement to The North Shropshire Electricity Distribution Network: 132kV Electrical Circuit from Oswestry to Wem Works

61 62 63 64

65

66

67

68

6970 71 72

73

74

75

76

SycamoreCottages

3

1

SycamoreFarm House

SchoolHouse

6

Hall2

10

Dandyford

SchoolBungalow 4

5

1

1

SycamoreView

1

HordleyCottages

ChestnutSpinney

Bethanylou

SmithyCottage

Farm

Tank

Red House

CO

NTI

NU

ES O

N S

HEE

T 7

CO

NTIN

UES O

N SH

EET 5

KC

0 100 20050

Metres

ZF SE

CheckedDrawn Approved

PROPOSED 132 kV POLE POSITIONS

PREFERRED LINE ROUTE (OF THE132 kV OVERHEAD LINE)

CONSTRUCTION AND OPERATIONSCORRIDOR

40m CONSULTATION BOUNDARY

PROPOSED 132 kV UNDERGROUNDCABLE

SPEN 11 kV OVERHEAD LINE

SPEN 33 kV OVERHEAD LINE

SPEN 132 kV OVERHEAD LINE

NATIONAL GRID 400 kV OVERHEAD LINE

EXISTING LOWER VOLTAGE OVERHEADLINE TO BE REMOVED

EXISTING LOWER VOLTAGE OVERHEADLINE TO BE REPLACED WITH NEWUNDERGROUND CABLE ON SAMEALIGNMENT

PROPOSED UNDERGROUND ROUTE OFEXISTING LOWER VOLTAGE OVERHEADLINE BEING REMOVED

PROPOSED TEMPORARY ACCESS

PROPOSED TEMPORARY LAYDOWNAREAS

The Draft Order Limits comprises the construction and operations corridor, temporary access, laydown areas, undergrounding ofthe new 132 kV cable, and the undergrounding of existing lower voltage overhead line where indicated.

The Construction and Operations corridor generally has a widthof 25m in total, centred on the Preferred Line Route. In general, the corridor width for undergrounding is 10m and the corridor for access routes is 5m.

DescriptionDateRev

Works Plan13/11/20171

Scheme Name:

Title:

REINFORCEMENT TO THE NORTH SHROPSHIREELECTRICITY DISTRIBUTION NETWORK:

132 kV ELECTRICAL CIRCUIT FROMOSWESTRY TO WEM

WORKS PLANSHEET 6 of 13

Scale: Rev:Sheet Size:Sheet:SHEET 6 of 13 11:2,500 A1 (594 mm x 841 mm)

1 2 3 4 5 78 9 10

11 1213

6

BACKGROUND MAPPING INFORMATION HAS BEEN REPRODUCED FROM THE ORDNANCE SURVEY MAP BY

PERMISSION OF ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONERY OFFICE.

CROWN COPYRIGHT AND DATABASE RIGHTS 2017. ORDNANCE SURVEY 0100031673. CONTAINS OS DATA © CROWN COPYRIGHT AND DATABASE RIGHT 2017.

Document Path: R:\P10787-00 001 NSRP Dec 2016\Figures\GIS\Layouts\Works Plans\P10787_NSRP_Works_Plan.mxd

LOCATION PLAN

KEY

°

NOTES

This drawing is scaled at an A1 paper size, therefore any prints made at a smaller size will affect the accuracy of measurement units and should not be scaled against.

Page 10: Reinforcement to The North Shropshire Electricity ... · Reinforcement to The North Shropshire Electricity Distribution Network: 132kV Electrical Circuit from Oswestry to Wem Works

76

77

78

79

80

81

82

83

84

85

86

87

88

The Nook

Reynold's

Springfields

KenwickWood

CouncilHouses

14

ParkHouse

TopHouse

KenwickOak

CO

NTI

NU

ES O

N S

HEE

T 6

CONTINUES ON SHEET 8

KC

0 100 20050

Metres

ZF SE

CheckedDrawn Approved

PROPOSED 132 kV POLE POSITIONS

PREFERRED LINE ROUTE (OF THE132 kV OVERHEAD LINE)

CONSTRUCTION AND OPERATIONSCORRIDOR

40m CONSULTATION BOUNDARY

PROPOSED 132 kV UNDERGROUNDCABLE

SPEN 11 kV OVERHEAD LINE

SPEN 33 kV OVERHEAD LINE

SPEN 132 kV OVERHEAD LINE

NATIONAL GRID 400 kV OVERHEAD LINE

EXISTING LOWER VOLTAGE OVERHEADLINE TO BE REMOVED

EXISTING LOWER VOLTAGE OVERHEADLINE TO BE REPLACED WITH NEWUNDERGROUND CABLE ON SAMEALIGNMENT

PROPOSED UNDERGROUND ROUTE OFEXISTING LOWER VOLTAGE OVERHEADLINE BEING REMOVED

PROPOSED TEMPORARY ACCESS

PROPOSED TEMPORARY LAYDOWNAREAS

The Draft Order Limits comprises the construction and operations corridor, temporary access, laydown areas, undergrounding ofthe new 132 kV cable, and the undergrounding of existing lower voltage overhead line where indicated.

The Construction and Operations corridor generally has a widthof 25m in total, centred on the Preferred Line Route. In general, the corridor width for undergrounding is 10m and the corridor for access routes is 5m.

DescriptionDateRev

Works Plan13/11/20171

Scheme Name:

Title:

REINFORCEMENT TO THE NORTH SHROPSHIREELECTRICITY DISTRIBUTION NETWORK:

132 kV ELECTRICAL CIRCUIT FROMOSWESTRY TO WEM

WORKS PLANSHEET 7 of 13

Scale: Rev:Sheet Size:Sheet:SHEET 7 of 13 11:2,500 A1 (594 mm x 841 mm)

1 2 3 4 5 6

8 9 1011 12

137

BACKGROUND MAPPING INFORMATION HAS BEEN REPRODUCED FROM THE ORDNANCE SURVEY MAP BY

PERMISSION OF ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONERY OFFICE.

CROWN COPYRIGHT AND DATABASE RIGHTS 2017. ORDNANCE SURVEY 0100031673. CONTAINS OS DATA © CROWN COPYRIGHT AND DATABASE RIGHT 2017.

Document Path: R:\P10787-00 001 NSRP Dec 2016\Figures\GIS\Layouts\Works Plans\P10787_NSRP_Works_Plan.mxd

LOCATION PLAN

KEY

°

NOTES

This drawing is scaled at an A1 paper size, therefore any prints made at a smaller size will affect the accuracy of measurement units and should not be scaled against.

Page 11: Reinforcement to The North Shropshire Electricity ... · Reinforcement to The North Shropshire Electricity Distribution Network: 132kV Electrical Circuit from Oswestry to Wem Works

84

85

86

87

88

89

90

91

92

93

94

95

96

9798

99

ShadeOak

The Oaks

FerneyHough

TopHouse

KenwickLodge

KenwickOak

CO

NTI

NU

ES O

N S

HEE

T 7

CONTINUESON SHEET 9

KC

0 100 20050

Metres

ZF SE

CheckedDrawn Approved

PROPOSED 132 kV POLE POSITIONS

PREFERRED LINE ROUTE (OF THE132 kV OVERHEAD LINE)

CONSTRUCTION AND OPERATIONSCORRIDOR

40m CONSULTATION BOUNDARY

PROPOSED 132 kV UNDERGROUNDCABLE

SPEN 11 kV OVERHEAD LINE

SPEN 33 kV OVERHEAD LINE

SPEN 132 kV OVERHEAD LINE

NATIONAL GRID 400 kV OVERHEAD LINE

EXISTING LOWER VOLTAGE OVERHEADLINE TO BE REMOVED

EXISTING LOWER VOLTAGE OVERHEADLINE TO BE REPLACED WITH NEWUNDERGROUND CABLE ON SAMEALIGNMENT

PROPOSED UNDERGROUND ROUTE OFEXISTING LOWER VOLTAGE OVERHEADLINE BEING REMOVED

PROPOSED TEMPORARY ACCESS

PROPOSED TEMPORARY LAYDOWNAREAS

The Draft Order Limits comprises the construction and operations corridor, temporary access, laydown areas, undergrounding ofthe new 132 kV cable, and the undergrounding of existing lower voltage overhead line where indicated.

The Construction and Operations corridor generally has a widthof 25m in total, centred on the Preferred Line Route. In general, the corridor width for undergrounding is 10m and the corridor for access routes is 5m.

DescriptionDateRev

Works Plan13/11/20171

Scheme Name:

Title:

REINFORCEMENT TO THE NORTH SHROPSHIREELECTRICITY DISTRIBUTION NETWORK:

132 kV ELECTRICAL CIRCUIT FROMOSWESTRY TO WEM

WORKS PLANSHEET 8 of 13

Scale: Rev:Sheet Size:Sheet:SHEET 8 of 13 11:2,500 A1 (594 mm x 841 mm)

1 2 3 4 5 6 7

9 1011 12

138

BACKGROUND MAPPING INFORMATION HAS BEEN REPRODUCED FROM THE ORDNANCE SURVEY MAP BY

PERMISSION OF ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONERY OFFICE.

CROWN COPYRIGHT AND DATABASE RIGHTS 2017. ORDNANCE SURVEY 0100031673. CONTAINS OS DATA © CROWN COPYRIGHT AND DATABASE RIGHT 2017.

Document Path: R:\P10787-00 001 NSRP Dec 2016\Figures\GIS\Layouts\Works Plans\P10787_NSRP_Works_Plan.mxd

LOCATION PLAN

KEY

°

NOTES

This drawing is scaled at an A1 paper size, therefore any prints made at a smaller size will affect the accuracy of measurement units and should not be scaled against.

Page 12: Reinforcement to The North Shropshire Electricity ... · Reinforcement to The North Shropshire Electricity Distribution Network: 132kV Electrical Circuit from Oswestry to Wem Works

99

100101

102103

104105 106 107 108 109 110

Highfields

Glendower

ChapelHouseFarm

StanwardineGrange

2

ChapelHouse

MeadowView

1

ExchangeMeadowgate

LowGrove

Tasker

Tyneholm

26

FairView

Stonehill

Chape

l

Gates

WestLeasow

View

1

2

Oakfield

TheGranary

Heronstone

StanwardineHouse

StanwardineHall

The HayBarnC

ON

TIN

UES

ON

SH

EET

8

CO

NTI

NU

ES O

N S

HEE

T 10

KC

0 100 20050

Metres

ZF SE

CheckedDrawn Approved

PROPOSED 132 kV POLE POSITIONS

PREFERRED LINE ROUTE (OF THE132 kV OVERHEAD LINE)

CONSTRUCTION AND OPERATIONSCORRIDOR

40m CONSULTATION BOUNDARY

PROPOSED 132 kV UNDERGROUNDCABLE

SPEN 11 kV OVERHEAD LINE

SPEN 33 kV OVERHEAD LINE

SPEN 132 kV OVERHEAD LINE

NATIONAL GRID 400 kV OVERHEAD LINE

EXISTING LOWER VOLTAGE OVERHEADLINE TO BE REMOVED

EXISTING LOWER VOLTAGE OVERHEADLINE TO BE REPLACED WITH NEWUNDERGROUND CABLE ON SAMEALIGNMENT

PROPOSED UNDERGROUND ROUTE OFEXISTING LOWER VOLTAGE OVERHEADLINE BEING REMOVED

PROPOSED TEMPORARY ACCESS

PROPOSED TEMPORARY LAYDOWNAREAS

The Draft Order Limits comprises the construction and operations corridor, temporary access, laydown areas, undergrounding ofthe new 132 kV cable, and the undergrounding of existing lower voltage overhead line where indicated.

The Construction and Operations corridor generally has a widthof 25m in total, centred on the Preferred Line Route. In general, the corridor width for undergrounding is 10m and the corridor for access routes is 5m.

DescriptionDateRev

Works Plan13/11/20171

Scheme Name:

Title:

REINFORCEMENT TO THE NORTH SHROPSHIREELECTRICITY DISTRIBUTION NETWORK:

132 kV ELECTRICAL CIRCUIT FROMOSWESTRY TO WEM

WORKS PLANSHEET 9 of 13

Scale: Rev:Sheet Size:Sheet:SHEET 9 of 13 11:2,500 A1 (594 mm x 841 mm)

1 2 3 4 5 6 78 10

11 1213

9

BACKGROUND MAPPING INFORMATION HAS BEEN REPRODUCED FROM THE ORDNANCE SURVEY MAP BY

PERMISSION OF ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONERY OFFICE.

CROWN COPYRIGHT AND DATABASE RIGHTS 2017. ORDNANCE SURVEY 0100031673. CONTAINS OS DATA © CROWN COPYRIGHT AND DATABASE RIGHT 2017.

Document Path: R:\P10787-00 001 NSRP Dec 2016\Figures\GIS\Layouts\Works Plans\P10787_NSRP_Works_Plan.mxd

LOCATION PLAN

KEY

°

NOTES

This drawing is scaled at an A1 paper size, therefore any prints made at a smaller size will affect the accuracy of measurement units and should not be scaled against.

Page 13: Reinforcement to The North Shropshire Electricity ... · Reinforcement to The North Shropshire Electricity Distribution Network: 132kV Electrical Circuit from Oswestry to Wem Works

110 111

112

113

114

115

116

117

118

119

120

121

122

123

WackleyLodge

The WoodMaltKilnFarm

RunnersRest

WoodFarm

CO

NTI

NU

ES O

N S

HEE

T 11

CO

NTIN

UES O

N SH

EET 9

KC

0 100 20050

Metres

ZF SE

CheckedDrawn Approved

PROPOSED 132 kV POLE POSITIONS

PREFERRED LINE ROUTE (OF THE132 kV OVERHEAD LINE)

CONSTRUCTION AND OPERATIONSCORRIDOR

40m CONSULTATION BOUNDARY

PROPOSED 132 kV UNDERGROUNDCABLE

SPEN 11 kV OVERHEAD LINE

SPEN 33 kV OVERHEAD LINE

SPEN 132 kV OVERHEAD LINE

NATIONAL GRID 400 kV OVERHEAD LINE

EXISTING LOWER VOLTAGE OVERHEADLINE TO BE REMOVED

EXISTING LOWER VOLTAGE OVERHEADLINE TO BE REPLACED WITH NEWUNDERGROUND CABLE ON SAMEALIGNMENT

PROPOSED UNDERGROUND ROUTE OFEXISTING LOWER VOLTAGE OVERHEADLINE BEING REMOVED

PROPOSED TEMPORARY ACCESS

PROPOSED TEMPORARY LAYDOWNAREAS

The Draft Order Limits comprises the construction and operations corridor, temporary access, laydown areas, undergrounding ofthe new 132 kV cable, and the undergrounding of existing lower voltage overhead line where indicated.

The Construction and Operations corridor generally has a widthof 25m in total, centred on the Preferred Line Route. In general, the corridor width for undergrounding is 10m and the corridor for access routes is 5m.

DescriptionDateRev

Works Plan13/11/20171

Scheme Name:

Title:

REINFORCEMENT TO THE NORTH SHROPSHIREELECTRICITY DISTRIBUTION NETWORK:

132 kV ELECTRICAL CIRCUIT FROMOSWESTRY TO WEM

WORKS PLANSHEET 10 of 13

Scale: Rev:Sheet Size:Sheet:SHEET 10 of 13 11:2,500 A1 (594 mm x 841 mm)

1 2 3 4 5 6 78 9 11 12

1310

BACKGROUND MAPPING INFORMATION HAS BEEN REPRODUCED FROM THE ORDNANCE SURVEY MAP BY

PERMISSION OF ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONERY OFFICE.

CROWN COPYRIGHT AND DATABASE RIGHTS 2017. ORDNANCE SURVEY 0100031673. CONTAINS OS DATA © CROWN COPYRIGHT AND DATABASE RIGHT 2017.

Document Path: R:\P10787-00 001 NSRP Dec 2016\Figures\GIS\Layouts\Works Plans\P10787_NSRP_Works_Plan.mxd

LOCATION PLAN

KEY

°

NOTES

This drawing is scaled at an A1 paper size, therefore any prints made at a smaller size will affect the accuracy of measurement units and should not be scaled against.

Page 14: Reinforcement to The North Shropshire Electricity ... · Reinforcement to The North Shropshire Electricity Distribution Network: 132kV Electrical Circuit from Oswestry to Wem Works

123

124125

126

127

128

129

130

131

132

133

134

135

136

137

138

139

140

MillFarm

BurltonGrange

Silo

MillBrook

Silo

MoorHouseFarm

TheFields

Woodfields

CoppiceFarm

BentleyFarm

CO

NTI

NU

ESO

N S

HEE

T 12

CO

NTI

NU

ES O

N S

HEE

T 10

KC

0 100 20050

Metres

ZF SE

CheckedDrawn Approved

PROPOSED 132 kV POLE POSITIONS

PREFERRED LINE ROUTE (OF THE132 kV OVERHEAD LINE)

CONSTRUCTION AND OPERATIONSCORRIDOR

40m CONSULTATION BOUNDARY

PROPOSED 132 kV UNDERGROUNDCABLE

SPEN 11 kV OVERHEAD LINE

SPEN 33 kV OVERHEAD LINE

SPEN 132 kV OVERHEAD LINE

NATIONAL GRID 400 kV OVERHEAD LINE

EXISTING LOWER VOLTAGE OVERHEADLINE TO BE REMOVED

EXISTING LOWER VOLTAGE OVERHEADLINE TO BE REPLACED WITH NEWUNDERGROUND CABLE ON SAMEALIGNMENT

PROPOSED UNDERGROUND ROUTE OFEXISTING LOWER VOLTAGE OVERHEADLINE BEING REMOVED

PROPOSED TEMPORARY ACCESS

PROPOSED TEMPORARY LAYDOWNAREAS

The Draft Order Limits comprises the construction and operations corridor, temporary access, laydown areas, undergrounding ofthe new 132 kV cable, and the undergrounding of existing lower voltage overhead line where indicated.

The Construction and Operations corridor generally has a widthof 25m in total, centred on the Preferred Line Route. In general, the corridor width for undergrounding is 10m and the corridor for access routes is 5m.

DescriptionDateRev

Works Plan13/11/20171

Scheme Name:

Title:

REINFORCEMENT TO THE NORTH SHROPSHIREELECTRICITY DISTRIBUTION NETWORK:

132 kV ELECTRICAL CIRCUIT FROMOSWESTRY TO WEM

WORKS PLANSHEET 11 of 13

Scale: Rev:Sheet Size:Sheet:SHEET 11 of 13 11:2,500 A1 (594 mm x 841 mm)

1 2 3 4 5 6 78 9 10 12

1311

BACKGROUND MAPPING INFORMATION HAS BEEN REPRODUCED FROM THE ORDNANCE SURVEY MAP BY

PERMISSION OF ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONERY OFFICE.

CROWN COPYRIGHT AND DATABASE RIGHTS 2017. ORDNANCE SURVEY 0100031673. CONTAINS OS DATA © CROWN COPYRIGHT AND DATABASE RIGHT 2017.

Document Path: R:\P10787-00 001 NSRP Dec 2016\Figures\GIS\Layouts\Works Plans\P10787_NSRP_Works_Plan.mxd

LOCATION PLAN

KEY

°

NOTES

This drawing is scaled at an A1 paper size, therefore any prints made at a smaller size will affect the accuracy of measurement units and should not be scaled against.

Page 15: Reinforcement to The North Shropshire Electricity ... · Reinforcement to The North Shropshire Electricity Distribution Network: 132kV Electrical Circuit from Oswestry to Wem Works

139

140

141

142

143

144

145

146

147

148 149 150 151 152 153 154 155 156 157 158

159

160

2HallCottages

Smithy

GraftonFarm

1

ForrestersFarm

WillowTreeCottage

ManorCottage

The

PearlFarm

WeaversLoft

CommonwoodFarm

ManorFarm

HopeCottage

Primrose

NoneleyHall Farm

ShayesFarm

ChapelHouse

TheHollies

Yew TreeCottage

The Firs

New Farm

1

Barns

56

3

2

4

SaltersStables

StoneGables

NoneleyGrange

CO

NTI

NU

ES O

N S

HEE

T 13

CO

NTI

NU

ES O

N S

HEE

T 11

KC

0 100 20050

Metres

ZF SE

CheckedDrawn Approved

PROPOSED 132 kV POLE POSITIONS

PREFERRED LINE ROUTE (OF THE132 kV OVERHEAD LINE)

CONSTRUCTION AND OPERATIONSCORRIDOR

40m CONSULTATION BOUNDARY

PROPOSED 132 kV UNDERGROUNDCABLE

SPEN 11 kV OVERHEAD LINE

SPEN 33 kV OVERHEAD LINE

SPEN 132 kV OVERHEAD LINE

NATIONAL GRID 400 kV OVERHEAD LINE

EXISTING LOWER VOLTAGE OVERHEADLINE TO BE REMOVED

EXISTING LOWER VOLTAGE OVERHEADLINE TO BE REPLACED WITH NEWUNDERGROUND CABLE ON SAMEALIGNMENT

PROPOSED UNDERGROUND ROUTE OFEXISTING LOWER VOLTAGE OVERHEADLINE BEING REMOVED

PROPOSED TEMPORARY ACCESS

PROPOSED TEMPORARY LAYDOWNAREAS

The Draft Order Limits comprises the construction and operations corridor, temporary access, laydown areas, undergrounding ofthe new 132 kV cable, and the undergrounding of existing lower voltage overhead line where indicated.

The Construction and Operations corridor generally has a widthof 25m in total, centred on the Preferred Line Route. In general, the corridor width for undergrounding is 10m and the corridor for access routes is 5m.

DescriptionDateRev

Works Plan13/11/20171

Scheme Name:

Title:

REINFORCEMENT TO THE NORTH SHROPSHIREELECTRICITY DISTRIBUTION NETWORK:

132 kV ELECTRICAL CIRCUIT FROMOSWESTRY TO WEM

WORKS PLANSHEET 12 of 13

Scale: Rev:Sheet Size:Sheet:SHEET 12 of 13 11:2,500 A1 (594 mm x 841 mm)

1 2 3 4 5 6 78 9 10

1113

12

BACKGROUND MAPPING INFORMATION HAS BEEN REPRODUCED FROM THE ORDNANCE SURVEY MAP BY

PERMISSION OF ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONERY OFFICE.

CROWN COPYRIGHT AND DATABASE RIGHTS 2017. ORDNANCE SURVEY 0100031673. CONTAINS OS DATA © CROWN COPYRIGHT AND DATABASE RIGHT 2017.

Document Path: R:\P10787-00 001 NSRP Dec 2016\Figures\GIS\Layouts\Works Plans\P10787_NSRP_Works_Plan.mxd

LOCATION PLAN

KEY

°

NOTES

This drawing is scaled at an A1 paper size, therefore any prints made at a smaller size will affect the accuracy of measurement units and should not be scaled against.

Page 16: Reinforcement to The North Shropshire Electricity ... · Reinforcement to The North Shropshire Electricity Distribution Network: 132kV Electrical Circuit from Oswestry to Wem Works

158

159

160

161

162

163

164

165

166

167

168

169

170

171

172

173

174

175

176

Factory

BelleVueThe

DitchesHall

The GateHouse

Oakdene

Overfields

HarleyHouse

Sherfield

Avondale

Pearl Farm

WeaversLoft

CommonwoodFarm

HopeCottage

PoolsFarm

CO

NTIN

UES O

N SH

EET 12

KC

0 100 20050

Metres

ZF SE

CheckedDrawn Approved

PROPOSED 132 kV POLE POSITIONS

PREFERRED LINE ROUTE (OF THE132 kV OVERHEAD LINE)

CONSTRUCTION AND OPERATIONSCORRIDOR

40m CONSULTATION BOUNDARY

PROPOSED 132 kV UNDERGROUNDCABLE

SPEN 11 kV OVERHEAD LINE

SPEN 33 kV OVERHEAD LINE

SPEN 132 kV OVERHEAD LINE

NATIONAL GRID 400 kV OVERHEAD LINE

EXISTING LOWER VOLTAGE OVERHEADLINE TO BE REMOVED

EXISTING LOWER VOLTAGE OVERHEADLINE TO BE REPLACED WITH NEWUNDERGROUND CABLE ON SAMEALIGNMENT

PROPOSED UNDERGROUND ROUTE OFEXISTING LOWER VOLTAGE OVERHEADLINE BEING REMOVED

PROPOSED TEMPORARY ACCESS

PROPOSED TEMPORARY LAYDOWNAREAS

The Draft Order Limits comprises the construction and operations corridor, temporary access, laydown areas, undergrounding ofthe new 132 kV cable, and the undergrounding of existing lower voltage overhead line where indicated.

The Construction and Operations corridor generally has a widthof 25m in total, centred on the Preferred Line Route. In general, the corridor width for undergrounding is 10m and the corridor for access routes is 5m.

DescriptionDateRev

Works Plan13/11/20171

Scheme Name:

Title:

REINFORCEMENT TO THE NORTH SHROPSHIREELECTRICITY DISTRIBUTION NETWORK:

132 kV ELECTRICAL CIRCUIT FROMOSWESTRY TO WEM

WORKS PLANSHEET 13 of 13

Scale: Rev:Sheet Size:Sheet:SHEET 13 of 13 11:2,500 A1 (594 mm x 841 mm)

1 2 3 4 5 6 78 9 10

11 1213

BACKGROUND MAPPING INFORMATION HAS BEEN REPRODUCED FROM THE ORDNANCE SURVEY MAP BY

PERMISSION OF ORDNANCE SURVEY ON BEHALF OF THE CONTROLLER OF HER MAJESTY'S STATIONERY OFFICE.

CROWN COPYRIGHT AND DATABASE RIGHTS 2017. ORDNANCE SURVEY 0100031673. CONTAINS OS DATA © CROWN COPYRIGHT AND DATABASE RIGHT 2017.

Document Path: R:\P10787-00 001 NSRP Dec 2016\Figures\GIS\Layouts\Works Plans\P10787_NSRP_Works_Plan.mxd

LOCATION PLAN

KEY

°

NOTES

This drawing is scaled at an A1 paper size, therefore any prints made at a smaller size will affect the accuracy of measurement units and should not be scaled against.