4.1 Machinery Installation PregroutSetup Checklist
INITIALS/DATE Anchor Bolt Preparation
______ ______ 3.5.2 Anchor bolt sleeves are clean
and dry and filled with a non-
bonding moldable material.
______ ______ 3.5.2 Anchor bolts are not tilted orbolt-bound and are perpen-
dicular with respect to the
bottom of the baseplate/
soleplate.
______ ______ 3.5.3 Foundation anchor boltthreads are undamaged.
______ ______ 3.5.3 Foundation anchor boltthreads have been wrapped
with duct tape for protection.
______ ______ 3.5.4 All anchor bolt locations and
projections have been veri-
fied.
Foundation Preparation
______ ______ 3.6.1 An adequate weather-protec-tive cover has been con-
structed over the areas to be
grouted.
______ ______ 3.6.2 Concrete foundation is
roughened up and all laitance
removed for a good grout
bond.
______ ______ 3.6.2 The minimum grout thick-ness under any portion of the
baseplate/soleplate will be
2550 millimeters (12
inches).
______ ______ 3.6.2 Foundation is free of struc-tural cracks.
______ ______ 3.6.3 All grout forms have beenprovided with 25-millimeter
(1-inch) 45-degree chamfer
strips at vertical corners and
horizontal edges.
______ ______ 3.6.4 Concrete grout areas are
clean and free of oil, dust,
and moisture.
INITIALS/DATE Grout Forms
______ ______ 3.7.1 Grout forms are of adequatestrength to support the grout.
______ ______ 3.7.3 Inside surfaces of grout havethree coats of paste wax ap-
plied.
______ ______ 3.7.4 Grout forms have been
sealed to the foundation to
prevent leaks.
______ ______ 3.7.5 Grout forms have 25-mil-
limeter (1-inch), 45-degreechamfer strips at all vertical
corners and at the horizontal
surface of the grout.
Mounting Plate DesignVerification
______ ______ 3.8.2 Baseplate/soleplate has 50-millimeter (2-inch) minimum
radiused corners.
______ ______ 3.8.3 Anchor bolts have 3-mil-
limeter (1/8-inch) annular
clearance in baseplate orsoleplate holes.
______ ______ 3.8.4 All pump and other smallbaseplates have been pro-
vided with vertical leveling
screws.
______ ______ 3.8.5 Baseplates have been pro-vided with one 10-centimeter
(4-inch) minimum grout fill-
ing hole in the center of each
bulkhead section and one 12-
millimeter (1/2-inch) vent
hole.
______ ______ 3.8.6 Baseplates have sufficient
grout and air vent holes in
each compartment to allow
for proper grouting.
______ ______ 3.8.7 Elevation adjustment nutswill not be permanently
grouted.
______ ______ 3.8.8 Baseplate leveling jack-screws have been provided
with stainless steel leveling
pads.
Section 4Grouting Checklists
RECOMMENDEDPRACTICES FORMACHINERYINSTALLATION ANDINSTALLATIONDESIGN, CHAPTER5 5-9
-
7/24/2019 REIE686,Checklist
2/5
5-10 API RECOMMENDEDPRACTICE686/PIP REIE 686
INITIALS/DATE Mounting Plate Design
Verification (continued)
______ ______ 3.8.9 Baseplate welds are continu-
ous and free of cracks.
______ ______ 3.8.10 All grout pour and vent holesare accessible.
Mounting Plate Preparation
______ ______ 3.9.1.1 Baseplate/soleplate has been
blasted and all grouting sur-
faces prepared in accordance
with the grout manufac-
turers recommendations.
______ ______ 3.9.1.2 Three coats of paste waxhave been applied to all sur-
faces where grout bond is not
desired. These surfaces in-
clude jackscrews, grout
forms, and coupling guard
bolts.
______ ______ 3.9.1.3 All miscellaneous mountingplate holes are plugged to
prevent the entrance of grout.
______ ______ 3.9.1.4 Equipment to be grouted is
isolated and in a strain-free
condition with all piping,conduit, and so forth, discon-
nected.
Expansion Joints
______ ______ 3.9.2.1 Expansion joints placed on1.4- to 2.8-meter (4- to 6-
foot) intervals.
______ ______ 3.9.2.2 Expansion joints fixed intoposition such that they will
not move when grout is
poured.
Soleplate Installation and
Leveling
______ ______ 3.9.3.1 The elevation to the top of
equipment baseplate or sole-
plate referenced to the civil
benchmark is in agreement
with the construction grout
drawing.
______ ______ 3.9.3.7 All shims used in subsole-plates are AISI Standard type
300 stainless steel.
INITIALS/DATE Soleplate Installation andLeveling (continued)
______ ______ 3.9.3.9 All machined baseplate orsoleplate surfaces are level in
accordance with the specifi-
cation, and signed-off Data
Sheets for level record have
been completed.
Baseplate and Installation
Leveling API 610 and ASMEPumps, and General PurposeEquipment
______ ______ 3.9.4.1 All baseplate elevations setin accordance with the con-
struction drawings.
______ ______ 3.9.4.2 A preliminary equipment
alignment check has been
made.
______ ______ 1.9.4.5 All baseplate surfaces arelevel in accordance with the
specification, and signed-off
Data Sheets for level record
have been completed.
Pregrout Setup
______ ______ 3.12.1 All surfaces in contact withgrout are clean, dry, and oil
free.
______ ______ 3.12.2 Anchor bolt nuts have beensnugged into position to
prevent baseplate/soleplate
floating.
______ ______ 3.12.3 Anchor bolt sleeves havebeen filled with flexible mas-
tic material.
______ ______ 3.12.3 Top of anchor bolt sleeve has
been packed with a softmoldable material.
______ ______ 3.12.4 Grout form elevation agreeswith the construction draw-
ings.
______ ______ 3.12.8 Grouting material is in clean,dry, unopened containers and
has been stored at a tempera-
ture of approximately 21C
(75F) for 48 hours prior to
grouting.
-
7/24/2019 REIE686,Checklist
3/5
RECOMMENDEDPRACTICES FORMACHINERYINSTALLATION ANDINSTALLATIONDESIGN, CHAPTER5 5-11
INITIALS/DATE Pregrout Setup (continued)
______ ______ 3.12.9 All foundation and metal sur-faces are within the tempera-
ture range of 1832C
(6590F).
______ ______ 3.12.10 Sufficient quantity of grout-ing materials are on hand at
the jobsite to complete the
job (1525 percent extra).
______ ______ 3.12.11 Clean tools, mixing equip-ment, and safety supplies are
on hand at the jobsite.
______ ______ 3.12.12 Material Safety Data Sheets
and personnel protection re-quirements have been re-
viewed with all grouting
personnel.
EQUIPMENT IDENTIFICATION NUMBER
GROUTING INSPECTOR DATE
-
7/24/2019 REIE686,Checklist
4/5
5-12 API RECOMMENDEDPRACTICE686/PIP REIE 686
INITIALS/DATE Mounting Plate Grouting
______ ______ Grout is placed within its pot life.Time at beginning of pour:
____________(AM) (PM).
Time at end of pour:
____________(AM) (PM).
______ ______ 3.14.2 No vibrator is used to facili-tate grout placement.
______ ______ 3.14.2 Grout pour rate is slowenough to permit air to es-
cape.
______ ______ 3.14.3 The grout volume used
agrees with the estimatedcavity volume.
______ ______ 3.14.4 No grout leaks are observed.
______ ______ 3.14.5 For special purpose equip-ment, a grout sample is ob-
tained for each batch mixture
(polystyrene cup full) for
compressive strength testing.
All samples are to be labeled
and their batch placement lo-
cation noted.
______ ______ 3.14.7 All grout surface air bubblesare removed.
______ ______ 3.14.9 Grout holes and vent holesfilled with grout.
______ ______ Ambient temperature at end of groutpour ______C (F).
4.2 Machinery Installation GroutPlacement Checklist
INITIALS/DATE
______ ______ Ambient temperature at beginning ofgrout pour ______C (F).
______ ______ Pre-grout meeting has been completedand all personnel understand the grout
plan and individual responsibilities.
Grout Mixing
______ ______ 3.13.2 Resin and hardener aremixed at 200250 rpm for
the specified time and no airentrainment is indicated.
______ ______ 3.13.3 Full bags of aggregate areslowly added to blended
resin/hardener liquid and
mixed to completely wet-out
the aggregate.
______ ______ 3.13.3 No partial units of epoxy,resins, hardener, or aggregate
used.
______ ______ 3.13.4 Grout mixed in a clean, slow-
speed (1520 rpm) portable
mortar mixer (or in a wheel-
barrow for small pours).
EQUIPMENT IDENTIFICATION NUMBER
GROUTING INSPECTOR DATE
-
7/24/2019 REIE686,Checklist
5/5
RECOMMENDEDPRACTICES FORMACHINERYINSTALLATION ANDINSTALLATIONDESIGN, CHAPTER5 5-13
4.3 Machinery Installation Post-Grouting
Checklist
INITIALS/DATE Post-Grouting Instructions
______ ______ 3.15.1 Grout is of sufficient hard-
ness to remove forms.
______ ______ 3.15.1 Grout forms remained in
place after grouting for
4836 hours.
______ ______ 3.15.3 Mounting plate jackscrewholes are filled with a flexi-
ble material such as RTV sil-
icone rubber.
______ ______ 3.15.4 Grout is checked for soft-ness with a dial indicator.
Baseplate/soleplate checked
for soft foot at each anchor
bolt location with a magnetic
base dial indicator as anchor
bolts are torqued. Base
movement does not exceed
0.02 millimeter (0.001 inch).
______ ______ 3.15.5 Expansion joints sealed withelastic epoxy seam sealant.
______ ______ 3.15.6 Top of machinery foundationpainted with a grout-compat-
ible nonskid protective coat-
ing.
______ ______ 3.15.7 Lubricate all anchor boltthreads liberally and torque
anchor bolts in accordance
with the manufacturers rec-
ommendations.
Anchor bolt size: ________________
Torque specification: _____________
Installed torque:_________________
______ ______ 3.15.8 Ensure that all anchor boltshave full penetration of the
anchor bolt nut and a mini-
mum of 21/2 threads protrude
above the anchor bolt nut.
INITIALS/DATE Filling Grout Voids
______ ______ 3.16.1 Baseplate sounded forvoids and all voids repaired.
Indicate number of voids
found, their size, and their lo-
cation: __________.
______ ______ 3.16.2 Void areas have NPT 1/8holes installed in opposite
corners of void with grease
fitting installed in one of the
holes.
______ ______ 3.16.3 Grout void fill and vent holesare in communication.
______ ______ 3.16.3 Dial indicator used onmounting plate to monitor
plate movement while filling
grout void.
______ ______ 3.16.4 All spilled grout is cleaned
up with manufacturers ap-
proved solvent.
______ ______ 3.16.5 Recheck baseplate to ensurethat all voids are filled with
grout.
EQUIPMENT IDENTIFICATION NUMBER
GROUTING INSPECTOR DATE