REHABILITATION OF APRON I - pgairport.ca€¦ · 4 3 1 1a 2a 5 6 2 dh8-4 a320 a319 b737 700 600 800...
Transcript of REHABILITATION OF APRON I - pgairport.ca€¦ · 4 3 1 1a 2a 5 6 2 dh8-4 a320 a319 b737 700 600 800...
7
3
A
4
3
1
1
A
2
A
5
6
2
DH8-4
A320
A319 B737
700
600
B737
800
B727
200
B1900
B737
800
B737
700
600
A320
A319
DH8-4
CRJDH8-4
DH8-1
DH8-2
DH8-3
B767-200
B757-200
B1900
B1900
B737
800
B727 200
DH8-1
DH8-2
DH8-3
DH8-4
CRJ
APRO
N I
A.T.B.
RUNW
AY 01
- 19
APRO
N III
TWY C
TAXIWAY DRUNWAY 06 - 24
RUNW
AY 15
- 33
K:\704-T
RN
.A
IR
P03038 - Y
XS
P
RIN
CE
G
EO
RG
E\D
esig
n\T
RN
-A
IR
P03038 Y
XS
C
0.0 - C
OV
ER
.d
wg
[C
0.0
] M
ay 24, 2016 - 2:59:25 p
m (B
Y: R
UD
NIS
KI, M
IK
E)
ISSUED DATE 16/05/25
TETRA TECH PROJECT NUMBER TRN.AIRP03038-01ISSUED FOR TENDER
SITE PLANPLAN OF CONSTRUCTION OPERATIONS - DAY TIME WORKPLAN OF CONSTRUCTION OPERATIONS - NIGHT TIME WORKMILLING / PAVING GRADING PLANCROSS SECTIONSSTORM PIPE REHABILITATION PLANPERMANENT PAINT MARKING PLANTEMPORARY PAINT MARKING PLANCONCRETE PANELS PLAN (PROVISIONAL WORK)CONCRETE PANELS DETAILS (PROVISIONAL WORK)
DRAWING LIST
C1.0C2.0C2.1C3.0C4.0C5.0C6.0C6.1C7.0C8.0
KEY PLAN0 500400300200100
Scale: 1: 10,000 (metres)
REHABILITATION OF APRON I
PROJECT LOCATION
CONTRACTOR'SSTAGING AREA 1
POTENTIAL CONTRACTOR'SSTAGING AREA 2
POTENTIAL CONTRACTOR'SSTAGING AREA 3
CONTRACTOR'S ESCORTED ACCESSROUTE ON AIRSIDE (TYP)
PROVISIONAL WORKCONTRACTOR'S ESCORTED ACCESSTO WORK SECTION A
MILLING/PAVING WORKCONTRACTOR'S ACCESSONTO AIRSIDE (TYP)
DISPOSAL SITE FOREXCAVATED
SALVAGEABLEGRAVELS
DISPOSAL SITE FOREXCAVATED
SALVAGEABLEGRAVELS
N
E
W
F
E
C
7
3
A
4 3
1
1A
2A
5
6
2
D
H
8
-
4
A
3
2
0
A
3
1
9
B
7
3
7 7
0
0 6
0
0
B
7
3
7 8
0
0
B
7
2
7
2
0
0
B1900
B
7
3
7
8
0
0
B
7
3
7 7
0
0
6
0
0
A
3
2
0
A
3
1
9
D
H
8
-
4
C
R
J
D
H
8
-
4
D
H
8
-
1
D
H
8
-
2
D
H
8
-
3
B
7
6
7
-
2
0
0
B
7
5
7
-
2
0
0
B1900
B1900
B737
800
B727
200
D
H
8
-
1
D
H
8
-
2
D
H
8
-
3
D
H
8
-
4
C
R
J
5
6
7
1A
1
2 A
3
2
0
A
3
1
9
B
7
3
7 7
0
0 6
0
0
B
7
3
7 8
0
0
B1900
B1900
B1900
B737
800
APRON IAPRON IV
A.T.B.
APRON II
TAXI
WAY
C
RUNWAY 06 - 24
NORTHERNTHUNDERBIRD
PROVISIONAL WORKHMAC CRACK TREATMENT
FOR SELECTEDEX. HMAC CRACKS (TYP)
STORM PIPE REHABILITATION (TYP)SEE DWG C5.0
EXISTING PCC PANELS
PROVISIONAL WORKNEW PCC PANELSSEE DWG C7.0, C8.0
HMAC COLD MILL AND PAVESEE DWG C3.0
NEW PAINT MARKINGS (TYP)SEE DWG C7.0
MH 1
MH 2
MH 3MH 4MH 5MH 6
MH 7MH 8
B
C
H
1
9
0
0
D
B
C
H
1
9
0
0
D
Q
4
0
0
Q
4
0
0
Q
4
0
0
Q
4
0
0
Q
4
0
0
Q
4
0
0
B
7
3
7
-
7
0
0
W
B
7
3
7
-
7
0
0
W
B
7
3
7
-
6
0
0
W
B
7
3
7
-
6
0
0
W
B
7
3
7
-
7
0
0
W
B
7
3
7
-
7
0
0
W
F
B
7
3
7
-
8
0
0
W
B
7
3
7
-
8
0
0
W
B
7
3
7
-
8
0
0
B
7
3
7
-
8
0
0
EX. FIRE HYDRANT
4.5
DOT 511
CP 01
CP 02
Q400Q400
Q400
B737(AIRCRAFT NOT EXPECTED DURINGPROJECT DURATION)
PROJECT CONTROL POINTS
POINT #
1
2
3
DESCRIPTION
DOT 511
CP 01
CP 02
NORTHING
5973893.544
5973845.130
5973801.537
EASTING
521507.273
521590.980
521691.436
ELEVATION
679.860
677.801
677.594
*CONTROL POINTS ARE PROVIDED IN PROJECT COORDINATES.*
K:\704-T
RN
.A
IR
P03038 - Y
XS
P
RIN
CE
G
EO
RG
E\D
esig
n\T
RN
-A
IR
P03038 Y
XS
C
1.0-S
IT
E.d
wg
[C
1.0
] M
ay 24, 2016 - 3:01:01 p
m (B
Y: R
UD
NIS
KI, M
IK
E)
DES
DWN
CKD
APP
REV
STATUS
DRAWINGPROJECT No.
of
SHEET No.DATE:
OFFICE
CLIENT
PROFESSIONAL SEALPERMIT
C1.0
704-TRN.AIRP03038 Kelowna KSA KSA
April, 2016 1 10 MER RMB 0
REHABILITATION OF APRON I
SITE PLAN
0 25m
Scale: 1:750 @ 22"x34"NUM DESCRIPTIONDATE APR
DRAWING STATUS
0 16/05/25 R.M.B. ISSUED FOR TENDERNUM DWN CKD DESCRIPTIONDATE APR
REVISIONS
STANDARD NOTES:1. ALL EXISTING UNDERGROUND UTILITIES TO BE FIELD LOCATED BY THE CONTRACTOR PRIOR TO EXCAVATION.2. ANY EXISTING UTILITIES DESTROYED DURING CONSTRUCTION ARE TO BE REPAIRED BY THE CONTRACTOR AT NO COST TO THE CONTRACT.3. COORDINATES ARE PROVIDED FOR CONVENIENCE ONLY. ALL DIMENSIONS ON THE DRAWING TO BE VERIFIED BY CONTRACTOR PRIOR TO CONSTRUCTION.4. THE ENGINEER IS TO BE NOTIFIED OF ANY CONFLICT BETWEEN COORDINATES AND DIMENSIONS.
7
3
A
4 3
1
1A
2A
5
6
2
D
H
8
-
4
A
3
2
0
A
3
1
9
B
7
3
7
7
0
0 6
0
0
B
7
3
7 8
0
0
B
7
2
7
2
0
0
B1900
B
7
3
7
8
0
0
B
7
3
7
7
0
06
0
0
A
3
2
0
A
3
1
9
D
H
8
-
4
C
R
J
D
H
8
-
4
D
H
8
-
1
D
H
8
-
2
D
H
8
-
3
B
7
6
7
-
2
0
0
B
7
5
7
-
2
0
0
B1900
B1900
B737
800
B727
200
D
H
8
-
1
D
H
8
-
2
D
H
8
-
3
D
H
8
-
4
C
R
J
APRON I
APRON IV
A.T.B.
APRON II
RUNWAY 01 - 19APRON III
TAXI
WAY
C
TAXIWAY D
Q400
Q400
Q
4
0
0
Q
4
0
0
Q400
Q400
Q
4
0
0
Q
4
0
0
Q400
Q400
Q
4
0
0
Q
4
0
0
Q400
Q400
Q400 WITH 4.5mWINGTIP CLEARANCE
PROVISIONAL WORK1.8m HIGH SECURE TEMPORARYMODULOC FENCE C/WSTEADY BURN RED LIGHTS.
Q400 WITH 4.5mWINGTIP CLEARANCE
NORTHERNTHUNDERBIRDRCMP
Q400 WITH 4.5mWINGTIP CLEARANCE
AIRCRAFT STAND CLOSED (TYP)
NO AIRCRAFT / VEHICLEACCESS ACROSSAPRON I DURING
DAYTIME CONSTRUCTION(ESTIMATE 6 DAYS
CLOSURE)
LOW BARRIERS SPACED AT 3mINTERVALS C/W STEADY BURN RED LIGHTS (TYP).SUPPLIED BY OWNER. CONTRACTOR TO INSTALL
TO WITHSTAND JET BLAST, RELOCATE AS REQUIREDAND REMOVE AT CONSTRUCTION COMPLETION.
(122 LIGHTS REQUIRED)
TEMPORARY 150mm WIDEYELLOW LEAD-IN PAINT MARKINGS (TYP).
SEE DWG C6.1.
POTENTIAL CONTRACTOR'S STAGING AREA 2
CONTRACTOR'S ESCORTEDACCESS ROUTE TO STAGING
AREA. VEHICLES YIELD TOAIRCRAFT AT ALL TIMES.
3.0(TYP)
117.6
40.7
Q400 WITH 4.5mWINGTIP CLEARANCE
83.5
116.3
34.0
7
6
54 3 2A
1A
1
3A
A.T.C.TOWER
MILLING / PAVING WORKCONTRACTOR ACCESSROUTE TO AIRSIDE
CONTRACTOR'S ESCORTEDACCESS ROUTE TO PROVISIONALWORK SECTION A.
60.0m SPACING TO RUNWAY 01-19
TEMPORARY BLUE TAXIWAY EDGE LIGHT / MARKERPROVIDED AND INSTALLED BY THE AIRPORT (TYP)
TEMPORARY BLUE TAXIWAY EDGE LIGHT / MARKERPROVIDED AND INSTALLED BY THE AIRPORT (TYP)
NTAIR / RCMP / LIGHT AIRCRAFT ACCESS ROUTE
EDGE OF RESTRICTED AREA (TYP)ONE ESCORT PER EVERY TENCONTRACTOR PERSONNEL
EX. TAXIWAY EDGE LIGHT(TYP)
CONTRACTOR TO PROVIDE ACCESSCONTROL GUARD FOR ALL TIMESTHE GATE IS UNLOCKED.
SECTION B
SECTION A
INSTALL / REMOVE ORANGEREFLECTIVE DELINEATORS
TO PROTECT PARKED OVERNIGHTAIRCRAFT (TYP)
PHASE 2
PHASE 1
2
K:\704-T
RN
.A
IR
P03038 - Y
XS
P
RIN
CE
G
EO
RG
E\D
esig
n\T
RN
-A
IR
P03038 Y
XS
C
2.0-P
CO
D
AY
.d
wg
[C
2.0] M
ay 24, 2016 - 3:02:32 p
m (B
Y: R
UD
NIS
KI, M
IK
E)
DES
DWN
CKD
APP
REV
STATUS
DRAWINGPROJECT No.
of
SHEET No.DATE:
OFFICE
CLIENT
PROFESSIONAL SEALPERMIT
C2.0
704-TRN.AIRP03038 Kelowna KSA KSA
April, 2016 2 10 MER RMB 0
REHABILITATION OF APRON I
PLAN OF CONSTRUCTION OPERATIONS
DAY TIME WORK
0 25m
Scale: 1:750 @ 22"x34"
DAYTIME MILLING / PAVING
DAYTIME EXCAVATION / GRAVELS / CONCRETE PANELS
LEGEND:
DENOTES AIRCRAFT STAND CLOSED 24 / 7 UNTILSECTION / PHASE IS COMPLETE AND RETURNED TO SERVICE#
TEMPORARY 1.8m HIGH SECURE FENCINGC/W RED LIGHTS
LOW BARRICADES C/W RED LIGHTS
M
CONTRACTOR VEHICLE ROUTE
AIRCRAFT ROUTE
M
ORANGE REFLECTIVE DELINEATORS
GENERAL REQUIREMENTS:
OPERATIONAL REQUIREMENTS1. CONTRACTOR SHALL CONTROL AND BE RESPONSIBLE FOR CONTRACTOR'S PERSONNEL / SUBCONTRACTORS.
2. ALL CONTRACTOR'S VEHICLES REQUIRED ON AIRSIDE FOR CONSTRUCTION ACTIVITIES SHALL BE EQUIPPEDWITH 360 DEGREE FLASHING AMBER BEACON.3. ALL CONTRACTOR'S PERSONNEL / SUB-CONTRACTORS ARE REQUIRED TO HAVE TEMPORARY RESTRICTEDAREA PASSES WHILE ON AIRSIDE.4. AIRSIDE ESCORT (A.E.) WILL BE PROVIDED BY THE AIRPORT. IT IS THE CONTRACTOR'S RESPONSIBILITY TOCOORDINATE AND SCHEDULE THE A.E. PROVIDE 72 HOURS NOTICE FOR SCHEDULING THE A.E. CONTACT THE PRINCEGEORGE AIRPORT'S SECURITY OFFICE.5. CONTRACTOR SHALL PROVIDE THE ACCESS CONTROL GUARD (ACG). ACG IS REQUIRED FOR ALL TIMES THEAIRSIDE ACCESS GATE IS UNLOCKED. THE PRINCE GEORGE AIRPORT WILL PROVIDE TRAINING FOR THECONTRACTOR'S ACG'S BEFORE CONSTRUCTION COMMENCES.6. CONTRACTOR'S CONSTRUCTION SAFETY SHALL MEET WORKERS COMPENSATION BOARD REGULATIONS ANDADVISE AND PROTECT PERSONNEL FROM NOISE AND POTENTIAL JET BLAST / PROP WASH OF ACTIVE AIRCRAFTOPERATIONS.7. ALL AIRPORT PAVEMENT SURFACES TO BE KEPT CLEAN OF CONSTRUCTION DEBRIS AND FOREIGN OBJECTDEBRIS (F.O.D.) CONTRACTOR IS RESPONSIBLE TO MAINTAIN & PROVIDE CLEAN PAVEMENT SURFACES. MECHANICALVACUUM SWEEPER SHALL BE REQUIRED EACH WORK SHIFT.8. NO SMOKING ALLOWED ON AIRSIDE.9. ALL F.O.D. POTENTIAL ITEMS AND GARBAGE MUST BE CONTAINED TO PREVENT FLYAWAY AND THEN DISPOSEDOFF-SITE AT THE END OF EACH WORK SHIFT.10. CONTRACTOR TO ARRANGE FOR LOCATES, SHUT DOWN AND LOCKOUT ELECTRICAL SYSTEMS PRIOR TO ANYSUBSURFACE WORK WITHIN 5M OF AIRPORT ELECTRICAL INFRASTRUCTURE. CONTRACTOR MUST RECEIVE PRIORAPPROVAL FROM THE AIRPORT IN ORDER TO SHUT DOWN ANY AIRPORT ELECTRICAL FACILITIES. CONTRACTOR MUSTCOORDINATE WITH THE AIRPORTS ELECTRICAL CONTRACTOR IN ORDER TO SCHEDULE ANY ELECTRICAL CIRCUITSHUTDOWNS AND START-UPS THAT MAY AFFECT ANY AIRPORT ELECTRICAL OR COMMUNICATION FACILITIES.11. ANY INTERRUPTION OF ELECTRICAL SYSTEMS OR NAVIGATIONAL AIDS REQUIRES A MINIMUM 72 HOURS PRIORNOTICE AND A SPECIFIC NOTAM.12. READ AND COMPLY WITH THE PCO INCLUDED AS PART OF THE SPECIFICATIONS.
WORK SECTION A - DAYTIME WORK:
SCOPE OF WORK:REMOVE EXISTING ASPHALT AND GRAVELS TO NEW SUBGRADE ELEVATIONS,INCLUDING EXCAVATION, CONSTRUCTION OF NEW CONCRETE PANELS, NEWASPHALT PAVING AND PAINT MARKINGS.OPERATIONAL REQUIREMENTS1. INSTALL SECURE, ENCLOSED 1.8M HIGH TEMPORARY MODULOK FENCING WITH
ONE LOCKABLE GATE AROUND NEW CONCRETE PANEL AREA FOR DURATION OFCONCRETE CONSTRUCTION. INSTALL TO WITHSTAND JET BLAST. INSTALL STEADYBURNING RED LIGHTS ON TEMPORARY FENCING. AIRPORT WILL SUPPLY THESOLAR RED LIGHTS. REMOVE FENCING AT CONSTRUCTION COMPLETION ANDRETURN RED LIGHTS TO OWNER.
2. ALL CONTRACTOR'S PERSONNEL / SUBCONTRACTORS SHALL BE ESCORTED BYTHE A.E. FOR ALL WORK ON AIRSIDE.WORK RESTRICTIONS:
1. NORMAL AIRCRAFT AND VEHICLE MOVEMENTS ARE OCCURRING ALONGSIDE THEWORK AREA.
2. CONTRACTOR MUST CONTROL DUST.3. NO STOCKPILES ALLOWED ABOVE EXISTING GRADES.
AIRPORT OPERATIONAL CHANGES REQUIRED:
1. SPECIAL OPERATIONS NOTICE NOTIFYING AIRPORT USERS OF CONSTRUCTIONACTIVITIES ON APRON I.
2. CLOSURE OF AIRCRAFT STANDS 1 AND 1A FOR THE DURATION OF WORK IN THISSECTION.
WORK SECTION B - DAYTIME WORK:
SCOPE OF WORK:REMOVE EXISTING ASPHALT BY COLD MILLING, NEW ASPHALT PAVING ON APRON I.OPERATIONAL REQUIREMENTS1. CONTRACTOR TO PLACE / MAINTAIN / REMOVE LOW ORANGE BARRIERS AND STEADY BURNING RED LIGHTS AS
SHOWN ON THE DRAWINGS. AIRPORT WILL SUPPLY THE LOW BARRIERS AND RED SOLAR LIGHTS.
2. ALL CONTRACTOR'S PERSONNEL / SUBCONTRACTORS SHALL BE ESCORTED BY THE A.E. FOR ALL WORK ONAIRSIDE.3. COMPLETE MILLING / PAVING / PAINTING IN PHASE 1 PRIOR TO COMMENCING PHASE 2 WORK. RE-ALIGNBARRIERS AND LIGHTS AT COMPLETION OF PHASE 1 TO ALLOW AIRCRAFT OPERATIONS IN PHASE 1.4. AIRCRAFT STANDS 5 AND 6 SHALL BE AVAILABLE FOR USE AFTER PHASE 1 IS COMPLETE.WORK RESTRICTIONS:
1. NORMAL AIRCRAFT AND VEHICLE MOVEMENTS ARE OCCURRING ALONGSIDE THE WORK AREA.
2. CONTRACTOR MUST CONTROL DUST.3. NO STOCKPILES ALLOWED ABOVE EXISTING GRADES.
AIRPORT OPERATIONAL CHANGES REQUIRED:
1. SPECIAL OPERATIONS NOTICE NOTIFYING AIRPORT USERS OF CONSTRUCTION ACTIVITIES ON APRON I.
2. CLOSURE OF AIRCRAFT STANDS 5. 6 & 7 FOR THE DURATION OF WORK IN PHASE 1.3. CLOSURE OF AIRCRAFT STAND 7 FOR DURATION OF WORK IN PHASE 2. AIRCRAFT STANDS 5 AND 6 WILL BE OPENFOR PHASE 2 WORK.4. RELOCATION OF AIRCRAFT PARKING IN FRONT OF NORTHERN THUNDERBIRD TO THE SOUTH.5. NEW TEMPORARY APRON TAXIWAY CENTRELINE MARKING.
NUM DESCRIPTIONDATE APR
DRAWING STATUS
0 16/05/25 R.M.B. ISSUED FOR TENDERNUM DWN CKD DESCRIPTIONDATE APR
REVISIONS
RESTRICTED AREA
STANDARD NOTES:1. ALL EXISTING UNDERGROUND UTILITIES TO BE FIELD LOCATED BY THE CONTRACTOR PRIOR TO EXCAVATION.2. ANY EXISTING UTILITIES DESTROYED DURING CONSTRUCTION ARE TO BE REPAIRED BY THE CONTRACTOR AT NO COST TO THE CONTRACT.3. COORDINATES ARE PROVIDED FOR CONVENIENCE ONLY. ALL DIMENSIONS ON THE DRAWING TO BE VERIFIED BY CONTRACTOR PRIOR TO CONSTRUCTION.4. THE ENGINEER IS TO BE NOTIFIED OF ANY CONFLICT BETWEEN COORDINATES AND DIMENSIONS.
--
TEMPORARY TAXIWAY CLOSURE MARKER DETAIL1:250
℄ RUNWAY
1.5
9.0YELLOW FABRIC OR PLYWOODSECURED WITH SANDBAGS OR
AS ACCEPTED BY CONSULTANT
7
3
A
4 3
1
1A
2A
5
6
2
D
H
8
-
4
A
3
2
0
A
3
1
9
B
7
3
7
7
0
0
6
0
0
B
7
3
7 8
0
0
B
7
2
7
2
0
0
B1900
B
7
3
7 8
0
0
B
7
3
7
7
0
0
6
0
0
A
3
2
0
A
3
1
9
D
H
8
-
4
C
R
J
D
H
8
-
4
D
H
8
-
1
D
H
8
-
2
D
H
8
-
3
B
7
6
7
-
2
0
0
B
7
5
7
-
2
0
0
B1900
B1900
B737
800
B727
200
D
H
8
-
1
D
H
8
-
2
D
H
8
-
3
D
H
8
-
4
C
R
J
APRON I
APRON IV
A.T.B.
APRON II
RUNWAY 01 - 19APRON III
TAXI
WAY
C
TAXIWAY D
Q
4
0
0
Q
4
0
0
Q
4
0
0
Q
4
0
0
Q
4
0
0
Q
4
0
0
NORTHERNTHUNDERBIRDRCMP
NO AIRCRAFT / VEHICLEACCESS ACROSSAPRON I DURING
DAYTIME CONSTRUCTION(ESTIMATE 6 DAYS
CLOSURE)
LOW BARRIERS SPACED AT3m INTERVALS C/W STEADY
BURN RED LIGHTS (TYP)SUPPLIED BY OWNER
(29 REQUIRED)
LOW BARRIERS SPACED AT3m INTERVALS C/W STEADY
BURN RED LIGHTS (TYP)SUPPLIED BY OWNER
(8 REQUIRED)REMOVE / REPLACE FOR
MIDNIGHT AIRCRAFT ARRIVALS
LOW BARRIERS SPACED AT3m INTERVALS C/W STEADYBURN RED LIGHTS (TYP)SUPPLIED BY OWNER(8 REQUIRED)REMOVE / REPLACE FORMIDNIGHT AIRCRAFT ARRIVALS
YELLOW TEMPORARY TAXIWAYCLOSURE MARKER SECUREDTO WITHSTAND JET BLAST.SUPPLY / INSTALL / REMOVE EACHNIGHT SHIFT.REMOVE / REPLACE FORMIDNIGHT AIRCRAFT ARRIVALS
YELLOW TEMPORARY TAXIWAYCLOSURE MARKER SECUREDTO WITHSTAND JET BLAST.SUPPLY / INSTALL / REMOVE EACHNIGHT SHIFT.REMOVE / REPLACE FORMIDNIGHT AIRCRAFT ARRIVALS
87.0
1A
1
A.T.C.TOWER
22.7
23.0
AIRCRAFT STAND CLOSED (TYP)
POTENTIAL CONTRACTOR'S STAGING AREA 2
CONTRACTOR'S ESCORTEDACCESS ROUTE TO STAGING
AREA. VEHICLES YIELD TOAIRCRAFT AT ALL TIMES.
60.0m SPACING TO RUNWAY 01-19
TEMPORARY BLUE TAXIWAY EDGE LIGHT / MARKERPROVIDED AND INSTALLED BY THE AIRPORT (TYP)
TEMPORARY BLUE TAXIWAY EDGE LIGHT / MARKERPROVIDED AND INSTALLED BY THE AIRPORT (TYP)
NTAIR / RCMP / LIGHT AIRCRAFT ACCESS ROUTE
7.0
EX. TAXIWAY EDGE LIGHT(TYP)
EDGE OF RESTRICTED AREA (TYP)ONE ESCORT PER EVERY TEN
CONTRACTOR PERSONNEL
MIN.
6.5m
(TYP
)
PROVIDE COLD MILLED OR PAVED TRANSITION RAMPFOR ANY AREAS NOT PAVED EACH WORK SHIFT ANDFOR LATE ARRIVAL AIRCRAFT. SEE DETAIL DWG C3.0.
INSTALL TO WITHSTAND JET BLAST /REMOVE ORANGE REFLECTIVE
DELINEATORS TO PROTECT PARKEDOVERNIGHT AIRCRAFT (TYP)
SECTION C
MILLING / PAVING WORKCONTRACTOR ACCESSROUTE TO AIRSIDE
CONTRACTOR TO PROVIDE ACCESSCONTROL GUARD FOR ALL TIMESTHE GATE IS UNLOCKED.
CONTRACTOR TO SCHEDULESECTIONS A, B & C WORKS SOTHAT MILLING / PAVING WILL COINCIDEWITH PROVISIONAL CONCRETEPCC TRANSITIONAL RAMPS WORKS.
5
7
6
4 3 2A3A
2
K:\704-T
RN
.A
IR
P03038 - Y
XS
P
RIN
CE
G
EO
RG
E\D
esig
n\T
RN
-A
IR
P03038 Y
XS
C
2.1-P
CO
N
IG
HT
.d
wg
[C
2.1
] M
ay 25, 2016 - 6:48:24 am
(B
Y: R
UD
NIS
KI, M
IK
E)
DES
DWN
CKD
APP
REV
STATUS
DRAWINGPROJECT No.
of
SHEET No.DATE:
OFFICE
CLIENT
PROFESSIONAL SEALPERMIT
C2.1
704-TRN.AIRP03038 Kelowna KSA KSA
April, 2016 3 10 MER RMB 0
REHABILITATION OF APRON I
PLAN OF CONSTRUCTION OPERATIONS
NIGHT TIME WORK
0 25m
Scale: 1:750 @ 22"x34"
NIGHTTIME MILLING PAVING,STORM REHABILITATION
LEGEND:
#
LOW BARRICADES C/W RED LIGHTS
CONTRACTOR VEHICLE ROUTE
AIRCRAFT ROUTE
M M
ORANGE REFLECTIVE DELINEATORS
TEMPORARY 1.8m HIGH SECURE FENCINGC/W RED LIGHTS
WORK SECTION C - NIGHTTIME WORK (21:30* - 05:30):
SCOPE OF WORK:REMOVE EXISTING ASPHALT BY COLD MILLING, NEW ASPHALT PAVING ON APRON I. STORM PIPE REHABILITATIONMANHOLES 1 - 7.OPERATIONAL REQUIREMENTS1. INSTALL LOW BARRIERS AND STEADY BURNING RED LIGHTS ACROSS TAXIWAY C, TAXIWAY D AND SOUTH EDGE OF
APRON. REMOVE AT END OF EACH WORK SHIFT.
2. INSTALL TEMPORARY YELLOW TAXIWAY CLOSURE MARKING AT TAXIWAY C AND TAXIWAY D.3. ALL CONTRACTOR'S PERSONNEL / SUBCONTRACTORS SHALL BE ESCORTED BY THE A.E. FOR ALL WORK ON AIRSIDE.4. CONTRACTOR TO SUPPLY PORTABLE FLOODLIGHTING FOR MILLING / PAVING WORK AS ACCEPTED BY THECONSULTANT.WORK RESTRICTIONS:1. NORMAL AIRCRAFT AND VEHICLE MOVEMENTS ARE OCCURRING SOUTH OF APRON I.
2. DENOTES TWO ARRIVAL FLIGHTS ARE SCHEDULED AT APPROXIMATELY MIDNIGHT EACH NIGHT. CONTRACTOR TOSCHEDULE WORK SECTION AND SHALL MAKE AREA CLEAN AND SWEPT TO ALLOW THESE AIRCRAFT ONTO TWO OF THETHREE AIRCRAFT STANDS 2A - 4 FOR OVERNIGHT PARKING. PROPOSED PHASING OF WORK TO ACCOMMODATEAIRCRAFT ARRIVALS SHALL BE REVIEWED AND APPROVED BY OWNER.3. CONTRACTOR TO CONSTRUCT COLD MILLED TRANSITION RAMP OR PAVED TRANSITION RAMP TO ACCOMMODATELATE ARRIVAL AIRCRAFT AND/OR ANY AREAS NOT PAVED BY END OF WORK SHIFT.4. AIRCRAFT WILL BE PARKED ON APRON I OVERNIGHT. CONTRACTOR TO PLACE ORANGE REFLECTIVE DELINEATORSTO PROTECT / MARK THE TAILS OF PARKED AIRCRAFT DURING WORK HOURS.5. CONTRACTOR MUST CONTROL DUST.6. NO PILES ALLOWED ABOVE EXISTING GRADES.
AIRPORT OPERATIONAL CHANGES REQUIRED:
1. SPECIAL OPERATIONS NOTICE NOTIFYING AIRPORT USERS OF CONSTRUCTION ACTIVITIES ON APRON I.
2. CLOSURE OF TAXIWAY C FOR NIGHT TIME WORK HOURS.3. PARTIAL CLOSURE OF TAXIWAY D, FROM WEST END OF APRON II TO APRON I FOR NIGHT TIME WORK HOURS.4. CLOSURE OF APRON I FOR THE WORK SHIFT IN THIS SECTION.
NUM DESCRIPTIONDATE APR
DRAWING STATUS
0 16/05/25 R.M.B. ISSUED FOR TENDERNUM DWN CKD DESCRIPTIONDATE APR
REVISIONS
DENOTES AIRCRAFT STAND CLOSED 24 / 7 UNTILSECTION / PHASE IS COMPLETE AND RETURNED TO SERVICE
STANDARD NOTES:1. ALL EXISTING UNDERGROUND UTILITIES TO BE FIELD LOCATED BY THE CONTRACTOR PRIOR TO EXCAVATION.2. ANY EXISTING UTILITIES DESTROYED DURING CONSTRUCTION ARE TO BE REPAIRED BY THE CONTRACTOR AT NO COST TO THE CONTRACT.3. COORDINATES ARE PROVIDED FOR CONVENIENCE ONLY. ALL DIMENSIONS ON THE DRAWING TO BE VERIFIED BY CONTRACTOR PRIOR TO CONSTRUCTION.4. THE ENGINEER IS TO BE NOTIFIED OF ANY CONFLICT BETWEEN COORDINATES AND DIMENSIONS.
RESTRICTED AREA
*
*
*
GENERAL REQUIREMENTS:
OPERATIONAL REQUIREMENTS1. CONTRACTOR SHALL CONTROL AND BE RESPONSIBLE FOR CONTRACTOR'S PERSONNEL / SUBCONTRACTORS.
2. ALL CONTRACTOR'S VEHICLES REQUIRED ON AIRSIDE FOR CONSTRUCTION ACTIVITIES SHALL BE EQUIPPEDWITH 360 DEGREE FLASHING AMBER BEACON.3. ALL CONTRACTOR'S PERSONNEL / SUB-CONTRACTORS ARE REQUIRED TO HAVE TEMPORARY RESTRICTEDAREA PASSES WHILE ON AIRSIDE.4. AIRSIDE ESCORT (A.E.) WILL BE PROVIDED BY THE AIRPORT. IT IS THE CONTRACTOR'S RESPONSIBILITY TOCOORDINATE AND SCHEDULE THE A.E. PROVIDE 72 HOURS NOTICE FOR SCHEDULING THE A.E. CONTACT THE PRINCEGEORGE AIRPORT'S SECURITY OFFICE.5. CONTRACTOR SHALL PROVIDE THE ACCESS CONTROL GUARD (ACG). ACG IS REQUIRED FOR ALL TIMES THEAIRSIDE ACCESS GATE IS UNLOCKED. THE PRINCE GEORGE AIRPORT WILL PROVIDE TRAINING FOR THECONTRACTOR'S ACG'S BEFORE CONSTRUCTION COMMENCES.6. CONTRACTOR'S CONSTRUCTION SAFETY SHALL MEET WORKERS COMPENSATION BOARD REGULATIONS ANDADVISE AND PROTECT PERSONNEL FROM NOISE AND POTENTIAL JET BLAST / PROP WASH OF ACTIVE AIRCRAFTOPERATIONS.7. ALL AIRPORT PAVEMENT SURFACES TO BE KEPT CLEAN OF CONSTRUCTION DEBRIS AND FOREIGN OBJECTDEBRIS (F.O.D.) CONTRACTOR IS RESPONSIBLE TO MAINTAIN & PROVIDE CLEAN PAVEMENT SURFACES. MECHANICALVACUUM SWEEPER SHALL BE REQUIRED EACH WORK SHIFT.8. NO SMOKING ALLOWED ON AIRSIDE.9. ALL F.O.D. POTENTIAL ITEMS AND GARBAGE MUST BE CONTAINED TO PREVENT FLYAWAY AND THEN DISPOSEDOFF-SITE AT THE END OF EACH WORK SHIFT.10. CONTRACTOR TO ARRANGE FOR LOCATES, SHUT DOWN AND LOCKOUT ELECTRICAL SYSTEMS PRIOR TO ANYSUBSURFACE WORK WITHIN 5M OF AIRPORT ELECTRICAL INFRASTRUCTURE. CONTRACTOR MUST RECEIVE PRIORAPPROVAL FROM THE AIRPORT IN ORDER TO SHUT DOWN ANY AIRPORT ELECTRICAL FACILITIES. CONTRACTOR MUSTCOORDINATE WITH THE AIRPORTS ELECTRICAL CONTRACTOR IN ORDER TO SCHEDULE ANY ELECTRICAL CIRCUITSHUTDOWNS AND START-UPS THAT MAY AFFECT ANY AIRPORT ELECTRICAL OR COMMUNICATION FACILITIES.11. ANY INTERRUPTION OF ELECTRICAL SYSTEMS OR NAVIGATIONAL AIDS REQUIRES A MINIMUM 72 HOURS PRIORNOTICE AND A SPECIFIC NOTAM.12. READ AND COMPLY WITH THE PCO INCLUDED AS PART OF THE SPECIFICATIONS.
0+050
0+06
3.109
0+09
3.641
0+08
8.803 0+08
7.497
0+04
9.358
0+05
3.852
-0.91
%
-0.56%
-0.30%
-0.065
-0.065
-0.065
-0.065
-0.065
-0.065
-0.065
-0.065
-0.065
-0.065
-0.065
-0.065
-0.065
-0.065
-0.065
-0.065
-0.065
-0.065
-0.065
-0.065
-0.065
-0.065
-0.065
-0.065
-0.065
-0.065
-0.065
-0.065
-0.065
-0.060
-0.031
-0.051
-0.065
-0.065
-0.065
-0.062
-0.041
-0.032
-0.055
-0.065
-0.065
-0.051
-0.026
-0.038
-0.054
-0.065
-0.065
-0.041
-0.028
-0.022
-0.039
-0.065
-0.065
-0.062
-0.046
-0.053
-0.065
-0.065
-0.065
-0.065
-0.065
-0.060
-0.065
-0.065
-0.043
-0.065
-0.065
-0.065
-0.84%
-0.94%
-1.00%
-1.24%
-0.92
%
-1.00%
-1.00
%
-1.01
%
2.0(TYP)
5.0(TYP)
-0.065
VARIABLE DEPTH MILLING LIMIT
STN.
0+05
0
STN.
0+09
5
-0.98
%-0.065
-0.065
-0.065
-0.065
-0.065
-0.065
-0.065
-0.065
-0.065
-0.060
-0.059
HIGH POINT
MH 3
0+0000+0500+1000+1500+2000+2500+270
0+00
0.000
0+27
0.024
0+01
3.621
0+26
6.988
0+22
0.939
0+24
7.172
0+15
1.588
0+15
7.121
0+06
3.109
0+09
3.641
0+08
8.803
0+15
2.962
0+21
6.528
0+14
7.151
0+21
0.078
0+21
5.144
0+08
7.497
0+04
9.358
0+05
3.852
APRON I
APRON IV
APRON II
TAXI
WAY
C
NORTHERNTHUNDERBIRD
PROVISIONAL WORKHMAC CRACK TREATMENT FOR
SELECTED EX. HMAC CRACKS (TYP).ACTUAL LOCATIONS TO BE
DETERMINED BY CONSULTANT.(SEE DETAIL '2' THIS DRAWING)
EX. PCC PANELS
65mm DEPTH HMAC COLDMILL AND PAVE
680.0
-0.68% -0.
62%
-0.86
%
-1.06
%
-0.77%
679.01
2678
.405
678.44
6
678.55
4
678.74
8
677.83
1
678.03
6
677.79
2678
.500
678.26
0
679.93
4
679.53
9679
.329
679.22
6679
.167
679.325678
.262
678.56
9
678.99
6
679.533
678.24
8
678.38
7
MH 1EX. CONC. RIMEL. 678.248
MATCH EX. PCCPANELS (TYP)
SAWCUT INTO 2015 REHABILITATION WORKS,CLEAN EDGE AND TACK PRIOR TO PAVING (TYP)
EX. 2015 HMAC REHABILITATION EDGE (TYP)
PROVISIONAL WORK19 NEW PCC PANELSSEE DWG C7.0
HIGH POINT
ASPHALT SWALEASPHALT SWALE
0.100 (TYP)
HIGHEST POINT OFCONC. MH CORNEREL. 679.173
679.31
1
EX. CONTOURS (TYP)
30.22
2
87.464
117.6
10
EX. MANHOLENOT SURVEYED
35.044
151.490
-1.00%
-1.70%
-1.50%
-1.72%
-1.66%
-1.20%
-0.98%
-0.72% -0.82%
-1.06%
-0.38% -0.86%
-0.91
%
-0.56%
-1.45%
-1.09%
-0.67%-1.01% -0.65% -0.30%
678.0
678.05
0
678.24
3
678.30
3
678.34
0
678.64
6
678.998 678.998678.582 678.582
678.267678.267
678.34
0
-0.84%
-0.94%-1.00%
-1.24%
-0.92
%-1.00%
-1.00
%
-1.01
%
VARIABLE DEPTH MILLING TOINCREASE SLOPES TO MH 3.
SEE INSET
-0.98
%
678.5
679.0679.5
HIGHEST POINT OFCONC. MH 5 CORNER
EL. 678.998
HIGHEST POINT OFCONC. MH 4 CORNER
EL. 678.582 HIGHEST POINT OFCONC. MH 3 CORNER
EL. 678.267
MILLING DEPTH LESS THAN65mm TO ACCOMMODATE 65mm
THICKNESS OF NEW HMAC TOTOP OF CONC. MH
MILLING DEPTH LESS THAN65mm TO ACCOMMODATE 65mm
THICKNESS OF NEW HMAC TOTOP OF CONC. MH
-0.72%
EX. CONCRETE LOAD TRANSFERRAMP UNDER HMAC (TYP)
MIN.
6.5m
PROVIDE COLD MILLED OR PAVED TRANSITION RAMPFOR ANY AREAS NOT PAVED EACH WORK SHIFT ANDFOR LATE ARRIVAL AIRCRAFT. SEE DETAIL '1' THIS DWG.
COLD MILL / PAVE BETWEEN SECTIONS'B' AND 'C' TO PROVIDE 0.050m OVERLAP
COLD MILLING / PAVING NOT REQUIREDIF PROVISIONAL WORK FOR NEW PCC PANELS
IS AWARDED BY CHANGE ORDER.(APPROX. 756m²)
MH 2
SEE DWG C4.0 FORALIGNMENT
GEOMETRY TABLE
SWALE ALIGNMENT PROFILE
677
678
680
682
677
678
680
682
0+020
677.8
967
7.893
0+040
678.1
167
8.107
0+060
678.2
967
8.289
0+08067
8.26
678.2
560+100
678.3
067
8.298
0+120
678.3
867
8.383
0+140
678.4
967
8.492
0+160
678.6
367
8.633
0+180
678.7
667
8.765
0+200
678.9
067
8.896
0+220
679.0
467
9.045
0+240
679.2
567
9.251
0+260
679.4
6
0+01
3.621
677
.826
0+04
9.358
678
.205
0+05
3.852
678
.245
0+06
3.109
678
.340
0+08
7.497
678
.267
0+08
8.803
678
.267
0+09
3.641
678
.282
0+14
7.151
678
.544
0+15
1.588
678
.582
0+15
2.962
678
.582
0+15
7.121
678
.616
0+21
0.078
678
.963
0+21
5.144
678
.998
0+21
6.528
678
.998
0+22
0.939
679
.064
0+24
7.172
679
.325
26.23265mm MILLING DEPTH
4.4125.066
52.95665mm MILLING DEPTH
4.1594.437
53.51065mm MILLING DEPTH
4.837
24.388 9.257 40.23165mm MILLING DEPTH
HIGH
POI
NT
10.8629.970
39.790MILLING DEPTH LESS THAN65mm TO ACCOMMODATE 65mm
THICKNESS OF NEW HMAC TOTOP OF CONC. MH 5
MILLING DEPTH LESS THAN65mm TO ACCOMMODATE 65mm
THICKNESS OF NEW HMAC TOTOP OF CONC. MH 4
MILLING DEPTH LESS THAN 65mmTO ACCOMMODATE 65mm THICKNESS
OF NEW HMAC AND INCREASE SLOPES TO MH 3.
MH 3
0
V 1:50 (metres)
5 10 15 20 25mH 1:500 (metres)
0 0.5 1 1.5 2 2.5m
-0.77% -0.55% -0.45% -0.29% -0.24%-0.24% -0.45%-0.67%-0.83%-0.85%-0.81%-0.74%
-0.65%-0.76%-0.54%-0.66%-0.69%-1.49%
-0.96%-1.16% -0.82% -1.05%
-0.31% 0.30% -1.03% -0.67% -1.00% -0.84% -1.06% -0.99% -1.18% -0.99%
0+000
1.0
0.0500.0
65
COLD MILL ALONG EXISTINGASPHALT CRACKS, SWEEP,CLEAN, TACK AND PAVEWITH NEW HMAC.
EX. HMAC SURFACE
HMAC AFTER 65mmMILLING
2-
HMAC CRACK TREATMENT DETAILN.T.S.
LIMIT
OF
HMAC
OVE
RLAY
OR E
XIST
ING
SURF
ACE
NOTE:LONGITUDINAL SLOPE OF TEMPORARY RAMP SHALL NOT EXCEED 1.0%MEASURED WITH REFERENCE TO THE HIGHER SURFACE
1-
TEMPORARY TRANSVERSE TRANSITION RAMPN.T.S.
MILLED SURFACEIF RAMP ISNEW HMAC
6.5m MIN. TRANSITION RAMP 65mm
NO TACK IF RAMP IS NEW HMACTO BE REMOVED LATER
1.0m TACK
K:\704-T
RN
.A
IR
P03038 - Y
XS
P
RIN
CE
G
EO
RG
E\D
esig
n\T
RN
-A
IR
P03038 Y
XS
C
3.0-G
RA
DIN
G.d
wg
[C
3.0
] M
ay 24, 2016 - 2:09:09 p
m (B
Y: R
UD
NIS
KI, M
IK
E)
DES
DWN
CKD
APP
REV
STATUS
DRAWINGPROJECT No.
of
SHEET No.DATE:
OFFICE
CLIENT
PROFESSIONAL SEALPERMIT
C3.0
704-TRN.AIRP03038 Kelowna KSA KSA
April, 2016 4 10 MER RMB 0
REHABILITATION OF APRON I
MILLING / PAVING GRADING PLAN
0 25m
Scale: 1:500 @ 22"x34"
OPTIONAL WORK - NEW PCC PANELS
MILL / PAVE HMAC
LEGEND:
0 10m
Scale: 1:200 @ 22"x34"
MILLING DEPTHS INSET
NUM DESCRIPTIONDATE APR
DRAWING STATUS
0 16/05/25 R.M.B. ISSUED FOR TENDERNUM DWN CKD DESCRIPTIONDATE APR
REVISIONS
678.40
5678
.050
DESIGN SPOT ELEVATION
EXISTING SPOT ELEVATION
STANDARD NOTES:1. ALL EXISTING UNDERGROUND UTILITIES TO BE FIELD LOCATED BY THE CONTRACTOR PRIOR TO EXCAVATION.2. ANY EXISTING UTILITIES DESTROYED DURING CONSTRUCTION ARE TO BE REPAIRED BY THE CONTRACTOR AT NO COST TO THE CONTRACT.3. COORDINATES ARE PROVIDED FOR CONVENIENCE ONLY. ALL DIMENSIONS ON THE DRAWING TO BE VERIFIED BY CONTRACTOR PRIOR TO CONSTRUCTION.4. THE ENGINEER IS TO BE NOTIFIED OF ANY CONFLICT BETWEEN COORDINATES AND DIMENSIONS.
MANHOLE
0+230.000
676
678
680
682
676
678
680
682
0 10 20 30 40 50 600-10-20-30-40-50-60
OFF:
0.00m
ELE
V:67
9.153
OFF:
7.86m
R E
LEV:
679.2
40
OFF:
15.74
m R
ELE
V:67
9.329
OFF:
23.53
m R
ELE
V:67
9.405
OFF:
31.18
m R
ELE
V:67
9.491
OFF:
39.07
m R
ELE
V:67
9.576
OFF:
43.05
m R
ELE
V:67
9.625
OFF:
47.29
m R
ELE
V:67
9.688
OFF:
52.09
m R
ELE
V:67
9.756
OFF:
54.21
m R
ELE
V:67
9.787
OFF:
0.00m
ELE
V:67
9.153
OFF:
-4.67
m L
ELEV
:679.1
71
OFF:
-8.70
m L
ELEV
:679.1
77
OFF:
-14.9
1m L
ELE
V:67
9.187
OFF:
-18.9
6m L
ELE
V:67
9.194
OFF:
-26.0
6m L
ELE
V:67
9.221
OFF:
-29.0
7m L
ELE
V:67
9.215
OFF:
-34.4
9m L
ELE
V:67
9.174
OFF:
-37.7
1m L
ELE
V:67
9.189
OFF:
-42.3
3m L
ELE
V:67
9.200
OFF:
-47.5
8m L
ELE
V:67
9.197
OFF:
-52.7
7m L
ELE
V:67
9.205
OFF:
-58.6
7m L
ELE
V:67
9.245
OFF:
-62.4
2m L
ELE
V:67
9.276
OFF:
-63.3
3m L
ELE
V:67
9.287
1.24%0.83% 0.68% -0.03%0.37% -0.04% 0.02%0.38% 0.48% -0.76% -0.20% 0.38% 0.22%0.15% 0.13% 0.22% 0.16% 0.41%0.34%0.86%0.75% 1.28% 1.19% 1.10% 1.11% 0.92% 0.85% 1.26% 1.30% 0.97% 1.09%1.58%1.36%1.54%1.48%1.38%1.36%1.57%
0+040.000
676
678
680
682
676
678
680
682
0 10 20 30 40 50 600-10-20-30-40-50-60
OFF:
0.00m
ELE
V:67
8.107
OFF:
7.10m
R E
LEV:
678.1
54
OFF:
13.02
m R
ELE
V:67
8.208
OFF:
16.09
m R
ELE
V:67
8.230
OFF:
20.51
m R
ELE
V:67
8.258
OFF:
22.61
m R
ELE
V:67
8.281
OFF:
0.00m
ELE
V:67
8.107
OFF:
-3.51
m L
ELEV
:678.1
12
OFF:
-10.7
2m L
ELE
V:67
8.204
OFF:
-14.3
4m L
ELE
V:67
8.245
OFF:
-17.9
2m L
ELE
V:67
8.296
OFF:
-22.8
1m L
ELE
V:67
8.351
OFF:
-27.1
9m L
ELE
V:67
8.419
OFF:
-31.2
6m L
ELE
V:67
8.458
OFF:
-36.2
6m L
ELE
V:67
8.505
OFF:
-39.4
4m L
ELE
V:67
8.541
OFF:
-44.6
8m L
ELE
V:67
8.592
OFF:
-48.0
5m L
ELE
V:67
8.638
OFF:
-52.6
6m L
ELE
V:67
8.680
OFF:
-55.7
4m L
ELE
V:67
8.684
OFF:
-55.9
7m L
ELE
V:67
8.685
0.06%0.11% 0.95% 1.69%1.22%0.87% 1.12% 1.11% 0.90%1.11%0.94% 1.57% 1.13% 1.66% 1.16%1.10% 1.48% 0.81%0.13%0.18%-0.18% 0.90% 0.91% 0.66%0.58%0.71%1.17%
EDGE
OF
NEW
PCC
EDGE
OF
NEW
PCC
OFF:
-52.3
4mL E
LEV:
678.6
77
OFF:
-5.96
mL E
LEV:
678.1
34
0+063.109
676
678
680
682
676
678
680
682
0 10 20 30 40 50 600-10-20-30-40-50-60
OFF:
0.00m
ELE
V:67
8.340
OFF:
3.49m
R E
LEV:
678.3
18
OFF:
7.30m
R E
LEV:
678.3
15
OFF:
11.36
m R
ELE
V:67
8.332
OFF:
14.79
m R
ELE
V:67
8.338
OFF:
18.07
m R
ELE
V:67
8.354
OFF:
21.55
m R
ELE
V:67
8.376
OFF:
23.17
m R
ELE
V:67
8.394
OFF:
0.00m
ELE
V:67
8.340
OFF:
-4.65
m L
ELEV
:678.3
17
OFF:
-11.3
8m L
ELE
V:67
8.378
OFF:
-17.0
9m L
ELE
V:67
8.430
OFF:
-17.5
5m L
ELE
V:67
8.426
0.94% 0.83% 0.91% -0.50% -0.92%-0.31%-0.32%0.58%0.14%0.49%0.07%0.23% 0.49% 0.64%1.36%
HIGH
POI
NT
EDGE
OF
EX. P
CC
0+152.275
676
678
680
682
676
678
680
682
0 10 20 30 40 50 600-10-20-30-40-50-60
OFF:
0.00m
ELE
V:67
8.582
OFF:
3.07m
R E
LEV:
678.6
02
OFF:
10.33
m R
ELE
V:67
8.664
OFF:
18.28
m R
ELE
V:67
8.719
OFF:
22.41
m R
ELE
V:67
8.746
OFF:
26.59
m R
ELE
V:67
8.771
OFF:
33.08
m R
ELE
V:67
8.801
OFF:
40.61
m R
ELE
V:67
8.840
OFF:
43.86
m R
ELE
V:67
8.850
OFF:
48.31
m R
ELE
V:67
8.864
OFF:
53.39
m R
ELE
V:67
8.856
OFF:
53.91
m R
ELE
V:67
8.855
OFF:
0.00m
ELE
V:67
8.582
OFF:
-3.57
m L
ELEV
:678.5
97
OFF:
-7.45
m L
ELEV
:678.6
13
OFF:
-11.2
6m L
ELE
V:67
8.628
OFF:
-17.1
7m L
ELE
V:67
8.654
OFF:
-17.1
8m L
ELE
V:67
8.654
0.45% 0.42% 0.39% 0.40% 0.62% 0.90% 1.23% 0.68% 0.73% 0.68% 0.70%0.59% 0.59% 0.52% 0.45% 0.39% 0.59% 0.30% 0.32% -0.17%
EDGE
OF
EX. P
CC
K:\704-T
RN
.A
IR
P03038 - Y
XS
P
RIN
CE
G
EO
RG
E\D
esig
n\T
RN
-A
IR
P03038 Y
XS
C
4.0-S
EC
TIO
NS
.d
wg
[C
4.0
] M
ay 24, 2016 - 3:21:20 p
m (B
Y: R
UD
NIS
KI, M
IK
E)
DES
DWN
CKD
APP
REV
STATUS
DRAWINGPROJECT No.
of
SHEET No.DATE:
OFFICE
CLIENT
PROFESSIONAL SEALPERMIT
C4.0
704-TRN.AIRP03038 Kelowna KSA KSA
April, 2016 5 10 MER RMB 0
REHABILITATION OF APRON I
CROSS SECTIONS
0 25
Vertical Scale 1:50 (meters)
5 10 15 20
0 2.50.5 1 1.5 2
Horizontal Scale 1:500 (meters)
NUM DESCRIPTIONDATE APR
DRAWING STATUS
0 16/05/25 R.M.B. ISSUED FOR TENDERNUM DWN CKD DESCRIPTIONDATE APR
REVISIONS
SEE DWG C3.0 FOR CHAINAGE PROFILE
BASELINE ALIGNMENT GEOMETRY TABLE
STANDARD NOTES:1. ALL EXISTING UNDERGROUND UTILITIES TO BE FIELD LOCATED BY THE CONTRACTOR PRIOR TO EXCAVATION.2. ANY EXISTING UTILITIES DESTROYED DURING CONSTRUCTION ARE TO BE REPAIRED BY THE CONTRACTOR AT NO COST TO THE CONTRACT.3. COORDINATES ARE PROVIDED FOR CONVENIENCE ONLY. ALL DIMENSIONS ON THE DRAWING TO BE VERIFIED BY CONTRACTOR PRIOR TO CONSTRUCTION.4. THE ENGINEER IS TO BE NOTIFIED OF ANY CONFLICT BETWEEN COORDINATES AND DIMENSIONS.
N
E
W
F
E
C
7
3
A
4 3
1
1A
2A
5
6
2
D
H
8
-
4
A
3
2
0
A
3
1
9
B
7
3
77
0
06
0
0
B
7
3
7
8
0
0
B
7
2
7
2
0
0
B1900
B
7
3
7
8
0
0
B
7
3
77
0
0
6
0
0
A
3
2
0
A
3
1
9
D
H
8
-
4
C
R
J
D
H
8
-
4
D
H
8
-
1
D
H
8
-
2
D
H
8
-
3
B
7
6
7
-
2
0
0
B
7
5
7
-
2
0
0
B1900
B1900
B7
37
80
0
B727
20
0
D
H
8
-
1
D
H
8
-
2
D
H
8
-
3
D
H
8
-
4
C
R
J
APRON I
APRON IV
A.T.B.
APRON II
TAXI
WAY
C
MH 1
MH 2
MH 3MH 4MH 5MH 6
MH 7MH 8
NORTHERNTHUNDERBIRD
PRESSURE GROUT ALL LEAKING JOINTSAND CIRCUMFERENTIAL CRACKS.TEST AND SEAL ALL JOINTS.
PRESSURE GROUT ALL LEAKING JOINTSAND CIRCUMFERENTIAL CRACKS.TEST AND SEAL ALL JOINTS.
PRESSURE GROUT CIRCUMFERENTIAL CRACKS.TEST AND SEAL ALL JOINTS.PRESSSURE GROUT ALL LEAKING JOINTS
AND SECTIONAL POINT REPAIR ONLONGITUDINAL CRACKS. TEST AND SEAL
ALL JOINTS.
APPROX. 59.823m
APPROX. 63.564m APPROX. 64.140m
APPROX. 22.632m
APPROX. 60.626m
K:\704-T
RN
.A
IR
P03038 - Y
XS
P
RIN
CE
G
EO
RG
E\D
esig
n\T
RN
-A
IR
P03038 Y
XS
C
5.0-S
TO
RM
.d
wg
[C
5.0
] M
ay 25, 2016 - 6:58:43 am
(B
Y: R
UD
NIS
KI, M
IK
E)
DES
DWN
CKD
APP
REV
STATUS
DRAWINGPROJECT No.
of
SHEET No.DATE:
OFFICE
CLIENT
PROFESSIONAL SEALPERMIT
C5.0
704-TRN.AIRP03038 Kelowna KSA KSA
April, 2016 6 10 MER RMB 0
REHABILITATION OF APRON I
STORM PIPE REHABILITATION PLAN
0 25m
Scale: 1:500 @ 22"x34"
1. PROTECT / PREVENT SUSPENDED PARTICLES / DELETERIOUS SUBSTANCESFROM ENTERING THE STORM SEWER SYSTEM.
NOTES:
NUM DESCRIPTIONDATE APR
DRAWING STATUS
0 16/05/25 R.M.B. ISSUED FOR TENDERNUM DWN CKD DESCRIPTIONDATE APR
REVISIONS
STANDARD NOTES:1. ALL EXISTING UNDERGROUND UTILITIES TO BE FIELD LOCATED BY THE CONTRACTOR PRIOR TO EXCAVATION.2. ANY EXISTING UTILITIES DESTROYED DURING CONSTRUCTION ARE TO BE REPAIRED BY THE CONTRACTOR AT NO COST TO THE CONTRACT.3. COORDINATES ARE PROVIDED FOR CONVENIENCE ONLY. ALL DIMENSIONS ON THE DRAWING TO BE VERIFIED BY CONTRACTOR PRIOR TO CONSTRUCTION.4. THE ENGINEER IS TO BE NOTIFIED OF ANY CONFLICT BETWEEN COORDINATES AND DIMENSIONS.
--
AIRSIDE VEHICLE CORRIDOR PAINT MARKING DETAIL1:250
7.5 (TYP) 4.5 (TYP) 150mm WIDE WHITE PAINT
7.5
3
A
4 3
2A
B
7
3
7
8
0
0
B
7
3
7 7
0
0
6
0
0
A
3
2
0
A
3
1
9
D
H
8
-
4
C
R
J
D
H
8
-
4
D
H
8
-
1
D
H
8
-
2
D
H
8
-
3
B
7
6
7
-
2
0
0
B
7
5
7
-
2
0
0
D
H
8
-
1
D
H
8
-
2
D
H
8
-
3
D
H
8
-
4
C
R
J
N
E
W
F
E
C
5
6
7
1A
1
2 A
3
2
0
A
3
1
9
B
7
3
7
7
0
0
6
0
0
B
7
3
7
8
0
0
B1900
B1900
B1900
B7
37
800
APRON I
APRON IV
A.T.B.
APRON II
TAXI
WAY
C
NORTHERNTHUNDERBIRD
EXISTING PCC PANELS
NEW VEHICLE CORRIDOR PAINT MARKINGSSEE DETAIL THIS DRAWING
NEW 150mm WIDE WHITEPASSENGER WALKWAY MARKINGS
NEW 150MM WIDE WHITEPASSENGER WALKWAY MARKINGS
NEW OP-STAND TRIANGLE / TEXTMARKINGS TO MATCH EX. MARKINGSSEE DETAIL THIS DRAWING
R11.250 R11.250
R15.000R15.0
00
R11.250R15.0
00
R11.250R15.000
R11.250R15.000 8.5284.8
45
6.7105.946 R18.750
70.654
3.496
47.271
152.22712
.736
9.646
2.0
2.0
1
2
34
5
6
7
8
9
10
11
12
13
14
1516
17
18
19
20 21
2223
24
25
2627
28
29
30 31
32
33
34 35
36
37
38
39
40
4142
4344
4546
474849
5051
5253
54
5556
57
MATCH NEW PAINT TOEX. PAINT MARKINGS
MATCH NEW PAINT TOEX. PAINT MARKINGS MATCH NEW PAINT TO
EX. PAINT MARKINGS MATCH NEW PAINT TOEX. PAINT MARKINGS
SEE PAINT LAYOUT COORDINATE TABLEFOR STOP BAR TEXT
26.00
0
5859
--
OP-STAND DESIGNATOR MARKING1:200
TOP POINT OFTRIANGLE
APPROX. 3.0
MATCH EX. DIMENSIONS
150mm WIDE YELLOW
APPR
OX. 2
.0
--
STOP BAR DETAIL1:150
NOTE:APPLY GLASS BEADSIN YELLOW PAINT.
1.500
0.300
0.1500.200
YELLOW STOP BAR
YELLOW LEAD-INLINE C/W BLACKOUTLINE
YELLOW TEXT ONBLACK BACKGROUND.
TEXT FACES PILOT.(SEE TABLE FOR TEXT)
0.1 (TYP
)
0.3 (TYP
)
MATCH EXISTING
PAINT LAYOUT COORDINATE TABLE
POINT #
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
NORTHING
5973819.170
5973817.475
5973785.752
5973781.687
5973778.707
5973779.909
5973779.035
5973769.902
5973632.883
5973632.000
5973616.826
5973628.412
5973627.554
5973612.265
5973656.558
5973655.047
5973642.120
5973643.000
5973588.575
5973592.226
5973613.366
5973614.385
5973593.955
5973590.720
5973600.613
5973604.723
5973605.743
5973604.696
5973644.720
5973638.509
EASTING
521641.453
521641.893
521650.129
521651.184
521651.958
521660.521
521662.004
521677.509
521563.602
521565.105
521590.925
521530.467
521531.917
521557.745
521503.376
521502.496
521494.959
521486.102
521577.809
521591.950
521604.307
521602.586
521590.643
521578.114
521561.444
521560.398
521558.678
521554.564
521487.122
521542.769
DESCRIPTION / TEXT
OS 1-TRIANGLE BASE
OS 1-LEAD-IN LINE
OS 1-STOP BAR
OS 1-STOP BAR
OS 1-STOP BAR
OS 1A-TRIANGLE BASE
OS 1A-LEAD-IN LINE
OS 1A-STOP BAR
OS 5-TRIANGLE BASE
OS 5-LEAD-IN LINE
OS 5-STOP BAR
OS 6-TRIANGLE BASE
OS 6-LEAD-IN LINE
OS 6-STOP BAR
OS 7-TRIANGLE BASE
OS 7-LEAD-IN LINE
OS 7-STOP BAR
WALKWAY
WALKWAY
WALKWAY
WALKWAY
WALKWAY
WALKWAY
WALKWAY
WALKWAY
WALKWAY
WALKWAY
WALKWAY
WALKWAY
VEHICLE CORRIDOR
PAINT LAYOUT COORDINATE TABLE
POINT #
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
NORTHING
5973769.682
5973775.391
5973778.224
5973782.913
5973791.975
5973783.723
5973786.556
5973775.426
5973774.449
5973755.937
5973773.951
5973767.114
5973767.980
5973756.850
5973762.559
5973701.677
5973695.968
5973685.634
5973679.043
5973680.253
5973669.699
5973675.408
5973634.674
5973771.375
5973775.403
5973775.807
5973769.957
5973762.587
5973764.341
EASTING
521620.012
521610.318
521621.206
521619.986
521625.377
521627.525
521638.412
521636.774
521643.412
521640.704
521645.746
521641.737
521635.854
521634.215
521624.521
521588.670
521598.364
521593.918
521590.070
521586.790
521582.895
521573.201
521549.214
521657.945
521656.901
521658.862
521660.378
521640.451
521639.979
DESCRIPTION / TEXT
VEHICLE CORRIDOR
RADIUS CENTRE
VEHICLE CORRIDOR
VEHICLE CORRIDOR
VEHICLE CORRIDOR
VEHICLE CORRIDOR
RADIUS CENTRE
VEHICLE CORRIDOR
VEHICLE CORRIDOR
RADIUS CENTRE
VEHICLE CORRIDOR
VEHICLE CORRIDOR
VEHICLE CORRIDOR
RADIUS CENTRE
VEHICLE CORRIDOR
VEHICLE CORRIDOR
RADIUS CENTRE
VEHICLE CORRIDOR
VEHICLE CORRIDOR
VEHICLE CORRIDOR
RADIUS CENTRE
VEHICLE CORRIDOR
VEHICLE CORRIDOR
WALKWAY
WALKWAY
WALKWAY
WALKWAY
OS 2-TRIANGLE BASE
OS 2-LEAD-IN LINE
STOP BAR TEXT
POINT #
4
5
8
11
LEFT SIDE
B737600700
B737800
B1900
B1900
RIGHT SIDE
A320A319
DH8-4
14 B1900
17 B737800
K:\704-T
RN
.A
IR
P03038 - Y
XS
P
RIN
CE
G
EO
RG
E\D
esig
n\T
RN
-A
IR
P03038 Y
XS
C
6.0-P
AIN
T.d
wg
[C
6.0] M
ay 24, 2016 - 3:06:55 p
m (B
Y: R
UD
NIS
KI, M
IK
E)
DES
DWN
CKD
APP
REV
STATUS
DRAWINGPROJECT No.
of
SHEET No.DATE:
OFFICE
CLIENT
PROFESSIONAL SEALPERMIT
C6.0
704-TRN.AIRP03038 Kelowna KSA KSA
April, 2016 7 10 MER RMB 0
REHABILITATION OF APRON I
PERMANENT PAINT MARKING PLAN
0 25m
Scale: 1:500 @ 22"x34"
NOTES:
1. ALL COORDINATES DENOTE CENTRE OF PAINT.
NUM DESCRIPTIONDATE APR
DRAWING STATUS
0 16/05/25 R.M.B. ISSUED FOR TENDERNUM DWN CKD DESCRIPTIONDATE APR
REVISIONS
STANDARD NOTES:1. ALL EXISTING UNDERGROUND UTILITIES TO BE FIELD LOCATED BY THE CONTRACTOR PRIOR TO EXCAVATION.2. ANY EXISTING UTILITIES DESTROYED DURING CONSTRUCTION ARE TO BE REPAIRED BY THE CONTRACTOR AT NO COST TO THE CONTRACT.3. COORDINATES ARE PROVIDED FOR CONVENIENCE ONLY. ALL DIMENSIONS ON THE DRAWING TO BE VERIFIED BY CONTRACTOR PRIOR TO CONSTRUCTION.4. THE ENGINEER IS TO BE NOTIFIED OF ANY CONFLICT BETWEEN COORDINATES AND DIMENSIONS.
7
3
A
4 3
1
1A
2A
5
6
2
D
H
8
-
4
A
3
2
0
A
3
1
9
B
7
3
7
7
0
0
6
0
0
B
7
3
7
8
0
0
B
7
2
7
2
0
0
B1900
B
7
3
7
8
0
0
B
7
3
7 7
0
0
6
0
0
A
3
2
0
A
3
1
9
D
H
8
-
4
C
R
J
D
H
8
-
4
D
H
8
-
1
D
H
8
-
2
D
H
8
-
3
B
7
6
7
-
2
0
0
B
7
5
7
-
2
0
0
B1900
B1900
B7
37
800
B7
27
20
0
D
H
8
-
1
D
H
8
-
2
D
H
8
-
3
D
H
8
-
4
C
R
J
N
E
W
F
E
C
APRON I
APRON IV
A.T.B.
APRON II
TAXI
WAY
C
NORTHERNTHUNDERBIRD
EXISTING PCC PANELS
TEMPORARY 150mm WIDE YELLOWLEAD-IN PAINT MARKINGS (TYP)
1
23
4
5
6
7
8
9
10
1112
13
1415
16 17
1819
20
21
22 23
R20.000
R20.000
R20.000
48.068 17.867
14.40
2
11.123
10.778
29.94
2
13.781
17.822
ERADICATE PAINT ON NON-REHABILITATED ASPHALTAT COMPLETION OF 'SECTION B' PAVING.SEE PCO DRAWINGS.
R20.000
R20.000
R20.000
R17.144
TEMPORARY PAINT LAYOUT COORDINATE TABLE
POINT #
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
NORTHING
5973808.330
5973793.021
5973775.833
5973780.756
5973770.310
5973759.530
5973754.606
5973738.672
5973722.737
5973732.753
5973717.287
5973675.851
5973665.811
5973650.766
5973707.247
5973692.253
5973751.841
5973773.937
5973759.201
5973802.953
5973798.029
5973813.352
5973825.123
EASTING
521574.874
521600.607
521590.381
521609.766
521612.419
521615.157
521595.772
521607.859
521619.946
521602.634
521593.686
521569.321
521586.639
521573.461
521611.004
521597.768
521632.805
521629.186
521620.425
521624.763
521605.379
521607.679
521614.844
DESCRIPTION
TEMP LINE
TEMP LINE
RADIUS CENTRE
TEMP LINE
TEMP LINE
TEMP LINE
RADIUS CENTRE
TEMP LINE
RADIUS CENTRE
TEMP LINE
TEMP LINE
TEMP LINE
RADIUS CENTRE
TEMP LINE
RADIUS CENTRE
TEMP LINE
TEMP LINE
RADIUS CENTRE
TEMP LINE
RADIUS CENTRE
TEMP LINE
TEMP LINE
TEMP LINE
K:\704-T
RN
.A
IR
P03038 - Y
XS
P
RIN
CE
G
EO
RG
E\D
esig
n\T
RN
-A
IR
P03038 Y
XS
C
6.1-T
EM
P P
AIN
T.d
wg
[C
6.1
] M
ay 24, 2016 - 3:08:00 p
m (B
Y: R
UD
NIS
KI, M
IK
E)
DES
DWN
CKD
APP
REV
STATUS
DRAWINGPROJECT No.
of
SHEET No.DATE:
OFFICE
CLIENT
PROFESSIONAL SEALPERMIT
C6.1
704-TRN.AIRP03038 Kelowna KSA KSA
April, 2016 8 10 MER RMB 0
REHABILITATION OF APRON I
TEMPORARY PAINT MARKING PLAN
0 25m
Scale: 1:500 @ 22"x34"NUM DESCRIPTIONDATE APR
DRAWING STATUS
0 16/05/25 R.M.B. ISSUED FOR TENDERNUM DWN CKD DESCRIPTIONDATE APR
REVISIONS
STANDARD NOTES:1. ALL EXISTING UNDERGROUND UTILITIES TO BE FIELD LOCATED BY THE CONTRACTOR PRIOR TO EXCAVATION.2. ANY EXISTING UTILITIES DESTROYED DURING CONSTRUCTION ARE TO BE REPAIRED BY THE CONTRACTOR AT NO COST TO THE CONTRACT.3. COORDINATES ARE PROVIDED FOR CONVENIENCE ONLY. ALL DIMENSIONS ON THE DRAWING TO BE VERIFIED BY CONTRACTOR PRIOR TO CONSTRUCTION.4. THE ENGINEER IS TO BE NOTIFIED OF ANY CONFLICT BETWEEN COORDINATES AND DIMENSIONS.
APRON I
-0.56%
678.40
5
678.44
6
678.55
4
678.74
8
677.83
1
678.24
8
678.38
7
A B C
D E F
G H I
J K
L M
N O
P Q
R S
6.000 6.000 6.000
6.000
6.000
5.000
5.000
6.094
6.094
6.101
6.101
6.000 6.000
678.68
4
678.62
1
1.000
1.000
1.000
1.000
NEW 1.0M CONCRETE TRANSITION RAMP (TYP).SEE DETAIL 'E' DWG C8.0
CONSTRUCT NEW PCC PANELS.SEE DETAIL THIS DWG AND DWG C8.0.
(TYP)
SAWCUT AND JOINT SEALPCC / HMAC JOINTS (TYP).SEE DETAIL 'F' DWG C8.0
SAWCUT EX. HMAC FULL DEPTHTO PROVIDE CLEAN JOINT ANDEXCAVATE GRAVELS (TYP).SEE DETAIL 'E' DWG C8.0.
REMOVE EX. HMAC AND DISPOSE OFF SITE.EXCAVATE / SALVAGE EX. GRAVELS ANDSTOCKPILE ON-SITE FOR FUTURE USEBY OWNER. SEE COVER PAGE FORDISPOSAL SITE.
REMOVE EX. HMAC AND DISPOSE OFF SITE.EXCAVATE / SALVAGE EX. GRAVELS FOR RE-USEAS ACCEPTED BY CONSULTANT.
SAWCUT FULL DEPTH ANDPROTECT EXISTING PANELS AND
REMOVE EX. HMAC AND PCCFULL DEPTH (TYP)
678.5
0.900
APPR
OX.
0.900APPROX.
APPROX. EDGE OF EX. PCCLOAD TRANSFER RAMP
UNDER HMAC.
NEW 25mm CERAMAR EXPANSION BOARDAT EX. PCC / NEW PCC JOINT
678.30
3
678.34
0
678.38
2
678.32
4678
.275
678.22
3
678.13
7
678.19
1
678.24
9
678.32
6
678.24
3678
.172
678.11
1678
.050
678.64
6
678.70
5
678.64
5678
.597
678.52
9
678.57
8
678.51
3678
.468
678.48
7678
.408
678.45
3
TYPICAL LONGITUDINAL JOINT.SEE DETAIL 'C' DWG C8.0.
TYPICAL TRANSVERSE PCC JOINTSEE DETAIL 'D' DWG C8.0
SAWCUT AND JOINT SEALPCC / PCC JOINTS (TYP).SEE DETAIL 'F' DWG C8.0
A-
A-
ALIGN NEW TRANSVERSE JOINTWITH EX. JOINT (TYP)
APPR
OXIM
ATE
E
XIST
ING
JO
INT
S
PACI
NGS
EXISTING 350mm THICK PCC PANELS
EXISTING 350mm THICK PCC PANELS
EXISTING 300mm THICK PCC PANELS
EXISTING 300mm THICK PCC PANELS
EXISTING 300mm THICK PCC PANELS
EXISTING 300mm THICK PCC PANELS
EXISTING 300mm THICK PCC PANELS
B-
B-
SEE DETAIL 'C'
SEE DETAIL 'D'
MATCH EX. JOINT SPACING(TYP)
--
SECTION 'A'N.T.S.
EX. APPROX. 215mm HMAC
EX. APPROX. 310mmGRANULAR BASE
EX. APPROX. 720mm GRANULAR SUBBASE
EX. 300mm PCC
EX. APPROX. MIN.150mmGRANULAR BASE UNDER PCC
EX.250mm
PCC
EX. 50-60mm HMAC
--
SECTION 'B'N.T.S.
EX. APPROX. 215mm HMAC
EX. APPROX. 310mmGRANULAR BASE
EX. APPROX. 720mm GRANULAR SUBBASE
EX. 350mm PCC
EX. APPROX.100mm HMACEX. APPROX.170mm PCCEX. APPROX.50mm R.A.P.
EX. APPROX. MIN.150mmGRANULAR BASE UNDER PCC
K:\704-T
RN
.A
IR
P03038 - Y
XS
P
RIN
CE
G
EO
RG
E\D
esig
n\T
RN
-A
IR
P03038 Y
XS
C
7.0-P
AN
EL
S.d
wg
[C
7.0
] M
ay 25, 2016 - 8:06:15 am
(B
Y: R
UD
NIS
KI, M
IK
E)
DES
DWN
CKD
APP
REV
STATUS
DRAWINGPROJECT No.
of
SHEET No.DATE:
OFFICE
CLIENT
PROFESSIONAL SEALPERMIT
C7.0
704-TRN.AIRP03038 Kelowna KSA KSA
April, 2016 9 10 MER RMB 0
REHABILITATION OF APRON I
CONCRETE PANELS PLAN
(PROVISIONAL WORK)
0 5m
Scale: 1:150 @ 22"x34"
PROVISIONAL WORK - NEW PCC PANELS
MILL / PAVE HMAC
LEGEND:
DETAIL 'C' - 6.100 & 5.000m LONGITUDINAL JOINT DOWEL SPACINGN.T.S.
LONG
ITUD
INAL
JOIN
T
EX. J
OINT
APP
ROX.
5000
EX. J
OINT
APP
ROX.
6100
TRANSVERSEJOINT
PCC TRANSVERSE JOINT
NEW PCC PANEL350mm THICK
NEW PCC PANEL350mm THICK
380m
m DO
WEL
SPA
CING
380m
m DO
WEL
SPA
CING
6000 (TYP)
220m
mNE
W D
OWEL
S AT
380m
m SP
ACIN
GEX
. PCC
PAN
ELS
- FEM
ALE
KEYW
AY
15 S
PACE
S (1
6 DOW
ELS)
12 S
PACE
S (1
3 DOW
ELS)
EXISTINGPCC
PANELS
200m
m
EX. P
CC P
ANEL
S - F
EMAL
E KE
YWAY
NEW
DOW
ELS
AT 38
0mm
SPAC
ING
200m
m
NEW EPOXY COATED SMOOTHSTEEL DOWELS (OWNER SUPPLIED)
PCC CONSTRUCTION JOINT
PCC LONGITUDINAL JOINT
NEW DOWEL BASKETS C/WEPOXY COATED SMOOTH STEEL DOWELS
(OWNER SUPPLIED)
NUM DESCRIPTIONDATE APR
DRAWING STATUS
0 16/05/25 R.M.B. ISSUED FOR TENDERNUM DWN CKD DESCRIPTIONDATE APR
REVISIONS
678.40
5678
.050
DESIGN SPOT ELEVATION
EXISTING SPOT ELEVATION
220m
m
DETAIL 'D' - 6.000 TRANSVERSE / LONGITUDINAL JOINT DOWEL SPACINGN.T.S.
LONG
ITUD
INAL
JOIN
T
LONG
ITUD
INAL
JOIN
T
NEW
JOIN
T 60
00 15
SPA
CES
(16 D
OWEL
S)
TRANSVERSEJOINT
TRANSVERSEJOINT
NEW JOINT 6000 380mm SPACING, 13 SPACES (14 DOWELS)
200m
m20
0mm
530mm
NEW PCC PANEL350mm THICK
NEW EPOXY COATED SMOOTHSTEEL DOWELS (OWNER SUPPLIED)
PCC CONSTRUCTION JOINT
PCC LONGITUDINAL JOINT
PCC TRANSVERSE JOINT
NEW DOWEL BASKETS C/WEPOXY COATED SMOOTH STEEL DOWELS
(OWNER SUPPLIED)
275mm
STANDARD NOTES:1. ALL EXISTING UNDERGROUND UTILITIES TO BE FIELD LOCATED BY THE CONTRACTOR PRIOR TO EXCAVATION.2. ANY EXISTING UTILITIES DESTROYED DURING CONSTRUCTION ARE TO BE REPAIRED BY THE CONTRACTOR AT NO COST TO THE CONTRACT.3. COORDINATES ARE PROVIDED FOR CONVENIENCE ONLY. ALL DIMENSIONS ON THE DRAWING TO BE VERIFIED BY CONTRACTOR PRIOR TO CONSTRUCTION.4. THE ENGINEER IS TO BE NOTIFIED OF ANY CONFLICT BETWEEN COORDINATES AND DIMENSIONS.
ALL DOWELS, BASKETSAND TIE BARS SUPPLIED
BY OWNER
330m
m 380m
m
330m
m
380m
m
38mm
75mm175
GENERAL NOTES:
ALL DIMENSIONS IN mm. AND ±3mm UNLESS NOTED OTHERWISEWIRE-CARBON STEEL PER ASTM A-310 GR. 1005 ALL WIRE INTERSECTIONS TO BE RESISTANCE WELDED.WIRE TENSILE STRENGTH IS TO BE 415 MPa MIN.DOWELS ARE TO BE PARALLEL TO EACH OTHER ±3mm AND PARALLEL TO THE ADJACENT SURFACE ±3mm
KEYNOTES:1. EPOXY COATED DOWEL RESISTANCE WELD ALTERNATING END OF DOWELS TO BASKET ASSEMBLY.2. #3 GA. (5.5mm DIA.) WIRE3. #7 GA. (4.5mm DIA.) WIRE, SPACER WIRE CUT @ CENTRELINE AFTER FASTENING ASSEMBLY TO GBC4. BASKET ASSEMBLY TO BE SECURELY FASTENED TO GBC5. PROVIDE 4mm CLEAR AROUND DOWEL TO ENSURE EASE OF ASSEMBLY IN THE FIELD6. BASKET SHALL BE 1140mm IN LENGTH (TOTAL) c/w 3 DOWEL PER BASKET.
175
DOWELS AND BASKETS ARE OWNER SUPPLIED.DETAIL INCLUDED FOR INFORMATION ONLY
DOWEL BASKET DETAILN.T.S.
AC7.0
380mm(TYP) 190mm(TYP)
END OF 1140mm BASKETNEW 350mm THICK PCC PANEL
JOINT DETAILN.T.S.
NOTES:ALL DIMENSIONS ARE IN mmUNLESS OTHERWISE NOTED
KEYNOTES:1. SAWCUT NEW JOINT TO BE DONE ONE CUT WHICH INCLUDES THE 6x6 CHAMFER. SEAL WITH CRAFCO ROADSAVER SILICONE SL JOINT SEAL AS PER SEALANT MANUFACTURERS SPECIFICATIONS.2. DIAMETER AND LENGTH OF DRILL HOLE FOR EPOXY
COATED SMOOTH DOWELS AS RECOMMENDED BY EPOXYMANUFACTURER. ENSURE NO VOIDS.
3. 30mm∅ x 510mm LONG @ 380 o.c. EPOXY COATED SMOOTHDOWEL BAR. PAINT EXPOSED STEEL WITH EPOXY.GREASE FREE END OF SMOOTH DOWEL PRIOR TOPLACING NEW CONCRETE.
4. PROTECT EX.PCC PANEL EDGES / KEYWAY DURINGREMOVALS OF UNDERLYING CONCRETE LOAD TRANSFERRAMP.
5. PROTECT EX.PCC PANELS AND UNDERLYING COMPACTEDGRANULAR GRAVELS FROM BEING UNDERMINED.
32
BACKER ROD
PCC
6 x 6CHAMFER
10
PCC/HMAC
ALL PCC-PCC &HMAC JOINTS TO BE
SEALED AS NOTEDSEE KEYNOTE 1 KE
YNOT
E 1
NEW PCC LONGITUDINAL JOINTN.T.S.
NEW 350mm THICK NON-REINFORCEDPORTLAND CEMENT CONCRETE
OP-STAND PAD
NEW 350mm THICK NON-REINFORCEDPORTLAND CEMENT CONCRETE
OP-STAND PAD
KEYNOTE 2KEYNOTE 3
CC7.0
NEW PCC TO EX. PCC JOINT CONSTRUCTION JOINTN.T.S.
BC7.0
NEW 350mm THICK NON-REINFORCEDPORTLAND CEMENT CONCRETE
OP-STAND PAD
EXIS
TING
PCC
VARI
ABLE
THI
CKNE
SS 'T
'
REMOVE LOOSE MATERIALCOMPACT AND FILL DEPRESSIONWITH GRANULAR BASE MATERIALS
TO BE CONFIRMEDDURING CONSTRUCTION
KEYNOTE 3
REMOVE LOOSE MATERIALCOMPACT AND FILL DEPRESSION
WITH GRANULAR BASE MATERIALS
F-
VARIABLE DEPTH NON-REINFORCEDPORTLAND CEMENT CONCRETE
OP-STAND PAD
T/2
KEYNOTE 2KEYNOTE 5
KEYNOTE 4
175
350
PCC - PCC CONTRACTIONJOINT DETAIL
N.T.S.
NOTE 1EXCEPT FOR INITIAL 3mm WIDE CONTRACTION SAWCUT,
THE NEW JOINT SAWCUT TO BE DONE IN ONE CUTWHICH INCLUDES THE 6x6 CHAMFER.
JOINT SEALANT AS PER SEALANT MANUFACTURERSSPECIFICATIONS.
REMOVE LOOSE MATERIALCOMPACT AND FILL
DEPRESSION WITH GRANULARBASE MATERIALS
NEW NON-REINFORCEDPORTLAND CEMENT CONCRETE
OP-STAND PAD
NOTES:ALL DIMENSIONS ARE IN mmUNLESS OTHERWISE NOTED
NEW NON-REINFORCEDPORTLAND CEMENT CONCRETE
OP-STAND PAD
350
175
INSTALL OWNER SUPPLIEDDOWELS IN WIRE BASKETS.SEE DETAIL 'E' THIS SHEET
90mm
SAW
CUT
PCC PCC
3mm
SAW
CUT
NOTE:90mm DEPTH, 3mm WIDESAWCUT TO BE DONE ASSOON AS POSSIBLE TOPREVENT CRACKING.
DC7.0
PCC TRANSVERSE JOINTN.T.S.
ALL PCC-PCC JOINTSTO BE SEALED.
SEE DETAIL 'F' THIS DWG.
EC7.0
CONCRETE TRANSITION RAMP DETAILN.T.S.
65mm
125m
m
1000mm
NEW 350mm PCC
175m
m
380mm 380mm
20mm x 760mm LONG EPOXYCOATED DEFORMED STEEL TIE
BAR @ 760mm CENTER TOCENTER SPACING
BEND TO PROVIDEMIN. 75mm CLEARANCE
NEW PCC NEW ASPHALT
SEE DETAIL 'F'PAVE MAXIMUM 75mm
COMPACTED LIFTS
MILL AND PAVE
EX. GRANULAR BASE APPROX. 310mm THICK
EX. GRANULAR SUBBASE APPROX. 740mm THICK
EX. APPROX. 150mm HMAC
NEW 65mm HMAC
SAWCUT EX. HMAC FULL DEPTHAND EXCAVATE VERTICALLY.USE FACE OF HMAC / EXCAVATIONAS THE FORM TO PLACECONCRETE TRANSITION RAMP.
K:\704-T
RN
.A
IR
P03038 - Y
XS
P
RIN
CE
G
EO
RG
E\D
esig
n\T
RN
-A
IR
P03038 Y
XS
C
8.0-C
ON
C D
ET
AIL
S.d
wg
[C
8.0
] M
ay 24, 2016 - 2:57:12 p
m (B
Y: R
UD
NIS
KI, M
IK
E)
DES
DWN
CKD
APP
REV
STATUS
DRAWINGPROJECT No.
of
SHEET No.DATE:
OFFICE
CLIENT
PROFESSIONAL SEALPERMIT
C8.0
704-TRN.AIRP03038 Kelowna KSA KSA
April, 2016 10 10 MER RMB 0
REHABILITATION OF APRON I
CONCRETE PANELS DETAILS
(PROVISIONAL WORK)
0 5m
Scale: 1:150 @ 22"x34"NUM DESCRIPTIONDATE APR
DRAWING STATUS
0 16/05/25 R.M.B. ISSUED FOR TENDERNUM DWN CKD DESCRIPTIONDATE APR
REVISIONS