APPLICATION REGULATIONS TRA CE 470/E
Edition 2.0 04/2018
REGULATIONS FOR THE
CE-CERTIFICATION OF GROUND GRANULATED
BLAST FURNACE SLAG (GGBS)
BY BE-CERT
Notified Body
CPR 0965
Regulations for CE-certification of GROUND GRANULATED BLAST
FURNACE SLAG by BE-CERT
TRA CE 470/E
Page 2/31
04/2018
BE-CERT
Table of contents
Definitions ....................................................................................................................................................... 5
References ......................................................................................................................................................... 7 Reference documents ....................................................................................................................................... 7 Abbreviations .................................................................................................................................................... 7
Art. 1 Area of application and rules ................................................................................................................. 9
Art. 1.1 Area of application ............................................................................................................................... 9 Art. 1.2 Application Rules .................................................................................................................................. 9
Art. 2 Certification body ................................................................................................................................... 9
Art. 2.1 Notifications ......................................................................................................................................... 9 Art. 2.2 Legal status ......................................................................................................................................... 10 Art. 2.3 Registered offices and secretariat ...................................................................................................... 10 Art. 2.4 Correspondence and work languages ................................................................................................ 10 Art. 2.5 Operation and structure ..................................................................................................................... 10 Art. 2.6 Internal Regulations............................................................................................................................ 10 Art. 2.7 Confidentiality .................................................................................................................................... 11
Art. 3 Inspection bodies ................................................................................................................................. 11
Art. 3.1 Generalities......................................................................................................................................... 11 Art. 3.2 Collaboration with the inspection bodies ........................................................................................... 11
Art. 4 Control laboratories ............................................................................................................................. 12
Art. 4.1 Collaboration with the control laboratories ....................................................................................... 12
Art. 5 Application for a CE certificate of conformity by a new factory ............................................................ 12
Art. 5.1 General provisions .............................................................................................................................. 12 Art. 5.2 Informative request ............................................................................................................................ 13 Art. 5.3 Formal application by a new factory .................................................................................................. 13 Art. 5.4 Admissibility of the formal application ............................................................................................... 14 Art. 5.5 Importers and distributors– Article 15 of CPR .................................................................................... 14
Art. 6 Application for certification of a new ground granulated blast furnace slag from an existing factory ... 14
Art. 6.1 Application for certification and quality control ................................................................................ 14 Art. 6.2 Inspection, initial test, initial period, allocation of the certificate ...................................................... 14
Art. 7 Preliminary visit and initial period ........................................................................................................ 15
Art. 7.1 Preliminary visit and initial type test .................................................................................................. 15 Art. 7.2 Initial period ....................................................................................................................................... 15 Art. 7.3 Autocontrol during the initial period .................................................................................................. 15 Art. 7.4 Identification of the ground granulated blast furnace slags in the initial period ............................... 15 Art. 7.5 External control in the initial period ................................................................................................... 15 Art. 7.6 Closure of the application file ............................................................................................................. 15 Art. 7.7 Extension and end of the initial period .............................................................................................. 16 Art. 7.8 Control reports ................................................................................................................................... 16
Art. 8 External control .................................................................................................................................... 16
Art. 8.1 General provisions .............................................................................................................................. 16 Art. 8.2 Control visits ....................................................................................................................................... 16 Art. 8.3 Follow-up of the inspection body’s visits ........................................................................................... 16 Art. 8.4 Types of remarks that can be notified ................................................................................................ 17 Art. 8.5 Control tests ....................................................................................................................................... 17 Art. 8.6 Visit reports ........................................................................................................................................ 18
Regulations for CE-certification of GROUND GRANULATED BLAST
FURNACE SLAG by BE-CERT
TRA CE 470/E
Page 3/31
04/2018
BE-CERT
Art. 8.7 Observations and observations with warning .................................................................................... 18
Art. 9 Autocontrol .......................................................................................................................................... 18
Art. 9.1 General requirements ........................................................................................................................ 18 Art. 9.2 Production facilities ............................................................................................................................ 18 Art. 9.3 Autocontrol laboratory ....................................................................................................................... 19 Art. 9.4 Calibrations and verification ............................................................................................................... 19 Art. 9.5 Control staff ........................................................................................................................................ 19 Art. 9.6 Technical records ................................................................................................................................ 19 Art. 9.7 Control scheme ................................................................................................................................... 19 Art. 9.8 Workbooks ......................................................................................................................................... 19 Art. 9.9 Control registers ................................................................................................................................. 20 Art. 9.10 Complaints register .......................................................................................................................... 20
Art. 10 Identification of ground granulated blast furnace slags and use of the certification logo ................... 20
Art. 10.1 Identification of ground granulated blast furnace slags ................................................................... 20 Art. 10.2 Use and specifications of the certification logo ............................................................................... 20
Art. 11 Management of stocks ....................................................................................................................... 20
Art. 11.1 Accessibility of stocks ....................................................................................................................... 20 Art. 11.2 Subdivision of stocks ........................................................................................................................ 20
Art. 12 CE Certificate ...................................................................................................................................... 21
Art. 12.1 Conditions for granting a CE-certificate............................................................................................ 21 Art. 12.2 Scope of CE-certificates .................................................................................................................... 21 Art. 12.3 Refusal to issue a CE-certificate ........................................................................................................ 21 Art. 12.4 Period of validity of the CE-certificate .............................................................................................. 21 Art. 12.5 CE-certificate .................................................................................................................................... 22 Art. 12.6 Suspension and withdrawal by the manufacturer ........................................................................... 22 Art. 12.7 Modification of the technical specifications of the ground granulated blast furnace slags and the
regulations ....................................................................................................................................................... 22 Art. 12.8 List of certified products ................................................................................................................... 23
Art. 13 Production during the period of validity of a certificate ..................................................................... 23
Art. 13.1 Downgraded ground granulated blast furnace slags ........................................................................ 23 Art. 13.2 Delivery of ground granulated blast furnace slag with CE marking .................................................. 23 Art. 13.3 Modification of production .............................................................................................................. 23
Art. 14 Complaints ......................................................................................................................................... 24
Art. 14.1 Complaints relating to the certification of ground granulated blast furnace slags .......................... 24
Art. 15 Sanctions ............................................................................................................................................ 24
Art. 15.1 Definition .......................................................................................................................................... 24 Art. 15.2 Application of sanctions ................................................................................................................... 25
Art. 16 Hearings, appeals and pleas ............................................................................................................... 26
Art. 16.1 Hearing ............................................................................................................................................. 26 Art. 16.2 Appeal ............................................................................................................................................... 26 Art. 16.3 Pleas.................................................................................................................................................. 26
Art. 17 Financial system ................................................................................................................................. 26
Art. 17.1 Financial rules ................................................................................................................................... 26
Art. 18 Disputes.............................................................................................................................................. 26
Art. 18.1 Arbitration of disputes...................................................................................................................... 26
Art. 19 Misuse of CE-certification and CE-certificates ..................................................................................... 27
Regulations for CE-certification of GROUND GRANULATED BLAST
FURNACE SLAG by BE-CERT
TRA CE 470/E
Page 4/31
04/2018
BE-CERT
Art. 20 Market surveillance ............................................................................................................................ 27
Annex 1: Additional clauses ........................................................................................................................... 28
1 Chloride Cl- content of ground granulated blast furnace slags .................................................................... 28 2 Division of autocontrol samples ................................................................................................................... 28 3 Transmission of autocontrol results ............................................................................................................. 28 4 Inter-laboratory tests ................................................................................................................................... 28 5 Designation of ground granulated blast furnace slags on bags and delivery slips ....................................... 28
5.1 CE-marking of ground granulated blast furnace slags in bags ............................................................. 28 5.2 CE-marking of ground granulated blast furnace slags in bulk ............................................................. 29
6 Calibration of strength testing machines ..................................................................................................... 29 7 Identification of points of delivery and points of sampling .......................................................................... 29 8 Allocation plans of the silos .......................................................................................................................... 29
Annex 2 (informative): List of inspection bodies ............................................................................................ 30
Annex 3 (informative): List of control laboratories ......................................................................................... 31
________________________
Regulations for CE-certification of GROUND GRANULATED BLAST
FURNACE SLAG by BE-CERT
TRA CE 470/E
Page 5/31
04/2018
BE-CERT
Definitions
Applicant
(EN ISO/IEC 17065:2012/3.1)
Supplier applying for a certificate of conformity to a certification body.
CE-certificate Certificate of constancy of performance of the construction product
that is issued by BE-CERT in accordance with this Regulation in
application of the CPR within an AVCP system 1+.
Distributor Supplier who is responsible for the distribution of the ground
granulated blast furnace slag.
Manufacturer Supplier who is responsible for the production of the ground granulated
blast furnace slag.
Supplier
(EN ISO 9000:2015/3.2.5)
Party with the responsibility of ensuring that the product meets and
continues to meet the requirements on which the certification is based.
Importer Supplier who is responsible for the import of the ground granulated
blast furnace slag into a country different from the one where it is
manufactured.
Inspector Authorised representative from the inspection body, in charge of
inspection.
Autocontrol laboratory [industrial] Internal or external laboratory that conducts tests in the context of
autocontrol.
Control laboratory External laboratory commissioned to conduct control tests designed to
validate the autocontrol.
External laboratory Laboratory that is independent from the supplier.
Internal laboratory Laboratory that is dependent of the supplier.
Certification logo Monogram enabling the mark to be displayed.
Mark [of conformity]
(EN 45020 – EN ISO/IEC 17000:2004)
Protected mark, affixed or issued according to the rules of the
certification system, indicating with a sufficient degree of confidence
that the product covered conforms with the technical specifications
relating to it (also see definition 3.8 in EN 15167-2).
New factory See definition 3.18 in EN 15167-2.
Non-conformity Something that does not conform to the technical specifications of the
product, the regulatory provisions or the provisions of the factory
production control.
Certification body See definition 3.4 in EN 15167-2
Inspection body See definition 3.15 in EN 15167-2
Product Result of an industrial activity or process that is the subject of technical
specifications. In the context of these application regulations, the
product is solely the ground granulated blast furnace slag.
Certification regulations Document that lays down the procedural and management rules of the
certification system.
Regulations for CE-certification of GROUND GRANULATED BLAST
FURNACE SLAG by BE-CERT
TRA CE 470/E
Page 6/31
04/2018
BE-CERT
Sanction Mandatory measure imposed by BE-CERT on the manufacturer when it
no longer has confidence in the manufacturer’s ability on the one hand
to guarantee the conformity of the product and, on the other hand, to
maintain the credibility of the mark.
Technical specifications [of a product]
(EN 45020/3.4)
Document that specifies the technical requirements that a product has
to meet (a standard or any other reference document).
Certification system [of products]
(EN ISO/IEC 17065:2012/3.9, NOTE 2)
System with its own procedural and management rules, designed to
lead to the certification [of a product].
Quality system Whole of the organisation, procedures, processes and resources
necessary to implement quality management.
Production unit Factory, in the sense of definition 3.13 in EN 15167-2.
Existing factory See definition 3.11 in EN 15167-2.
Regulations for CE-certification of GROUND GRANULATED BLAST
FURNACE SLAG by BE-CERT
TRA CE 470/E
Page 7/31
04/2018
BE-CERT
Note: If the title of the documents does not include a date, implicit reference is made to the most recent version.
References
NBN EN ISO/IEC 17065 Conformity assessment -- Requirements for bodies certifying products,
processes and services
EN 45020 Standardisation and associated activities – General vocabulary
NBN EN ISO/IEC 17020 Conformity assessment -- Requirements for the operation of various types of
bodies performing inspection
NBN EN ISO/IEC 17025 General requirements for the competence of testing and calibration
laboratories
NBN EN ISO 9000 Kwaliteitsmanagementsystemen - Grondbeginselen en verklarende
woordenlijst (ISO 9000:2015)
ISO/IEC Guide 99 International vocabulary of metrology — Basic and general concepts and
associated terms (IVM)
Reference documents
European harmonized standard for Ground granulated blast furnace
EN 15167-1 Ground granulated blast furnace slag for use in concrete, mortar and grout -
Part 1: Definitions, specifications and conformity criteria.
European standard regarding the conformity evaluation for Ground granulated blast furnace
EN 15167-2 Ground granulated blast furnace slag for use in concrete, mortar and grout -
Part 2: Conformity evaluation
Documents related to the CE marking
Regulation UE N° 305/2011 Regulation (EU) No 305/2011 of the European parliament and of the council of
9 March 2011 laying down harmonised conditions for the marketing of
construction products and repealing Council Directive 89/106/EEC (CPR).
Delegated acts In order to remove and avoid restrictions on the availability of construction
products on the market and for the purpose of achieving the objectives of the
CPR, a series of acts are delegated to the European Commission.
Position Paper Recommendation approved by the Advisory Group or by Sector Groups of the
Group of Notified Bodies in the context of the CPR and presented to the
Standing Committee for Construction of the European Commission.
Other documents
ROI-PVP Rules of procedure of the Steering Committee of BE-CERT
ROI-CD Rules of procedure of the Direction Committees of BE-CERT
ROI-CC Rules of procedure of the Certification Committee of BE-CERT
Abbreviations
AVCP Assessment and Verification of Constancy of Performance
BELAC Belgian Accreditation Organization
BE-CERT Body for the certification and control of construction products, concrete and its
components
Regulations for CE-certification of GROUND GRANULATED BLAST
FURNACE SLAG by BE-CERT
TRA CE 470/E
Page 8/31
04/2018
BE-CERT
CEPANI Belgian Centre for the Study and Practice of National and International
Arbitration
CPR Construction Product Regulation
EA European Co-operation for Accreditation
ETAG European Technical Assessment Guideline.
FPC Factory Production Control
IB Inspection body
Regulations for CE-certification of GROUND GRANULATED BLAST
FURNACE SLAG by BE-CERT
TRA CE 470/E
Page 9/31
04/2018
BE-CERT
Art. 1 Area of application and rules
Art. 1.1 Area of application
Art. 1.1. This document defines the provisions to be applied for the use of the CE-marking by a
manufacturer and the use of this marking by the manufacturer in the process of assessment
and verification of constancy of performance of construction products in the context of the CE
marking of system 1 + as defined in point 1.1 of The Commission Delegated Regulation (EU) No
568/2014 of 18 February2014 amending Annex V to Regulation (EU) No 305/2011 of the
European Parliament and of the Council as regards the assessment and verification of
constancy of performance of construction products.
As soon as a manufacturer wishes to affix a CE mark under AVCP 1 + on its ground granulated
blast furnace slag, the obtaining of a CE certificate is essential. This certificate is based on the
conformity of the FPC with the harmonized part of one or more parts of the above-mentioned
European ground granulated blast furnace slag standards.
Art. 1.1.2 The manufacturer is responsible for its products for which he declares performance based on:
§ the factory production control (FPC);
§ further testing of samples taken at the factory in accordance with the prescribed test plan.
Art. 1.1.3 In case of system 1+, BE-CERT shall decide on the issuing, restriction, suspension or withdrawal
of the certificate of constancy of performance of the construction product on the basis of the
outcome of the following assessments and verifications carried out by BE-CERT:
§ an assessment of the performance of the construction product carried out on the basis of
testing (including sampling), calculation, tabulated values or descriptive documentation
of the product;
§ initial inspection of the manufacturing plant and of factory production control;
§ continuous surveillance, assessment and evaluation of factory production control;
§ audit-testing of samples taken by the notified product body at the manufacturing plant or
at the manufacturer's storage facilities.
Art. 1.2 Application Rules
Art. 1.2.1 These regulations apply for the issuing of CE-certificates by BE-CERT to a manufacturer of
ground granulated blast furnace slag and when using the CE-marking by the manufacturer.
Art. 1.2.2 The standard EN 15167-2 applies in full, with exception of sections 8 and 9. Unless there is
dispensation mentioned specifically in the wording of these regulations, in the event of any
contradiction between EN 15167-2 and other certification regulations, EN 15167-2 prevails.
Art 1.2.3 According the revision of the regulations, the guidelines drawn up by the Notified bodies and
approved by the “Advisory Group of The Notified Bodies” in order to contribute to the
equivalent application of CE certification procedures by the various European notified bodies
shall be implemented.
Art. 2 Certification body
Art. 2.1 Notifications
Art. 2.1.1 The list of sectors, for which the FPS Economy, P.M.E, Middle Classes and Energy has notified
BE-CERT in terms of organization and management of the CE marking, is kept up-to-date at BE-
CERT’s secretariat. BE-CERT has a certificate of accreditation issued by BELAC (510-PROD) for
Regulations for CE-certification of GROUND GRANULATED BLAST
FURNACE SLAG by BE-CERT
TRA CE 470/E
Page 10/31
04/2018
BE-CERT
this activity.
Art. 2.1.2 The Enterprise Directorate General at the European Commission attributed the identification
number 0965 to BE-CERT in the context the CPR Regulations No 305/2011.
Art. 2.1.3 An overview of the domains for which BE-CERT has been notified may be requested at the
secretary of BE-CERT. A list of the notified bodies is published by the European Commission on
the website ‘NANDO’ – the database of the notified bodies –
(http://ec.europa.eu/growth/tools-databases/nando/).
The FPS Economy manages for Belgium the NANDO database in which the data of the bodies
notified by the Belgian public authorities are mentioned.
Art. 2.2 Legal status
Art. 2.2.1 BE-CERT has the legal status of a non-profit association in accordance with Belgian law.
Art. 2.3 Registered offices and secretariat
Art. 2.3.1 The registered offices of BE-CERT are established at Avenue Edmond Van Nieuwenhuyse6, B-
1160 Brussels, Belgium.
Art. 2.3.2 BE-CERT’s secretariat is located at the same address.
Art. 2.4 Correspondence and work languages
Art. 2.4.1 All correspondence regarding the CE marking shall be addressed to BE-CERT’s secretariat, with
the exception of correspondence relating to:
· the activities and responsibilities of the inspection body, for which the correspondence shall
be addressed to the secretariat of the inspection body, with a copy to BE-CERT;
· the appeal against a decision by BE-CERT, which should be sent to the competent appeal
body (Art. 16.3), with a copy to BE-CERT.
Art. 2.4.2 The working languages of BE-CERT are French and Dutch
Unless provided otherwise, all documents drawn up and published by BE-CERT are made
available in these two working languages. BE-CERT is not responsible for the unavailability of
the applicable harmonized standards and ‘Position Papers’ in the aforementioned languages.
The manufacturer may write the documentation and the records as part of the assessment for
CE-certification in English.
Art. 2.5 Operation and structure
Art. 2.5.1 The operation and structure of BE-CERT for the organisation and management of the CE
certification are described in its Statutes and in the internal Regulations of the Steering Board,
the Direction Committee for certification and of BE-CERT’s Certification Committee.
Art. 2.5.2 BE-CERT’s operations and structure conform to ISO/IEC 17065:2012 standard for the area of
application stated in Art. 1.1.
Art. 2.6 Internal Regulations
Art. 2.6.1 The Internal Regulations of the Steering Board (ROI-PVP), of the Direction Committee (ROI-CD)
and of the Certification Committee (ROI-CC) set out the authorities that take the decisions or
which issue opinions in accordance with these regulations.
Art. 2.6.2 The Hearing and Appeal Rules of BE-CERT set out the procedure for handling the appeal of a
manufacturer against a certification decision of BE-CERT. It can be obtained on request from
BE-CERT.
Regulations for CE-certification of GROUND GRANULATED BLAST
FURNACE SLAG by BE-CERT
TRA CE 470/E
Page 11/31
04/2018
BE-CERT
Art. 2.7 Confidentiality
Art. 2.7.1 Without the manufacturer’s written authorization or legal obligation, BE-CERT shall not provide
information to thirds parties about a specific product or specific manufacturer obtained during
the certification activities.
Art. 2.7.2 If required by law that such information must be disclosed to third parties, BE-CERT shall notify
the manufacturer about the information to be disclosed.
Art. 2.7.3 The personnel of BE-CERT, inspection bodies or any other body that has concluded a
cooperation agreement with BE-CERT or makes personnel available to BE-CERT shall be bound
by the obligation of professional secrecy regarding the content of the certification files.
Art. 2.7.4 Members who sit in the committees of BE-CERT and who, as part of the certification process,
have knowledge of the contents of certification files, are subject to confidentiality.
Art. 2.7.5 BE-CERT shall inform the notifying or market surveillance authorities of any refusal, restriction,
suspension or withdrawal of a CE-certificate and, on request, of all information regarding the
activities carried out under this regulation (article 53 of CPR).
Art. 2.7.6 BE-CERT provides, on request, other bodies notified carrying out similar tasks for construction
products covered by the same harmonized technical specification, with relevant information
on issues relating to negative and positive results from these assessments and/or verifications
(article 53 of CPR).
Art. 2.7.7 BELAC auditors have access to the contents of the manufacturers’ individual certification files
as part of BE-CERT’s accreditation file’s processing. They are also subject to confidentiality.
Art. 3 Inspection bodies
Art. 3.1 Generalities
Art. 3.1.1 BE-CERT, the certification body, carries out itself the function of inspection body; however, the
fulfilment of inspection assignments may be subcontracted to other inspection bodies, which
in no way reduces the final responsibility of BE-CERT regarding certification. If reference is
made to BE-CERT elsewhere in this text, BE-CERT is understood to be exclusively a Certification
Body.
Art. 3.2 Collaboration with the inspection bodies
Art. 3.2.1 The list of inspection bodies with which BE-CERT has subcontracting agreements or mutual
recognition under certain special circumstances, is attached in Annex 2.
Art. 3.2.2 The manufacturer selects an inspection body that is accredited by an accreditation body that
itself is recognised by the EA (European cooperation for Accreditation, http://www.european-
accreditation.org). Accreditation of the inspection body must have been obtained in
accordance with the standard EN ISO/IEC 17020 and this inspection body must have amongst
its staff trained auditors for their entrusted tasks. In all cases, BE-CERT ensures that the
inspection body works in compliance with the approval and notification specifications
(standard or ETAG) and has the necessary skills to carry out inspection operations.
Art. 3.2.3 If a manufacturer selects an inspection body not featured in the list, he must first obtain the
written authorization of the inspection body for the inspections to be carried out by BE-CERT
to ensure that the inspection body works in accordance with EN ISO/IEC 17020 and has the
necessary skills to carry out the tests. This can lead to delays and additional costs, borne by the
manufacturer.
Art. 3.2.4 BE-CERT may not be held liable for any delays that arise from the choice of a non-notified
inspection body by the manufacturer. The manufacturer is required to pay BE-CERT all costs
incurred for the acceptance of the inspection body that it has designated, even if the body turns
Regulations for CE-certification of GROUND GRANULATED BLAST
FURNACE SLAG by BE-CERT
TRA CE 470/E
Page 12/31
04/2018
BE-CERT
out to be unable to fulfil the criteria of standard EN ISO/IEC 17020, thus forcing BE-CERT to
refuse the body as a subcontractor.
Art. 3.2.5 The inspection body will invoice its services directly to the manufacturer.
Art. 3.2.6 An inspection body is selected by the factory.
Art. 3.2.7. BE-CERT may replace one inspection body by another, possibly to carry out a specific
assignment, based on a reasoned opinion.
Art. 4 Control laboratories
Art. 4.1 Collaboration with the control laboratories
Art. 4.1.1 The list of control laboratories with which BE-CERT has subcontracting agreements or mutual
recognition under certain special circumstances, is attached in Annex 3.
Art. 4.1.2 The manufacturer selects a control laboratory that is accredited by an accreditation body that
itself is recognised by the EA (European cooperation for Accreditation, http://www.european-
accreditation.org). Accreditation of the laboratory must have been obtained in application of
standard EN ISO/IEC 17025 and this laboratory must have amongst its staff trained technicians
for their entrusted tasks. In all cases, BE-CERT ensures that the control laboratory works in
compliance with the approval and notification specifications (standard or ETAG) and has the
necessary skills to carry out test operations.
Art. 4.1.3 If a manufacturer selects a control laboratory not featured in the list, he must first obtain the
written authorization of the control laboratory for the inspections to be carried out by BE-CERT
to ensure that the control laboratory works in accordance with EN ISO/IEC 17025 and has the
necessary skills to carry out the tests. This can lead to delays and additional costs, borne by the
manufacturer.
Art. 4.1.4 BE-CERT cannot be held responsible for delays arising from the choice of a non-notified control
laboratory by the manufacturer. The manufacturer is required to pay BE-CERT all costs incurred
for the acceptance of the control laboratory that it has designated, even if the laboratory turns
out to be unable to meet the requirements of standard EN ISO/IEC 17025, thus forcing BE-CERT
to refuse the body as a subcontractor.
Art. 4.1.5 The control laboratory will invoice its services directly to the manufacturer.
Art. 4.1.6 One or more control laboratories are selected per factory.
Art. 4.1.7 BE-CERT may suggest replacing one control laboratory by another, for all or certain tests, based
on a reasoned opinion.
Art. 4.1.8 A laboratory that is unable to demonstrate its independence from the manufacturer, or which
is involved in the manufacturer’s autocontrol, will be excluded from carrying out control tests
for that manufacturer.
Art. 5 Application for a CE certificate of conformity by a new factory
Art. 5.1 General provisions
Art. 5.1.1 An application for a certificate may be laid down by any manufacturer of ground granulated
blast furnace slag covered in the reference documents or by its authorised representative
established in the European Economic Area (EEA).
Art. 5.1.2 The working languages accepted by BE-CERT are defined in §2.4.
Art. 5.1.3 The manufacturer has facilities capable of supplying products conform to the harmonized
standards (hEN) to be applied.
Art. 5.1.4 The manufacturer has implemented a factory production control or FPC allowing him on a
continuous basis to ensure the conformity of the performance of his products in line with the
Regulations for CE-certification of GROUND GRANULATED BLAST
FURNACE SLAG by BE-CERT
TRA CE 470/E
Page 13/31
04/2018
BE-CERT
DoP established, in accordance with the requirements of the CPR and with the applicable
harmonized standards. This control relates to the essential characteristics for which the
manufacturer declares a performance. The manufacturer shall record all data related to the
FPC. The manufacturer is responsible for the organisation of the FPC and its effective
application.
The manufacturer remains solely responsible for the conformity of his products with the
declared performance with all provisons of the CPR, including aspects related to the
production.
Art. 5.1.5 The manufacturer determines the product-type on the basis of type testing (TT). These tests
are described in the harmonized specifications and further specified in the manufacturer‘s
quality documents. The results of these tests are recorded and evaluated by the manufacturer.
Art. 5.1.6 The manufacturer shall have a procedure for dealing with complaints.
It consists at least of:
§ a description of the complaint;
§ an investigation to determine the causes and an analysis of the extent;
§ an analysis of the causes and the possible solutions;
§ a corrective action plan to be implemented;
§ a verification of the effectiveness of those corrective actions;
The manufacturer shall record all the elements listed above in a complaint register and
document them (see art. 9.10 of this document).
Art. 5.2 Informative request
Art. 5.2.1 The manufacturer who wishes to obtain a CE-certificate may submit an informative request to
BE-CERT. This request contains at least the following information:
§ the identity of the person submitting the request;
§ the mail and/or e-mail address for sending the application file;
§ if necessary, the place and name of the production facility;
§ the hEN standards in force and a list of products covered by the application.
Art. 5.2.2 After receiving the informative request, BE-CERT informs the applicant in writing over the
principles involved in the procedure for issuing the certificate and will send the applicant the
following documents:
§ a copy of the regulations in force or the instructions in order to download the available
documents on BE-CERT’s website;
§ a list of standards and normative documents in force;
§ the service contract for the evaluation and verification of the constancy of performances
of the factory production control (FPC).
Art. 5.2.3 If, prior to the submission of his formal request, the manufacturer wishes to receive more
detailed information about the technical aspects of the application file, he may request an
informative visit to this effect. If applicable, the related costs shall be borne by the
manufacturer.
Art. 5.3 Formal application by a new factory
Art. 5.3.1 The manufacturer shall establish one request per factory; the request mentions the list of
ground granulated blast furnace slags for which the certification is requested.
Art. 5.3.2 The applicant sends to BE-CERT an application file that contains at least the following
Regulations for CE-certification of GROUND GRANULATED BLAST
FURNACE SLAG by BE-CERT
TRA CE 470/E
Page 14/31
04/2018
BE-CERT
documents:
§ two original signed copies of the contract stating:
- the capacity of the applicant, demonstrating that he may apply for a certificate;
- the name and address of the factory for which the CE-certificate(s) is (are) requested;
- the name of the person responsible for the contacts with BE-CERT and authorized to
represent the applicant regarding BE-CERT and his deputy;
- where applicable, the inspection body and the control laboratory which the factory wishes
to use in the context of certification;
§ the service contract for the assessment and verification of constancy of performance of the
factory production control (FPC) signed by a duly authorised member of the management;
§ a copy of the quality manual provided for in § 4.1.2 of EN 15167-2 as well as a list of FPC
documents and procedures regarding the production facility.
Art. 5.3.3 By submitting his formal application, the applicant undertakes, inter alia:
§ to respect the provisions of these regulations;
§ to take all the measures to ensure that the conformity of the FPC is guaranteed
continuously.
Art. 5.4 Admissibility of the formal application
Art. 5.4.1 As soon as the application file is complete and it can therefore be concluded that the
manufacturer is authorized to apply for a CE-certificate, and as soon as the financial obligations
have been met, BE-CERT informs the applicant of the admissibility of the formal application.
Art. 5.5 Importers and distributors– Article 15 of CPR
Art. 5.5.1 An importer or distributor shall be considered a manufacturer according to Article 15 of CPR
and shall be subject to the obligations of a manufacturer pursuant to Article 11 of CPR, where
he places a product on the market under his name or trademark or modifies a construction
product already placed on the market in such a way that conformity with the declaration of
performance may be affected.
Art. 5.5.2 BE-CERT always carries out an initial visit of the production facility, which will lead to the issue
of the CE-certificate. This means that BE-CERT must visit the production facility where the
physical manufacturing is taking place. To visit the premises of the importer/distributor would
not be enough.
Art. 5.5.3 If the importer/distributor performs storage or other operations that may affect the conformity
of the product with the declared performances, it should be included in the FPC. Consequently,
the places where these operations take place must undergo inspection visits.
Art. 6 Application for certification of a new ground granulated blast furnace slag from an
existing factory
Art. 6.1 Application for certification and quality control
Art. 6.1.1 If a manufacturer applies for the certification of a new ground granulated blast furnace slag, he
sends a formal written application to BE-CERT, accompanied by a copy of any modifications
made to its quality manual that may be necessary to handle production of a new product
successfully.
Art. 6.1.2 The manufacturer demonstrates by his factory production control system and by his
autocontrol that the new ground granulated blast furnace slag(s) is (are) and remains conform.
Art. 6.2 Inspection, initial test, initial period, allocation of the certificate
Regulations for CE-certification of GROUND GRANULATED BLAST
FURNACE SLAG by BE-CERT
TRA CE 470/E
Page 15/31
04/2018
BE-CERT
Art. 6.2.1 If the modifications of the production equipment and quality system justify it, BE-CERT is
authorised to impose an additional inspection of the factory (§ 5.5.2 of EN 15167-2).
Art. 6.2.2 BE-CERT also organises an initial type test and an initial period (§ 7 of EN 15167-2 and Art. 7
below) relating to the new ground granulated blast furnace slag(s) that is (are) the subject of
the new application.
Art. 6.3.3 If the results of the initial type test are conform, BE-CERT issues the CE-certificate to the ground
granulated blast furnace slag concerned. BE-CERT adapts the official list of ground granulated
blast furnace slags for which it has issued CE-certificates.
Art. 7 Preliminary visit and initial period
Art. 7.1 Preliminary visit and initial type test
Art. 7.1.1 The first two paragraphs of section 7 of EN 15167-2 apply.
Art. 7.2 Initial period
Art. 7.2.1 The initial period serves to demonstrate the ability of the applicant to guarantee the continuity
of the ground granulated blast furnace slag’s conformity.
Art. 7.2.2 The initial period starts from the time that the CE-certificate is issued for a ground granulated
blast furnace slag (see definition 3.5 in EN 15167-2).
Art. 7.2.3 The duration of the initial period is a minimum of 3 months (see § 5.6.1 of EN 15167-2).
Art. 7.3 Autocontrol during the initial period
Art. 7.3.1 Autocontrol testing is carried out according to the requirements of the relevant table of the
applicable standard mentioned in the reference documents. As soon as the application for a
certificate has been filed the manufacturer applies his factory production control system.
Except if he has run a unique, punctual production campaign for this application, he realises
autocontrol testing at least to a frequency as mentioned in the column for a ‘routine situation’.
During the initial period, autocontrol is carried out according to the frequencies mentioned in
the column under ‘initial period’.
Art. 7.4 Identification of the ground granulated blast furnace slags in the initial period
Art. 7.4.1 As soon as the application for a certificate has been filed, identification of the ground
granulated blast furnace slags is carried out in accordance with the requirements of the
standards mentioned in the reference documents. The CE marking cannot be applied before a
CE-certificate has been issued.
Art. 7.5 External control in the initial period
Art. 7.5.1 During the initial period, at least three samples of ground granulated blast furnace slag shall be
taken at intervals of approximately one month (see § 5.4.2 of EN 15167-2).
Art. 7.6 Closure of the application file
Art. 7.6.1 If the initial period cannot be completed despite the extensions granted according to Art. 7.7.1,
BE-CERT will notify the applicant in writing of the closure of the application file. If he wishes,
the applicant may submit a new application at a later date.
Art. 7.6.2 The applicant may at any time withdraw its application in writing. However, the applicant
remains liable for the cost of all operations that have been carried out by all of the bodies
involved in the context of dealing with the applicant’s file. BE-CERT confirms in writing to the
applicant the closure of its application file.
Regulations for CE-certification of GROUND GRANULATED BLAST
FURNACE SLAG by BE-CERT
TRA CE 470/E
Page 16/31
04/2018
BE-CERT
Art. 7.7 Extension and end of the initial period
Art. 7.7.1 If the applicant is facing particular difficulties during the initial period or if he submits a justified
request, BE-CERT is authorised, based on a positive advice from the inspection body, to extend
the length of the initial period on exceptional basis.
Art. 7.7.2 The initial period is completed either by:
· the confirmation of the issuance of the CE-certificate(s);
· the refusal of the CE-certificate(s);
· the closure of the application file by the applicant or by BE-CERT.
Art. 7.8 Control reports
Art. 7.8.1 The reports provided for in § 5.2.3, 5.3.5, 5.4.6, 5.5.5 and 5.6.3 of EN 15167-2 are drawn up by
the inspection body. The evaluation and control reports contain all of the relevant comments
required to assess control over production, autocontrol by the manufacturer and the
conformity of the ground granulated blast furnace slags .
Art. 7.8.2 The control reports, signed by a person in charge at the inspection body, are sent without delay
to BE-CERT.
Art. 8 External control
Art. 8.1 General provisions
Art. 8.1.1 The purpose of the external control is to verify the validity of the manufacturer’s autocontrol
system. The external control includes visits carried out by one or more representatives from
the inspection body to the factory (visits for taking samples - § 5.4.1 of EN 15167-2 and visits to
evaluate the factory production control (quality audits) - § 5.2.2 of EN 15167-2) and control
tests carried out in a control laboratory.
Art. 8.2 Control visits
Art. 8.2.1 § 5.2 and 5.4 of EN 15167-2 apply.
Art. 8.2.2 The inspection body may be accompanied by observers (BE-CERT and/or accreditation body).
The responsibility of the inspection remains with the inspection body. The observer is subject
to a confidentiality clause.
Art. 8.3 Follow-up of the inspection body’s visits
Art. 8.3.1 At the end of each visit, all classified remarks (type A, B or C) requiring a corrective action by
the manufacturer are given to the manufacturer’s representative. Remarks can be notified by
the inspection body as well as BE-CERT. In this case, BE-CERT notifies its remarks and endorses
those notified by the inspection body after examination of the visit report according to its
internal procedures and any eventual consultation of the manufacturer. The manufacturer may
enter any comments directly on the form or by means of a separate letter.
Art. 8.3.2 A remark shall be notified for each finding, during the visit, of non-conformity related to the
technical specifications of the product or to the regulations, as well as to the specific provisions
imposed by BE-CERT.
Art. 8.3.3 The manufacturer is required to investigate the causes of the non-conformity and to take the
corrective actions that may be necessary to avoid the retention or the repetition of this non-
conformity. A deadline should be defined between the manufacturer and the body that has
made the remark with regard to the realization of the corrective actions according to:
§ the regulations;
§ if no deadline is included in the regulations, the case-law established with BE-CERT’s
Certification Committee;
Regulations for CE-certification of GROUND GRANULATED BLAST
FURNACE SLAG by BE-CERT
TRA CE 470/E
Page 17/31
04/2018
BE-CERT
§ if no case-law exists within BE-CERT’s Certification Committee, an agreement between the
parties.
A written answer should be sent to the inspection body within a month after the date of the
closing meeting to present the corrective actions plan – including the time frame for the
implementation of the correctieve measures – and/or the overview of actions that have
already been carried out following the inspection remarks.
Art. 8.3.4 In case of absence of corrective actions within the agreed deadlines, retention or repetition of
a non-conformity, BE-CERT is entitled to not renew or to withdraw the CE-certificate.
If the importance of the remarks and/or the monitoring of the effectiveness of the corrective
actions justify it, BE-CERT can impose a new visit at the manufacturer’s expense.
If BE-CERT considers that the corrective actions taken and/or planned as a result of the remarks
made at the end of the initial visit are insufficient, it informs the manufacturer in writing to
invite him to act. In the absence of actions to ensure conformity of the FPC with the
requirements of TRA CE, BE-CERT is entitled to end the certification process and the contract
unilaterally, not without having first informed the manufacturer in writing and examined his
arguments.
Art. 8.4 Types of remarks that can be notified
Art. 8.4.1 Non-conformities relate only to the FPC and its implementation.
The presence of one or more control test results outside the declared values is not necessarily
considered as a non-conformity. However, in this case, the absence of corrective actions
constitutes a non-conformity of type A, B, or C depending on the case.
Art. 8.4.2 Depending on the seriousness of the non-conformities found, three types of remarks can be
notified to the manufacturer:
§ A-type remarks concern non conformities that affect the functioning and efficiency of the
FPC in such a way that there is a risk of bringing products to the market that don’t satisfy
the requirements of the technical specifications. The existence of an A type remark can
lead to the repetition of the entire audit or part of it at the manufacturer’s expense. The
need to repeat all or part of the inspection is decided by BE-CERT;
§ B-type remarks concern non conformities that don’t represent any risk for the efficient
functioning of the FPC if they are eliminated within a limited time span (for example,
within 2 months). In this case, the manufacturer must inform BE-CERT and the inspection
body in writing of the effective implementation of the correctives actions within the
defined deadlines.
§ C-type remarks concern non conformities that don’t represent any risk for the efficient
functioning of the FPC but must be handled by the next control visit of the FPC.
Art. 8.4.3 The measures imposed have a binding character.
The recurring finding of identical or similar shortcomings can lead to a more severe
classification of the remark.
Art. 8.4.4 In case of a significant number of remarks of type B and/or C, BE-CERT is free to decide whether
or not it is necessary to repeat all or part of the inspection at the manufacturer’s expense.
The control visits normally take place once per calendar year and by production unit.
Art. 8.5 Control tests
Art. 8.5.1 Following control tests can be distinguished:
· periodical control tests, for which samples are taken during sampling visits;
Regulations for CE-certification of GROUND GRANULATED BLAST
FURNACE SLAG by BE-CERT
TRA CE 470/E
Page 18/31
04/2018
BE-CERT
· exceptional control tests, for which samples may also be taken any time BE-CERT deems
it to be necessary.
Art. 8.5.2 The frequency of sampling for periodical control tests is set by EN 15167-2, § 5.4.
By derogation with § 5.4.4 "Testing" of EN 15167-2, it is recommended that the number
of sub-samples taken be four; two of these being kept by the manufacturer for 6 months
following the sampling.
Art. 8.5.3 Sampling and transport of the samples for the control tests are carried out according to a
procedure subject to approval by the inspection body, either by the manufacturer or the
inspection body, at the manufacturer’s expense.
Art. 8.5.4 The test samples are given an identification by the inspection body.
Art. 8.5.5 For every assignment involving control tests, the inspection body establishes a document that
includes all of the relevant details regarding the samples. This document is signed for approval
by the manufacturer’s authorised representative.
Art. 8.5.6 Unless otherwise agreed by BE-CERT, the control laboratory only sends the test report to the
inspection body, which itself sends a copy of the report to the manufacturer after having
received the corresponding autocontrol results. Under no circumstances does the control
laboratory provide the results nor send the report to third parties.
Art. 8.5.7 The control laboratory has the right to report to BE-CERT the difficulties that may arise during
the payment of an invoice in the context of the agreement with BE-CERT.
Art. 8.6 Visit reports
Art. 8.6.1 § 5.2.3 of EN 15167-2 applies.
Art. 8.6.2 At the end of each audit, during a closing meeting, the auditor submits a form containing all of
his written remarks to the manufacturer’s representative. By signing this form, the authorized
representative of the audited factory confirms having read the remarks and understood their
content.
Art. 8.6.3 The initial and surveillance audit reports are prepared by the inspection body. The reports
contain all relevant findings necessary for the assessment of the control of production. They
need to ensure the traceability of the elements examined during the audit.
Art. 8.6.4 Inspection body’s reports are validated in accordance with the quality system’s rules of the
bodies concerned.
Art. 8.7 Observations and observations with warning
Art. 8.7.1 In case of first non-conformity of autocontrol test results and/or external control test results
for the specified characteristic value of the criterion and the limit value for individual results,
table 1 of standard EN 15167-2 is applied.
Art. 8.7.2 In case of observation with warning, the provisions of §6.1 in standard EN 15167-2 are applied.
Art. 9 Autocontrol
Art. 9.1 General requirements
Art. 9.1.1 § 4.1.1 of EN 15167-2 applies.
Art. 9.2 Production facilities
Art. 9.2.1 The manufacturer shall have facilities which are suitable to produce ground granulated blast
furnace slag that conforms to the requirements. § 5.5.3 of EN 15167-2 applies.
Regulations for CE-certification of GROUND GRANULATED BLAST
FURNACE SLAG by BE-CERT
TRA CE 470/E
Page 19/31
04/2018
BE-CERT
Art. 9.3 Autocontrol laboratory
Art. 9.3.1 The factory has an in-house autocontrol laboratory equipped to carry out all of the autocontrol
tests imposed by the relevant standards mentioned in the reference documents, the
description and operation of which are described in the factory’s quality manual (see § 4.2.2
and 5.5.4 of EN 15167-2).
Art. 9.3.2 Provided prior agreement is given by BE-CERT, the manufacturer may use an external
laboratory, to which all of the requirements in Art. 4.1 apply, to carry out all or part of the
autocontrol tests. The mutual obligations of the manufacturer and external autocontrol
laboratory are specified in a written agreement which states in particular that the auditors of
the inspection body must be authorised to check the conformity of the external laboratory
when they visit the manufacturer’s facilities.
Art. 9.4 Calibrations and verification
Art. 9.4.1 The calibration and verification of the measurement equipment at the production facilities and
the measurement equipment used for autocontrol tests are to be carried out in accordance
with the manufacturer’s quality manual and under the manufacturer’s responsibility.
Art. 9.4.2 Calibration and verification are carried out either:
· by an external laboratory:
§ accredited by a member of EA;
§ or, if not available, accepted by the certification body BE-CERT;
· by the supplier of the equipment if he proves that he has the appropriate means to do so;
· by the manufacturer himself, under the supervision of the inspection body and in
accordance with a written procedure included in its quality manual.
Art. 9.4.3 Calibration or verification is in any case carried out by qualified persons, using appropriate
means.
Art. 9.4.4 If there is any doubt regarding the calibration or verification carried out by the manufacturer
or the supplier, the certification body BE-CERT may request to execute the calibration or
verification again in the presence of the inspection body.
Art. 9.5 Control staff
Art. 9.5.1 § 4.1.3.1 and 4.1.3.3 of EN 15167-2 apply.
Art. 9.5.2 The manufacturer will give authority to at least two qualified persons to sign the sampling
reports.
Art. 9.6 Technical records
Art. 9.6.1 § 4.1.2 of EN 15167-2 applies.
Art. 9.7 Control scheme
Art. 9.7.1 The control scheme indicating the minimum requirements for autocontrol are defined in the
relevant table of the standards mentioned in the reference documents.
Art. 9.7.2 The measures to be taken in the event of non-conform control results are described in the
factory’s quality manual and in § 6.1 of EN 15167-2.
Art. 9.8 Workbooks
Art. 9.8.1 § 4.1.4.2 and 4.3.4 of EN 15167-2 apply.
Regulations for CE-certification of GROUND GRANULATED BLAST
FURNACE SLAG by BE-CERT
TRA CE 470/E
Page 20/31
04/2018
BE-CERT
Art. 9.9 Control registers
Art. 9.9.1 § 4.1.4.2 and 4.3.4 of EN 15167-2 apply.
Art. 9.10 Complaints register
Art. 9.10.1 The complaints register includes complaints received in relation to the certified ground
granulated blast furnace slags , stating the origin and the date of the complaint, its content and
the action taken as a result.
Art. 9.10.2 The complaints register contains in annex additional documents relating to the way in which
the complaint was handled (correspondence, departmental memos, any corrective action
taken, etc.).
Art. 10 Identification of ground granulated blast furnace slags and use of the certification
logo
Art. 10.1 Identification of ground granulated blast furnace slags
Art. 10.1.1 Annex ZA of the relevant standards mentioned in the reference documents applies, as does §
5 of Annex 1 of these regulation.
Art 10.1.2 If a manufacturer produces ground granulated blast furnace slags for which the application of
these regulations would lead to identical designations, the manufacturer must distinguish
between them by way of an additional individual identification that forms part of the
designation. The choice of the additional identification is subject to the approval of BE-CERT.
Art. 10.1.3 The designation of the ground granulated blast furnace slag may be accompanied by a
statement of additional characteristics not covered by the CE marking.
Art. 10.1.4 The CE-marking should be the only marking of the conformity of the construction product with
the declared performance and compliance with applicable requirements relating to European
Union harmonization legislation. However, other markings may be used, provided that they
help to improve the protection of users of construction products and are not covered by the
existing European Union harmonization legislation (extract “Expected 33” of CPR, Regulation
No 305/2011).
The standard product designation, apart from the CE marking as given in Annex ZA.3 of the
harmonized standard (hEN), may be accompanied by additional characteristics not covered by
the CE marking provided that no confusion between the certified and non-certified
characteristics is allowed.
Art. 10.2 Use and specifications of the certification logo
Art. 10.2.1 The form, specifications and rules applied for the use of the certification logo are given on the
website http://ec.europa.eu/growth/single-market/ce-marking/ and in Annex ZA of the
standards mentioned in the reference documents.
Art. 11 Management of stocks
Art. 11.1 Accessibility of stocks
Art. 11.1.1 § 5.4.1 of EN 15167-2 applies.
Art. 11.2 Subdivision of stocks
Art. 11.2.1 The manufacture identifies and distinguishes clearly those ground granulated blast furnace
slags bearing the CE marking from those that might be exempt or from ground granulated blast
furnace slags whose conformity is doubtful or might be downgraded.
Regulations for CE-certification of GROUND GRANULATED BLAST
FURNACE SLAG by BE-CERT
TRA CE 470/E
Page 21/31
04/2018
BE-CERT
Art. 12 CE Certificate
Art. 12.1 Conditions for granting a CE-certificate
Art. 12.1.1 BE-CERT issues the CE-certificate as soon as, on the basis of control reports and the audit report,
it appears that conformity with § 7 of EN 15167-2 is met and it was observed that all
requirements of a technical, administrative and financial nature are met.
Art. 12.2 Scope of CE-certificates
Art. 12.2.1 CE-certificates are issued to the manufacturer by factory and by ground granulated blast
furnace slag.
Art. 12.2.2 By issuing the CE-certificate, BE-CERT declares that
§ the product mentioned is subject to the FPC by the manufacturer
§ the product mentioned is subject to tests on samples, taken in the factory, in accordance
with a determined test programme
§ BE-CERT has determined the performances of the product on the basis of TT
§ BE-CERT has done the initial inspection of the factory and the FPC and executed a
random control of the samples
§ BE-CERT is responsible for the continuous surveillance, assessment and evaluation of
the FPC
§ All tasks related to the ACVP are carried out in accordance with the harmonized
standards in force
§ the conformity of the certified ground granulated blast furnace slag has been checked
at a frequency imposed on the basis of an external control of the manufacturer’s
autocontrol procedure by a third party.
Art. 12.2.3 By issuing the CE-certificate, the manufacturer is not discharged of his legal responsibilities and
obligations concerning the CE-certification and may not substitute those of BE-CERT, the
inspection body or any other body concerned by the CE-certification.
Art. 12.3 Refusal to issue a CE-certificate
Art. 12.3.1 In the event of refusing to issue the CE-certificate, BE-CERT shall inform the applicant in writing,
giving reasons for its decision.
Art. 12.4 Period of validity of the CE-certificate
Art. 12.4.1 The CE-certificate has a validity date and is in principle renewed annually.
Art. 12.4.2 The validity of the CE-certificate may be suspended:
- at the request of the manufacturer (Art. 12.6) ;
- by BE-CERT as the result of a sanction (Art. 15).
The maximum period of suspension requested by the manufacturer - voluntary suspension - is
12 months.
The normal period for a suspension decided as the result of a sanction is 3 months; this period
may be reduced to 1 month or increased to 6 months if the authority imposing the sanction
justifies it.
Art. 12.4.3 The validity of CE-certificate is terminated as the result of:
Regulations for CE-certification of GROUND GRANULATED BLAST
FURNACE SLAG by BE-CERT
TRA CE 470/E
Page 22/31
04/2018
BE-CERT
- the CE-certificate being withdrawn by BE-CERT as the result of the manufacturer’s
renunciation (Art. 12.6), production being halted, a sanction (Art. 15) or refusal to issue
the CE-certificate at the end of the initial period (Art. 7.7.2);
- a period of 12 months without production after a request for the voluntary suspension of
the CE-certificate;
- the cessation of the CE-certification system for ground granulated blast furnace slags.
Art. 12.4.4 The suspension of end of the validity of the CE-certificate shall be notified in writing to the
manufacturer by BE-CERT.
Art. 12.5 CE-certificate
Art. 12.5.1 Annex ZA of the standards mentioned in the reference documents applies.
Art. 12.5.2 The manufacturer may only distribute complete copies of the CE-certificate. The manufacturer
is obliged to provide free of charge a full copy of the CE-certificate to any direct customer.
Art. 12.6 Suspension and withdrawal by the manufacturer
Art. 12.6.1 The manufacturer may request the suspension of a CE-certificate, or renounce to it. The
suspension and withdrawal can therefore relate to one of the ground granulated blast furnace
slags or the whole of the certified production.
Art. 12.6.2 The manufacturer must lodge a written request for suspension, indicating the required period
of suspension, as well as the time required for stocks of the certified ground granulated blast
furnace slags to be exhausted.
Art. 12.6.3 The certification body shall grant the suspension from the end of the stocks being exhausted
and for a maximum period of 12 months.
Art. 12.6.4 The manufacturer notifies the certification body of the withdrawal of a ground granulated blast
furnace slag by registered letter. The letter includes an indication, giving reasons, of the time
required to exhaust the stocks of the certified ground granulated blast furnace slag. On this
basis of this indication, the certification body determines the date of the withdrawal of the CE-
certificate.
Art. 12.6.5 Renouncing the signed commitment can only take effect at the end of a calendar year by way
of 6 months’ notice. During the time of its commitment, the minimum fee due to BE-CERT by
the manufacturer corresponds to the amount stated in the fees for the CE-certification of a
ground granulated blast furnace slag.
Art. 12.7 Modification of the technical specifications of the ground granulated blast furnace
slags and the regulations
Art. 12.7.1 BE-CERT informs in due time the manufacturer of any modification to the technical
specifications of the ground granulated blast furnace slag and the regulations relating to the
CE-certification of the ground granulated blast furnace slag, stating the period of time that the
manufacturer has to adapt to the modified prescriptions unless if it is indicated in the Official
Journal of the European Union.
Art. 12.7.2 BE-CERT informs in due time the inspection bodies and the control laboratories of any
modification to the technical specifications of the ground granulated blast furnace slag and the
CE regulations relating to the inspections and control tests concerning them, stating the
moment at which the modifications come into effect.
Art. 12.7.3 BE-CERT may decide, if necessary, to carry out an additional visit at the the manufacturer’s
expense on the basis of the type of modifications.
Regulations for CE-certification of GROUND GRANULATED BLAST
FURNACE SLAG by BE-CERT
TRA CE 470/E
Page 23/31
04/2018
BE-CERT
Art. 12.8 List of certified products
Art. 12.8.1 BE-CERT keeps up to date a list of the manufacturers and ground granulated blast furnace slag
for which BE-CERT has issued a CE-certificate. The list is available on the BE-CERT website
http://www.be-cert.be and can also be obtained from BE-CERT by simple request.
Art. 12.8.2 In addition to the manufacturers and the certified ground granulated blast furnace slag, the list
also mentions the date of applications for withdrawal that have taken place in the three months
prior to the publication, as well as the date of the application and the length of any suspensions
that were in effect in the three months prior to the publication. Sanctioned (Art. 15) or
voluntary (Art. 12.6) suspension or withdrawal is indicated clearly.
Art. 13 Production during the period of validity of a certificate
Art. 13.1 Downgraded ground granulated blast furnace slags
Art. 13.1.1 Ground granulated blast furnace slags that do not conform after the final stage of production
are downgraded by the manufacturer.
Art. 13.1.2 Downgraded ground granulated blast furnace slags are recorded in the production status
report in such a way that their traceability can be ensured. The identification of a downgraded
ground granulated blast furnace slag features a clear and indelible symbol that is proof of its
downgrading.
Art. 13.2 Delivery of ground granulated blast furnace slag with CE marking
Art. 13.2.1 The FPC must give confidence in the constancy of performance of the product concerning the
essential characteristics for which the manufacturer has declared a performance.
Art. 13.2.2 Each delivery note for certified ground granulated blast furnace slag must state the quantity
and identification of the ground granulated blast furnace slag being delivered and satisfies the
requirements of Annex ZA of the standards mentioned in the reference documents.
Art. 13.2.3 The CE marking cannot be affixed to non-conforming ground granulated blast furnace slags
under any circumstances.
Art. 13.2.4 The treatment of downgraded ground granulated blast furnace slags is described in the
factory’s quality manual (§ 4.2.1.3 of EN 15167-2). Informing BE-CERT, as provided for in the
note at the end of § 4.3.2 in EN 15167-2, is required.
Art. 13.2.5 The manufacturer establishes and applies an appropriate procedure ensuring the cleanliness
of the tanks on trucks and ships before bulk ground granulated blast furnace slags are loaded.
Art. 13.3 Modification of production
Art. 13.3.1 If production is discontinued or interrupted on a temporary basis, the manufacturer is required
to inform BE-CERT and the inspection body of any period of production or interruption, in such
a way that control visits can be programmed to coincide with period of production.
Art. 13.3.2 BE-CERT is authorised to take all measures necessary to ensure that confidence in the
conformity of the ground granulated blast furnace slag is maintained after an interruption in
production.
Art. 13.3.3 The manufacturer informs BE-CERT by registered letter of the final end to any production. The
final end of production is considered by BE-CERT as a withdrawal by the manufacturer (Art.
12.6).
Regulations for CE-certification of GROUND GRANULATED BLAST
FURNACE SLAG by BE-CERT
TRA CE 470/E
Page 24/31
04/2018
BE-CERT
Art. 14 Complaints
Art. 14.1 Complaints relating to the certification of ground granulated blast furnace slags
Art. 14.1.1 Any written complaint submitted to BE-CERT is dealt with in application of the appropriate
procedure covered in its quality manual. As the responsibility for the quality of the ground
granulated blast furnace slag is always incumbent upon the manufacturer, complaints that
relate to the use of the ground granulated blast furnace slag and that would be passed on to
BE-CERT are always for the manufacturer and will be forwarded to it systematically.
Art. 15 Sanctions
Art. 15.1 Definition
Art. 15.1.1 BE-CERT is authorised to take the measures described in Table 1 of EN 15167-2 following the
observation of a non-conformity with the technical specifications of the ground granulated
blast furnace slag on application of this table.
BE-CERT is also authorised to notify sanctions and to take the measures provided for in the
reference documents, regulations and quality manuals that apply after a non-conformity has
been observed with regard to regulatory provisions and special provisions that it has imposed
in the context of certification.
Art. 15.1.2 A sanction may concern part or all of the certified production. The sanction may be
accompanied by a strengthening of the industrial autocontrol procedures or external control
and the various measures of a mandatory nature required of the manufacturer. The
manufacturer must take all of the corrective action necessary to avoid the breach or failing
being maintained or repeated.
Art. 15.1.3 Depending on the seriousness of the non-conformity, except for those provided for in Table 1
of EN 15167-2, the following sanctions can be distinguished:
· WARNING: the manufacturer is warned that the maintenance or repetition of the non-
conformity will place in doubt the manufacturer’s ability to ensure the continuity of the
ground granulated blast furnace slag’s conformity and may give rise to a heavier
sanction;
· SUSPENSION OF INDEPENDENT DELIVERY: the manufacturer may no longer deliver
under CE marking those parts of the production concerned without prior authorisation
from BE-CERT. The autocontrol procedure and external control are then continued
without restriction.
· SUSPENSION: the manufacturer may no longer deliver under CE marking those parts of
the production concerned for a period defined at the moment the sanction is
announced. The autocontrol procedure and external control are then continued without
restriction.
· PARTIAL WITHDRAWAL: the manufacturer may no longer deliver under CE marking
those parts of the production concerned. The external control relating to those parties
of the production concerned is halted.
· WITHDRAWAL OF ALL CERTIFICATES: the manufacturer may no longer deliver ground
granulated blast furnace slag with CE marking. External control is halted, with the
exception of a visit made during the three months following the withdrawal, the aim
being to check on the level of stocks.
Art. 15.1.4 The suspension of independent delivery is pronounced for an indeterminate period. The
suspension may only be lifted at a time when there is a sufficient level of confidence in the fact
Regulations for CE-certification of GROUND GRANULATED BLAST
FURNACE SLAG by BE-CERT
TRA CE 470/E
Page 25/31
04/2018
BE-CERT
that the manufacturer is once again in a position to ensure the conformity of its ground
granulated blast furnace slag.
Art. 15.1.5 The suspension is pronounced for a specific period, which may be extended if necessary. The
maximum period for a suspension is 6 months.
Art. 15.1.6 The withdrawal of a certificate is final. The manufacturer may only submit a formal application
for a new certificate after a period of at least 6 months.
Art. 15.1.7 A warning or suspension of independent delivery are confidential sanctions and are never
divulged to third parties. They are notified in writing.
Art. 15.1.8 The suspension and withdrawal of a certificate are public sanctions and are clearly stated in the
list of certified products. These sanctions are notified to the manufacturer by registered letter,
after the manufacturer has been informed of the risk being run and not without allowing the
manufacturer to present its defence on the matter.
Art. 15.2 Application of sanctions
Art. 15.2.1 For every non-conformity, depending on the regulatory provisions, findings made by the
inspection body and observations, as well as the jurisprudence constituted by it, BE-CERT’s
Certification Committee decides on the appropriateness of notifying a sanction and determines
its level and duration, as well as any additional measures that may be required.
Art. 15.2.2 The following occurrences in particular may give rise to a warning:
§ non-compliance with the nature or frequency of a control required in the context of
autocontrol;
§ non-compliance with the quality system provided for in the manufacturer’s quality manual.
Art. 15.2.3 Another occurrence that may also lead to a suspension of independent delivery, is the delivery
affixing CE marking of parts of production whose non-conformity is observed after delivery has
been made.
Art. 15.2.4 The following occurrences in particular may give rise to the suspension of one or more
certificates:
§ the delivery affixing CE marking of parts of production whose non-conformity should have
been known to the manufacturer;
§ non-compliance with the measures imposed in cases where the autocontrol results do not
meet the technical specifications of the ground granulated blast furnace slag or the
regulatory provisions;
§ the non-payment of invoices relating to work carried out in the context of the certification
process and owed to BE-CERT, an inspection body or a control laboratory.
Art. 15.2.5 The following occurrences in particular will lead to the withdrawal of all certificates:
§ any voluntary act designed to conceal the non-conformity of parts of production;
§ the delivery affixing the CE marking of parts of production during a period of suspension or
without the authorisation of BE-CERT during the period of suspension of independent
delivery.
Art. 15.2.6 Non-compliance with an obligation arising from a sanction or the observation during the period
relating to a sanction, of the same type of non-conformity, or a second non-conformity also
resulting in a sanction, may result in the sanction being made heavier.
Regulations for CE-certification of GROUND GRANULATED BLAST
FURNACE SLAG by BE-CERT
TRA CE 470/E
Page 26/31
04/2018
BE-CERT
Art. 16 Hearings, appeals and pleas
Art. 16.1 Hearing
Art. 16.1.1 Any manufacturer disputing a decision taken or a sanction handed down by BE-CERT has the
right to be heard by BE-CERT.
Art. 16.1.2 Applications for a hearing must be made in writing.
Art. 16.1.3 The decisions taken and sanctions handed down by BE-CERT are not suspended by an
application for a hearing.
Art. 16.1.4 The hearing takes place during the first Certification Committee following the examination of
the application.
Art. 16.2 Appeal
Art. 16.2.1 Any manufacturer disputing a decision taken by BE-CERT regarding the suspension or
withdrawal of a certificate following a sanction has the right to lodge an appeal against the
decision with an Appeal Committee established within BE-CERT.
Art. 16.2.2 Lodging an appeal is carried out by registered letter within ten working days after receipt of the
notification of the sanction in question, addressed to BE-CERT’s secretariat.
Art. 16.2.3 The suspension or withdrawal of a certificate following sanction is not suspended by an appeal.
Art. 16.3 Pleas
Art. 16.3.1 A plea against any decision taken by BE-CERT is possible with the authority that has notified BE-
CERT, i.e. the Federal Public Service Economy1.
Art. 16.3.2 The suspension or withdrawal of a certificate following sanction is not suspended by a plea.
Art. 17 Financial system
Art. 17.1 Financial rules
Art. 17.1.1 The fees that apply and rules of the financial system for the certification of ground granulated
blast furnace slag are established by BE-CERT. They are communicated with each modification
or on request.
The fees for the inspection bodies and the control laboratories are managed by each of them.
Art. 18 Disputes
Art. 18.1 Arbitration of disputes
Art. 18.1.1 The applicant or the manufacturer on the one hand, and BE-CERT on the other hand, undertake
to have any dispute ruled on by arbitration that may arise in terms of the implementation or
interpretation of the regulatory provisions. The procedure takes place in accordance with the
CEPANI regulations (see http://www.cepani.be). Belgian law applies. The place of arbitration is
Brussels. The national languages are accepted as the languages for conducting the arbitration.
The arbitration will take place in first instance and final appeal.
1 Federal Public Service Economy, North Gate, Boulevard du Roi Albert II 16, , B-1000 Brussels - Belgium
Regulations for CE-certification of GROUND GRANULATED BLAST
FURNACE SLAG by BE-CERT
TRA CE 470/E
Page 27/31
04/2018
BE-CERT
Art. 19 Misuse of CE-certification and CE-certificates
Art. 19.1 Regardless of the media used, the manufacturer complies with the requirements of this
regulation and of the CPR in its communication regarding CE-certification.
Art. 19.2 The manufacturer’s DoP is within the scope of the CE-certification.
Art. 19.3 The manufacturer does not use CE-certification in a way that could harm BE-CERT. He makes
no declaration regarding CE-certification that BE-CERT could consider misleading or unlawful.
Art. 19.4 In the event of suspension, withdrawal or end of validity of the CE-certification, the
manufacturer ceases all reference to CE-certification.
Art. 19.5 BE-CERT reserves the right to draw the manufacturer’s attention to any inaccuracies or
deficiencies in the DoP that he established or in the information accompanying the CE-marking
which bear the identification number of BE-CERT as a notified body.
Art. 19.6 BE-CERT reserves the right to take legal action against any misuse or falsification of its
identification number as a notified body or a CE-certificate issued by its services.
Art. 20 Market surveillance
Art. 20.1 The manufacturer meets all the requirements of CPR for the use of CE-marking and for editing
and communicating the DoP.
Art. 20.2 BE-CERT is not competent for market surveillance in the context of the application of CPR.
Art. 20.3 The competent administrative authorities of the Member States are responsible for the market
surveillance in the context of the application of CPR.
______________________
Regulations for CE-certification of GROUND GRANULATED BLAST
FURNACE SLAG by BE-CERT
TRA CE 470/E
Page 28/31
04/2018
BE-CERT
Annex 1: Additional clauses
1 Chloride Cl- content of ground granulated blast furnace slags
The maximum content of chlorides Cl- in ground granulated blast furnace slags that contain more than 0.10%
shall be explicitly stated on the bags and delivery documents.
The manufacturer shall declare the maximum chlorides content in these ground granulated blast furnace slags
to the certification body; the inspection body is responsible for checking that this maximum content is indeed
complied with.
2 Division of autocontrol samples
In cases where a ground granulated blast furnace slag type is distributed in varying types of packaging (bags,
bulk, big bags, etc.), the samples for autocontrol and external control shall be divided between the various
methods of distribution, pro rata with the quantities delivered in the various forms of packaging.
In cases where the holder of the CE-certificate distributes the same certified ground granulated blast furnace
slag via more than one point of delivery managed under its own responsibility (different points of delivery in the
factory and/or in one or more depots), the samples for autocontrol and external control shall be divided between
the various points of delivery, pro rata with the quantities delivered from each site.
3 Transmission of autocontrol results
The person in charge of contacts with BE-CERT, designated by the applicant, shall have an e-mail address.
The results of the autocontrol shall be sent monthly to the inspection body in a format and according to a
procedure defined by BE-CERT.
4 Inter-laboratory tests
In accordance with §5.4.7 of standard EN 15167-2, the testing laboratory shall carry out regular proficiency
testing with other testing laboratories in order to maintain the required accuracy.
The laboratories involved in the CE certification of ground granulated blast furnace slags shall take part in inter-
laboratory tests organised by the Direction Committee for the certification of Additions Type II for concrete of
BE-CERT regarding ground granulated blast furnace slags.
5 Designation of ground granulated blast furnace slags on bags and delivery slips
In order to be placed on the market, ground granulated blast furnace slag shall carry the CE-marking as described
in Annex ZA of the standards mentioned in the reference documents.
5.1 CE-marking of ground granulated blast furnace slags in bags
In cases where ground granulated blast furnace slags are supplied in bags, those must display all of the CE-
marking, the identification number of the certification body and any accompanying information, as described in
§ ZA 3 of EN 15167-1.
Regarding the date of bagging, it is permitted to mention in the box, in the place designed for the date, where it
may be found on the bag (for example: "see the side of the bag").
No particular specification is provided for in terms of the delivery documents for these ground granulated blast
furnace slags; however, they may mention the CE-marking and the information that goes with it, or only a part
of the prescribed information. If the "CE" logo is printed on the delivery slip, it must be accompanied by the
identification number of the certification body (0965 in the case of BE-CERT).
Regulations for CE-certification of GROUND GRANULATED BLAST
FURNACE SLAG by BE-CERT
TRA CE 470/E
Page 29/31
04/2018
BE-CERT
5.2 CE-marking of ground granulated blast furnace slags in bulk
5.2.1 General rule
Regarding the shipping date, it is permitted to mention in the box, in the area designed for it, where it may be
found on the delivery document, (for example: "see shipping date above").
5.2.2 Individual cases
If the layout cannot be achieved, it is permitted not to abide by it, although differing as little as possible. In all
cases, all of the information required must nevertheless be mentioned on the delivery slip and be present in such
a way as to avoid any equivocation or ambiguity relative to CE-marking.
6 Calibration of strength testing machines
Laboratory strength testing machines shall be calibrated at least once a year by a body accredited by a member
of EA.
7 Identification of points of delivery and points of sampling
The points of sampling of ground granulated blast furnace slags for autocontrol and audit testing are clearly
identified with the designation of the ground granulated blast furnace slags in application of §5 of this annex.
The points of delivery for bulk ground granulated blast furnace slag have to be univocally identified at any
position where it is required for production, dispatch or inspection purposes.
8 Allocation plans of the silos
An allocation plan of the silos shall be established by the factory. This plan is systematically updated when
modifications are made to the allocation of ground granulated blast furnace slags in the silos or if the installations
are modified. With each update of the silo plan, a copy shall be sent immediately to the inspection body.
Regulations for CE-certification of GROUND GRANULATED BLAST
FURNACE SLAG by BE-CERT
TRA CE 470/E
Page 30/31
04/2018
BE-CERT
Annex 2 (informative): List of inspection bodies
with which BE-CERT has subcontracting agreements or mutual recognition
BE-CERT Avenue Edmond Van nieuwenhuyse 6
B-1160 Brussels
Belgium
tel.: + 32 (0)2 234 67 60
e-mail: [email protected]
internet: http://www.be-cert.be
Regulations for CE-certification of GROUND GRANULATED BLAST
FURNACE SLAG by BE-CERT
TRA CE 470/E
Page 31/31
04/2018
BE-CERT
Annex 3 (informative): List of control laboratories with which BE-CERT has subcontracting agreements or mutual recognition
CRIC-OCCN Belgium
tel.: + 32 (0)2 626 89 20
fax: + 32 (0)2 648 51 20
e-mail: [email protected]
internet: http://www.cric-occn.be
GEOS Belgium
tel.: +32 (0)12 67 09 09
fax: + 32 (0)12 74 54 05
e-mail: [email protected]