Register of New Projects in India-Metallurgical Industries
-
Upload
satya-priya -
Category
Documents
-
view
372 -
download
0
Transcript of Register of New Projects in India-Metallurgical Industries
Brief Note on the Metallurgical Industries Volume
We have taken utmost care to present the data in this volume accurately. However, despite our best efforts, it is possible that certain errors might have crept in, which may kindly be brought to our notice. The information contained in this volume has been updated to May 2007.
We have covered most of the new projects in the Metallurgical Industries sector. This includes integrated steel plant, mini steel plants, steel products, sponge iron, pig iron, foundries, non ferrous smelting and refining, non ferrous products and a host of others. The volume not only covers greenfield projects but also expansion and modernisation schemes of existing metallurgical units.
Abbreviations / Acronyms Used
CPP Captive Power Plant
tpa tonnes per annum
MW Mega Watt
tpd tonnes per day
WHR Waste Heat Recovery
DRI Direct Reduced Iron
tpm tonnes per month
MoU Memorandum of Understan
HSM Hot Strip Mill
SPV Special Purpose Vehicle
DPR Detail Project Report
HR Coil Hot Rolled Coil
tph tonnes per hour
mtpa million tonnes per annum
cu.m. cubic meters
Note : Costs are expressed in Millions of Rupees
One Million equals Ten Lakhs.
Register of New Projects in India 2007
METALLURGICAL INDUSTRIES
Publisher
P. V. Satyanarayana Asst. Editor : R VedanthamMarketing Services Manager : Anuradha PrabhudesaiEditorial Manager : V. Meenakshi SundaramResearch Executives : 1. A. Anuradha 2. A. VijiResearch Assistants : 1. K. Selvakumaran 2. R. Francis William Register of New Projects in India is published annually/biennially in separate volumes covering the following industry sectors.
No part of this book may be reproduced, stored in any form or means – electronic, photocopying, recording or otherwise without prior permission from Domex Business Information Pvt Ltd.
‘Register of New Projects in India’ is useful for the following categories of executives:
· Sales/Marketing Managers for identifying selling opportunities.
· Corporate Planners / Economists for analysing and forecasting industry trends besides drawing up corporate perspective plans.
· Company Directors/Chief Executives for influencing their business decisions.
· Businessman / Entrepreneurs to derive ideas regarding industrial investment and product diversification.
· Market Researchers for analysing and forecasting industrial and consumer markets.
Projects in Planning Stage
A
Adhunik Corp 1
Aditya Alumina 1
Aditya Pigiron 1
Agni Steels 1
Akshay Ispat Udyog 1
Anindita Traders & Invests 2
Arcelor Mittal 2
Arees Iron & Steel 2
Atibir Industries 3
B
Bajaj Electricals 3
Balmukund Sponge & Iron 3
Basai Steels 3
Benaka Sponge Iron 4
Bharat Aluminium 4
Bhushan Power & Steel 4
Bilasraika Steel 5
BMW Industries 5
Brahma Iron & Power 5
Brakes Auto India 5
Burakia Steel Alloys 6
C
Castings & Allied Industries 6
Chaibasa Steel 6
Chaman Metallics 6
Chambal Alums 6
Chhattisgarh Electricity 7
CMS Consultants 7
Register of New Projects in India 2007METALLURGICAL INDUSTRIES
Company-Wise
ContEntS
nEW PRoJECtS In InDIA 2007
Register of
Brief Note on the Metallurgical Industries Volume
We have taken utmost care to present the data in this volume accurately. However, despite our best efforts, it is possible that certain errors might have crept in, which may kindly be brought to our notice. The information contained in this volume has been updated to May 2007.
We have covered most of the new projects in the Metallurgical Industries sector. This includes integrated steel plant, mini steel plants, steel products, sponge iron, pig iron, foundries, non ferrous smelting and refining, non ferrous products and a host of others. The volume not only covers greenfield projects but also expansion and modernisation schemes of existing metallurgical units.
Abbreviations / Acronyms Used
CPP Captive Power Plant
tpa tonnes per annum
MW Mega Watt
tpd tonnes per day
WHR Waste Heat Recovery
DRI Direct Reduced Iron
tpm tonnes per month
MoU Memorandum of Understan
HSM Hot Strip Mill
SPV Special Purpose Vehicle
DPR Detail Project Report
HR Coil Hot Rolled Coil
tph tonnes per hour
mtpa million tonnes per annum
cu.m. cubic meters
Note : Costs are expressed in Millions of Rupees
One Million equals Ten Lakhs.
Register of New Projects in India 2007
METALLURGICAL INDUSTRIES
Publisher
P. V. Satyanarayana Asst. Editor : R VedanthamMarketing Services Manager : Anuradha PrabhudesaiEditorial Manager : V. Meenakshi SundaramResearch Executives : 1. A. Anuradha 2. A. VijiResearch Assistants : 1. K. Selvakumaran 2. R. Francis William Register of New Projects in India is published annually/biennially in separate volumes covering the following industry sectors.
No part of this book may be reproduced, stored in any form or means – electronic, photocopying, recording or otherwise without prior permission from Domex Business Information Pvt Ltd.
‘Register of New Projects in India’ is useful for the following categories of executives:
· Sales/Marketing Managers for identifying selling opportunities.
· Corporate Planners / Economists for analysing and forecasting industry trends besides drawing up corporate perspective plans.
· Company Directors/Chief Executives for influencing their business decisions.
· Businessman / Entrepreneurs to derive ideas regarding industrial investment and product diversification.
· Market Researchers for analysing and forecasting industrial and consumer markets.
Projects in Planning Stage
A
Adhunik Corp 1
Aditya Alumina 1
Aditya Pigiron 1
Agni Steels 1
Akshay Ispat Udyog 1
Anindita Traders & Invests 2
Arcelor Mittal 2
Arees Iron & Steel 2
Atibir Industries 3
B
Bajaj Electricals 3
Balmukund Sponge & Iron 3
Basai Steels 3
Benaka Sponge Iron 4
Bharat Aluminium 4
Bhushan Power & Steel 4
Bilasraika Steel 5
BMW Industries 5
Brahma Iron & Power 5
Brakes Auto India 5
Burakia Steel Alloys 6
C
Castings & Allied Industries 6
Chaibasa Steel 6
Chaman Metallics 6
Chambal Alums 6
Chhattisgarh Electricity 7
CMS Consultants 7
Register of New Projects in India 2007METALLURGICAL INDUSTRIES
Company-Wise
ContEntS
nEW PRoJECtS In InDIA 2007
Register of
D
Deivam Foundry 7
Dewas Metal Sections 7
Dinbandhu Steel & Power 8
Divya Jyoti Sponge Iron 8
E
Electrosteel Castings 8
Electrosteel Castings 8
Ennore Foundries 8
Essar Steels 9
Essar Steel Orissa 9
G
G. S. Alloy Castings 9
Gallantt Ispat 9
H
Hindalco Almex Aerospace 10
Hindalco Industries 10
Hindustan Zinc 10
Hothur Steels 11
I
Ind Synergy 11
Indian Rare Earths 11
Ispat Industries 11
J
Jai Balaji Sponge 12
Jeet Metals 12
Jeevaka Industries 12
Jhelum Cements 12
Jindal Aluminium 12
Jindal Steel & Power 13
Jindal South West Steel 13
Jsons Foundry 14
JSW Aluminium 14
JSW Steel 14
K
Kamini Ferrous 15
Karnataka Gears 15
Kerala Minerals & Metals 15
Kirloskar Ferrous Industries 15
L
Lal Traders & Agencies 16
Laxmi Vayaapar 16
M
Mahabal Metals 16
Mahalaxmi Ingots 16
Maithan Ispat 16
Manaksia 17
Menon Alkop 17
Mohan Engineering Industries 17
Monnet Ispat & Energy 17
MSP Metallics 18
MSP Steel & Power 18
Mysore Minerals 18
n
Nalwa Sponge Iron 18
Nandhini Castings 19
Narayanadri Power Projects 19
National Mineral Dev Corp 19
Nithya Industries 19
Nutan Ispat 20
P
Pancharatna Metal Processing 20
Parikh Enterprises 20
Parwaz Sponge Iron 20
Patwari Steels 20
Pawanjai Steel & Power 21
Pioneer Engineering Industries 21
Prakash Ispat 21
Register of New Projects in India 2007METALLURGICAL INDUSTRIES
Company-Wise
ContEntS
nEW PRoJECtS In InDIA 2007
Register of
D
Deivam Foundry 7
Dewas Metal Sections 7
Dinbandhu Steel & Power 8
Divya Jyoti Sponge Iron 8
E
Electrosteel Castings 8
Electrosteel Castings 8
Ennore Foundries 8
Essar Steels 9
Essar Steel Orissa 9
G
G. S. Alloy Castings 9
Gallantt Ispat 9
H
Hindalco Almex Aerospace 10
Hindalco Industries 10
Hindustan Zinc 10
Hothur Steels 11
I
Ind Synergy 11
Indian Rare Earths 11
Ispat Industries 11
J
Jai Balaji Sponge 12
Jeet Metals 12
Jeevaka Industries 12
Jhelum Cements 12
Jindal Aluminium 12
Jindal Steel & Power 13
Jindal South West Steel 13
Jsons Foundry 14
JSW Aluminium 14
JSW Steel 14
K
Kamini Ferrous 15
Karnataka Gears 15
Kerala Minerals & Metals 15
Kirloskar Ferrous Industries 15
L
Lal Traders & Agencies 16
Laxmi Vayaapar 16
M
Mahabal Metals 16
Mahalaxmi Ingots 16
Maithan Ispat 16
Manaksia 17
Menon Alkop 17
Mohan Engineering Industries 17
Monnet Ispat & Energy 17
MSP Metallics 18
MSP Steel & Power 18
Mysore Minerals 18
n
Nalwa Sponge Iron 18
Nandhini Castings 19
Narayanadri Power Projects 19
National Mineral Dev Corp 19
Nithya Industries 19
Nutan Ispat 20
P
Pancharatna Metal Processing 20
Parikh Enterprises 20
Parwaz Sponge Iron 20
Patwari Steels 20
Pawanjai Steel & Power 21
Pioneer Engineering Industries 21
Prakash Ispat 21
Register of New Projects in India 2007METALLURGICAL INDUSTRIES
Company-Wise
ContEntS
nEW PRoJECtS In InDIA 2007
Register of
R
Raj Refractories 21
Rajesh Strips 22
Rathi Bars 22
Ravindra Mining Co 22
Rourkela Steel Plant 22
Rukminirama Steel Rollings 23
Rungta Mines 23
S
Sangam Wires 23
Saravana Alloy Steels 23
Shah Alloys 23
Shri Badrinarain Alloys & Steels 24
Shri Bajrang Power & Ispat 24
Shyam Steel Industries 24
Sino Steel India 24
SLR Metaliks 24
SMS Steels 25
Southern Ispat 25
Sova Electrocasting 25
Sova Ispat 25
Spectrum Iron & Alloys 26
Sri Sakthivel Murugan Castings 26
Steelco Gujarat 26
Stork Ferro & Mineral Industries 26
Suguna Ispat 26
Sunflag Iron & Steel 27
Suzlon Energy 27
t
Tata Metaliks 27
Tata Sponge Iron 27
Tinplate Co of India 27
Topaz Steel & Calcination India 28
Topworth Steels 28
U
Ultratech Metals 28
U R Casting & Alloys 28
V
Vandana Ispat 28
Varun Agricultural Investments 29
Velumani Engineering Industry 29
Vikash Smelters 29
Projects Under Implementation Stage
A
A.N. Steels 31
Aarti Steels 31
Abhinandhan Steels 31
Adhunik Metaliks 31
Alankar Alloys 32
Andhra Ferro Alloys 32
Ankit Metal & Power 32
Aqua pumps Engineering 32
Ashok Iron Works 33
Atlas Automotive Components 33
B
Beekay Steel & Power 33
Best Engineers Pumps 33
Bhushan Power & Steel 33
BMW Industries 35
Brahmi Impex 35
Brand Alloys 35
C
C. P. Re-rollers 35
Cochin Minerals & Rutiles 35
Cosmic Ferro Alloys 36
D
D S Group 36
Dove Marine Exports 36
E
Electrotherm India 36
Ennore Coke 36
Ennore Foundries 37
Register of New Projects in India 2007METALLURGICAL INDUSTRIES
Company-Wise
ContEntS
nEW PRoJECtS In InDIA 2007
Register of
R
Raj Refractories 21
Rajesh Strips 22
Rathi Bars 22
Ravindra Mining Co 22
Rourkela Steel Plant 22
Rukminirama Steel Rollings 23
Rungta Mines 23
S
Sangam Wires 23
Saravana Alloy Steels 23
Shah Alloys 23
Shri Badrinarain Alloys & Steels 24
Shri Bajrang Power & Ispat 24
Shyam Steel Industries 24
Sino Steel India 24
SLR Metaliks 24
SMS Steels 25
Southern Ispat 25
Sova Electrocasting 25
Sova Ispat 25
Spectrum Iron & Alloys 26
Sri Sakthivel Murugan Castings 26
Steelco Gujarat 26
Stork Ferro & Mineral Industries 26
Suguna Ispat 26
Sunflag Iron & Steel 27
Suzlon Energy 27
t
Tata Metaliks 27
Tata Sponge Iron 27
Tinplate Co of India 27
Topaz Steel & Calcination India 28
Topworth Steels 28
U
Ultratech Metals 28
U R Casting & Alloys 28
V
Vandana Ispat 28
Varun Agricultural Investments 29
Velumani Engineering Industry 29
Vikash Smelters 29
Projects Under Implementation Stage
A
A.N. Steels 31
Aarti Steels 31
Abhinandhan Steels 31
Adhunik Metaliks 31
Alankar Alloys 32
Andhra Ferro Alloys 32
Ankit Metal & Power 32
Aqua pumps Engineering 32
Ashok Iron Works 33
Atlas Automotive Components 33
B
Beekay Steel & Power 33
Best Engineers Pumps 33
Bhushan Power & Steel 33
BMW Industries 35
Brahmi Impex 35
Brand Alloys 35
C
C. P. Re-rollers 35
Cochin Minerals & Rutiles 35
Cosmic Ferro Alloys 36
D
D S Group 36
Dove Marine Exports 36
E
Electrotherm India 36
Ennore Coke 36
Ennore Foundries 37
Register of New Projects in India 2007METALLURGICAL INDUSTRIES
Company-Wise
ContEntS
nEW PRoJECtS In InDIA 2007
Register of
M
Magna Electro Castings 44
Mahakalyani Steel & Mines 45
Mahindra Intertrade 45
Meherkiran Enterprises 45
Modern Foundry 45
Modern India Con-cast 46
Mukand 46
n
Nelcast 46
o
Orion Ispat 46
P
Padmavathi Ferrous 46
Pasupati Castings 47
Peekay Steel Casting 47
Pioneer Torsteel Mills 47
Pithampur Steels 48
POSCO India 48
Power Flow Copper 48
Prema Engineering 48
R
Raajaratna Metal 48
Raipur Alloys & Steel 49
Raipur Forgings & Castings 49
Rana Girders 49
Rashmi Metaliks 49
Rashmi Sponge Iron 50
Rathi Udyog 50
Real India Consultancy 50
Rashtriya Ispat Nigam 50
RMS Die Castings 50
Rohit Ferro Tech 51
Rosvar Iron & Power 51
Rosvar Steels 51
Rourkela Steel Plant 52
G
Gajanan Iron 37
Gajendra Agencies 38
Gandhikumar Foundry 38
Ghatge Patil industries 38
Golden Ispat Casting 38
Gontermann Peipers India 38
Grace Industries 39
Gujarat NRE Coke 39
Gupta Domestic Fuels 39
H
Hallmark Steel 39
Harihar Forgings 40
Hindalco Industries 40
HKT Mining 40
Hooghly Alloy & Steels 40
Hooghly Metcoke & Power 41
Hospet Steel 41
Hysco Steel India 41
I
Ispat Industries 41
J
Jagdamba Iron & Steel 42
Jai Raj Ispat 42
Janakiram Industries 42
Jewel Seamless 42
Jindal Steel & Power 43
JSW Steel Processing Centres 43
K
Kauntia Castings 43
Kudremukh Iron Ore Co 43
Kushal Chemicals 44
L
Lalbaba Seamless Tubes 44
Lalwani Ferro Alloys 44
Lloyds Steel Industries 44
Register of New Projects in India 2007METALLURGICAL INDUSTRIES
Company-Wise
ContEntS
nEW PRoJECtS In InDIA 2007
Register of
M
Magna Electro Castings 44
Mahakalyani Steel & Mines 45
Mahindra Intertrade 45
Meherkiran Enterprises 45
Modern Foundry 45
Modern India Con-cast 46
Mukand 46
n
Nelcast 46
o
Orion Ispat 46
P
Padmavathi Ferrous 46
Pasupati Castings 47
Peekay Steel Casting 47
Pioneer Torsteel Mills 47
Pithampur Steels 48
POSCO India 48
Power Flow Copper 48
Prema Engineering 48
R
Raajaratna Metal 48
Raipur Alloys & Steel 49
Raipur Forgings & Castings 49
Rana Girders 49
Rashmi Metaliks 49
Rashmi Sponge Iron 50
Rathi Udyog 50
Real India Consultancy 50
Rashtriya Ispat Nigam 50
RMS Die Castings 50
Rohit Ferro Tech 51
Rosvar Iron & Power 51
Rosvar Steels 51
Rourkela Steel Plant 52
G
Gajanan Iron 37
Gajendra Agencies 38
Gandhikumar Foundry 38
Ghatge Patil industries 38
Golden Ispat Casting 38
Gontermann Peipers India 38
Grace Industries 39
Gujarat NRE Coke 39
Gupta Domestic Fuels 39
H
Hallmark Steel 39
Harihar Forgings 40
Hindalco Industries 40
HKT Mining 40
Hooghly Alloy & Steels 40
Hooghly Metcoke & Power 41
Hospet Steel 41
Hysco Steel India 41
I
Ispat Industries 41
J
Jagdamba Iron & Steel 42
Jai Raj Ispat 42
Janakiram Industries 42
Jewel Seamless 42
Jindal Steel & Power 43
JSW Steel Processing Centres 43
K
Kauntia Castings 43
Kudremukh Iron Ore Co 43
Kushal Chemicals 44
L
Lalbaba Seamless Tubes 44
Lalwani Ferro Alloys 44
Lloyds Steel Industries 44
Register of New Projects in India 2007METALLURGICAL INDUSTRIES
Company-Wise
ContEntS
nEW PRoJECtS In InDIA 2007
Register of
S
SAIL 52
Sakthe Shell 53
Saurashtra Ferrous 53
Scan Steels 53
Shah Alloys 53
Shah Alloys 54
Shaifali Rolls 54
Shivalik Power & Steel 54
Shree Nakoda Ispat 54
Shriniwas Engineering 55
Southern Iron & Steel Co 55
Sri Venkateswara Coil Mills 55
Sri Vishnu Foundry 55
Steel Cast 56
Suguna Charitable Trust 56
Sunder Rolling Mills 56
Supreme Conductors 56
Surana Industries 57
t
Trivista Steel & Power 57
U
Uma Precision 57
Utkal Alumina International 57
V
Veer Gurjar Alluminium Industries 58
Venkateshwara Sponge & Iron 58
Vikas Metaliks & Energy 58
Vinayak Steels 58
Viraj Profiles 58
Visa Steel 59
Recently Commissioned Projects
A
AIA Engineering 61
B
B R Technocast 61
Bina Metal Way 61
F
FIE Spherotech 61
G
Gujarat Forgings 61
H
Harihar Alloy casting 62
L
Lakshmanveer Steel 62
M
Maks Industries 62
P
P.C. Sons Castings 62
Prakash Roadlines Corp 62
S
Seleno Steels 63
Shree Ram Sponge & Steel 63
Sunil Sponge Iron 63
V
Venkatesh Energy & Metals 63
Register of New Projects in India 2007METALLURGICAL INDUSTRIES
Company-Wise
ContEntS
nEW PRoJECtS In InDIA 2007
Register of
S
SAIL 52
Sakthe Shell 53
Saurashtra Ferrous 53
Scan Steels 53
Shah Alloys 53
Shah Alloys 54
Shaifali Rolls 54
Shivalik Power & Steel 54
Shree Nakoda Ispat 54
Shriniwas Engineering 55
Southern Iron & Steel Co 55
Sri Venkateswara Coil Mills 55
Sri Vishnu Foundry 55
Steel Cast 56
Suguna Charitable Trust 56
Sunder Rolling Mills 56
Supreme Conductors 56
Surana Industries 57
t
Trivista Steel & Power 57
U
Uma Precision 57
Utkal Alumina International 57
V
Veer Gurjar Alluminium Industries 58
Venkateshwara Sponge & Iron 58
Vikas Metaliks & Energy 58
Vinayak Steels 58
Viraj Profiles 58
Visa Steel 59
Recently Commissioned Projects
A
AIA Engineering 61
B
B R Technocast 61
Bina Metal Way 61
F
FIE Spherotech 61
G
Gujarat Forgings 61
H
Harihar Alloy casting 62
L
Lakshmanveer Steel 62
M
Maks Industries 62
P
P.C. Sons Castings 62
Prakash Roadlines Corp 62
S
Seleno Steels 63
Shree Ram Sponge & Steel 63
Sunil Sponge Iron 63
V
Venkatesh Energy & Metals 63
PRojeCtS IN PlaNNINg Stage
AdhUnIk CorP is to set up a 500,000 tpa sponge iron plant and a 25 MW CPP at jamshedpur in east Singhbhum district of jharkhand. the steel complex envisages an investment of Rs.4,000 million to be funded through term loan from banks & internal accruals. Consultants & equipment suppliers are yet to be finalized. As of May 2007, clearances were awaited. The civil work was expected to begin after obtaining the clearances.
ß AdhunikCorpLtd,14,NetajiSubhasRoad,Kolkata700001,WestBengal.&033-22313741.(Mr.D.Dutta,Gen.Mgr.)
AdItyA AlUmInA, a subsidiary of Hindalco Industries is to set up a 1.5 million tpa alumina refinery and 3,25,000 tpa aluminium plant in Orissa. As of March 2007, the company had obtained in-principle approval and was in the process of acquiring land. Plans are also on the anvil to set up another 1.5 million tpa alumina plant at Utkal in orissa. the project entails an investment of Rs.110,000 million. The project is to be implemented in joint venture with Alcan, Canada. the scheme also includes setting up of 260,000 tpa aluminium smelter and 650 MW captive power plant besides development of 3 million tonnes bauxite mine.
ß AdityaAlumina,C/o.HindalcoIndustriesLtd,CenturyBhavan,3rdFloor, Dr.AnnieBesantRoad,Worli,Mumbai400025,Maharashtra.& 022-66626666.Fax:24362516/24227586.
AdItyA PIg Iron is planning to set up a 200 tpd pig iron unit at Hirekasana Kandi in Koppal district of Karnataka. The plant envisages an investment of Rs.300 million, to be funded through banks & internal accruals. Mr. Patwari, Bellary has been appointed as the project consultant. As of March 2007, the project was awaiting for statutory clearances. Work on the project is expected to begin after obtaining the clearances and targeted for completion by end of fiscal 2007–08.
ß AdithyaPigironIndiaPvtLtd,BharathiNagar,Ganapati,Coimbatore641006,TamilNadu.& 0422-2510266.Fax:2513866.(Mr.Gurusamy,Gen.Mgr.)
AgnI SteelS is planning to double the capacity of sponge iron at its existing Ingur facility in erode district of tN. the project is to raise the capacity from 100 tpd to 200 tpd at a cost of Rs.1,200 million. EICS, Bilaspur has been appointed as the project consultant. As of April 2007, work on the project was expected to begin shortly and is scheduled for completion by early 2008.
ß AgniSteelsPvtLtd,TeachersColony,Erode638011,TamilNadu.& 0424-2266682.ß Engineering&IndustrialConsultancyServices,1stFloor,DoorNo.103–106,OmResidency, RingRoad2,Bilaspur495001,Chhattisgarh.& 07752-500212/518257.Fax:500941.
AkShAy ISPAt Udyog is planning to set up a 300 tpd to 400 tpd sponge iron unit in two phases at Rajnandgaon district of Chhattisgarh. the project also includes setting up of a rolling mill and a 8 MW WHR based Captive Power Plant. The project entails a cumulative investment of Rs.1,150 million. The phase I includes setting of sponge Iron unit with a capacity of 150 tpd to 200 tpd while in phase II the capacity of the sponge iron is to be doubled along with a rolling mill and a 8 MW WHR based CPP. The company’s in-house team
AdhUnIk CorP
1.
2.
3.
4.
5.
register ofneW ProJeCtS In IndIA 2007
1
AdhUnIk CorP is to set up a 500,000 tpa sponge iron plant and a 25 MW CPP at jamshedpur in east Singhbhum district of jharkhand. the steel complex envisages an investment of Rs.4,000 million to be funded through term loan from banks & internal accruals. Consultants & equipment suppliers are yet to be finalized. As of May 2007, clearances were awaited. The civil work was expected to begin after obtaining the clearances.
ß AdhunikCorpLtd,14,NetajiSubhasRoad,Kolkata700001,WestBengal.&033-22313741.(Mr.D.Dutta,Gen.Mgr.)
AdItyA AlUmInA, a subsidiary of Hindalco Industries is to set up a 1.5 million tpa alumina refinery and 3,25,000 tpa aluminium plant in Orissa. As of March 2007, the company had obtained in-principle approval and was in the process of acquiring land. Plans are also on the anvil to set up another 1.5 million tpa alumina plant at Utkal in orissa. the project entails an investment of Rs.110,000 million. The project is to be implemented in joint venture with Alcan, Canada. the scheme also includes setting up of 260,000 tpa aluminium smelter and 650 MW captive power plant besides development of 3 million tonnes bauxite mine.
ß AdityaAlumina,C/o.HindalcoIndustriesLtd,CenturyBhavan,3rdFloor, Dr.AnnieBesantRoad,Worli,Mumbai400025,Maharashtra.& 022-66626666.Fax:24362516/24227586.
AdItyA PIg Iron is planning to set up a 200 tpd pig iron unit at Hirekasana Kandi in Koppal district of Karnataka. The plant envisages an investment of Rs.300 million, to be funded through banks & internal accruals. Mr. Patwari, Bellary has been appointed as the project consultant. As of March 2007, the project was awaiting for statutory clearances. Work on the project is expected to begin after obtaining the clearances and targeted for completion by end of fiscal 2007–08.
ß AdithyaPigironIndiaPvtLtd,BharathiNagar,Ganapati,Coimbatore641006,TamilNadu.& 0422-2510266.Fax:2513866.(Mr.Gurusamy,Gen.Mgr.)
AgnI SteelS is planning to double the capacity of sponge iron at its existing Ingur facility in erode district of tN. the project is to raise the capacity from 100 tpd to 200 tpd at a cost of Rs.1,200 million. EICS, Bilaspur has been appointed as the project consultant. As of April 2007, work on the project was expected to begin shortly and is scheduled for completion by early 2008.
ß AgniSteelsPvtLtd,TeachersColony,Erode638011,TamilNadu.& 0424-2266682.ß Engineering&IndustrialConsultancyServices,1stFloor,DoorNo.103–106,OmResidency, RingRoad2,Bilaspur495001,Chhattisgarh.& 07752-500212/518257.Fax:500941.
AkShAy ISPAt Udyog is planning to set up a 300 tpd to 400 tpd sponge iron unit in two phases at Rajnandgaon district of Chhattisgarh. the project also includes setting up of a rolling mill and a 8 MW WHR based Captive Power Plant. The project entails a cumulative investment of Rs.1,150 million. The phase I includes setting of sponge Iron unit with a capacity of 150 tpd to 200 tpd while in phase II the capacity of the sponge iron is to be doubled along with a rolling mill and a 8 MW WHR based CPP. The company’s in-house team
AdhUnIk CorP
1.
2.
3.
4.
5.
register ofneW ProJeCtS In IndIA 2007
2
is rendering consultancy services and the equipment suppliers are to be finalised. As of April 2007, the proposal was in a preliminary stage. Phase I programme is expected to begin by July 2007 and is scheduled to be completed in 10 months thereafter.
ß AkshayIspatUdyog,C/o.AkshayinvestmentsPvtLtd,A-3,FaristaComplex,GERoad, Raipur492001,Chhattisgarh.& 0771-2233493.Fax:2282134.
AnIndItA trAderS & InVeStS is to set up a 120,000 tpa tMt bars unit at its existing Ramgarh steel plant in Hazaribagh district of Jharkhand. The scheme also includes setting up of a 200,000 tpa pig iron unit. The project will entail a cumulative investment of Rs.3,850 million to be funded through banks & internal accruals. Popuri engineering, Hyderabad is the project consultant & V. K. engineering, Mumbai is the major equipment supplier. as of May 2007, clearances had been obtained and the civil works were yet to begin. The project is slated for completion in 12 months.
ß AninditaTraders&InvestsLtd,Vikasbhawan,BariatuRoad,Ranchi834008,Jharkhand.& 0651-2541327.Fax:2541845.(Mr.Nath,Gen.Mgr.-Proj.)ß PopuriEngineering&ConsultancyServicesPvtLtd,12-2-460,NewHUDALayout, Gudimalkapur,Opp.AnushaHospital,Mehdipatnam,Hyderabad500028,AndhraPradesh.& 040-23510649/23510777/23510811/23510844.ß V.K.EngineeringWorks,128,NagindasMasterRoad,Fort,Mumbai400023,Maharashtra.&022-22674312/22674345.(MrJ.Lakhani,Partner.)
ArCelor mIttAl is planning to set up an integrated steel plant with a capacity of 12 million tpa in Keonjhar district of Orissa. The project is to be implemented in two phases each with a capacity of 6 million tpa. the project entails an estimated investment of Rs.400,000 million. As of March 2007, the company had signed an MoU with the state government.The phase I programme is slated for commissioning in 48 months from the date of submission of DPR while the subsequent phase in the next 54 months thereafter.
ß ArcelorMittal,C/o.Arcelor,19,AvenuedelaLiberte,L-2930,Luxembourg.& 3524792-1.Fax:+35247922675.ß IndianOperations:ArcelorNeelTailoredBlanksPvtLtd,PaceCity-11,Sector- 36, Gurgaon,Haryana.& 0124-2210943.
AreeS Iron & Steel is planning to set up a 2.5 million tpa steel plant at Basapur in Koppal district of Karnataka. The project is to be implemented in two phases. The phase I of the programme will have a capacity of 1 million tpa at an investment of Rs.30,000 million. the company is likely to source funds through equity and internal accruals. Mecon has been appointed as the project consultant. As of March 2007, the company was in the process of acquiring land. Work on the project was expected to begin in the next 3 months and scheduled to be completed by june 2009.
ß AreesIron&SteelLtd,BaldotaEnclave,AbheRaj,BaldotaRoad,Hospet,Bellary, Karnataka.& 08394-232002.Fax:232333.ß MeconLtd,89,SouthEndRoad,Basavanagudi,Bangalore560004,Karnataka.& 080-26576442.Fax:26576352.
AnIndItA trAderS & InVeStS
6.
7.
8.
AtIbIr IndUStrIeS is to set up a 2,50,000 tpa pig iron unit at its existing Manjhiladhi facility in giridih district of jharkhand. the unit entails an investment of Rs.1,500 million to be funded through banks & internal accruals. The company was yet to secure loan from banks. As of May 2007, work on the project was to commence. The unit is slated for completion by the end of 2007.
ß AtibirIndustriesCoLtd,Manjhiladhi,Giridih,Jharkhand.& 06532-229222.to24.(Mr.SandeepSarogi,Dir.)
bAJAJ eleCtrICAlS is planning an expansion programme at its existing steel galvanising plant at Ranjangoan in Pune district of Maharashtra. the capacity is to be increased from 30,000 tpa to 50,000 tpa. As of March 2007, the company was yet to finalise the equipment suppliers. The work on the project is expected to begin by fiscal 2007–08.
ß BajajElectricalsLtd,15/17,SantSatvaMarg,RaeyRoad,Mumbai400010,Maharashtra.& 022-23725168/23724192.ß Plt:B-7,MIDCRanjangaon,Pune412209,Maharashtra.& 02138-232061/232062.
bAlmUkUnd SPonge & Iron is to expand its integrated steel plant in giridih district of Jharkhand. The expansion includes setting up of a ferro alloy, pig iron & CPP. The project will entail an investment of Rs.400 million to be funded through term loan from banks and internal accruals. Mecon, Ranchi is the project consultant and Inductotherm India, ahmedabad is the equipment supplier. As of May 2007, the company had applied for loan from various banks. Work on the project is expected to begin in August 2007 and slated for completion in two years thereafter.
ß BalmukundSponge&IronLtd,BajrangChowk,Giridih,815301,Jharkhand.& 06532-225954.Fax:225262(Mr.Rohit,Mgr.-Fin.)ß MeconLtd,P.O.Doranda,Ranchi834002,Jharkhand.& 0651-2480216.Fax:2482214.ß InductothermIndiaPvtLtd,ShriKishorebhaiD.VyasBuilding,Bopal, Ahmedabad380058,Gujarat.& 02717-231961.(8lines).Fax:231266.
bASAI SteelS is to set up an integrated steel plant at Sidiginahola Village in Bellary district of Karnataka. The integrated steel complex will comprise 700 tpd sponge iron unit, 250,000 tpa rolling mill, 50 MW WHR based captive power plant, 1000 tpd pelletisation plant, 30 tonnes induction furnace, 200 cu.mtr mini blast furnace and a electric arc furnace. the entire project is estimated to cost Rs.5,000 million. EICS, Bilaspur and Korus Engineering Solutions, New Delhi has been appointed as the project consultants. As of March 2007, the company had obtained clearance up to Rs.500 million and was to obtain further clearances for higher investment from the statutory bodies. Meanwhile, the company was to begin work for the first kiln by April onwards and expected to complete by December 2007.
ß BasaiSteelsPvtLtd,No.A-23/5&6,BalanagarIndlArea,Hyderabad500037,AndhraPradesh.& 040-23774178/23776265.Fax:23774180.(Mr.T.S.Davay,Gen.Mgr.)ß Plt:No.52,AjayVilla,BadrinarayanTempleStreet,NearGandhiNagarMarket,
AtIbIr IndUStrIeS
9.
10.
11.
12.
register ofneW ProJeCtS In IndIA 2007
3
is rendering consultancy services and the equipment suppliers are to be finalised. As of April 2007, the proposal was in a preliminary stage. Phase I programme is expected to begin by July 2007 and is scheduled to be completed in 10 months thereafter.
ß AkshayIspatUdyog,C/o.AkshayinvestmentsPvtLtd,A-3,FaristaComplex,GERoad, Raipur492001,Chhattisgarh.& 0771-2233493.Fax:2282134.
AnIndItA trAderS & InVeStS is to set up a 120,000 tpa tMt bars unit at its existing Ramgarh steel plant in Hazaribagh district of Jharkhand. The scheme also includes setting up of a 200,000 tpa pig iron unit. The project will entail a cumulative investment of Rs.3,850 million to be funded through banks & internal accruals. Popuri engineering, Hyderabad is the project consultant & V. K. engineering, Mumbai is the major equipment supplier. as of May 2007, clearances had been obtained and the civil works were yet to begin. The project is slated for completion in 12 months.
ß AninditaTraders&InvestsLtd,Vikasbhawan,BariatuRoad,Ranchi834008,Jharkhand.& 0651-2541327.Fax:2541845.(Mr.Nath,Gen.Mgr.-Proj.)ß PopuriEngineering&ConsultancyServicesPvtLtd,12-2-460,NewHUDALayout, Gudimalkapur,Opp.AnushaHospital,Mehdipatnam,Hyderabad500028,AndhraPradesh.& 040-23510649/23510777/23510811/23510844.ß V.K.EngineeringWorks,128,NagindasMasterRoad,Fort,Mumbai400023,Maharashtra.&022-22674312/22674345.(MrJ.Lakhani,Partner.)
ArCelor mIttAl is planning to set up an integrated steel plant with a capacity of 12 million tpa in Keonjhar district of Orissa. The project is to be implemented in two phases each with a capacity of 6 million tpa. the project entails an estimated investment of Rs.400,000 million. As of March 2007, the company had signed an MoU with the state government.The phase I programme is slated for commissioning in 48 months from the date of submission of DPR while the subsequent phase in the next 54 months thereafter.
ß ArcelorMittal,C/o.Arcelor,19,AvenuedelaLiberte,L-2930,Luxembourg.& 3524792-1.Fax:+35247922675.ß IndianOperations:ArcelorNeelTailoredBlanksPvtLtd,PaceCity-11,Sector- 36, Gurgaon,Haryana.& 0124-2210943.
AreeS Iron & Steel is planning to set up a 2.5 million tpa steel plant at Basapur in Koppal district of Karnataka. The project is to be implemented in two phases. The phase I of the programme will have a capacity of 1 million tpa at an investment of Rs.30,000 million. the company is likely to source funds through equity and internal accruals. Mecon has been appointed as the project consultant. As of March 2007, the company was in the process of acquiring land. Work on the project was expected to begin in the next 3 months and scheduled to be completed by june 2009.
ß AreesIron&SteelLtd,BaldotaEnclave,AbheRaj,BaldotaRoad,Hospet,Bellary, Karnataka.& 08394-232002.Fax:232333.ß MeconLtd,89,SouthEndRoad,Basavanagudi,Bangalore560004,Karnataka.& 080-26576442.Fax:26576352.
AnIndItA trAderS & InVeStS
6.
7.
8.
AtIbIr IndUStrIeS is to set up a 2,50,000 tpa pig iron unit at its existing Manjhiladhi facility in giridih district of jharkhand. the unit entails an investment of Rs.1,500 million to be funded through banks & internal accruals. The company was yet to secure loan from banks. As of May 2007, work on the project was to commence. The unit is slated for completion by the end of 2007.
ß AtibirIndustriesCoLtd,Manjhiladhi,Giridih,Jharkhand.& 06532-229222.to24.(Mr.SandeepSarogi,Dir.)
bAJAJ eleCtrICAlS is planning an expansion programme at its existing steel galvanising plant at Ranjangoan in Pune district of Maharashtra. the capacity is to be increased from 30,000 tpa to 50,000 tpa. As of March 2007, the company was yet to finalise the equipment suppliers. The work on the project is expected to begin by fiscal 2007–08.
ß BajajElectricalsLtd,15/17,SantSatvaMarg,RaeyRoad,Mumbai400010,Maharashtra.& 022-23725168/23724192.ß Plt:B-7,MIDCRanjangaon,Pune412209,Maharashtra.& 02138-232061/232062.
bAlmUkUnd SPonge & Iron is to expand its integrated steel plant in giridih district of Jharkhand. The expansion includes setting up of a ferro alloy, pig iron & CPP. The project will entail an investment of Rs.400 million to be funded through term loan from banks and internal accruals. Mecon, Ranchi is the project consultant and Inductotherm India, ahmedabad is the equipment supplier. As of May 2007, the company had applied for loan from various banks. Work on the project is expected to begin in August 2007 and slated for completion in two years thereafter.
ß BalmukundSponge&IronLtd,BajrangChowk,Giridih,815301,Jharkhand.& 06532-225954.Fax:225262(Mr.Rohit,Mgr.-Fin.)ß MeconLtd,P.O.Doranda,Ranchi834002,Jharkhand.& 0651-2480216.Fax:2482214.ß InductothermIndiaPvtLtd,ShriKishorebhaiD.VyasBuilding,Bopal, Ahmedabad380058,Gujarat.& 02717-231961.(8lines).Fax:231266.
bASAI SteelS is to set up an integrated steel plant at Sidiginahola Village in Bellary district of Karnataka. The integrated steel complex will comprise 700 tpd sponge iron unit, 250,000 tpa rolling mill, 50 MW WHR based captive power plant, 1000 tpd pelletisation plant, 30 tonnes induction furnace, 200 cu.mtr mini blast furnace and a electric arc furnace. the entire project is estimated to cost Rs.5,000 million. EICS, Bilaspur and Korus Engineering Solutions, New Delhi has been appointed as the project consultants. As of March 2007, the company had obtained clearance up to Rs.500 million and was to obtain further clearances for higher investment from the statutory bodies. Meanwhile, the company was to begin work for the first kiln by April onwards and expected to complete by December 2007.
ß BasaiSteelsPvtLtd,No.A-23/5&6,BalanagarIndlArea,Hyderabad500037,AndhraPradesh.& 040-23774178/23776265.Fax:23774180.(Mr.T.S.Davay,Gen.Mgr.)ß Plt:No.52,AjayVilla,BadrinarayanTempleStreet,NearGandhiNagarMarket,
AtIbIr IndUStrIeS
9.
10.
11.
12.
register ofneW ProJeCtS In IndIA 2007
4
Bellary583103,Karnataka.& 09880381471.ß KorusEngineeringSolutionsPvtLtd,400,4thFloor,NetajiSubhashITLTwinTower,New Delhi110088,Delhi.& 011-27190630/27190631.ß Engineering&IndustrialConsultancyServices,1stFloor,DoorNo.103–106,OMResidency, RingRoad2,Bilaspur495001,Chhattisgarh.ß 07752-500212/518257.Fax:500941.
benAkA SPonge Iron is to implement an expansion for sponge iron at its existing Belagala facility in Bellary district of Karnataka. The expansion is to double the capacity from 100 tpd to 200 tpd. The project will entail a cost of Rs.200 million to be funded through bank loans & internal accruals. Bellary Engineering & Consultants Services, Bellary is the project consultant. Hari Machines, Orissa is the equipment supplier. As of May 2007, clearances were awaited and land acquisition was under progress.
ß BenakaSpongeIronPvtLtd,SriGanesha,Opp.GandhiNagarMarket,GandhiNagar, Bellary,Karnataka.& 08392-254000/254700.Fax:257100.(Mr.C.S.Ramesh,Admin.Mgr.)ß HariMachinesLtd,Rajgangpur,Sundergarh770017,Orissa.& 06624-220141/220161.Fax:220151.
bhArAt AlUmInIUm is poised to begin an expansion programme for hot rolled coils production at Korba in Chhattisgarh. the capacity is to be expanded from 24,000 tpa to 52,000 tpa. the programme envisages an investment of Rs.1,000 million. Cecon, Chennai is the major equipment supplier. As of April 2007, clearances have been obtained and the civil works is to begin shortly. The expansion is slated for completion in 6 months from zero date.
ß BharatAluminiumCoLtd,BalcoNagar,Korba495684,Chhatisgarh.& 07759-242047.Fax:241286.(Mr.Balakrishnan,Gen.Mgr.-Fabrications.)ß CeconLtd,1130,1stblock,6thAvenue,AnnaNagar,Chennai600040,TamilNadu.& 044-26184586.
bhUShAn PoWer & Steel is to set up a 3 million tpa long steel production unit and a 900 MW coal based CPP at Potca circle near jamshedpur in east Singbhum district of jharkhand. the project entails a cumulative cost of Rs.105,000 million. Mecon, Ranchi is the project consultant and the equipment suppliers are being finalised. As of May 2007, land acquisition was under progress. The project is expected to be operational in 3 years from zero date.
ß BhushanPowerandSteelLtd,4thFloor,TolstoyHouse,K17TolstoyMarg,CannoughtPlace, NewDelhi110001,Delhi.& 011-23712737.Fax:23712737.(Mr.RajeshSharma,Gen.Mgr.)ß MeconLtd,Doranda,Ranchi834002,Jharkhand.& 0651-2480002/2481451.Fax:2482214/2482189.
bhUShAn PoWer & Steel has drawn up plans to set up an integrated steel plant in Chhattisgarh. The project includes setting up of a 1.2 million tpa DRI unit, a 4,20,000 tpa rolled products unit, a 1,80,000 tpa wire drawing unit, a 1,20,000 tpa galvanised wire, a 1,20,000 tpa steel casting unit, a 60,000 tpa forging unit, a 1,20,000 tpa alloy steel / stainless
benAkA SPonge Iron
13.
14.
15.
16.
steel / bright bar unit, a 1,80,000 seamless pipe unit, a 300 MW captive power plant and a 500,000 tpa slag cement unit. the project envisages an estimated investment of Rs.55,000 million. As of May 2007, an MoU had been signed between the company and the Chhattisgarh government.
ß BhushanPowerandSteelLtd,4thFloor,TolstoyHouse,15-17TolstoyMarg,CannoughtPlace, NewDelhi110001,Delhi.& 011-30451000.Fax:23712737.
bIlASrAIkA Steel is to set up a 250 tpd pig iron and 300 tpd iron ore pelletisation plant at Kunikeri in Koppal district of Karnataka. the project envisages a cumulative investment of Rs.245 million. Consultants and equipment suppliers are yet to be finalized. As of April 2007, all statutory clearances were awaited. The project is slated for completion in 6 months from zero date.
ß BilasraikaSteelPvtLtd,No.21-2-11,Pathergatti,Hyderabad500002.AndhraPradesh.& 040-24578067.Fax:24578466.(Mr.BilasRoy,Dir.)
bmW IndUStrIeS is to set up a 500,000 tpa semi-finished steel plant at Bokaro in Jharkhand. The project includes setting up of a direct reduced iron (DRI), pig iron and billets at a cumulative investment of Rs.2,000 million. Mecon, Ranchi has been appointed as the project consultant. Equipment suppliers to be finalized and the company was yet to secure loan from banks. As of May 2007, the project details preparation work was under progress and clearances were awaited. The plant is slated for completion in 8 months.
ß BMWIndustriesLtd,12/2,ParkMansion,57AParkStreet,Kolkata700016,WestBengal.& 033-22295631.(Mr.T.K.Datta,Dir.)ß MeconLtd,Doranda,Ranchi834002,Jharkhand.& 0651-2480002/2481451.Fax:2482214/2482189.
brAhmA Iron & PoWer is to set up an integrated steel plant in phases at Devli in Saraikela Kharsawan district of Jharkand. The plant include a 100,000 tpa sponge iron, a rolling mill & a 15 MW multi-fuel based (WHR & coal) CPP. The project will entail a cumulative investment of Rs.1,000 million to be funded through banks & internal accruals. Phase I programme envisages setting up of a sponge iron unit. Negotiation were underway with Popuri Engineering, Hyderabad for consultancy services while equipment suppliers were yet to be finalized. As of April 2007, land acquisition was under way. Civil work is to begin by August 2007. The phase I programme is scheduled for completion in 12 months.
ß BrahmaIron&PowerPvtLtd,SikariaComplex,4thFloor,S.J.Road,Athgaon, Kamrup781001,Assam.& 0361-2547154.Fax:2511041.(Mr.SushilAgarwal,Gen.Mgr.-Commercial.)ß PopuriEngineering&ConsultancyServicesPvtLtd,12-2-460,NewHUDALayout, Gudimalkapur,Opp.AnushaHospital,Mehdipatnam,Hyderabad500028,AndhraPradesh.& 040-23510649/23510777/23510811/23510844.
brAkeS AUto IndIA plans to set up a 25,000 tpa steel casting and forging unit in Chennai and in Kolkata. An investment of Rs.668.7 million is envisaged to be funded through loan from banks & internal accruals. Yellow Consultants from Mumbai is the consultant and the company
bIlASrAIkA Steel
17.
18.
19.
20.
register ofneW ProJeCtS In IndIA 2007
5
Bellary583103,Karnataka.& 09880381471.ß KorusEngineeringSolutionsPvtLtd,400,4thFloor,NetajiSubhashITLTwinTower,New Delhi110088,Delhi.& 011-27190630/27190631.ß Engineering&IndustrialConsultancyServices,1stFloor,DoorNo.103–106,OMResidency, RingRoad2,Bilaspur495001,Chhattisgarh.ß 07752-500212/518257.Fax:500941.
benAkA SPonge Iron is to implement an expansion for sponge iron at its existing Belagala facility in Bellary district of Karnataka. The expansion is to double the capacity from 100 tpd to 200 tpd. The project will entail a cost of Rs.200 million to be funded through bank loans & internal accruals. Bellary Engineering & Consultants Services, Bellary is the project consultant. Hari Machines, Orissa is the equipment supplier. As of May 2007, clearances were awaited and land acquisition was under progress.
ß BenakaSpongeIronPvtLtd,SriGanesha,Opp.GandhiNagarMarket,GandhiNagar, Bellary,Karnataka.& 08392-254000/254700.Fax:257100.(Mr.C.S.Ramesh,Admin.Mgr.)ß HariMachinesLtd,Rajgangpur,Sundergarh770017,Orissa.& 06624-220141/220161.Fax:220151.
bhArAt AlUmInIUm is poised to begin an expansion programme for hot rolled coils production at Korba in Chhattisgarh. the capacity is to be expanded from 24,000 tpa to 52,000 tpa. the programme envisages an investment of Rs.1,000 million. Cecon, Chennai is the major equipment supplier. As of April 2007, clearances have been obtained and the civil works is to begin shortly. The expansion is slated for completion in 6 months from zero date.
ß BharatAluminiumCoLtd,BalcoNagar,Korba495684,Chhatisgarh.& 07759-242047.Fax:241286.(Mr.Balakrishnan,Gen.Mgr.-Fabrications.)ß CeconLtd,1130,1stblock,6thAvenue,AnnaNagar,Chennai600040,TamilNadu.& 044-26184586.
bhUShAn PoWer & Steel is to set up a 3 million tpa long steel production unit and a 900 MW coal based CPP at Potca circle near jamshedpur in east Singbhum district of jharkhand. the project entails a cumulative cost of Rs.105,000 million. Mecon, Ranchi is the project consultant and the equipment suppliers are being finalised. As of May 2007, land acquisition was under progress. The project is expected to be operational in 3 years from zero date.
ß BhushanPowerandSteelLtd,4thFloor,TolstoyHouse,K17TolstoyMarg,CannoughtPlace, NewDelhi110001,Delhi.& 011-23712737.Fax:23712737.(Mr.RajeshSharma,Gen.Mgr.)ß MeconLtd,Doranda,Ranchi834002,Jharkhand.& 0651-2480002/2481451.Fax:2482214/2482189.
bhUShAn PoWer & Steel has drawn up plans to set up an integrated steel plant in Chhattisgarh. The project includes setting up of a 1.2 million tpa DRI unit, a 4,20,000 tpa rolled products unit, a 1,80,000 tpa wire drawing unit, a 1,20,000 tpa galvanised wire, a 1,20,000 tpa steel casting unit, a 60,000 tpa forging unit, a 1,20,000 tpa alloy steel / stainless
benAkA SPonge Iron
13.
14.
15.
16.
steel / bright bar unit, a 1,80,000 seamless pipe unit, a 300 MW captive power plant and a 500,000 tpa slag cement unit. the project envisages an estimated investment of Rs.55,000 million. As of May 2007, an MoU had been signed between the company and the Chhattisgarh government.
ß BhushanPowerandSteelLtd,4thFloor,TolstoyHouse,15-17TolstoyMarg,CannoughtPlace, NewDelhi110001,Delhi.& 011-30451000.Fax:23712737.
bIlASrAIkA Steel is to set up a 250 tpd pig iron and 300 tpd iron ore pelletisation plant at Kunikeri in Koppal district of Karnataka. the project envisages a cumulative investment of Rs.245 million. Consultants and equipment suppliers are yet to be finalized. As of April 2007, all statutory clearances were awaited. The project is slated for completion in 6 months from zero date.
ß BilasraikaSteelPvtLtd,No.21-2-11,Pathergatti,Hyderabad500002.AndhraPradesh.& 040-24578067.Fax:24578466.(Mr.BilasRoy,Dir.)
bmW IndUStrIeS is to set up a 500,000 tpa semi-finished steel plant at Bokaro in Jharkhand. The project includes setting up of a direct reduced iron (DRI), pig iron and billets at a cumulative investment of Rs.2,000 million. Mecon, Ranchi has been appointed as the project consultant. Equipment suppliers to be finalized and the company was yet to secure loan from banks. As of May 2007, the project details preparation work was under progress and clearances were awaited. The plant is slated for completion in 8 months.
ß BMWIndustriesLtd,12/2,ParkMansion,57AParkStreet,Kolkata700016,WestBengal.& 033-22295631.(Mr.T.K.Datta,Dir.)ß MeconLtd,Doranda,Ranchi834002,Jharkhand.& 0651-2480002/2481451.Fax:2482214/2482189.
brAhmA Iron & PoWer is to set up an integrated steel plant in phases at Devli in Saraikela Kharsawan district of Jharkand. The plant include a 100,000 tpa sponge iron, a rolling mill & a 15 MW multi-fuel based (WHR & coal) CPP. The project will entail a cumulative investment of Rs.1,000 million to be funded through banks & internal accruals. Phase I programme envisages setting up of a sponge iron unit. Negotiation were underway with Popuri Engineering, Hyderabad for consultancy services while equipment suppliers were yet to be finalized. As of April 2007, land acquisition was under way. Civil work is to begin by August 2007. The phase I programme is scheduled for completion in 12 months.
ß BrahmaIron&PowerPvtLtd,SikariaComplex,4thFloor,S.J.Road,Athgaon, Kamrup781001,Assam.& 0361-2547154.Fax:2511041.(Mr.SushilAgarwal,Gen.Mgr.-Commercial.)ß PopuriEngineering&ConsultancyServicesPvtLtd,12-2-460,NewHUDALayout, Gudimalkapur,Opp.AnushaHospital,Mehdipatnam,Hyderabad500028,AndhraPradesh.& 040-23510649/23510777/23510811/23510844.
brAkeS AUto IndIA plans to set up a 25,000 tpa steel casting and forging unit in Chennai and in Kolkata. An investment of Rs.668.7 million is envisaged to be funded through loan from banks & internal accruals. Yellow Consultants from Mumbai is the consultant and the company
bIlASrAIkA Steel
17.
18.
19.
20.
register ofneW ProJeCtS In IndIA 2007
6
was in the process of appointing equipment suppliers. As of April 2007, land acquisition was under progress. The project is expected to be completed in 7 months.
ß BrakesAutoIndiaLtd,1011,EmbassyCentre,NarimanPoint,Mumbai400021,Maharashtra.& 022-22823367.Fax:22832445. bUrAkIA Steel AlloyS is to overhaul the existing steel alloy unit at athgoan in Kamrup district of Assam. The project is estimated to cost Rs.3 million to be funded through internal accruals. Megatherm, Kolkata is to supply the equipment. As of May 2007, clearances were awaited and work on the programme was expected to begin in June. The project is to be completion by September 2007.
ß BurakiaSteelAlloysPvtLtd,B-10,PanchratanApartment,S.J.Road,Athgoan,Kamrup, Guwahati781001,Assam.& 0361-251727.
CAStIngS & AllIed IndUStrIeS is planning to relocate its 100 tpm cast iron and alloy castings unit at Vellamadai from Periannayakanpalayam in Coimbatore district of tN. the relocation entails an investment of Rs.2 million to be funded through banks. as of March 2007, civil work were to begin shortly. The programme is scheduled to be completed by May 2008.
ß Castings&AlliedIndustries,12/634G,MTPRoad,Periannayakanpalayam, Coimbatore641020,TamilNadu.& 0422-2696413/2692724.
ChAIbASA Steel is planning to set up a 400,000 tpa sponge iron plant at Chaibasa in West Singhbhum district of Jharkhand. The project entails an investment of Rs.750 million. As of May 2007, land had been acquired and allotment of captive mine was awaited. Work on the project was expected to commence soon after the allotment of captive mine. Plans are also on the anvil to set up a CPP in the upcoming project.
ßChaibasaSteelsPvtLtd,7/398,GandhiTola,Chaibasa,WestSinghbhum833201,Jharkhand.& 06582-258460/258461.(Mr.I.C.Bihani,Gen.Mgr.-Proj.)
ChAmAn metAllICS has embarked an expansion programme at its existing tadali unit in Chandrapur district of Maharashtra. the programme entails to increase the capacity of iron ore pelletisation. As of May 2007, the proposal was in a nascent stage and the project details yet to be finalise.
ß ChamanMetallicsPvtLtd,16/S,Block-A,NewAlipore,Kolkata700053,WestBengal.& 033-24570038/24573940.
ChAmbAl AlUmS has announced plans to set up a 6,000 tpa copper metal production unit at loget gate in Kathua district of j&K. the company is likely to invest Rs.400 million. the project cost to be met through term loan from banks & internal accruals. As of March 2007, the project was awaiting for statutory clearances and negotiations were underway with banks. the project is scheduled to be completed in 12 months.
ß ChambalAlumsPvtLtd,38,ShoppingCentre,Kota324007,Rajasthan.& Tel:0744-2361530.(Mr.R.Agarwal,Dir.)
bUrAkIA Steel AlloyS
21.
22.
23.
24.
25.
ChhAttISgArh eleCtrICIty is to set up a 100,000 tpa ferro alloys unit and a 60 MW CPP at Dahej in Bharuch district of Gujarat. The project entails a cumulative investment of Rs.3,000 million, to be funded through banks & internal accruals. As of March 2007, land was being acquired and statutory clearances were awaited. The project is scheduled for completion in 12 months.
ß ChhattisgarhElectricityCoLtd,SiltaraIndlArea,Raipur493111,Chhattisgarh.& 07721-264209.Fax:264213.(Mr.AshishGupta,Mgr.-Corp.)
ChhAttISgArh eleCtrICIty is to set up a 600,000 tpa iron ore pelletisation plant at Mandhar in Raipur district of Chhattisgarh. the project envisages an investment of Rs.1,250 million to be funded through banks & internal accruals. Consultancy for the project is to be rendered by an in-house team. equipments are being imported from China. as of april 2007, the clearances had been obtained and site development work was under progress. The project is slated for completion in one year from now.
ß ChhattisgarhElectricityCoLtd,IndustrialGrowthCentre,Siltara,Raipur493111,Chhattisgarh.& 07721-264209.Fax:264213.(Mr.AshishGupta,Mgr.-Corp.)
CmS ConSUltAntS is to set up a 1,000 tpa foundry for near Pollachi in Coimbatore district of TN. The unit will manufacture steel, alloy & wear resistant castings and will entail an investment of Rs.15 million. Mr. Ramesh, Chennai is the civil contractor. DRI Cast, New Zealand & Met Cast India, Howrah are the equipment suppliers. As of April 2007, statutory clearances were awaited. The plant is slated for completion in 6 months from zero date.
ß CMSConsultants,1/201,KrishnaEnclave,Ahmednagar414001,Maharashtra.& 0241-2430628.Fax:2430628.(Mr.P.H.Rao,Dir.)ß MetcastIndia,11/24,GuhaRoad,Ghusuri,Howrah711107,WestBengal.& 033-26456819.
deIVAm FoUndry has drawn up plans to expand its existing Vilankurichi foundry unit in Coimbatore district of tN. the programme is to raise the capacity of iron & steel castings from 60 tpm to 100 tpm at an investment of Rs.40 million. As of April 2007, clearances were awaited and loans being secured. Work on the project is expected to begin in the last quarter of 2007 and is scheduled to be completed in 12 months thereafter.
ß DeivamFoundry,424,TannerPandal,Peelamedu,VilankurichiRoad, Coimbatore641004,TamilNadu.& 0422-2512404.
deWAS metAl SeCtIonS is to set up a cold rolled formed metal and components production unit at Samsawadi in Pune district of Maharashtra. D.T. Industries, Dewas is the equipment supplier. As of March 2007, land had been acquired and the company has obtained all statutory clearances for the project. Work on the project was expected to begin in the next 2 months and is slated for completion in 6 months thereafter.
ß DewasMetalSectionsLtd,VillageAmona,A.B.Road,Amona,Dewas455001, MadhyaPradesh.& 07572-258526.
ChhAttISgArh eleCtrICIty
26.
27.
28.
29.
30.
register ofneW ProJeCtS In IndIA 2007
7
was in the process of appointing equipment suppliers. As of April 2007, land acquisition was under progress. The project is expected to be completed in 7 months.
ß BrakesAutoIndiaLtd,1011,EmbassyCentre,NarimanPoint,Mumbai400021,Maharashtra.& 022-22823367.Fax:22832445. bUrAkIA Steel AlloyS is to overhaul the existing steel alloy unit at athgoan in Kamrup district of Assam. The project is estimated to cost Rs.3 million to be funded through internal accruals. Megatherm, Kolkata is to supply the equipment. As of May 2007, clearances were awaited and work on the programme was expected to begin in June. The project is to be completion by September 2007.
ß BurakiaSteelAlloysPvtLtd,B-10,PanchratanApartment,S.J.Road,Athgoan,Kamrup, Guwahati781001,Assam.& 0361-251727.
CAStIngS & AllIed IndUStrIeS is planning to relocate its 100 tpm cast iron and alloy castings unit at Vellamadai from Periannayakanpalayam in Coimbatore district of tN. the relocation entails an investment of Rs.2 million to be funded through banks. as of March 2007, civil work were to begin shortly. The programme is scheduled to be completed by May 2008.
ß Castings&AlliedIndustries,12/634G,MTPRoad,Periannayakanpalayam, Coimbatore641020,TamilNadu.& 0422-2696413/2692724.
ChAIbASA Steel is planning to set up a 400,000 tpa sponge iron plant at Chaibasa in West Singhbhum district of Jharkhand. The project entails an investment of Rs.750 million. As of May 2007, land had been acquired and allotment of captive mine was awaited. Work on the project was expected to commence soon after the allotment of captive mine. Plans are also on the anvil to set up a CPP in the upcoming project.
ßChaibasaSteelsPvtLtd,7/398,GandhiTola,Chaibasa,WestSinghbhum833201,Jharkhand.& 06582-258460/258461.(Mr.I.C.Bihani,Gen.Mgr.-Proj.)
ChAmAn metAllICS has embarked an expansion programme at its existing tadali unit in Chandrapur district of Maharashtra. the programme entails to increase the capacity of iron ore pelletisation. As of May 2007, the proposal was in a nascent stage and the project details yet to be finalise.
ß ChamanMetallicsPvtLtd,16/S,Block-A,NewAlipore,Kolkata700053,WestBengal.& 033-24570038/24573940.
ChAmbAl AlUmS has announced plans to set up a 6,000 tpa copper metal production unit at loget gate in Kathua district of j&K. the company is likely to invest Rs.400 million. the project cost to be met through term loan from banks & internal accruals. As of March 2007, the project was awaiting for statutory clearances and negotiations were underway with banks. the project is scheduled to be completed in 12 months.
ß ChambalAlumsPvtLtd,38,ShoppingCentre,Kota324007,Rajasthan.& Tel:0744-2361530.(Mr.R.Agarwal,Dir.)
bUrAkIA Steel AlloyS
21.
22.
23.
24.
25.
ChhAttISgArh eleCtrICIty is to set up a 100,000 tpa ferro alloys unit and a 60 MW CPP at Dahej in Bharuch district of Gujarat. The project entails a cumulative investment of Rs.3,000 million, to be funded through banks & internal accruals. As of March 2007, land was being acquired and statutory clearances were awaited. The project is scheduled for completion in 12 months.
ß ChhattisgarhElectricityCoLtd,SiltaraIndlArea,Raipur493111,Chhattisgarh.& 07721-264209.Fax:264213.(Mr.AshishGupta,Mgr.-Corp.)
ChhAttISgArh eleCtrICIty is to set up a 600,000 tpa iron ore pelletisation plant at Mandhar in Raipur district of Chhattisgarh. the project envisages an investment of Rs.1,250 million to be funded through banks & internal accruals. Consultancy for the project is to be rendered by an in-house team. equipments are being imported from China. as of april 2007, the clearances had been obtained and site development work was under progress. The project is slated for completion in one year from now.
ß ChhattisgarhElectricityCoLtd,IndustrialGrowthCentre,Siltara,Raipur493111,Chhattisgarh.& 07721-264209.Fax:264213.(Mr.AshishGupta,Mgr.-Corp.)
CmS ConSUltAntS is to set up a 1,000 tpa foundry for near Pollachi in Coimbatore district of TN. The unit will manufacture steel, alloy & wear resistant castings and will entail an investment of Rs.15 million. Mr. Ramesh, Chennai is the civil contractor. DRI Cast, New Zealand & Met Cast India, Howrah are the equipment suppliers. As of April 2007, statutory clearances were awaited. The plant is slated for completion in 6 months from zero date.
ß CMSConsultants,1/201,KrishnaEnclave,Ahmednagar414001,Maharashtra.& 0241-2430628.Fax:2430628.(Mr.P.H.Rao,Dir.)ß MetcastIndia,11/24,GuhaRoad,Ghusuri,Howrah711107,WestBengal.& 033-26456819.
deIVAm FoUndry has drawn up plans to expand its existing Vilankurichi foundry unit in Coimbatore district of tN. the programme is to raise the capacity of iron & steel castings from 60 tpm to 100 tpm at an investment of Rs.40 million. As of April 2007, clearances were awaited and loans being secured. Work on the project is expected to begin in the last quarter of 2007 and is scheduled to be completed in 12 months thereafter.
ß DeivamFoundry,424,TannerPandal,Peelamedu,VilankurichiRoad, Coimbatore641004,TamilNadu.& 0422-2512404.
deWAS metAl SeCtIonS is to set up a cold rolled formed metal and components production unit at Samsawadi in Pune district of Maharashtra. D.T. Industries, Dewas is the equipment supplier. As of March 2007, land had been acquired and the company has obtained all statutory clearances for the project. Work on the project was expected to begin in the next 2 months and is slated for completion in 6 months thereafter.
ß DewasMetalSectionsLtd,VillageAmona,A.B.Road,Amona,Dewas455001, MadhyaPradesh.& 07572-258526.
ChhAttISgArh eleCtrICIty
26.
27.
28.
29.
30.
register ofneW ProJeCtS In IndIA 2007
8
dInbAndhU Steel & PoWer is to expand its existing Kalinganagar facility in jajpur district of orissa. the programme envisages installation of a 14 inch furnace for fully automatic rolling mill and a 10 MW WHR based CPP. the project entails a cumulative investment of Rs.1,340 million. Thermax Ltd, Pune is the turnkey consultant for CPP. R. Dasgupta, Kolkata is providing the consultancy services for rolling mill. As of March 2007, the company was in the process of securing loan. The rolling mill is scheduled to be completed by end of 2008.
ß DinbandhuSteel&PowerLtd,001,ShayamkunjApartment,KathjodiRingRoad, Cuttack753012,Orissa.& 0672-2332933.Fax:2322933.ß ThermaxLtd,ThermaxHouse,4,Mumbai-PuneRoad,ShivajiNagar, Pune411005,Maharashtra.& 020-25512122.
dIVyA JyotI SPonge Iron is to set up a 80,000 tpa TMT bars production unit at Mejia in Bankura district of WB. The plant envisages an investment of Rs.440 million and to be funded through banks & internal accruals. Consultants and equipment suppliers are yet to be appointed. As of April 2007, clearances have been obtained and loans are being secured. The unit is slated for completion in one year from zero date.
ß DivyaJyotiSpongeIronPvtLtd,46A,RafiAhmedKidwaiRoad, Kolkata700016,WestBengal.& 033-22296219.(Mr.SunilJain,Mgr.-Proj.)
eleCtroSteel CAStIngS is planning an expansion project for its steel pipes unit at Khardah in North 24 Parganas district of WB. The scheme is to augment the capacity from 2 million tpa to 2.5 million tpa. The investment details are to be finalized. Consultancy is to be rendered by an in-house expertise and the equipments are to be imported from China. As of April 2007, clearances were awaited. The expansion is scheduled for completion in 12 months.
ß ElectrosteelCastingsLtd,19,CamacStreet,Kolkata700017,WestBengal.& 033-22839990.Fax:22894336.
eleCtroSteel CAStIngS is to set up a 1.3 million tpa ductile iron pipes unit and a 12 MW coal based CPP in jharkhand. the project envisages a cumulative investment of Rs.5,000 million to be funded through banks & internal accruals. M. N. Dastur & Co, Kolkata is the project consultant. Equipments are imported from China. As of April 2007, clearances were awaited and land acquisition underway. The project is scheduled for completion in 30 months.
ß ElectrosteelCastingsLtd,19,CamacStreet,Kolkata700017,WestBengal.& 033-22839990.Fax:22894336.ß M.N.Dastur&CoPvtLtd,FaradyHouse,P-17,MissionRowExtension, Kolkata700013,WestBengal.&033-22255420.Fax:22251422.
ennore FoUndrIeS has drawn up plans to expand the foundry for duct iron castings at its existing Uppal facility in Ranga Reddy district of aP. the scheme is to augment the capacity
dInbAndhU Steel & PoWer
31.
32.
33.
34.
35.
from 35,000 tpm to 60,000 tpm. An investment of Rs.400 million is envisaged to be funded through banks & internal accruals. The company is likely to source equipments from BMD, Germany. As of April 2007, statutory clearances obtained and the civil work is to begin by December 2007. The expansion is slated for completion in 15 months thereafter.
ß EnnoreFoundriesLtd,K.H.Road,EnnoreThermalStation,Ennore, Chennai600057,TamilNadu.&044-25750210.Fax:25750390.(Mr.Purushothaman,Gen.Mgr.-Proj.)
eSSAr Steel orissa has announced plans to set up a 6 million tpa steel slab unit in jagatsinghpur district of orissa. an investment of Rs.100,000 million is envisaged to be funded through banks & internal accruals. Consultants & equipment suppliers are yet to be finalized. As of May 2007, land acquisition was. The project is expected to be completed by 2010.
ß EssarSteelOrissaLtd,EssarHouse,11KeshavRaoKhadyeMarg,Mahalaxmi, Mumbai400034,Maharashtra.& 022-24950606/66601100.Fax:24928896.
eSSAr SteelS is setting up its second steel plant at Hazira in Surat district of Gujarat. The plant is to produce 3.9 mtpa steel flat products. The project is estimated to cost Rs.85,000 million to be funded through proceeds of equity & term loan from banks. Consultancy is to be rendered by an in-house team and equipment is being imported from Korea. As of May 2007, the project was nearing financial closure. The project is slated for completion in three years from now.
ß EssarSteel&PowerLtd,EssarHouse,11KeshavraoKhadyeMarg,Mahalaxmi, Mumbai400034,Maharashtra.& 022-24950606/66601100.Fax:24928896.
g. S. Alloy CAStIngS is setting up a 15,000 tpa foundry at Surampalli in Krishna district of AP. The project envisages an investment of Rs.200 million to be funded through financial institutions. As of March 2007, civil works had been initiated and appointed major equipment suppliers. The project is scheduled for completion by last quarter of 2008.
ß G.S.AlloyCastingsLtd,Payakapuram,Vijayawada,AndhraPradesh.& 0866-2400615.Fax:2477515.
gAllAntt ISPAt is poised to begin a 2 x 200 tpd sponge iron plant and a 20 MW WHR based CPP at Gorakhpur in UP. The project entails a cumulative investment of Rs.3,300 million to be funded through banks & internal accruals. Sparkonix, Pune is the equipment supplier for the sponge iron plant. As of April 2007, clearances obtained and civil works were to begin shortly. The plant is scheduled for completion by July 2008.
ß GallanttIspatLtd,3rdFloor,RoomNo.306,CentrePoint,21,HemantBasuSarani, Kolkata700001,WestBengal.& 033-30288500to06.ßSite:GorakhpurIndustrialDevelopmentAuthority,GorakhpurUttarPradesh.& 0551-2260244.
eSSAr Steel
36.
37.
38.
39.
register ofneW ProJeCtS In IndIA 2007
9
dInbAndhU Steel & PoWer is to expand its existing Kalinganagar facility in jajpur district of orissa. the programme envisages installation of a 14 inch furnace for fully automatic rolling mill and a 10 MW WHR based CPP. the project entails a cumulative investment of Rs.1,340 million. Thermax Ltd, Pune is the turnkey consultant for CPP. R. Dasgupta, Kolkata is providing the consultancy services for rolling mill. As of March 2007, the company was in the process of securing loan. The rolling mill is scheduled to be completed by end of 2008.
ß DinbandhuSteel&PowerLtd,001,ShayamkunjApartment,KathjodiRingRoad, Cuttack753012,Orissa.& 0672-2332933.Fax:2322933.ß ThermaxLtd,ThermaxHouse,4,Mumbai-PuneRoad,ShivajiNagar, Pune411005,Maharashtra.& 020-25512122.
dIVyA JyotI SPonge Iron is to set up a 80,000 tpa TMT bars production unit at Mejia in Bankura district of WB. The plant envisages an investment of Rs.440 million and to be funded through banks & internal accruals. Consultants and equipment suppliers are yet to be appointed. As of April 2007, clearances have been obtained and loans are being secured. The unit is slated for completion in one year from zero date.
ß DivyaJyotiSpongeIronPvtLtd,46A,RafiAhmedKidwaiRoad, Kolkata700016,WestBengal.& 033-22296219.(Mr.SunilJain,Mgr.-Proj.)
eleCtroSteel CAStIngS is planning an expansion project for its steel pipes unit at Khardah in North 24 Parganas district of WB. The scheme is to augment the capacity from 2 million tpa to 2.5 million tpa. The investment details are to be finalized. Consultancy is to be rendered by an in-house expertise and the equipments are to be imported from China. As of April 2007, clearances were awaited. The expansion is scheduled for completion in 12 months.
ß ElectrosteelCastingsLtd,19,CamacStreet,Kolkata700017,WestBengal.& 033-22839990.Fax:22894336.
eleCtroSteel CAStIngS is to set up a 1.3 million tpa ductile iron pipes unit and a 12 MW coal based CPP in jharkhand. the project envisages a cumulative investment of Rs.5,000 million to be funded through banks & internal accruals. M. N. Dastur & Co, Kolkata is the project consultant. Equipments are imported from China. As of April 2007, clearances were awaited and land acquisition underway. The project is scheduled for completion in 30 months.
ß ElectrosteelCastingsLtd,19,CamacStreet,Kolkata700017,WestBengal.& 033-22839990.Fax:22894336.ß M.N.Dastur&CoPvtLtd,FaradyHouse,P-17,MissionRowExtension, Kolkata700013,WestBengal.&033-22255420.Fax:22251422.
ennore FoUndrIeS has drawn up plans to expand the foundry for duct iron castings at its existing Uppal facility in Ranga Reddy district of aP. the scheme is to augment the capacity
dInbAndhU Steel & PoWer
31.
32.
33.
34.
35.
from 35,000 tpm to 60,000 tpm. An investment of Rs.400 million is envisaged to be funded through banks & internal accruals. The company is likely to source equipments from BMD, Germany. As of April 2007, statutory clearances obtained and the civil work is to begin by December 2007. The expansion is slated for completion in 15 months thereafter.
ß EnnoreFoundriesLtd,K.H.Road,EnnoreThermalStation,Ennore, Chennai600057,TamilNadu.&044-25750210.Fax:25750390.(Mr.Purushothaman,Gen.Mgr.-Proj.)
eSSAr Steel orissa has announced plans to set up a 6 million tpa steel slab unit in jagatsinghpur district of orissa. an investment of Rs.100,000 million is envisaged to be funded through banks & internal accruals. Consultants & equipment suppliers are yet to be finalized. As of May 2007, land acquisition was. The project is expected to be completed by 2010.
ß EssarSteelOrissaLtd,EssarHouse,11KeshavRaoKhadyeMarg,Mahalaxmi, Mumbai400034,Maharashtra.& 022-24950606/66601100.Fax:24928896.
eSSAr SteelS is setting up its second steel plant at Hazira in Surat district of Gujarat. The plant is to produce 3.9 mtpa steel flat products. The project is estimated to cost Rs.85,000 million to be funded through proceeds of equity & term loan from banks. Consultancy is to be rendered by an in-house team and equipment is being imported from Korea. As of May 2007, the project was nearing financial closure. The project is slated for completion in three years from now.
ß EssarSteel&PowerLtd,EssarHouse,11KeshavraoKhadyeMarg,Mahalaxmi, Mumbai400034,Maharashtra.& 022-24950606/66601100.Fax:24928896.
g. S. Alloy CAStIngS is setting up a 15,000 tpa foundry at Surampalli in Krishna district of AP. The project envisages an investment of Rs.200 million to be funded through financial institutions. As of March 2007, civil works had been initiated and appointed major equipment suppliers. The project is scheduled for completion by last quarter of 2008.
ß G.S.AlloyCastingsLtd,Payakapuram,Vijayawada,AndhraPradesh.& 0866-2400615.Fax:2477515.
gAllAntt ISPAt is poised to begin a 2 x 200 tpd sponge iron plant and a 20 MW WHR based CPP at Gorakhpur in UP. The project entails a cumulative investment of Rs.3,300 million to be funded through banks & internal accruals. Sparkonix, Pune is the equipment supplier for the sponge iron plant. As of April 2007, clearances obtained and civil works were to begin shortly. The plant is scheduled for completion by July 2008.
ß GallanttIspatLtd,3rdFloor,RoomNo.306,CentrePoint,21,HemantBasuSarani, Kolkata700001,WestBengal.& 033-30288500to06.ßSite:GorakhpurIndustrialDevelopmentAuthority,GorakhpurUttarPradesh.& 0551-2260244.
eSSAr Steel
36.
37.
38.
39.
register ofneW ProJeCtS In IndIA 2007
10
hIndAlCo Almex AeroSPACe is planning to set up a 46,000 tpa aluminium products manufacturing unit in Aurangabad district of Maharashtra. The unit will manufacture aluminium billets, slabs and rolling ingots cater to aerospace components. the project entails an investment of Rs.1,550 million and Hindalco will hold 70% equity participation while Almex will hold 30% in the JV. As of March 2007, the company had applied for statutory clearances. The Project was in a preliminary stage. The unit is scheduled to become operational by first quarter of 2008.
ß HindalcoAlmexAerospaceLtd,C/o.HindalcoIndustries,CenturyBhavan,3rdFloor, Dr.AnnieBesantRoad,Worli,Mumbai400025,Maharashtra.& 022-66626666.Fax:24362516/24227586.
hIndAlCo IndUStrIeS has announced plans to set up a 3,25,000 tpa aluminium smelter in Latehar district of Jharkhand. The project includes setting up of 750 MW coal based Captive power plant supported by a 5 million tonnes captive coal mine. As of March 2007, the company signed an MoU with the state government and the proposal is in a preliminary stage. The company had initiated the process of acquiring land and other infrastructure facilities.
ß HindalcoIndustriesLtd,CenturyBhavan,3rdFloor,Dr.AnnieBesantRoad,Worli, Mumbai400025,Maharashtra.& 022-66626666.Fax:24362516/24227586.
hIndAlCo IndUStrIeS is plans to expand its aluminium smelter capacity at Belgaum in Karnataka. The expansion include increase in capacity of aluminium smelter from 3,50,000 tpa to 6,50,000 tpa and high value special alumina capacity from 91,000 tpa to 1,67,000 tpa. As of March 2007, the proposal was in a preliminary stage and further developments expected in the following months. The company has also applied for bauxite ore mining lease.
ß HindalcoIndustriesLtd,CenturyBhavan,3rdFloor,Dr.AnnieBesantRoad,Worli, Mumbai400025,Maharashtra.& 022-66626666.Fax:24362516/24227586.ß Plt:YamanapurVillage,Belgaum590010,Karnataka.& 0831-2472716/2472733to35.
hIndAlCo IndUStrIeS has drawn up plans to set up a 3,25,000 tpa aluminium smelter at Bargawan in Sidhi district of MP. A 750 MW captive power plant is also to be set up supported by a captive coal mine. Alumina will be sourced from its parent company Utkal Alumina, Orissa. The project is estimated to cost Rs.77,000 million to be funded through internal accruals & debt. As of March 2007, the company has obtained in-principle approval for the project, further developments are expected in the following months. The company is expected to commission the facility in 4 years from now.
ß HindalcoIndustriesLtd,CenturyBhavan,3rdFloor,Dr.AnnieBesantRoad,Worli, Mumbai400025,Maharashtra.& 022-66626666.Fax:24362516/24227586.
hIndUStAn ZInC has drawn plans to set up a 2,20,000 tpa melting and casting unit at Haridwar in Uttaranchal Consultants and suppliers are yet to be appointed. As of April 2007, clearances were to be obtained and the project was in a nascent stage. Further developments
hIndAlCo Almex AeroSPACe
40.
41.
42.
43.
44.
are expected in the following months.
ß HindustanZincLtd,YashadBhawan,Udaipur313004,Rajasthan.& 0294-2523532.Fax:2526443.
hothUr SteelS is to set up a 300 tpd rolling mill and a 15 MW WHR based CPP at its existing Halkundi facility in Bellary district of Karnataka. The project also includes installation of induction furnace and envisages an investment of Rs.550 million. Areva T&D India, Kolkata is the project consultant. electrotherm & Inductotherm, ahmedabad are the equipment suppliers. As of April 2007, civil works was to begin shortly. The plant is scheduled for completion in 18 months.
ß HothurSteelsLtd,HothurArcade,RTORoad,Cantonment,Bellary583101,Karnataka.& 0839-2241786.Fax:2241539.ß Plt:HalkundiVillage,BellaryTaluk,Bellary,Karnataka.Fax:08392-2324455/241539.ß ArevaT&DIndiaLtd,D-2,GillanderHouse,8,NetajiSubhasRoad, Kolkata700001,WestBengal.& 033-22303991to94.Fax:22303995ß ElectrothermIndiaLtd,SurveyNo.72,Palodia,ViaThaltej,Ahmedabad382115,Gujarat.& 02717-660550.Fax:234866.
Ind Synergy is implementing expansion programme at its existing Kotmar facility in Raigarh district of Chhattisgarh. The programme envisages setting up of a 300,000 tpa pig iron, 5,50,000 tpa semi-finished steel, 500,000 tpa finished hot rolled products and a 50 MW CPP at a cost of Rs.10,000 million. MCC, China has been appointed as the turnkey consultant. As of May 2007, the civil work had been initiated. The expansion is scheduled for completion in 18 months from now.
ß IndSynergyLtd,624,UrlaIndustrialComplex,Raipur493221,Chhattisgarh.& 0771-2323209/2324403.Fax:2324404.(Mr.P.K.Gaur,Vice.Pres.)ß Off2:301,LandMarkBuilding,Juhu-TaraRoad,Santacruz,Mumbai400049,Maharashtra.& 022-26613245to47.Fax:26613221.ß Plt:VillageKotmar,Raigarh496001,Chhattisgarh.& 07762-262526.
IndIAn rAre eArths is to set up a 100,000 tpa monazite processing plant at Chatrapur in Ganjam district of Orissa. The plant envisages an investment of Rs.1,000 million. FEDO, Cochin is the turnkey consultant. As of May 2007, clearances were awaited. The work on the project is expected to begin by October 2007 and is slated for completion in 2 years thereafter.
ß IndianRareEarthsLtd,OrissaSandComplex,P.O.Matikhalo,GanjamChatrapur761045, Orissa.& 06811-257890to95.Fax:257988.ß FACTEngineering&DesignOrganisation,Udyogamandal,Ernakulam-683501,Kerala.& 0484-2545451to58.Fax:2545215.
ISPAt IndUStrIeS has announced plans to set up a 5 million tpa integrated steel plant in two phase at Manoharpur in West Singhbhum district of Jharkhand. The phase I will include
hothUr SteelS
45.
46.
47.
48.
register ofneW ProJeCtS In IndIA 2007
11
hIndAlCo Almex AeroSPACe is planning to set up a 46,000 tpa aluminium products manufacturing unit in Aurangabad district of Maharashtra. The unit will manufacture aluminium billets, slabs and rolling ingots cater to aerospace components. the project entails an investment of Rs.1,550 million and Hindalco will hold 70% equity participation while Almex will hold 30% in the JV. As of March 2007, the company had applied for statutory clearances. The Project was in a preliminary stage. The unit is scheduled to become operational by first quarter of 2008.
ß HindalcoAlmexAerospaceLtd,C/o.HindalcoIndustries,CenturyBhavan,3rdFloor, Dr.AnnieBesantRoad,Worli,Mumbai400025,Maharashtra.& 022-66626666.Fax:24362516/24227586.
hIndAlCo IndUStrIeS has announced plans to set up a 3,25,000 tpa aluminium smelter in Latehar district of Jharkhand. The project includes setting up of 750 MW coal based Captive power plant supported by a 5 million tonnes captive coal mine. As of March 2007, the company signed an MoU with the state government and the proposal is in a preliminary stage. The company had initiated the process of acquiring land and other infrastructure facilities.
ß HindalcoIndustriesLtd,CenturyBhavan,3rdFloor,Dr.AnnieBesantRoad,Worli, Mumbai400025,Maharashtra.& 022-66626666.Fax:24362516/24227586.
hIndAlCo IndUStrIeS is plans to expand its aluminium smelter capacity at Belgaum in Karnataka. The expansion include increase in capacity of aluminium smelter from 3,50,000 tpa to 6,50,000 tpa and high value special alumina capacity from 91,000 tpa to 1,67,000 tpa. As of March 2007, the proposal was in a preliminary stage and further developments expected in the following months. The company has also applied for bauxite ore mining lease.
ß HindalcoIndustriesLtd,CenturyBhavan,3rdFloor,Dr.AnnieBesantRoad,Worli, Mumbai400025,Maharashtra.& 022-66626666.Fax:24362516/24227586.ß Plt:YamanapurVillage,Belgaum590010,Karnataka.& 0831-2472716/2472733to35.
hIndAlCo IndUStrIeS has drawn up plans to set up a 3,25,000 tpa aluminium smelter at Bargawan in Sidhi district of MP. A 750 MW captive power plant is also to be set up supported by a captive coal mine. Alumina will be sourced from its parent company Utkal Alumina, Orissa. The project is estimated to cost Rs.77,000 million to be funded through internal accruals & debt. As of March 2007, the company has obtained in-principle approval for the project, further developments are expected in the following months. The company is expected to commission the facility in 4 years from now.
ß HindalcoIndustriesLtd,CenturyBhavan,3rdFloor,Dr.AnnieBesantRoad,Worli, Mumbai400025,Maharashtra.& 022-66626666.Fax:24362516/24227586.
hIndUStAn ZInC has drawn plans to set up a 2,20,000 tpa melting and casting unit at Haridwar in Uttaranchal Consultants and suppliers are yet to be appointed. As of April 2007, clearances were to be obtained and the project was in a nascent stage. Further developments
hIndAlCo Almex AeroSPACe
40.
41.
42.
43.
44.
are expected in the following months.
ß HindustanZincLtd,YashadBhawan,Udaipur313004,Rajasthan.& 0294-2523532.Fax:2526443.
hothUr SteelS is to set up a 300 tpd rolling mill and a 15 MW WHR based CPP at its existing Halkundi facility in Bellary district of Karnataka. The project also includes installation of induction furnace and envisages an investment of Rs.550 million. Areva T&D India, Kolkata is the project consultant. electrotherm & Inductotherm, ahmedabad are the equipment suppliers. As of April 2007, civil works was to begin shortly. The plant is scheduled for completion in 18 months.
ß HothurSteelsLtd,HothurArcade,RTORoad,Cantonment,Bellary583101,Karnataka.& 0839-2241786.Fax:2241539.ß Plt:HalkundiVillage,BellaryTaluk,Bellary,Karnataka.Fax:08392-2324455/241539.ß ArevaT&DIndiaLtd,D-2,GillanderHouse,8,NetajiSubhasRoad, Kolkata700001,WestBengal.& 033-22303991to94.Fax:22303995ß ElectrothermIndiaLtd,SurveyNo.72,Palodia,ViaThaltej,Ahmedabad382115,Gujarat.& 02717-660550.Fax:234866.
Ind Synergy is implementing expansion programme at its existing Kotmar facility in Raigarh district of Chhattisgarh. The programme envisages setting up of a 300,000 tpa pig iron, 5,50,000 tpa semi-finished steel, 500,000 tpa finished hot rolled products and a 50 MW CPP at a cost of Rs.10,000 million. MCC, China has been appointed as the turnkey consultant. As of May 2007, the civil work had been initiated. The expansion is scheduled for completion in 18 months from now.
ß IndSynergyLtd,624,UrlaIndustrialComplex,Raipur493221,Chhattisgarh.& 0771-2323209/2324403.Fax:2324404.(Mr.P.K.Gaur,Vice.Pres.)ß Off2:301,LandMarkBuilding,Juhu-TaraRoad,Santacruz,Mumbai400049,Maharashtra.& 022-26613245to47.Fax:26613221.ß Plt:VillageKotmar,Raigarh496001,Chhattisgarh.& 07762-262526.
IndIAn rAre eArths is to set up a 100,000 tpa monazite processing plant at Chatrapur in Ganjam district of Orissa. The plant envisages an investment of Rs.1,000 million. FEDO, Cochin is the turnkey consultant. As of May 2007, clearances were awaited. The work on the project is expected to begin by October 2007 and is slated for completion in 2 years thereafter.
ß IndianRareEarthsLtd,OrissaSandComplex,P.O.Matikhalo,GanjamChatrapur761045, Orissa.& 06811-257890to95.Fax:257988.ß FACTEngineering&DesignOrganisation,Udyogamandal,Ernakulam-683501,Kerala.& 0484-2545451to58.Fax:2545215.
ISPAt IndUStrIeS has announced plans to set up a 5 million tpa integrated steel plant in two phase at Manoharpur in West Singhbhum district of Jharkhand. The phase I will include
hothUr SteelS
45.
46.
47.
48.
register ofneW ProJeCtS In IndIA 2007
12
setting a capacity of 2.8 million tpa and remaining in the second phase. The project will entail an investment of Rs.67,500 million. As of April 2007, the company has signed an MoU with the state government and the proposal was in a preliminary stage.
ß IspatIndustriesLtd,ParkPlaza,1stFloor,71,ParkStreet,Kolkata700016,WestBengal.& 033-22492117/22493119/22495102/22295104.Fax:22293050/22291956.
JAI bAlAJI SPonge has drawn up plans to set up a 30,000 tpa billets unit and a 125 MW captive power plant at Durgapur in Burdwan district of WB. The project entails a cumulative cost of Rs.18,000 million to be funded through banks & internal accruals. Consultants & equipment suppliers were yet to be appointed. As of May 2007, land acquisition process was underway. The project is expected to be completed in a year.
ß JaiBalajiSpongeLtd,No.5,1stFloor,BentickStreet,Kolkata700001,WestBengal.&033-22489808/22488173/33060042.Fax:22430021.(Mr.Sorkar,Gen.Mgr.)
Jeet metAlS has announced plans to set up a 40 tpd foundry unit at aligarh in UP. the unit will produce castings for copper rods, pipes, sheets and dies. The project entails an investment of Rs.12,000 million to be funded through foreign investments & equity. as of March 2007, land was being acquired. The work on the project is expected to begin in the next 6 months and slated for completion by 2008.
ß JeetMetalsPvtLtd,No.268,AgarhLayout,9thCross,ShanthiColony, Bangalore560027,Karnataka.&080-41501994/41501995.(Mr.MahendraSingh,Mg.Dir.)
JeeVAkA IndUStrIeS has announced plans to set up a 400 tpd MS ingots and billets production unit at Nastipur in Medak district of aP. the project entails an investment of Rs.200 million to be funded through banks & internal accruals. As of April 2007, the environmental clearances were awaited and the company was in the process of securing loan. The unit is expected to be operational in 1 year.
ß JeevakaIndustriesLtd,15-2-358,1stFloor,Mukhtyargunj,Hyderabad500012,AndhraPradesh.&040-65345232.Fax:24605888.
JhelUm CementS is planning to set up a 100 tpd steel ingots production unit near Pathankot in Punjab. The unit will manufacture products by installing induction furnace. An investment of Rs.150 million is envisaged to be funded through internal accruals & loans. As of March 2007, preparation of DPR was underway. The plant is expected to commission by second quarter of 2008.
ß JhelumCementLtd,37,FBICGandhiNagar,Jammu180004,Jammu&Kashmir.& 0191-2431012.Fax:23220620.
JIndAl AlUmInIUm has proposed plans to expand its existing aluminium plant near Bangalore in Karnataka. The capacity is to be increased from 25,000 tpa to 40,000 tpa at an estimated cost of Rs.415 million. As of March 2007, finalisation of consultants and equipment suppliers were underway. The plant with the expanded capacity is scheduled to be completed by March 2008.
JAI bAlAJI SPonge
49.
50.
51.
52.
53.
ß JindalAluminiumLtd,JindalNagar,TumkurRoadBangalore560073,Karnataka.& 080-23715555/23715558/23715560/23715565.Fax:23713333.
JIndAl Steel & PoWer is to set up an integrated steel plant at Patratu in Hazaribagh district of Jharkhand. The unit is to produce crude and semi finished steel products by setting up of a blast furnace, a 1.6 million tpa bar mill, a 700,000 tpa rod mill, a structural mill and 1,000 MW coal based CPP. the project entails an estimated investment of Rs.160,000 million to be funded through equity, loan from banks & internal accruals. Mecon has been appointed as the project consultant. As of May 2007, statutory clearances were awaited. The project is scheduled for completion by 2011.
ß JindalSteel&PowerLtd,JindalCentre,12BikajiCamaPlace,NewDelhi110066,Delhi.& 011-26188345.Fax:26161271.(Mr.AshishBharathwaj,Dy.Mgr-Projs.)ß MeconLtd,P.ODoranda,Ranchi834002,Jharkhand.& 0651-2480216.Fax:2482214.
JIndAl Steel & PoWer has announced plans for the expansion of its existing Raigarh facility in Chhattisgarh. The project includes setting up of a 3.2 million tpa blast furnace, a 2 x 1.5 million tpa casters unit, a 3 million tpa rolling mill, a 2 x 120 tonnes ladle refining furnace, a 3 million tpa BOF unit, a 600 MW captive power plant, a 2,800 tpd oxygen plant and a lime plant along with rail siding at a cumulative cost of Rs.80,000 million. As of May 2007, the company has signed an MoU with the state government.
ß JindalSteel&PowerLtd,JindalCentre,12BhikaijiCamaPlace,NewDelhi110066,Delhi.& 011-26188345.Fax:26170691.ß Plt:KharsiaRoad,P.B.No.16,Raigarh460001,Chhattisgarh.& 07762-227001to05.
JIndAl SoUth WeSt Steel is to implement an expansion programme of its existing Toranagallu complex in Bellary district of Karnataka. The project details are given below:
ñ Setting up of a 2 million tpa hot strip mill and upgradable upto 5 million tpa as part of the backward integration. The company is likely to invest around Rs.70,000 million to be funded through internal accruals, equity, debt & term loans. the project includes a sinter plant, coke oven, blast furnaces, 2 converters, 2 casters, 2 lime kilns and a 300 MW WHR based CPP along with associated logistics and common facilities. Work on the project is expected to begin in the last quarter of 2007 and is scheduled for completed in 3 years thereafter.
ñ To set up a new HSM plant in the premises. As of May 2007, site development work was underway and the equipment suppliers were being finalised. The plant is scheduled for completion by September 2009.
ñ Setting up of a 1 million tpa cold rolling mill. As of May 2007, erection of major equipment was underway. The project is scheduled for completion by September 2007.
ñ Modernisation of blast furnace no. 1 includes augmenting the capacity from 900,000 tpa to 1.2 million tpa. As of May 2007, negotiations were underway for the appointment of
JIndAl Steel & PoWer
54.
55.
56.
register ofneW ProJeCtS In IndIA 2007
13
setting a capacity of 2.8 million tpa and remaining in the second phase. The project will entail an investment of Rs.67,500 million. As of April 2007, the company has signed an MoU with the state government and the proposal was in a preliminary stage.
ß IspatIndustriesLtd,ParkPlaza,1stFloor,71,ParkStreet,Kolkata700016,WestBengal.& 033-22492117/22493119/22495102/22295104.Fax:22293050/22291956.
JAI bAlAJI SPonge has drawn up plans to set up a 30,000 tpa billets unit and a 125 MW captive power plant at Durgapur in Burdwan district of WB. The project entails a cumulative cost of Rs.18,000 million to be funded through banks & internal accruals. Consultants & equipment suppliers were yet to be appointed. As of May 2007, land acquisition process was underway. The project is expected to be completed in a year.
ß JaiBalajiSpongeLtd,No.5,1stFloor,BentickStreet,Kolkata700001,WestBengal.&033-22489808/22488173/33060042.Fax:22430021.(Mr.Sorkar,Gen.Mgr.)
Jeet metAlS has announced plans to set up a 40 tpd foundry unit at aligarh in UP. the unit will produce castings for copper rods, pipes, sheets and dies. The project entails an investment of Rs.12,000 million to be funded through foreign investments & equity. as of March 2007, land was being acquired. The work on the project is expected to begin in the next 6 months and slated for completion by 2008.
ß JeetMetalsPvtLtd,No.268,AgarhLayout,9thCross,ShanthiColony, Bangalore560027,Karnataka.&080-41501994/41501995.(Mr.MahendraSingh,Mg.Dir.)
JeeVAkA IndUStrIeS has announced plans to set up a 400 tpd MS ingots and billets production unit at Nastipur in Medak district of aP. the project entails an investment of Rs.200 million to be funded through banks & internal accruals. As of April 2007, the environmental clearances were awaited and the company was in the process of securing loan. The unit is expected to be operational in 1 year.
ß JeevakaIndustriesLtd,15-2-358,1stFloor,Mukhtyargunj,Hyderabad500012,AndhraPradesh.&040-65345232.Fax:24605888.
JhelUm CementS is planning to set up a 100 tpd steel ingots production unit near Pathankot in Punjab. The unit will manufacture products by installing induction furnace. An investment of Rs.150 million is envisaged to be funded through internal accruals & loans. As of March 2007, preparation of DPR was underway. The plant is expected to commission by second quarter of 2008.
ß JhelumCementLtd,37,FBICGandhiNagar,Jammu180004,Jammu&Kashmir.& 0191-2431012.Fax:23220620.
JIndAl AlUmInIUm has proposed plans to expand its existing aluminium plant near Bangalore in Karnataka. The capacity is to be increased from 25,000 tpa to 40,000 tpa at an estimated cost of Rs.415 million. As of March 2007, finalisation of consultants and equipment suppliers were underway. The plant with the expanded capacity is scheduled to be completed by March 2008.
JAI bAlAJI SPonge
49.
50.
51.
52.
53.
ß JindalAluminiumLtd,JindalNagar,TumkurRoadBangalore560073,Karnataka.& 080-23715555/23715558/23715560/23715565.Fax:23713333.
JIndAl Steel & PoWer is to set up an integrated steel plant at Patratu in Hazaribagh district of Jharkhand. The unit is to produce crude and semi finished steel products by setting up of a blast furnace, a 1.6 million tpa bar mill, a 700,000 tpa rod mill, a structural mill and 1,000 MW coal based CPP. the project entails an estimated investment of Rs.160,000 million to be funded through equity, loan from banks & internal accruals. Mecon has been appointed as the project consultant. As of May 2007, statutory clearances were awaited. The project is scheduled for completion by 2011.
ß JindalSteel&PowerLtd,JindalCentre,12BikajiCamaPlace,NewDelhi110066,Delhi.& 011-26188345.Fax:26161271.(Mr.AshishBharathwaj,Dy.Mgr-Projs.)ß MeconLtd,P.ODoranda,Ranchi834002,Jharkhand.& 0651-2480216.Fax:2482214.
JIndAl Steel & PoWer has announced plans for the expansion of its existing Raigarh facility in Chhattisgarh. The project includes setting up of a 3.2 million tpa blast furnace, a 2 x 1.5 million tpa casters unit, a 3 million tpa rolling mill, a 2 x 120 tonnes ladle refining furnace, a 3 million tpa BOF unit, a 600 MW captive power plant, a 2,800 tpd oxygen plant and a lime plant along with rail siding at a cumulative cost of Rs.80,000 million. As of May 2007, the company has signed an MoU with the state government.
ß JindalSteel&PowerLtd,JindalCentre,12BhikaijiCamaPlace,NewDelhi110066,Delhi.& 011-26188345.Fax:26170691.ß Plt:KharsiaRoad,P.B.No.16,Raigarh460001,Chhattisgarh.& 07762-227001to05.
JIndAl SoUth WeSt Steel is to implement an expansion programme of its existing Toranagallu complex in Bellary district of Karnataka. The project details are given below:
ñ Setting up of a 2 million tpa hot strip mill and upgradable upto 5 million tpa as part of the backward integration. The company is likely to invest around Rs.70,000 million to be funded through internal accruals, equity, debt & term loans. the project includes a sinter plant, coke oven, blast furnaces, 2 converters, 2 casters, 2 lime kilns and a 300 MW WHR based CPP along with associated logistics and common facilities. Work on the project is expected to begin in the last quarter of 2007 and is scheduled for completed in 3 years thereafter.
ñ To set up a new HSM plant in the premises. As of May 2007, site development work was underway and the equipment suppliers were being finalised. The plant is scheduled for completion by September 2009.
ñ Setting up of a 1 million tpa cold rolling mill. As of May 2007, erection of major equipment was underway. The project is scheduled for completion by September 2007.
ñ Modernisation of blast furnace no. 1 includes augmenting the capacity from 900,000 tpa to 1.2 million tpa. As of May 2007, negotiations were underway for the appointment of
JIndAl Steel & PoWer
54.
55.
56.
register ofneW ProJeCtS In IndIA 2007
14
VaI Siemens as a turnkey contractor. the programme is scheduled for completion by early 2009.
ñ expansion programme to increase the overall capacity of the integrated steel plant from 2.8 million tpa to 6.8 million tpa. The expansion includes installation of the state-of-the-art-technology based equipments such as blast furnace, sinter plant, coke oven plant, steel melt shop and long product mills. As of May 2007, erection of plant and machinery were underway. the project is scheduled to become operational by March 2009.
ñ Modernisation of existing HSM plant (phase II) includes augmentation of the capacity from 2.5 million tpa to 3.2 million tpa. As of May 2007, the equipment suppliers were being finalised. The programme is scheduled for completion by early 2008.
ñ Expansion of CPP no. 2 from 90 MW to 130 MW. Erection of a 200 tph boiler was underway. The CPP is slated for completion by December 2007.
ßJSWSteelLtd,JindalMansion,5A,GDeshmukhMarg,Mumbai400026,Maharashtra.& 022-23513000.Fax:23526400.ß Plt:JindalNagar,Toranagallu,Bellary583123,Karnataka.& 08395-250120to30.Fax:250138.
JSonS FoUndry is planning to expand its foundry for pumps and valves at Kupwad in Sangli district of Maharashtra. The capacity is to be augmented from 150 tpm to 700 tpm and entails an investment of Rs.40 million funded through banks & internal accruals. Inductotherm, Ahmedabad is the equipment supplier. As of April 2007, clearances are awaited. The expansion is scheduled to be completed in 3 months from zero date.
ß JsonsFoundryPvtLtd,G-13,MIDC,KupwadBlock,Sangli416436,Maharashtra.& 0233-2644603.Fax:2644605(Mr.AjayJadhav,Mg.Dir.)ß InductothermIndiaPvtLtd,ShriKishorebhaiD.VyasBuilding,Bopal, Ahmedabad380058,Gujarat.& 02717-231961(8lines).Fax:231266.
JSW AlUmInIUm is to set up a 1.4 million tpa alumina refinery and a 250,000 tpa aluminium plant in Vijayanagaram district of aP. the project entails a cumulative investment of Rs.90,000 million to be funded through equity & term loan from banks. Consultant and equipment suppliers were yet to be appointed. As of May 2007, land was being acquired and clearances are awaited. The project is scheduled to be completed by March 2010.
ß JSWAluminiumLtd,JindalMansion,Dr.G.DeshmukhMarg,Mumbai400026,Maharashtra.& 022-23513000ß Off2:JindalBhawan,58-17-1/1,SanjeevayaNagar,NearNADKothaRoadJunction, Visakhapatnam530009,AndhraPradesh.& 0891-2513280/2513281.
JSW Steel has announced plans to set up a 10 million tpa greenfield steel plant at Godapisal in West Midnapur district of WB. An investment of Rs.3,50,000 million is envisaged. The project is to be implemented in a phased manner through a SPV promoted in jointly with WBIDC and
JSonS FoUndry
57.
58.
59.
WBMDTC. Phase-I includes setting of a 3 million tpa plant which is to be completed within 4 years further the capacity to be expanded to 10 million tpa in three phases at a later stage. as of April 2007, the company had signed an MoU with the state government.
ß JSWSteelLtd,JindalMansion,5A,GDeshmukhMarg,Mumbai400026,Maharashtra.& 022-23513000.Fax:23526400.
kAmInI FerroUS is to expand the steel ingot production at its existing jaladhulagori unit in Howrah district of WB. The expansion entails an augmentation of the capacity from 50,000 tpa to 1,50,000 tpa. an investment of Rs.100 million is envisaged and to be funded through banks & internal accruals. Consultants & equipment Suppliers are yet to be finalized. Land clearance from WBIDC is awaited. As of May 2007, work on the project isexpected to commence in September 2007. The unit is scheduled to become operational by March 2008.
ß KaminiFerrousLtd,17,RowlandRoad,Kolkata700020,WestBengal.& 033-24766611.Fax:24768811.(Mr.B.K.Maruthia,Mgr.)
kArnAtAkA geArS is to set up a cold rolling mill at Kanakapura near Bangalore in Karnataka. The unit is to produce galvanized and pre-printed steel sheets & rolls. An investment of Rs.200 million is envisaged to be funded through internal accruals. Consultants and equipment suppliers were to be finalized. As of April 2007, all clearances were awaited and land was to be acquired. The plant is slated for completion in 12 months.
ß KarnatakaGearsPvtLtd,No.380,1stFloor,13thCross,BhashyamCircle,Sadashivanagar, Bangalore560080,Karnataka.& 080-23610152/23611153/28395873/28392713.Fax:23617267.(Mr.VijayKamath,Dir.)
kerAlA mInerAlS & metAlS has drawn up plans to expand its titanium production capacity at Chavara facility in Kollam district of Kerala. the programme is to increase the capacity from 40,000 tpa to 100,000 tpa to be implemented in two phases. Mecon has been appointed as the project consultant. The programme is estimated to cost Rs.8,000 million. As of March 2007, the project was awaiting statutory clearances.
ß KeralaMinerals&MetalsLtd,Sankaramangalam,Chavara,Kollam691583,Kerala.& 0476-2686722to33(12Lines).Fax:2680101/2686721. (Mr.M.Muralidharan,Dy.GenMgr.)ß MeconLtd,89,SouthEndRoad,Basavanagudi,Bangalore560004,Karnataka.& 080-26576442.Fax:26576352.
kIrloSkAr FerroUS IndUStrIeS is to set up a 500,000 tpa pig iron and casting units at its existing Rudrapur facility in Koppal district of Karnataka. the programme envisages an investment of Rs.6,000 million to be funded through banks & internal accruals. Consultants and equipment suppliers were to be finalized. As of April 2007, statutory clearances obtained and loans were being secured. The unit is scheduled for completion in 1 year from zero date.
ß KirloskarFerrousIndustriesLtd,13,LaxmanraoKirloskarRoad,Khadki, Pune411003,Maharashtra.& 020-66084664.Fax:25813208.ß Plt:BevinahalliVillage,HitnalPost,Koppal583234,Karnataka.& 08539-286711to15/286767.Fax:286761/486706.(Mr.K.Ramesh,Dy.Gen.Mgr.)
kAmInI FerroUS
60.
61.
62.
63.
register ofneW ProJeCtS In IndIA 2007
15
VaI Siemens as a turnkey contractor. the programme is scheduled for completion by early 2009.
ñ expansion programme to increase the overall capacity of the integrated steel plant from 2.8 million tpa to 6.8 million tpa. The expansion includes installation of the state-of-the-art-technology based equipments such as blast furnace, sinter plant, coke oven plant, steel melt shop and long product mills. As of May 2007, erection of plant and machinery were underway. the project is scheduled to become operational by March 2009.
ñ Modernisation of existing HSM plant (phase II) includes augmentation of the capacity from 2.5 million tpa to 3.2 million tpa. As of May 2007, the equipment suppliers were being finalised. The programme is scheduled for completion by early 2008.
ñ Expansion of CPP no. 2 from 90 MW to 130 MW. Erection of a 200 tph boiler was underway. The CPP is slated for completion by December 2007.
ßJSWSteelLtd,JindalMansion,5A,GDeshmukhMarg,Mumbai400026,Maharashtra.& 022-23513000.Fax:23526400.ß Plt:JindalNagar,Toranagallu,Bellary583123,Karnataka.& 08395-250120to30.Fax:250138.
JSonS FoUndry is planning to expand its foundry for pumps and valves at Kupwad in Sangli district of Maharashtra. The capacity is to be augmented from 150 tpm to 700 tpm and entails an investment of Rs.40 million funded through banks & internal accruals. Inductotherm, Ahmedabad is the equipment supplier. As of April 2007, clearances are awaited. The expansion is scheduled to be completed in 3 months from zero date.
ß JsonsFoundryPvtLtd,G-13,MIDC,KupwadBlock,Sangli416436,Maharashtra.& 0233-2644603.Fax:2644605(Mr.AjayJadhav,Mg.Dir.)ß InductothermIndiaPvtLtd,ShriKishorebhaiD.VyasBuilding,Bopal, Ahmedabad380058,Gujarat.& 02717-231961(8lines).Fax:231266.
JSW AlUmInIUm is to set up a 1.4 million tpa alumina refinery and a 250,000 tpa aluminium plant in Vijayanagaram district of aP. the project entails a cumulative investment of Rs.90,000 million to be funded through equity & term loan from banks. Consultant and equipment suppliers were yet to be appointed. As of May 2007, land was being acquired and clearances are awaited. The project is scheduled to be completed by March 2010.
ß JSWAluminiumLtd,JindalMansion,Dr.G.DeshmukhMarg,Mumbai400026,Maharashtra.& 022-23513000ß Off2:JindalBhawan,58-17-1/1,SanjeevayaNagar,NearNADKothaRoadJunction, Visakhapatnam530009,AndhraPradesh.& 0891-2513280/2513281.
JSW Steel has announced plans to set up a 10 million tpa greenfield steel plant at Godapisal in West Midnapur district of WB. An investment of Rs.3,50,000 million is envisaged. The project is to be implemented in a phased manner through a SPV promoted in jointly with WBIDC and
JSonS FoUndry
57.
58.
59.
WBMDTC. Phase-I includes setting of a 3 million tpa plant which is to be completed within 4 years further the capacity to be expanded to 10 million tpa in three phases at a later stage. as of April 2007, the company had signed an MoU with the state government.
ß JSWSteelLtd,JindalMansion,5A,GDeshmukhMarg,Mumbai400026,Maharashtra.& 022-23513000.Fax:23526400.
kAmInI FerroUS is to expand the steel ingot production at its existing jaladhulagori unit in Howrah district of WB. The expansion entails an augmentation of the capacity from 50,000 tpa to 1,50,000 tpa. an investment of Rs.100 million is envisaged and to be funded through banks & internal accruals. Consultants & equipment Suppliers are yet to be finalized. Land clearance from WBIDC is awaited. As of May 2007, work on the project isexpected to commence in September 2007. The unit is scheduled to become operational by March 2008.
ß KaminiFerrousLtd,17,RowlandRoad,Kolkata700020,WestBengal.& 033-24766611.Fax:24768811.(Mr.B.K.Maruthia,Mgr.)
kArnAtAkA geArS is to set up a cold rolling mill at Kanakapura near Bangalore in Karnataka. The unit is to produce galvanized and pre-printed steel sheets & rolls. An investment of Rs.200 million is envisaged to be funded through internal accruals. Consultants and equipment suppliers were to be finalized. As of April 2007, all clearances were awaited and land was to be acquired. The plant is slated for completion in 12 months.
ß KarnatakaGearsPvtLtd,No.380,1stFloor,13thCross,BhashyamCircle,Sadashivanagar, Bangalore560080,Karnataka.& 080-23610152/23611153/28395873/28392713.Fax:23617267.(Mr.VijayKamath,Dir.)
kerAlA mInerAlS & metAlS has drawn up plans to expand its titanium production capacity at Chavara facility in Kollam district of Kerala. the programme is to increase the capacity from 40,000 tpa to 100,000 tpa to be implemented in two phases. Mecon has been appointed as the project consultant. The programme is estimated to cost Rs.8,000 million. As of March 2007, the project was awaiting statutory clearances.
ß KeralaMinerals&MetalsLtd,Sankaramangalam,Chavara,Kollam691583,Kerala.& 0476-2686722to33(12Lines).Fax:2680101/2686721. (Mr.M.Muralidharan,Dy.GenMgr.)ß MeconLtd,89,SouthEndRoad,Basavanagudi,Bangalore560004,Karnataka.& 080-26576442.Fax:26576352.
kIrloSkAr FerroUS IndUStrIeS is to set up a 500,000 tpa pig iron and casting units at its existing Rudrapur facility in Koppal district of Karnataka. the programme envisages an investment of Rs.6,000 million to be funded through banks & internal accruals. Consultants and equipment suppliers were to be finalized. As of April 2007, statutory clearances obtained and loans were being secured. The unit is scheduled for completion in 1 year from zero date.
ß KirloskarFerrousIndustriesLtd,13,LaxmanraoKirloskarRoad,Khadki, Pune411003,Maharashtra.& 020-66084664.Fax:25813208.ß Plt:BevinahalliVillage,HitnalPost,Koppal583234,Karnataka.& 08539-286711to15/286767.Fax:286761/486706.(Mr.K.Ramesh,Dy.Gen.Mgr.)
kAmInI FerroUS
60.
61.
62.
63.
register ofneW ProJeCtS In IndIA 2007
16
lAl trAderS & AgenCIeS has announced plans to set up an integrated steel plant spread over 100 acres at Badampahar in Mayurbganj district of Orissa. The two phase scheme entails an investment of Rs.2,000 million. As of April 2007, land had been acquired and the proposal was in a preliminary stage. Further developments are expected in the following months.
ß LalTraders&AgenciesLtd,2ndFloor,7,SirajUddaulaSarani,WaterlooStreet, Kolkata700069,WestBengal.& 033-22482623.Fax:22482623.(Mr.RajkumarMishra,Dir.)
lAxmI VAyAAPAr is planning to set up a 10,000 tpa seamless tubes and pipes production unit at Pandua in Hooghly district of WB. The unit envisages an investment of Rs.20 million to be funded through banks & internal accruals. Consultants and equipment suppliers are yet to be finalized. As of April 2007, statutory clearances are awaited and loans are yet to be secured. The project is expected to begin in June 2007 and is scheduled for completion by mid 2008.
ß LaxmiVayaaparPvtLtd,189,MukaramBabuStreet,Kolkata700007,WestBengal.& 033-24553961.Fax:24553961.
mAhAbAl metAlS has announced plans an expansion programme at its existing Miraj facility in Sangli district of Maharashtra. the programme is to increase the capacity of cast iron from 500 tpm to 2,250 tpm at an investment of Rs.50 million. the project is to be funded through internal accruals and term loan from banks. As of April 2007, land was being acquired and negotiations with FI’s were underway for securing loan. The programme is slated for completion in 6 months from zero date.
ß MahabalMetalsPvtLtd,PlotNo.23,MIDC,Miraj,Sangli416410,Maharashtra.& 0233-2211101.Fax:2644092.
mAhAlAxmI IngotS is planning to set up a 700 tpd steel bars production unit at MIDC Jalna in Maharashtra. As of March 2007, the company was to appoint the consultant. Meanwhile, the company had initiated process for land acquisition and the project details were to be finalised. Plans are also on the anvil to set up a rolling mill and billets facilities.
ß MahalaxmiIngotsPvtLtd,D-57,MIDCAdditional,Jalna,431203,Maharashtra.& 02482-221209.
mAIthAn ISPAt is setting up a sponge iron plant and associated units at Kalinganagar in Jajpur district of Orissa. The project includes setting up of a 350 tpd sponge iron plant, 262,000 tpa hot rolled semi finished iron and steel products, 400,000 tpa rolling mill and 30 MW WHR based captive power plant. The project entails a cumulative investment of Rs.5,350 million to be funded through internal accruals and loan from banks. The equipments for the project will be sourced from Tata group. As of March 2007, civil work initiated. The sponge iron plant is scheduled to be completed by April 2008. It may be noted that the clearances for rolling mill & hot rolled products were to be obtained.
ß MaithanIspatLtd,20,BritishIndiaStreet,Kolkatta700069,WestBengal.& 033-22138532.Fax:22430585.(Mr.BishnuBajaj,Mgr-Fin.)
lAl trAderS & AgenCIeS
64.
65.
66.
67.
68.
mAnAkSIA is planning a debottlenecking programme at its existing units in WB with a cumulative investment of Rs.1,155 million. the scheme envisages installation of additional equipments and machinery for aluminum rolling mill, speciality alloy plant and steel cold rolling plant. The project is scheduled for completion in the financial year 2008.
ß ManaksiaLtd,BikanerBuilding,3rdFloor,8/1,LalbazarStreet,Kolkata700001,WestBengal.& 033-22310050to52.Fax:22300336.
menon AlkoP has announced plans to double the capacity at its existing Kagal foundry in Kolhapur district of Maharashtra. The capacity of die castings will be increased from 250 tpm to 500 tpm. As of April 2007, the proposal was in a preliminary stage and the project was schedule to be finalised in the following months.
ß MenonAlkopPvtLtd,PlotNo.C-1,FiveStarMIDCKagal,KolhapurMaharashtra.& 0231-2305001to05.(Mr.T.M.Verma,Asst.Mgr.-Mktg.)
mohAn engIneerIng IndUStrIeS is to set up a foundry at Idigarai in Coimbatore district of tN. the unit envisages setting up of a capacity of 50 tpm for ferrous castings and a 20 tpm for non-ferrous castings at an investment of Rs.7.5 million. Sarvalakshmi Foundry, Coimbatore is the equipment supplier. As of April 2007, clearances had been obtained and civil work is to begin by October 2007. The unit is slated for completion in 1 year thereafter.
ß MohanEngineeringIndustries,29,SubramaniamLayout,Opp.Viswanathapuram,Thudiyalur, Coimbatore641034,TamilNadu.& 0422-2642226.(Mr.Mohan,Dir.)
monnet ISPAt & energy has drawn up plans to double the steel production at its existing Hazaribagh facility in Jharkhand. The programme is to increase the capacity of steel ingots, billets and sponge iron from 0.5 million tpa to 1 million tpa. an investment of Rs.161,000 million is envisaged to be funded through internal accruals & loans. the company may procure most of the equipments from China. As of March 2007, clearances were to be obtained and land to be acquired. the project is likely to be completed in 4 years.
ß MonnetIspat&EnergyLtd,304,MohtaChambers,BhikajiCamaPlace, NewDelhi110066,Delhi.& 011-26176705to07.Fax:26102567.(Mr.Narware,Dir.-Technical.)
monnet ISPAt & energy has drawn up plans for an expansion of its Raigarh facility in Chhattisgarh. The project includes setting up of a 1.55 million tpa steel mill, a 75,000 tpa ferro alloys unit, a 1.5 million tpa rolling & plate mill, a 1 million tpa blast furnace, a 1.8 million tpa pelletisation unit, a 1 million tpa coal benefication unit, a 750,000 tpa centre plant, a 400,000 tpa sponge iron unit and a 170 MW captive power plant. The project envisages an estimated cost of Rs.20,870 million. As of May 2007, the company had signed an MoU with the state government.
ß MonnetIspat&EnergyLtd,304,MohtaChambers,BhikajiCamaPlace, NewDelhi110066,Delhi.& 011-26176705to07.Fax:26102567.ß Plt:Naharpali,TahsilKharsia,Raigarh496601,Chhattisgarh& 07762-232969/325169.
mAnAkSIA
69.
70.
71.
72.
73.
register ofneW ProJeCtS In IndIA 2007
17
lAl trAderS & AgenCIeS has announced plans to set up an integrated steel plant spread over 100 acres at Badampahar in Mayurbganj district of Orissa. The two phase scheme entails an investment of Rs.2,000 million. As of April 2007, land had been acquired and the proposal was in a preliminary stage. Further developments are expected in the following months.
ß LalTraders&AgenciesLtd,2ndFloor,7,SirajUddaulaSarani,WaterlooStreet, Kolkata700069,WestBengal.& 033-22482623.Fax:22482623.(Mr.RajkumarMishra,Dir.)
lAxmI VAyAAPAr is planning to set up a 10,000 tpa seamless tubes and pipes production unit at Pandua in Hooghly district of WB. The unit envisages an investment of Rs.20 million to be funded through banks & internal accruals. Consultants and equipment suppliers are yet to be finalized. As of April 2007, statutory clearances are awaited and loans are yet to be secured. The project is expected to begin in June 2007 and is scheduled for completion by mid 2008.
ß LaxmiVayaaparPvtLtd,189,MukaramBabuStreet,Kolkata700007,WestBengal.& 033-24553961.Fax:24553961.
mAhAbAl metAlS has announced plans an expansion programme at its existing Miraj facility in Sangli district of Maharashtra. the programme is to increase the capacity of cast iron from 500 tpm to 2,250 tpm at an investment of Rs.50 million. the project is to be funded through internal accruals and term loan from banks. As of April 2007, land was being acquired and negotiations with FI’s were underway for securing loan. The programme is slated for completion in 6 months from zero date.
ß MahabalMetalsPvtLtd,PlotNo.23,MIDC,Miraj,Sangli416410,Maharashtra.& 0233-2211101.Fax:2644092.
mAhAlAxmI IngotS is planning to set up a 700 tpd steel bars production unit at MIDC Jalna in Maharashtra. As of March 2007, the company was to appoint the consultant. Meanwhile, the company had initiated process for land acquisition and the project details were to be finalised. Plans are also on the anvil to set up a rolling mill and billets facilities.
ß MahalaxmiIngotsPvtLtd,D-57,MIDCAdditional,Jalna,431203,Maharashtra.& 02482-221209.
mAIthAn ISPAt is setting up a sponge iron plant and associated units at Kalinganagar in Jajpur district of Orissa. The project includes setting up of a 350 tpd sponge iron plant, 262,000 tpa hot rolled semi finished iron and steel products, 400,000 tpa rolling mill and 30 MW WHR based captive power plant. The project entails a cumulative investment of Rs.5,350 million to be funded through internal accruals and loan from banks. The equipments for the project will be sourced from Tata group. As of March 2007, civil work initiated. The sponge iron plant is scheduled to be completed by April 2008. It may be noted that the clearances for rolling mill & hot rolled products were to be obtained.
ß MaithanIspatLtd,20,BritishIndiaStreet,Kolkatta700069,WestBengal.& 033-22138532.Fax:22430585.(Mr.BishnuBajaj,Mgr-Fin.)
lAl trAderS & AgenCIeS
64.
65.
66.
67.
68.
mAnAkSIA is planning a debottlenecking programme at its existing units in WB with a cumulative investment of Rs.1,155 million. the scheme envisages installation of additional equipments and machinery for aluminum rolling mill, speciality alloy plant and steel cold rolling plant. The project is scheduled for completion in the financial year 2008.
ß ManaksiaLtd,BikanerBuilding,3rdFloor,8/1,LalbazarStreet,Kolkata700001,WestBengal.& 033-22310050to52.Fax:22300336.
menon AlkoP has announced plans to double the capacity at its existing Kagal foundry in Kolhapur district of Maharashtra. The capacity of die castings will be increased from 250 tpm to 500 tpm. As of April 2007, the proposal was in a preliminary stage and the project was schedule to be finalised in the following months.
ß MenonAlkopPvtLtd,PlotNo.C-1,FiveStarMIDCKagal,KolhapurMaharashtra.& 0231-2305001to05.(Mr.T.M.Verma,Asst.Mgr.-Mktg.)
mohAn engIneerIng IndUStrIeS is to set up a foundry at Idigarai in Coimbatore district of tN. the unit envisages setting up of a capacity of 50 tpm for ferrous castings and a 20 tpm for non-ferrous castings at an investment of Rs.7.5 million. Sarvalakshmi Foundry, Coimbatore is the equipment supplier. As of April 2007, clearances had been obtained and civil work is to begin by October 2007. The unit is slated for completion in 1 year thereafter.
ß MohanEngineeringIndustries,29,SubramaniamLayout,Opp.Viswanathapuram,Thudiyalur, Coimbatore641034,TamilNadu.& 0422-2642226.(Mr.Mohan,Dir.)
monnet ISPAt & energy has drawn up plans to double the steel production at its existing Hazaribagh facility in Jharkhand. The programme is to increase the capacity of steel ingots, billets and sponge iron from 0.5 million tpa to 1 million tpa. an investment of Rs.161,000 million is envisaged to be funded through internal accruals & loans. the company may procure most of the equipments from China. As of March 2007, clearances were to be obtained and land to be acquired. the project is likely to be completed in 4 years.
ß MonnetIspat&EnergyLtd,304,MohtaChambers,BhikajiCamaPlace, NewDelhi110066,Delhi.& 011-26176705to07.Fax:26102567.(Mr.Narware,Dir.-Technical.)
monnet ISPAt & energy has drawn up plans for an expansion of its Raigarh facility in Chhattisgarh. The project includes setting up of a 1.55 million tpa steel mill, a 75,000 tpa ferro alloys unit, a 1.5 million tpa rolling & plate mill, a 1 million tpa blast furnace, a 1.8 million tpa pelletisation unit, a 1 million tpa coal benefication unit, a 750,000 tpa centre plant, a 400,000 tpa sponge iron unit and a 170 MW captive power plant. The project envisages an estimated cost of Rs.20,870 million. As of May 2007, the company had signed an MoU with the state government.
ß MonnetIspat&EnergyLtd,304,MohtaChambers,BhikajiCamaPlace, NewDelhi110066,Delhi.& 011-26176705to07.Fax:26102567.ß Plt:Naharpali,TahsilKharsia,Raigarh496601,Chhattisgarh& 07762-232969/325169.
mAnAkSIA
69.
70.
71.
72.
73.
register ofneW ProJeCtS In IndIA 2007
18
monnet ISPAt & energy is to set up an integrated steel plant in angul district of orissa. the project includes setting up of a 200,000 tpa sponge iron, a 400,000 tpa steel billets and a 1,000 MW CPP at an estimated investment of Rs.50,000 million. DCPL, Kolkata is the project consultant for CPP. Consultants for the steel plant were to be finalised. Beekay Engineering, Bhilai is the equipment supplier. As of May 2007, land acquisition was under progress. The project is scheduled for completion in 3 years from now.
ß MonnetIspat&EnergyLtd,304,MohtaChambers,BhikajiCamaPlace, NewDelhi110066,Delhi.& 011-26176705to07.(Mr.A.K.Jain,ExeDir.)ß BeekayEngineeringCorp,45/47,IndustrialEstate,Bhilai490026,Chhattisgarh.& 0788-2282571to76.Fax:2282578.
mSP metAllICS has proposed to set up a iron ore pelletisation and sinter plant at Markuta in Jharsuguda district of Orissa. The company was to finalise capacity and other parameters pertaining to the project. As of May 2007, the project was in a nascent stage and further developments were expected in the coming months.
ß MSPMetallicsLtd,16/S,Block-A,NewAlipore,Kolkata700053,WestBengal.& 033-24570038/24573940.
mSP Steel & PoWer has drawn up plans for an expansion programme at its existing Raigarh integrated steel complex in Chhattisgarh. the expansion includes setting up of a 400,000 tpa pig iron unit, a 600,000 tpa pelletisation unit, a 300,000 tpa billets unit, a 300,000 tpa DRI unit, a 300,000 tpa re-rolled products and a 60 MW WHR based CPP. The project envisages a cumulative investment of Rs.8,500 million. As of May 2007, MoU was signed with the Chhattisgarh government. Work on the project will be initiated in the following months.
ß MSPSteel&PowerLtd,16/S,BlockA,NewAlipore,Kolkata700053,WestBengal.& 033-24570038to40.Fax:24582239.ß Plt:P.O&Village:Jamgaon,Raigarh,Chhattisgarh,& 07762-264450to53.
mySore mInerAlS is to set up a benefication plant for metallurgical products. The plant will pelletise and process iron ores and chromites. The proposal is to be implemented on PPP (public-private partnership) basis. As of March 2007, the company was scouting for a JV partner to implement the project.
ß MysoreMineralsLtd,39,MahatmaGandhiRoad,Bangalore560001,Karnataka.& 080-25580373/25580374/25580375.Fax:25583172.
nAlWA SPonge Iron is to set up a steel plant at Nalwa in Raigarh district of Chhattishgarh. The project includes setting up of a 1,000 tpd sponge iron and a 76 MW (WHR & coal based) CPP. The project will entail a cumulative investment of Rs.5,000 million, to be funded through bank loans & internal accruals. M.N. Dastur, Kolkata is to render project consultancy. The company was in the process of appointing civil contractor and the equipment suppliers. As of May 2007, the DPR was being prepared. The work on the project is expected to begin in September 2007 and is schedule for completion in 18 months thereafter.
ß NalwaSpongeIronLtd,TaraimalGhagodaRoad,Raigarh496001,Chhattisgarh.
monnet ISPAt & energy
74.
75.
76.
77.
78.
& 07762-261489to91.Fax:261491/261492.(Mr.Asimnath,Asst.Mgr.)ß M.N.Dastur&CoPvtLtd,FaradyHouse,P-17,MissionRowExtension, Kolkata700013,WestBengal.& 033-22255420.Fax:22251422.
nAndhInI CAStIngS has announced plans to expand its foundry for iron castings at Keeranatham in Coimbatore district of TN. The capacity is to be augmented from 30 tpm to 100 tpm. The project will entail an investment of Rs.1.5 million to be funded through internal accruals. Sakthi Machine Tools, Bangalore is the equipment supplier. As of April 2007, clearances for the project received. Civil work is expected to commence in the last quarter of 2007and the expansion is scheduled for completion in one year thereafter.
ß NandhiniCastings,QuartresRoad,BharathiNagar,GanapathiPost, Coimbatore641006,TamilNadu.& 0422-2510286.ß SakthiMachineTools,10/3,1stFloor,6thcross,VictoriaLayout,Bangalore560047,Karnataka.& 080-5570249.Fax:5570248.
nArAyAnAdrI PoWer ProJeCtS is planning to set up a 100 tpd sponge iron plant at thippayapalli in Cuddapah district of aP. an investment of Rs.140 million is envisaged to be funded entirely through loan from ASFC. As of May 2007, all clearances were awaited and the equipment suppliers were to be finalised. Work on the project is expected to begin after securing the clearances.
ß NarayanadriPowerProjectsPvtLtd,443/A/28/A,RoadNo,86JubileeHills, Hyderabad500034,AndhraPradesh.& 040-23540950.
nAtIonAl mInerAl deV CorP is to set up an integrated steel plant in two phases at Nagarmar in jagdalpur district of Chhattishgarh. Phase I programme comprising a 100,000 tpa sponge iron unit and a 10 MW coal based CPP at a cumulative investment of Rs.800 million. Sponge Iron India, Hyderabad has been appointed as the project consultant. as of April 2007, empanelment tenders were being prepared and clearances were awaited. Phase I programme is scheduled for completion in 2 years. Phase II includes a 100,000 tpa billet unit, an induction furnace & a capacity addition of 35 MW to the existing 45 MW CPP from Phase I at a cost of Rs.500 million. Both phases are to be funded through internal accruals. Phase II is to begin after the completion of phase I and scheduled for completion in 1 year thereafter.
ß NationalMineralDevCorpLtd,KhanjiBhavan,MasabTank,HyderabadAndhraPradesh.& 040-23538713to20.Fax:23538711.(Mr.Agarwal,Addl.Gen.Mgr.)ß SpongeIronIndiaLimited,10-3-311/A,6thFloor,CastleHills,MasabTank, Hyderabad500028,AndhraPradesh.& 040-23535156/23534716.Fax:23535531.
nIthyA IndUStrIeS has drawn up plans to expand its Vilankurichi foundry in Coimbatore district of TN. The capacity is to augmented from 250 tpm to 350 tpm. The expansion envisages an investment of Rs.50 million to be funded through banks & internal accruals at a ratio of 3:1. Sakthi Automotive Components, Coimbatore is the equipment supplier. As of April 2007,
nAndhInI CAStIngS
79.
80.
81.
82.
register ofneW ProJeCtS In IndIA 2007
19
monnet ISPAt & energy is to set up an integrated steel plant in angul district of orissa. the project includes setting up of a 200,000 tpa sponge iron, a 400,000 tpa steel billets and a 1,000 MW CPP at an estimated investment of Rs.50,000 million. DCPL, Kolkata is the project consultant for CPP. Consultants for the steel plant were to be finalised. Beekay Engineering, Bhilai is the equipment supplier. As of May 2007, land acquisition was under progress. The project is scheduled for completion in 3 years from now.
ß MonnetIspat&EnergyLtd,304,MohtaChambers,BhikajiCamaPlace, NewDelhi110066,Delhi.& 011-26176705to07.(Mr.A.K.Jain,ExeDir.)ß BeekayEngineeringCorp,45/47,IndustrialEstate,Bhilai490026,Chhattisgarh.& 0788-2282571to76.Fax:2282578.
mSP metAllICS has proposed to set up a iron ore pelletisation and sinter plant at Markuta in Jharsuguda district of Orissa. The company was to finalise capacity and other parameters pertaining to the project. As of May 2007, the project was in a nascent stage and further developments were expected in the coming months.
ß MSPMetallicsLtd,16/S,Block-A,NewAlipore,Kolkata700053,WestBengal.& 033-24570038/24573940.
mSP Steel & PoWer has drawn up plans for an expansion programme at its existing Raigarh integrated steel complex in Chhattisgarh. the expansion includes setting up of a 400,000 tpa pig iron unit, a 600,000 tpa pelletisation unit, a 300,000 tpa billets unit, a 300,000 tpa DRI unit, a 300,000 tpa re-rolled products and a 60 MW WHR based CPP. The project envisages a cumulative investment of Rs.8,500 million. As of May 2007, MoU was signed with the Chhattisgarh government. Work on the project will be initiated in the following months.
ß MSPSteel&PowerLtd,16/S,BlockA,NewAlipore,Kolkata700053,WestBengal.& 033-24570038to40.Fax:24582239.ß Plt:P.O&Village:Jamgaon,Raigarh,Chhattisgarh,& 07762-264450to53.
mySore mInerAlS is to set up a benefication plant for metallurgical products. The plant will pelletise and process iron ores and chromites. The proposal is to be implemented on PPP (public-private partnership) basis. As of March 2007, the company was scouting for a JV partner to implement the project.
ß MysoreMineralsLtd,39,MahatmaGandhiRoad,Bangalore560001,Karnataka.& 080-25580373/25580374/25580375.Fax:25583172.
nAlWA SPonge Iron is to set up a steel plant at Nalwa in Raigarh district of Chhattishgarh. The project includes setting up of a 1,000 tpd sponge iron and a 76 MW (WHR & coal based) CPP. The project will entail a cumulative investment of Rs.5,000 million, to be funded through bank loans & internal accruals. M.N. Dastur, Kolkata is to render project consultancy. The company was in the process of appointing civil contractor and the equipment suppliers. As of May 2007, the DPR was being prepared. The work on the project is expected to begin in September 2007 and is schedule for completion in 18 months thereafter.
ß NalwaSpongeIronLtd,TaraimalGhagodaRoad,Raigarh496001,Chhattisgarh.
monnet ISPAt & energy
74.
75.
76.
77.
78.
& 07762-261489to91.Fax:261491/261492.(Mr.Asimnath,Asst.Mgr.)ß M.N.Dastur&CoPvtLtd,FaradyHouse,P-17,MissionRowExtension, Kolkata700013,WestBengal.& 033-22255420.Fax:22251422.
nAndhInI CAStIngS has announced plans to expand its foundry for iron castings at Keeranatham in Coimbatore district of TN. The capacity is to be augmented from 30 tpm to 100 tpm. The project will entail an investment of Rs.1.5 million to be funded through internal accruals. Sakthi Machine Tools, Bangalore is the equipment supplier. As of April 2007, clearances for the project received. Civil work is expected to commence in the last quarter of 2007and the expansion is scheduled for completion in one year thereafter.
ß NandhiniCastings,QuartresRoad,BharathiNagar,GanapathiPost, Coimbatore641006,TamilNadu.& 0422-2510286.ß SakthiMachineTools,10/3,1stFloor,6thcross,VictoriaLayout,Bangalore560047,Karnataka.& 080-5570249.Fax:5570248.
nArAyAnAdrI PoWer ProJeCtS is planning to set up a 100 tpd sponge iron plant at thippayapalli in Cuddapah district of aP. an investment of Rs.140 million is envisaged to be funded entirely through loan from ASFC. As of May 2007, all clearances were awaited and the equipment suppliers were to be finalised. Work on the project is expected to begin after securing the clearances.
ß NarayanadriPowerProjectsPvtLtd,443/A/28/A,RoadNo,86JubileeHills, Hyderabad500034,AndhraPradesh.& 040-23540950.
nAtIonAl mInerAl deV CorP is to set up an integrated steel plant in two phases at Nagarmar in jagdalpur district of Chhattishgarh. Phase I programme comprising a 100,000 tpa sponge iron unit and a 10 MW coal based CPP at a cumulative investment of Rs.800 million. Sponge Iron India, Hyderabad has been appointed as the project consultant. as of April 2007, empanelment tenders were being prepared and clearances were awaited. Phase I programme is scheduled for completion in 2 years. Phase II includes a 100,000 tpa billet unit, an induction furnace & a capacity addition of 35 MW to the existing 45 MW CPP from Phase I at a cost of Rs.500 million. Both phases are to be funded through internal accruals. Phase II is to begin after the completion of phase I and scheduled for completion in 1 year thereafter.
ß NationalMineralDevCorpLtd,KhanjiBhavan,MasabTank,HyderabadAndhraPradesh.& 040-23538713to20.Fax:23538711.(Mr.Agarwal,Addl.Gen.Mgr.)ß SpongeIronIndiaLimited,10-3-311/A,6thFloor,CastleHills,MasabTank, Hyderabad500028,AndhraPradesh.& 040-23535156/23534716.Fax:23535531.
nIthyA IndUStrIeS has drawn up plans to expand its Vilankurichi foundry in Coimbatore district of TN. The capacity is to augmented from 250 tpm to 350 tpm. The expansion envisages an investment of Rs.50 million to be funded through banks & internal accruals at a ratio of 3:1. Sakthi Automotive Components, Coimbatore is the equipment supplier. As of April 2007,
nAndhInI CAStIngS
79.
80.
81.
82.
register ofneW ProJeCtS In IndIA 2007
20
clearances have been obtained and loans to be secured. The project work is likely to begin by june and is scheduled to be completed in 6 months thereafter.
ß NithyaIndustries,SF.No.429,6thCross,ThaneerPandhal,B.K.Road, Coimbatore641004,TamilNadu.&0422-253421.(Mr.Udhyakumar,Mgr.Dir.)ß SakthiAutoComponents,180,RaceCourseRoad,Coimbatore641018,TamilNadu.& 0422-2221551/2221552.Fax:2220574/2220329.
nUtAn ISPAt is to set up a 300 million tpa iron ore pelletisation unit at Jaroda in Raipur district of Chhattisgarh. the project envisages an investment of Rs.2,000 million to be funded through banks & internal accruals. The company’s in-house team is involved in development activities while machineries to be imported from China. As of April 2007, loans were being secured and the clearances were awaited. The unit is scheduled for completion in 6 months from zero date.
ß NutanIspatPvtLtd,P.O.Jaroda,BlockDharsiwa,Raipur493127,Chhattisgarh.& 0771-2250327.(Mr.PradeepKumarBiswas,Dir.-Tech.)
PAnChArAtnA metAl ProCeSSIng has announced plans to set up a new steel rolling mill and induction furnace at Khambalapa in Medak district of AP. As of March 2007, consultants were yet to be appointed and the proposal was in a preliminary stage. Further developments are expected in the following months.
ß PanchratnaMetalProcessingLtd,5-2-202,FirstFloor,BalajiMarket,Ranigunj, Secunderabad-500003,AndhraPradesh.& 040-27544171.(Mr.Agarwal,Mg.Dir.)
PArIkh enterPrISeS is to set up a 36,000 tpa copper products unit at Bharuch in Gujarat. the project envisages an investment of Rs.1,000 million, to be funded through banks & internal accruals at a ratio of 7:3. The company was in the process to secure loans. As of April 2007, statutory clearances were awaited. Civil work is expected to begin by June 2007 and is slated for completion in 18 months.
ß ParikhEnterprisesPvtLtd,PlotNo.442,GIDC,Odhav,Ahmedabad382415,Gujarat.& 079-22871471/22871442.Fax:22872797.(Mr.Suresh,Exe.Dir.)
PArWAZ SPonge Iron is to set up a 2 x 100 tpd sponge iron plant at Hagari Bommanahalli in Bellary district of Karnataka. The plant envisages an investment of Rs.250 million to be funded through banks & internal accruals at a ratio of 9:1. As of April 2007, statutory clearances were awaited and the civil work was expected to begin by June 2007. The project is slated for completion in one year thereafter. Plans are also on the anvil to set up captive power plant in the second phase.
ß ParwazSpongeIronPvtLtd,ParwazManzil,12/792,Devinagar,ChittawadgiHospet, Bellary583211,Karnataka.& 08394-227860.Fax:223880.(Mr.MohammedImam,Dir.)
PAtWArI SteelS is planning to set up a 10,000 tpm sponge iron plant at Rourkela in Sundargarh district of Orissa. An investment of Rs.800 million is to be entailed and funded
nUtAn ISPAt
83.
84.
85.
86.
87.
through banks & internal accruals in a ratio of 75:25. As of March 2007, statutory clearances were awaited. The company is expected to commission in 12 months.
ß PatwariSteelsPvtLtd,6A,RajendraNagar,PatnaSagar,Patna800016,Bihar.& 0612-2672907.
PAWAnJAI Steel & PoWer is planning to set up an integrated steel plant at Sitio in lohardaga district of jharkhand. the project includes setting up of a 1,000 tpd sponge iron unit, a 25 MW CPP and a 4,000 tpd rolling mill. the project entails a cumulative investment of Rs.14,000 million to be funded through banks & internal accruals. Venky Naidu, Hyderabad is the project consultant while the equipment suppliers were yet to be finalised. As of April 2007, the clearances were awaited and the proposal was in a conceptual stage. The project is expected to be commissioned by March 2008.
ß PawanjaiSteel&PowerLtd,EastGolaRoad,UpperBazar,Lohardaga,835302,Jharkhand.& 06526-224075/224584.Fax:224075.(Mr.B.C.Kuila,Proj.Mgr.)
PIoneer engIneerIng Industries is planning to expand its existing Ujjain facility in MP. The programme is to double the capacity from 1,200 tpa to 2,400 tpa of SG iron castings with an investment of Rs.15 million. Deepak Pneumatics, Mumbai is the project consultant and Inductotherm India, Ahmedabad is supplying the major equipments. The company was to begin negotiations with FI’s shortly to secure loan. As of April 2007, the civil work was to begin shortly. The expansion is likely scheduled for completion in 8 months.
ß PioneerEngineeringIndustries,75/7,IndustrialArea,MaxiRoad, Ujjain,456010,MadhyaPradesh.& 0734-2517762.ß InductothermIndiaPvtLtd,ShriKishorebhaiD.VyasBuilding,Bopal, Ahmedabad380058,Gujarat.& 02717-231961.(8lines).Fax:231266
PrAkASh ISPAt is to set up a 200,000 tpa pig iron plant by installing blast furnace at Chaibasa in West Singhbhum district of jharkhand. the project entails an investment of Rs.1,000 million. As of May 2007, land has been acquired and allotment of captive mine was awaited. Work on the project is expected to commence soon after the allotment of captive mine. Plans are also on the anvil to set up a CPP in the upcoming project.
ß PrakashIspatLtd,7/398,GandhiTola,Chaibasa,WestSinghbhum833201,Jharkhand.& 06582-258460/258461.(Mr.I.C.Bihani,Gen.Mgr.&Proj.Incharge.)
rAJ reFrACtorIeS is to set up a steel plant at Patratu in Hazaribagh district of Jharkhand. the project is includes setting up of a 200 tpd sponge iron unit, installation of a 2.5 MVa furnace for ferro alloys and a 12 MW WHR based CPP. the project envisages a cumulative investment of Rs.510 million to be funded through banks & internal accruals. Popuri engineering Consultants, Hyderabad is the project consultant. As of April 2007, statutory clearances were awaited. The project is slated for completion in 2 years.
ß RajRefractoriesPvtLtd,HindusthanBuilding,5thFloor,MainRoad,Ranchi834001,Jharkhand.& 0651-2209036.Fax:2300878.(Mr.RajeevBiani,Mgr.-Proj.&Mktg.)ß PopuriEngineering&ConsultancyServicesPvtLtd,12-2-460,NewHUDALayout, Gudimalkapur,Opp.AnushaHospital,Mehdipatnam,Hyderabad500028,AndhraPradesh.& 040-23510649/23510777/23510811/23510844.
PAWAnJAI Steel & PoWer
88.
89.
90.
91.
register ofneW ProJeCtS In IndIA 2007
21
clearances have been obtained and loans to be secured. The project work is likely to begin by june and is scheduled to be completed in 6 months thereafter.
ß NithyaIndustries,SF.No.429,6thCross,ThaneerPandhal,B.K.Road, Coimbatore641004,TamilNadu.&0422-253421.(Mr.Udhyakumar,Mgr.Dir.)ß SakthiAutoComponents,180,RaceCourseRoad,Coimbatore641018,TamilNadu.& 0422-2221551/2221552.Fax:2220574/2220329.
nUtAn ISPAt is to set up a 300 million tpa iron ore pelletisation unit at Jaroda in Raipur district of Chhattisgarh. the project envisages an investment of Rs.2,000 million to be funded through banks & internal accruals. The company’s in-house team is involved in development activities while machineries to be imported from China. As of April 2007, loans were being secured and the clearances were awaited. The unit is scheduled for completion in 6 months from zero date.
ß NutanIspatPvtLtd,P.O.Jaroda,BlockDharsiwa,Raipur493127,Chhattisgarh.& 0771-2250327.(Mr.PradeepKumarBiswas,Dir.-Tech.)
PAnChArAtnA metAl ProCeSSIng has announced plans to set up a new steel rolling mill and induction furnace at Khambalapa in Medak district of AP. As of March 2007, consultants were yet to be appointed and the proposal was in a preliminary stage. Further developments are expected in the following months.
ß PanchratnaMetalProcessingLtd,5-2-202,FirstFloor,BalajiMarket,Ranigunj, Secunderabad-500003,AndhraPradesh.& 040-27544171.(Mr.Agarwal,Mg.Dir.)
PArIkh enterPrISeS is to set up a 36,000 tpa copper products unit at Bharuch in Gujarat. the project envisages an investment of Rs.1,000 million, to be funded through banks & internal accruals at a ratio of 7:3. The company was in the process to secure loans. As of April 2007, statutory clearances were awaited. Civil work is expected to begin by June 2007 and is slated for completion in 18 months.
ß ParikhEnterprisesPvtLtd,PlotNo.442,GIDC,Odhav,Ahmedabad382415,Gujarat.& 079-22871471/22871442.Fax:22872797.(Mr.Suresh,Exe.Dir.)
PArWAZ SPonge Iron is to set up a 2 x 100 tpd sponge iron plant at Hagari Bommanahalli in Bellary district of Karnataka. The plant envisages an investment of Rs.250 million to be funded through banks & internal accruals at a ratio of 9:1. As of April 2007, statutory clearances were awaited and the civil work was expected to begin by June 2007. The project is slated for completion in one year thereafter. Plans are also on the anvil to set up captive power plant in the second phase.
ß ParwazSpongeIronPvtLtd,ParwazManzil,12/792,Devinagar,ChittawadgiHospet, Bellary583211,Karnataka.& 08394-227860.Fax:223880.(Mr.MohammedImam,Dir.)
PAtWArI SteelS is planning to set up a 10,000 tpm sponge iron plant at Rourkela in Sundargarh district of Orissa. An investment of Rs.800 million is to be entailed and funded
nUtAn ISPAt
83.
84.
85.
86.
87.
through banks & internal accruals in a ratio of 75:25. As of March 2007, statutory clearances were awaited. The company is expected to commission in 12 months.
ß PatwariSteelsPvtLtd,6A,RajendraNagar,PatnaSagar,Patna800016,Bihar.& 0612-2672907.
PAWAnJAI Steel & PoWer is planning to set up an integrated steel plant at Sitio in lohardaga district of jharkhand. the project includes setting up of a 1,000 tpd sponge iron unit, a 25 MW CPP and a 4,000 tpd rolling mill. the project entails a cumulative investment of Rs.14,000 million to be funded through banks & internal accruals. Venky Naidu, Hyderabad is the project consultant while the equipment suppliers were yet to be finalised. As of April 2007, the clearances were awaited and the proposal was in a conceptual stage. The project is expected to be commissioned by March 2008.
ß PawanjaiSteel&PowerLtd,EastGolaRoad,UpperBazar,Lohardaga,835302,Jharkhand.& 06526-224075/224584.Fax:224075.(Mr.B.C.Kuila,Proj.Mgr.)
PIoneer engIneerIng Industries is planning to expand its existing Ujjain facility in MP. The programme is to double the capacity from 1,200 tpa to 2,400 tpa of SG iron castings with an investment of Rs.15 million. Deepak Pneumatics, Mumbai is the project consultant and Inductotherm India, Ahmedabad is supplying the major equipments. The company was to begin negotiations with FI’s shortly to secure loan. As of April 2007, the civil work was to begin shortly. The expansion is likely scheduled for completion in 8 months.
ß PioneerEngineeringIndustries,75/7,IndustrialArea,MaxiRoad, Ujjain,456010,MadhyaPradesh.& 0734-2517762.ß InductothermIndiaPvtLtd,ShriKishorebhaiD.VyasBuilding,Bopal, Ahmedabad380058,Gujarat.& 02717-231961.(8lines).Fax:231266
PrAkASh ISPAt is to set up a 200,000 tpa pig iron plant by installing blast furnace at Chaibasa in West Singhbhum district of jharkhand. the project entails an investment of Rs.1,000 million. As of May 2007, land has been acquired and allotment of captive mine was awaited. Work on the project is expected to commence soon after the allotment of captive mine. Plans are also on the anvil to set up a CPP in the upcoming project.
ß PrakashIspatLtd,7/398,GandhiTola,Chaibasa,WestSinghbhum833201,Jharkhand.& 06582-258460/258461.(Mr.I.C.Bihani,Gen.Mgr.&Proj.Incharge.)
rAJ reFrACtorIeS is to set up a steel plant at Patratu in Hazaribagh district of Jharkhand. the project is includes setting up of a 200 tpd sponge iron unit, installation of a 2.5 MVa furnace for ferro alloys and a 12 MW WHR based CPP. the project envisages a cumulative investment of Rs.510 million to be funded through banks & internal accruals. Popuri engineering Consultants, Hyderabad is the project consultant. As of April 2007, statutory clearances were awaited. The project is slated for completion in 2 years.
ß RajRefractoriesPvtLtd,HindusthanBuilding,5thFloor,MainRoad,Ranchi834001,Jharkhand.& 0651-2209036.Fax:2300878.(Mr.RajeevBiani,Mgr.-Proj.&Mktg.)ß PopuriEngineering&ConsultancyServicesPvtLtd,12-2-460,NewHUDALayout, Gudimalkapur,Opp.AnushaHospital,Mehdipatnam,Hyderabad500028,AndhraPradesh.& 040-23510649/23510777/23510811/23510844.
PAWAnJAI Steel & PoWer
88.
89.
90.
91.
register ofneW ProJeCtS In IndIA 2007
22
rAJeSh StrIPS has announced plans to implement the phase II expansion programme at its Urla facility in Raipur district of Chhattisgarh. the scheme envisages setting up of a 300,000 tpa steel melting shop, a 150,000 tpa structural mill and a 50 MW WHR based CPP at a cumulative investment of Rs.3,200 million. As of March 2007, the company signed an MoU with the state government. Work on the project is expected to begin in the following months.
ß RajeshStripsLtd,535/C,UrlaIndlArea,Raipur493221,Chhattisgarh.& 0771-2323401/2323402.Fax:2324402.(Mr.AshokAgarwal,Gen.Mgr.)
rAthI bArS is planning modernisation and upgradation programme at its existing Bhiwadi facility in Rajasthan. the programme envisages increasing the capacity of steel bars from 18,000 tpa to 22,500 tpa with an investment of Rs.198.8 million. The project is to be funded through IPO, term loans & internal accruals. As of March 2007, building and plant design works had been initiated while equipment suppliers were yet to be appointed. Work on the project expected to begin in the next 2 months and is scheduled to be completed by March 2008.
ß RathiBarsLtd,A-24/7,MohanCo-operativeIndustrialEstate,MathuraRoad, NewDelhi110044,Delhi.& 011-41831191to96.Fax:41679787.ß Plt:SP1-7,RIICOIndlArea,Khushkhera,BhiwadiP.O.Tapukra,Alwar301707,Rajasthan.& 01493-250046to50/250144/250145.Fax:250433.
rAVIndrA mInIng Co has announced plans to set up a 30,000 tpa sponge iron unit near Kabirdham in Kawardh district of Chhattisgarh. The project envisages an investment of Rs.140 million. As of April 2007, the project was to obtain all clearances and awaiting for land allotment. Work on the project is expected to begin in mid 2008 and is slated for completion in one year thereafter.
ß RavindraMiningCompanyPvtLtd,FlatNo.201,PavaniAnnex,BesideQ-MartBuilding,Road No.2,BanjaraHills,Hyderabad500034,AndhraPradesh.& 040-66465585.Fax:66102166.
roUrkelA Steel PlAnt is to revamp the coke oven battery no. 4 at its facility in Sundargarh district of Orissa. The programme is to revamp 70 ovens at a cost of Rs.2,000 million. CET, Ranchi has been appointed as the project consultant. The company was yet to appoint the equipment suppliers. As of May 2007, the project was awaiting for clearances. the project is likely scheduled for completion in 24 months.
ß SteelAuthorityofIndiaLtd,IspatBhawan,No.2,LodhiRoad,NewDelhi110003,Delhi.& 011-24367481.Fax:24367015.(Mr.Panigrahi,Dy.Gen.Mgr.)ß RourkelaSteelPlant,Rourkela,769011,Orissa.& 0661-2445508.Fax:2510107.ß CentreforEngineering&Technology,RDCISLabBuilding,4thFloor, Ranchi834002,Jharkhand.& 0651-2411201/2411167/2411171/2411174/2411176.Fax:2411197.
rAJeSh StrIPS
92.
93.
94.
95.
rUkmInIrAmA Steel rollIngS is to set up a steel plant at Varadapurhara in Bellary district of Karnataka. The project includes a 300,000 tpa sponge iron unit, a 3 MW CPP and rolling mill. the project envisages a cumulative investment of Rs.400 million to be funded through banks and internal accruals. Consultants & equipment suppliers were to be appointed. As of April 2007, clearances were awaited. The plant is slated for completion in 1 year from zero date.
ß RukminiramaSteelRollingsPvtLtd,L-26,CuncolimIndustrialEstate,SalceteTaluka, Cuncolim403703,Goa.& 0832-2764670.Fax:2866267.
rUngtA mIneS plans to set up a MS billets production unit at its existing Komando facility in Sundargarh district of Orissa. The company was to finalise the project details and other parameters. As of May 2007, the proposal was in a nascent stage and further developments are expected by early 2008.
ß RungtaMinesLtd,RungtaHouse,Chaibasa,WestSinghbhum833201,Jharkhand.&06582-256861/256761/256661.ß Off2:SpongeIronDivision,MainRoad,Barbil,KeonjharOrissa.& 06767-277391/276891.
SAngAm WIreS has proposed to set up a high tensile steel wires production unit near Visakhapatnam in AP. As of April 2007, the company was scouting for a suitable location and the proposal was in a preliminary stage.
ß SangamWiresPvtLtd,FlatNo.104,ASComplex,S.P.Road, Secunderabad500003,AndhraPradesh.& 040-27805431.Fax:27805027.
SArAVAnA Alloy SteelS is set up a 200 tpd sponge iron plant at Hirebaganal in Koppal district of Karnataka. an investment of Rs.400 million is envisaged to be funded through loan from banks & by internal accruals. As of April 2007, the equipment suppliers were being finalized and civil work was to begin shortly. The unit is slated for completion by March 2008.
ß SaravanaAlloySteelsPvtLtd,No.21/D,IndustrialSuburb,2ndStage,Yeshwanthpura, TumkurRoad,Bangalore560022,Karnataka.& 080-23378779.
ShAh AlloyS is to set up a 3000 tpm cold rolled iron coils production unit at Kalol in Gandhinagar district of Gujarat. The plant envisages an investment of Rs.300 million to be funded through internal accruals. Varia engineering Works, ahmedabad is the equipment supplier. As of April 2007, clearances have been obtained and the civil work was to begin shortly. The unit is slated for completion by December 2007.
ß ShahAlloysLtd,GNFCInfoTower,9thFloor,Sarkhej-GandhinagarHighway,Bodakdev, Ahmedabad380054,Gujarat.& 079-55308100.Fax:55308110.(Mr.SachinPatel,Sr.Mgr.-Purchase.)ß Site:BlockNo.2221-2222,ShahIndustrialEstate,Sola-KalolRoad,SantejTaluk,Gandhinagar Kalol382043Gujarat.ß VariaEngineeringWorks,PlotNo.2005,GIDCVatva,Phase-5,Ahmedabad,Gujarat.& 079-25894407.Fax:25832603.
rUkmInIrAmA Steel rollIngS
96.
97.
98.
99.
100.
register ofneW ProJeCtS In IndIA 2007
23
rAJeSh StrIPS has announced plans to implement the phase II expansion programme at its Urla facility in Raipur district of Chhattisgarh. the scheme envisages setting up of a 300,000 tpa steel melting shop, a 150,000 tpa structural mill and a 50 MW WHR based CPP at a cumulative investment of Rs.3,200 million. As of March 2007, the company signed an MoU with the state government. Work on the project is expected to begin in the following months.
ß RajeshStripsLtd,535/C,UrlaIndlArea,Raipur493221,Chhattisgarh.& 0771-2323401/2323402.Fax:2324402.(Mr.AshokAgarwal,Gen.Mgr.)
rAthI bArS is planning modernisation and upgradation programme at its existing Bhiwadi facility in Rajasthan. the programme envisages increasing the capacity of steel bars from 18,000 tpa to 22,500 tpa with an investment of Rs.198.8 million. The project is to be funded through IPO, term loans & internal accruals. As of March 2007, building and plant design works had been initiated while equipment suppliers were yet to be appointed. Work on the project expected to begin in the next 2 months and is scheduled to be completed by March 2008.
ß RathiBarsLtd,A-24/7,MohanCo-operativeIndustrialEstate,MathuraRoad, NewDelhi110044,Delhi.& 011-41831191to96.Fax:41679787.ß Plt:SP1-7,RIICOIndlArea,Khushkhera,BhiwadiP.O.Tapukra,Alwar301707,Rajasthan.& 01493-250046to50/250144/250145.Fax:250433.
rAVIndrA mInIng Co has announced plans to set up a 30,000 tpa sponge iron unit near Kabirdham in Kawardh district of Chhattisgarh. The project envisages an investment of Rs.140 million. As of April 2007, the project was to obtain all clearances and awaiting for land allotment. Work on the project is expected to begin in mid 2008 and is slated for completion in one year thereafter.
ß RavindraMiningCompanyPvtLtd,FlatNo.201,PavaniAnnex,BesideQ-MartBuilding,Road No.2,BanjaraHills,Hyderabad500034,AndhraPradesh.& 040-66465585.Fax:66102166.
roUrkelA Steel PlAnt is to revamp the coke oven battery no. 4 at its facility in Sundargarh district of Orissa. The programme is to revamp 70 ovens at a cost of Rs.2,000 million. CET, Ranchi has been appointed as the project consultant. The company was yet to appoint the equipment suppliers. As of May 2007, the project was awaiting for clearances. the project is likely scheduled for completion in 24 months.
ß SteelAuthorityofIndiaLtd,IspatBhawan,No.2,LodhiRoad,NewDelhi110003,Delhi.& 011-24367481.Fax:24367015.(Mr.Panigrahi,Dy.Gen.Mgr.)ß RourkelaSteelPlant,Rourkela,769011,Orissa.& 0661-2445508.Fax:2510107.ß CentreforEngineering&Technology,RDCISLabBuilding,4thFloor, Ranchi834002,Jharkhand.& 0651-2411201/2411167/2411171/2411174/2411176.Fax:2411197.
rAJeSh StrIPS
92.
93.
94.
95.
rUkmInIrAmA Steel rollIngS is to set up a steel plant at Varadapurhara in Bellary district of Karnataka. The project includes a 300,000 tpa sponge iron unit, a 3 MW CPP and rolling mill. the project envisages a cumulative investment of Rs.400 million to be funded through banks and internal accruals. Consultants & equipment suppliers were to be appointed. As of April 2007, clearances were awaited. The plant is slated for completion in 1 year from zero date.
ß RukminiramaSteelRollingsPvtLtd,L-26,CuncolimIndustrialEstate,SalceteTaluka, Cuncolim403703,Goa.& 0832-2764670.Fax:2866267.
rUngtA mIneS plans to set up a MS billets production unit at its existing Komando facility in Sundargarh district of Orissa. The company was to finalise the project details and other parameters. As of May 2007, the proposal was in a nascent stage and further developments are expected by early 2008.
ß RungtaMinesLtd,RungtaHouse,Chaibasa,WestSinghbhum833201,Jharkhand.&06582-256861/256761/256661.ß Off2:SpongeIronDivision,MainRoad,Barbil,KeonjharOrissa.& 06767-277391/276891.
SAngAm WIreS has proposed to set up a high tensile steel wires production unit near Visakhapatnam in AP. As of April 2007, the company was scouting for a suitable location and the proposal was in a preliminary stage.
ß SangamWiresPvtLtd,FlatNo.104,ASComplex,S.P.Road, Secunderabad500003,AndhraPradesh.& 040-27805431.Fax:27805027.
SArAVAnA Alloy SteelS is set up a 200 tpd sponge iron plant at Hirebaganal in Koppal district of Karnataka. an investment of Rs.400 million is envisaged to be funded through loan from banks & by internal accruals. As of April 2007, the equipment suppliers were being finalized and civil work was to begin shortly. The unit is slated for completion by March 2008.
ß SaravanaAlloySteelsPvtLtd,No.21/D,IndustrialSuburb,2ndStage,Yeshwanthpura, TumkurRoad,Bangalore560022,Karnataka.& 080-23378779.
ShAh AlloyS is to set up a 3000 tpm cold rolled iron coils production unit at Kalol in Gandhinagar district of Gujarat. The plant envisages an investment of Rs.300 million to be funded through internal accruals. Varia engineering Works, ahmedabad is the equipment supplier. As of April 2007, clearances have been obtained and the civil work was to begin shortly. The unit is slated for completion by December 2007.
ß ShahAlloysLtd,GNFCInfoTower,9thFloor,Sarkhej-GandhinagarHighway,Bodakdev, Ahmedabad380054,Gujarat.& 079-55308100.Fax:55308110.(Mr.SachinPatel,Sr.Mgr.-Purchase.)ß Site:BlockNo.2221-2222,ShahIndustrialEstate,Sola-KalolRoad,SantejTaluk,Gandhinagar Kalol382043Gujarat.ß VariaEngineeringWorks,PlotNo.2005,GIDCVatva,Phase-5,Ahmedabad,Gujarat.& 079-25894407.Fax:25832603.
rUkmInIrAmA Steel rollIngS
96.
97.
98.
99.
100.
register ofneW ProJeCtS In IndIA 2007
24
ShrI bAdrInArAIn AlloyS & SteelS is to expand its existing sponge iron plant in two phases at Mouza Srirampore in Howrah district of WB. Phase I envisages setting up of a 120,000 tpa TMT bar unit, a 200,000 tpa pig iron unit and a 15 MW multi fuel (Coal & WHR) based CPP. Phase II includes setting up of a 300 tpd sponge iron unit, a 15 MW multi fuel (Coal & WHR) based CPP and induction of arc furnace. The expansion entails a cumulative investmet of Rs.5,000 million to be funded through proceeds from equity, bank loans & internal accruals. Consultant & equipment suppliers were to be finalised. As of May 2007, the DPR has been prepared. Work on the project is to begin in the next 6 months and expected to be completed in 18 months thereafter.
ß ShriBadrinarainAlloys&SteelsLtd,HalosiyaMansion,4thFloor,6/2,MoiraStreet, Kolkata700017,WestBengal.& 033-30231901/30231902.Fax:30231900.(Mr.DilipChoudhry,Gen.Mgr.)
ShrI bAJrAng PoWer & ISPAt has announced plans to set up a 60,000 tpa pig iron plant at its existing Urla facility near Raipur in Chhattisgarh. the proposal is estimated to cost around Rs.300 million. As of April 2007, the proposal was in a preliminary stage and work on the project is expected to begin in the last quarter of 2007. Completion schedule is yet to be decided. Meanwhile, the company is poised to commission a 200 tpd TMT bars facility at a cost of Rs.250 million.
ß ShriBajrangPower&IspatLtd,522/C,UrlaIndustrialArea,RaipurChhattisgarh.& 0771-2324281.(Mr.RameshChoubey,Gen.Mgr.-Fin.)
ShyAm Steel IndUStrIeS has announced plans to set up a sponge iron plant in Midnapore district of WB. The company was scouting for proper location and the project details were to be finalized. As of May 2007, the proposal was in a nascent stage and further developments is expected in the next 2 to 3 months.
ß ShyamSteelIndustriesLtd,No.115,CollegeStreet,Kolkata700012,WestBengal.& 033-22373333/22373311.
SIno Steel IndIA has plans to set up a 5 million tpa long products unit in jharkhand. the project entails an investment of Rs.160,000 million to be funded though bank loans & internal accruals. Consultant was to be finalised. The company plans to import part of the machinery while rest of the machinery is to be procured from local vendors. As of May 2007, statutory clearances and land allotment were awaited. Work on the project is expected to begin in the next 12 months.
ß SinoSteelIndiaPvtLtd,12thFloor,ErosCorporateTower,NehruPlace, NewDelhi110019,Delhi.& 011-42895600.Fax:42895628.(Mr.Supraj,Asst.Gen.Mgr.-Projs.)
Slr metAlIkS is to set up a 300,000 tpa pig iron and billets production unit at Chikkakasa Nakandi in Koppal district of Karnataka. The unit envisages an investment of Rs.350 million. Thermax, Pune and Metco, Kolkata are the equipment suppliers. The company was in the process of securing loan from banks. As of March 2007, the company was awaiting for statutory clearances. the plant is slated for completion in 2 years.
ShrI bAdrInArAIn AlloyS & SteelS
101.
102.
103.
104.
105.
ß SLRMetaliksLtd,A-2/452,Sector-8,Rohini,NewDelhi110085,Delhi.& 011-27940168.(Mr.NareshGoyal,Head-Fin.)ß ThermaxLtd,Thermaxhouse,4,Mumbai-PuneRoad,ShivajiNagar,Pune411005.Maharashtra.& 020-25512122.Fax:25511226.ß Metco,P-4,TransportRoad,Kolkota700088,WestBengal.& 033-24491866.
SmS SteelS is to set up a 90,000 tpa pig iron plant at Pargimandal in Rangareddy district of aP. an investment of Rs.200 million is envisaged to be funded through internal accruals & banks. Universal Consultants, Vizag is the civil consultant.The company was in the process of finalising the equipment suppliers. As of March 2007, statutory clearances were awaited. The project is likely scheduled for completion by the third quarter of 2007.
ß SMSSteelsPvtLtd,1-7-228/44,UBComplex,ParadiseCircle,S.D.Road, Secunderabad500003,AndhraPradesh.& 040-66316137.Fax:66310032.
SoUthern ISPAt has proposed to set up an integrated steel plant at Koothuparamba in Kannur district of Kerala. the project includes setting up of a 1,000 tpa sponge iron, 50 MW WHR CPP and a 800 tpa steel billet plant with a cumulative investment of Rs.5,000 million. The project is to be funded through equity, term loan from banks and partly by internal accruals. Consultants and contractors were to be finalized. As of April 2007, clearances were awaited. Civil work is expected to begin in the following months. The project is to be completed in 18 months from zero date.
ß SouthernIspatLtd,18/739,Sreevatsam,RacketCourtRoad,NearShadiMahal, Palakkad678014,Kerala.& 0491-2531698.Fax:2530035.(Mr.VivekAgarwal,Mg.Dir.)
SoVA eleCtroCAStIng is to set up a casting and forging unit at Bamunara Industrial area in Bardhaman district of WB. The unit will produce 15,000 tpa special castings for iron & steel along with melting shop and heat treatment facilities. The project entails an investment of Rs.250 million to be funded through loan from banks & internal accruals. the company is yet to appoint consultant and in the process of securing loan. As of May 2007, the company has acquired land while the project schedule is yet to finalise. Meanwhile, the company is setting up a 100,000 tpa re-rolling mill in the same locality at a cost of Rs.170 million. The project is scheduled for completion by first quarter of fiscal 2008-09.
ß SovaElectrocastingLtd,HahnemannSarani,Angadpur,Durgapur713215,WestBengal.& 0343-2591207.(Mr.SatyamMukherjee,Gen.Mgr.-Proj.&Tech.).
SoVA ISPAt plans to set up a complex for steel and cement at Mejia in Bankura district of WB. The complex includes setting up of a 200 tpd sponge iron, 150,000 tpa sinter plant, 50,000 tpa slag cement and a 12 MW captive power plant. The project entails a cumulative investment of Rs.2,000 million to be funded through banks & internal accruals. Consultants and the equipment suppliers were yet to be finalized. As of May 2007, the company was in the process of securing loan. The project is slated for completion by December 2008.
ß SovaIspatLtd,HahnemannSarani,Angadpur,DurgapurBardhaman713215,WestBengal.& 0343-2591207.(Mr.S.N.Mukherjee,Gen.Mgr.-Proj.).
SmS SteelS
106.
107.
108.
109.
register ofneW ProJeCtS In IndIA 2007
25
ShrI bAdrInArAIn AlloyS & SteelS is to expand its existing sponge iron plant in two phases at Mouza Srirampore in Howrah district of WB. Phase I envisages setting up of a 120,000 tpa TMT bar unit, a 200,000 tpa pig iron unit and a 15 MW multi fuel (Coal & WHR) based CPP. Phase II includes setting up of a 300 tpd sponge iron unit, a 15 MW multi fuel (Coal & WHR) based CPP and induction of arc furnace. The expansion entails a cumulative investmet of Rs.5,000 million to be funded through proceeds from equity, bank loans & internal accruals. Consultant & equipment suppliers were to be finalised. As of May 2007, the DPR has been prepared. Work on the project is to begin in the next 6 months and expected to be completed in 18 months thereafter.
ß ShriBadrinarainAlloys&SteelsLtd,HalosiyaMansion,4thFloor,6/2,MoiraStreet, Kolkata700017,WestBengal.& 033-30231901/30231902.Fax:30231900.(Mr.DilipChoudhry,Gen.Mgr.)
ShrI bAJrAng PoWer & ISPAt has announced plans to set up a 60,000 tpa pig iron plant at its existing Urla facility near Raipur in Chhattisgarh. the proposal is estimated to cost around Rs.300 million. As of April 2007, the proposal was in a preliminary stage and work on the project is expected to begin in the last quarter of 2007. Completion schedule is yet to be decided. Meanwhile, the company is poised to commission a 200 tpd TMT bars facility at a cost of Rs.250 million.
ß ShriBajrangPower&IspatLtd,522/C,UrlaIndustrialArea,RaipurChhattisgarh.& 0771-2324281.(Mr.RameshChoubey,Gen.Mgr.-Fin.)
ShyAm Steel IndUStrIeS has announced plans to set up a sponge iron plant in Midnapore district of WB. The company was scouting for proper location and the project details were to be finalized. As of May 2007, the proposal was in a nascent stage and further developments is expected in the next 2 to 3 months.
ß ShyamSteelIndustriesLtd,No.115,CollegeStreet,Kolkata700012,WestBengal.& 033-22373333/22373311.
SIno Steel IndIA has plans to set up a 5 million tpa long products unit in jharkhand. the project entails an investment of Rs.160,000 million to be funded though bank loans & internal accruals. Consultant was to be finalised. The company plans to import part of the machinery while rest of the machinery is to be procured from local vendors. As of May 2007, statutory clearances and land allotment were awaited. Work on the project is expected to begin in the next 12 months.
ß SinoSteelIndiaPvtLtd,12thFloor,ErosCorporateTower,NehruPlace, NewDelhi110019,Delhi.& 011-42895600.Fax:42895628.(Mr.Supraj,Asst.Gen.Mgr.-Projs.)
Slr metAlIkS is to set up a 300,000 tpa pig iron and billets production unit at Chikkakasa Nakandi in Koppal district of Karnataka. The unit envisages an investment of Rs.350 million. Thermax, Pune and Metco, Kolkata are the equipment suppliers. The company was in the process of securing loan from banks. As of March 2007, the company was awaiting for statutory clearances. the plant is slated for completion in 2 years.
ShrI bAdrInArAIn AlloyS & SteelS
101.
102.
103.
104.
105.
ß SLRMetaliksLtd,A-2/452,Sector-8,Rohini,NewDelhi110085,Delhi.& 011-27940168.(Mr.NareshGoyal,Head-Fin.)ß ThermaxLtd,Thermaxhouse,4,Mumbai-PuneRoad,ShivajiNagar,Pune411005.Maharashtra.& 020-25512122.Fax:25511226.ß Metco,P-4,TransportRoad,Kolkota700088,WestBengal.& 033-24491866.
SmS SteelS is to set up a 90,000 tpa pig iron plant at Pargimandal in Rangareddy district of aP. an investment of Rs.200 million is envisaged to be funded through internal accruals & banks. Universal Consultants, Vizag is the civil consultant.The company was in the process of finalising the equipment suppliers. As of March 2007, statutory clearances were awaited. The project is likely scheduled for completion by the third quarter of 2007.
ß SMSSteelsPvtLtd,1-7-228/44,UBComplex,ParadiseCircle,S.D.Road, Secunderabad500003,AndhraPradesh.& 040-66316137.Fax:66310032.
SoUthern ISPAt has proposed to set up an integrated steel plant at Koothuparamba in Kannur district of Kerala. the project includes setting up of a 1,000 tpa sponge iron, 50 MW WHR CPP and a 800 tpa steel billet plant with a cumulative investment of Rs.5,000 million. The project is to be funded through equity, term loan from banks and partly by internal accruals. Consultants and contractors were to be finalized. As of April 2007, clearances were awaited. Civil work is expected to begin in the following months. The project is to be completed in 18 months from zero date.
ß SouthernIspatLtd,18/739,Sreevatsam,RacketCourtRoad,NearShadiMahal, Palakkad678014,Kerala.& 0491-2531698.Fax:2530035.(Mr.VivekAgarwal,Mg.Dir.)
SoVA eleCtroCAStIng is to set up a casting and forging unit at Bamunara Industrial area in Bardhaman district of WB. The unit will produce 15,000 tpa special castings for iron & steel along with melting shop and heat treatment facilities. The project entails an investment of Rs.250 million to be funded through loan from banks & internal accruals. the company is yet to appoint consultant and in the process of securing loan. As of May 2007, the company has acquired land while the project schedule is yet to finalise. Meanwhile, the company is setting up a 100,000 tpa re-rolling mill in the same locality at a cost of Rs.170 million. The project is scheduled for completion by first quarter of fiscal 2008-09.
ß SovaElectrocastingLtd,HahnemannSarani,Angadpur,Durgapur713215,WestBengal.& 0343-2591207.(Mr.SatyamMukherjee,Gen.Mgr.-Proj.&Tech.).
SoVA ISPAt plans to set up a complex for steel and cement at Mejia in Bankura district of WB. The complex includes setting up of a 200 tpd sponge iron, 150,000 tpa sinter plant, 50,000 tpa slag cement and a 12 MW captive power plant. The project entails a cumulative investment of Rs.2,000 million to be funded through banks & internal accruals. Consultants and the equipment suppliers were yet to be finalized. As of May 2007, the company was in the process of securing loan. The project is slated for completion by December 2008.
ß SovaIspatLtd,HahnemannSarani,Angadpur,DurgapurBardhaman713215,WestBengal.& 0343-2591207.(Mr.S.N.Mukherjee,Gen.Mgr.-Proj.).
SmS SteelS
106.
107.
108.
109.
register ofneW ProJeCtS In IndIA 2007
26
SPeCtrUm Iron & AlloyS has drawn up plans to set up a 400,000 tpa sponge iron plant at Chaibasa in West Singhbhum district of jharkhand. the project entails an investment of Rs.1,000 million. As of May 2007, land has been acquired and allotment of captive mine was awaited. Work on the project is expected to commence soon after the allotment of captive mine.
ß SpectrumIron&AlloysPvtLtd,7/398,GandhiTola,Chaibasa, WestSinghbhum833201,Jharkhand.& 06582-258460/258461.(Mr.I.C.Bihani,Gen.Mgr.&Proj.Incharge.)
SrI SAkthIVel mUrUgAn CAStIngS has announced plans to set up a 400 tpm foundry for gun metal at Kallampalayam in Coimbatore district of tN. the unit envisages an investment of Rs.30 million. Contractors and equipment suppliers were to be finalised. As of April 2007, clearances were awaited and mode of financing to be decided. The project is scheduled to be completed in 6 months.
ß SriSakthivelMuruganCastingsPvtLtd,1F,GandhiNagar,OndipudhurRoad,Irugur, Coimbatore641103,TamilNadu.& 0422-2628714.
SteelCo gUJArAt has announced plans to expand its steel complex at Bharuch district of gujarat. the expansion envisages increasing the capacity of the cold rolled coil unit from 1,44,000 tpa to 2,00,000 tpa and setting up of a 3.5 MW WHR based CPP. The project will entail an investment of Rs.450 million and to be funded through banks & internal accruals. as of April 2007, clearances were awaited and the company was to secure loan from banks. The expansion is slated for completion in 2009.
ß SteelcoGujaratLtd,PlotNo.2,GIDCEstate,Palej,Bharuch392220,Gujarat.& 02642-277479/277480.Fax:277307.(Mr.M.P.Singh,Mgr.-Fin.)
Stork Ferro & mInerAl IndUStrIeS, a subsidiary of an austrian based company is planning to set up a greenfield metallurgical complex at Somnathpur in Balasore district of Orissa. The unit will comprise of a 25,000 tpa ferro alloy unit, 28,000 tpa ferro chrome unit with installation of 2 x 16.5 MVA furnace and a 2 x 20 MW coal based captive power plant. An investment of US$ 71 million is to be entailed and funded through FDI, internal accruals & bank loans. As of March 2007, land had been acquired and the proposal was in a preliminary stage. The company is likely to appoint consultants and EPC contractors in the following months.
ß StorkFerro&MineralIndustriesPvtLtd,A-305,SomduttChambers-I,BhikajiCamaPlace, NewDelhi110066,Delhi.& 011-26716517.(Mr.V.N.Singh,Dir.)
SUgUnA ISPAt is to set up a 20,000 tpa MS billets and ingots production unit at Bhongir in Nalgonda district of AP. ABB, Baroda is the equipment supplier. As of April 2007, all clearances have been obtained and civil works is to commence in the following months. The plant is scheduled for completion in 6 months from zero date.
ß SugunaIspatLtd,C/o.SunderSteelLtd,2-1-41,TobaccoBazaar,Secunderabad,AndhraPradesh.& 040-27813892.
SPeCtrUm Iron & AlloyS
110.
111.
112.
113.
114.
SUnFlAg Iron & Steel has announced plans to implement the expansion project at its existing Bhandara facility in Maharashtra. The scheme includes capacity augmentation of steel rolled products from 2 million tpa to 4 million tpa and to manufacture round bars, angles and channels. As of May 2007, the proposal was in a nascent stage and the project details are yet to be finalised.
ß SunflagIron&SteelCoLtd,33,MountRoad,Sadar,Nagpur440001,Maharashtra.& 0712-2524661.(J.M.Sathey,Dir.)ß Plt:BhandaraRoad,NearNagpur,BhandaraMaharashtra.& 07197-285551to55.
SUZlon energy is poised to set up a 1,200 tpa foundry at Coimbatore in tN. the unit entails an investment of Rs.5,000 million to be funded through banks & internal accruals. Project consultant is yet to be finalized and the machinery will be imported from Germany. As of April 2007, all clearances have been obtained and the civil work was to begin shortly. The unit is scheduled for completion by July 2008.
ß SuzlonEnergyLtd,5,ShrimaliSociety,NearSriKrishnaComplex,Navrangpura, Ahmedabad380009,Gujarat.& 0265-2466893/2466894.Fax:26471200.(Mr.PramodPatel,Sr.Proj.Engr.)
tAtA metAlIkS is to set up a state-of-the-art technology based 110,000 tpa DI (ductile iron) pipes production unit at Kharagpur in WB. The DI pipe is to be produced from liquid pig iron, sourced from its existing pig iron unit. The project is to be implemented jointly with Kubota Corp, Japan with an investment of Rs.2,000 million. As of April 2007, both the companies have signed an agreement. The JV partner will provide the technical assistance. The plant is scheduled to become operational by early 2009.
ß TataMetaliksLtd,TataCentre,43,J.L.NehruRoad,Kolkata700071,WestBengal.& Tel:033-22881764(D)/22883702/22884014/22886016.Fax:22884372.
tAtA SPonge Iron has taken up an expansion programme at its existing joda facility in Keonjhar district of orissa. the programme envisages increasing the capacity of sponge iron from 240,000 tpa to 840,000 tpa and of CPP from 7.5 MW to 63 MW. The project entails a cumulative investment of Rs.5,950 million. M.N. Dastur, Kolkata has been appointed as the project consultant. As of March 2007, the company was in the process of obtaining all statutory clearances, the discussion was underway with equipment suppliers. The expansion is scheduled to be completed in 5 years from zero date.
ß TataSpongeIronLtd,P.O.Joda,Keonjhar785034,Orissa.& 06767-278318/278010.Fax:278159.ß M.N.Dastur&CoPvtLtd,FaradayHouse,P-17,MissionRowExtension,Kolkata700013, WestBengal.& 033-22250500.
tInPlAte Co oF IndIA has drawn up plans to expand its existing Golmuri coil and sheet-manufacturing unit in east Singhbhum district of jharkhand. the capacity is to be augmented from 90,000 tpa to 380,000 tpa at an estimated investment of Rs.2,100 million. The project is to be funded through banks & internal accruals. Equipments for the project will be imported from Japan. As of May 2007, loans were awaited and work on the project was yet to commence. the expansion is likely to be completed in 2 years.
SUnFlAg Iron & Steel
115.
116.
117.
118.
119.
register ofneW ProJeCtS In IndIA 2007
27
SPeCtrUm Iron & AlloyS has drawn up plans to set up a 400,000 tpa sponge iron plant at Chaibasa in West Singhbhum district of jharkhand. the project entails an investment of Rs.1,000 million. As of May 2007, land has been acquired and allotment of captive mine was awaited. Work on the project is expected to commence soon after the allotment of captive mine.
ß SpectrumIron&AlloysPvtLtd,7/398,GandhiTola,Chaibasa, WestSinghbhum833201,Jharkhand.& 06582-258460/258461.(Mr.I.C.Bihani,Gen.Mgr.&Proj.Incharge.)
SrI SAkthIVel mUrUgAn CAStIngS has announced plans to set up a 400 tpm foundry for gun metal at Kallampalayam in Coimbatore district of tN. the unit envisages an investment of Rs.30 million. Contractors and equipment suppliers were to be finalised. As of April 2007, clearances were awaited and mode of financing to be decided. The project is scheduled to be completed in 6 months.
ß SriSakthivelMuruganCastingsPvtLtd,1F,GandhiNagar,OndipudhurRoad,Irugur, Coimbatore641103,TamilNadu.& 0422-2628714.
SteelCo gUJArAt has announced plans to expand its steel complex at Bharuch district of gujarat. the expansion envisages increasing the capacity of the cold rolled coil unit from 1,44,000 tpa to 2,00,000 tpa and setting up of a 3.5 MW WHR based CPP. The project will entail an investment of Rs.450 million and to be funded through banks & internal accruals. as of April 2007, clearances were awaited and the company was to secure loan from banks. The expansion is slated for completion in 2009.
ß SteelcoGujaratLtd,PlotNo.2,GIDCEstate,Palej,Bharuch392220,Gujarat.& 02642-277479/277480.Fax:277307.(Mr.M.P.Singh,Mgr.-Fin.)
Stork Ferro & mInerAl IndUStrIeS, a subsidiary of an austrian based company is planning to set up a greenfield metallurgical complex at Somnathpur in Balasore district of Orissa. The unit will comprise of a 25,000 tpa ferro alloy unit, 28,000 tpa ferro chrome unit with installation of 2 x 16.5 MVA furnace and a 2 x 20 MW coal based captive power plant. An investment of US$ 71 million is to be entailed and funded through FDI, internal accruals & bank loans. As of March 2007, land had been acquired and the proposal was in a preliminary stage. The company is likely to appoint consultants and EPC contractors in the following months.
ß StorkFerro&MineralIndustriesPvtLtd,A-305,SomduttChambers-I,BhikajiCamaPlace, NewDelhi110066,Delhi.& 011-26716517.(Mr.V.N.Singh,Dir.)
SUgUnA ISPAt is to set up a 20,000 tpa MS billets and ingots production unit at Bhongir in Nalgonda district of AP. ABB, Baroda is the equipment supplier. As of April 2007, all clearances have been obtained and civil works is to commence in the following months. The plant is scheduled for completion in 6 months from zero date.
ß SugunaIspatLtd,C/o.SunderSteelLtd,2-1-41,TobaccoBazaar,Secunderabad,AndhraPradesh.& 040-27813892.
SPeCtrUm Iron & AlloyS
110.
111.
112.
113.
114.
SUnFlAg Iron & Steel has announced plans to implement the expansion project at its existing Bhandara facility in Maharashtra. The scheme includes capacity augmentation of steel rolled products from 2 million tpa to 4 million tpa and to manufacture round bars, angles and channels. As of May 2007, the proposal was in a nascent stage and the project details are yet to be finalised.
ß SunflagIron&SteelCoLtd,33,MountRoad,Sadar,Nagpur440001,Maharashtra.& 0712-2524661.(J.M.Sathey,Dir.)ß Plt:BhandaraRoad,NearNagpur,BhandaraMaharashtra.& 07197-285551to55.
SUZlon energy is poised to set up a 1,200 tpa foundry at Coimbatore in tN. the unit entails an investment of Rs.5,000 million to be funded through banks & internal accruals. Project consultant is yet to be finalized and the machinery will be imported from Germany. As of April 2007, all clearances have been obtained and the civil work was to begin shortly. The unit is scheduled for completion by July 2008.
ß SuzlonEnergyLtd,5,ShrimaliSociety,NearSriKrishnaComplex,Navrangpura, Ahmedabad380009,Gujarat.& 0265-2466893/2466894.Fax:26471200.(Mr.PramodPatel,Sr.Proj.Engr.)
tAtA metAlIkS is to set up a state-of-the-art technology based 110,000 tpa DI (ductile iron) pipes production unit at Kharagpur in WB. The DI pipe is to be produced from liquid pig iron, sourced from its existing pig iron unit. The project is to be implemented jointly with Kubota Corp, Japan with an investment of Rs.2,000 million. As of April 2007, both the companies have signed an agreement. The JV partner will provide the technical assistance. The plant is scheduled to become operational by early 2009.
ß TataMetaliksLtd,TataCentre,43,J.L.NehruRoad,Kolkata700071,WestBengal.& Tel:033-22881764(D)/22883702/22884014/22886016.Fax:22884372.
tAtA SPonge Iron has taken up an expansion programme at its existing joda facility in Keonjhar district of orissa. the programme envisages increasing the capacity of sponge iron from 240,000 tpa to 840,000 tpa and of CPP from 7.5 MW to 63 MW. The project entails a cumulative investment of Rs.5,950 million. M.N. Dastur, Kolkata has been appointed as the project consultant. As of March 2007, the company was in the process of obtaining all statutory clearances, the discussion was underway with equipment suppliers. The expansion is scheduled to be completed in 5 years from zero date.
ß TataSpongeIronLtd,P.O.Joda,Keonjhar785034,Orissa.& 06767-278318/278010.Fax:278159.ß M.N.Dastur&CoPvtLtd,FaradayHouse,P-17,MissionRowExtension,Kolkata700013, WestBengal.& 033-22250500.
tInPlAte Co oF IndIA has drawn up plans to expand its existing Golmuri coil and sheet-manufacturing unit in east Singhbhum district of jharkhand. the capacity is to be augmented from 90,000 tpa to 380,000 tpa at an estimated investment of Rs.2,100 million. The project is to be funded through banks & internal accruals. Equipments for the project will be imported from Japan. As of May 2007, loans were awaited and work on the project was yet to commence. the expansion is likely to be completed in 2 years.
SUnFlAg Iron & Steel
115.
116.
117.
118.
119.
register ofneW ProJeCtS In IndIA 2007
28
ß TinplateCoofIndiaLtd,4,BankshallStreet,Kolkata700001,WestBengal.& 033-22435401.Fax:22204170.(Mr.T.K.Ghosh,Pres.)
toPAZ Steel & CAlCInAtIon IndIA has announced plans to set up a 100,000 tpa steel ingots and billets production unit at Medak in aP. the project entails an estimated investment of Rs.400 million to be funded through internal accruals & by loan. the company has initiated process to secure loan. As of March 2007, the company was awaiting for statutory clearances. Work on the project is expected to begin in the next 3 to 4 months.
ß TopazSteels&CalcinationIndiaLtd,PlotNo.247,DwarakapuriColony,Punjagutta, Hyderabad500081,AndhraPradesh.& 040-23351187.(Mr.MadanMohan,Proj.Incharge.)
toPWorth SteelS is to set up an integrated steel plant in Durg district of Chhattisgarh. the project includes setting up of a 500,000 tpa blast furnace, a 500,000 tpa sinter plant, a 400,000 tpa coke oven plant, a 70 MVA electric arc furnace, a 30,000 tpa ferro alloys plant (2 x 9 MVA), a 1 million tpa iron ore pelletisation plant, a 100,000 tpa rolling mill strips, a 300,000 tpa rolling mill for special steels, a oxygen plant and a 80 MW WHR based CPP. The project entails an estimated investment of Rs.12,257.4 million. As of May 2007, the company has signed an MoU with the state government. Further developments are expected in the near future.
ß TopworthSteelsPvtLtd,214,FreePressJournalMarg,4,GroundFloor,NarimanPoint, Mumbai-400021,Maharashtra.& 022-22841414.Fax:22840211.
UltrAteCh metAlS is to set up a 5,000 tpa foundry for production of castings and wires at jaipur in Rajasthan. an investment of Rs.500 million is envisaged. Consultants and equipment suppliers are yet to be finalized. As of April 2007, statutory clearances were awaited. Work on the project was to begin by May 2007 and the unit is slated for completion by May 2008.
ß UltratechMetalsIndiaLtd,A-134,RoadNo.12,V.K.I.Area,Jaipur302013,Rajasthan.& 0141-2332833.Fax:2331408.(Mr.T.K.Rastogi,Vice.Pres.)
U r Casting & Alloys is to set up a 200 tpm foundry at Kunnathur in Coimbatore district of tN. the unit is to produce stainless steel castings and carbon steel castings. the project entails an investment of Rs.100 million to be funded through internal accruals. equipment suppliers are yet to be finalised. As of May 2007, civil work was to begin shortly. The project is slated for completion by August 2008.
ß URCastingandAlloysPvtLtd,1056-C,2ndFloor,URHouse,SF76&80,Thirumalayam Palayam,Madukkarai,Coimbatore641105,TamilNadu.& 0422-2656521/2656510/2656724.
VAndAnA ISPAt is to set up an integrated steel plant in Chhattisgarh. the project includes setting up of a 830,000 tpa DRI unit, a 750,000 tpa steel melting shop, a 505,000 tpa centre plant, a 690,000 tpa rolling mill/rolled products unit, a 600,000 tpa high grade iron ore pelletisation plant, a 2 million tpa coke oven plant, a 4.8 million ferro alloys unit, a 1.2 million tpa coal washery, a 75,000 tpa coal tar products, a 108,000 tpa fly ash waste products, a 120
toPAZ Steel & CAlCInAtIon IndIA
120.
121.
122.
123.
124.
MW captive power plant and an oxygen plant. The project envisages a cumulative investment of Rs.13,100 million. As of May 2007, an MoU has been signed between the company and the Chhattisgarh government.
ß VandanaIspatLtd,VandanaBhawan,M.G.Road,Raipur492001,Chhattisgarh.& 0771-2535440.
VArUn AgrICUltUrAl InVeStmentS is to set up a 1.1 million tpa billets and ingots production unit at its existing Pithampur facility in Dhar district of MP. As of March 2007, the proposal was in a planning stage. The company is likely to import machinery from Germany. Work on the project is expected to begin in the last quarter of 2007, is scheduled for completion by December 2008.
ß VarunAgriculturalInvestmentsPvtLtd,Janak,11,NewPalasa,Indore452001,MadhyaPradesh.& 0731-4240017.Fax:42025555.
VelUmAnI engIneerIng IndUStry is to expand its foundry for iron castings at Kathimanaickenpalayam in Coimbatore district of TN. The capacity is to be doubled from 300 tpm to 600 tpm. The expansion project is estimated to cost Rs.3 million to be funded through banks & internal accruals. Prymid Quality Systems is the project consultant and Megatherm, Kolkata is the equipment supplier. As of April 2007, statutory clearances were awaited and loans being secured. The expansion is scheduled to be completed in 6 months from zero date.
ß VelumaniEngineeringIndustry,Vellkinaru,ThudiyalurPost,Coimbatore641034,TamilNadu.& 0422-2642599.Fax:2642577.ß MegathermElectronicsPvtLtd,Plot-L1,BlockGP,Sector-V,SaltLakeCity, Kolkata700091,WestBengal.& 033-23577745/23577352/23577854.Fax:23577757.
VIkASh SmelterS is to set up a 1,000 tpd pig iron unit at Salanpur in Burdwan district of WB. The project entails an estimated investment of Rs.1,200 million. As of April 2007, land has been acquired and the equipment suppliers were yet to be finalized. The plant is slated for completion in 2 years.
ß VikashSmeltersLtd,CentrePoint,3rdFloor,21HemantabasuSarani,Kolkata700001, WestBengal.& 033-22318305to09.
VArUn AgrICUltUrAl InVeStmentS
125.
126.
127.
register ofneW ProJeCtS In IndIA 2007
29
ß TinplateCoofIndiaLtd,4,BankshallStreet,Kolkata700001,WestBengal.& 033-22435401.Fax:22204170.(Mr.T.K.Ghosh,Pres.)
toPAZ Steel & CAlCInAtIon IndIA has announced plans to set up a 100,000 tpa steel ingots and billets production unit at Medak in aP. the project entails an estimated investment of Rs.400 million to be funded through internal accruals & by loan. the company has initiated process to secure loan. As of March 2007, the company was awaiting for statutory clearances. Work on the project is expected to begin in the next 3 to 4 months.
ß TopazSteels&CalcinationIndiaLtd,PlotNo.247,DwarakapuriColony,Punjagutta, Hyderabad500081,AndhraPradesh.& 040-23351187.(Mr.MadanMohan,Proj.Incharge.)
toPWorth SteelS is to set up an integrated steel plant in Durg district of Chhattisgarh. the project includes setting up of a 500,000 tpa blast furnace, a 500,000 tpa sinter plant, a 400,000 tpa coke oven plant, a 70 MVA electric arc furnace, a 30,000 tpa ferro alloys plant (2 x 9 MVA), a 1 million tpa iron ore pelletisation plant, a 100,000 tpa rolling mill strips, a 300,000 tpa rolling mill for special steels, a oxygen plant and a 80 MW WHR based CPP. The project entails an estimated investment of Rs.12,257.4 million. As of May 2007, the company has signed an MoU with the state government. Further developments are expected in the near future.
ß TopworthSteelsPvtLtd,214,FreePressJournalMarg,4,GroundFloor,NarimanPoint, Mumbai-400021,Maharashtra.& 022-22841414.Fax:22840211.
UltrAteCh metAlS is to set up a 5,000 tpa foundry for production of castings and wires at jaipur in Rajasthan. an investment of Rs.500 million is envisaged. Consultants and equipment suppliers are yet to be finalized. As of April 2007, statutory clearances were awaited. Work on the project was to begin by May 2007 and the unit is slated for completion by May 2008.
ß UltratechMetalsIndiaLtd,A-134,RoadNo.12,V.K.I.Area,Jaipur302013,Rajasthan.& 0141-2332833.Fax:2331408.(Mr.T.K.Rastogi,Vice.Pres.)
U r Casting & Alloys is to set up a 200 tpm foundry at Kunnathur in Coimbatore district of tN. the unit is to produce stainless steel castings and carbon steel castings. the project entails an investment of Rs.100 million to be funded through internal accruals. equipment suppliers are yet to be finalised. As of May 2007, civil work was to begin shortly. The project is slated for completion by August 2008.
ß URCastingandAlloysPvtLtd,1056-C,2ndFloor,URHouse,SF76&80,Thirumalayam Palayam,Madukkarai,Coimbatore641105,TamilNadu.& 0422-2656521/2656510/2656724.
VAndAnA ISPAt is to set up an integrated steel plant in Chhattisgarh. the project includes setting up of a 830,000 tpa DRI unit, a 750,000 tpa steel melting shop, a 505,000 tpa centre plant, a 690,000 tpa rolling mill/rolled products unit, a 600,000 tpa high grade iron ore pelletisation plant, a 2 million tpa coke oven plant, a 4.8 million ferro alloys unit, a 1.2 million tpa coal washery, a 75,000 tpa coal tar products, a 108,000 tpa fly ash waste products, a 120
toPAZ Steel & CAlCInAtIon IndIA
120.
121.
122.
123.
124.
MW captive power plant and an oxygen plant. The project envisages a cumulative investment of Rs.13,100 million. As of May 2007, an MoU has been signed between the company and the Chhattisgarh government.
ß VandanaIspatLtd,VandanaBhawan,M.G.Road,Raipur492001,Chhattisgarh.& 0771-2535440.
VArUn AgrICUltUrAl InVeStmentS is to set up a 1.1 million tpa billets and ingots production unit at its existing Pithampur facility in Dhar district of MP. As of March 2007, the proposal was in a planning stage. The company is likely to import machinery from Germany. Work on the project is expected to begin in the last quarter of 2007, is scheduled for completion by December 2008.
ß VarunAgriculturalInvestmentsPvtLtd,Janak,11,NewPalasa,Indore452001,MadhyaPradesh.& 0731-4240017.Fax:42025555.
VelUmAnI engIneerIng IndUStry is to expand its foundry for iron castings at Kathimanaickenpalayam in Coimbatore district of TN. The capacity is to be doubled from 300 tpm to 600 tpm. The expansion project is estimated to cost Rs.3 million to be funded through banks & internal accruals. Prymid Quality Systems is the project consultant and Megatherm, Kolkata is the equipment supplier. As of April 2007, statutory clearances were awaited and loans being secured. The expansion is scheduled to be completed in 6 months from zero date.
ß VelumaniEngineeringIndustry,Vellkinaru,ThudiyalurPost,Coimbatore641034,TamilNadu.& 0422-2642599.Fax:2642577.ß MegathermElectronicsPvtLtd,Plot-L1,BlockGP,Sector-V,SaltLakeCity, Kolkata700091,WestBengal.& 033-23577745/23577352/23577854.Fax:23577757.
VIkASh SmelterS is to set up a 1,000 tpd pig iron unit at Salanpur in Burdwan district of WB. The project entails an estimated investment of Rs.1,200 million. As of April 2007, land has been acquired and the equipment suppliers were yet to be finalized. The plant is slated for completion in 2 years.
ß VikashSmeltersLtd,CentrePoint,3rdFloor,21HemantabasuSarani,Kolkata700001, WestBengal.& 033-22318305to09.
VArUn AgrICUltUrAl InVeStmentS
125.
126.
127.
Projects Under ImPlementatIon
A.N. SteelS is setting up a 70 tpd re-rolling mill at modavalasa village in Vijayanagaram district of aP. the project is estimated to cost rs.35.8 million. Preeth machines and encorn Furnishers, UP are the major equipment suppliers. as of march 2007, erection of machinery was under progress and is expected to be commissioned by september 2007.
ß A.N.Steels,55-14-80/1,APSEBColony,Seethammadhara, Visakhapatnam530013,AndhraPradesh.& 0891-2549469.Fax:2549469.
AArti SteelS is set to expand its existing Ghantikhal integrated steel plant in the jajpur district of orissa. the programme will increase the capacity of steel (sponge iron & billets) production from 1.5 million to 6.5 million tpa at a cost of rs.4,000 million. mecon and lurgi metallurgy are the project consultants. as of march 2007, work on the project was expected to begin in the following months and is scheduled to be completed by 2011.
ß AartiSteelsLtd,FocalPoint,Ludhiana141010,Punjab.& 0161-2670973to76.Fax:2670977.(Mr.BharatJain,Dir.)ß Plt:Steel&PowerDivision,Ghantikhal,AthagarhP.O.,Mahakalbasta,Jajpur753014,Orissa.& 0671-3061000.ß MeconLtd,P.O.Doranda,Ranchi834002,Jharkhand.& 0651-2480216.ß LurgiIndiaCoLtd,A-30,MohanCooperativeIndlEstate,MathuraRoad,NewDelhi110044.& 011-42595242.Fax:42595051/42595071.
AbhiNANdhAN SteelS is setting up a 4,000 tpa ms bars and steel strips rolling mill near Haridwar in Uttarakhand. the project is being implemented at a cost of rs.40 million. as of may 2007, erection of machinery was underway. the project is scheduled for completion by the end of 2007.
ß AbhinandhanSteelsPvtLtd,61/26,LaxmanVihar,MuzaffarnagarUttarPradesh.& 0131-2667948.(Mr.G.K.Jain,Dir.)
AdhuNik MetAlikS is implementing the phase II expansion programme at its existing sundargarh facility in orissa. the expansion includes increasing the capacity of steel plants from 2,50,000 tpa to 6,20,000 tpa and setting up of a 100,000 tpa coke oven, 100,000 tpa sinter plant, 100,000 tpa rolling mill, 1,30,000 tpa bloom caster, 50,000 tpa ss caster, 40,000 tpa ferro alloys, oxygen plant and a 19 mW (coal & WHr based) cPP. the programme entails an investment of rs.4,500 million. Korus engineering, delhi is rendering the consultancy services. electrotherm, concast India, WmI are the major equipment suppliers. as of may 2007, civil works were underway. the expansion is scheduled for completion by december 2007.
ßAdhunikMetaliksLtd,2/1A,SaratBoseRoad,Kolkata700020,WestBengal.& 033-22890279.Fax:22890285.(Mr.SubbhaRao,Gen.Mgr.-Proj.)ß KorusEngineeringSolutionsPvtLtd,400,4thFloor,NetajiSubhashITLTwinTower, Pitampura,NewDelhi110088.& 011-27190630/27190631.ß ElectrothermIndiaLtd,H.O.SurveyNo.72,Palodia,ViaThatej,Ahmedabad382115,Gujarat.
A. N. SteelS register ofNeW PrOJeCtS iN iNdiA 2007
128.
129.
130.
131.
31
Projects Under ImPlementatIon
A.N. SteelS is setting up a 70 tpd re-rolling mill at modavalasa village in Vijayanagaram district of aP. the project is estimated to cost rs.35.8 million. Preeth machines and encorn Furnishers, UP are the major equipment suppliers. as of march 2007, erection of machinery was under progress and is expected to be commissioned by september 2007.
ß A.N.Steels,55-14-80/1,APSEBColony,Seethammadhara, Visakhapatnam530013,AndhraPradesh.& 0891-2549469.Fax:2549469.
AArti SteelS is set to expand its existing Ghantikhal integrated steel plant in the jajpur district of orissa. the programme will increase the capacity of steel (sponge iron & billets) production from 1.5 million to 6.5 million tpa at a cost of rs.4,000 million. mecon and lurgi metallurgy are the project consultants. as of march 2007, work on the project was expected to begin in the following months and is scheduled to be completed by 2011.
ß AartiSteelsLtd,FocalPoint,Ludhiana141010,Punjab.& 0161-2670973to76.Fax:2670977.(Mr.BharatJain,Dir.)ß Plt:Steel&PowerDivision,Ghantikhal,AthagarhP.O.,Mahakalbasta,Jajpur753014,Orissa.& 0671-3061000.ß MeconLtd,P.O.Doranda,Ranchi834002,Jharkhand.& 0651-2480216.ß LurgiIndiaCoLtd,A-30,MohanCooperativeIndlEstate,MathuraRoad,NewDelhi110044.& 011-42595242.Fax:42595051/42595071.
AbhiNANdhAN SteelS is setting up a 4,000 tpa ms bars and steel strips rolling mill near Haridwar in Uttarakhand. the project is being implemented at a cost of rs.40 million. as of may 2007, erection of machinery was underway. the project is scheduled for completion by the end of 2007.
ß AbhinandhanSteelsPvtLtd,61/26,LaxmanVihar,MuzaffarnagarUttarPradesh.& 0131-2667948.(Mr.G.K.Jain,Dir.)
AdhuNik MetAlikS is implementing the phase II expansion programme at its existing sundargarh facility in orissa. the expansion includes increasing the capacity of steel plants from 2,50,000 tpa to 6,20,000 tpa and setting up of a 100,000 tpa coke oven, 100,000 tpa sinter plant, 100,000 tpa rolling mill, 1,30,000 tpa bloom caster, 50,000 tpa ss caster, 40,000 tpa ferro alloys, oxygen plant and a 19 mW (coal & WHr based) cPP. the programme entails an investment of rs.4,500 million. Korus engineering, delhi is rendering the consultancy services. electrotherm, concast India, WmI are the major equipment suppliers. as of may 2007, civil works were underway. the expansion is scheduled for completion by december 2007.
ßAdhunikMetaliksLtd,2/1A,SaratBoseRoad,Kolkata700020,WestBengal.& 033-22890279.Fax:22890285.(Mr.SubbhaRao,Gen.Mgr.-Proj.)ß KorusEngineeringSolutionsPvtLtd,400,4thFloor,NetajiSubhashITLTwinTower, Pitampura,NewDelhi110088.& 011-27190630/27190631.ß ElectrothermIndiaLtd,H.O.SurveyNo.72,Palodia,ViaThatej,Ahmedabad382115,Gujarat.
A. N. SteelS register ofNeW PrOJeCtS iN iNdiA 2007
128.
129.
130.
131.
32
& 02717-550575.Fax:234556.ß ValcunEngineersLtd,T-181,MIDC,BhosariIndustrialEstate,Pune-NashikRoad, Pune411026,Maharashtra.& 020-27120245.Fax:27122129.
AlANkAr AllOyS is setting up a 40,000 tpa rolling mill for hot rolled products at Borjhara in raipur district of chhattisgarh. the project entails an investment of rs.100 million to be funded through bank loans & internal accruals. In-house team is implementing project development. The equipment suppliers for the project have been finalised. As of May 2007, the civil works were under progress. the project is scheduled for completion by november 2007.
ßAlankarAlloysPvtLtd,AgrawalComplex,SamtaColony,Raipur492001,Chhattisgarh.& 0771-2254807.Fax:2254801.(Mr.E.D.Agrawal,Dir.)
ANdhrA FerrO AllOyS is implementing an expansion programme at its existing Garbham facility in Vizianagaram district of aP. the capacity of high carbon ferro chrome is to be expanded from 40,000 tpa to 60,000 tpa. the project will entail an investment of rs.90 million to be funded through banks & internal accruals. rally tech is the project consultant. alstom, chennai is the equipment supplier. as of may 2007, civil work was underway. the facility is scheduled for completion by june 2008.
ß AndhraFerroAlloysLtd,FlatNo.501,SwagruhaCoral,R.K.Beach,Visakhapatnam530003, AndhraPradesh.& 0891-2552998/2567625.Fax:2552998.(Mr.DinkarShetty,Vice.Pres.)ß AlstomLtd,19/1,G.S.TRoad,Pallavaram,Chennai600043,TamilNadu.& 044-22640033.Fax:22640040.
ANkit MetAl & POWer is setting up a rolling mill and a WHr based cPP at its existing jorehira facility in Bankura district of WB. the project entails a capacity of 1,20,000 tpa for rolling mill and a 12 mW for cPP at an investment of rs.1,000 million. rana Udyog, Kolkata is the turnkey consultant. as of may 2007, civil works completed and machinery erection was underway. the project is slated for completion by june 2007.
ß AnkitMetal&PowerLtd,35,CRAvenue,Kolkata700012,WestBengal.& 033-22119805/22119806.Fax:22110522.(Mr.George,Gen.Mgr.)ß RanaUdyogLtd,C/o.ModernGroupofCompanies,18D,EverestHouse,46/C,ChowringheeRoad,Kolkata700071,WestBengal.& 033-30521114/30521116/30521117/30521120.Fax:22889247/22881121.
AquA PuMPS eNgiNeeriNg is implementing expansion programme at its thudiyalur foundry in coimbatore district of tn. the capacity of cast iron is to be augmented from 400 tpm to 1200 tpm. the expansion entails an investment of rs.300 million to be funded through banks & internal accruals. defamatics, Bangalore is the equipment supplier. as of march 2007, erection of machinery was underway. the expansion was scheduled for completion by may 2007.
ß AquapumpsEngineering,ThudiyalurPost,Coimbatore641034,TamilNadu.& 0422-2642484.Fax:2642128.(Mr.Purushothaman,Gen.Mgr.)
AlANkAr AllOyS register ofNeW PrOJeCtS iN iNdiA 2007
132.
133.
134.
135.
AShOk irON WOrkS is setting up a third foundry in Belgaum district of Karnataka. the project is implemented in two phases. Phase I envisage a capacity of 70,000 tpa. mr. W. a. Pech, Germany is the project consultant. as of march 2007, civil works were nearing completion and machinery erection had been initiated. the phase I is scheduled to be completed by june 2007.
ß AshokIronworksLtd,MazagaonRoad,Udyambag,Belgaum590008,Karnataka.& 0831-2442599.Fax:2441899.(Mr.G.M.Savanth,Mgr.Proj.)
AtlAS AutOMOtive components is expanding its chinchwad foundry for aluminium castings in Pune district of maharashtra. the capacity is being expanded from 3,500 tpa to 4,000 tpa and entails an investment of rs.70 million. r. r. dooth & co, Pune is the civil contractor and Pioneer engineering, Gujarat is the equipment supplier. as of april 2007, civil works completed and machinery erection was under progress. the expansion is scheduled for completion by june 2007.
ß AtlasAutomotiveComponentsLtd,D/2,PlotNo.58/59,MIDC,Chinchwad, Pune411019,Maharashtra.& 020-27473856/57/27474931/27484515/27459126/27461114/27463562.ß PioneerEngineering,238/B,2ndFloor,AksharArcade,Opp.MemnagarFireStation, Navrangpura,Ahmedabad380009,Gujarat.& 079-26401770/26401756.Fax:26401756.
beekAy Steel & POWer is setting up a steel melting shop to produce 75,000 tpa billets at its Uliburu plant in Keonjhar district of orissa. the project entails an investment of rs.1,000 million to be funded through banks & equity. megatherm, Kolkata is the equipment supplier. as of may 2007, machinery erection were under progress. the project is slated for completion by july 2007. Plans are also on the anvil to set up a 12 mW cPP in the same premises.
ß BeekaySteel&PowerLtd,Uliburu,Barbil,Keonjhar758035,Orissa.& 06767-277490/277492.(Mr.S.N.Jhah,Plt.Mgr.)ß MegathermElectronicsPvtLtd,Plot-L1,BlockGP,Sector-V,SaltLakeCity, Kolkata700091,WestBengal.& 033-23577745/23577352/23577854.Fax:23577757.
beSt eNgiNeerS PuMPS is setting up a foundry for ferrous and castings at somayampalayam in coimbatore district of tn. the unit entails a cumulative capacity of 100 tpm at an investment of rs.4.5 million is funded through internal accruals. as of april 2007, civil works completed and machinery erection was under progress. the unit is slated for completion by june 2007.
ß BestEngineersPumpsPvtLtd,59-B,ThadagamRoad,Velandiapalayam, Coimbatore641025,TamilNadu.& 0422-2432195.Fax:2451599.(Mr.Saranathan,Head.-QC.)
bhuShAN POWer & Steel has reported progress on expansion of its integrated steel complex at jharsuguda in orissa. an investment of rs.3,000 million is envisaged. the project is to be implemented in two phases. the upcoming steel complex will include a 900,000 tpa steel plant, 700,000 tpa pig iron plant, 4,50,000 tpa coke oven plant, 1 million tpa sinter plant
AShOk irON WOrkS register ofNeW PrOJeCtS iN iNdiA 2007
136.
137.
138.
139.
140.
33
& 02717-550575.Fax:234556.ß ValcunEngineersLtd,T-181,MIDC,BhosariIndustrialEstate,Pune-NashikRoad, Pune411026,Maharashtra.& 020-27120245.Fax:27122129.
AlANkAr AllOyS is setting up a 40,000 tpa rolling mill for hot rolled products at Borjhara in raipur district of chhattisgarh. the project entails an investment of rs.100 million to be funded through bank loans & internal accruals. In-house team is implementing project development. The equipment suppliers for the project have been finalised. As of May 2007, the civil works were under progress. the project is scheduled for completion by november 2007.
ßAlankarAlloysPvtLtd,AgrawalComplex,SamtaColony,Raipur492001,Chhattisgarh.& 0771-2254807.Fax:2254801.(Mr.E.D.Agrawal,Dir.)
ANdhrA FerrO AllOyS is implementing an expansion programme at its existing Garbham facility in Vizianagaram district of aP. the capacity of high carbon ferro chrome is to be expanded from 40,000 tpa to 60,000 tpa. the project will entail an investment of rs.90 million to be funded through banks & internal accruals. rally tech is the project consultant. alstom, chennai is the equipment supplier. as of may 2007, civil work was underway. the facility is scheduled for completion by june 2008.
ß AndhraFerroAlloysLtd,FlatNo.501,SwagruhaCoral,R.K.Beach,Visakhapatnam530003, AndhraPradesh.& 0891-2552998/2567625.Fax:2552998.(Mr.DinkarShetty,Vice.Pres.)ß AlstomLtd,19/1,G.S.TRoad,Pallavaram,Chennai600043,TamilNadu.& 044-22640033.Fax:22640040.
ANkit MetAl & POWer is setting up a rolling mill and a WHr based cPP at its existing jorehira facility in Bankura district of WB. the project entails a capacity of 1,20,000 tpa for rolling mill and a 12 mW for cPP at an investment of rs.1,000 million. rana Udyog, Kolkata is the turnkey consultant. as of may 2007, civil works completed and machinery erection was underway. the project is slated for completion by june 2007.
ß AnkitMetal&PowerLtd,35,CRAvenue,Kolkata700012,WestBengal.& 033-22119805/22119806.Fax:22110522.(Mr.George,Gen.Mgr.)ß RanaUdyogLtd,C/o.ModernGroupofCompanies,18D,EverestHouse,46/C,ChowringheeRoad,Kolkata700071,WestBengal.& 033-30521114/30521116/30521117/30521120.Fax:22889247/22881121.
AquA PuMPS eNgiNeeriNg is implementing expansion programme at its thudiyalur foundry in coimbatore district of tn. the capacity of cast iron is to be augmented from 400 tpm to 1200 tpm. the expansion entails an investment of rs.300 million to be funded through banks & internal accruals. defamatics, Bangalore is the equipment supplier. as of march 2007, erection of machinery was underway. the expansion was scheduled for completion by may 2007.
ß AquapumpsEngineering,ThudiyalurPost,Coimbatore641034,TamilNadu.& 0422-2642484.Fax:2642128.(Mr.Purushothaman,Gen.Mgr.)
AlANkAr AllOyS register ofNeW PrOJeCtS iN iNdiA 2007
132.
133.
134.
135.
AShOk irON WOrkS is setting up a third foundry in Belgaum district of Karnataka. the project is implemented in two phases. Phase I envisage a capacity of 70,000 tpa. mr. W. a. Pech, Germany is the project consultant. as of march 2007, civil works were nearing completion and machinery erection had been initiated. the phase I is scheduled to be completed by june 2007.
ß AshokIronworksLtd,MazagaonRoad,Udyambag,Belgaum590008,Karnataka.& 0831-2442599.Fax:2441899.(Mr.G.M.Savanth,Mgr.Proj.)
AtlAS AutOMOtive components is expanding its chinchwad foundry for aluminium castings in Pune district of maharashtra. the capacity is being expanded from 3,500 tpa to 4,000 tpa and entails an investment of rs.70 million. r. r. dooth & co, Pune is the civil contractor and Pioneer engineering, Gujarat is the equipment supplier. as of april 2007, civil works completed and machinery erection was under progress. the expansion is scheduled for completion by june 2007.
ß AtlasAutomotiveComponentsLtd,D/2,PlotNo.58/59,MIDC,Chinchwad, Pune411019,Maharashtra.& 020-27473856/57/27474931/27484515/27459126/27461114/27463562.ß PioneerEngineering,238/B,2ndFloor,AksharArcade,Opp.MemnagarFireStation, Navrangpura,Ahmedabad380009,Gujarat.& 079-26401770/26401756.Fax:26401756.
beekAy Steel & POWer is setting up a steel melting shop to produce 75,000 tpa billets at its Uliburu plant in Keonjhar district of orissa. the project entails an investment of rs.1,000 million to be funded through banks & equity. megatherm, Kolkata is the equipment supplier. as of may 2007, machinery erection were under progress. the project is slated for completion by july 2007. Plans are also on the anvil to set up a 12 mW cPP in the same premises.
ß BeekaySteel&PowerLtd,Uliburu,Barbil,Keonjhar758035,Orissa.& 06767-277490/277492.(Mr.S.N.Jhah,Plt.Mgr.)ß MegathermElectronicsPvtLtd,Plot-L1,BlockGP,Sector-V,SaltLakeCity, Kolkata700091,WestBengal.& 033-23577745/23577352/23577854.Fax:23577757.
beSt eNgiNeerS PuMPS is setting up a foundry for ferrous and castings at somayampalayam in coimbatore district of tn. the unit entails a cumulative capacity of 100 tpm at an investment of rs.4.5 million is funded through internal accruals. as of april 2007, civil works completed and machinery erection was under progress. the unit is slated for completion by june 2007.
ß BestEngineersPumpsPvtLtd,59-B,ThadagamRoad,Velandiapalayam, Coimbatore641025,TamilNadu.& 0422-2432195.Fax:2451599.(Mr.Saranathan,Head.-QC.)
bhuShAN POWer & Steel has reported progress on expansion of its integrated steel complex at jharsuguda in orissa. an investment of rs.3,000 million is envisaged. the project is to be implemented in two phases. the upcoming steel complex will include a 900,000 tpa steel plant, 700,000 tpa pig iron plant, 4,50,000 tpa coke oven plant, 1 million tpa sinter plant
AShOk irON WOrkS register ofNeW PrOJeCtS iN iNdiA 2007
136.
137.
138.
139.
140.
34
register ofNeW PrOJeCtS iN iNdiA 2007
and 900,000 tpa Hr coil facility. mecon, ranchi is the project consultant. as of march 2007, construction work is under progress and most of the equipments are being imported. the expansion is scheduled for commissioning by 2010.
ß BhushanPower&SteelLtd,J.K.MillenniumCentre,6thFloor,46-DJLNehruRoad, Kolkata700071,WestBengal.& 033-22881710.ß Off2:15–17,4thFloor,TolstoyHouse,TolstoyMarg,ConnaughtPlace,NewDelhi110001.& 011-30451000.Fax:23712737.ß MeconLtd,Doranda,Ranchi834002,Jharkhand.& 0651-2480002/2481451.Fax:2482214/2482189.
bhuShAN POWer & Steel is setting up an integrated steel plant at rengali in sambalpur district of orissa. the facility includes setting up of a crude steel unit with a capacity of 4 million tpa, a 390 mW captive power plant (WHr & coal) based, a 900,000 tpa rolling mill, an 800,000 tpa pig iron and a sponge iron plant. the cumulative project cost is estimated to be rs.80,000 million to be funded through proceeds from equity, bank loans & internal accruals. mecon, ranchi and dcPl, Kolkata are the project consultants. equipments are sourced from sms demag, Germany and also from other countries in europe. thermax, Pune is the equipment supplier for cPP. as of may 2007, the company has commissioned 1.2 million tpa crude steel unit while installation of remaining capacity was in progress along with other steel products. the entire project is slated for completion by early 2011.
ß BhushanPower&SteelLtd,15–17,4thFloor,TolstoyHouse,TolstoyMarg,ConnaughtPlace, NewDelhi110001.& 011-30451000.Fax:23712737.(Mr.RajeshSharma,Gen.Mgr.-Proj.)ß MeconLtd,Doranda,Ranchi834002,Jharkhand.& 0651-2480002/2481451.Fax:2482214/2482189.
bhuShAN Steel & StriPS is implementing an expansion programme in 2 phases at its existing dhenkanal facility in orissa. the expansion is to double the capacity of steel production from 3 million tpa to 6 million tpa. mecon, ranchi is rendering the consultancy services. l&t and Petron are the civil contractors. sms demag – Germany, corof – Poland, BHel and sandvik are the equipment suppliers. as of april 2007, erection of machinery was under progress. Phase I of the programme is slated to be completed by 2009.
ß BhushanSteels&StripsLtd,FBlock,1stFloor,InternationalTradeTower, NehruPlace,NewDelhi110011.& 011-42297777/4295555.Fax:2648750/26415845.ß Plt:Narendrapur,P.O.Shibapur,Meramandali,Dhenkanal759121,Orissa.& 06764-229850.Fax:229853.ß MeconLtd,Doranda,Ranchi834002,Jharkhand.& 0651-2480002/2481451.Fax:2482214/2482189.
bMW iNduStrieS is setting up a steel unit at junglepur in Howrah district of WB. the project includes setting up of a 500,000 tpa hot rolled steel and 200,000 tpa steel galvanizing plant at a cumulative cost of rs.850 million. r K associates, Kolkata is the civil consultant. as of may 2007, the civil works and erection of machinery were underway. the project is
bhuShAN POWer & Steel
142.
141.
143.
register ofNeW PrOJeCtS iN iNdiA 2007
scheduled to become operational by july.
ß BMWIndustriesLtd,12/2,ParkMansion,57A,ParkStreet,Kolkata700016,WestBengal.& 033-22295631.(Mr.T.K.Datta,Dir.)ß R.K.Associates,141,GopalLalTagoreRoad,Kolkata700108,WestBengal.& 033-25777581.Fax:25773486.
brAhMi iMPex is setting up a 1.1 million tpa sponge iron plant at nala block in jantara district of jharkhand. mecon has been appointed as the project consultant and the project is to be implemented in three phases at a cost of rs.15,000 million. as of may 2007, the civil work had been initiated and the company was in the process of finalizing equipment suppliers. the phase I is expected to be commissioned by 2008.
ß BrahmiImpexPvtLtd,No.3,2ndFloor,BysackStreet,Kolkata700007,WestBengal.& 033-22598462.(Mr.S.K.Singhania,Dir.)
brANd AllOyS is setting up an integrated steel plant at Palaspanga in Keonjhar district of orissa. the project includes setting up of a 2,70,000 tpa sponge iron, a 36,000 tpa ferro alloys, a 100,000 tpa ms products and a 24 mW WHr based cPP. the project entails a cumulative investment of rs.3,000 million to be funded through loan from banks & internal accruals. Work on phase I is under progress which includes a 216,000 tpa sponge iron unit. As of April 2007, civil works were underway and the equipment suppliers has been finalised. Phase I is scheduled for completion in the first quarter of 2008.
ß BrandAlloysLtd,No.37,ShakespeareSarani,Kolkata700017,WestBengal.& 033-22878631.Fax:22870925. (Mr.Banerjee,Mgr.-Proj.)
C. P. re-rOllerS is setting up a 100 tpd sponge iron plant at Burdwan in WB. the project entails an investment of rs.350 million. Popuri engineering is rendering consultancy services and Beekay engineering, Bhilai is supplying the major equipments. as of april 2007, construction work was under progress. commercial production is expected to begin by the third quarter of 2007.
ß C.P.Re-rollersLimited,RaturiaAngadpurIndlArea,BurdwanDurgapur713215,WestBengal.& 0343-2591111.Fax:2591111.(Mr.A.B.Dhatta,Gen.Mgr.)ß PopuriEngineering&ConsultancyServicesPvtLtd,12-2-460,NewHUDALayout, Gudimalkapur,Opp.AnushaHospital,Mehdipatnam,Hyderabad500028,AndhraPradesh.& 040-23510649/23510777/23510811/23510844.ß BeekayEngineeringCorp,45/47,IndustrialEstate,Bhilai490026,Chhattisgarh.& 0788-2282571to76.Fax:2282578.
COChiN MiNerAlS & rutileS is set to expand the capacity of titanium at alwaye in ernakulam district of Kerala. the programme will augment the capacity from 36,000 tpa to 60,000 tpa at a cost of rs.1,000 million. regional research laboratory, tiruvananthapuram is the technical consultant. As of May 2007, bids were under finalisation to appoint the equipment suppliers and contractors. Work on the project is expected to begin in august and is scheduled for completion in 2 years thereafter.
ß CochinMinerals&RutilesLtd,VIII/224,MarketRoad,P.B.No.73,Alwaye683101, Eranakulam,Kerala.
brAhMi iMPex
144.
145.
146.
147.
35
register ofNeW PrOJeCtS iN iNdiA 2007
and 900,000 tpa Hr coil facility. mecon, ranchi is the project consultant. as of march 2007, construction work is under progress and most of the equipments are being imported. the expansion is scheduled for commissioning by 2010.
ß BhushanPower&SteelLtd,J.K.MillenniumCentre,6thFloor,46-DJLNehruRoad, Kolkata700071,WestBengal.& 033-22881710.ß Off2:15–17,4thFloor,TolstoyHouse,TolstoyMarg,ConnaughtPlace,NewDelhi110001.& 011-30451000.Fax:23712737.ß MeconLtd,Doranda,Ranchi834002,Jharkhand.& 0651-2480002/2481451.Fax:2482214/2482189.
bhuShAN POWer & Steel is setting up an integrated steel plant at rengali in sambalpur district of orissa. the facility includes setting up of a crude steel unit with a capacity of 4 million tpa, a 390 mW captive power plant (WHr & coal) based, a 900,000 tpa rolling mill, an 800,000 tpa pig iron and a sponge iron plant. the cumulative project cost is estimated to be rs.80,000 million to be funded through proceeds from equity, bank loans & internal accruals. mecon, ranchi and dcPl, Kolkata are the project consultants. equipments are sourced from sms demag, Germany and also from other countries in europe. thermax, Pune is the equipment supplier for cPP. as of may 2007, the company has commissioned 1.2 million tpa crude steel unit while installation of remaining capacity was in progress along with other steel products. the entire project is slated for completion by early 2011.
ß BhushanPower&SteelLtd,15–17,4thFloor,TolstoyHouse,TolstoyMarg,ConnaughtPlace, NewDelhi110001.& 011-30451000.Fax:23712737.(Mr.RajeshSharma,Gen.Mgr.-Proj.)ß MeconLtd,Doranda,Ranchi834002,Jharkhand.& 0651-2480002/2481451.Fax:2482214/2482189.
bhuShAN Steel & StriPS is implementing an expansion programme in 2 phases at its existing dhenkanal facility in orissa. the expansion is to double the capacity of steel production from 3 million tpa to 6 million tpa. mecon, ranchi is rendering the consultancy services. l&t and Petron are the civil contractors. sms demag – Germany, corof – Poland, BHel and sandvik are the equipment suppliers. as of april 2007, erection of machinery was under progress. Phase I of the programme is slated to be completed by 2009.
ß BhushanSteels&StripsLtd,FBlock,1stFloor,InternationalTradeTower, NehruPlace,NewDelhi110011.& 011-42297777/4295555.Fax:2648750/26415845.ß Plt:Narendrapur,P.O.Shibapur,Meramandali,Dhenkanal759121,Orissa.& 06764-229850.Fax:229853.ß MeconLtd,Doranda,Ranchi834002,Jharkhand.& 0651-2480002/2481451.Fax:2482214/2482189.
bMW iNduStrieS is setting up a steel unit at junglepur in Howrah district of WB. the project includes setting up of a 500,000 tpa hot rolled steel and 200,000 tpa steel galvanizing plant at a cumulative cost of rs.850 million. r K associates, Kolkata is the civil consultant. as of may 2007, the civil works and erection of machinery were underway. the project is
bhuShAN POWer & Steel
142.
141.
143.
register ofNeW PrOJeCtS iN iNdiA 2007
scheduled to become operational by july.
ß BMWIndustriesLtd,12/2,ParkMansion,57A,ParkStreet,Kolkata700016,WestBengal.& 033-22295631.(Mr.T.K.Datta,Dir.)ß R.K.Associates,141,GopalLalTagoreRoad,Kolkata700108,WestBengal.& 033-25777581.Fax:25773486.
brAhMi iMPex is setting up a 1.1 million tpa sponge iron plant at nala block in jantara district of jharkhand. mecon has been appointed as the project consultant and the project is to be implemented in three phases at a cost of rs.15,000 million. as of may 2007, the civil work had been initiated and the company was in the process of finalizing equipment suppliers. the phase I is expected to be commissioned by 2008.
ß BrahmiImpexPvtLtd,No.3,2ndFloor,BysackStreet,Kolkata700007,WestBengal.& 033-22598462.(Mr.S.K.Singhania,Dir.)
brANd AllOyS is setting up an integrated steel plant at Palaspanga in Keonjhar district of orissa. the project includes setting up of a 2,70,000 tpa sponge iron, a 36,000 tpa ferro alloys, a 100,000 tpa ms products and a 24 mW WHr based cPP. the project entails a cumulative investment of rs.3,000 million to be funded through loan from banks & internal accruals. Work on phase I is under progress which includes a 216,000 tpa sponge iron unit. As of April 2007, civil works were underway and the equipment suppliers has been finalised. Phase I is scheduled for completion in the first quarter of 2008.
ß BrandAlloysLtd,No.37,ShakespeareSarani,Kolkata700017,WestBengal.& 033-22878631.Fax:22870925. (Mr.Banerjee,Mgr.-Proj.)
C. P. re-rOllerS is setting up a 100 tpd sponge iron plant at Burdwan in WB. the project entails an investment of rs.350 million. Popuri engineering is rendering consultancy services and Beekay engineering, Bhilai is supplying the major equipments. as of april 2007, construction work was under progress. commercial production is expected to begin by the third quarter of 2007.
ß C.P.Re-rollersLimited,RaturiaAngadpurIndlArea,BurdwanDurgapur713215,WestBengal.& 0343-2591111.Fax:2591111.(Mr.A.B.Dhatta,Gen.Mgr.)ß PopuriEngineering&ConsultancyServicesPvtLtd,12-2-460,NewHUDALayout, Gudimalkapur,Opp.AnushaHospital,Mehdipatnam,Hyderabad500028,AndhraPradesh.& 040-23510649/23510777/23510811/23510844.ß BeekayEngineeringCorp,45/47,IndustrialEstate,Bhilai490026,Chhattisgarh.& 0788-2282571to76.Fax:2282578.
COChiN MiNerAlS & rutileS is set to expand the capacity of titanium at alwaye in ernakulam district of Kerala. the programme will augment the capacity from 36,000 tpa to 60,000 tpa at a cost of rs.1,000 million. regional research laboratory, tiruvananthapuram is the technical consultant. As of May 2007, bids were under finalisation to appoint the equipment suppliers and contractors. Work on the project is expected to begin in august and is scheduled for completion in 2 years thereafter.
ß CochinMinerals&RutilesLtd,VIII/224,MarketRoad,P.B.No.73,Alwaye683101, Eranakulam,Kerala.
brAhMi iMPex
144.
145.
146.
147.
36
register ofNeW PrOJeCtS iN iNdiA 2007
& 0484-2626789.Fax:2625674.(Mr.Narayanan,Gen.Mgr.-Proj.)ß RegionalResearchLaboratory,IndustrialEstate,P.O.Pappanamcode,Tiruvanan thapuram695019,Kerala.& 0471-2490224/2490674/2490811/2495565.
COSMiC FerrO AllOyS is expanding its Ferro alloy unit at Ghutgoria in Bankura district of WB. the furnace capacity is being augmented from 18 mVa to 36 mVa. the expansion entails an investment of rs.500 million to be funded through bank loans & internal accruals. Transformers and Rectifiers are the equipment suppliers. As of May 2007, erection of equipment was underway and the project is scheduled for completion by june 2007.
ß CosmicFerroAlloysLtd,SikkimCommerceHouse,4thFloor,4/1,MiddletonStreet, Kolkata700071,WestBengal.& 033-22836551/22836552/22836554.Fax:22836553.(Mr.VijayKumarBirla,Dir.)
d S grOuP is setting up of a steel complex at agartala in tripura. the project includes a 150,000 tpa cr sheets & coils unit and a 50,000 tpa galvanised steel units with an investment of Rs.2,500 million. As of May 2007, the equipment suppliers had been finalized and civil works were under progress. the plant is scheduled to become operational by early 2008.
ß DharampalSatyapalGroup,A-85&86,Sector2,Noida201301,UttarPradesh.& 0120-2522140/2530551/2530554/2587911to17.Fax:2522592.
dOve MAriNe exPOrtS is to set up a 100 tpd sponge iron plant at dhimli in Bastar district of chhattisgarh. an investment of rs.120 million is entailed andwill be funded through internal accruals. Tenders have been floated for appointing consultants and equipment suppliers. As of may 2007, the company has applied for mining lease and further developments is expected in the following months.
ß DoveMarineExportsPvtLtd,C/o.PheonixIndiaExportsLtd,PlotNo.13,DoctorsColony, Seethamadhara,Visakhapatnam530013,AndhraPradesh.& 0891-2552374.
eleCtrOtherM iNdiA is setting up a 700,000 tpa pig iron unit in two phases at samkhiyali in Kutch district of Gujarat. the project entails an investment of rs.75,000 million. as of april 2007, erection of machinery was under progress. Phase I includes 300,000 tpa of pig iron. the work on phase I was under progress and is scheduled for completion by june 2007. Work on phase II will be initiated after the completion of phase I.
ß ElectrothermIndiaLtd,72,Palodia,ViaThaltej,Ahmedabad382115,Gujarat.& 02717-234553.Fax:234556.(Mr.RajeshMangal,Mgr.-Fin.)
eNNOre COke is setting up a 300,000 tpa met coke plant and 18 mW co-gen power plant in two phase in Haldia district of WB. the project is being implemented at a cost of rs.430 million. the phase I includes setting of a met coke plant with a initial capacity of 100,000 tpa and a 6 mW co-gen power plant. shriram ePc, chennai has been appointed as the turnkey contractor. as of april 2007, erection of equipments were underway and the phase I was scheduled to be completed by december 2007. In Phase II and the capacity of the met coke unit will be increased from 100,000 tpa to 300,000 tpa and the capacity of co-gen from 6 mW
COSMiC FerrO AllOyS
148.
149.
150.
151.
152.
register ofNeW PrOJeCtS iN iNdiA 2007
to 18 mW with an investment of rs.670 million. Work on the phase II is expected to begin after the completion of phase I. the company is expected to begin commercial production by the first quarter of 2009.
ß EnnoreCokeLtd,No.36,CollegeRoad,Nungambakkam,Chennai600006,TamilNadu.& 044-28272590.Fax:28262416.(Mr.Rajgopal,Ch.Fin.Off.)ß ShriramEPC,9,VanagaramRoad,Ayanambakkam,Chennai602102,TamilNadu.& 044-26533572/26533313.
eNNOre FOuNdrieS is setting up a 72,000 tpm foundry for grey iron and s.G. iron castings at sriperamputhur in Kancheepuram district of tn. the project entails an investment of rs.1,500 million to be funded through banks & internal accruals. Kunkel Wagner, Germany & Inductotherm, Hyderabad are the equipment suppliers. as of april 2007, civil work completed and machinery erection was underway. the project is scheduled to be completed by august 2007.
ß EnnoreFoundriesLtd,K.H.Road,EnnoreThermalStation,Ennore, Chennai600057,TamilNadu.& 044-25750210.Fax:25750390.(Mr.Purushothaman,Gen.Mgr.-Proj.)ß InductothermIndiaPvtLtd,FlatNo.301,3rdFloor,PlotNo.12,SurveyNo.28,6-3-1090/A/2, Somajiguda,Hyderabad500082,AndhraPradesh.& 040-23376575/23319840.Fax:23392475.
eNNOre FOuNdrieS is implementing a modernization scheme at its ennore facilities near chennai in tn. the project entails a capacity increase of 120 moulds/hr in unit I and of 45 moulds/hr in unit II at an investment of rs.500 million. Gustav Zimmermam, Germany & Fritz Hamsberg, Italy are the equipment suppliers. as of april 2007, civil works were underway and machinery erection commenced. the modernisation project was scheduled for completion by june 2007.
ß EnnoreFoundriesLtd,K.H.Road,EnnoreThermalStation,Ennore, Chennai600057,TamilNadu.& 044-25750210.Fax:25750390.(Mr.Purushothaman,Gen.Mgr.-Proj.)ß FritzHansberg,Spa.viaCesari27,ModenaI-41100,Italy.&+39059333488.Fax:+39059333431.
gAJANAN irON is to set up a 72 tpd steel ingots plant at mondalpur in Burdhwan district of WB. the project envisages an estimated investment of rs.70 million to be funded through term loan & internal accruals. Inductotherm, Kolkata is the equipment supplier. as of april 2007, work on the project is to be initiated in the coming months. the project is expected to be completed by first quarter of 2009.
ß GajananIronPvtLtd,1MAStreet,PuccaBazaar,ShreeRamMarket, BardhamanAsansol713301,WestBengal.& 0341-2205457/3293559.(Mr.VikasPrasad,Ch.Exe.Off.)ß InductothermIndiaPvtLtd,Bopal,Ahmedabad380058,Gujarat.& 02717-231961(8lines).Fax:02717-231266.
eNNOre FOuNdrieS
153.
154.
155.
37
register ofNeW PrOJeCtS iN iNdiA 2007
& 0484-2626789.Fax:2625674.(Mr.Narayanan,Gen.Mgr.-Proj.)ß RegionalResearchLaboratory,IndustrialEstate,P.O.Pappanamcode,Tiruvanan thapuram695019,Kerala.& 0471-2490224/2490674/2490811/2495565.
COSMiC FerrO AllOyS is expanding its Ferro alloy unit at Ghutgoria in Bankura district of WB. the furnace capacity is being augmented from 18 mVa to 36 mVa. the expansion entails an investment of rs.500 million to be funded through bank loans & internal accruals. Transformers and Rectifiers are the equipment suppliers. As of May 2007, erection of equipment was underway and the project is scheduled for completion by june 2007.
ß CosmicFerroAlloysLtd,SikkimCommerceHouse,4thFloor,4/1,MiddletonStreet, Kolkata700071,WestBengal.& 033-22836551/22836552/22836554.Fax:22836553.(Mr.VijayKumarBirla,Dir.)
d S grOuP is setting up of a steel complex at agartala in tripura. the project includes a 150,000 tpa cr sheets & coils unit and a 50,000 tpa galvanised steel units with an investment of Rs.2,500 million. As of May 2007, the equipment suppliers had been finalized and civil works were under progress. the plant is scheduled to become operational by early 2008.
ß DharampalSatyapalGroup,A-85&86,Sector2,Noida201301,UttarPradesh.& 0120-2522140/2530551/2530554/2587911to17.Fax:2522592.
dOve MAriNe exPOrtS is to set up a 100 tpd sponge iron plant at dhimli in Bastar district of chhattisgarh. an investment of rs.120 million is entailed andwill be funded through internal accruals. Tenders have been floated for appointing consultants and equipment suppliers. As of may 2007, the company has applied for mining lease and further developments is expected in the following months.
ß DoveMarineExportsPvtLtd,C/o.PheonixIndiaExportsLtd,PlotNo.13,DoctorsColony, Seethamadhara,Visakhapatnam530013,AndhraPradesh.& 0891-2552374.
eleCtrOtherM iNdiA is setting up a 700,000 tpa pig iron unit in two phases at samkhiyali in Kutch district of Gujarat. the project entails an investment of rs.75,000 million. as of april 2007, erection of machinery was under progress. Phase I includes 300,000 tpa of pig iron. the work on phase I was under progress and is scheduled for completion by june 2007. Work on phase II will be initiated after the completion of phase I.
ß ElectrothermIndiaLtd,72,Palodia,ViaThaltej,Ahmedabad382115,Gujarat.& 02717-234553.Fax:234556.(Mr.RajeshMangal,Mgr.-Fin.)
eNNOre COke is setting up a 300,000 tpa met coke plant and 18 mW co-gen power plant in two phase in Haldia district of WB. the project is being implemented at a cost of rs.430 million. the phase I includes setting of a met coke plant with a initial capacity of 100,000 tpa and a 6 mW co-gen power plant. shriram ePc, chennai has been appointed as the turnkey contractor. as of april 2007, erection of equipments were underway and the phase I was scheduled to be completed by december 2007. In Phase II and the capacity of the met coke unit will be increased from 100,000 tpa to 300,000 tpa and the capacity of co-gen from 6 mW
COSMiC FerrO AllOyS
148.
149.
150.
151.
152.
register ofNeW PrOJeCtS iN iNdiA 2007
to 18 mW with an investment of rs.670 million. Work on the phase II is expected to begin after the completion of phase I. the company is expected to begin commercial production by the first quarter of 2009.
ß EnnoreCokeLtd,No.36,CollegeRoad,Nungambakkam,Chennai600006,TamilNadu.& 044-28272590.Fax:28262416.(Mr.Rajgopal,Ch.Fin.Off.)ß ShriramEPC,9,VanagaramRoad,Ayanambakkam,Chennai602102,TamilNadu.& 044-26533572/26533313.
eNNOre FOuNdrieS is setting up a 72,000 tpm foundry for grey iron and s.G. iron castings at sriperamputhur in Kancheepuram district of tn. the project entails an investment of rs.1,500 million to be funded through banks & internal accruals. Kunkel Wagner, Germany & Inductotherm, Hyderabad are the equipment suppliers. as of april 2007, civil work completed and machinery erection was underway. the project is scheduled to be completed by august 2007.
ß EnnoreFoundriesLtd,K.H.Road,EnnoreThermalStation,Ennore, Chennai600057,TamilNadu.& 044-25750210.Fax:25750390.(Mr.Purushothaman,Gen.Mgr.-Proj.)ß InductothermIndiaPvtLtd,FlatNo.301,3rdFloor,PlotNo.12,SurveyNo.28,6-3-1090/A/2, Somajiguda,Hyderabad500082,AndhraPradesh.& 040-23376575/23319840.Fax:23392475.
eNNOre FOuNdrieS is implementing a modernization scheme at its ennore facilities near chennai in tn. the project entails a capacity increase of 120 moulds/hr in unit I and of 45 moulds/hr in unit II at an investment of rs.500 million. Gustav Zimmermam, Germany & Fritz Hamsberg, Italy are the equipment suppliers. as of april 2007, civil works were underway and machinery erection commenced. the modernisation project was scheduled for completion by june 2007.
ß EnnoreFoundriesLtd,K.H.Road,EnnoreThermalStation,Ennore, Chennai600057,TamilNadu.& 044-25750210.Fax:25750390.(Mr.Purushothaman,Gen.Mgr.-Proj.)ß FritzHansberg,Spa.viaCesari27,ModenaI-41100,Italy.&+39059333488.Fax:+39059333431.
gAJANAN irON is to set up a 72 tpd steel ingots plant at mondalpur in Burdhwan district of WB. the project envisages an estimated investment of rs.70 million to be funded through term loan & internal accruals. Inductotherm, Kolkata is the equipment supplier. as of april 2007, work on the project is to be initiated in the coming months. the project is expected to be completed by first quarter of 2009.
ß GajananIronPvtLtd,1MAStreet,PuccaBazaar,ShreeRamMarket, BardhamanAsansol713301,WestBengal.& 0341-2205457/3293559.(Mr.VikasPrasad,Ch.Exe.Off.)ß InductothermIndiaPvtLtd,Bopal,Ahmedabad380058,Gujarat.& 02717-231961(8lines).Fax:02717-231266.
eNNOre FOuNdrieS
153.
154.
155.
38
register ofNeW PrOJeCtS iN iNdiA 2007
gAJeNdrA AgeNCieS is setting up a 200 tpm foundry at Keeranatham in coimbatore district of tn. the unit is to produce cI castings. as of april 2007, civil work was completed and machinery erection was under progress. the unit is scheduled to be completed by june 2007.
ß GajendraAgencies,52,1stCross,BharathiNagar,Ganapathy,Coimbatore641006,TamilNadu.& 0422-2575171.Fax:2590093.
gANdhikuMAr FOuNdry is implementing expansion programme at its existing Velankurichi facility, coimbatore in tn. the scheme envisages to increase the capacity of cast iron from 60 tpm to 250 tpm at a cost of rs.3 million. eviro care India, madurai is the project consultant. sri sakthi Foundry equipments & dhass engg co, coimbatore are the equipment suppliers. as of march 2007, civil work was nearing completion and erection work initiated. the project is scheduled to be completed by june 2007.
ß GandhikumarFoundry,315,VeelankurichiRoad,Coimbatore641004,TamilNadu.& 0422-2512724.Fax:2512866.ß EviroCareIndiaPvtLtd,PlotNo.45,SecondStreet,HarveyNagar, Madurai625016,TamilNadu.& 0452-4355103.Fax:2611127.
ghAtge PAtil iNduStrieS is setting up a 3,000 tpm foundry for Gs and GI castings at Kohlapur in maharashtra. the unit envisages an investment of rs.950 million to be funded through FI’s & IPo. all statutory clearances obtained and the equipments are to be imported from Italy. As of April 2007, loans have been partly secured & IPO is to be floated shortly. Civil works had been initiated and the plant is slated for commissioning by 2009.
ß GhatgePatilIndustriesLtd,Uchgaon,Kohlapur,Maharashtra.& 0231-2608000.Fax:2605983.(S.Gulkarni,Mgr.-Corporate.)
gOldeN iSPAt CAStiNg is setting up a 10,000 tpm pig iron unit including a blast furnace and a 12 mW WHr based cPP at mezia in Bardhaman district of WB. a cumulative cost of rs.12,500 million is entailed being funded through banks & internal accruals. alstom Bengal is to supply the boiler and turbine is being imported from china. as of april 2007, the civil works were under progress. the project is slated for completion by march 2008.
ß GoldenIspatCasting,C/o.GoldenPolyProductsLtd,DegaulleAvenue,Durgapur, Bardhaman713206,WestBengal.& 0343-6532960.Fax:2555293.(Mr.RamShyamPrasad,Mg.Dir.)
gONterMANN PeiPerS iNdiA is implementing modernisation and upgradation programme at its existing Bishnupur facility in Bankura district of WB. the ongoing scheme will result in increase the capacity of iron & steel rolls from 1,000 tpm to 1,800 tpm at a cost of rs.400 million. chrome tech, Usa is the turnkey contractor. as of april 2007, civil works were under progress. the programme is scheduled to be completed by end of 2007.
ß GontermannPeipersIndiaLtd,DiamondHarbourRoad,P.O.Palian,South24Parganas, Bishnupur743512,WestBengal.& 033-24532455/24532456/24978183/24978294/24978462. Fax:24978313/24978547/24978686.(Mr.Burmann,Sr.Vice.Pres.-Operations.)
gAJeNdrA AgeNCieS
156.
157.
158.
159.
160.
register ofNeW PrOJeCtS iN iNdiA 2007
grACe iNduStrieS is expanding the existing sponge iron plant at tadali in chandrapur district of maharashtra. the project includes setting up of a billets unit and a 25 mW WHr based cPP at a cost of rs.2,000 million. Indure Power, delhi has been appointed as the turnkey consultant for CPP. The company is yet to finalise the consultant and capacity for billets. as of may 2007, civil works have been initiated. the unit is scheduled for completion in 15 months.
ß GraceIndustriesLtd,GuptaBhavan,SethMahadeoprasadGuptaMarg,TempleBazaar, Sitabuldi,Nagpur440012,Maharashtra.& 0712-2524431/2550229/2540452/2524431.Fax:2528706.(Mr.P.Misra,Proj.Mgr.)
guJArAt Nre COke is implementing the capacity expansion programme at its existing dharwad facility in Karnataka. the programme is to double the capacity of coke oven from 400,000 tpa to 800,000 tpa. an investment of rs.700 million is envisaged. as of april 2007, civil works and erection of equipments were underway. the expansion is scheduled for completion by july 2007. Plans are also on the anvil to set up two co-gen power plants with a capacity of 15 mW along with coal washery at Bhachau in Kutch district and coke plant at Khambhalla in jamnagar district of Gujarat with an investment of rs.500 million to rs.550 million each. Both the plants are scheduled to become operational in 24 months from july 2007.
ß GujaratNRECokeLtd,22,BlockC,5thFloor,CamacStreet,Kolkata700016,WestBengal.& 033-22891471to75.Fax:22891470.(Mr.Kaushik,Mgr.-Materials.)ß SAILConsultancyDivisionC/o.SteelAuthorityofIndiaLimited,SCOPEMinar,NorthTower, 19thFloor,LaxmiNagarDistrictCentre,NewDelhi110092.&011-22448381/22531242.Fax:22464616.
guPtA dOMeStiC FuelS is implementing expansion programme at its existing tadali plant in chandrapur district of maharashtra. the programme is to increase the capacity of sponge iron from 200 tpd to 400 tpd with an investment of rs.500 million. Popuri engineering consultants, Hyderabad has been appointed as the project consultant and Beekay engineering, Bhilai is the equipment supplier. as of april 2007, the project was awaiting statutory clearances and the company yet to appoint other equipment suppliers. the expansion is scheduled to be completed by september 2008.
ß GuptaDomesticFuels(Nagpur)Ltd,GuptaBhavan,SethMahadeoprasadGuptaMarg, Sitabuldi,Nagpur440012,Maharashtra.& 0712-2524431/2550229/2540452.Fax:2528706.ß PopuriEngineering&ConsultancyServicesPvtLtd,12-2-460,NewHUDALayout, Gudimalkapur,Opp.AnushaHospital,Mehdipatnam,Hyderabad500028,AndhraPradesh.& 040-23510649/23510777/23510811/23510844.ß BeekayEngineeringCorp,45/47,IndustrialEstate,Bhilai490026,Chhattisgarh.& 0788-2282571to76.Fax:2282578.
hAllMArk Steel is implementing an expansion project at its existing Bhiwadi facility in alwar district of rajasthan. the project will result in augmenting the capacity of steel bars from 30 tpa to 100 tpa. the project will entails an investment of rs.360 million. the company is importing machinery from Us. as of may 2007, erection of machinery will be initiated shortly and is scheduled to be completed in the next 2 to 3 months.
grACe iNduStrieS
161.
162.
163.
164.
39
register ofNeW PrOJeCtS iN iNdiA 2007
gAJeNdrA AgeNCieS is setting up a 200 tpm foundry at Keeranatham in coimbatore district of tn. the unit is to produce cI castings. as of april 2007, civil work was completed and machinery erection was under progress. the unit is scheduled to be completed by june 2007.
ß GajendraAgencies,52,1stCross,BharathiNagar,Ganapathy,Coimbatore641006,TamilNadu.& 0422-2575171.Fax:2590093.
gANdhikuMAr FOuNdry is implementing expansion programme at its existing Velankurichi facility, coimbatore in tn. the scheme envisages to increase the capacity of cast iron from 60 tpm to 250 tpm at a cost of rs.3 million. eviro care India, madurai is the project consultant. sri sakthi Foundry equipments & dhass engg co, coimbatore are the equipment suppliers. as of march 2007, civil work was nearing completion and erection work initiated. the project is scheduled to be completed by june 2007.
ß GandhikumarFoundry,315,VeelankurichiRoad,Coimbatore641004,TamilNadu.& 0422-2512724.Fax:2512866.ß EviroCareIndiaPvtLtd,PlotNo.45,SecondStreet,HarveyNagar, Madurai625016,TamilNadu.& 0452-4355103.Fax:2611127.
ghAtge PAtil iNduStrieS is setting up a 3,000 tpm foundry for Gs and GI castings at Kohlapur in maharashtra. the unit envisages an investment of rs.950 million to be funded through FI’s & IPo. all statutory clearances obtained and the equipments are to be imported from Italy. As of April 2007, loans have been partly secured & IPO is to be floated shortly. Civil works had been initiated and the plant is slated for commissioning by 2009.
ß GhatgePatilIndustriesLtd,Uchgaon,Kohlapur,Maharashtra.& 0231-2608000.Fax:2605983.(S.Gulkarni,Mgr.-Corporate.)
gOldeN iSPAt CAStiNg is setting up a 10,000 tpm pig iron unit including a blast furnace and a 12 mW WHr based cPP at mezia in Bardhaman district of WB. a cumulative cost of rs.12,500 million is entailed being funded through banks & internal accruals. alstom Bengal is to supply the boiler and turbine is being imported from china. as of april 2007, the civil works were under progress. the project is slated for completion by march 2008.
ß GoldenIspatCasting,C/o.GoldenPolyProductsLtd,DegaulleAvenue,Durgapur, Bardhaman713206,WestBengal.& 0343-6532960.Fax:2555293.(Mr.RamShyamPrasad,Mg.Dir.)
gONterMANN PeiPerS iNdiA is implementing modernisation and upgradation programme at its existing Bishnupur facility in Bankura district of WB. the ongoing scheme will result in increase the capacity of iron & steel rolls from 1,000 tpm to 1,800 tpm at a cost of rs.400 million. chrome tech, Usa is the turnkey contractor. as of april 2007, civil works were under progress. the programme is scheduled to be completed by end of 2007.
ß GontermannPeipersIndiaLtd,DiamondHarbourRoad,P.O.Palian,South24Parganas, Bishnupur743512,WestBengal.& 033-24532455/24532456/24978183/24978294/24978462. Fax:24978313/24978547/24978686.(Mr.Burmann,Sr.Vice.Pres.-Operations.)
gAJeNdrA AgeNCieS
156.
157.
158.
159.
160.
register ofNeW PrOJeCtS iN iNdiA 2007
grACe iNduStrieS is expanding the existing sponge iron plant at tadali in chandrapur district of maharashtra. the project includes setting up of a billets unit and a 25 mW WHr based cPP at a cost of rs.2,000 million. Indure Power, delhi has been appointed as the turnkey consultant for CPP. The company is yet to finalise the consultant and capacity for billets. as of may 2007, civil works have been initiated. the unit is scheduled for completion in 15 months.
ß GraceIndustriesLtd,GuptaBhavan,SethMahadeoprasadGuptaMarg,TempleBazaar, Sitabuldi,Nagpur440012,Maharashtra.& 0712-2524431/2550229/2540452/2524431.Fax:2528706.(Mr.P.Misra,Proj.Mgr.)
guJArAt Nre COke is implementing the capacity expansion programme at its existing dharwad facility in Karnataka. the programme is to double the capacity of coke oven from 400,000 tpa to 800,000 tpa. an investment of rs.700 million is envisaged. as of april 2007, civil works and erection of equipments were underway. the expansion is scheduled for completion by july 2007. Plans are also on the anvil to set up two co-gen power plants with a capacity of 15 mW along with coal washery at Bhachau in Kutch district and coke plant at Khambhalla in jamnagar district of Gujarat with an investment of rs.500 million to rs.550 million each. Both the plants are scheduled to become operational in 24 months from july 2007.
ß GujaratNRECokeLtd,22,BlockC,5thFloor,CamacStreet,Kolkata700016,WestBengal.& 033-22891471to75.Fax:22891470.(Mr.Kaushik,Mgr.-Materials.)ß SAILConsultancyDivisionC/o.SteelAuthorityofIndiaLimited,SCOPEMinar,NorthTower, 19thFloor,LaxmiNagarDistrictCentre,NewDelhi110092.&011-22448381/22531242.Fax:22464616.
guPtA dOMeStiC FuelS is implementing expansion programme at its existing tadali plant in chandrapur district of maharashtra. the programme is to increase the capacity of sponge iron from 200 tpd to 400 tpd with an investment of rs.500 million. Popuri engineering consultants, Hyderabad has been appointed as the project consultant and Beekay engineering, Bhilai is the equipment supplier. as of april 2007, the project was awaiting statutory clearances and the company yet to appoint other equipment suppliers. the expansion is scheduled to be completed by september 2008.
ß GuptaDomesticFuels(Nagpur)Ltd,GuptaBhavan,SethMahadeoprasadGuptaMarg, Sitabuldi,Nagpur440012,Maharashtra.& 0712-2524431/2550229/2540452.Fax:2528706.ß PopuriEngineering&ConsultancyServicesPvtLtd,12-2-460,NewHUDALayout, Gudimalkapur,Opp.AnushaHospital,Mehdipatnam,Hyderabad500028,AndhraPradesh.& 040-23510649/23510777/23510811/23510844.ß BeekayEngineeringCorp,45/47,IndustrialEstate,Bhilai490026,Chhattisgarh.& 0788-2282571to76.Fax:2282578.
hAllMArk Steel is implementing an expansion project at its existing Bhiwadi facility in alwar district of rajasthan. the project will result in augmenting the capacity of steel bars from 30 tpa to 100 tpa. the project will entails an investment of rs.360 million. the company is importing machinery from Us. as of may 2007, erection of machinery will be initiated shortly and is scheduled to be completed in the next 2 to 3 months.
grACe iNduStrieS
161.
162.
163.
164.
40
register ofNeW PrOJeCtS iN iNdiA 2007
ß HallmarkSteelPvtLtd,306,RIICOIndustrialArea,Bhiwadi,Alwar301019,Rajasthan.& 01493-512514.Fax:512515.
hArihAr FOrgiNgS is setting up a 25,000 tpa pig iron and billets manufacturing unit at Viralimalai near trichy in tn. the company is likely to invest rs.160 million funded through internal accruals & bank loans. satish metha, mumbai is rendering the consultancy services. the company is procuring used machinery from russia. as of march 2007, civil work was underway and erection of equipments initiated. the unit is scheduled to become operational by september 2007.
ß HariharForgingsPvtLtd,1/43,RaceCourseRoad,Kajamalai,Trichy620023,TamilNadu.& Tel:0431-2422884.Fax:2421056.(Mr.Subramaniam,Mgr.)
hiNdAlCO iNduStrieS is implementing modernization and expansion programme at its existing Hirakud complex in sambalpur district of orissa. the programme envisages increasing the capacity of aluminium smelter from 65,000 tpa to 143,000 tpa using soderberg to pre-bake technology. the programme is scheduled to be completed by early 2008.
ß HindalcoIndustriesLtd,CenturyBhavan,3rdFloor,Dr.AnnieBasantRoad,Worli, Mumbai400025,Maharashtra.& 022-56626666.Fax:24362516/24227586.ß Plt:HirakudAluminiumSmelter,Hirakud768016,Sambalpur,Orissa& 0663-2401655/2481307/2481273.
hkt MiNiNg is setting up a 1.2 million tpa iron ore benefication and a pelletisation plant at danapur in Bellary district of Karnataka. srt consultants, Hyderabad is the project consultants. metso corp, sweden is the equipment suppliers. as of april 2007, civil works were completed and machinery erection was under progress. the plant is scheduled for completion by september 2007.
ß H.K.TMiningPvtLtd,Danapurvillage,Hospettaluk,Bellary,Karnataka.& 08394-244680-244688.(Mr.S.Aravind,Proj.Engr.)ß S.R.KConsultants,8-3-214/36,SrinivasaColony(West),Hyderabad500038,AndhraPradesh.& Tel:040-23732294.Fax:23733494.ß MetsoMinerals(India)PvtLtd,6thFloor,DLFGatewayTower,DLFCity,Phase-III, Gurgaon122002,Haryana.& 0124-2351541.Fax:2351601.
hOOghly AllOy & SteelS is setting up a 39,000 tpa rolling mill as part of the forward integration programme at its existing Hooghly facility in WB. the unit envisages an estimated investment of rs.100 million. as of april 2007, the civil work was under progress and the equipment suppliers has been finalised. The unit is expected to begin commercial production in july 2007.
ß HooghlyAlloy&SteelsCoPvtLtd,90,StephenHouse,5thFloor,4BBDBaghEast, Kolkata700001,WestBengal.& 033-22421834.Fax:22105661.ß Plt:OnNH2Kolkata-DelhiRoad,Mallickpara,Hooghly712203,WestBengal.& 033-26224179/26227222.
hArihAr FOrgiNgS
165.
166.
167.
168.
register ofNeW PrOJeCtS iN iNdiA 2007
hOOghly MetCOke & POWer is setting up a 1.6 million tpa met coke plant at Haldia in WB. the project is to be implemented in four phases, each with a capacity of 400,000 tpa and a 60 mW WHr based cPP. the company is procuring the minerals from various countries. m.n. dastur is the project consultant, sino steel Industries & trade Group corp, china is the major equipment supplier. as of march 2007, machinery erection was underway. the phase I of the programme with a capacity of 400,000 tpa is scheduled to be completed by august 2007. the project with a full capacity of 1.6 million tpa is scheduled for completion by march 2008.
ß HooghlyMetalCoke&PowerCoLtd,16thFloor,TataCenter,43,JawarharlalNehruRoad, Kolkata700071,WestBengal.& 033-22885463.Fax:22882074.ß M.N.Dastur&CoPvtLtd,FaradayHouse,P-17,MissionRowExtension, Kolkata700013,WestBengal.& 033-22250500.ß SinoSteelIndiaPvtLtd,12thFloor,ErosCorporateTower,NehruPlace,NewDelhi110019.& 011-42895600.Fax:42895628.
hOSPet Steel is expanding pig iron production capacity at its existing Ginigera facility in Koppal district of Karnataka. the expansion is to augment the capacity from 400,000 tpa to 700,000 tpa. an investment outlay of rs.1,000 million is envisaged to be funded through term loans from banks & internal accruals. Gdc constructions, mumbai is the civil contractor and Fouress engineering, mumbai is the equipment supplier. as of may 2007, civil work was under progress. the project is slated for completion by october 2007.
ß HospetsteelsLtd,Hospetroad,VillageGinigera,Koppal-583226,Karnataka.& 08539-286606.Fax:286611.(Mr.Srinivas,Dy.Gen.Mgr.)ß FouressEngineeringLtd,MahalakshmiChambers,22,BhulabhaidesaiRoad, Mumbai400026,Maharashtra.& 022-23534400/23534405.
hySCO Steel iNdiA is setting up a 1,40,000 tpa cold rolled steel sheet production unit at tiruvallur near chennai in tn. the project entails an estimated investment of rs.500 million to be funded through banks & internal accruals. logos consultants, chennai is the civil consultant. as of april 2007, the civil work was under progress and equipment suppliers to be finalized. The project is scheduled for completion by July 2007.
ß HyscoSteelIndiaLtd,FlatNo.2A,No.40,JeyamkondarBuilding,MurraysGateRoad, Alwarpet,Chennai,TamilNadu.& 044-43141941.Fax:43141940.
iSPAt iNduStrieS is implementing expansion programme at its existing dolvi facility in raigad district of maharashtra. the programme envisages increasing the capacity of steel sheet production from 3.6 million tpa to 5.2 million tpa. the expansion entails an investment of rs.20,000 million. m n dastur, Kolkata is the project consultant. machinery is imported from south Korea & european countries. as of april 2007, civil work was under progress. the expansion is scheduled for completion by may 2008.
hOOghly MetCOke & POWer
169.
170.
171.
172.
41
register ofNeW PrOJeCtS iN iNdiA 2007
ß HallmarkSteelPvtLtd,306,RIICOIndustrialArea,Bhiwadi,Alwar301019,Rajasthan.& 01493-512514.Fax:512515.
hArihAr FOrgiNgS is setting up a 25,000 tpa pig iron and billets manufacturing unit at Viralimalai near trichy in tn. the company is likely to invest rs.160 million funded through internal accruals & bank loans. satish metha, mumbai is rendering the consultancy services. the company is procuring used machinery from russia. as of march 2007, civil work was underway and erection of equipments initiated. the unit is scheduled to become operational by september 2007.
ß HariharForgingsPvtLtd,1/43,RaceCourseRoad,Kajamalai,Trichy620023,TamilNadu.& Tel:0431-2422884.Fax:2421056.(Mr.Subramaniam,Mgr.)
hiNdAlCO iNduStrieS is implementing modernization and expansion programme at its existing Hirakud complex in sambalpur district of orissa. the programme envisages increasing the capacity of aluminium smelter from 65,000 tpa to 143,000 tpa using soderberg to pre-bake technology. the programme is scheduled to be completed by early 2008.
ß HindalcoIndustriesLtd,CenturyBhavan,3rdFloor,Dr.AnnieBasantRoad,Worli, Mumbai400025,Maharashtra.& 022-56626666.Fax:24362516/24227586.ß Plt:HirakudAluminiumSmelter,Hirakud768016,Sambalpur,Orissa& 0663-2401655/2481307/2481273.
hkt MiNiNg is setting up a 1.2 million tpa iron ore benefication and a pelletisation plant at danapur in Bellary district of Karnataka. srt consultants, Hyderabad is the project consultants. metso corp, sweden is the equipment suppliers. as of april 2007, civil works were completed and machinery erection was under progress. the plant is scheduled for completion by september 2007.
ß H.K.TMiningPvtLtd,Danapurvillage,Hospettaluk,Bellary,Karnataka.& 08394-244680-244688.(Mr.S.Aravind,Proj.Engr.)ß S.R.KConsultants,8-3-214/36,SrinivasaColony(West),Hyderabad500038,AndhraPradesh.& Tel:040-23732294.Fax:23733494.ß MetsoMinerals(India)PvtLtd,6thFloor,DLFGatewayTower,DLFCity,Phase-III, Gurgaon122002,Haryana.& 0124-2351541.Fax:2351601.
hOOghly AllOy & SteelS is setting up a 39,000 tpa rolling mill as part of the forward integration programme at its existing Hooghly facility in WB. the unit envisages an estimated investment of rs.100 million. as of april 2007, the civil work was under progress and the equipment suppliers has been finalised. The unit is expected to begin commercial production in july 2007.
ß HooghlyAlloy&SteelsCoPvtLtd,90,StephenHouse,5thFloor,4BBDBaghEast, Kolkata700001,WestBengal.& 033-22421834.Fax:22105661.ß Plt:OnNH2Kolkata-DelhiRoad,Mallickpara,Hooghly712203,WestBengal.& 033-26224179/26227222.
hArihAr FOrgiNgS
165.
166.
167.
168.
register ofNeW PrOJeCtS iN iNdiA 2007
hOOghly MetCOke & POWer is setting up a 1.6 million tpa met coke plant at Haldia in WB. the project is to be implemented in four phases, each with a capacity of 400,000 tpa and a 60 mW WHr based cPP. the company is procuring the minerals from various countries. m.n. dastur is the project consultant, sino steel Industries & trade Group corp, china is the major equipment supplier. as of march 2007, machinery erection was underway. the phase I of the programme with a capacity of 400,000 tpa is scheduled to be completed by august 2007. the project with a full capacity of 1.6 million tpa is scheduled for completion by march 2008.
ß HooghlyMetalCoke&PowerCoLtd,16thFloor,TataCenter,43,JawarharlalNehruRoad, Kolkata700071,WestBengal.& 033-22885463.Fax:22882074.ß M.N.Dastur&CoPvtLtd,FaradayHouse,P-17,MissionRowExtension, Kolkata700013,WestBengal.& 033-22250500.ß SinoSteelIndiaPvtLtd,12thFloor,ErosCorporateTower,NehruPlace,NewDelhi110019.& 011-42895600.Fax:42895628.
hOSPet Steel is expanding pig iron production capacity at its existing Ginigera facility in Koppal district of Karnataka. the expansion is to augment the capacity from 400,000 tpa to 700,000 tpa. an investment outlay of rs.1,000 million is envisaged to be funded through term loans from banks & internal accruals. Gdc constructions, mumbai is the civil contractor and Fouress engineering, mumbai is the equipment supplier. as of may 2007, civil work was under progress. the project is slated for completion by october 2007.
ß HospetsteelsLtd,Hospetroad,VillageGinigera,Koppal-583226,Karnataka.& 08539-286606.Fax:286611.(Mr.Srinivas,Dy.Gen.Mgr.)ß FouressEngineeringLtd,MahalakshmiChambers,22,BhulabhaidesaiRoad, Mumbai400026,Maharashtra.& 022-23534400/23534405.
hySCO Steel iNdiA is setting up a 1,40,000 tpa cold rolled steel sheet production unit at tiruvallur near chennai in tn. the project entails an estimated investment of rs.500 million to be funded through banks & internal accruals. logos consultants, chennai is the civil consultant. as of april 2007, the civil work was under progress and equipment suppliers to be finalized. The project is scheduled for completion by July 2007.
ß HyscoSteelIndiaLtd,FlatNo.2A,No.40,JeyamkondarBuilding,MurraysGateRoad, Alwarpet,Chennai,TamilNadu.& 044-43141941.Fax:43141940.
iSPAt iNduStrieS is implementing expansion programme at its existing dolvi facility in raigad district of maharashtra. the programme envisages increasing the capacity of steel sheet production from 3.6 million tpa to 5.2 million tpa. the expansion entails an investment of rs.20,000 million. m n dastur, Kolkata is the project consultant. machinery is imported from south Korea & european countries. as of april 2007, civil work was under progress. the expansion is scheduled for completion by may 2008.
hOOghly MetCOke & POWer
169.
170.
171.
172.
42
register ofNeW PrOJeCtS iN iNdiA 2007
ß IspatIndustriesLtd,CasaBlanca,PlotNo.45,Sector11,CBDBelapur, NaviMumbai400614,Maharashtra.& 022-56472500.(Mr.Das,Vice.Pres.).ß Plt:Geetapuram,Dolvivillage,PenTaluka,Raigad,Maharashtra.& 02143-277501/277514.ß M.N.Dastur&CoPvtLtd,P-17,MissionRowExtension,Kolkata700013,WestBengal.& 033-22255420/22250500.Fax:2225142.
JAgdAMbA irON & Steel is setting up a 250 tpd pig iron plant at rajrungpur in mayurbganj district of orissa. the project entails an investment of rs.450 million to be funded through loan from banks & by internal accruals. as of may 2007, civil work was underway and the equipment suppliers has been finalized. The project is scheduled for completion by early 2008.
ß JagdambaIron&SteelPvtLtd,PlotNo.2,AsanbaniIndustrialEstate,Mayurbganj, Rajrangpur757043,Orissa.& 06794-222140.Fax:222392.(Mr.ManishKumarAgarwal,Dir.)
JAi rAJ iSPAt is to set up a 400 tpd sponge iron plant at Halkundi in Bellary district of Karnataka. Industrial technical consultants, raipur has been appointed as the project consultant. the project envisages an investment of rs.460 million to be funded through internal accruals & loan from banks. as of march 2007, the company was awaiting statutory clearances. Work on the project is expected to begin by may-june 2007 and scheduled to be completed by march 2008.
ß JaiRajIspatLtd,PlotNo.8,IDAJeedimetla,PhaseIII,Hyderabad500055,AndhraPradesh.& 040-23095602/23095603/23095005.Fax:23096664. (Mr.Anil,Mg.Dir./Mr.P.Srinivasakumar,Asst.Gen.Mgr.)ß IndustrialTechnicalConsultants,B-1,SeethaVihar,Sector-2,AvanthiVihar, Raipur492006,Chhattisgarh.& 0771-5089649.
JANAkirAN iNduStrieS is relocating the 50 tpm foundry producing iron casting at Kurumbapalayam in coimbatore district of tn. the plant is to be located at an estimated cost rs.2.5 million funded through banks & internal accruals. as of june 2007, civil works and machinery erection are underway. the unit is expected to become operational by the end of july.
ß JanakiramIndustries,No.103,SoundeeswariNagar,NearNavaIndia,Avarampalayam, Coimbatore641006,TamilNadu.& 0422-2562593.(Mr.Balu,Mg.Dir.)
JeWel SeAMleSS is implementing an expansion programme at its existing Pithampur facility in dhar district of mP. the programme is to increase the capacity of ss ingots from 60,000 tpa to 78,000 tpa at a cost of rs.300 million. as of may 2007, erection of machinery was underway. the expansion is scheduled for completion by september 2007.
ß JewelSeamlessLtd,AbhayPrashalWestWing,NearIndianAirlines,RaceCourseRoad, Indore452003,MadhyaPradesh.
JAgdAMbA irON & Steel
173.
174.
175.
176.
register ofNeW PrOJeCtS iN iNdiA 2007
& 0731-4076165.Fax:2538115(Mr.KaranMittal,Mg.Dir.)ß Plt:PlotNo:159,PithampurIndlArea,Sector-3,Dhar,MadhyaPradesh.& 07292-401483.
JiNdAl Steel & POWer is setting up an integrated steel plant at Kerjang in angul district of Orissa. The project is to produce crude and finished steel products by setting up of a 2 million tpa sponge iron, installation of a 3.2 million tpa blast furnace, a oxygen plant and a 4 million tpa hot rolling mill at a cost of rs.160,000 million to be funded through equity, loan & internal accruals. mecon, ranchi has been appointed as the project consultant and the equipment suppliers being finalised. As of May 2007, the civil works were underway. The plant is scheduled for by 2011.
ß JindalSteel&PowerLtd,JindalCentre,12BikajiCamaPlace,NewDelhi110066.& 011-26188345.Fax:26161271.(Mr.AshishBharathwaj,Dy.Mgr.-Proj.)ß MeconLtd,P.ODoranda,Ranchi834002,Jharkhand.& 0651-2480216.Fax:2482214.
JSW Steel PrOCeSSiNg CeNtreS is setting up a 1 million tpa processing unit at its existing torangallu facility in Bellary district of Karnataka. the project includes setting up of a 200,000 tpa hot rolling pickled & oiled and 800,000 tpa cold rolling close & annealed at a cost of rs.10,000 million. as of april 2007, civil works had been completed and machinery erection was under way. the project is scheduled for completion by july 2007.
ß JSWSteelProcessingCentresLtd,C/o.JSWLtd,JindalMansion,5-AG,DeshmukhMarg, Mumbai400026,Maharashtra.& 022-23513000.
kAuNtiA CAStiNgS is setting up a 1,000 tpm foundry for iron castings at Uluberia in Howrah district of WB. the unit entails an investment of rs.50 million to be funded through banks & internal accruals. as of april 2007, civil works completed and erection of machinery was under progress. the plant is slated for commissioning by june 2007.
ß KauntiaCastingsLtd,FMC,FortunaBuilding,234/3A,3rdFloor,AJCBoseRoad, Kolkata700020,WestBengal.& 033-22876048.Fax:22876049.
kudreMukh irON Ore CO is to set up a ductile iron spun pipe plant at mangalore in Karnataka. A capacity of 100,000 tpa of finished pipes of various sizes is envisaged. Mecon, Bangalore has been appointed as the project consultant. as of april 2007, appointment of turnkey contractor was underway. the project is scheduled for completion in 20 months from zero date.
ß KudremukhIronOreCoLtd, OfficeoftheGeneralManager(CP&TS),Block2,Koramangala,Bangalore560034,Karnataka.& 080-25535892.Fax:25532153/25535941.ß MeconLtd,89,SouthEndRoad,Basavanagudi,Bangalore560004,Karnataka.& 080-26576442.Fax:26576352.
JiNdAl Steel & POWer
177.
178.
179.
180.
43
register ofNeW PrOJeCtS iN iNdiA 2007
ß IspatIndustriesLtd,CasaBlanca,PlotNo.45,Sector11,CBDBelapur, NaviMumbai400614,Maharashtra.& 022-56472500.(Mr.Das,Vice.Pres.).ß Plt:Geetapuram,Dolvivillage,PenTaluka,Raigad,Maharashtra.& 02143-277501/277514.ß M.N.Dastur&CoPvtLtd,P-17,MissionRowExtension,Kolkata700013,WestBengal.& 033-22255420/22250500.Fax:2225142.
JAgdAMbA irON & Steel is setting up a 250 tpd pig iron plant at rajrungpur in mayurbganj district of orissa. the project entails an investment of rs.450 million to be funded through loan from banks & by internal accruals. as of may 2007, civil work was underway and the equipment suppliers has been finalized. The project is scheduled for completion by early 2008.
ß JagdambaIron&SteelPvtLtd,PlotNo.2,AsanbaniIndustrialEstate,Mayurbganj, Rajrangpur757043,Orissa.& 06794-222140.Fax:222392.(Mr.ManishKumarAgarwal,Dir.)
JAi rAJ iSPAt is to set up a 400 tpd sponge iron plant at Halkundi in Bellary district of Karnataka. Industrial technical consultants, raipur has been appointed as the project consultant. the project envisages an investment of rs.460 million to be funded through internal accruals & loan from banks. as of march 2007, the company was awaiting statutory clearances. Work on the project is expected to begin by may-june 2007 and scheduled to be completed by march 2008.
ß JaiRajIspatLtd,PlotNo.8,IDAJeedimetla,PhaseIII,Hyderabad500055,AndhraPradesh.& 040-23095602/23095603/23095005.Fax:23096664. (Mr.Anil,Mg.Dir./Mr.P.Srinivasakumar,Asst.Gen.Mgr.)ß IndustrialTechnicalConsultants,B-1,SeethaVihar,Sector-2,AvanthiVihar, Raipur492006,Chhattisgarh.& 0771-5089649.
JANAkirAN iNduStrieS is relocating the 50 tpm foundry producing iron casting at Kurumbapalayam in coimbatore district of tn. the plant is to be located at an estimated cost rs.2.5 million funded through banks & internal accruals. as of june 2007, civil works and machinery erection are underway. the unit is expected to become operational by the end of july.
ß JanakiramIndustries,No.103,SoundeeswariNagar,NearNavaIndia,Avarampalayam, Coimbatore641006,TamilNadu.& 0422-2562593.(Mr.Balu,Mg.Dir.)
JeWel SeAMleSS is implementing an expansion programme at its existing Pithampur facility in dhar district of mP. the programme is to increase the capacity of ss ingots from 60,000 tpa to 78,000 tpa at a cost of rs.300 million. as of may 2007, erection of machinery was underway. the expansion is scheduled for completion by september 2007.
ß JewelSeamlessLtd,AbhayPrashalWestWing,NearIndianAirlines,RaceCourseRoad, Indore452003,MadhyaPradesh.
JAgdAMbA irON & Steel
173.
174.
175.
176.
register ofNeW PrOJeCtS iN iNdiA 2007
& 0731-4076165.Fax:2538115(Mr.KaranMittal,Mg.Dir.)ß Plt:PlotNo:159,PithampurIndlArea,Sector-3,Dhar,MadhyaPradesh.& 07292-401483.
JiNdAl Steel & POWer is setting up an integrated steel plant at Kerjang in angul district of Orissa. The project is to produce crude and finished steel products by setting up of a 2 million tpa sponge iron, installation of a 3.2 million tpa blast furnace, a oxygen plant and a 4 million tpa hot rolling mill at a cost of rs.160,000 million to be funded through equity, loan & internal accruals. mecon, ranchi has been appointed as the project consultant and the equipment suppliers being finalised. As of May 2007, the civil works were underway. The plant is scheduled for by 2011.
ß JindalSteel&PowerLtd,JindalCentre,12BikajiCamaPlace,NewDelhi110066.& 011-26188345.Fax:26161271.(Mr.AshishBharathwaj,Dy.Mgr.-Proj.)ß MeconLtd,P.ODoranda,Ranchi834002,Jharkhand.& 0651-2480216.Fax:2482214.
JSW Steel PrOCeSSiNg CeNtreS is setting up a 1 million tpa processing unit at its existing torangallu facility in Bellary district of Karnataka. the project includes setting up of a 200,000 tpa hot rolling pickled & oiled and 800,000 tpa cold rolling close & annealed at a cost of rs.10,000 million. as of april 2007, civil works had been completed and machinery erection was under way. the project is scheduled for completion by july 2007.
ß JSWSteelProcessingCentresLtd,C/o.JSWLtd,JindalMansion,5-AG,DeshmukhMarg, Mumbai400026,Maharashtra.& 022-23513000.
kAuNtiA CAStiNgS is setting up a 1,000 tpm foundry for iron castings at Uluberia in Howrah district of WB. the unit entails an investment of rs.50 million to be funded through banks & internal accruals. as of april 2007, civil works completed and erection of machinery was under progress. the plant is slated for commissioning by june 2007.
ß KauntiaCastingsLtd,FMC,FortunaBuilding,234/3A,3rdFloor,AJCBoseRoad, Kolkata700020,WestBengal.& 033-22876048.Fax:22876049.
kudreMukh irON Ore CO is to set up a ductile iron spun pipe plant at mangalore in Karnataka. A capacity of 100,000 tpa of finished pipes of various sizes is envisaged. Mecon, Bangalore has been appointed as the project consultant. as of april 2007, appointment of turnkey contractor was underway. the project is scheduled for completion in 20 months from zero date.
ß KudremukhIronOreCoLtd, OfficeoftheGeneralManager(CP&TS),Block2,Koramangala,Bangalore560034,Karnataka.& 080-25535892.Fax:25532153/25535941.ß MeconLtd,89,SouthEndRoad,Basavanagudi,Bangalore560004,Karnataka.& 080-26576442.Fax:26576352.
JiNdAl Steel & POWer
177.
178.
179.
180.
44
register ofNeW PrOJeCtS iN iNdiA 2007
kuShAl CheMiCAlS is setting up a 50 tpm metal powder production unit at Bhilai in durg district of chhattisgarh. the unit entails an investment of rs.40 million is funded through banks & internal accruals. as of may 2007, civil works were under way. the unit is scheduled to become operational by august 2007.
ß KushalChemicals,74,LightIndustrialArea,BhilaiNagar,Durg490026,Chhattisgarh.& 0788-2285363.Fax:2285363.(Mr.Chopra,Prop.).
lAlbAbA SeAMleSS tubeS is setting up a 3000 tpa production unit for seamless tubes and pipes at mouza-Kashbere in midnapur district of WB. the project entails an investment of rs.650 million to be funded through banks & internal accruals. an in-house team is rendering project consultancy. equipments are imported from china and Ukraine. as of may 2007, civil work had been initiated. the plant is scheduled for completion by november 2007.
ß LalbabaSeamlessTubesPvtLtd,28,StrandRoad,3rdFloor,Kolkata700001,WestBengal.& 033-22303180.Fax:22104706.(Mr.A.Banerjee,Mgr.)
lAlWANi FerrO AllOyS is setting up a 1,200 tpm ferro alloy plant in Bankura district of WB. r G con services, Visakhapatnam is the technical consultant. mr. nandi, Bankura is the civil consultant for the project. as of april 2007, civil work was under progress. the plant is scheduled for completion by december 2007.
ß LalwaniFerroAlloysPvtLtd,3rdFloor,Jabakusumhouse,34,ChittranjanAvenue, Kolkata700012,WestBengal.& 033-22120575/22120588/30280436/22370098.ß Plt:PlastoLastoSteelPark,GhutghoriaBarjora,Bankura722202,WestBengal.ß RGConServices,ArunodhayaComplex,No.9&10,DwarkaNagar,1stLane, Visakhapatnam530016,AndhraPradesh.& 0891-2748052/6568052.
lOydS Steel iNduStrieS is setting up a 1,20,000 tpa iron ore pelletisation plant at Barbil in Keonjahar district of orissa. an investment of rs.1,000 million is envisaged. the project is being funded through banks & internal accruals. eisen, thane is the technical collaborator. equipments are imported from china and also procured from avera t&d, India & rock Well automation, Honkong. as of april 2007, civil works and erection of machinery were underway. the unit was scheduled for completion by june 2007.
ß LloydsSteelIndustriesLtd,ModernCentre,BWing,2ndFloor,SaneGurujiMarg,Mahalaxmi, Mumbai400011,Maharashtra.& 022-30418111.Fax:30418269.(Mr.GirishPatel,Sr.Engr.-Proj.)ß AveraT&DIndia,14thFloor,DevikaTowers,6,NehruPlace,NewDelhi110019.& 011-26449902.ß EisenInternational,15,VardhamanEstate,OldAgraRoad,Thane,Maharashtra.& 022-25447118.Fax:25448213.
MAgNA eleCtrO CAStiNgS is implementing an expansion programme at its existing Pollachi foundry in coimbatore district of tn. the expansion will result in increasing the capacity of cast iron from 600 tpm to 900 tpm. as of april 2007, erection of machinery was under progress. the project was scheduled to be completed by may 2007.
kuShAl CheMiCAlS
181.
182.
183.
184.
185.
register ofNeW PrOJeCtS iN iNdiA 2007
ß MagnaElectroCastingsLtd,43,BalasundaramRoad,Coimbatore-641018,TamilNadu.& 0422-2210109/2216184/2210487.Fax:2216209.
MAhAkAlyANi Steel & MiNeS is to set up a pig iron and concast pelletisation plant each with a capacity of 500 tpd at Purnanagar near Giridih in jharkhand. the project is to be implemented in two phases. the phase I includes setting up of a 150 tpd pig iron and a 300 tpd pelletisation plant. the project entails a cumulative investment of rs.750 million. the company was in the process of securing loan. raw material for pig iron is to be sourced from the existing rourkela plant. suppliers for some equipment have been appointed. as of april 2007, the project work was expected to begin shortly. Phase I is scheduled for completion by november 2007.
ß MahakalyaniSteel&MinesPvtLtd,P.O.Pachamba,Giridih815316,Jharkhand.& 06532-224621.
MAhiNdrA iNtertrAde is setting up a steel coils production unit at savli in Vadodara district of Gujarat. the project entails an investment of rs.400 million is to be funded through banks & internal accruals. equipments are being imported from Germany. the project capacity was to be finalised. As of April 2007, the civil work was under progress. The plant is slated for completion by december 2007.
ß MahindraIntertradeLtd,MahindraTowers,P.K.KurneChowk,Worli, Mumbai400018,Maharashtra.& 022-24935185/24955186.Fax:24951236/24951872.
MeherkirAN eNterPriSeS is setting up a 100,000 tpa met coke unit at Pisinikonda in Visakhapatnam district of aP. the project is estimated cost rs.350 million to be funded through bank loans & internal accruals. rhi clasil, Vishakapatnam is supplying the major equipments for the project. as of may 2007, the civil works were in progress. the project is scheduled for completion by september 2007.
ß MeherkiranEnterprisesLtd,PlotNo.494/A,RoadNo.22,JublieeHills,Hyderabad500033, AndhraPradesh.& 040-23547358.Fax:23554783.ß RHIClasilLtd,VenkatapuramVillage,MunagarPakaMandal,NearParawada, Visakhapatnam531021,AndhraPradesh.& 08924-247829.
MOderN FOuNdry is implementing an expansion programme at its existing Vellakinar facility in coimbatore district of tn. the programme is to raise the capacity of sG & cI iron castings from 50 tpa to 100 tpa. an estimated investment of rs.2.5 million is envisaged. equipments are procured from laxmi narayan engineering Works. as of march 2007, civil work is nearing completion and erection of machinery is underway. the unit is slated for completion by june 2007.
ß ModernFoundry,AlamaraThottam,Vattamalaipalayam,NGGOColony, Coimbatore641022,TamilNadu.& 0422-2460775.Fax:2460755.ß LakshmiNarayanEngineeringWorks,2A,BhagwatiChatterjeeStreet,Belgharia, Kolkata700056,WestBengal.& 033-25646998.
MAhAkAlyANi Steel & MiNeS
186.
187.
188.
189.
45
register ofNeW PrOJeCtS iN iNdiA 2007
kuShAl CheMiCAlS is setting up a 50 tpm metal powder production unit at Bhilai in durg district of chhattisgarh. the unit entails an investment of rs.40 million is funded through banks & internal accruals. as of may 2007, civil works were under way. the unit is scheduled to become operational by august 2007.
ß KushalChemicals,74,LightIndustrialArea,BhilaiNagar,Durg490026,Chhattisgarh.& 0788-2285363.Fax:2285363.(Mr.Chopra,Prop.).
lAlbAbA SeAMleSS tubeS is setting up a 3000 tpa production unit for seamless tubes and pipes at mouza-Kashbere in midnapur district of WB. the project entails an investment of rs.650 million to be funded through banks & internal accruals. an in-house team is rendering project consultancy. equipments are imported from china and Ukraine. as of may 2007, civil work had been initiated. the plant is scheduled for completion by november 2007.
ß LalbabaSeamlessTubesPvtLtd,28,StrandRoad,3rdFloor,Kolkata700001,WestBengal.& 033-22303180.Fax:22104706.(Mr.A.Banerjee,Mgr.)
lAlWANi FerrO AllOyS is setting up a 1,200 tpm ferro alloy plant in Bankura district of WB. r G con services, Visakhapatnam is the technical consultant. mr. nandi, Bankura is the civil consultant for the project. as of april 2007, civil work was under progress. the plant is scheduled for completion by december 2007.
ß LalwaniFerroAlloysPvtLtd,3rdFloor,Jabakusumhouse,34,ChittranjanAvenue, Kolkata700012,WestBengal.& 033-22120575/22120588/30280436/22370098.ß Plt:PlastoLastoSteelPark,GhutghoriaBarjora,Bankura722202,WestBengal.ß RGConServices,ArunodhayaComplex,No.9&10,DwarkaNagar,1stLane, Visakhapatnam530016,AndhraPradesh.& 0891-2748052/6568052.
lOydS Steel iNduStrieS is setting up a 1,20,000 tpa iron ore pelletisation plant at Barbil in Keonjahar district of orissa. an investment of rs.1,000 million is envisaged. the project is being funded through banks & internal accruals. eisen, thane is the technical collaborator. equipments are imported from china and also procured from avera t&d, India & rock Well automation, Honkong. as of april 2007, civil works and erection of machinery were underway. the unit was scheduled for completion by june 2007.
ß LloydsSteelIndustriesLtd,ModernCentre,BWing,2ndFloor,SaneGurujiMarg,Mahalaxmi, Mumbai400011,Maharashtra.& 022-30418111.Fax:30418269.(Mr.GirishPatel,Sr.Engr.-Proj.)ß AveraT&DIndia,14thFloor,DevikaTowers,6,NehruPlace,NewDelhi110019.& 011-26449902.ß EisenInternational,15,VardhamanEstate,OldAgraRoad,Thane,Maharashtra.& 022-25447118.Fax:25448213.
MAgNA eleCtrO CAStiNgS is implementing an expansion programme at its existing Pollachi foundry in coimbatore district of tn. the expansion will result in increasing the capacity of cast iron from 600 tpm to 900 tpm. as of april 2007, erection of machinery was under progress. the project was scheduled to be completed by may 2007.
kuShAl CheMiCAlS
181.
182.
183.
184.
185.
register ofNeW PrOJeCtS iN iNdiA 2007
ß MagnaElectroCastingsLtd,43,BalasundaramRoad,Coimbatore-641018,TamilNadu.& 0422-2210109/2216184/2210487.Fax:2216209.
MAhAkAlyANi Steel & MiNeS is to set up a pig iron and concast pelletisation plant each with a capacity of 500 tpd at Purnanagar near Giridih in jharkhand. the project is to be implemented in two phases. the phase I includes setting up of a 150 tpd pig iron and a 300 tpd pelletisation plant. the project entails a cumulative investment of rs.750 million. the company was in the process of securing loan. raw material for pig iron is to be sourced from the existing rourkela plant. suppliers for some equipment have been appointed. as of april 2007, the project work was expected to begin shortly. Phase I is scheduled for completion by november 2007.
ß MahakalyaniSteel&MinesPvtLtd,P.O.Pachamba,Giridih815316,Jharkhand.& 06532-224621.
MAhiNdrA iNtertrAde is setting up a steel coils production unit at savli in Vadodara district of Gujarat. the project entails an investment of rs.400 million is to be funded through banks & internal accruals. equipments are being imported from Germany. the project capacity was to be finalised. As of April 2007, the civil work was under progress. The plant is slated for completion by december 2007.
ß MahindraIntertradeLtd,MahindraTowers,P.K.KurneChowk,Worli, Mumbai400018,Maharashtra.& 022-24935185/24955186.Fax:24951236/24951872.
MeherkirAN eNterPriSeS is setting up a 100,000 tpa met coke unit at Pisinikonda in Visakhapatnam district of aP. the project is estimated cost rs.350 million to be funded through bank loans & internal accruals. rhi clasil, Vishakapatnam is supplying the major equipments for the project. as of may 2007, the civil works were in progress. the project is scheduled for completion by september 2007.
ß MeherkiranEnterprisesLtd,PlotNo.494/A,RoadNo.22,JublieeHills,Hyderabad500033, AndhraPradesh.& 040-23547358.Fax:23554783.ß RHIClasilLtd,VenkatapuramVillage,MunagarPakaMandal,NearParawada, Visakhapatnam531021,AndhraPradesh.& 08924-247829.
MOderN FOuNdry is implementing an expansion programme at its existing Vellakinar facility in coimbatore district of tn. the programme is to raise the capacity of sG & cI iron castings from 50 tpa to 100 tpa. an estimated investment of rs.2.5 million is envisaged. equipments are procured from laxmi narayan engineering Works. as of march 2007, civil work is nearing completion and erection of machinery is underway. the unit is slated for completion by june 2007.
ß ModernFoundry,AlamaraThottam,Vattamalaipalayam,NGGOColony, Coimbatore641022,TamilNadu.& 0422-2460775.Fax:2460755.ß LakshmiNarayanEngineeringWorks,2A,BhagwatiChatterjeeStreet,Belgharia, Kolkata700056,WestBengal.& 033-25646998.
MAhAkAlyANi Steel & MiNeS
186.
187.
188.
189.
46
register ofNeW PrOJeCtS iN iNdiA 2007
MOderN iNdiA CON-CASt is expanding its ferro alloys plant at Bishnupur in Bankura district of WB. the expansion is to double the capacity from 35,000 tpa to 70,000 tpa at an outlay of rs.280 million. the project is funded through bank loans & internal accruals. r G con services, Visakhapatnam is the project consultant. as of may 2007, civil works were in progress. The plant is scheduled for completion in the first quarter of 2008.
ß ModernIndiaCon-castLtd,18D,Everest,46C,JawaharlalNehruRoad,Kolkata700071, WestBengal.& 033-30521113.Fax:22889247.(Mr.ChethanAgarwal,Dir.)
MukANd is implementing an expansion programme at its Kalwa unit in maharashtra and at Hospet unit in Karnataka. the overall steel making capacity is being increased from 284,000 tpa to 500,000 tpa and rolling mill capacity from 267,000 tpa to 520,000 tpa with a cumulative investment of rs.2,710 million. mogashmar, sweden is the major equipment supplier. as of may 2007, civil works were underway. the project is scheduled to be completed by mid 2009.
ß MukandLtd,BajajBhawan,JamnalalBajajMarg,226,NarimanPoint, Mumbai400021,Maharashtra.& 022-22822222/22021060.ß Plt:Belapur,Kalwa,Thane400605,Maharashtra.& 022-25347373/25348181.ß Plt2:C/o.HospetSteelLtd, HospetRoad,Ginigera583238,Bellary,Karnataka& 08539-286603/286606.
NelCASt is setting up a 24,000 tpa foundry for GI & sG castings at Gudur in aP. the project entails an investment of rs.250 million to be funded through equity, debt & internal accruals. Inductotherm and dIsa India are the equipment suppliers. as of june 2007, civil work is under progress. the project is scheduled for completion by october 2007.
ß NelcastLtd,Unit-II,34,IndustrialEstate,Gudur,Nellore524101,AndhraPradesh.& 08624-251266/-251266321/-251266405.
OriON iSPAt has embarked on an expansion project at its existing ramchandrapur facility in Keonjhar district of orissa. the scheme is to increase the capacity of ms Ingots from 300 tpd to 1,000 tpd by installing 2 x 7.5 tonnes induction furnace and setting up of a 12 mW cPP at an estimated investment of rs.600 million. as of may 2007, land was being acquired. Work on the project is expected to begin in september 2007 and is scheduled to be completed in 2 years thereafter.
ß OrionIspatLtd,RamchandrapurVillage,Kashipur,Keonjhar,Orissa.& 06766-253362.(Mr.SanjithPanda,Asst.Gen.Mgr.-Proj.).
PAdMAvAthi FerrOuS is setting up a 4 x 100 tpd sponge iron plant and a 12 mW WHr based cPP at chikkantapur in Bellary district of Karnataka. the project is estimated to cost rs.1,100 million to be funded through banks & internal accruals. engineering & Industrial consultancy services, chennai has been appointed as the project consultant and the equipment suppliers were to be finalised. As of April 2007, the civil work had been initiated.
MOderN iNdiA CON-CASt
190.
191.
192.
193.
194.
register ofNeW PrOJeCtS iN iNdiA 2007
the unit is expected to be completed by april 2009.
ß PadmavathiFerrousPvtLtd,JVSLIndustrialEstate,ChikkantapurVillage,nearToranagallu, VidyanagarPost,Bellary,Karnataka.& 08395-250694.(Mr.Shailesh,Mgr.-Prod.)ß EICSPowerServicesPvtLtd,T-94,3rdAvenue,1stFloor,AnnaNagar,Chennai600040, TamilNadu.& 044-30585824.Fax:30585825
PASuPAti CAStiNgS is setting up a 75,000 tpa ms bars and tmt bars production unit near aligarh in UP. an investment of rs.120 million is envisaged. the project is being funded through internal accruals & loan from banks. alstom, Kolkata is supplying the critical equipments. as of march 2007, civil works were underway and equipments erection initiated. the unit is scheduled to become operational by june 2007.
ß PasupatiCastingsLtd,KasampurRoad,Aligarh202001,UttarPradesh.& 0571-2482114.Fax:2482321.ß AlstomLtd,D-2,GillanderHouse,NetajiSubhasRoad,Kolkata700001,WestBengal.& 033-22203991to94.Fax:22203994.
PeekAy Steel CAStiNg is implementing an expansion programme at its existing units in southern region. the project is being implemented at a cumulative cost of rs.120 million. ImF, Italy is supplying the major equipments. the project details are given below:
ñ expansion of Kozhikode facility in Kerala is to augment the capacity from 360 tpd to 700 tpd of ss & carbon alloy castings. the manufactured products cater to oil & gas, power and mining industry.
ñ expansion of coimbatore facility in tamil nadu is to augment the capacity from 150 tpd to 400 tpd of steel castings. the manufactured products cater to oil & gas and engineering industry.
as of may 2007, equipments erection was underway and is scheduled for completion by july.
ß PeekaySteelCastingPvtLtd,Nallalam,Kozhikode673027,Kerala.& 0495-2421701.Fax:2420724.ß Plt:ChinnamadamPalayam,BillichiP.O.,Coimbatore641019,TamilNadu& 04254-274433/274533/275301.
PiONeer tOrSteel MillS is setting up a 200 tpd sponge iron unit at Wadaram in medak district of aP. the project entails an estimated cost of rs.170 million to be funded through bank loans & internal accruals. Kakatia engineering, Hyderabad is supplying the major equipments and mr. moorthy, Hyderabad is rendering the consultancy services for the project. as of april 2007, erection of machinery was underway. the plant is expected to begin commercial production by august 2007.
ß PioneerTorsteelMillsPvtLtd,1-4-880/A,Musheerabad,Hyderabad500020,AndhraPradesh.& 040-27532154/27532549.(Mr.H.M.Salim,Dir.)
PASuPAti CAStiNgS
195.
196.
197.
47
register ofNeW PrOJeCtS iN iNdiA 2007
MOderN iNdiA CON-CASt is expanding its ferro alloys plant at Bishnupur in Bankura district of WB. the expansion is to double the capacity from 35,000 tpa to 70,000 tpa at an outlay of rs.280 million. the project is funded through bank loans & internal accruals. r G con services, Visakhapatnam is the project consultant. as of may 2007, civil works were in progress. The plant is scheduled for completion in the first quarter of 2008.
ß ModernIndiaCon-castLtd,18D,Everest,46C,JawaharlalNehruRoad,Kolkata700071, WestBengal.& 033-30521113.Fax:22889247.(Mr.ChethanAgarwal,Dir.)
MukANd is implementing an expansion programme at its Kalwa unit in maharashtra and at Hospet unit in Karnataka. the overall steel making capacity is being increased from 284,000 tpa to 500,000 tpa and rolling mill capacity from 267,000 tpa to 520,000 tpa with a cumulative investment of rs.2,710 million. mogashmar, sweden is the major equipment supplier. as of may 2007, civil works were underway. the project is scheduled to be completed by mid 2009.
ß MukandLtd,BajajBhawan,JamnalalBajajMarg,226,NarimanPoint, Mumbai400021,Maharashtra.& 022-22822222/22021060.ß Plt:Belapur,Kalwa,Thane400605,Maharashtra.& 022-25347373/25348181.ß Plt2:C/o.HospetSteelLtd, HospetRoad,Ginigera583238,Bellary,Karnataka& 08539-286603/286606.
NelCASt is setting up a 24,000 tpa foundry for GI & sG castings at Gudur in aP. the project entails an investment of rs.250 million to be funded through equity, debt & internal accruals. Inductotherm and dIsa India are the equipment suppliers. as of june 2007, civil work is under progress. the project is scheduled for completion by october 2007.
ß NelcastLtd,Unit-II,34,IndustrialEstate,Gudur,Nellore524101,AndhraPradesh.& 08624-251266/-251266321/-251266405.
OriON iSPAt has embarked on an expansion project at its existing ramchandrapur facility in Keonjhar district of orissa. the scheme is to increase the capacity of ms Ingots from 300 tpd to 1,000 tpd by installing 2 x 7.5 tonnes induction furnace and setting up of a 12 mW cPP at an estimated investment of rs.600 million. as of may 2007, land was being acquired. Work on the project is expected to begin in september 2007 and is scheduled to be completed in 2 years thereafter.
ß OrionIspatLtd,RamchandrapurVillage,Kashipur,Keonjhar,Orissa.& 06766-253362.(Mr.SanjithPanda,Asst.Gen.Mgr.-Proj.).
PAdMAvAthi FerrOuS is setting up a 4 x 100 tpd sponge iron plant and a 12 mW WHr based cPP at chikkantapur in Bellary district of Karnataka. the project is estimated to cost rs.1,100 million to be funded through banks & internal accruals. engineering & Industrial consultancy services, chennai has been appointed as the project consultant and the equipment suppliers were to be finalised. As of April 2007, the civil work had been initiated.
MOderN iNdiA CON-CASt
190.
191.
192.
193.
194.
register ofNeW PrOJeCtS iN iNdiA 2007
the unit is expected to be completed by april 2009.
ß PadmavathiFerrousPvtLtd,JVSLIndustrialEstate,ChikkantapurVillage,nearToranagallu, VidyanagarPost,Bellary,Karnataka.& 08395-250694.(Mr.Shailesh,Mgr.-Prod.)ß EICSPowerServicesPvtLtd,T-94,3rdAvenue,1stFloor,AnnaNagar,Chennai600040, TamilNadu.& 044-30585824.Fax:30585825
PASuPAti CAStiNgS is setting up a 75,000 tpa ms bars and tmt bars production unit near aligarh in UP. an investment of rs.120 million is envisaged. the project is being funded through internal accruals & loan from banks. alstom, Kolkata is supplying the critical equipments. as of march 2007, civil works were underway and equipments erection initiated. the unit is scheduled to become operational by june 2007.
ß PasupatiCastingsLtd,KasampurRoad,Aligarh202001,UttarPradesh.& 0571-2482114.Fax:2482321.ß AlstomLtd,D-2,GillanderHouse,NetajiSubhasRoad,Kolkata700001,WestBengal.& 033-22203991to94.Fax:22203994.
PeekAy Steel CAStiNg is implementing an expansion programme at its existing units in southern region. the project is being implemented at a cumulative cost of rs.120 million. ImF, Italy is supplying the major equipments. the project details are given below:
ñ expansion of Kozhikode facility in Kerala is to augment the capacity from 360 tpd to 700 tpd of ss & carbon alloy castings. the manufactured products cater to oil & gas, power and mining industry.
ñ expansion of coimbatore facility in tamil nadu is to augment the capacity from 150 tpd to 400 tpd of steel castings. the manufactured products cater to oil & gas and engineering industry.
as of may 2007, equipments erection was underway and is scheduled for completion by july.
ß PeekaySteelCastingPvtLtd,Nallalam,Kozhikode673027,Kerala.& 0495-2421701.Fax:2420724.ß Plt:ChinnamadamPalayam,BillichiP.O.,Coimbatore641019,TamilNadu& 04254-274433/274533/275301.
PiONeer tOrSteel MillS is setting up a 200 tpd sponge iron unit at Wadaram in medak district of aP. the project entails an estimated cost of rs.170 million to be funded through bank loans & internal accruals. Kakatia engineering, Hyderabad is supplying the major equipments and mr. moorthy, Hyderabad is rendering the consultancy services for the project. as of april 2007, erection of machinery was underway. the plant is expected to begin commercial production by august 2007.
ß PioneerTorsteelMillsPvtLtd,1-4-880/A,Musheerabad,Hyderabad500020,AndhraPradesh.& 040-27532154/27532549.(Mr.H.M.Salim,Dir.)
PASuPAti CAStiNgS
195.
196.
197.
48
register ofNeW PrOJeCtS iN iNdiA 2007
PithAMPur SteelS is setting up a 40,000 tpa steel billet unit at nardana in dhule district of maharashtra. the project entails an investment of rs.400 million to be funded through bank loans & internal accruals. the company was in the process of securing loan. Yellow Consultancy, Mumbai is the project consultant and the equipment supplier to be finalized. as of april 2007, the civil work was under progress. the unit is slated for completion by december 2007.
ß PithampurSteelsLtd,1011,EmbassyCentre,207,NarimanPoint,Mumbai400021,Maharashtra.& 022-22823368.Fax:2212445.
POSCO india is to set up an integrated steel plant at Paradip in jagitsingpur district of orissa. the 12 million tpa facility will be set up in three phases. each phase will have a capacity of 4 million tpa. the project entails a cumulative cost of Us$ 12 billion to be funded through FdI. m n dastur & co is the project consultant. the company is to install its indigenous developed FIneX and Mini Flat Mill. as of april 2007, the civil works to begin shortly. the steel plant is scheduled for completion in 2016 while the phase I by end of 2010.
ß POSCOIndiaLtd,FortuneTower,5thFloor,Chandrasekharpur,Bhubaneshwar751015,Orissa.& 674-2303690to92Extn.512.Fax:2300058.ß M.N.Dastur&CoPvtLtd,P-17,MissionRowExtension,Kolkata700013,WestBengal.& 033-22255420/22250500.Fax:2225142.
POWer FlOW COPPer is setting up a 2,500 tpa copper strips and tubes production facility at daman in Valsad district of Gujarat. the project entails an investment of rs.40 million. as of April 2007, most of the major equipment suppliers were finalised. The upcoming facility is scheduled to go onstream by end 2008.
ß PowerFlowCopper,302,GulmuhorRoyalGardens,DamanRoad,CHLAVapi, Valsad396191,Gujarat.& 09825022587.(MrPushkarGoyal,Dir.)
PreMA eNgiNeeriNg has taken up an expansion programme at its thottipalayam facility near coimbatore in tn. the programme is to augment the capacity of iron castings from 100 tpm to 250 tpm at a cost of rs.12.5 million. disa India, Bangalore is the equipment supplier and mr. mani, coimbatore is the civil contractor. as of march 2007, civil work completed and machinery erection was under progress. the expansion is slated for completion by june 2007.
ß PremaEngineering,737/1,ThottipalayamRoad,CivilAerodrome, Coimbatore641014,TamilNadu.& 0422-2628162.Fax:2628162.ß DisaIndiaLtd,No.23,4thFloor,PrestigeTakt,KasturibaRoadCross,Bangalore,Karnataka. & 080-22109381.Fax:22109570.
rAAJArAtNA MetAl is implementing the expansion programme at its existing Bhileswarpura facility in Gandhinagar district of Gujarat. the expansion is to increase the capacity of ss wires and bars from 6,000 tpa to 36,000 tpa. the programme entails an investment of rs.50 million to be funded through internal accruals & loan from banks. the company is importing second-hand machineries from Hydom Industries, Korea. as of march 2007, civil work was
PithAMPur SteelS
198.
199.
200.
201.
202.
register ofNeW PrOJeCtS iN iNdiA 2007
underway. the plant is scheduled for completion by june 2007.
ß RaajratnaMetalIndustriesLtd,909,Sakar-3,AshramRoad,NearIncomeTax,Office, Ahmedabad380009,Gujarat.& 079-27543681.Fax:27543085.(Mr.AshishShah,Proj.Incharge.)
rAiPur AllOyS & Steel is implementing an expansion programme at its existing siltara facility in raipur district of chhattisgarh. the capacity of sponge iron is being augmented from 210,000 tpa to 360,000 tpa with an investment of Rs.750 million. The company has finalised the equipment suppliers. as of march 2007, civil work has been initiated. the expansion is slated for commissioning by the third quarter of 2007.
ß RaipurAlloys&SteelLtd,73-A,CentralAvenue,Nagpur440018,Maharashtra.& 0712-2727509.Fax:2728207.(Mr.G.K.Lakhotia,Gen.Mgr.-Proj.) Plt:SiltaraIndlArea,Raipur,Chhattisgarh.& 07721-403925to27/264206to09.
rAiPur FOrgiNgS & CAStiNgS is setting up a casting and forging unit at sirgitti in Bilaspur district of chhattisgarh. the project is to be implemented in three phases at an estimated investment of rs.120 million to rs.150 million. as of may 2007, the civil work underway and the equipment suppliers has been finalised. The phase I programme is scheduled to be completed by december 2007.
ß RaipurForgings&CastingsPvtLtd,HIG-1,Sector1,ShankarNagar, Raipur492007,Chhattisgarh.& 0771-2283700.Fax:2283237. (Mr.RajeshRataria,Mgr.)
rANA girderS is implementing the capacity expansion programme at its existing muzaffarnagar tmt bar unit in UP. the expansion is to double the capacity from 200 tpd to 400 tpd. the programme envisages an estimated investment of rs.150 million funded through banks & internal accruals. Parikh consultants, rajasthan is the project consultant. anand engineering, ahmedabad is the equipment supplier. as of may 2007, civil work was under progress. the project is scheduled for completion by october 2007.
ß RanaGirdersLtd,7thKMStone,MeerutRoad,Muzaffarnagar251003,UttarPradesh.& 0131-2990312/3292894.Fax:252412.(Mr.ZakirAliRana,Dir.)ß AnandEngineering,PlotNo.7601,Phase-N,GIDCEstate,Ahmedabad382445,Gujarat.& 20562234.Fax:56907226.
rAShMi MetAlikS is setting up a 500 tpd pig iron plant at Kharagpur in WB. Gannon dunkerley & co, Kolkata is the civil contractor. Universal engineering co, Vizag is the equipment supplier. as of may 2007, the civil work and erection of equipments were underway. the project is scheduled for completion by july 2007.
ß RashmiMetaliksLtd,1,GarstinPalace,Patwari,3BOrbit,Kolkata,WestBengal.& 033-22438517.Fax:22438521.(Mr.Raha,Vice.Pres.-Proj.)ß GannonDunkerley&CoLtd,23-A,4thFloor,N.S.Road,Kolkata700001,WestBengal.& 033-22300261to64.
rAiPur AllOyS & Steel
203.
204.
205.
206.
49
register ofNeW PrOJeCtS iN iNdiA 2007
PithAMPur SteelS is setting up a 40,000 tpa steel billet unit at nardana in dhule district of maharashtra. the project entails an investment of rs.400 million to be funded through bank loans & internal accruals. the company was in the process of securing loan. Yellow Consultancy, Mumbai is the project consultant and the equipment supplier to be finalized. as of april 2007, the civil work was under progress. the unit is slated for completion by december 2007.
ß PithampurSteelsLtd,1011,EmbassyCentre,207,NarimanPoint,Mumbai400021,Maharashtra.& 022-22823368.Fax:2212445.
POSCO india is to set up an integrated steel plant at Paradip in jagitsingpur district of orissa. the 12 million tpa facility will be set up in three phases. each phase will have a capacity of 4 million tpa. the project entails a cumulative cost of Us$ 12 billion to be funded through FdI. m n dastur & co is the project consultant. the company is to install its indigenous developed FIneX and Mini Flat Mill. as of april 2007, the civil works to begin shortly. the steel plant is scheduled for completion in 2016 while the phase I by end of 2010.
ß POSCOIndiaLtd,FortuneTower,5thFloor,Chandrasekharpur,Bhubaneshwar751015,Orissa.& 674-2303690to92Extn.512.Fax:2300058.ß M.N.Dastur&CoPvtLtd,P-17,MissionRowExtension,Kolkata700013,WestBengal.& 033-22255420/22250500.Fax:2225142.
POWer FlOW COPPer is setting up a 2,500 tpa copper strips and tubes production facility at daman in Valsad district of Gujarat. the project entails an investment of rs.40 million. as of April 2007, most of the major equipment suppliers were finalised. The upcoming facility is scheduled to go onstream by end 2008.
ß PowerFlowCopper,302,GulmuhorRoyalGardens,DamanRoad,CHLAVapi, Valsad396191,Gujarat.& 09825022587.(MrPushkarGoyal,Dir.)
PreMA eNgiNeeriNg has taken up an expansion programme at its thottipalayam facility near coimbatore in tn. the programme is to augment the capacity of iron castings from 100 tpm to 250 tpm at a cost of rs.12.5 million. disa India, Bangalore is the equipment supplier and mr. mani, coimbatore is the civil contractor. as of march 2007, civil work completed and machinery erection was under progress. the expansion is slated for completion by june 2007.
ß PremaEngineering,737/1,ThottipalayamRoad,CivilAerodrome, Coimbatore641014,TamilNadu.& 0422-2628162.Fax:2628162.ß DisaIndiaLtd,No.23,4thFloor,PrestigeTakt,KasturibaRoadCross,Bangalore,Karnataka. & 080-22109381.Fax:22109570.
rAAJArAtNA MetAl is implementing the expansion programme at its existing Bhileswarpura facility in Gandhinagar district of Gujarat. the expansion is to increase the capacity of ss wires and bars from 6,000 tpa to 36,000 tpa. the programme entails an investment of rs.50 million to be funded through internal accruals & loan from banks. the company is importing second-hand machineries from Hydom Industries, Korea. as of march 2007, civil work was
PithAMPur SteelS
198.
199.
200.
201.
202.
register ofNeW PrOJeCtS iN iNdiA 2007
underway. the plant is scheduled for completion by june 2007.
ß RaajratnaMetalIndustriesLtd,909,Sakar-3,AshramRoad,NearIncomeTax,Office, Ahmedabad380009,Gujarat.& 079-27543681.Fax:27543085.(Mr.AshishShah,Proj.Incharge.)
rAiPur AllOyS & Steel is implementing an expansion programme at its existing siltara facility in raipur district of chhattisgarh. the capacity of sponge iron is being augmented from 210,000 tpa to 360,000 tpa with an investment of Rs.750 million. The company has finalised the equipment suppliers. as of march 2007, civil work has been initiated. the expansion is slated for commissioning by the third quarter of 2007.
ß RaipurAlloys&SteelLtd,73-A,CentralAvenue,Nagpur440018,Maharashtra.& 0712-2727509.Fax:2728207.(Mr.G.K.Lakhotia,Gen.Mgr.-Proj.) Plt:SiltaraIndlArea,Raipur,Chhattisgarh.& 07721-403925to27/264206to09.
rAiPur FOrgiNgS & CAStiNgS is setting up a casting and forging unit at sirgitti in Bilaspur district of chhattisgarh. the project is to be implemented in three phases at an estimated investment of rs.120 million to rs.150 million. as of may 2007, the civil work underway and the equipment suppliers has been finalised. The phase I programme is scheduled to be completed by december 2007.
ß RaipurForgings&CastingsPvtLtd,HIG-1,Sector1,ShankarNagar, Raipur492007,Chhattisgarh.& 0771-2283700.Fax:2283237. (Mr.RajeshRataria,Mgr.)
rANA girderS is implementing the capacity expansion programme at its existing muzaffarnagar tmt bar unit in UP. the expansion is to double the capacity from 200 tpd to 400 tpd. the programme envisages an estimated investment of rs.150 million funded through banks & internal accruals. Parikh consultants, rajasthan is the project consultant. anand engineering, ahmedabad is the equipment supplier. as of may 2007, civil work was under progress. the project is scheduled for completion by october 2007.
ß RanaGirdersLtd,7thKMStone,MeerutRoad,Muzaffarnagar251003,UttarPradesh.& 0131-2990312/3292894.Fax:252412.(Mr.ZakirAliRana,Dir.)ß AnandEngineering,PlotNo.7601,Phase-N,GIDCEstate,Ahmedabad382445,Gujarat.& 20562234.Fax:56907226.
rAShMi MetAlikS is setting up a 500 tpd pig iron plant at Kharagpur in WB. Gannon dunkerley & co, Kolkata is the civil contractor. Universal engineering co, Vizag is the equipment supplier. as of may 2007, the civil work and erection of equipments were underway. the project is scheduled for completion by july 2007.
ß RashmiMetaliksLtd,1,GarstinPalace,Patwari,3BOrbit,Kolkata,WestBengal.& 033-22438517.Fax:22438521.(Mr.Raha,Vice.Pres.-Proj.)ß GannonDunkerley&CoLtd,23-A,4thFloor,N.S.Road,Kolkata700001,WestBengal.& 033-22300261to64.
rAiPur AllOyS & Steel
203.
204.
205.
206.
50
register ofNeW PrOJeCtS iN iNdiA 2007
rAShMi SPONge irON is implementing an expansion programme at its raipur facility in chhattisgarh. the expansion is to set up a pig iron unit by installing 150 cu.m. blast furnace and 30 mW cPP. the project entails an investment of rs.3,500 million. as of march 2007, work on the project was expected to begin shortly and scheduled to be completed in 18 months from zero date.
ß RashmiSpongeIronPvtLtd,No.407&408,ShanthaColony,Raipur492001,Chhattisgarh.& 0771-2253782.
rAthi udyOg is setting up an integrated steel plant at sikirdi in sambalpur district of orissa. the steel complex includes setting up of 1,50,000 tpa sponge iron, 1,50,000 tpa steel melting shop and 20 mW WHr based cPP. the plant entails a cumulative investment of rs.2,000 million and to be funded through banks & internal accruals. orissa sponge Iron is rendering the consultancy services. as of march 2007, civil works completed and machinery is being erected. the plant is slated for completion by june 2007.
ß RathiUdyogLtd,A-3,SouthofGTRoad,IndustrialArea,Ghaziabad,UttarPradesh.& 0120-2840346/2840355.Fax:2840351.(Mr.KushanAgarwal,Mgr.-Proj.&Fin.)
reAl iNdiA CONSultANCy is setting up a 20 tph ferro chrome unit at dubri in jajpur district of orissa. the project entails an investment of rs.232.4 million. as of march 2007, civil work was in progress. the equipment suppliers for the project have been appointed. the project is slated for completion by december 2007.
ß RealIndiaConsultancyLtd,N3/194IRC,Nayapally,Bhubaneshwar751015,Orissa.& 0674-2550442.(Mr.Acharya,Mg.Dir.)
rAShtriyA iSPAt NigAM has embarked on an expansion programme at its existing Vizag facility in aP. the programme envisages doubling the capacity of hot metal from 3.2 million tpa to 6.5 million tpa by installing third blast furnace. l&t consortium with Paul Wurth, Italy has been appointed as ePc contractor. the contract value at rs.14,000 million. the programme is scheduled to be completed in 30 months from the date of award of contract.
ß RashtriyaIspatNigamLtd,ABlock,VisakhapatnamSteelPlant, Visakhapatnam530031,AndhraPradesh.& 0891-2518277/2518429.Fax:2518764.ß Larsen&ToubroLtd,ECCDivision,MountPoonamaleeRoad,Manapakkam,Chennai600089,TamilNadu.& 044-22495656.Fax:22494306.
rMS die CAStiNgS is setting up a 600 tpa aluminium casting unit at Kalapatti in coimbatore district of tn. the project entailed an investment of rs.10 million. Vimta labs, coimbatore is the project consultant and southern Builders, coimbatore is the civil contractor. sKr engineering, Bangalore supplied the equipments for the project. as of march 2007, civil work completed and equipments were being erected. the unit is slated for completion by may 2007.
ß RMSDieCastings,6-C,AKGNagar,Upplipalayam,Coimbatore,641015,TamilNadu.& 0422-2574892.
rAShMi SPONge irON
207.
208.
209.
210.
211.
register ofNeW PrOJeCtS iN iNdiA 2007
rOhit FerrO teCh is expanding its ferro alloy plant at Bishnupur in Bankura district of WB. the capacity is to be augmented from 40,000 tpa to 60,000 tpa. the expansion entails an investment of rs.700 million funded through banks & internal accruals. transform electricals, Bangalore is the equipment supplier. as of april 2007, the civil works were underway. the expansion is scheduled to be completed by october 2007.
ß RohitFerroTechLtd,35,ChittaranjanAvenue,4thFloor,Kolkata700012,WestBengal.& 033-22119805.Fax:22256143.(Mr.VikasJain,Vice.Pres.-Fin.)ß TransformElectricals,20/75,BahubaliNagar,M.E.S.Road,Jalahalli, Bangalore560013,Karnataka.& 080-23456968/28381758.Fax:23456968/28381758.
rOhit FerrO teCh is setting up a 100,000 tpa sponge iron plant at Kalinganagar in jajpur district of orissa. the project entails an investment of rs.1,500 million. the project is to be funded through banks & internal accruals. Kalsasi engineering systems, Pune is the project consultant. transform electricals, Bangalore is the equipment supplier. as of april 2007, civil works were under progress. the plant is scheduled for completion by october 2007.
ß RohitFerroTechLtd,35,ChittaranjanAvenue,4thFloor,Kolkata700012,WestBengal.& 033-22119805/22119806/22118807.Fax:22256143/22119834. (Mr.VikasJain,Vice.Pres.-Fin.)ß TransformElectricals,20/75,BahubaliNagar,M.E.S.Road,Jalahalli, Bangalore560013,Karnataka.& 080-23456968/28381758.Fax:23456968/28381758.
rOSvAr irON & POWer is setting up an 80 tpd ms billets unit and a 250 mW WHr based cPP at Hospet in Bellary district of Karnataka. Industrial Project services, Bilaspur is rendering consultancy services. as of april 2007, the civil works and machinery erection were under progress. the plant is expected to be completed in 12 months. meanwhile, the company has recently commissioned a 300 tpd sponge iron plant in the same location.
ß RosvarIron&PowerLtd,350-A,SubramaniampalyamRoad,P.O.G.N.Mills, Coimbatore,TamilNadu.& 0422-2642086.Fax:2642219.(Mr.Venkatesh,Mgr.-Purchase.)ß IndustrialProjectServices,AF6,AnchanaVihar,NehruNagar,Bilaspur495001,Chhattisgarh.& 07752-503007.Fax:503267.
rOSvAr SteelS is setting up a 300 tpd steel ingots foundry at Kuppepalayam in coimbatore district of tn. the project is to be implemented in three phases with a capacity of 100 tpd each. IPs Industries, Bilaspur is the project consultant. laxminarayan equipments, Kolkata, asoka machines, ahmedabad & mausil mauthali, chhattisgarh are the equipment suppliers. as of april 2007, work on the project had been initiated and is slated for completion by november 2007.
ß RosvarSteelsLtd,66/3-B,KuppepalayamPost,Ganeshapuram, Coimbatore641107,TamilNadu.& 0422-2654774(Mr.Venkatesh,Mgr.-Purchase.)ß IndustrialProjectServices,AF6,AnchanaVihar,NehruNagar,Bilaspur495001,Chhattisgarh.& 07752-503007.Fax:503267.
rOhit FerrO teCh
212.
213.
214.
215.
51
register ofNeW PrOJeCtS iN iNdiA 2007
rAShMi SPONge irON is implementing an expansion programme at its raipur facility in chhattisgarh. the expansion is to set up a pig iron unit by installing 150 cu.m. blast furnace and 30 mW cPP. the project entails an investment of rs.3,500 million. as of march 2007, work on the project was expected to begin shortly and scheduled to be completed in 18 months from zero date.
ß RashmiSpongeIronPvtLtd,No.407&408,ShanthaColony,Raipur492001,Chhattisgarh.& 0771-2253782.
rAthi udyOg is setting up an integrated steel plant at sikirdi in sambalpur district of orissa. the steel complex includes setting up of 1,50,000 tpa sponge iron, 1,50,000 tpa steel melting shop and 20 mW WHr based cPP. the plant entails a cumulative investment of rs.2,000 million and to be funded through banks & internal accruals. orissa sponge Iron is rendering the consultancy services. as of march 2007, civil works completed and machinery is being erected. the plant is slated for completion by june 2007.
ß RathiUdyogLtd,A-3,SouthofGTRoad,IndustrialArea,Ghaziabad,UttarPradesh.& 0120-2840346/2840355.Fax:2840351.(Mr.KushanAgarwal,Mgr.-Proj.&Fin.)
reAl iNdiA CONSultANCy is setting up a 20 tph ferro chrome unit at dubri in jajpur district of orissa. the project entails an investment of rs.232.4 million. as of march 2007, civil work was in progress. the equipment suppliers for the project have been appointed. the project is slated for completion by december 2007.
ß RealIndiaConsultancyLtd,N3/194IRC,Nayapally,Bhubaneshwar751015,Orissa.& 0674-2550442.(Mr.Acharya,Mg.Dir.)
rAShtriyA iSPAt NigAM has embarked on an expansion programme at its existing Vizag facility in aP. the programme envisages doubling the capacity of hot metal from 3.2 million tpa to 6.5 million tpa by installing third blast furnace. l&t consortium with Paul Wurth, Italy has been appointed as ePc contractor. the contract value at rs.14,000 million. the programme is scheduled to be completed in 30 months from the date of award of contract.
ß RashtriyaIspatNigamLtd,ABlock,VisakhapatnamSteelPlant, Visakhapatnam530031,AndhraPradesh.& 0891-2518277/2518429.Fax:2518764.ß Larsen&ToubroLtd,ECCDivision,MountPoonamaleeRoad,Manapakkam,Chennai600089,TamilNadu.& 044-22495656.Fax:22494306.
rMS die CAStiNgS is setting up a 600 tpa aluminium casting unit at Kalapatti in coimbatore district of tn. the project entailed an investment of rs.10 million. Vimta labs, coimbatore is the project consultant and southern Builders, coimbatore is the civil contractor. sKr engineering, Bangalore supplied the equipments for the project. as of march 2007, civil work completed and equipments were being erected. the unit is slated for completion by may 2007.
ß RMSDieCastings,6-C,AKGNagar,Upplipalayam,Coimbatore,641015,TamilNadu.& 0422-2574892.
rAShMi SPONge irON
207.
208.
209.
210.
211.
register ofNeW PrOJeCtS iN iNdiA 2007
rOhit FerrO teCh is expanding its ferro alloy plant at Bishnupur in Bankura district of WB. the capacity is to be augmented from 40,000 tpa to 60,000 tpa. the expansion entails an investment of rs.700 million funded through banks & internal accruals. transform electricals, Bangalore is the equipment supplier. as of april 2007, the civil works were underway. the expansion is scheduled to be completed by october 2007.
ß RohitFerroTechLtd,35,ChittaranjanAvenue,4thFloor,Kolkata700012,WestBengal.& 033-22119805.Fax:22256143.(Mr.VikasJain,Vice.Pres.-Fin.)ß TransformElectricals,20/75,BahubaliNagar,M.E.S.Road,Jalahalli, Bangalore560013,Karnataka.& 080-23456968/28381758.Fax:23456968/28381758.
rOhit FerrO teCh is setting up a 100,000 tpa sponge iron plant at Kalinganagar in jajpur district of orissa. the project entails an investment of rs.1,500 million. the project is to be funded through banks & internal accruals. Kalsasi engineering systems, Pune is the project consultant. transform electricals, Bangalore is the equipment supplier. as of april 2007, civil works were under progress. the plant is scheduled for completion by october 2007.
ß RohitFerroTechLtd,35,ChittaranjanAvenue,4thFloor,Kolkata700012,WestBengal.& 033-22119805/22119806/22118807.Fax:22256143/22119834. (Mr.VikasJain,Vice.Pres.-Fin.)ß TransformElectricals,20/75,BahubaliNagar,M.E.S.Road,Jalahalli, Bangalore560013,Karnataka.& 080-23456968/28381758.Fax:23456968/28381758.
rOSvAr irON & POWer is setting up an 80 tpd ms billets unit and a 250 mW WHr based cPP at Hospet in Bellary district of Karnataka. Industrial Project services, Bilaspur is rendering consultancy services. as of april 2007, the civil works and machinery erection were under progress. the plant is expected to be completed in 12 months. meanwhile, the company has recently commissioned a 300 tpd sponge iron plant in the same location.
ß RosvarIron&PowerLtd,350-A,SubramaniampalyamRoad,P.O.G.N.Mills, Coimbatore,TamilNadu.& 0422-2642086.Fax:2642219.(Mr.Venkatesh,Mgr.-Purchase.)ß IndustrialProjectServices,AF6,AnchanaVihar,NehruNagar,Bilaspur495001,Chhattisgarh.& 07752-503007.Fax:503267.
rOSvAr SteelS is setting up a 300 tpd steel ingots foundry at Kuppepalayam in coimbatore district of tn. the project is to be implemented in three phases with a capacity of 100 tpd each. IPs Industries, Bilaspur is the project consultant. laxminarayan equipments, Kolkata, asoka machines, ahmedabad & mausil mauthali, chhattisgarh are the equipment suppliers. as of april 2007, work on the project had been initiated and is slated for completion by november 2007.
ß RosvarSteelsLtd,66/3-B,KuppepalayamPost,Ganeshapuram, Coimbatore641107,TamilNadu.& 0422-2654774(Mr.Venkatesh,Mgr.-Purchase.)ß IndustrialProjectServices,AF6,AnchanaVihar,NehruNagar,Bilaspur495001,Chhattisgarh.& 07752-503007.Fax:503267.
rOhit FerrO teCh
212.
213.
214.
215.
52
register ofNeW PrOJeCtS iN iNdiA 2007
rOurkelA Steel PlANt is poised to begin a coal dust injection unit at rourkela in sunderghar district of orissa. the facility envisages a capacity of 150 kg coal dust at an investment of rs.580 million. centre for engineering & technology, ranchi is the project consultant. sino steel, china has been appointed as the turnkey contractor. as of march 2007, clearances for the project obtained and project designing work was underway. the project is slated for completion in 18 months from zero date.
ß SteelAuthorityofIndiaLtd,IspatBhawan,No.2,LodhiRoad,NewDelhi110003.& 011-24367481.Fax:24367015.(Mr.D.Panigrahi,Dy.Gen.Mgr.) Plt:officeoftheDeputyGeneralManager-Projects,Rourkela769011,Orissa.& 0661-2510407.ß CentreforEngineering&Technology,4thFloor,RDCISLabBuilding, Ranchi834002,Jharkhand.& 0651-2411201.Fax:2411197.ß SinoSteelIndiaPvtLtd,12thFloor,ErosCorporateTower,NehruPlace,NewDelhi110019.& 011-42895600.Fax:42895628.
SAil is implementing expansion programme at its existing salem steel plant in tn. the expansion includes:
ñ setting up of a new steel melting shop with a capacity of 1,80,000 tpa.
ñ expansion of the existing cold rolled mill capacity from 65,000 tpa to 146,000 tpa.
ñ Induction of grinding machine in hot rolled mill will result to increase the capacity from 180,000 tpa to 370,000 tpa of steel coils & sheets.
a cumulative investment of rs.15,530 million is envisaged. m.n. dastur & co is the project consultant .expression of interest from equipment suppliers have been invited. as of april 2007, all statutory clearances obtained and civil work was to begin shortly. the expansion is scheduled to be completed in three years.
ß SteelAuthorityofIndiaLtd,IspatBhawan,No.2,LodhiRoad,NewDelhi110003.& 011-24367481.Fax:24367015.ß Plt:SalemSteelPlant,Salem-636013,TamilNadu.& 0427-2383021/2383247/2383444.Fax:2382800/2383249.ß M.N.Dastur&CoPvtLtd,480,AnnaSalai,KhivrajComplex,3rdFloor,Nandanam, Chennai600035,TamilNadu.& 044-24342002/24342018/24342026.Fax:24343712.
SAil is setting up a 3.1 million tpa steel melting shop at its existing Bokaro steel plant in jharkhand. the project envisages an investment of rs.40,000 million. mecon, ranchi has been appointed as the project consultant. equipment suppliers are yet to be appointed. as of april 2007, clearances have been obtained and civil work is expected to begin by may. the plant is scheduled to become operational by 2010.
ß SteelAuthorityofIndiaLtd,IspatBhawan,No.2,LodhiRoad,NewDelhi110003.
rOurkelA Steel PlANt
216.
217.
218.
register ofNeW PrOJeCtS iN iNdiA 2007
& 011-24367481.Fax:24367015.(Mr.K.Kishore,Gen.Mgr.)ß Plt:BokaroSteelPlant,BokaroSteelCity,Bokaro827001,Jharkhand.& 06542-240329.ß MeconLtd,Doranda,Ranchi834002,Jharkhand.& 0651-2480002/2481451.Fax:2482214/2482189.
SAkthe Shell is setting up a 50 tpm foundry for shell moulded grey iron castings at malumachampatty in coimbatore district of tn. the unit envisages an investment of rs.3.5 million. Inductotherm, coimbatore is supplying the equipments. as of march 2007, civil works are completed and the erection of machinery was under progress. the unit was scheduled for completion by may 2007.
ß SaktheShellLtd,OpptoRathinamCollege,S.F.No.622/2-B,PollachiMainRoad, EachanariPost,Coimbatore641021,TamilNadu.& 0422-2676460.ß InductothermIndiaPvtLtd,RenaissanceTerrace,FlatNo.L,2ndFloor, 126,TirugnasambanthamStreet,RaceCourseRoad,Coimbatore641018,TamilNadu.& 0422-2210302/3255912.Fax:2210295.
SAurAShtrA FerrOuS is setting up a 130 tpd foundry at lakhapur in mundra district of Gujarat. the company will produce cast iron products with an investment of rs.400 million. anjaneya consultancy, jamshedpur is the consultant. as of march 2007, civil work was underway and the major equipment suppliers finalised. The project is scheduled to be completed by may 2008.
ß SaurashtraFerrousPvtLtd,Lakhapur,Mundra,Kutch370421,Gujarat.& 02838-224161.Fax:224141.(Mr.S.K.Bhatt,Mg.Dir.)ß AnjaneyaConsultancyPvtLtd,29,RainBaseraSanjayNagar,Adityapur,Jamshedpur, SeraikelaKharsawan832109,Jharkhand.
SCAN SteelS is setting up a 2 x 100 tpd sponge iron plant at its existing rajgangpur facility in sundargarh district of orissa. the project is being implemented at a substantial investment. as of april 2007, construction of phase I was underway and the equipment suppliers had been finalised. The phase I programme is scheduled to be completed by June 2007.
ß ScanSteelsLtd,MainRoad,Rajgangpur,Sundargarh770017,Orissa.& 06624-222194/222319.
ShAh AllOyS is implementing an expansion programme at its existing Gandhidham integrated steel plant in Gujarat. the expansion is to be implemented in two phases. the phase I include addition of a 2 x 500 tpd sponge iron & 40 mW (WHr & coal) based cPP. the phase II includes setting up of a induction furnace, a blast furnace, a 25,000 tpm steel melting shop and a 3,000 tpm cold rolled coil facilities. the expansion entails a cumulative investment of rs.13,000 million. as of may 2007, civil work initiated and the equipment suppliers were being finalised. The phase I is scheduled to be completed by December 2007.
ß ShahAlloysLtd,GNFCInfotower,9thFloor,Sarkhej-GandhinagarHighway,Bodakdev, Ahmedabad380054,Gujarat.& 079-55308100.Fax:55308110.(Mr.BharathShah,Gen.Mgr.-Purchase.) Plt:DharaparVillage,Gandhidham,Kutch370201,Gujarat.& 02836-282195to97.
SAkthe Shell
219.
220.
221.
222.
53
register ofNeW PrOJeCtS iN iNdiA 2007
rOurkelA Steel PlANt is poised to begin a coal dust injection unit at rourkela in sunderghar district of orissa. the facility envisages a capacity of 150 kg coal dust at an investment of rs.580 million. centre for engineering & technology, ranchi is the project consultant. sino steel, china has been appointed as the turnkey contractor. as of march 2007, clearances for the project obtained and project designing work was underway. the project is slated for completion in 18 months from zero date.
ß SteelAuthorityofIndiaLtd,IspatBhawan,No.2,LodhiRoad,NewDelhi110003.& 011-24367481.Fax:24367015.(Mr.D.Panigrahi,Dy.Gen.Mgr.) Plt:officeoftheDeputyGeneralManager-Projects,Rourkela769011,Orissa.& 0661-2510407.ß CentreforEngineering&Technology,4thFloor,RDCISLabBuilding, Ranchi834002,Jharkhand.& 0651-2411201.Fax:2411197.ß SinoSteelIndiaPvtLtd,12thFloor,ErosCorporateTower,NehruPlace,NewDelhi110019.& 011-42895600.Fax:42895628.
SAil is implementing expansion programme at its existing salem steel plant in tn. the expansion includes:
ñ setting up of a new steel melting shop with a capacity of 1,80,000 tpa.
ñ expansion of the existing cold rolled mill capacity from 65,000 tpa to 146,000 tpa.
ñ Induction of grinding machine in hot rolled mill will result to increase the capacity from 180,000 tpa to 370,000 tpa of steel coils & sheets.
a cumulative investment of rs.15,530 million is envisaged. m.n. dastur & co is the project consultant .expression of interest from equipment suppliers have been invited. as of april 2007, all statutory clearances obtained and civil work was to begin shortly. the expansion is scheduled to be completed in three years.
ß SteelAuthorityofIndiaLtd,IspatBhawan,No.2,LodhiRoad,NewDelhi110003.& 011-24367481.Fax:24367015.ß Plt:SalemSteelPlant,Salem-636013,TamilNadu.& 0427-2383021/2383247/2383444.Fax:2382800/2383249.ß M.N.Dastur&CoPvtLtd,480,AnnaSalai,KhivrajComplex,3rdFloor,Nandanam, Chennai600035,TamilNadu.& 044-24342002/24342018/24342026.Fax:24343712.
SAil is setting up a 3.1 million tpa steel melting shop at its existing Bokaro steel plant in jharkhand. the project envisages an investment of rs.40,000 million. mecon, ranchi has been appointed as the project consultant. equipment suppliers are yet to be appointed. as of april 2007, clearances have been obtained and civil work is expected to begin by may. the plant is scheduled to become operational by 2010.
ß SteelAuthorityofIndiaLtd,IspatBhawan,No.2,LodhiRoad,NewDelhi110003.
rOurkelA Steel PlANt
216.
217.
218.
register ofNeW PrOJeCtS iN iNdiA 2007
& 011-24367481.Fax:24367015.(Mr.K.Kishore,Gen.Mgr.)ß Plt:BokaroSteelPlant,BokaroSteelCity,Bokaro827001,Jharkhand.& 06542-240329.ß MeconLtd,Doranda,Ranchi834002,Jharkhand.& 0651-2480002/2481451.Fax:2482214/2482189.
SAkthe Shell is setting up a 50 tpm foundry for shell moulded grey iron castings at malumachampatty in coimbatore district of tn. the unit envisages an investment of rs.3.5 million. Inductotherm, coimbatore is supplying the equipments. as of march 2007, civil works are completed and the erection of machinery was under progress. the unit was scheduled for completion by may 2007.
ß SaktheShellLtd,OpptoRathinamCollege,S.F.No.622/2-B,PollachiMainRoad, EachanariPost,Coimbatore641021,TamilNadu.& 0422-2676460.ß InductothermIndiaPvtLtd,RenaissanceTerrace,FlatNo.L,2ndFloor, 126,TirugnasambanthamStreet,RaceCourseRoad,Coimbatore641018,TamilNadu.& 0422-2210302/3255912.Fax:2210295.
SAurAShtrA FerrOuS is setting up a 130 tpd foundry at lakhapur in mundra district of Gujarat. the company will produce cast iron products with an investment of rs.400 million. anjaneya consultancy, jamshedpur is the consultant. as of march 2007, civil work was underway and the major equipment suppliers finalised. The project is scheduled to be completed by may 2008.
ß SaurashtraFerrousPvtLtd,Lakhapur,Mundra,Kutch370421,Gujarat.& 02838-224161.Fax:224141.(Mr.S.K.Bhatt,Mg.Dir.)ß AnjaneyaConsultancyPvtLtd,29,RainBaseraSanjayNagar,Adityapur,Jamshedpur, SeraikelaKharsawan832109,Jharkhand.
SCAN SteelS is setting up a 2 x 100 tpd sponge iron plant at its existing rajgangpur facility in sundargarh district of orissa. the project is being implemented at a substantial investment. as of april 2007, construction of phase I was underway and the equipment suppliers had been finalised. The phase I programme is scheduled to be completed by June 2007.
ß ScanSteelsLtd,MainRoad,Rajgangpur,Sundargarh770017,Orissa.& 06624-222194/222319.
ShAh AllOyS is implementing an expansion programme at its existing Gandhidham integrated steel plant in Gujarat. the expansion is to be implemented in two phases. the phase I include addition of a 2 x 500 tpd sponge iron & 40 mW (WHr & coal) based cPP. the phase II includes setting up of a induction furnace, a blast furnace, a 25,000 tpm steel melting shop and a 3,000 tpm cold rolled coil facilities. the expansion entails a cumulative investment of rs.13,000 million. as of may 2007, civil work initiated and the equipment suppliers were being finalised. The phase I is scheduled to be completed by December 2007.
ß ShahAlloysLtd,GNFCInfotower,9thFloor,Sarkhej-GandhinagarHighway,Bodakdev, Ahmedabad380054,Gujarat.& 079-55308100.Fax:55308110.(Mr.BharathShah,Gen.Mgr.-Purchase.) Plt:DharaparVillage,Gandhidham,Kutch370201,Gujarat.& 02836-282195to97.
SAkthe Shell
219.
220.
221.
222.
54
register ofNeW PrOJeCtS iN iNdiA 2007
ShAh AllOyS is expanding its ms hot rolled coils unit at Kalol in Gandhinagar district of Gujarat. the project includes increase in capacity of ms hot rolled coils unit from 2,60,000 tpa to 3,60,000 tpa and installation of 60 tonnes arc furnace. the project entails a cumulative investment of rs.2,500 million to be funded through term loan from banks & internal accruals. Varia engineering works, ahmedabad is the equipment supplier. as of april 2007, the civil work was progress. the expansion is slated for completion by october 2007.
ß ShahAlloysLtd,GNFCInfoTower,9thFloor,Sarkhej-GandhinagarHighway,Bodakdev, Ahmedabad380054,Gujarat.& 079-55308100.Fax:55308110.(Mr.SachinPatel,Sr.Mgr.-Purchase.)ß Plt:BlockNo.2221-2222,ShahIndustrialEstate,Sola-KalolRoad,SantejTaluk,Kalol, Gandhinagar382043,Gujarat.& 02764-286525/286545.Fax:286615.ß VariaEngineeringWorks,PlotNo.2005,G.I.D.C.Vatva,Phase-5,Ahmedabad,Gujarat&079-25894407.Fax:25832603.
ShAiFAli rOllS is setting up a 5,000 tpa steel ingots production unit at anjar in Kutch district of Gujarat. the project entails an investment of rs.300 million to rs.350 million funded through term loan & by internal accruals. GPI, mazda, thermax and Puja engineering Works are the major equipment suppliers. as of may 2007, erection of machinery was nearing completion and scheduled to become operational in the next 2 to 3 months.
ß ShaifaliRollsLtd,Santej,Gandhinagar,Kalol382721,Gujarat.& 02764-286617.Fax:268235.ß ThermaxLtd,ThermaxHouse,4,Mumbai-PuneRoad,ShivajiNagar, Pune411005,Maharashtra.& 020-25512122.ß PujaEngineeringWorks,66-67,IndlEstPoloGround,Indore452003,MadhyaPradesh.
ShivAlik POWer & Steel is setting up a 2,000 tpm metal casting foundry at Belsonda in mahasamund district of chhattisgarh. the casting products cater to automotive and railway industries. the project entails a cost of rs.140 million. Vme & sarvamangala, coimbatore and Inductotherm, Kolkata are the major equipment suppliers. as of may 2007, the civil works were underway. the project is scheduled to be completed by august.
ß ShivalikPower&SteelPvtLtd, C33,3rdFloor,AshokaMilleniumRingRoad,No.1,Raipur492001,Chhattisgarh.& 0771-2411470/2411471.Fax:2411469.
Shree NAkOdA iSPAt is expanding its sponge iron unit at mowa in raipur district of chhattisgarh. the sponge iron capacity is being agumented from 100 tpd to 400 tpd and the capacity of captive power plant is being doubled from 6 mW to 12 mW. the project entails a cumulative investment of rs.750 million. Inductotherm, ahmedabad is the equipment supplier. as of april 2007, civil work was under progress. the expansion is scheduled for completion by march 2008.
ß ShreeNakodaIspatLtd,NearRailwayCrossing,Mowa,P.O.ShankarNagar, Raipur492007,Chhattisgarh.
ShAh AllOyS
223.
224.
225.
226.
register ofNeW PrOJeCtS iN iNdiA 2007
& 0771-2282330(Mr.AmitabhShome,Dir.-Tech.)ß InductothermIndiaPvtLtd,ShriKishorebhaiD.VyasBuilding,Bopal,Ahmedabad380058, Gujarat.& 02717-231961(8lines).Fax:231266.
ShriNiWAS eNgiNeeriNg is setting up a 1,20,000 tpa grey iron foundry at mIdc talegaon in Pune district of maharashtra. the project entails an investment of rs.3,500 million. as of March 2007, civil work was underway and the equipment suppliers finalised. The unit is slated for completion by july 2007.
ß ShriniwasEngineeringAutoComponentsPvtLtd,NavlakhaUmbare,A-14,MIDCTalegoan, MavalTaluka,Pune,Maharashtra.& 09823017643.(Mr.G.S.Kale,Mg.Dir.)
SOutherN irON & Steel CO is expanding its integrated steel plant at Pottaneri in salem district of tn. the expansion includes setting up of a 500,000 tpa rolling mill, 500,000 tpa blooming unit, a 30 mW gas based cPP and a 65 tonnes steel melting shop. the cumulative cost of the project is rs.13,000 million is to be funded through equity, loan & internal accruals. mecon, Bangalore and Korus engineering solution, delhi are the project consultants. equipments are being imported partly from china & europe countries and the rest will be supplied by mukund engineering ltd, maharashtra. as of may 2007, civil work was progress. the captive power project was nearing completion and the rest of the plant is expected to be completed by early 2008.
ß SouthernIron&SteelCoLtd,Pottaneri,Mecheri,MetturTaluk,Salem636453,TamilNadu.& 04298-278400to403.Fax:278618.(Mr.K.Kannan,Ch.Gen.Mgr.-Engg.)ß MeconLtd,89,SouthEndRoad,Basavanagudi,Bangalore560004,Karnataka.& 080-26576442.Fax:26576352.ß KorusEngineeringSolutionsPvtLtd,400,4thFloor,NetajiSubhashITLTwinTower, Pitampura,NewDelhi110088.& 011-27190630/27190631.
Sri veNkAteSWArA COil MillS is setting up a 1500 tpa aluminium foil manufacturing unit at nandigram near Kothur in mehboobnagar district of aP. the plant envisages an investment of rs.71.7 million to be funded through loan from banks & internal accruals. Varia Pratik, ahmedabad is the turnkey consultant. as of march 2007, civil work was in progress. the project is slated for completion by june 2007.
ß SriVenkateswaraCoilMillsPvtLtd,HS.YNo1435/AA,1435/E-1435/EE, Nandigram(V),Kothur(M),Mehboobnagar,AndhraPradesh.& 09849070857.ß VariaPratik,Vatva,Ahmedabad382445,Gujarat.& 0792-25890255.
Sri viShNu FOuNdry is setting up a 300 tpm foundry for iron and steel castings at Kurumbapalayam in coimbatore district of tn. the unit entails an investment of rs.17.5 million to be funded through banks & internal accruals. megatherm, Kolkata is the equipment supplier. as of april 2007, civil work was nearing completion and machineries had been erected. the unit is scheduled to be completed by july.
ShriNiWAS eNgiNeeriNg
227.
228.
229.
230.
55
register ofNeW PrOJeCtS iN iNdiA 2007
ShAh AllOyS is expanding its ms hot rolled coils unit at Kalol in Gandhinagar district of Gujarat. the project includes increase in capacity of ms hot rolled coils unit from 2,60,000 tpa to 3,60,000 tpa and installation of 60 tonnes arc furnace. the project entails a cumulative investment of rs.2,500 million to be funded through term loan from banks & internal accruals. Varia engineering works, ahmedabad is the equipment supplier. as of april 2007, the civil work was progress. the expansion is slated for completion by october 2007.
ß ShahAlloysLtd,GNFCInfoTower,9thFloor,Sarkhej-GandhinagarHighway,Bodakdev, Ahmedabad380054,Gujarat.& 079-55308100.Fax:55308110.(Mr.SachinPatel,Sr.Mgr.-Purchase.)ß Plt:BlockNo.2221-2222,ShahIndustrialEstate,Sola-KalolRoad,SantejTaluk,Kalol, Gandhinagar382043,Gujarat.& 02764-286525/286545.Fax:286615.ß VariaEngineeringWorks,PlotNo.2005,G.I.D.C.Vatva,Phase-5,Ahmedabad,Gujarat&079-25894407.Fax:25832603.
ShAiFAli rOllS is setting up a 5,000 tpa steel ingots production unit at anjar in Kutch district of Gujarat. the project entails an investment of rs.300 million to rs.350 million funded through term loan & by internal accruals. GPI, mazda, thermax and Puja engineering Works are the major equipment suppliers. as of may 2007, erection of machinery was nearing completion and scheduled to become operational in the next 2 to 3 months.
ß ShaifaliRollsLtd,Santej,Gandhinagar,Kalol382721,Gujarat.& 02764-286617.Fax:268235.ß ThermaxLtd,ThermaxHouse,4,Mumbai-PuneRoad,ShivajiNagar, Pune411005,Maharashtra.& 020-25512122.ß PujaEngineeringWorks,66-67,IndlEstPoloGround,Indore452003,MadhyaPradesh.
ShivAlik POWer & Steel is setting up a 2,000 tpm metal casting foundry at Belsonda in mahasamund district of chhattisgarh. the casting products cater to automotive and railway industries. the project entails a cost of rs.140 million. Vme & sarvamangala, coimbatore and Inductotherm, Kolkata are the major equipment suppliers. as of may 2007, the civil works were underway. the project is scheduled to be completed by august.
ß ShivalikPower&SteelPvtLtd, C33,3rdFloor,AshokaMilleniumRingRoad,No.1,Raipur492001,Chhattisgarh.& 0771-2411470/2411471.Fax:2411469.
Shree NAkOdA iSPAt is expanding its sponge iron unit at mowa in raipur district of chhattisgarh. the sponge iron capacity is being agumented from 100 tpd to 400 tpd and the capacity of captive power plant is being doubled from 6 mW to 12 mW. the project entails a cumulative investment of rs.750 million. Inductotherm, ahmedabad is the equipment supplier. as of april 2007, civil work was under progress. the expansion is scheduled for completion by march 2008.
ß ShreeNakodaIspatLtd,NearRailwayCrossing,Mowa,P.O.ShankarNagar, Raipur492007,Chhattisgarh.
ShAh AllOyS
223.
224.
225.
226.
register ofNeW PrOJeCtS iN iNdiA 2007
& 0771-2282330(Mr.AmitabhShome,Dir.-Tech.)ß InductothermIndiaPvtLtd,ShriKishorebhaiD.VyasBuilding,Bopal,Ahmedabad380058, Gujarat.& 02717-231961(8lines).Fax:231266.
ShriNiWAS eNgiNeeriNg is setting up a 1,20,000 tpa grey iron foundry at mIdc talegaon in Pune district of maharashtra. the project entails an investment of rs.3,500 million. as of March 2007, civil work was underway and the equipment suppliers finalised. The unit is slated for completion by july 2007.
ß ShriniwasEngineeringAutoComponentsPvtLtd,NavlakhaUmbare,A-14,MIDCTalegoan, MavalTaluka,Pune,Maharashtra.& 09823017643.(Mr.G.S.Kale,Mg.Dir.)
SOutherN irON & Steel CO is expanding its integrated steel plant at Pottaneri in salem district of tn. the expansion includes setting up of a 500,000 tpa rolling mill, 500,000 tpa blooming unit, a 30 mW gas based cPP and a 65 tonnes steel melting shop. the cumulative cost of the project is rs.13,000 million is to be funded through equity, loan & internal accruals. mecon, Bangalore and Korus engineering solution, delhi are the project consultants. equipments are being imported partly from china & europe countries and the rest will be supplied by mukund engineering ltd, maharashtra. as of may 2007, civil work was progress. the captive power project was nearing completion and the rest of the plant is expected to be completed by early 2008.
ß SouthernIron&SteelCoLtd,Pottaneri,Mecheri,MetturTaluk,Salem636453,TamilNadu.& 04298-278400to403.Fax:278618.(Mr.K.Kannan,Ch.Gen.Mgr.-Engg.)ß MeconLtd,89,SouthEndRoad,Basavanagudi,Bangalore560004,Karnataka.& 080-26576442.Fax:26576352.ß KorusEngineeringSolutionsPvtLtd,400,4thFloor,NetajiSubhashITLTwinTower, Pitampura,NewDelhi110088.& 011-27190630/27190631.
Sri veNkAteSWArA COil MillS is setting up a 1500 tpa aluminium foil manufacturing unit at nandigram near Kothur in mehboobnagar district of aP. the plant envisages an investment of rs.71.7 million to be funded through loan from banks & internal accruals. Varia Pratik, ahmedabad is the turnkey consultant. as of march 2007, civil work was in progress. the project is slated for completion by june 2007.
ß SriVenkateswaraCoilMillsPvtLtd,HS.YNo1435/AA,1435/E-1435/EE, Nandigram(V),Kothur(M),Mehboobnagar,AndhraPradesh.& 09849070857.ß VariaPratik,Vatva,Ahmedabad382445,Gujarat.& 0792-25890255.
Sri viShNu FOuNdry is setting up a 300 tpm foundry for iron and steel castings at Kurumbapalayam in coimbatore district of tn. the unit entails an investment of rs.17.5 million to be funded through banks & internal accruals. megatherm, Kolkata is the equipment supplier. as of april 2007, civil work was nearing completion and machineries had been erected. the unit is scheduled to be completed by july.
ShriNiWAS eNgiNeeriNg
227.
228.
229.
230.
56
register ofNeW PrOJeCtS iN iNdiA 2007
ß SriVishnuFoundry,234,SathyRoad,Coimbatore641006,TamilNadu.& 0422-2531039.ß MegathermElectronicsPvtLtd,Plot-L1,BlockGP,Sector-V,SaltLakeCity, Kolkata700091,WestBengal.& 033-23577745/23577352/23577854.Fax:23577757.
Steel CASt is expanding its existing two foundries in Bhavnagar district of Gujarat. the project includes increase in capacity of unit I from 7,200 tpa to 10,200 tpa and that of unit II from 2,000 tpa to 3,000 tpa. the project entails a cumulative cost of rs.300 million. smPs consultants, ahmedabad is the civil contractor. sogen, Italy & Inductotherm, Pune are the equipment suppliers. as of april 2007, the civil works were under progress. the expansion is scheduled to be completed by september 2007.
ß SteelCastLtd,108/B-1,MuniDeri,NearMuniDeri,Bhavnagar364005,Gujarat.& 0278-2519062to64.(Mr.V.L.Shah,Dy.Gen.Mgr.-Prod.)ß InductothermIndiaPvtLtd,ShriKishorebhaiD.VyasBuilding,Bopal, Ahmedabad380058,Gujarat.& 02717-231961(8lines).Fax:231266.
SuguNA ChAritAble truSt is implementing an expansion programme at its existing Kallapatti foundry in coimbatore district of tn. the capacity is to be raised from 3,000 tpa to 8,000 tpa. the project is estimated to cost rs.40 million funded through internal accruals. j. K. controls, UK is the equipment supplier. as of april 2007, civil works were under progress. the expansion is slated for completion by july 2007.
ß SugunaCharitableTrust,707,AvanashiRoad,P.B.No.4003,Coimbatore641018,TamilNadu.& 0422-2627869.Fax:2211097.(Mr.Arvindhan,Gen.Mgr.)
SuNder rOlliNg MillS is setting up a hot rolled steel production unit at Buttibori in nagpur district of maharashtra. a capacity of 42,000 mtpa is being installed at a cost of rs.1,600 million. the project is to be funded through internal accruals and loans from bank. navratna engineers, Ghaziabad is the equipment supplier. as of march 2007, installation of machinery is under progress. the unit is scheduled for completion by the second quarter of 2007.
ß SunderRollingMillsPvtLtd,7,AdarshNagar,GandhiNagar,Ghaziabad201001,UttarPradesh.& 0120-2723970.Fax:2867252.
SuPreMe CONduCtOrS is setting up a 3,600 tpa copper rod and wire production unit at mIdc nardana in dhule district of maharashtra. an investment of rs.400 million is envisaged to be funded through banks & internal accruals. consultant and equipment supplier are yet to be finalized. As of April 2007, civil work was under progress and the company initiated process with the banks to secure loan. Work on the project is scheduled to be completed by december 2007.
ß SupremeConductorsLtd,1011,EmbassyCentre,207,NarimanPoint, Mumbai400021,Maharashtra.& 022-22823367.Fax:22832445.
Steel CASt
231.
232.
233.
234.
register ofNeW PrOJeCtS iN iNdiA 2007
SurANA iNduStrieS is setting up an integrated steel plant at Wadlure in raichur district of Karnataka. the project includes setting up of a 400 tpd sponge iron, a 225,000 tpa steel melting shop, a 200,000 tpa alloy steel and two captive power plants with a capacity of 35 mW (coal and WHr based) each. a cumulative investment of rs.4,730 million is envisaged to be funded through term loan from banks & by internal accruals. eastern metec, Kolkata is rendering the turnkey consultancy services. as of may 2007, the civil works were underway. the project is scheduled for completion by march 2008.
ß SuranaIndustriesLtd,29,WhitesRoad,IIFloor,Royapettah,Chennai600014,TamilNadu.& 044-28525127.Fax:28521143.(Mr.RajivSurana,Sr.Vice.Pres.)ß EasternMetecPvtLtd,46A,RAKidwaiRoad,ParkStreet,Kolkata700016,WestBengal.& 033-22277085/22278527.
triviStA Steel & POWer is setting up a 200 tpd sponge iron plant and a 4 mW WHr based cPP at Hirebaganal in Koppal district of Karnataka. the unit entails an investment of rs.460 million. Universal consultancy services, Vishakapatnam is the project consultant. Varsha techno Ind-equip, Hyderabad is the equipment supplier. as of april 2007, the civil work was under progress. the unit is slated for completion by march 2008.
ß TrivistaSteel&PowerPvtLtd,5-62/11,StreetNo.8,NearAndhraBank,Habsiguda, Hyderabad,AndhraPradesh.& 040-27178626.(Mr.K.NarenderReddy,Mg.Dir.) Site:HirebaganalVillage,KasanakandiRoad,Koppal,Karnataka.& 08394-230037.ß VarshaTechnoInd-EquipPvtLtd,PlotNo.2A,SVCIE,IDA,Jeedimetla, Hyderabad500055,AndhraPradesh.& 040-23097003.ß UniversalConsultancyServices,27-1-6/I,VaniArcade,2ndFloor,Opp.DolphinHotelOffices, No.1,Allipuram,Visakhapatnam530004,AndhraPradesh.& 0891-2735680.
uMA PreCiSiON is setting up a 600 tpm bright bar production unit at Waluj in aurangabad district of maharashtra with an investment of rs.152.16 million. as of april 2007, archicon Associates is the civil consultant while the equipment supplier is yet to be finalised. Work on the project was expected to begin by june and is scheduled for completion by early 2008.
ß UmaPrecisionLtd,64/21,DIIBlock,MIDC,Chinchwad,Pune411019,Maharashtra.& 020-27443153/27443154.Fax:27450020.
utkAl AluMiNA iNterNAtiONAl is setting up a 3 million mtpa aluminium manufacturing plant at rayagada in orissa. the project is to be implemented in three phases. the phase I includes setting aluminum unit with a capacity of 1.5 million tpa at a cost of rs.50,000 million. as of march 2007, civil work initiated and the company was in the process of appointing the equipment suppliers. Phase I programme is scheduled for completion by 2009.
ß UtkalAluminaInternationalLtd,RanigudaFarm,Rayagada765001,Orissa.& 06856-224192/224193.(Mr.VikashNaik,Mgr.-Materials.)
SurANA iNduStrieS
235.
236.
237.
238.
57
register ofNeW PrOJeCtS iN iNdiA 2007
ß SriVishnuFoundry,234,SathyRoad,Coimbatore641006,TamilNadu.& 0422-2531039.ß MegathermElectronicsPvtLtd,Plot-L1,BlockGP,Sector-V,SaltLakeCity, Kolkata700091,WestBengal.& 033-23577745/23577352/23577854.Fax:23577757.
Steel CASt is expanding its existing two foundries in Bhavnagar district of Gujarat. the project includes increase in capacity of unit I from 7,200 tpa to 10,200 tpa and that of unit II from 2,000 tpa to 3,000 tpa. the project entails a cumulative cost of rs.300 million. smPs consultants, ahmedabad is the civil contractor. sogen, Italy & Inductotherm, Pune are the equipment suppliers. as of april 2007, the civil works were under progress. the expansion is scheduled to be completed by september 2007.
ß SteelCastLtd,108/B-1,MuniDeri,NearMuniDeri,Bhavnagar364005,Gujarat.& 0278-2519062to64.(Mr.V.L.Shah,Dy.Gen.Mgr.-Prod.)ß InductothermIndiaPvtLtd,ShriKishorebhaiD.VyasBuilding,Bopal, Ahmedabad380058,Gujarat.& 02717-231961(8lines).Fax:231266.
SuguNA ChAritAble truSt is implementing an expansion programme at its existing Kallapatti foundry in coimbatore district of tn. the capacity is to be raised from 3,000 tpa to 8,000 tpa. the project is estimated to cost rs.40 million funded through internal accruals. j. K. controls, UK is the equipment supplier. as of april 2007, civil works were under progress. the expansion is slated for completion by july 2007.
ß SugunaCharitableTrust,707,AvanashiRoad,P.B.No.4003,Coimbatore641018,TamilNadu.& 0422-2627869.Fax:2211097.(Mr.Arvindhan,Gen.Mgr.)
SuNder rOlliNg MillS is setting up a hot rolled steel production unit at Buttibori in nagpur district of maharashtra. a capacity of 42,000 mtpa is being installed at a cost of rs.1,600 million. the project is to be funded through internal accruals and loans from bank. navratna engineers, Ghaziabad is the equipment supplier. as of march 2007, installation of machinery is under progress. the unit is scheduled for completion by the second quarter of 2007.
ß SunderRollingMillsPvtLtd,7,AdarshNagar,GandhiNagar,Ghaziabad201001,UttarPradesh.& 0120-2723970.Fax:2867252.
SuPreMe CONduCtOrS is setting up a 3,600 tpa copper rod and wire production unit at mIdc nardana in dhule district of maharashtra. an investment of rs.400 million is envisaged to be funded through banks & internal accruals. consultant and equipment supplier are yet to be finalized. As of April 2007, civil work was under progress and the company initiated process with the banks to secure loan. Work on the project is scheduled to be completed by december 2007.
ß SupremeConductorsLtd,1011,EmbassyCentre,207,NarimanPoint, Mumbai400021,Maharashtra.& 022-22823367.Fax:22832445.
Steel CASt
231.
232.
233.
234.
register ofNeW PrOJeCtS iN iNdiA 2007
SurANA iNduStrieS is setting up an integrated steel plant at Wadlure in raichur district of Karnataka. the project includes setting up of a 400 tpd sponge iron, a 225,000 tpa steel melting shop, a 200,000 tpa alloy steel and two captive power plants with a capacity of 35 mW (coal and WHr based) each. a cumulative investment of rs.4,730 million is envisaged to be funded through term loan from banks & by internal accruals. eastern metec, Kolkata is rendering the turnkey consultancy services. as of may 2007, the civil works were underway. the project is scheduled for completion by march 2008.
ß SuranaIndustriesLtd,29,WhitesRoad,IIFloor,Royapettah,Chennai600014,TamilNadu.& 044-28525127.Fax:28521143.(Mr.RajivSurana,Sr.Vice.Pres.)ß EasternMetecPvtLtd,46A,RAKidwaiRoad,ParkStreet,Kolkata700016,WestBengal.& 033-22277085/22278527.
triviStA Steel & POWer is setting up a 200 tpd sponge iron plant and a 4 mW WHr based cPP at Hirebaganal in Koppal district of Karnataka. the unit entails an investment of rs.460 million. Universal consultancy services, Vishakapatnam is the project consultant. Varsha techno Ind-equip, Hyderabad is the equipment supplier. as of april 2007, the civil work was under progress. the unit is slated for completion by march 2008.
ß TrivistaSteel&PowerPvtLtd,5-62/11,StreetNo.8,NearAndhraBank,Habsiguda, Hyderabad,AndhraPradesh.& 040-27178626.(Mr.K.NarenderReddy,Mg.Dir.) Site:HirebaganalVillage,KasanakandiRoad,Koppal,Karnataka.& 08394-230037.ß VarshaTechnoInd-EquipPvtLtd,PlotNo.2A,SVCIE,IDA,Jeedimetla, Hyderabad500055,AndhraPradesh.& 040-23097003.ß UniversalConsultancyServices,27-1-6/I,VaniArcade,2ndFloor,Opp.DolphinHotelOffices, No.1,Allipuram,Visakhapatnam530004,AndhraPradesh.& 0891-2735680.
uMA PreCiSiON is setting up a 600 tpm bright bar production unit at Waluj in aurangabad district of maharashtra with an investment of rs.152.16 million. as of april 2007, archicon Associates is the civil consultant while the equipment supplier is yet to be finalised. Work on the project was expected to begin by june and is scheduled for completion by early 2008.
ß UmaPrecisionLtd,64/21,DIIBlock,MIDC,Chinchwad,Pune411019,Maharashtra.& 020-27443153/27443154.Fax:27450020.
utkAl AluMiNA iNterNAtiONAl is setting up a 3 million mtpa aluminium manufacturing plant at rayagada in orissa. the project is to be implemented in three phases. the phase I includes setting aluminum unit with a capacity of 1.5 million tpa at a cost of rs.50,000 million. as of march 2007, civil work initiated and the company was in the process of appointing the equipment suppliers. Phase I programme is scheduled for completion by 2009.
ß UtkalAluminaInternationalLtd,RanigudaFarm,Rayagada765001,Orissa.& 06856-224192/224193.(Mr.VikashNaik,Mgr.-Materials.)
SurANA iNduStrieS
235.
236.
237.
238.
58
register ofNeW PrOJeCtS iN iNdiA 2007
veer gurJAr AlluMiNiuM iNduStrieS is poised to begin a 60,000 tpm aluminium alloy production unit at Gangapur in aurangabad district of maharashtra. the plant envisages an investment of rs.500 million to be funded through banks & internal accruals. m. sane, Pune is the project consultant and the equipment suppliers has been finalised. As of March 2007, the civil work was to begin shortly. the project was scheduled to completed in 6 months from zero date.
ß VeerGurjarAlluminiumIndustriesPvtLtd,K-250/2,MTDC,Walut,Gangapur, Aurangabad431136,Maharashtra.& 0240-2553350.Fax:2553351.
veNkAteShWArA SPONge & irON is setting up a 2 x 100 tpd sponge iron plant in Giridih district of jharkhand. Phase I includes setting 100 tpd sponge iron unit at an investment of rs.160 million. eIcs, Bilaspur has been appointed as the project consultant and the equipment suppliers been finalised. As of April 2007, civil work was under progress. Phase I programme is scheduled for completion in 4 months and the work on phase II will begin thereafter.
ß VenkateshwaraSponge&IronPvtLtd,B.B.C.Road,P.O.Box.124, Giridih815301,Jharkhand.& 06532-222957.ß EICSPowerServicesPvtLtd,1stFloor,DoorNo:103-106,OmResidency,RingRoad2, Bilaspur495001,Chhattisgarh.& 07752-500212/518257.Fax:500941.
vikAS MetAlikS & eNergy is setting up a iron ore pelletilisation and benefication plant with a capacity of 2.4 million tpa at tusel in Bastar district of chhattisgarh. the project entails an investment of rs.1,000 million to be funded through internal accruals & term loan from banks. mr. Buddhadev Basu, rourkela is rendering the consultancy services. metso minerals, Finland is the equipment supplier. as of april 2007, machinery erection was nearing completion. the project was scheduled for completion by may 2007.
ß VikasMetaliks&EnergyLtd,F-7,ModernComplex,MotibagChowk,Raipur492001, Chhattisgarh.& 0771-2236690.Fax:2236690.(Mr.UmeshSharma,Dir.)
viNAyAk SteelS is setting up a 150 tpd steel rolling mill at Kothur in mehaboobnagar district of aP. the project envisages an investment of rs.100 million. as of march 2007, the civil works were in progress and the major plant & machinery suppliers had been finalised. the plant is slated for completion by the last quarter of 2007.
ß VinayakSteelsLtd,5-4-83,TSKChambers,1stFloor,M.G.Road, Secunderabad500003,AndhraPradesh.& 040-27537606.Fax:27537595.(Mr.BasantKumarMandelia,Gen.Mgr.) Plt:97/A,J.P.DurgaRoad,KothurVillage,SahidnagarTaluka,Mehaboobnagar,AndhraPradesh.& 08548-256049.
virAJ PrOFileS is setting up a 20,000 tpm stainless steel casting unit at Wada in thane district of maharashtra. the unit will produce round bars, angles and pipes. machinery is being imported from europe. the company’s in-house team is involved in project development. as
veer gurJAr AlluMiNiuM iNduStrieS
239.
240.
241.
242.
243.
register ofNeW PrOJeCtS iN iNdiA 2007
virAJ PrOFileS
of april 2007, civil work was under progress. the unit is scheduled for completion in 2008.
ß VirajProfilesLtd,10,ImperialChambers,1stFloor,WilsonRoad,BallardEstate, Mumbai400038,Maharashtra.& 022-22613056/22614284.Fax:22612980/22659713. (Mrs.SangamaniSrinivasan,Mgr.-Mktg.)
viSA Steel is setting up an integrated steel complex at jakhapura in jajpur district of orissa. the complex includes setting up of a 500 x 2 tpa sponge iron unit, 400,000 tpa coke oven, 2 mini blast furnaces, 2 arc furnaces and a 50 mW coal based captive Power Plant. the project entails an investment of rs.12,500 million to be funded through banks & internal accruals. Kalsasi engineering systems is the project consultant. tIsco, mumbai is the equipment supplier. as of april 2007, civil works completed and machinery erection was under progress. the project is slated for completion by november 2007.
ß VisaSteelLtd,KalinganagarIndustrialComplex,P.O.Jakhapura,Jajpur755019,Orissa.& 06726-242441/242444.Fax:242442.(Mr.SaleemAkthar,Mgr.-Fin.)
244.
59
register ofNeW PrOJeCtS iN iNdiA 2007
veer gurJAr AlluMiNiuM iNduStrieS is poised to begin a 60,000 tpm aluminium alloy production unit at Gangapur in aurangabad district of maharashtra. the plant envisages an investment of rs.500 million to be funded through banks & internal accruals. m. sane, Pune is the project consultant and the equipment suppliers has been finalised. As of March 2007, the civil work was to begin shortly. the project was scheduled to completed in 6 months from zero date.
ß VeerGurjarAlluminiumIndustriesPvtLtd,K-250/2,MTDC,Walut,Gangapur, Aurangabad431136,Maharashtra.& 0240-2553350.Fax:2553351.
veNkAteShWArA SPONge & irON is setting up a 2 x 100 tpd sponge iron plant in Giridih district of jharkhand. Phase I includes setting 100 tpd sponge iron unit at an investment of rs.160 million. eIcs, Bilaspur has been appointed as the project consultant and the equipment suppliers been finalised. As of April 2007, civil work was under progress. Phase I programme is scheduled for completion in 4 months and the work on phase II will begin thereafter.
ß VenkateshwaraSponge&IronPvtLtd,B.B.C.Road,P.O.Box.124, Giridih815301,Jharkhand.& 06532-222957.ß EICSPowerServicesPvtLtd,1stFloor,DoorNo:103-106,OmResidency,RingRoad2, Bilaspur495001,Chhattisgarh.& 07752-500212/518257.Fax:500941.
vikAS MetAlikS & eNergy is setting up a iron ore pelletilisation and benefication plant with a capacity of 2.4 million tpa at tusel in Bastar district of chhattisgarh. the project entails an investment of rs.1,000 million to be funded through internal accruals & term loan from banks. mr. Buddhadev Basu, rourkela is rendering the consultancy services. metso minerals, Finland is the equipment supplier. as of april 2007, machinery erection was nearing completion. the project was scheduled for completion by may 2007.
ß VikasMetaliks&EnergyLtd,F-7,ModernComplex,MotibagChowk,Raipur492001, Chhattisgarh.& 0771-2236690.Fax:2236690.(Mr.UmeshSharma,Dir.)
viNAyAk SteelS is setting up a 150 tpd steel rolling mill at Kothur in mehaboobnagar district of aP. the project envisages an investment of rs.100 million. as of march 2007, the civil works were in progress and the major plant & machinery suppliers had been finalised. the plant is slated for completion by the last quarter of 2007.
ß VinayakSteelsLtd,5-4-83,TSKChambers,1stFloor,M.G.Road, Secunderabad500003,AndhraPradesh.& 040-27537606.Fax:27537595.(Mr.BasantKumarMandelia,Gen.Mgr.) Plt:97/A,J.P.DurgaRoad,KothurVillage,SahidnagarTaluka,Mehaboobnagar,AndhraPradesh.& 08548-256049.
virAJ PrOFileS is setting up a 20,000 tpm stainless steel casting unit at Wada in thane district of maharashtra. the unit will produce round bars, angles and pipes. machinery is being imported from europe. the company’s in-house team is involved in project development. as
veer gurJAr AlluMiNiuM iNduStrieS
239.
240.
241.
242.
243.
register ofNeW PrOJeCtS iN iNdiA 2007
virAJ PrOFileS
of april 2007, civil work was under progress. the unit is scheduled for completion in 2008.
ß VirajProfilesLtd,10,ImperialChambers,1stFloor,WilsonRoad,BallardEstate, Mumbai400038,Maharashtra.& 022-22613056/22614284.Fax:22612980/22659713. (Mrs.SangamaniSrinivasan,Mgr.-Mktg.)
viSA Steel is setting up an integrated steel complex at jakhapura in jajpur district of orissa. the complex includes setting up of a 500 x 2 tpa sponge iron unit, 400,000 tpa coke oven, 2 mini blast furnaces, 2 arc furnaces and a 50 mW coal based captive Power Plant. the project entails an investment of rs.12,500 million to be funded through banks & internal accruals. Kalsasi engineering systems is the project consultant. tIsco, mumbai is the equipment supplier. as of april 2007, civil works completed and machinery erection was under progress. the project is slated for completion by november 2007.
ß VisaSteelLtd,KalinganagarIndustrialComplex,P.O.Jakhapura,Jajpur755019,Orissa.& 06726-242441/242444.Fax:242442.(Mr.SaleemAkthar,Mgr.-Fin.)
244.
Projects recentlY commIssIoned
register ofNeW PrOJeCtS iN iNdiA 2007
AiA eNgiNeeriNg
AiA eNgiNeeriNg is poised to commission the expansion programme at its existing odhav facility in ahmedabad district of Gujarat. the programme is to augment the capacity of ferro chrome from 65,000 tpa to 100,000 tpa at a cost of rs.1,500 million. as of may 2007, commercial production is expected to begin shortly.
ß AIAEngineeringLtd,115,GVMMEstate,OdhavRoad,Odhav,Ahmedabad382410,Gujarat.&079-22901078to81.Fax:22901077.(Mr.Ragahavan,Gen.Mgr.-Proj.)
b r teChNOCASt is poised to commission the expansion programme at its existing shapar foundry in rajkot district of Gujarat. the programme has increased the capacity of sG and cI casting from 600 tpm to 2,000 tpm. an investment of rs.40 million is envisaged. Inductotherm, ahmedabad is the equipment supplier. the company is expected to begin the commercial production shortly.
ß BRTechnocastLtd,C-1,GIDC,202/3,N.Road,AjiVasahat,Rajkot360003,Gujarat.& 0281-2389182/3098148.Fax:2389182.(Mr.J.A.Modi,Dir-Tech.)ß InductothermIndiaLtd,Bopal,Ahmedabad380058,Gujarat.& 079-23731961(8Lines).Fax:23731266/23731268.
biNA MetAl WAy is poised to commission a 5,000 tpa steel tubes production unit at Gamaria in seraikela Kharswan district of jharkhand. the project entails an investment of rs.30 million funded through banks & internal accruals. nirmal manufactures, new delhi is the equipment supplier. as of april 2007, machinery erection has been completed. the unit is scheduled to become operational shortly.
ß BinaMetalWayPvtLtd, B-4,PhaseII,IndustrialArea,Adityapur, Jamshedpur831013,Jharkhand.& 0657-2200404(Mr.Raoth,Mgr.-Works.)ß NirmalManufacturing&AlliedIndustriesLtd,1303,HemkuntHouse,No.6RajendreaPlace, NewDelhi110008. &011-41536641/41536642.
Fie SPherOteCh has recently commissioned a 500 tpm foundry unit for production of cI & GI castings at Hatkanagle in Kolhapur district of maharashtra. an investment of rs.35 million is entailed and the machinery are procured from Italy. the unit is scheduled to begin commercial production from may onwards.
ß FIESpherotech,678,LaxmiCo-operativeIndustrialEstate,Hatkanagle,Kolhapur,Maharashtra.& 0230-2366175/2366208/2366162/2366268/2366133/2366271.Fax:2366133.
guJArAt FOrgiNgS has commissioned the expansion of foundry in rajkot district of Gujarat. the expansion has increased the capacity of iron castings from 50 tpm to 800 tpm at an investment of rs.100 million funded through internal accruals. mr. somaj, Gujarat is the project consultant. Inductotherm, ahmedabad is the equipment supplier. as of may 2007, trial production is in progress and is poised to begin the commercial production shortly.
ß GujaratForgingsLtd,Opp.PDTC,AjiIndlArea,Rajkot360003,Gujarat.& 0281-2387750/2387752/2389348/2389349.Fax:2387751.
245.
246.
247.
248.
249.
61
Projects recentlY commIssIoned
register ofNeW PrOJeCtS iN iNdiA 2007
AiA eNgiNeeriNg
AiA eNgiNeeriNg is poised to commission the expansion programme at its existing odhav facility in ahmedabad district of Gujarat. the programme is to augment the capacity of ferro chrome from 65,000 tpa to 100,000 tpa at a cost of rs.1,500 million. as of may 2007, commercial production is expected to begin shortly.
ß AIAEngineeringLtd,115,GVMMEstate,OdhavRoad,Odhav,Ahmedabad382410,Gujarat.&079-22901078to81.Fax:22901077.(Mr.Ragahavan,Gen.Mgr.-Proj.)
b r teChNOCASt is poised to commission the expansion programme at its existing shapar foundry in rajkot district of Gujarat. the programme has increased the capacity of sG and cI casting from 600 tpm to 2,000 tpm. an investment of rs.40 million is envisaged. Inductotherm, ahmedabad is the equipment supplier. the company is expected to begin the commercial production shortly.
ß BRTechnocastLtd,C-1,GIDC,202/3,N.Road,AjiVasahat,Rajkot360003,Gujarat.& 0281-2389182/3098148.Fax:2389182.(Mr.J.A.Modi,Dir-Tech.)ß InductothermIndiaLtd,Bopal,Ahmedabad380058,Gujarat.& 079-23731961(8Lines).Fax:23731266/23731268.
biNA MetAl WAy is poised to commission a 5,000 tpa steel tubes production unit at Gamaria in seraikela Kharswan district of jharkhand. the project entails an investment of rs.30 million funded through banks & internal accruals. nirmal manufactures, new delhi is the equipment supplier. as of april 2007, machinery erection has been completed. the unit is scheduled to become operational shortly.
ß BinaMetalWayPvtLtd, B-4,PhaseII,IndustrialArea,Adityapur, Jamshedpur831013,Jharkhand.& 0657-2200404(Mr.Raoth,Mgr.-Works.)ß NirmalManufacturing&AlliedIndustriesLtd,1303,HemkuntHouse,No.6RajendreaPlace, NewDelhi110008. &011-41536641/41536642.
Fie SPherOteCh has recently commissioned a 500 tpm foundry unit for production of cI & GI castings at Hatkanagle in Kolhapur district of maharashtra. an investment of rs.35 million is entailed and the machinery are procured from Italy. the unit is scheduled to begin commercial production from may onwards.
ß FIESpherotech,678,LaxmiCo-operativeIndustrialEstate,Hatkanagle,Kolhapur,Maharashtra.& 0230-2366175/2366208/2366162/2366268/2366133/2366271.Fax:2366133.
guJArAt FOrgiNgS has commissioned the expansion of foundry in rajkot district of Gujarat. the expansion has increased the capacity of iron castings from 50 tpm to 800 tpm at an investment of rs.100 million funded through internal accruals. mr. somaj, Gujarat is the project consultant. Inductotherm, ahmedabad is the equipment supplier. as of may 2007, trial production is in progress and is poised to begin the commercial production shortly.
ß GujaratForgingsLtd,Opp.PDTC,AjiIndlArea,Rajkot360003,Gujarat.& 0281-2387750/2387752/2389348/2389349.Fax:2387751.
245.
246.
247.
248.
249.
62
hArihAr AllOy CAStiNg
hArihAr AllOy CAStiNg is setting up a foundry at lakshmanapatti near suriyur in Pudukottai district of tn. an investment of rs.150 million is to be entailed and funded through bank loans. as of march 2007, civil works and erection of machinery were under progress. the company is expected to begin commercial production by april.
ß HariharAlloyCasting,C/o.HariharForgingsPvtLtd,1/43,RaceCourseRoad,Kajamalai, Trichy620023,TamilNadu.& 0431-2422884.Fax:2421056.(Mr.Subramaniam,Mgr.)
lAkShMANveer Steel has set up a 35,000 tpa tmt Bar production unit at jhotwara in jaipur district of rajasthan. mr. jagananth sharma, Faridabad is the project consultant and P P rolling mills manufacturing co, Faridabad is the equipment supplier. as of may 2007, civil works and erection of machinery have been completed. the unit is scheduled to become operational from june 2007.
ß LakshmanveerSteelPvtLtd,65-A,IndustrialArea,Jhotwara,Jaipur-302012,Rajasthan.&0141-2340811.(Mr.LaxmanRao,Mg.Dir.)ß PPRollingMillsManufacturingCoPvtLtd,PlotNo.39,Sector-27C,Faridabad,Haryana.
MAkS iNduStrieS is poised to commission a 1,000 tpm iron castings unit at cherlapally in rangareddy district of aP. an investment of rs.70 million is envisaged and to be funded through loan from banks. reino machines, Gujarat is the equipment supplier. as of april 2007, erection of machinery are under progress. the unit is scheduled to become operational by may 2007.
ß MaksIndustriesLtd,PlotNo.8,IndlDevArea,Uppal,Hyderabad500039,AndhraPradesh.& 040-27208704.Fax:27208704.(Mr.ShriramMoorthy,Prod.Mgr.)
P.C. SONS CAStiNgS is poised to commission the expansion programme at its malumichampatti facility in coimbatore district of tn. the capacity of steel castings is to be increased from 100 tpm to 300 tpm at an investment of rs.15 million. sakthi auto components, coimbatore is the equipment supplier. as of april 2007, machinery erection is nearing completion. the expanded facility is expected to begin commercial production shortly.
ß P.C.SonsCastingsPvtLtd,S.F.No.322,PollachiMainRoad,Malumichampatti, Coimbatore641021,TamilNadu.& 0422-2610310.Fax:2610310.(Mr.Rajendran,Mgr.)ß SakthiAutoComponents,180,RaceCourseRoad,Coimbatore641018,TamilNadu.& 0422-2221551to54.Fax:2220574/2220329.
PrAkASh rOAdliNeS COrP is poised to commission a 300 tpd iron ore processing unit at Baraiburu in West singhbhum district of jharkhand. the plant entails an investment of rs.10 million funded through banks & internal accruals. Project consultancy is provided by an in-house team. as of may 2007, machinery erection is nearing completion and is scheduled to become operational shortly.
ß PrakashRoadlinesCorpLtd,P-3,NewC.I.T.Road,(TirettyBazar), Kolkata700073,WestBengal.& 033-22259142/22252275.(Mr.N.C.Sharma,Dy.Gen.Mgr.)
register ofNeW PrOJeCtS iN iNdiA 2007
250.
251.
252.
253.
254.
SeleNO SteelS is poised to commission the expansion programme at its existing taraimal unit in raigarh district of chhattisgarh. the programme is to increase the capacity of sponge iron from 100 tpd to 150 tpd. Popuri engineering has rendered the consultancy services. Kitti steels is the equipment supplier. as of april 2007, civil works and machinery erection was nearing completion. the expanded unit is scheduled to become operational from may.
ß SelenoSteelsLtd,Taraimal,Gharghoda,Raigarh223528,Chhattisgarh.& 07762-223528.Fax:221257.ß PopuriEngineering&ConsultancyServicesPvtLtd, 12-2-460,NewHUDALayout,Gudimalkapur,Opp.AnushaHospital,Mehdipatnam, Hyderabad500028,AndhraPradesh.& 040-23510649/23510777/23510811/23510844.
Shree rAM SPONge & Steel is poised to commission a 300 tpd tmt bars production unit at its existing sundargarh facility in orissa. an investment of rs.800 million is envisaged and dee dee consultancy, durgapur has provided the technical assistance. the unit is scheduled to become operational from april 2007.
ß ShreeRamSponge&Steel,A/10,JagnathComplex,Udidnagar,Rourkela700034,Orissa.& 06624-28088.;Fax:281146.
SuNil SPONge irON is poised to commission an integrated steel plant at raigarh in chhattisgarh. the project includes setting up of a 35 tpd sponge iron unit, a 125 tpd coal washery, steel melting shop and a 12 mW cPP at a cumulative cost of rs.1,160 million. Predominant engineers & contractors, Gurgaon is rendering the consultancy services and Beekay Industries, mumbai is the major equipment supplier. as of april 2007, erection of machinery is nearing completion. the plant is slated for commissioning by may 2007.
ß SunilSpongeIronLtd,CrescentTower,6thFloor,229,A.J.C.BoseRoad, Kolkata700020,WestBengal.& 033-22806946to48;Fax:22805708(Mr.S.K.Patnaik,Mgr.-Proj.) Plt:Raigarh,Chhattisgarh.& 07762-329562.ß BeekayIndustries,HanumanNagar,Kandivili,Mumbai400101,Maharashtra.& 022-28862437.ß PredominantEngineers&ContractorsPvtLtd,A-14/28A,DLFQutubEnclave,Phase-I, Gurgaon,Haryana.& 0124-2563558/5054177.Fax:5051359.
veNkAteSh eNergy & MetAlS is poised to commission a 50 tpd iron ore processing unit at moulibhatta in jagdalpur district of chhattisgarh. omkar Industries, Gujarat is the equipment supplier. as of april 2007, machinery erection is nearing completion and is scheduled to become operational from may.
ß VenkateshEnergy&MetalsPvtLtd,145,LohanchalColony,BokaroSteelCity, Bokaro827012,Jharkhand.& 06542-257807.(Mr.V.P.Singh,Dir.)ß OmkarIndustries,NarodaRoad,SaijpurBogha,Ahmedabad382345,Gujarat.& 079-22820220.
SeleNO SteelS register ofNeW PrOJeCtS iN iNdiA 2007
255.
256.
257.
258.
63
hArihAr AllOy CAStiNg
hArihAr AllOy CAStiNg is setting up a foundry at lakshmanapatti near suriyur in Pudukottai district of tn. an investment of rs.150 million is to be entailed and funded through bank loans. as of march 2007, civil works and erection of machinery were under progress. the company is expected to begin commercial production by april.
ß HariharAlloyCasting,C/o.HariharForgingsPvtLtd,1/43,RaceCourseRoad,Kajamalai, Trichy620023,TamilNadu.& 0431-2422884.Fax:2421056.(Mr.Subramaniam,Mgr.)
lAkShMANveer Steel has set up a 35,000 tpa tmt Bar production unit at jhotwara in jaipur district of rajasthan. mr. jagananth sharma, Faridabad is the project consultant and P P rolling mills manufacturing co, Faridabad is the equipment supplier. as of may 2007, civil works and erection of machinery have been completed. the unit is scheduled to become operational from june 2007.
ß LakshmanveerSteelPvtLtd,65-A,IndustrialArea,Jhotwara,Jaipur-302012,Rajasthan.&0141-2340811.(Mr.LaxmanRao,Mg.Dir.)ß PPRollingMillsManufacturingCoPvtLtd,PlotNo.39,Sector-27C,Faridabad,Haryana.
MAkS iNduStrieS is poised to commission a 1,000 tpm iron castings unit at cherlapally in rangareddy district of aP. an investment of rs.70 million is envisaged and to be funded through loan from banks. reino machines, Gujarat is the equipment supplier. as of april 2007, erection of machinery are under progress. the unit is scheduled to become operational by may 2007.
ß MaksIndustriesLtd,PlotNo.8,IndlDevArea,Uppal,Hyderabad500039,AndhraPradesh.& 040-27208704.Fax:27208704.(Mr.ShriramMoorthy,Prod.Mgr.)
P.C. SONS CAStiNgS is poised to commission the expansion programme at its malumichampatti facility in coimbatore district of tn. the capacity of steel castings is to be increased from 100 tpm to 300 tpm at an investment of rs.15 million. sakthi auto components, coimbatore is the equipment supplier. as of april 2007, machinery erection is nearing completion. the expanded facility is expected to begin commercial production shortly.
ß P.C.SonsCastingsPvtLtd,S.F.No.322,PollachiMainRoad,Malumichampatti, Coimbatore641021,TamilNadu.& 0422-2610310.Fax:2610310.(Mr.Rajendran,Mgr.)ß SakthiAutoComponents,180,RaceCourseRoad,Coimbatore641018,TamilNadu.& 0422-2221551to54.Fax:2220574/2220329.
PrAkASh rOAdliNeS COrP is poised to commission a 300 tpd iron ore processing unit at Baraiburu in West singhbhum district of jharkhand. the plant entails an investment of rs.10 million funded through banks & internal accruals. Project consultancy is provided by an in-house team. as of may 2007, machinery erection is nearing completion and is scheduled to become operational shortly.
ß PrakashRoadlinesCorpLtd,P-3,NewC.I.T.Road,(TirettyBazar), Kolkata700073,WestBengal.& 033-22259142/22252275.(Mr.N.C.Sharma,Dy.Gen.Mgr.)
register ofNeW PrOJeCtS iN iNdiA 2007
250.
251.
252.
253.
254.
SeleNO SteelS is poised to commission the expansion programme at its existing taraimal unit in raigarh district of chhattisgarh. the programme is to increase the capacity of sponge iron from 100 tpd to 150 tpd. Popuri engineering has rendered the consultancy services. Kitti steels is the equipment supplier. as of april 2007, civil works and machinery erection was nearing completion. the expanded unit is scheduled to become operational from may.
ß SelenoSteelsLtd,Taraimal,Gharghoda,Raigarh223528,Chhattisgarh.& 07762-223528.Fax:221257.ß PopuriEngineering&ConsultancyServicesPvtLtd, 12-2-460,NewHUDALayout,Gudimalkapur,Opp.AnushaHospital,Mehdipatnam, Hyderabad500028,AndhraPradesh.& 040-23510649/23510777/23510811/23510844.
Shree rAM SPONge & Steel is poised to commission a 300 tpd tmt bars production unit at its existing sundargarh facility in orissa. an investment of rs.800 million is envisaged and dee dee consultancy, durgapur has provided the technical assistance. the unit is scheduled to become operational from april 2007.
ß ShreeRamSponge&Steel,A/10,JagnathComplex,Udidnagar,Rourkela700034,Orissa.& 06624-28088.;Fax:281146.
SuNil SPONge irON is poised to commission an integrated steel plant at raigarh in chhattisgarh. the project includes setting up of a 35 tpd sponge iron unit, a 125 tpd coal washery, steel melting shop and a 12 mW cPP at a cumulative cost of rs.1,160 million. Predominant engineers & contractors, Gurgaon is rendering the consultancy services and Beekay Industries, mumbai is the major equipment supplier. as of april 2007, erection of machinery is nearing completion. the plant is slated for commissioning by may 2007.
ß SunilSpongeIronLtd,CrescentTower,6thFloor,229,A.J.C.BoseRoad, Kolkata700020,WestBengal.& 033-22806946to48;Fax:22805708(Mr.S.K.Patnaik,Mgr.-Proj.) Plt:Raigarh,Chhattisgarh.& 07762-329562.ß BeekayIndustries,HanumanNagar,Kandivili,Mumbai400101,Maharashtra.& 022-28862437.ß PredominantEngineers&ContractorsPvtLtd,A-14/28A,DLFQutubEnclave,Phase-I, Gurgaon,Haryana.& 0124-2563558/5054177.Fax:5051359.
veNkAteSh eNergy & MetAlS is poised to commission a 50 tpd iron ore processing unit at moulibhatta in jagdalpur district of chhattisgarh. omkar Industries, Gujarat is the equipment supplier. as of april 2007, machinery erection is nearing completion and is scheduled to become operational from may.
ß VenkateshEnergy&MetalsPvtLtd,145,LohanchalColony,BokaroSteelCity, Bokaro827012,Jharkhand.& 06542-257807.(Mr.V.P.Singh,Dir.)ß OmkarIndustries,NarodaRoad,SaijpurBogha,Ahmedabad382345,Gujarat.& 079-22820220.
SeleNO SteelS register ofNeW PrOJeCtS iN iNdiA 2007
255.
256.
257.
258.
Register of New Projects in India 2007METALLURGICAL INDUSTRIES
64NEW PROJECTS IN INDIA 2007
Register of
WeSterN regiON
Chhattisgarh
Akshay Ispat Udyog 5
Bharat Aluminium 14
Bhushan Power & Steel 16
Chhattisgarh Electricity 27
Dove Marine Exports 150
Ind Synergy 46
Jindal Steel & Power 55
Kushal Chemicals 181
Monnet Ispat & Energy 73
MSP Steel & Power 76
Nalwa Sponge Iron 78
National Mineral Dev Corp 81
Nutan Ispat 83
Raipur Alloys & Steel 203
Raipur Forgings & Castings 204
Rajesh Strips 92
Jammu & Kashmir
Chambal Alums 25
Punjab
Jhelum Cements 52
Rajasthan
Hallmark Steel 164
Lakshmanveer Steel 251
Rathi Bars 93
Ultratech Metals 122
Uttaranchal
Abhinandhan Steels 130
Hindustan Zinc 44
Uttar Pradesh
Gallantt Ispat 39
Jeet Metals 50
Pasupati Castings 195
Rana Girders 205
WeSterN regiON
Register of New Projects in India 2007METALLURGICAL INDUSTRIES
65NEW PROJECTS IN INDIA 2007
Register of
WeSterN regiON
Chhattisgarh
Akshay Ispat Udyog 5
Bharat Aluminium 14
Bhushan Power & Steel 16
Chhattisgarh Electricity 27
Dove Marine Exports 150
Ind Synergy 46
Jindal Steel & Power 55
Kushal Chemicals 181
Monnet Ispat & Energy 73
MSP Steel & Power 76
Nalwa Sponge Iron 78
National Mineral Dev Corp 81
Nutan Ispat 83
Raipur Alloys & Steel 203
Raipur Forgings & Castings 204
Rajesh Strips 92
Jammu & Kashmir
Chambal Alums 25
Punjab
Jhelum Cements 52
Rajasthan
Hallmark Steel 164
Lakshmanveer Steel 251
Rathi Bars 93
Ultratech Metals 122
Uttaranchal
Abhinandhan Steels 130
Hindustan Zinc 44
Uttar Pradesh
Gallantt Ispat 39
Jeet Metals 50
Pasupati Castings 195
Rana Girders 205
WeSterN regiON
Register of New Projects in India 2007METALLURGICAL INDUSTRIES
66NEW PROJECTS IN INDIA 2007
Register of
Gujarat Forgings 249
Mahindra Intertrade 187
Parikh Enterprises 85
Power Flow Copper 200
Raajaratna Metal 202
Saurashtra Ferrous 220
Shah Alloys 100, 222, 223
Shaifali Rolls 224
Steel Cast 231
Steelco Gujarat 112
Madhya Pradesh
Hindalco Industries 43
Jewel Seamless 176
Pioneer Engineering 89
Varun Agricultural Investments 125
WeSterN regiON
Rashmi Sponge Iron 207
Ravindra Mining Co 94
Seleno Steels 255
Shivalik Power & Steel 225
Shree Nakoda Ispat 226
Shri Bajrang Power & Ispat 102
Sunil Sponge Iron 257
Topworth Steels 121
Vandana Ispat 124
Venkatesh Energy & Metals 258
Vikas Metaliks & Energy 241
Gujarat
AIA Engineering 245
B R Technocast 246
Chhattisgarh Electricity 26
Electrotherm India 151
Essar Steel 37
WeSterN regiON
Register of New Projects in India 2007METALLURGICAL INDUSTRIES
67NEW PROJECTS IN INDIA 2007
Register of
Gujarat Forgings 249
Mahindra Intertrade 187
Parikh Enterprises 85
Power Flow Copper 200
Raajaratna Metal 202
Saurashtra Ferrous 220
Shah Alloys 100, 222, 223
Shaifali Rolls 224
Steel Cast 231
Steelco Gujarat 112
Madhya Pradesh
Hindalco Industries 43
Jewel Seamless 176
Pioneer Engineering 89
Varun Agricultural Investments 125
WeSterN regiON
Rashmi Sponge Iron 207
Ravindra Mining Co 94
Seleno Steels 255
Shivalik Power & Steel 225
Shree Nakoda Ispat 226
Shri Bajrang Power & Ispat 102
Sunil Sponge Iron 257
Topworth Steels 121
Vandana Ispat 124
Venkatesh Energy & Metals 258
Vikas Metaliks & Energy 241
Gujarat
AIA Engineering 245
B R Technocast 246
Chhattisgarh Electricity 26
Electrotherm India 151
Essar Steel 37
WeSterN regiON
Register of New Projects in India 2007METALLURGICAL INDUSTRIES
68NEW PROJECTS IN INDIA 2007
Register of
Pithampur Steels 198
Shriniwas Engineering 227
Sunder Rolling Mills 233
Sunflag Iron & Steel 115
Supreme Conductors 234
Uma Precision 237
Veer Gurjar Alluminium Industries 239
Viraj Profiles 243
WeSterN regiON
Maharashtra
Atlas Automotive 137
Bajaj Electricals 10
Chaman Metallics 24
Dewas Metal Sections 30
FIE Spherotech 248
Ghatge Patil industries 158
Grace Industries 161
Gupta Domestic Fuels 163
Hindalco Almex Aerospace 40
Ispat Industries 172
Jsons Foundry 57
Mahabal Metals 66
Mahalaxmi Ingots 67
Menon Alkop 70
Mukand 191
WeSterN regiON
Register of New Projects in India 2007METALLURGICAL INDUSTRIES
69NEW PROJECTS IN INDIA 2007
Register of
Pithampur Steels 198
Shriniwas Engineering 227
Sunder Rolling Mills 233
Sunflag Iron & Steel 115
Supreme Conductors 234
Uma Precision 237
Veer Gurjar Alluminium Industries 239
Viraj Profiles 243
WeSterN regiON
Maharashtra
Atlas Automotive 137
Bajaj Electricals 10
Chaman Metallics 24
Dewas Metal Sections 30
FIE Spherotech 248
Ghatge Patil industries 158
Grace Industries 161
Gupta Domestic Fuels 163
Hindalco Almex Aerospace 40
Ispat Industries 172
Jsons Foundry 57
Mahabal Metals 66
Mahalaxmi Ingots 67
Menon Alkop 70
Mukand 191
WeSterN regiON
Register of New Projects in India 2007METALLURGICAL INDUSTRIES
70NEW PROJECTS IN INDIA 2007
Register of
Sri Venkateswara Coil Mills 229
Suguna Ispat 114
Topaz Steel & Calcination India 120
Vinayak Steels 242
Karnataka
Aditya Pigiron 3
Arees Iron & Steel 8
Ashok Iron Works 136
Basai Steels 12
Benaka Sponge Iron 13
Bilasraika Steel 17
Gujarat NRE Coke 162
Hindalco Industries 42
HKT Mining 167
Hospet Steel 170
Hothur Steels 45
Jai Raj Ispat 174
SOutherN regiON
Andhra Pradesh
A.N. Steels 128
Alankar Alloys 132
Andhra Ferroalloys 133
Ennore Foundries 35
G. S. Alloy Castings 38
Jeevaka Industries 51
JSW Aluminium 58
Maks Industries 252
Meherkiran Enterprises 188
Narayanadri Power Projects 80
Nelcast 192
Pancharatna Metal Processing 84
Pioneer Torsteel Mills 197
Rashtriya Ispat Nigam 210
Sangam Wires 98
SMS Steels 106
SOutherN regiON
Register of New Projects in India 2007METALLURGICAL INDUSTRIES
71NEW PROJECTS IN INDIA 2007
Register of
Sri Venkateswara Coil Mills 229
Suguna Ispat 114
Topaz Steel & Calcination India 120
Vinayak Steels 242
Karnataka
Aditya Pigiron 3
Arees Iron & Steel 8
Ashok Iron Works 136
Basai Steels 12
Benaka Sponge Iron 13
Bilasraika Steel 17
Gujarat NRE Coke 162
Hindalco Industries 42
HKT Mining 167
Hospet Steel 170
Hothur Steels 45
Jai Raj Ispat 174
SOutherN regiON
Andhra Pradesh
A.N. Steels 128
Alankar Alloys 132
Andhra Ferroalloys 133
Ennore Foundries 35
G. S. Alloy Castings 38
Jeevaka Industries 51
JSW Aluminium 58
Maks Industries 252
Meherkiran Enterprises 188
Narayanadri Power Projects 80
Nelcast 192
Pancharatna Metal Processing 84
Pioneer Torsteel Mills 197
Rashtriya Ispat Nigam 210
Sangam Wires 98
SMS Steels 106
SOutherN regiON
Register of New Projects in India 2007METALLURGICAL INDUSTRIES
72NEW PROJECTS IN INDIA 2007
Register of
Kerala
Cochin Minerals & Rutiles 147
Kerala Minerals & Metals 62
Peekay Steel Casting 196
Southern Ispat 107
Tamil Nadu
Agni Steels 4
Aqua pumps Engineering 135
Best Engineers Pumps 139
Brakes Auto India 20
Castings & Allied Industries 22
CMS Consultants 28
Deivam Foundry 29
Ennore Foundries 153,154
Gajendra Agencies 156
Gandhikumar Foundry 157
Harihar Alloy Casting 250
SOutherN regiON
Jindal Aluminium 53
JSW Steel Processing Centres 178
Jindal South West Steel 56
Karnataka Gears 61
Kirloskar Ferrous Industries 63
Kudremukh Iron Ore Co 180
Mukand 191
Mysore Minerals 77
Padmavathi Ferrous 194
Parwaz Sponge Iron 86
Rosvar Iron & Power 214
Rukminirama Steel Rollings 96
Saravana Alloy Steels 99
SLR Metaliks 105
Surana Industries 235
Trivista Steel & Power 236
SOutherN regiON
Register of New Projects in India 2007METALLURGICAL INDUSTRIES
73NEW PROJECTS IN INDIA 2007
Register of
Kerala
Cochin Minerals & Rutiles 147
Kerala Minerals & Metals 62
Peekay Steel Casting 196
Southern Ispat 107
Tamil Nadu
Agni Steels 4
Aqua pumps Engineering 135
Best Engineers Pumps 139
Brakes Auto India 20
Castings & Allied Industries 22
CMS Consultants 28
Deivam Foundry 29
Ennore Foundries 153,154
Gajendra Agencies 156
Gandhikumar Foundry 157
Harihar Alloy Casting 250
SOutherN regiON
Jindal Aluminium 53
JSW Steel Processing Centres 178
Jindal South West Steel 56
Karnataka Gears 61
Kirloskar Ferrous Industries 63
Kudremukh Iron Ore Co 180
Mukand 191
Mysore Minerals 77
Padmavathi Ferrous 194
Parwaz Sponge Iron 86
Rosvar Iron & Power 214
Rukminirama Steel Rollings 96
Saravana Alloy Steels 99
SLR Metaliks 105
Surana Industries 235
Trivista Steel & Power 236
SOutherN regiON
Register of New Projects in India 2007METALLURGICAL INDUSTRIES
74NEW PROJECTS IN INDIA 2007
Register of
Sri Vishnu Foundry 230
Suguna Charitable Trust 232
Suzlon Energy 116
U R Casting & Alloys 123
Velumani Engineering Industry 126
SOutherN regiON
Harihar Forgings 165
Hysco Steel India 171
Janakiran Industries 175
Magna Electro Castings 185
Modern Foundry 189
Mohan Engineering Industries 71
Nandhini Castings 79
Nithya Industries 82
P.C. Sons Castings 253
Peekay Steel Casting 196
Prema Engineering 201
RMS Die Castings 211
Rosvar Steels 215
SAIL 217
Sakthe Shell 219
Southern Iron & Steel Co 228
Sri Sakthivel Murugan Castings 111
SOutherN regiON
Register of New Projects in India 2007METALLURGICAL INDUSTRIES
75NEW PROJECTS IN INDIA 2007
Register of
Sri Vishnu Foundry 230
Suguna Charitable Trust 232
Suzlon Energy 116
U R Casting & Alloys 123
Velumani Engineering Industry 126
SOutherN regiON
Harihar Forgings 165
Hysco Steel India 171
Janakiran Industries 175
Magna Electro Castings 185
Modern Foundry 189
Mohan Engineering Industries 71
Nandhini Castings 79
Nithya Industries 82
P.C. Sons Castings 253
Peekay Steel Casting 196
Prema Engineering 201
RMS Die Castings 211
Rosvar Steels 215
SAIL 217
Sakthe Shell 219
Southern Iron & Steel Co 228
Sri Sakthivel Murugan Castings 111
SOutherN regiON
Register of New Projects in India 2007METALLURGICAL INDUSTRIES
76NEW PROJECTS IN INDIA 2007
Register of
Pawanjai Steel & Power 88
Prakash Ispat 90
Prakash Roadlines Corp 254
Raj Refractories 91
SAIL 218
Sino Steel India 104
Spectrum Iron & Alloys 26
Tinplate Co of India 119
Venkateshwara Sponge & Iron 240
Orissa
Aarti Steels 129
Aditya Alumina 2
Adhunik Metaliks 131
Arcelor Mittal 7
Beekay Steel & Power 138
Bhushan Power & Steel 140,141
Bhushan Steel & Strips 142
eASterN regiON
Jharkhand
Adhunik Corp 1
Anindita Traders & Invests 6
Atibir Industries 9
Balmukund Sponge & Iron 11
Bhushan Power & Steel 15
BMW Industries 18
Bina Metal Way 247
Brahma Iron & Power 19
Brahmi Impex 144
Chaibasa Steel 23
Electrosteel Castings 34
Hindalco Industries 41
Ispat Industries 48
Jindal Steel & Power 54
Mahakalyani Steel & Mines 186
Monnet Ispat & Energy 72
eASterN regiON
Register of New Projects in India 2007METALLURGICAL INDUSTRIES
77NEW PROJECTS IN INDIA 2007
Register of
Pawanjai Steel & Power 88
Prakash Ispat 90
Prakash Roadlines Corp 254
Raj Refractories 91
SAIL 218
Sino Steel India 104
Spectrum Iron & Alloys 26
Tinplate Co of India 119
Venkateshwara Sponge & Iron 240
Orissa
Aarti Steels 129
Aditya Alumina 2
Adhunik Metaliks 131
Arcelor Mittal 7
Beekay Steel & Power 138
Bhushan Power & Steel 140,141
Bhushan Steel & Strips 142
eASterN regiON
Jharkhand
Adhunik Corp 1
Anindita Traders & Invests 6
Atibir Industries 9
Balmukund Sponge & Iron 11
Bhushan Power & Steel 15
BMW Industries 18
Bina Metal Way 247
Brahma Iron & Power 19
Brahmi Impex 144
Chaibasa Steel 23
Electrosteel Castings 34
Hindalco Industries 41
Ispat Industries 48
Jindal Steel & Power 54
Mahakalyani Steel & Mines 186
Monnet Ispat & Energy 72
eASterN regiON
Register of New Projects in India 2007METALLURGICAL INDUSTRIES
78NEW PROJECTS IN INDIA 2007
Register of
Rohit Ferro Tech 213
Rourkela Steel Plant 95, 216
Rungta Mines 97
Scan Steels 221
Shree Ram Sponge & Steel 256
Stork Ferro & Mineral Industries 113
Tata Metaliks 117
Tata Sponge Iron 118
Utkal Alumina International 127
Visa Steel 244
Tripura
D S Group 149
West Bengal
Ankit Metal & Power 134
BMW Industries 143
Burakia Steel Alloys 21
C. P. Re-rollers 146
eASterN regiON
Brand Alloys 145
Dinbandhu Steel & Power 31
Essar Steel 36
Hindalco Industries 166
Indian Rare Earths 47
Jagdamba Iron & Steel 173
Jindal Steel & Power 177
Lal Traders & Agencies 64
Lloyds Steel Industries 184
Maithan Ispat 68
Monnet Ispat & Energy 74
MSP Metallics 75
Orion Ispat 193
Patwari Steels 87
POSCO India 199
Rathi Udyog 208
Real India Consultancy 209
eASterN regiON
Register of New Projects in India 2007METALLURGICAL INDUSTRIES
79NEW PROJECTS IN INDIA 2007
Register of
Rohit Ferro Tech 213
Rourkela Steel Plant 95, 216
Rungta Mines 97
Scan Steels 221
Shree Ram Sponge & Steel 256
Stork Ferro & Mineral Industries 113
Tata Metaliks 117
Tata Sponge Iron 118
Utkal Alumina International 127
Visa Steel 244
Tripura
D S Group 149
West Bengal
Ankit Metal & Power 134
BMW Industries 143
Burakia Steel Alloys 21
C. P. Re-rollers 146
eASterN regiON
Brand Alloys 145
Dinbandhu Steel & Power 31
Essar Steel 36
Hindalco Industries 166
Indian Rare Earths 47
Jagdamba Iron & Steel 173
Jindal Steel & Power 177
Lal Traders & Agencies 64
Lloyds Steel Industries 184
Maithan Ispat 68
Monnet Ispat & Energy 74
MSP Metallics 75
Orion Ispat 193
Patwari Steels 87
POSCO India 199
Rathi Udyog 208
Real India Consultancy 209
eASterN regiON
Register of New Projects in India 2007METALLURGICAL INDUSTRIES
80NEW PROJECTS IN INDIA 2007
Register of
Modern India Con-cast 190
Rashmi Metaliks 206
Rohit Ferro Tech 212
Shri Badrinarain Allys & Steels 101
Shyam Steel Industries 103
Sova Electrocasting 108
Sova Ispat 109
Vikash Smelters 127
eASterN regiON
Cosmic Ferro Alloys 148
Divya Jyoti Sponge Iron 32
Electrosteel Castings 33
Ennore Coke 152
Gajanan Iron 155
Golden Ispat Casting 159
Gontermann Peipers India 160
Hooghly Alloy & Steels 168
Hooghly Metcoke & Power 169
Jai Balaji Sponge 49
JSW Steel 59
Kamini Ferrous 60
Kauntia Castings 179
Lalbaba Seamless Tubes 182
Lalwani Ferro Alloys 183
Laxmi Vayaapar 65
Manaksia 69
eASterN regiON
Register of New Projects in India 2007METALLURGICAL INDUSTRIES
81NEW PROJECTS IN INDIA 2007
Register of
Modern India Con-cast 190
Rashmi Metaliks 206
Rohit Ferro Tech 212
Shri Badrinarain Allys & Steels 101
Shyam Steel Industries 103
Sova Electrocasting 108
Sova Ispat 109
Vikash Smelters 127
eASterN regiON
Cosmic Ferro Alloys 148
Divya Jyoti Sponge Iron 32
Electrosteel Castings 33
Ennore Coke 152
Gajanan Iron 155
Golden Ispat Casting 159
Gontermann Peipers India 160
Hooghly Alloy & Steels 168
Hooghly Metcoke & Power 169
Jai Balaji Sponge 49
JSW Steel 59
Kamini Ferrous 60
Kauntia Castings 179
Lalbaba Seamless Tubes 182
Lalwani Ferro Alloys 183
Laxmi Vayaapar 65
Manaksia 69
eASterN regiON
Register of New Projects in India 2007METALLURGICAL INDUSTRIES
82NEW PROJECTS IN INDIA 2007
Register of
B
Bars MS 130, 195
Bars Steel 67, 93 , 164
Bars round 1 15, 243
Billets 18, 49, 51, 72, 76, 81, 105, 114,
120,125, 129, 138,162, 165, 214
Billets Steel 74, 107, 198,
Billets MS 97, 114
Bright Bar 16, 237
C
Casters Bloom 55, 131
Casters SS 131
Cast Iron 22, 29, 34, 66, 126, 135, 157, 185, 220
Cast Iron Products 220
Castings Aluminium 211
Castings Iron 29,175, 179, 201, 230
Castings 139
Product index
A
Alloy 28
Alloy Castings 22
Alloy Ferro 11, 26, 73, 91, 113, 121, 124, 131, 145, 148, 183, 190, 212
Alloy Steel 16, 21
Alumina 58
Alumina Refinery 2
Aluminium 2, 53, 238
Aluminium Rolling Ingots 40
Aluminium Slabs 40
Aluminium Alloy 239
Aluminium Billets 40
Aluminium Foil 229
Aluminium Smelter 42, 43
Angles & Channels 115
Product index
Register of New Projects in India 2007METALLURGICAL INDUSTRIES
83NEW PROJECTS IN INDIA 2007
Register of
B
Bars MS 130, 195
Bars Steel 67, 93 , 164
Bars round 1 15, 243
Billets 18, 49, 51, 72, 76, 81, 105, 114,
120,125, 129, 138,162, 165, 214
Billets Steel 74, 107, 198,
Billets MS 97, 114
Bright Bar 16, 237
C
Casters Bloom 55, 131
Casters SS 131
Cast Iron 22, 29, 34, 66, 126, 135, 157, 185, 220
Cast Iron Products 220
Castings Aluminium 211
Castings Iron 29,175, 179, 201, 230
Castings 139
Product index
A
Alloy 28
Alloy Castings 22
Alloy Ferro 11, 26, 73, 91, 113, 121, 124, 131, 145, 148, 183, 190, 212
Alloy Steel 16, 21
Alumina 58
Alumina Refinery 2
Aluminium 2, 53, 238
Aluminium Rolling Ingots 40
Aluminium Slabs 40
Aluminium Alloy 239
Aluminium Billets 40
Aluminium Foil 229
Aluminium Smelter 42, 43
Angles & Channels 115
Product index
Register of New Projects in India 2007METALLURGICAL INDUSTRIES
84NEW PROJECTS IN INDIA 2007
Register of
Castings Zinc 44
Coal Dust 216
Chromites 77
Coal Tar Products 124
Coils CR 112, 149
Coils HR 14, 223
Coils Steel 187
Cold Rolled Formed Metal and Components 30
Cold Rolling Close & Annealed 178
Cold Rolled Coil 222
Cold Rolled Iron Coil 100
Coke 162
CR Sheets & Coils 149
Concast pelletisation 186
Copper Metal 25
Copper products 85
Copper rod and wire 234
Product index
Casting CI 156, 189, 246, 248,
Casting Aluminium 137, 211
Castings Iron 79, 108, 230, 249, 252
Castings Ferrous 71
Casting Non Ferrous 71
Castings Carbon Alloy 196
Casting Carbon Steel 123
Castings Copper rods, pipes, sheets and dies 50
Castings Die 70
Castings Duct Iron 35
Castings GS, GI 158, 192, 219, 248
Castings Iron S G 153
Casting Steel 16, 20, 29, 108, 196, 230
Castings Stainless Steel 123, 196, 243
Castings SG Iron 246
Castings and Wires 122
Castings Wear Resistant 28
Product index
Register of New Projects in India 2007METALLURGICAL INDUSTRIES
85NEW PROJECTS IN INDIA 2007
Register of
Castings Zinc 44
Coal Dust 216
Chromites 77
Coal Tar Products 124
Coils CR 112, 149
Coils HR 14, 223
Coils Steel 187
Cold Rolled Formed Metal and Components 30
Cold Rolling Close & Annealed 178
Cold Rolled Coil 222
Cold Rolled Iron Coil 100
Coke 162
CR Sheets & Coils 149
Concast pelletisation 186
Copper Metal 25
Copper products 85
Copper rod and wire 234
Product index
Casting CI 156, 189, 246, 248,
Casting Aluminium 137, 211
Castings Iron 79, 108, 230, 249, 252
Castings Ferrous 71
Casting Non Ferrous 71
Castings Carbon Alloy 196
Casting Carbon Steel 123
Castings Copper rods, pipes, sheets and dies 50
Castings Die 70
Castings Duct Iron 35
Castings GS, GI 158, 192, 219, 248
Castings Iron S G 153
Casting Steel 16, 20, 29, 108, 196, 230
Castings Stainless Steel 123, 196, 243
Castings SG Iron 246
Castings and Wires 122
Castings Wear Resistant 28
Product index
Register of New Projects in India 2007METALLURGICAL INDUSTRIES
86NEW PROJECTS IN INDIA 2007
Register of
H
Hot Metal 210
Hot Rolling Pickled & Oiled 178
Hot Rolled Products 132
Hot Rolled MS Coil 223
Hot Rolled Semi Finished Iron 68
Hot strip mill 56
I
Ingots 40, 114, 125, 193, 224
Ingots MS 51, 193
Ingots SS 176
Ingots Steel 52, 60, 72, 120, 155, 215
Iron Grey 153, 227
Iron SG 89, 189
Iron ore 77, 254, 258
Iron ore pelletisation 12, 17, 24, 27, 75, 83,
121, 124, 167, 184, 237, 241
Product index
Copper strips and tubes 200
Crude & Finished Steel Products 177
D
Direct Reduced Iron 16,18 , 76, 77, 124
Ductile iron pipes 34, 117
M
Metal powder 181
F
Ferro Chrome 113, 209, 245
Ferro Chrome Carbon 133
Fly Ash Waste Product 124
Finished Hot Rolled Products 46
G
Galvanised wire 16
Galvanised Pre printed Steel Sheets & Rolls 61
Gun Metal 111
Gulmuri Coli & Sheets 119
Product index
Register of New Projects in India 2007METALLURGICAL INDUSTRIES
87NEW PROJECTS IN INDIA 2007
Register of
H
Hot Metal 210
Hot Rolling Pickled & Oiled 178
Hot Rolled Products 132
Hot Rolled MS Coil 223
Hot Rolled Semi Finished Iron 68
Hot strip mill 56
I
Ingots 40, 114, 125, 193, 224
Ingots MS 51, 193
Ingots SS 176
Ingots Steel 52, 60, 72, 120, 155, 215
Iron Grey 153, 227
Iron SG 89, 189
Iron ore 77, 254, 258
Iron ore pelletisation 12, 17, 24, 27, 75, 83,
121, 124, 167, 184, 237, 241
Product index
Copper strips and tubes 200
Crude & Finished Steel Products 177
D
Direct Reduced Iron 16,18 , 76, 77, 124
Ductile iron pipes 34, 117
M
Metal powder 181
F
Ferro Chrome 113, 209, 245
Ferro Chrome Carbon 133
Fly Ash Waste Product 124
Finished Hot Rolled Products 46
G
Galvanised wire 16
Galvanised Pre printed Steel Sheets & Rolls 61
Gun Metal 111
Gulmuri Coli & Sheets 119
Product index
Register of New Projects in India 2007METALLURGICAL INDUSTRIES
88NEW PROJECTS IN INDIA 2007
Register of
Steel Sheet 172
Steel Cold Rolled Sheet 171
Sponge Iron 1, 4, 5, 12, 13, 19, 23, 39,72, 74,
78 , 80, 81, 86, 87, 88, 91, 94, 96,
99, 101, 103, 109, 110, 145, 144 ,
118, 129, 141, 146, 150, 161, 163,
174,177, 194, 197, 203, 208, 213,
221, 226, 235, 236, 255, 257, 240, 244
SS wires and bars 202
Steel 7, 8, 11, 28, 59, 142, 191
Steel Coils & Sheet 217
Steel Rolled Products 115
Stainless Steel 16
Steel Crude 141
Steel Crude Products 54
Steel Casting 253
Steel Galvanised 10, 143 , 149
Steel Hot Rolled 143 , 233
Product index
L
Long Products 104
M
Met Coke 152 , 188
Monazite 47
MSProducts 145
PPig Iron 3, 6, 9, 11, 17, 18, 46, 63, 68, 76, 90,
101, 102, 105 , 106, 107, 105, 127, 140,
141, 151, 159, 165, 168,173, 186, 206, 207
Pumps and valves 57
R
Rolls Iron & Steel 160
Rerolled Product 76
Rolled Product 16
S
Seamless tubes and Pipes 65, 182
Semi finished steel products 46, 54
Product index
Register of New Projects in India 2007METALLURGICAL INDUSTRIES
89NEW PROJECTS IN INDIA 2007
Register of
Steel Sheet 172
Steel Cold Rolled Sheet 171
Sponge Iron 1, 4, 5, 12, 13, 19, 23, 39,72, 74,
78 , 80, 81, 86, 87, 88, 91, 94, 96,
99, 101, 103, 109, 110, 145, 144 ,
118, 129, 141, 146, 150, 161, 163,
174,177, 194, 197, 203, 208, 213,
221, 226, 235, 236, 255, 257, 240, 244
SS wires and bars 202
Steel 7, 8, 11, 28, 59, 142, 191
Steel Coils & Sheet 217
Steel Rolled Products 115
Stainless Steel 16
Steel Crude 141
Steel Crude Products 54
Steel Casting 253
Steel Galvanised 10, 143 , 149
Steel Hot Rolled 143 , 233
Product index
L
Long Products 104
M
Met Coke 152 , 188
Monazite 47
MSProducts 145
PPig Iron 3, 6, 9, 11, 17, 18, 46, 63, 68, 76, 90,
101, 102, 105 , 106, 107, 105, 127, 140,
141, 151, 159, 165, 168,173, 186, 206, 207
Pumps and valves 57
R
Rolls Iron & Steel 160
Rerolled Product 76
Rolled Product 16
S
Seamless tubes and Pipes 65, 182
Semi finished steel products 46, 54
Product index
Register of New Projects in India 2007METALLURGICAL INDUSTRIES
90NEW PROJECTS IN INDIA 2007
Register of
Steel Long 15
Steel Pipes 33
Steel Flat Products 37
Steel Products 51, 68, 115, 142
Steel rolling 84 , 242
Steel slab 36
Steel Strip 130
Steel Tubes 247
Steel Wires high tensile 98
Titanium 62, 147
TMT bars 6 , 32 , 195 , 205, 251 , 256
Wires 16
Product index