8/16/2019 Regional Infrastructure Development Master Plan Executive Summary
1/40
Regional InfrastructureDevelopment Master Plan
Execuiv SmaryAugust 2012
-
8/16/2019 Regional Infrastructure Development Master Plan Executive Summary
2/40
Angola
Boswana
DRC
Lesoho
Madagascar
Malawi
Mauriius
Mozambique
Namibia
Seychelles
Souh Arica
Swaziland
anzania
Zambia
Zimbabwe
Acknowledgements
We would like o express our sincere graiude o heDeparmen or Inernaional Developmen (DFID), hroughradeMark Souhern Arica (MSA) as he key sponsoro he developmen o he SADC Regional InrasrucureDevelopmen Maser Plan (RIDMP), wihou which we couldno have achieved his milesone in he advancemen o ourRegional Inegraion Agenda
We also wish o exend our appreciaion o he EuropeanUnion (EU) and Developmen Bank o Souhern Arica (DBSA)or making significan conribuions owards his process.
-
8/16/2019 Regional Infrastructure Development Master Plan Executive Summary
3/40
1Execuiv Smary
Foreword rom he SADC Chairperson 2
From he Execuive Secreary’s Desk 3
Te SADC – Regional Inrasrucure Developmen Maser Plan 4
Energy 6
ourism 7
ranspor 8
Inormaion and Communicaion echnologies (IC) 10
Meeorology 12
Waer 13
RIDMP Implementation Sraegies 15
Criical Success Facors or Projec Implemenaion 16Conclusion 18
Annex 1 19
Annex 2 27
Content
-
8/16/2019 Regional Infrastructure Development Master Plan Executive Summary
4/40
Execuiv Smary2
My Esteemed Colleagues,
One year has come and gone since he las Ordinary Summi held in Luanda,Angola, in Augus 2011, during which we were honoured o Chair our augusbody, he Souhern Arican Developmen Communiy (SADC). During haperiod, we were humbled by he unequalled cooperaion ha we receivedrom yourselves and oher Member Sae represenaives wihin oher SADC
policy srucures wih which we collaboraed. You will recall, Your Excellencies,ha a he very ouse o our ascendancy o he SADC Chair, we idenifiedinrasrucure developmen as no only a prioriy, bu as an area which wewere going o champion. We ook he reins a a ime when he process ocrafing he SADC Regional Inrasrucure Developmen Maser Plan (RIDMP)had jus commenced, guided by he Execuive Secreary. I was very clear hahe adven o he RIDMP would usher an opporuniy or Member Saes osrike consensus on prioriy projecs, which would consiue he basis or noonly our cooperaion as Member Saes, bu our cooperaion as a region wihInernaional Cooperaion and Developmen Parners.
Te SADC Inrasrucure Maser Plan has now been compleed or our reviewand adopion. Perusal o he documens no doub suggess ha a lo o work
was underaken by he Member Saes, assised by he SADC Secrearia. I ammade o undersand ha he process was underaken by regional consulans,which is highly commendable. I wish o commend he Execuive Secreary andhis eam or puing ogeher his piece o work, enabling he region o achievehis hisoric milesone, especially given he ariculaion o our prioriies oninrasrucure developmen. I am mos inspired by he Maser Plan – Shor-ermAcion Plan (SAP), which elaboraes on he projecs ha will be implemenedin he shor erm. Tese projecs are a differen levels o developmen, bu allo hem are scheduled o be compleed during phase 1 o his plan. Tose in hepreliminary sages are he realisic candidaes o be packaged hrough undingrom he SADC Projecs Preparaion Developmen Faciliy (PPDF), besidesoher exising global mechanisms, o ensure ha he region has a pipeline obankable projecs in which we are confiden and can solici serious appeie orunding and invesmen by boh public and privae off-akers.
I would be remiss on my par i I did no recognise he suppor received romhe UK Deparmen or Inernaional Developmen (DFID), hrough radeMarkSouhern Arica (MSA), he main under o he RIDMP developmen process.I would also like o commend he European Union and he DevelopmenBank o Souhern Arica (DBSA), boh o which provided significan resourceso complemen he process wihin he ramework o he SADC-InernaionalCooperaing Parner (ICP) parnership, as espoused by he WindhoekDeclaraion.
I is imporan ha we clearly lay ou our sraegy or he implemenaion o heRIDMP, bearing in mind ha he Plan is no an end in isel, bu a means o anend. Consequenly I am comored by he ac ha insiuional arrangemens
and a ramework or monioring, evaluaion and reporing on implemenaiono he RIDMP has been agreed, as ariculaed by he Plan o Acion.
Inrasrucure is he bedrock o our economic developmen and he deepeningo our regional inegraion. I is hereore criical ha, as Summi, we accordall our suppor o he implemenaion o he RIDMP. I noe wih grea prideha, as par o our roadmap, a SADC Inrasrucure Invesmen Summi hasbeen pencilled or nex year. I urge you all o accord his process considerableprioriy and indeed suppor. Angola is proud o no only have been pary ohis process, bu o have led and guided i o successul conclusion, hanks oyour cooperaion.
HE José Eduardo Dos Santos, President, Republic of Angola and outgoing SADC
Chairperson
FOREWORDFROM
THE SADC
CHAIRPERSON
-
8/16/2019 Regional Infrastructure Development Master Plan Executive Summary
5/40
3Execuiv Smary
Your Excellencies, you will recall ha during your brainsorming session onhe Up-scaling o he Implemenaion o Inrasrucure in he Region a heLusaka Summi held in Augus 2007, you direced Council o oversee hedevelopmen o he Souhern Arican Developmen Communiy (SADC)Regional Inrasrucure Developmen Maser Plan (RIDMP), which wouldconsiue he Inrasrucure Developmen Blueprin or our region. Pursuano your wise counsel, and ollowing he successul mobilisaion o resources
rom our parners, he process o developing he RIDMP commenced inearnes in 2011. Te process was characerised by a broad-based consulaiveprocess in which Member Saes were cenral in elaboraing he inrasrucureprojecs, suppored by all our key sakeholders and he privae secor. I wisho commend he echnical expers, senior officials and our minisers or akinghe developmen o he RIDMP hrough a painsaking, bu necessary, processo ensure ha i reached a waershed, namely a sage where Member Saes cansar implemening inrasrucure in a sysemaic and holisic manner, guidedby agreed prioriies wihin he Plan. SADC mainains is pracice regardingemphasis on developmen o inrasrucure, or which i has been renownedover he years. Te delivery o he RIDMP ushers a new opporuniy o up-scalehis process, or which we need o creae he necessary enabling environmenor invesmen in his area. Our prioriy, as a Communiy o Saes, remains he
deepening o our regional inegraion and addressing our overarching objeciveo povery reducion. Tere is no doub ha he provision o inrasrucureprovides a launch pad or hese inervenions.
Te RIDMP is aligned o he Programme or Inrasrucure Developmen inArica, as well as he COMESA-EAC-SADC Iner-Regional Inrasrucure MaserPlan, and no doub lays a oundaion or he developmen o he AricanEconomic Communiy, as espoused by he Lagos Plan o Acion and he Abujareay. Implemenaion o he RIDMP will enable us o consolidae he SADCFree rade Area, he COMESA-EAC-SADC riparie Grand Free rade Area,as we march owards he oal inegraion o Arica, guided by he ideals o ourounding ahers, whose legacy remains unparalleled.
I am confiden ha, hrough your disinguished leadership, you will coninue o
guide his region o unprecedened success, especially on he implemenaiono inrasrucure. Te ac ha SADC has successully implemened inrasrucureis no longer an issue or debae, he issue a sake is how can we up-scale hedelivery o world-class inrasrucure o our people in he region and in Aricaas a whole.
I is criical, as we seek o accelerae our inrasrucure programme, ha weseriously address ransi aciliaion or our six landlocked counries, Boswana,Lesoho, Malawi, Swaziland, Zambia and Zimbabwe, in order or hose counrieso enjoy realisic, compeiive prices or landed producs as well as expors oglobal markes. Tere can be no doub ha any meaningul implemenaion ohe RIDMP should accord prioriy o addressing power shortalls in he region,hrough he developmen and commissioning o requisie power generaion
and ransmission inrasrucure, as main concerns o he prioriy. Te iner-connecion o Angola, Malawi and he Unied Republic o anzania is necessaryo enable he migraion o hese Member Saes o Operaing Members o heSouhern Arican Power Pool.
Le me underscore he sraegic imporance o resources or he implemenaiono inrasrucure. Firs, i is criical ha resources be allocaed or projecpreparaion hrough he SADC Projec Preparaion and Developmen Faciliy(PPDF), as well as or invesmen hrough, among ohers, he SADC DevelopmenFund. We are looking orward o make available bankable projecs which heregion would seek o promoe among invesors.
FROM THE
EXECUTIVESECRETARY’SDESK
Going orward, our minisers have pu in place heappropriae insiuional mechanisms o oversee he
implemenaion o inrasrucure, suppored by hePlan o Acion. Te role o Member Saes in leadinghis process is pivoal, wih he SADC Secreariacenral o he coordinaion o and reporing on heprocess.
I have no doub, Your Excellencies, ha his process isdoable, le’s go or i!
Tomáz Augusto Salomão
Executive Secretary
-
8/16/2019 Regional Infrastructure Development Master Plan Executive Summary
6/40
Towards a common futureTe Souhern Arican Developmen Communiy (SADC) Inrasrucure Vision2027 was conceived a he 2007 Lusaka Summi in Lusaka, Zambia, wih heobjecive o esablishing a sraegic ramework o guide he developmen oseamless, cos-effecive rans-boundary inrasrucure. Te SADC InrasrucureVision 2027 is anchored on six pillars consising o energy, ranspor, inormaionand communicaion echnologies (IC), meeorology, rans-boundary waerresources and ourism (rans-ronier conservaion areas), which consiue heSADC Regional Inrasrucure Developmen Programme. Te six inrasrucurepillars are esablished on a solid oundaion o harmonised policies andregulaions, capped by a join pool o human resource capaciy developmenand a concered effor o engender public awareness and commimeno hese goals. Te compeiiveness o he SADC will, o a larger exen,depend on join acion and join pooling o available resources o achievehe comprehensive developmen o inrasrucure as envisioned by he SADCInrasrucure Vision 2027.
Te Regional Inrasrucure Developmen Maser Plan (RIDMP) Sudy revealedha he region currenly aces a number o challenges wih regard o heprovision o adequae regional inrasrucure. Te compelling indicaorshighlighed by he Sudy insil a sense o urgency or he region o expediehe implemenaion o sraegies o bridge he idenified gaps and eliminaebolenecks o unlock he regional poenial o SADC.
Te sudy prognosis is ha he curren populaion o he SADC region, which isa approximaely 272 million, will grow a he rae o abou 1.7% per annum oreach approximaely 350 million by 2027. Te siuaional analysis also revealed
ha he region is no coping wih curren inrasrucure requiremens. Tis,hereore, requires an innovaive approach in order o respond posiively o hegreaer challenges o a more complicaed uure, especially when compoundedby rising compeiion brough abou by increasing globalisaion.
The SADC –Regional
InfrastructureDevelopmentMaster Plan
Execuiv Smary4
-
8/16/2019 Regional Infrastructure Development Master Plan Executive Summary
7/40
Te Diagnosic Repor o he RIDMP draws aenion o he ac ha he regionis acing a number o challenges, including:
• Insucient energy supply to serve increased production and to extendaccess;
• Highly priced, unpredictable transport and logistics services, especially for
landlocked saes;• Lack of low-cost access to information and communications technologies;
• Inadequate meteorological services for eective and ecient planning andmanagemen o waer resources, energy producion, ranspor services andoher climae-sensiive secors;
• Unacceptably high number of citizens without access to safe drinkingwaer, adequae saniaion and waer or irrigaion o improve sysems oragriculural producion which will conribue o ood securiy; and
• Slow response to new tourism trends and opportunities.
Te SADC region is embarking on he undamenal ask o creaing an enabling
environmen by delivering inrasrucure requiremens by 2027 in order oaciliae he realisaion o susainable regional socio-economic developmenand inegraion wihin he ramework o he SADC Inrasrucure Vision 2027.While some o he proposed arges appear o be ambiious, he region hasadequae poenial o susain he envisaged developmen requiremenshrough commimen and coninued collaboraion.
Te challenges and aspiraions oulined above generae he imperaivenecessiy o drive he SADC Inrasrucure Vision 2027 by ranslaing i inoa rolling programme, anchored on he six pillars consiuing he regionalinrasrucure programme.
5Execuiv Smary
-
8/16/2019 Regional Infrastructure Development Master Plan Executive Summary
8/40
Execuiv Smary6
Te region has made significan srides in he esablishmen o regionalinrasrucure in he elecriciy sub-secor, as evidenced by he inerconneciono nine o SADC Member Saes o he regional power pool, he SouhernArican Power Pool (SAPP). Te inerconnecion o hese Member Saes hasopimised power sysem producion and rade. Wha is now clearly urgen inhe Regional Energy Secor Programme is he connecion o he remaining hreemainland Member Saes, Angola, Malawi and anzania, o he SAPP.
Te RIDMP has revealed ha, nowihsanding he curren inerconneciviyachievemens, he SADC region sill aces a number o challenges wih regard oenergy delivery, access and price. Te Sudy ’s ineresing indicaors reveal ha:
• Some of the SADC countries have less than 5% rural access to electricity;
• Comparatively, the SADC region lags behind its sister Regional EconomicCommuniies (RECs) in respec o overall access o elecriciy. 24% o SADCresidens have access o elecriciy compared o 36% in he Easern AricaPower Pool (EAPP) and 44% in Wesern Arica Power Pool (WAPP);
• e SADC region has been facing an electricity decit since 2007 and theexpectations are that the identied gap will be met by 2014. However,indicaions are ha he implemenaion o projecs can lag behind heirplanned daes due o a lack o unding;
• Low taris, poor project preparation, no o-takers that can sign PowerPurchase Agreemens (PPAs) under single buyer models and a lack o requiredpolicy/regulaory rameworks are hampering invesmen and financing;
• To date, coal has been the backbone of power generation in the region(conribuing 75%), ye is considered an unclean uel under he globalwarming debae;
• e petroleum and gas sub-sector is plagued by volatile prices. Althoughhe region is endowed wih peroleum and gas resources, a lo o i is noavailable due o oreign commimens or inadequae inrasrucure; and
• Large, estimated renewable energy (RE) potential needs infrastructure forgrid connecion, manuacuring and qualiy esing, and alhough he pricesare coming down, RE needs innovaive financing.
Te Energy Secor Plan (ESP) is designed o address our key sraegic objecives,namely ensuring energy securiy, improving access o modern energy services,apping he abundan energy resources and achieving financial invesmenand environmenal susainabiliy. Collecively, hese acors conribue o heSADC energy goal o achieving adequae, reliable, lowes cos, environmenallysusainable energy services or economic growh and povery eradicaion.
Idenified ‘hard’ inrasrucure projecs include he planned elecriciygeneraion and ransmission projecs; refineries, sorage aciliies and pipelinesor he peroleum and gas; and ranspor aciliies or coal disribuion andexpors. Mos o he regional energy projecs are already included in heelecriciy plan. In addiion o he defici in ‘hard’ inrasrucure, here are alsoshortalls in he ‘sof’ inrasrucure such as a lack o coordinaed planning,
harmonised requisie policy and regulaory rameworks, insiuional suppor,capaciy, financing and invesmen.
Te Sudy idenified 73 power generaion projecs o increase generaion romhe curren 56 000 MW and surpass he projeced demand o 96 000 MW by2027. Tree major inerconnecing projecs would aciliae he inerconneciono Angola, Malawi and anzania o he SAPP. Te esimaed invesmen cos o allplanned elecriciy generaion projecs is US$62 billion or he shor erm (2012– 2017), US$39 billion or he medium erm (2017 – 2022) and US$72 billionor he long erm (2022 – 2027), oalling US$173 billion. Prioriised generaionprojecs wih capaciy greaer han 1000 MW were esimaed in his sudy ocos beween US$65 billion and US$104 billion, while hose prioriised wih acapaciy o less han 1000 MW were esimaed o cos beween US$7 billionand US$18 billion. Te oal cos o he prioriised projecs would rangebeween US$42 billion and US$122 billion. In addiion, he esimaed cos orprioriy iner-connecor and ransmission projecs is US$3 billion.
ENERGY
-
8/16/2019 Regional Infrastructure Development Master Plan Executive Summary
9/40
7Execuiv Smary
TOURISM
Te region recognises he urgen need o improve ourism inrasrucure inreadiness or he orecased growh ha could see he SADC region receivingapproximaely fify-eigh percen (58%) o he oal coninenal raffic by 2027.
Recen repors indicae ha inernaional ouris arrivals increased rom882 million in 2009 o 940 million in 2010 and reached 980 million in 2011.ourism receips improved rom US$852 billion in 2009 o US$940 billion in
2010 (Unied Naions World ourism Organizaion (UNWO), 2012 Repor).Te UNWO orecass a growh o 3% or he secor in 2012 and expecsinernaional ouris arrivals o reach he one billion mark.
I has also been observed ha rends in he ourism markes show a shif romhe radiional sun, sea and sand mass ourism o more personalised, responsibleand experienial holidays. ouriss are araced by ehical values relaing osocial, culural and environmenal responsibiliy wihin he places hey visiand he producs hey use. Furhermore, growh in he secor’s differenmarke segmens is being influenced by he consumer’s search or “auhenicexperiences”.
Tis shif has, in many ways, benefied he Arican coninen, mainly because
o is diverse culural and geographical naure. ouris arrivals in he Aricanconinen increased rom 46 million in 2009 o 49.8 million in 2010. Tehighes growh was experienced in he Sub-Saharan region, which regisered14% growh during he same period. oal ouris arrivals in he SADC regiongrew rom 20.5 million in 2009 o 21.5 million in 2010 (REOSA, 2011 AnnualRepor).
Te SADC region has deployed a number o sraegies in response o heserequiremens so as o ensure ha i reains and susains his conemporarymarke. One o he sraegies is he developmen o rans-Fronier ConservaionAreas (FCAs) o ensure he ease o movemen o ouriss across he SADCregion, wilderness proecion, employmen creaion and income generaion inrural areas, which ranslaes ino an improved qualiy o lie or he ciizens ohis region.
Te RIDMP indicaes ha he number o ouriss coming o he SADCregion could riple by 2027, hence here is an urgen need o have physicalinrasrucure in he FCAs o capure and increase he marke share.
Te ourism Chaper idenified an Inrasrucure Developmen Acion Plan,comprising five prioriy projecs, among ohers, or implemenaion wihinhe regional rans-ronier Conservaion Areas. Te esimaed coss or heseprojecs is US$1.1 billion.
-
8/16/2019 Regional Infrastructure Development Master Plan Executive Summary
10/40
Execuiv Smary8
Te ranspor secor enails road ranspor, rail ranspor, pors, mariime andinland waerways, as well as air ranspor. Te need o capaciae he SADCSecrearia o underake he criical role o coordinaing and aciliaingsraegic policy ormulaion and implemenaion in he ranspor secor cannobe overemphasised.
Surface TransportTe highlighs o he ranspor diagnosic analysis indicae ha here is awidening gap in he provision o inrasrucure in he surace ranspor sub-secor across he region. While roads have improved in mos counries, railwaylines have seen minimal improvemen. Te repors highligh he sraegyadoped by he region in response o hese challenges and in recogniion oan urgen need o inensiy regional ranspor programmes, which enhancemulimodal ranspor linkages and improve inerconneciviy. In his regard, heregion adoped a Spaial Corridor Developmen Sraegy in 2008, which hasyielded he flagship programme, he Norh-Souh Corridor Projec.
Te SADC corridor approach o regional developmen is based on boh well-mainained, operaed inrasrucure and he provision o seamless ranspor
services. Te realisaion o rade projecions will require increased capaciyand perormance o he ranspor and logisics secor o serve boh inra-regional and overseas rade. Te Programme or Inrasrucure Developmenor Arica (PIDA), which is a coninenal sraegic ramework or inrasrucuredevelopmen, orecass indicaors or he SADC region as ollows:
• Transit trac for landlocked SADC countries1 will increase rom 13 milliononnes in 2009 o 50 million onnes by 2030 and 148 million by 2040, aan average annual growh rae o 8.2%. Mos regional pors handle only 30-50% ransi raffic, meaning ha acual por volumes will be ar higher;
• Total port trac in Southern Africa will jump from 92 million tonnes in 2009o 500 million onnes by 2027;
• Current projects for additional container terminals at Dar-es-Salaam willonly provide adequae conainer capaciy unil 2020; planning or urherexpansion and/or a new por should commence;
• OR Tambo International Airport in Johannesburg will have demand for2 million passengers per year by 2030 and 3 million by 2040; and
• Lusaka International Airport currently operates at 70% capacity, butwill reach 124% o capaciy by 2020. Aeropor de Kinshasa (DemocraicRepublic o he Congo (DRC)) is currenly operaing a 70% o capaciy andwill reach 133% o capaciy by 2020. Te siuaion is similar a many oherSADC regional airpors.
Tese findings have been largely subsaniaed by he RIDMP.
Produciviy in every secor is affeced by he qualiy and perormance o heroad sysem. While here is currenly considerable capaciy on mos o henework, he projecions or 2027 sugges he need or widening, consruciono bypasses or major ciies, passing lanes in hilly regions and more efficienborder poss. Missing links have o be paved in areas where he nework is sillgravel or earh. A major issue across he region is mainenance unding, andmany o he proposed projecs are he rehabiliaion o runk roads affeced byoverloading and a lack o adequae regular mainenance. Te enorcemen oharmonised load limis and relaed regulaory sandards is a major componeno many projecs or he preservaion o he asse and saey improvemens.
1 PIDA, Phase II Transport Sector Brief. Countries are Botswana, Malawi, Southern DRC,
Zambia and Zimbabwe.
TRANSPORT
-
8/16/2019 Regional Infrastructure Development Master Plan Executive Summary
11/40
9Execuiv Smary
Angola is engaged in a major expansion o is airporsand he erminals in Gaborone, Kinshasa, Windhoek,Vicoria Falls, Kariba and Buffalo Range Airpors arecurrenly being expanded. According o PIDA, oherregional airpors, such as he inernaional airpors inLusaka, Lilongwe, Mauriius and Dar-es-Salaam, willneed expansion beore 2020.
Intermodal Development A number o dry por projecs are under consrucionor in he planning sages o aciliae mode ineracein he nework. Te rail link rom Mchinji (Malawi)o Chipaa (Zambia) will have a cargo erminal oserve he adjacen par o Zambia wih rail accesshrough Malawi o he Mozambican seapors. A drypor a Dona Ana and a conainer erminal a ee(Mozambique) are planned in conjuncion wih herehabiliaion o he Sena railway line o serve Malawiand easern Zambia. Oher dry pors are planned or
Lusaka, Kiwe and Edeola in Zambia, ouside Dar-es-Salaam in anzania, a he Lebombo/Ressano Garciaborder beween Souh Arica and Mozambique anda Walvis Bay in Namibia.
Te RIDMP idenifies key ranspor projecs orroads, railways, inland waerways, land borders, airand seapors , a a cos o 100 US$ billion over hefifeen (15) plan period.
Te SADC regional railways, which are exensive and coniguous, operaed ona common gauge (Cape), should be operaing as seamless, relaively as cross-border services, bu are insead operaed as a collecion o naional sysems.Common echnical, operaing and saey sandards need o be esablished andenorced in order or railways o operae across borders under he oversigho a regional regulaor. Te ormulaion o a mulilaeral regional businessagreemen beween railways needs o be negoiaed o aciliae migraion
rom he exising consrains o bilaeral agreemens.
Te SADC railways generally operae well below heir original design capaciy,ye hey canno increase heir volumes because o poor rack condiion, lack olocomoive and wagon availabiliy and low operaing capial. Te Secor Plansuggess projecs o revialise he exising railways, build missing links (especiallyhose serving he mining secor) and rehabiliae he Sena line o Beira andMalawi, he Lobio line in Angola and o he SNCC sysem in he DRC.
Naional por auhoriies do he por planning and developmen. Whileregional and inernaional associaions, respecively, play an imporan rolein his sub-secor, he SADC Secrearia’s abiliy o aciliae and coordinaemariime policy and sraegic planning is currenly compromised by a lack o
commensurae capaciy, criical o he realisaion o regional objecives in hissub-secor. More privae secor paricipaion should be considered or erminaloperaions, as is he case a Dar-es-Salaam and Beira. Enhancing mariimesaey and securiy is a major por goal which impacs on he cos o mariimeransporaion.
Mos regional pors are currenly operaing near or over capaciy. Some o heacors causing delays and high coss are poor por/road and por/rail ineraces,poor handling capabiliies and equipmen, congesed access roues, inefficienlayous, insufficien use o operaing sofware, insufficien berhs and drafs andslow clearances by regulaory agencies and ranspor operaors. Despie hecurren expansion programmes a mos o he region’s pors, here is apparenlyan urgen need o increase por capaciy and landside access beyond heprojecs already in he pipeline, paricularly or exising deep-waer pors such
as Nacala and Walvis Bay.
Air TransportAir ranspor is a global enerprise based on commercial consideraionsand governed by inernaional convenions ha sipulae Sandards andRecommended Pracices (SARPs) under he auspices o he Inernaional CivilAviaion Organizaion (ICAO). Tere is need o expedie he esablishmen oan oversigh body a SADC level o augmen he saey oversigh capaciy onaional civil aviaion auhoriies and o aciliae he harmonisaion o regulaoryand operaing sysems and procedures. Privae or quasi-privae operaion oairpors, airpor services and air navigaion services migh be explored in heconex o esablishing a regional body. Issues o marke access in compliance
wih he coninenal marke liberalisaion iniiaives wihin he ramework o heYamoussoukro Decision are being addressed wihin he riparie (COMESA-EAC-EADC) context through the establishment of a Joint CompetitionAuhoriy and Compeiion Regulaions. Idenified prioriies or cooperaioninclude he inegraion o he regional upper airspace, implemenaion o heYamoussoukro Decision, incorporaion o ICAO SARPs ino naional legislaionand he esablishmen o join regional raining insiuions.
Te SADC region has numerous airpors, many o which are currenly beingupgraded. OR ambo Inernaional Airpor, which is he larges airpor, servesas a regional hub or flighs coming ino he region and inra-regional flighs.
-
8/16/2019 Regional Infrastructure Development Master Plan Executive Summary
12/40
Execuiv Smary10
Inormaion and Communicaion echnologies (IC) have become he liebloodo he knowledge economy, or as some observed, he elecriciy o he 21sCenury. Te goal o he IC Secor Plan is o ensure ha every Member Saeciizen has ull access o his vial resource.
Te region has sepped up is momenum in he developmen o regionalinrasrucure in he field o IC. Te irony is ha while i is possible o reach
he required capaciy in his secor, progress is consrained by a lack ocomplemenary inrasrucure, paricularly energy.
An analysis o he curren saus o IC urher reveals ha one o he mainshortalls is ha alhough mos o he underlying inrasrucure is in place, i isno efficienly uilised. Landlocked SADC Member Saes sill pay more o geheir raffic o he coas or o he res o Arica han hey do o ge rom hecoas o Europe, he Unied Saes or Asia. Naional fibre opic backbones inmany SADC Member Saes require improved managemen, upgrading andexension o cover more o he populaion, a affordable prices. I is evidenha due o limied developmen o raffic exchange poins, much domesic andregional raffic is exchanged overseas, leading o poor nework perormanceand millions o dollars in ransi ees annually paid o oreign operaors. As a
resul, high access coss prevail across he region, severely limiing use, especiallyor broadband services, among he general public. Tis in urn consrainsdemand or he developmen o local applicaions and services, resuling in heconinued use o inefficien manual processes.
Te curren saus o IC in SADC can be summarised as ollows:
• Average mobile uptake is 60% of the population, the range is from 20% to100%;
• 6% of total voice subscribers are xed line holders, underlining theimporance o mobile neworks;
• 4% of SADC residents are internet users with a wide variation betweenMember Saes, rom 1% in he DRC o 40% in he Seychelles;
• Less than 25% of the borders between neighbouring SADC Member Statesdirecly exchanges Inerne raffic;
• ere is a 5% annual decline in postal mail volumes due to e-mail andprivae carriers, which maches he global rend;
• Postal services handle 96% of domestic leers and 80% of internationalleers, bu only 28% o domesic parcel service and 20% o inernaionalparcel service; and
• Globally, parcel mail is increasing as a result of e-commerce and SADC mayexperience his soon, bu as shown above his business could go o privaecouriers.
Te Secor Plan goals are based on always-on, affordable conneciviy, richconen and useul applicaions, wih easy o use access devices and posalsysems. Wih a 4% per capia Inerne user base in 2011, he assumpion is hahis would reach 20% by 2027 (reaching 80-90% o households and businesseswih access). In order o ensure he achievemen o his goal by 2027, hereis a need or rapid and concered effors by all sakeholders. I will requirehe srong commimen o governmens, wih he allocaion o clear roles andresponsibiliies on he basis o a sysemaic approach, o eliminae bolenecksand ideniy he bes mehods o move orward. Te ramework or his sraegy
INFORMATION
and COMMUNI-CATIONTECHNOLOGIES
(ICT)
-
8/16/2019 Regional Infrastructure Development Master Plan Executive Summary
13/40
11Execuiv Smary
is anchored on our pillars esablished on a platorm o IC policy and regulaoryharmonisaion, confidence and securiy o neworks and services. Te pillars areinrasrucure, capaciy building and conen, e-services and oher applicaions,research, innovaion and indusry developmen.
Te IC Chaper has idenified projecs aimed a improving he enablingpolicy and regulaory environmen or encouraging increased privae secor
invesmen in IC inrasrucure, he bridging o gaps wihin he SADCRegional and Naional Inegraed Broadband Inrasrucure and SADC RegionalInormaion Inrasrucure (SRII), aciliaing he ull inegraion o SADCMember Saes and ocusing on he deploymen o a region-wide pervasive,reliable, resilien, affordable, modern, ully inegraed, inerconneced andcomplemenary nework, which will be enhanced by uilising he underseacables ha have landed on he easern and wesern sea-boards o he region,and exensive enhancing o posal sysems in order o suppor he presen anduure socio-economic developmen o he SADC region. Te oal esimaedcos o providing an IC inrasrucure and he implemenaion o oheridenified projecs is US$21.4 billion.
-
8/16/2019 Regional Infrastructure Development Master Plan Executive Summary
14/40
Execuiv Smary12
Te SADC region suffers rom meeorology inrasrucure deficiency. Tis lacko appropriae inrasrucure poses a serious hrea o he region’s planningprocesses in he conex o changing climae paerns.
As indicaed earlier, souhern Arica is home o abou 272 million peoplewhose muli-secoral socio-economic aciviies, such as power generaion,waer resource managemen and agriculure, among ohers, are o a greaer
or lesser exen impaced by climae variaions. Te improvemen o oupu,hereore, demands accurae and imely weaher orecass and seasonal climaepredicions. Miigaion measures are required o aver disasers relaed omeeorological and hydrological exremes, which are increasing in he SADCregion and indeed across Arica. Tis requires early warning sysems.
Saisics show ha:
• In 1993 about 15 large-scale disasters occurred. Since 2000 disasters haveflucuaed beween 60 and 100 a year;
• From 1980 to 2007 over 90% of all disasters related to natural hazards;71% o he casualies and 78% o economic losses were caused by weaher,climae and waer-relaed hazards; and
• Climate-induced fatalities have been reduced, but economic losses areincreasing.
I is becoming more apparen ha meeorological services are criical o hesocio-economic developmen and securiy o he region’s ciizens, he proeciono lie and propery and he susained proecion o he environmen. Te valueo he inormaion disseminaed increases wih is qualiy, accuracy, imeliness,locaion specificiy and user-riendliness. While he work o meeorologissis coordinaed by he World Meeorological Organizaion (WMO) and daacolleced eeds ino global inormaion and analysis sysems, i is mandaedunder naional law and implemened by Naional Meeorological Services(NMSs). NMSs ace many challenges in carrying ou heir work, including
poor observaion neworks, inadequae insrumenaion, a shorage o skills,inefficien daa managemen sysems and poor elecommunicaion sysemsor collecing and disseminaing inormaion. Te region has o address manychallenges in order o benefi rom he advances in climae sciences andechnologies.
Te sudy idenified a number o regional projecs which ocus on:
• Strengthening the meteorological observation network infrastructure forhe monioring and analysis o weaher and climae variabiliy and change;
• Modernising meteorological telecommunications and communicationsysems o improve rapid daa collecion, managemen, processing,exchange and disseminaion o daa and inormaion;
• Improving technical capacities in terms of resources and expertise;
• Strengthening the institutional capacity of the National MeteorologicalServices o provide relevan, reliable and imely ailored producs or userso climae and weaher services; and
• Strengthening the capacities of the regional climate and meteorologicalinsiuions o uncion as efficien regional coordinaion, developmen,service and disseminaion cenres.
Te esimaed cos o implemening he projecs is US$125 million.
METEOROLOGY
-
8/16/2019 Regional Infrastructure Development Master Plan Executive Summary
15/40
13Execuiv Smary
WATER
Te mos compelling indicaors revealed by he Waer Diagnosic Sudyare ha he SADC region only reains 14% o he available renewable waerresources o which 10% is reained in he Kariba and Cahora lakes respecively,which are he larges man-made reservoirs in he region, boh o which are onhe Zambezi River. Te res o he oal available renewable waer resourcesgo back o oceans. Te indicaors shows ha o he esimaed oal o2 300 km3/year o renewable waer resources available, he curren level o
absracion is only 44 km3/year or 170 m3/capia/year; 77% o which is used orirrigaion, 18% or domesic purposes and 5% is used by indusry.
Te saisics show ha here are adequae waer resources o suppor heciizen o SADC, however he challenge is ha here is insufficien inrasrucurewhich is appropriae o make hese resources available o he populace orheir economic and social use. I is a noable ac ha he disribuion o waerresources varies significanly rom norh o souh and rom eas o wes. Tesechallenges hereore require concered effor in join planning, managemenand developmen o waer resources in order o achieve he regional argesAnd o ensure availabiliy and adequacy across he SADC region.
Te ollowing indicaors define he curren siuaion:
• e current level of abstraction is only 44 km3/year or 170 m3/capia/year– abou 2% o he available resource. 77% o he curren absracion is orirrigaion, 18% or domesic purposes and 5% or use by indusry (Aquasa2008);
• If the storage of the Kariba and Cahora Bassa dams is excluded, only 4% ofhe oal annual renewable waer resources in he SADC region are currenlysored, which is very low compared o 70-90% in mos indusrialisedcounries (UNEP 2009);
• If the storage of the Kariba and Cahora Bassa dams is included, 14% of theoal annual renewable waer resources in he SADC region are currenlybeing sored;
• Of region’s population of 272 million people, 39% have no access toadequae, sae drinking waer, while 61% has no access o adequaesaniaion services; and
• Of the potential 150 GW of hydropower, only 12 GW is currently installed(SADC 2011).
Te SADC region needs o inves in he waer secor inrasrucure in order odevelop economically, provide beer livelihoods and enhanced he qualiy olie o is ciizens.
Te Waer Chaper idenified some 34 waer inrasrucure projecs haare ready or immediae implemenaion beween 2013 and 2021, givenhe preparaion ha has already been underaken, wih an esimaed cos o
US$16 billion. In erms o impac, he projecs shall address and aciliae heincrease o:
• Annual renewable water resources storage from 14% to 25%;
• e area under irrigation from 3.4 million hectares to 10 million hectares(i.e. by 13% o he poenial);
• Hydropower generation from 12 GW to 75 GW (i.e. an increase from 8% to50% o poenial);
• Access to water supply from 61% of the population to 75% of thepopulaion; and
• Access to sanitation services from 39% to 75% of the population.
-
8/16/2019 Regional Infrastructure Development Master Plan Executive Summary
16/40
Execuiv Smary14
Short-term Action Plan 2013-2017
Te Shor-erm Acion Plan (SAP) 2013-2017 was developed o guide heimplemenaion o Phase 1 o he Regional Inrasrucure Developmen MaserPlan (RIDMP). Projecs conained in he SAP are hose ha are consideredready or implemenaion during he nex five years. During he shor-ermphase, oher projecs will be prepared according o he level o bankabiliy,is readiness or financing and or implemenaion in laer phases. Te projecpipelines will be coninuously updaed as addiional projecs undergo heprojec preparaion process. Te SAP also includes “sof” projecs relaedo capaciy building, regulaory and insiuional srenghening ha may benecessary or he effecive implemenaion o associaed inrasrucure projecs.Annex I depics he RIDMP secor plans in maps. Annex II conains deails oprojecs in he SAP.
Programme of InfrastructureDevelopment in Africa
Te RIDMP is an inegral par o he Programme o Inrasrucure Developmenin Arica (PIDA) and he region coninues o build synergies wih PIDA oleverage suppor and exploi is comparaive advanage underpinned bycollecive implemenaion a coninenal level wih leadership provided by heArican Union.
Infrastructure Programme for OceanicStates
Te Maser Plan Sudy also delivered a compendium o projecs or he oceanicsaes, Mauriius and he Seychelles, o ensure ha heir paricular requiremens,
which are no caered or a sub-regional level, are indeed addressed.
Plan of Action
In addiion, a Plan o Acion, which will guide implemenaion o he approvedprogramme, has been developed and i will engender a sysemaic approachwhen allocaing resources and oversigh, including monioring and evaluaionaspecs.
-
8/16/2019 Regional Infrastructure Development Master Plan Executive Summary
17/40
15Execuiv Smary
RIDMPIMPLEMEN-
TATION
STRATEGIES
Te various projecs submied by he Member Saes have been mapped inoa dynamic Geographical Inormaion Sysems (GIS) daabase, which enablessakeholders and ineresed paries o access projec profiles and geographiclocaion direcly hrough he Inerne.
In order o ensure he expediious implemenaion o he prioriy inrasrucureprojecs elaboraed in he Maser Plan, a Plan o Acion has been developed o
guide he region owards implemenaion.
Criical elemens o operaionalise he Plan o Acion include he ollowing:
• Proposed funding mechanisms: e Plan of Action outlines some of thekey modaliies or financing inrasrucure, which include public financinghrough fiscal mechanisms and sovereign loans, grans rom developmenparners, privae secor unding and privae-public parnership (PPP)arrangemens.
• Institutional structures/monitoring and evaluation mechanisms: eollowing srucures will coninue o oversee he approval process o heSADC Inrasrucure Programme as espoused in he SADC Proocols:
o Secoral Projec Commiee a he secoral Level;
o Sub-Secoral Commiee (SCOM);
o Commiee o Senior Officials;
o Secoral Miniserial Commiee;
o Inrasrucure Minisers Commiee;
o Council; and
o Summi.
-
8/16/2019 Regional Infrastructure Development Master Plan Executive Summary
18/40
Execuiv Smary16
Te RIDMP criically reviews he enabling environmen and highlighs he needo expedie he implemenaion o he agreed policies.
Te compleion o he RIDMP consiues a launch pad or he sysemaicimplemenaion o prioriy inrasrucure projecs on which MemberSaes have aained consensus. Te documen becomes he key basis orcooperaion wih developmen parners and all sakeholders, guiding he
collaboraion ramework owards he implemenaion o inrasrucure,including he convening o inrasrucure invesmen conerences. Te Plan isa means o an end, no an end in isel, and he real work commences wih hefinalisaion o hereo.
Cerain condiions have o be me o ensure he expediious implemenaion oprioriy inrasrucure projecs as criical success acors including:
• Commitment by Member States and related agencies: I is criical haMember Saes demonsrae heir commimen o he projecs by signingMemorandums o Undersanding (MoUs), cooperaing ully wih oherparicipaing saes, making budgeary provisions or idenified projecsand including he projecs in which Member Saes have an ineres in
heir Naional Developmen Plans. Te experience gained hrough heimplemenaion o projecs o dae will be valuable in consolidainghis process;
• Creation and strengthening of oversight and implementinginstitutions: Te RIDMP has recommended he creaion and srengheningo oversigh and implemening insiuions in order o effecively manageand coordinae he implemenaion o inrasrucure projecs. I is criicalha appropriae insiuions be creaed, or he exising ones srenghened,o effecively discharge heir mandaes as recommended by he RIDMP.Tese insiuions include he regional bodies mandaed o implemenprojecs a a echnical level (e.g. Souhern Arican Power Pool, SouhernArican Railways Associaion, Souhern Arican elecommunicaionsAssociaion, ec.) or ad hoc srucures, including projec implemenaion
srucures wihin minisries or agencies in he Member Saes;• Appropriate policy, institutional and regulatory framework: Pursuan
o he recommendaions o he RIDMP, i is necessary ha he processo implemenaion o inrasrucure projecs be underpinned by anappropriae policy, regulaory and insiuional ramework, which provideshe necessary enabling environmen or he processes. Te region, asprovided or in he requisie proocols, has developed model policies,regulaory rameworks and insiuional rameworks, which have beenadoped and domesicaed by he Member Saes;
• Provision of a robust monitoring and evaluation system: Te RIDMPPlan o Acion provides guidance on monioring and evaluaion sysemsin order o ensure adequae ollow-up and reporing on progress relaingo inrasrucure developmen based on he agreed arges. I is imporan
ha a robus monioring and evaluaion sysem be pu in place o ensureha implemenaion occurs wihin he agreed milesones, ailing which hisool provides correcive mechanisms. I is criical ha hese measures be puin place a all levels o he operaional srucures;
• Availability of a pipeline of bankable projects: Te RIDMP dynamic GISdaabase is designed o aciliae he availabiliy o a pipeline o bankableprojecs. Experience has shown ha in order o up-scale he implemenaiono inrasrucure projecs, i is necessary ha a pipeline o bankable projecsbe available. In his regard, i is necessary o ideniy, develop and packageprojecs o he sage o bankabiliy. On is par, Summi has approved heSADC Projec Preparaion and Developmen Fund o suppor he packagingo prioriy inrasrucure projecs. Tere are also oher projec preparaionaciliies ha can be accessed by Member Saes or he same purpose;
CRITICALSUCCESS
FACTORSFOR PROJECT
IMPLEMEN-TATION
-
8/16/2019 Regional Infrastructure Development Master Plan Executive Summary
19/40
17Execuiv Smary
• Financial sustainability of projects funding: Te Diagnosic Analysishighlighed he challenges relaed o he financial susainabiliy o projecunding. In order or projecs o be successully unded, i is necessaryha hey are financially viable and susainable. Te overall esimaes o heinvesmen programme o he RIDMP are summarised below, however, ihas o be noed ha some o he approved projecs have no been cosedand hereore have no been accouned or in he summary;
Sector Program DescriptionInitial Investment Cost
(US$ million – US$ billion)
Energy Energy generaion and gridconnecions
290.00 – 420.00
ranspor Consrucion and mainenance 100.00 – 100.00
IC Complee broadbandconneciviy
21.40 – 21.40
Meeorology Improved equipmen,manpower and experise
0.19 – 0.19
Waer Invesmen projecs and
sudies
15.41 – 15.41
ourism(FCAs)
FCA aciliies invesmenplans
1.10 – 1.10
Total 428.10 – 558.10
• Partnership with private sector in infrastructure development: Research sudies and, as deermined by he RIDMP, public financing oinrasrucure, coninues o ace challenges owing o fiscal limiaions andcompeing needs rom oher urgen socio-economic secors. In order oaddress his challenge, he RIDMP advocaes he adopion o join public-privae parnership paricipaion in regional inrasrucure developmen.In pracice, some SADC Member Saes have invied he privae secoro parner wih governmen on invesmen in inrasrucure, eiher as sole
invesors or in he orm o PPPs. Te RIDMP also recommends ha MemberSaes need o explore he eliminaion o monopolies and insiuionaliseopen access opions where he services are more amenable o he privaesecor; and
• Adoption of the user pays principle: One o he key challenges ohe susainabiliy and rehabiliaion o inrasrucure, as observed byhe Diagnosic Analysis o he RIDMP, is he lack o cos-reflecive ariffsapplicaion or he usage o inrasrucure, which has resuled in limiedresources or mainenance and he dilapidaion o inrasrucure. In hecase o power projecs, his has adversely affeced he securing o PowerPurchase Agreemens owing o he non-viabiliy o projecs operaedon curren sub-economic ariffs. I he region is o arac invesmen, i isimporan ha i migraes o cos-reflecive ariffs across all secors and ha
Member Saes examine, i necessary, he cushioning o he disadvanagedhrough oher means ha do no prejudice he abiliy o oser mainenanceo prescribed sandards.
-
8/16/2019 Regional Infrastructure Development Master Plan Executive Summary
20/40
Execuiv Smary18
Te curren 4-7% economic growh in he SADC region is propelled by risingexernal demand, high inernaional meal prices, rising global income, resurgencapial flows and he sound macro-economic policies o SADC Member Saes.New invesmens in mining and mineral oupus are increasing, and fiscaldiscipline and abundan naural resources have combined o arac ForeignDirec Invesmen (FDI) ino he region. Coninued growh will, o a largeexen, depend on he diversificaion, greaer beneficiaion and value addiiono commodiies, which will in urn creae local employmen. Tere is a criicalrequiremen or improved inra-regional disribuion neworks, srenghenedinsiuional capaciy o arac susained capial and increased domesicsavings and invesmen. Efficien, inegraed, cos-effecive inrasrucure is aprerequisie or harnessing opporuniies in he global economy.
CONCLUSION
-
8/16/2019 Regional Infrastructure Development Master Plan Executive Summary
21/40
19Execuiv Smary
Name of Project Member States Estimated Year of Completion1 Cenral ransmission Corridor (CC) Boswana, Namibia, Zambia and Zimbabwe 2014
2 ZIZABONA Inerconnecor Projec Boswana, Namibia, Zambia and Zimbabwe 2015
3 Zambia–anzania–Kenya (Z--K) PowerInerconnecor Projec Zambia, anzania, Kenya 2016
4 Namibia – Angola Inerconnecor Projec Namibia, Angola 2016
5 Democraic Repulic o he Congo (DRC) –Angola Inerconnecor DRC and Angola 2016
6 Mozambique – Malawi Inerconnecor Mozambique and Malawi 2016
7 2nd Souh Arica – ZimbabweInerconnecor Souh Arica and Zimbabwe 2017
8 2nd DRC – Zambia Inerconnecor DRC and Zambia 2017
9 Mozambique Backbone Projec Mozambique 2020
Annex 1: SADC InfrastructureProgramme in Maps
Energy SectorSADC Regional Power Inerconnecor Projecs
Angola
Luanda
Brazzaville Kinshasa
Rep o CongoRwandaBurundi
KenyaNairobi
anzania
Dar es Salaam
Malawi
MozambiqueZambia
Lusaka
Harare
Zimbabwe
Mapuo
Planned InerconnecorsExising Inerconnecorsand ransmission Lines
Mbabane
Swaziland
Lesoho
Cape own Souh Arica
JohannesburgPreoria
Gabarone
Boswana
Namibia
Windhoek
-
8/16/2019 Regional Infrastructure Development Master Plan Executive Summary
22/40
Execuiv Smary20
Tourism Sector
ransronier Conservaion Areas (FCA) is defined as “he area or componen o a large ecological region ha comprise he boundarieso wo or more counries encompassing one or more proeced areas and muliple resources-use areas”.
Name of TFCA Countries Involved Status
1. !Ai/!Ais-Richersveldransronier Park
Namibia and Souh AricaMoU signed in 2001reay signed 2003
2. Kgalagadi ransronier Park Boswana and Souh Arica reay signed in May 2000
3. Greaer Mapungubwe FCA Boswana, Souh Arica and ZimbabweMoU signed in 2006. reay o besigned during he course o 2012
4. Grea Limpopo ransronier Park Mozambique, Souh Arica and ZimbabweMoU signed in 2000reay signed in 2002
5. Lubombo FCA Mozambique, Souh Arica and Swaziland rilaeral Proocol signed in 2000
6. Maloi-Drakensberg FCA Lesoho and Souh Arica MoU signed in 2001
7. Iona-Skeleon Coas FCA Angola and Namibia MoU signed on 1 Augus 2003
8. Liuwa Plain-Kameia FCA Angola and Zambia Concepual phase
9. Kavango-Zambezi FCA Angola, Boswana, Namibia, Zambia and Zimbabwe reay signed in Augus 2011
10. Lower Zambezi – Mana Pools FCA Zambia and Zimbabwe Concepual phase
11. Malawi-Zambia FCA (Nyika andKasungu/Lukusuzi)
Malawi and Zambia MoU signed in 2004
12. Niassa – Selous FCA Mozambique and anzania Concepual phase
13. Mnazi Bay – Quirimbas FCA Mozambique and anzania Concepual phase
14. Chimanimani FCA Mozambique and Zimbabwe MoU signed
15. Maiombe Fores FCA Angola, Congo and DRC Concepual phase
16. Kagera FCA Rwanda/anzania Concepual phase
17. ZIMOZA FCA Mozambique, Zambia and Zimbabwe Concepual phase
Treaty signed1 !Ai-!Ais Richersveld P (Namibia/Souh Arica)2 Kgalagadi P (Boswana/Souh Arica)4 Grea Limpopo P (Mozambique/Souh Arica/Zimbabwe)MoU signed3 Limpopo-Shashe FCA (Boswana/Souh Arica/Zimbabwe)5 Lubombo FCA (Mozambique/Souh Arica/Swaziland)6 Nakiu - Drakensberg FCA (Lesoho/Souh Arica)7 Iona - Skeleon Coas FCA (Angola/Namibia)11 Malawi - Zambia FCA (Malawi/Zambia)14 Chimanimani FCA (Mozambique/Zimbabwe)Conceptual phase8 Liuwa Plain - Kameia FCA (Angola/Zambia)9 Kavango - Zambezi FCA (Angola/Boswana/Namibia/Zambia/Zimbabwe)10 Lower Zambezi - Mana Pools FCA (Zambia/Zimbabwe)12 Niassa - Selous FCA (Mozambique/anzania)13 Mnazi Bay - Quirimbas FCMA (Mozambique/anzania)18 ZIMOZA FCA (Mozambique/Zambia/Zimbabwe)Other15 Kagera FCA (Rwanda/anzania/Uganda)16 Liwonde - Lichinga FCA (Malawi/Mozambique)17 Malombe Fores FCA (Angola/Congo/DRC)
TP - Transfrontier ParkTFCA - Transfrontier Conservation AreaTFCMA - Transfrontier Conservation Marine Area
DRC
Angola
ZambiaMalawi
MozambiqueZimbabwe
Namibia
Boswana
Swaziland
Lesoho
Souh Arica
Madagascar
ransronier ConservaionAreas idenified in SADC
Mauriius
Kampala
Bujumbura
Nairobi
Dodoma
Dar es Salaam
Libreville
Kinshasa
Luanda
Lilongwe
LusakaHarare
WindhoekGaborone
Maseru
Mbabane MapuoPreoria
Cape own
Angola Boswana DRC Lesoho Madagascar Malawi Mauriius Mozambique Namibia Souh Arica Swaziland anzania Zambia Zimbabwe
-
8/16/2019 Regional Infrastructure Development Master Plan Executive Summary
23/40
21Execuiv Smary
ReferenceSADC Pors
Hub (General Cargo)Bulk Mineral ExporsGeneral CargoFeeder Porranspor Corridor
SADC Major ranspor NeworkTrans-African Highway (TAH)runk RoadRoads OherRailway
SADC CounryAccess o SeaLandlockedWaer Areaown
Cape own Por Elizabeh
Bhisho
MoyeniQacha’s Nek
Mafikeng DurbanUlundi
Richards Bay
MaseruBloemonein
Kimberley
Johannesburg
Karasburg
Eas London
Hlatikulu
SiekiKeemanshoop
Behanien
Malahöhe
Luderiz
sabong
T r a n s - K a l a h a r i H i g h w a y
Kilomeers
T r a n s - K u n e n e H i g h w
a y
T ra ns - Ca p r i v i H ig h
wa y
Kanye Lobase PreoriaNelsprui
Mbabane
Mapuo
Xai-XaiGaborone
MochudiMolepolole
Polokwane
MasvingoBulawayoFrancisown
Serowe
Ghanzi
GobabisRehoboh
Windhoek
OkahandjaKaribib
Omaruru
Walvis Bay
Swakopmund
OjiwarongoOujo
Oavisumeb
Maun
KasaneLivingsone
Inhambane
BeiraChimoio
MuareGweru
Harare
ee
Blanyre
Quelimane
Nampula
Nacala
Pemba
LusakaMongu
Kabwe Chipaa
Lilongwe
LichingaNdola
Menongue
Namibe
Lubango
HuamboKuio
Benguela
Lobio LuenaSolwezi Lubumbashi
Mansa
Kasama
Mzuzu
SongeaMwara
Lindi
Dar es SalaamKibaha
Morogoro
Iringa
Mbeya
SaurimoMalange
Ngunza
LuandaNdalaando
Caxio
Kahemba
Lucapa
Ulge
Mbanza Congo
Mbuji-Mayi
Kigoma aboraSingida
Dodoma ZanzibarMkoani
anga Wee
Mombasa
MoshiArushaShinyangaRuyigi
Ngozi
Mwanza
Musoma
KibungoKigali
BuareKibuye
Byumba
Buluko Mbarara
Bukoba
MasakaNakuru
Nairobi
Embu
Madagascar Development Corridor
Dar es Salaam Corridor
TIFFA Corridor
Lobito Development Corridor
Malange Development Corridor
Nimbe Development Corridor
Walvis Bay Corridor
Maputo Development Corridor
Limpopo Development Corridor
Beira Development Corridor
Beira Development Corridor
NcalaDevelopment Corridor
Mtwara DevelopmentCorridor
North South Corridor
North South Corridor
Development Corridor
North South Corridor
Jinja Kisumu
Mbale
KampalaFor PoralKisanganiMbandaka
Owando
Djambalachibanga
Mouila Masuka
Kaulomouou
Makokou
MongomoOyem Ouesso Impondo
Ebebiyin
Ebolowa
Yaounde
BerouaBerberai
Nola Mbaiki
Bangui MobayeBangassou
Ngaoundere
BouarBozoum Bossangoa
Sibu Bambari
Kaga Bandoro
Ndele
Bria
Obo
Wau
AruaGulu
Moroo
Por Louis
MauriiusMahajanga
Ansiranana
oamasinaAnananarivo
Fianaransoa
oliara
Madagascar
Congo, DR
Angola
Zambia
Namibia
Boswana
Souh Arica
Swaziland
Lesoho
Zimbabwe
Mozambique
Malawi
anzania
Bujumbura
Sambawanga
KanangaMaadiCabinda
Poine NoireMadingou Kinshasa
BrazzavilleSibii
Bandudu
Saldanha Bay
Transport Sector
SADC Regional ranspor Corridors – Mainland
Mariime corridors serving he SADC (island and mainland) saes are sill under developmen
Air ranspor: Te regional airspace and airpors inrasrucure is developed wihin he ramework o he Inernaional Civil Aviaion Organisaion (ICAO) Aricaand Indian Ocean Regional Air Navigaion Plan, in collaboraion wih he Arican Civil Aviaion Commission (AFCAC), as ouline in he RIDMP.
Te map highlighs he SADC corridors, which are a differen levels o developmen.
Member States Corridors
Angola 1. Lobio (Benguela); 2. Namibe; 3. rans-Cunene; 4. Malange; 5. Bas Congo
Boswana 1. rans-Kalahari (KC); 2. Norh-Souh (NSC)
DRC 1. Norh-Souh (NSC); 2. Malange; 3. Walvis Bay – Ndola – Lubumbashi, (rans-Caprivi); 4. Dar-es-Salaam;5. Cenral; 6. Bas Congo; 7. Lobio (Benguela)
Lesoho 1. Maseru – Durban
Malawi 1. Nacala; 2. Beira; 3. Mwara; 4. Dar-es-Salaam; 5. Norh-Souh (NSC)
Mozambique 1. Mapuo; 2. Beira; 3. Nacala; 4. Mwara; 5. Norh-Souh (NSC); 6. Limpopo
Namibia 1. rans-Kalahari (KC); 2. rans-Orange; 3. rans-Cunene; 4. Walvis Bay – Ndola – Lubumbashi (rans-Caprivi);5. Namibe
Souh Arica 1. Norh-Souh (NSC); 2. Mapuo; 3. rans-Kalahari (KC); 4. rans-Orange; 5. Maseru – Durban; 6. Manzini – Durban
Swaziland 1. Mapuo; 2. Manzini – Durban
anzania 1. Dar-es-Salaam; 2. Mwara; 3. Cenral
Zambia 1. Norh-Souh (NSC); 2. Dar-es-Salaam; 3. Mwara; 4. Beira; 5. Walvis Bay – Ndola – Lubumbashi (rans-Caprivi);6. Lobio (Benguela)
Zimbabwe 1. Beira; 2. Mapuo; 3. Norh-Souh (NSC); 4. Limpopo
-
8/16/2019 Regional Infrastructure Development Master Plan Executive Summary
24/40
Execuiv Smary22
ICT Sector
Project Title Participating Countries Target Date
1. D migraion suppor o SADC Member Saes 2012 – 2016 Seleced SADC Member Saes 2013
2. SADC Regional Inormaion Inrasrucure (SRII) Phase II All SADC Member Saes 2016
3. Naional and Regional Inerne Exchange Poins (N/RIXP) All SADC Member Saes 2013
4. SADC Regional and Naional Inegraed Broadband Inrasrucure All SADC Member Saes 2017
Comparaive analyses show ha he SADC region now has he mos pervasive regional erresrial fibre nework. Te bilaeral linksbeween he naional backbones o he incumben operaors in each counry orm he basis o mos o he cross-border erresrial fibrein he region, which was achieved under he aegis o Phase I o SAA’s SRII projec.
SRII Phase II – Nex Generaion Nework (NGN) Platorm erresrial fibre linksbeween counries in place
Angola
Namibia
Zambia
DRC
anzania
Malawi
Zimbabwe
Boswana Mozambique
Seychelles
Swaziland
LesohoSouh Arica
Madagascar
Mauriius
-
8/16/2019 Regional Infrastructure Development Master Plan Executive Summary
25/40
23Execuiv Smary
London,England
Marselle,FranceVigo,
SpainMonaco
Sesimbra,Porugal Palermo,
Ialy
Asilah,Morocco
Casablanca,Morocco
A l t a V i s t a,
C a n a r y I s l a n d s
N o u a k c h
o t ,
M a u r i a
n i a
D a k a
r , S e n e g a l
T e G
a m b i a
C o n a k r y
, G u i n
e a
F r e e o
w n , S i e r
r a L e
o n e
M o n
r o v i a
, L i b
e r i a
A b i
j a n ,
C o t e D ’ I v
o i r e
A c c r a
, G h
a n a
L o m
e , T o g
o
C o t o n
o u , B
e n i n
L a g o
s , N i g e
r i a
B o n n y,
N i g e r i a
D o u a l a
, C a m e
r o o n
B a t a, E
q u a t o r i
a l G u i n
e a
L i b r e v i l l
e, G a b o
n
Pointe Noire, CongoMuanda, DRC
C a c u a c o , An g o l a Lu a n d a , An g o l a
Swakopmund, Namibia
olaria, Madagascar
S Paul, Reunion
Baie du Jacobet,Mauriius
amaave,Madagascar
Moroni,Camoros
Seychelles
Colombo, SriLanka
Cochin, India
Chennaii, India
MumbaiIndia
Dar EsSalaam,anzania
Mombasa, Kenya
Mogadishu, Somalia
Djiboui
Oman
Massawa,Erirea
Por Sudan,,Sudan
Jeddah,Saudi Arabia
Suez,Egyp
Cairo,Egyp
Alexandria,Egyp
ripoli,Lebanon
MediterraneanUndersea Cables
Alas offshore320 gigabis
Acive
SAS-11280 gigabis
Acive
SEA-ME-WE 41280 gigabis
Acive
I-ME-WE3840 gigabis
Acive
EIG3840 gigabis
Acive
N.B. Several smaller MedierraneanUndersea Cables no shown
East Coast SEAS 320 gigabis Q3 2012
EAMs1280 gigabis
Acive Seacom
1280 Gigabis Acive
Lion21280 Gigabis
Acive
Lion1300 Gigabis
Acive
EASSy4720 Gigabis
Acive
Brics12.8 erabis
2014
West Coast SA3/SAFE
340 Gigabis Acive
MaIn OnE1920 Gigabis
Acive
GLO-12500 Gigabis
Acive
WACS5129 Gigabis
Q2 2012
ACE5120 Gigabis
Q3 2012
SAex12.8 erabis
2014
WASACE40 erabis
2014
Fujairah, UniedArabs Emiraes
Karachi, Pakisan
Mayae
Sao ome and Principet o F o r t a l e z a B r a z i l
Mapuo,Mozambique
Munzini
Yzeronein
Melkbossrand
Cape Vrede
A n n a
b a
,
A l g
e r i a
B i z
e r t e
,
T u n i s i a
T r i p
o l i ,
L i b
y a
Chipiona,Spain
Arican Undersea Cables (2014)hp://manypossibiliies.ne/Arican-undersea-cablesVersion 33
Mar 2012
Under –Sea Cables
Country Access to Rest of the World
Angola SA-3, WACS, (ACE, SAex)
Boswana Currenly via Souh Arica laer via Namibia o WACSDRC Currenly saellie, laer WACS, ACE
Lesoho Via Souh Arica
Madagascar EASSy, LION (SEACOM)
Malawi Via anzania and Mozambique
Mauriius SAFE, LION (LION2, BRICS)
Mozambique SEACOM, EASSy
Namibia Via Souh Arica or Angola unil WACS
Seychelles Currenly saellie, laer SEAS
Souh Arica SA-3, SEACOM, SAFE, EASSy, WACS, (ACE, SAex, BRICS)
Swaziland Via SA and Mozambique
anzania SEACOM, EASSy
Zambia Via Namibia, Boswana, and anzaniaZimbabwe Via Souh Arica and Mozambique
-
8/16/2019 Regional Infrastructure Development Master Plan Executive Summary
26/40
Execuiv Smary24
Te RegionalInrasrucureDevelopmenMaser Plan (RIDMP)highlighs heseriousness o helevel o inadequacyo observaionaldaa in SADC, whichis eviden romhe laes WorldMeeorologicalOrganizaion (WMO)Annual Global DaaMonioring resulsor Ocober 2010o April 2011. Te
resuls clearly showha he region’sperormance is byar below he globalaverage.
Meteorology Sector
Project Benefiting Countries /Owners
AMESD Projec Angola, Boswana, Namibia, Lesoho, Malawi, Mozambique, Souh Arica,Swaziland, anzania, Zimbabwe, and Zambia.
Insiuional Suppor o Arican Climae Cenre Insiuion
Projec (ISACIP)
Angola, Boswana, DRC, Namibia, Lesoho, Malawi, Madagascar,
Mauriius, Mozambique, Seychelles, Souh Arica, Swaziland, anzania,Zimbabwe, and Zambia.
SAMPRO (Souhern Arica Meeorology Projec) Angola, Boswana, DRC, Namibia, Lesoho, Malawi, Madagascar,Mauriius, Mozambique, Seychelles, Souh Arica, Swaziland, anzania,Zimbabwe, and Zambia.
ClimDev-Arica Angola, Boswana, DRC, Namibia, Lesoho, Malawi, Madagascar,Mauriius, Mozambique, Seychelles, Souh Arica, Swaziland, anzania,Zimbabwe, and Zambia.
Srenghening o Weaher and Climae Observing Sysemin he SADC region
Angola, Boswana, DRC, Namibia, Lesoho, Malawi, Madagascar,Mauriius, Mozambique, Seychelles, Souh Arica, Swaziland, anzania,Zimbabwe, and Zambia.
Srenghening he capaciy o he SADC regional climaeand meeorological unis (CSC, MASA, RMCs, and RICC)
Angola, Boswana, DRC, Namibia, Lesoho, Malawi, Madagascar,Mauriius, Mozambique, Seychelles, Souh Arica, Swaziland, anzania,
Zimbabwe, and Zambia.Improving he Meeorological elecommunicaions andCommunicaion Sysems or rapid daa exchange and hedisseminaion o inormaion
Angola, Boswana, DRC, Namibia, Lesoho, Malawi, Madagascar,Mauriius, Mozambique, Seychelles, Souh Arica, Swaziland, anzania,Zimbabwe, and Zambia.
Improving he level o echnical capaciies (resources andexperise) o generae appropriae, policy-relevan climaeinormaion and operaional warning services
Angola, Boswana, DRC, Namibia, Lesoho, Malawi, Madagascar,Mauriius, Mozambique, Seychelles, Souh Arica, Swaziland, anzania,Zimbabwe, and Zambia.
15.00 20.00 25.00 30.00 35.00 40.00 45.00 50.00 55.00
5.00
0.00
-5.00
-10.00
-15.00
-20.00
-25.00
-30.00
-
8/16/2019 Regional Infrastructure Development Master Plan Executive Summary
27/40
25Execuiv Smary
Water Sector
SADC Waer Inrasrucure Prioriy Projecs
Project # Project Name Countries
Regional Projecs
1 Inga 3 Hydropower DRC-shared Regional Elecriciy
2 Lesotho Highlands, Phase II Lesoho, Souh Arica
3 Batoka Gorge Hydropower Zambia, Zimabwe
4 Songwe River Basin Developmen Programme Malawi, anzania
Cross Border Projecs
1 Food Securiy - Upper Okavango Angola, Namibia
2 Vaal-Gamagara Waer Supply Boswana, Souh Arica
3 Ressano Garcia Weir - Waer Supply Mozambique, Souh Arica
4 Lomahasha/Namaacha Waer Supply Swaziland, Mozambique
5 Cross border locaions - Waer Supply & Saniaion Zam-Ang-Bo-DRC-Mal-Moz-an-Zim
Naional Prioriy Projecs
1 Lubango - Phase 2: Waer Supply & Saniaion Angola
2 Limpopo Basin Joint Water Monitoring Bo, Moz, RSA, Zim
3 Kinshasa - Waer supply & Saniaion DRC
4 Lesoho Lowlands Waer Supply Scheme - Zone 1 Lesoho
5 Pending Madagascar
6 Mombezi Dam - Mulipurpose Malawi
7 13 Housing Estates - Water Supply Mauriius
8 Movene Dam - Mulipurpose Mozambique
9 Windhoek - Managed Aquier Recharge Namibia
10 Non-revenue Waer and use efficiency Seychelles
11 Waer demand Managemen Souh Arica
12 Nondvo Dam - Mulipurpose Swaziland
13 Ruhuhu Valley Irrigaion anzania
14 Climae Change Adapion AER 1 Zambia15 Bulawayo Waer Supply rom Zambezi River Zimbabwe
-
8/16/2019 Regional Infrastructure Development Master Plan Executive Summary
28/40
Execuiv Smary26
ransboundary River Basins in he SADC Region
Daa SourceBasin boundaries rom Program in Waer Conflic Managemenand ransormaion a Oregon Sae Universiy.
Nigeria
Cenral Arican Republic Sudan Ehiopia
Cameroon
UgandaKenyaGabon
CongoCongo Basin
Zambezi Basin
Cuvelai Basin
Kunene Basin
Ruvuma Basin
Pungwe Basin
Buzi Basin
Save/Sabi Basin
Limpopo Basin
Incomai Basin
Umbeluzi Basin
Mapuo-Usuu-Pongola Basin
Congo Basin
Okavango Basin
Congo, DRC
anzania
Malawi
Zambia
Mozambique
Zimbabwe
Boswana
Swaziland
Lesoho
Souh Arica
Zimbabwe
Angola
-
8/16/2019 Regional Infrastructure Development Master Plan Executive Summary
29/40
27Execuiv Smary
Annex 2
SADC RIDMP Short-Term Action Plan (STAP) 2013–2017
Te SADC RIDMP Shor-erm Acion Plan (SAP) 2017 is he shor-erm programme o he SADC Regional Inrasrucure DevelopmenMaser Plan (RIDMP), which consiss o projecs ha are currenly in differen sages o developmen. Some o hese projecs havecommied financing, while ohers are in he prioriy pipeline or resource mobilisaion and allocaion. Te Plan consiues hardinrasrucure projecs, as well as sof projecs relaing o policy, regulaory and insiuional capaciy building. Te laer is gearedowards he creaion o an enabling environmen ha will aciliae he effecive execuion and delivery o projecs conained in he SAP.
Te SAP 2017 comprises projecs rom he six secors consiuing he SADC Inrasrucure Regional Maser Plan, namely energy,ourism, ranspor, IC, meeorology and waer. Projecs conained in he SAP will be implemened during he firs five years o heplanned period as shown below.
Te cross-linkages beween he hree phases are as indicaed by Figure 1 below.
Figure 1: Common Elements of Sector Action Plans
Te oal cos o he SAP is US$64.15 billion.
Te Coninenal PIDA PAP 2020 SADC Programme is subsumed under he RIDMP SAP 2017 o ensure he complemenary, effeciveaciliaion and coordinaion o he coninenal and regional prioriy programmes.
Phase 1 – 2013-2017Harmonise/dra policies/regsDevelop new insiuionsImplemen ready projecsBuild capaciyPrepare Phase 2 Projecs
Phase 2 – 2018-2022Implemen Phase 2 ProjecsPrepare Phase 3 ProjecsMonior progress
Phase 3 – 2023-2027Implemen Phase 3 ProjecsEvaluae oupus
-
8/16/2019 Regional Infrastructure Development Master Plan Executive Summary
30/40
Execuiv Smary28
1. Energy Sector
ProjectBenefiting
Member StatesRegion
Project CostEstimate
($ million)
ExpectedCompletion
YearProject Status
Mozambique backbone
ransmission lines Phase I and II
Mozambique SADC 1,700.00 2016 EIAs concluded and
submied o governmenZIZABONA400kV ransmission lines, 408km
Zimbabwe, Zambia,Boswana andNamibia
SADC 223.00 2015 Invesors’ round able held inNamibia. IG-MoU signed
ZK Inerconnecor400 HVAC transmission line,700 km
Zambia, anzaniaand Kenya
SADC/COMESA/EAC/PIDA PAP
860.00 2016 Funding secured or Zambianporion and or easibiliysudies in anzania
Cenral ransmission CorridorNework (CC) Phase IIo srenghen powerransmission capaciy,paricularly he 280 km Alaska– Sherwood line
Zimbabwe SADC/PIDAPAP
100 .00 2016 Funding secured or projecpreparaion
DRC-Zambia Inerconnecor330 kV ransmission line romSolwezi o Kolwezi
DRC and Zambia SADC/PIDAPAP
94.00 2016 Funding secured or DRC andZambian porions rom heWorld Bank and he ElecriciyCouncil Inernaional (CEC),respecively
Namibia – AngolaInerconnecor
Angola and Namibia SADC/PIDAPAP
250.00 2016 erms o Reerence havebeen prepared or heechnical sudies and areawaiing approval
DRC – Angola Inerconnecor Angola SADC/PIDAPAP
95.00 2016 Sill busy wih he easibiliysudy
2nd Souh Arica – ZimbabweInerconnecor
Souh Arica andZimbabwe
SADC/PIDAPAP
280.00 2017 o be anchored by a powerpurchase agreemen (PPA),
bu sill a he easibiliy sudylevel
2nd DRC – ZambiaInerconnecor
DRC and Zambia SADC/PIDAPAP
80.00 2017 o be anchored by a PPA
Mozambique – MalawiInerconnecor
Mozambique –Malawi
SADC/PIDAPIDA
93.00 2015 Agreemen reached beweenwo counries o moveexpediiously
Cahora Bass Norh Bank PowerSaion
Mozambique SADC 800.00 2017 o be anchored by a PPA
Mpanda Nkuwa Hydro PowerSaion – Phase 1
Mozambique SADC/PIDAPAP
2,000.00 2016 Ongoing
Hwange Power Station 7 and 8
Expansion Projec
Zimbabwe SADC 1,080.00 2017 Sill a he easibiliy sudy
sageGokwe Norh Power Saion Zimbabwe SADC 2,240.00 2017 Updaing he easibiliy
sudies
Inga III Hydro Power Project DRC SADC 1,730.00 2018 Negoiaing wih financiers
Kudu Gas power Saion Namibia SADC 640.00 2016 Engineering and designsudies underway
Total 12,27 billion
-
8/16/2019 Regional Infrastructure Development Master Plan Executive Summary
31/40
29Execuiv Smary
2. Tourism Sector
ProjectBenefiting
Countries/OwnersRegion
Project CostEstimate
($ million)
ExpectedCompletion
YearProject Status
Upgrading o he Sani Pass road
from Himeville to Mokhotlong(Maloi/Drakensberg FCA)
Lesoho, Souh
Arica
SADC 62.50 2012 – 2014 Feasibiliy sudy compleed
Relocaion o Sani Pass borderpos (Maloi/DrakensbergFCA)
Lesoho, SouhArica,
SADC 6.20 2012 – 2014 EIA, srucural designand geoechnical reporscompleed
Limpopo RiverCrossing(GLFCA) – Krugerand Gonarezhou
Souh Arica,Zimbabwe
SADC 2.40 2012 – 2014 EIA compleed. Scopingrepor in place and sieidenified
Upgrading o he Barberono Piggs Peak road (LubomboFCA)
Swaziland SADC 10.00 2012 – 2014 Te road is currenly anunpaved 4x4 road
Consrucion o he DinosaurInerpreaive Cenre a GoldenGae Naional Park (Maloi –
Drakensberg FCA)
Souh Arica SADC 28.00 2012 – 2014 Business plan, easibiliy sudyand concepual exhibiiondesign compleed
Upgrading of Joel's Drio Mononsa Pass roadand border pos (Maloi –Drakensberg FCA)
Lesoho SADC 42.00 2012 – 2016 Seeking an invesor
Upgrading of Ha Mpiti toSehlabahebe Naional Parkvia Ramatseliso's border gate(Maloi – Drakensberg FCA)
Lesoho SADC 112.50 2012 – 2016 Seeking an invesor
Upgrading o OngeluksnekPass and esablishing heone-sop border pos (Maloi –Drakensberg FCA)
Lesoho SADC 36.00 2012 – 2016 Seeking an invesor
Upgrading o Aliwalskop o
elebridge Road (Maloi –Drakensberg FCA)
Lesoho SADC 7.20 2012 – 2016 Seeking an invesor
Usuhu Gorge (Mambane)Communiy Conservaion AreaFencing (Lubombo FCA)
Swaziland SADC 7.00 2012 – 2016 Seeking an invesor
Consrucion o access bridgebeween Mooiplaas andDoorhoek Gae, SongimveloNaure Reserve (LubomboFCA)
Souh Arica SADC 3.00 2013 – 2017 Seeking an invesor
Developmen o a ouris linkroad alongside he KomaiRiver, linking he Songimveloand Maloloja game reserves(Lubombo FCA)
Souh Arica,Swaziland
SADC 1.50 2013 – 2017 Seeking an invesor
Policy harmonisaion,insiuional srenghening andsraegy developmen
All SADC MemberSaes
SADC 1.20 2013 – 2017
Developmen o markeingools and sysems, as well asbuilding capaciy o creaeawareness or he Uni-Visa
Pilo members:Angola,Mozambique,Namibia, Swazilandand Zimbabwe
SADC 1.50 2013 – 2017
Developmen and markeing orans-naional ourism producsor he Vanilla Islands Saes
Mauriius andSeychelles
SADC 3.00 2013 – 2017
Total 324 million
-
8/16/2019 Regional Infrastructure Development Master Plan Executive Summary
32/40
Execuiv Smary30
3. Transport Sector
ProjectBenefiting
Member StatesRegion
Project CostEstimate
($ million)
ExpectedCompletion
YearProject Status
Souh Arican pors: Durban
por expansion
Regional SADC Norh-
Souh corridor
2.92 bi llion 2014 – 2017 Ongoing
Walvis Bay: por expansion Regional SADC rans-Kalaharicorridor
650 2014 – 2017 Deailed design compleed.Procuremen or worksconrac ongoing.
Huambo Airport:improvemens
SADC Lobiocorridor
50 2013 – 2017 Pre-easibiliy sudiescompleed
Kazungula Bridge: consruciono a road bridge which can alsohandle rains in uure
Boswana andZambia
SADC/COMESANorh-Souhcorridor
250 2012 – 2014 Deailed design compleed.MoU and projecimplemenaion arrangemensbeing finalised
Beibridge – Chirundu: roadupgrading
Souh Arica andZimbabwe
SADC/COMESALimpopo
corridor
932 2013 – 2016 Feasibil iy sudies compleed
Beibridge border OSBP:upgrading and expanding heinrasrucure
Zimbabwe SADC Norh-Souh corridor
6 2013 – 2014 Ongoing consulaionbeween Zimbabwe andSouh Arica. Preliminarysudies ongoing
rans-Kalahari/Mamuno OSBP Boswana andNamibia
SADC rans-Kalaharicorridor
6 2013 – 2014 Feasibil iy sudies compleed
Naional railways o Zimbabwe:revival
Zimbabwe SADCLimpopocorridor
200 2013 Feasibiliy sudies ongoing
Ressano Garcia/LebomboOSBP: inrasrucure upgrades
and redesign o processes
Mozambique andSouh Arica
SADC Mapuocorridor
6 2013 – 2014 Feasibil iy sudies compleed.Some works compleed, bu
main pendingLobio corridor roads:rehabiliae he main eederroads wihin he corridor
Angola SADC Lobiocorridor
390 2012 – 2016 Feasibil iy sudies and someworks ongoing
Dar-es-Salaam: Chalinze ollroad
anzania, Zambia,DRC and Malawi
SADC Dar-es-Salaamcorridor
585 2012 – 2017 Feasibil iy sudies compleedin 2010. PPP viabiliy sudycompleed
Nakonde – unduma OSBP anzania, Zambia,DRC and Malawi
SADC Dar-es-Salaamcorridor
8 2012 – 2017 Feasibil iy sudies compleedand consrucion sared onZambian side. MOU signed
Makambako – Songea road:rehabiliaion
anzania, Zambia,Malawi
SADC -Dares SalaamCorridor
138 2012 – 2017 Te road secion is underdeailed design hroughWorld Bank financing. Funds
required or rehabiliaionPlumree – Bulawayo – Gweru– Harare – Mutare road:rehabiliaion
Zimbabwe,Mozambique,Malawi, DRC andBoswana
SADCBeira andNorh-Souhcorridors
206 2012 – 2017 Minor works ongoing
Isaka – Keza – Kigali – Msongairailway line
anzania, Rwanda,Burundi and DRC
SADCriparieCenralcorridor
3,130 2012 – 2017 Feasibil iy sudy compleed
anzania Railway Limiedservices: revival
anzania, Rwanda,Burundi and DRC
SADCriparieCenralcorridor
362 2012 – 2017 Ongoing
-
8/16/2019 Regional Infrastructure Development Master Plan Executive Summary
33/40
31Execuiv Smary
ProjectBenefiting
Member StatesRegion
Project CostEstimate
($ million)
ExpectedCompletion
YearProject Status
Mwara - Liganga -Muchuchuma - Songea -Mbamba railway
anzania, Zambia,Malawi andMozambique
SADC Mwaracorridor
1,386 2012 – 2017 Feasibil iy sudy compleedby Japan InternationalCooperaion Agency
( JICA) and the NationalDevelopmen Council (NDC).Deailed design pending
Manyoni - abora - Kigomaroad: rehabiliaion
anzania, Rwanda,Burundi and DRC
SADCriparieCenralcorridor
450 2012 – 2017 Deailed design and enderdocumens compleed. Worksongoing in some secions
Kisarawe - Dar-es-Salaam:consrucion o ICD
anzania, Rwanda,Burundi, DRC,Malawi and Zambia
SADC Dar-es-Salaamand Cenralcorridors
120 2012 – 2017 Pre-easibiliy sudycompleed. RFP or easibiliysudy issued
Kolwezi - Dilolo road (Angola
border, SADC Roue 20,426 km): rehabiliaion
DRC, Zambia and
Angola
SADC Lobio
corridor
2 2012 – 2017 Pre-easibiliy sudy done.
Feasibiliy and deaileddesign pending
Kinshasa - Inkisi - Ngindinga -Mbanza Sosso road (Angolaborder, 120 km): rehabiliaion
Angola and DRC SADC Malanjecorridor/PIDATAH 3
120 2012 – 2017 Feasibiliy sudy compleed
Kisangani - Niania - Bunia -Beni- Kasindi (Uganda border,845 km): rehabiliaion
DRC, Rwanda,Uganda, anzaniaand Kenya
SADCriparieNorhernand Cenralcorridors
700 2012 – 2016 Feasibil iy sudy compleed.Deailed design andconsrucion pending
shikapa - Angola border (117km)
Angola and DRC SADC Malanjecorridor
118 2012 – 2016 Pre-easibiliy sudycompleed. Funding or ulleasibiliy and deailed design
pending
Kolwezi - Dilolo railway:rehabiliaion
DRC, Zambia andAngola
SADC Lobiocorridor
250 2012 – 2016 Pre-easibiliy sudycompleed. Funding or ulleasibiliy and deailed designpending
Kinshasa - Ilebo railway link:consrucion
DRC, Zambia,Zimbabwe, SouhArica, Boswanaand anzania
SADC NSC,rans-Caprivi,Beira andMapuocorridors
8 2012 – 2016 Pre-easibiliy sudycompleed. Funding ordeailed design required
Pona echobanine,Mozambique: heavy haul
railway line and por
Mozambique,Boswana,
Zimbabwe, SouhArica and Swaziland
Mapuocorridor,
Norh-Souhcorridor
1.7 2012 – 2019 Abridged execuive summarycompleed in Augus 2010,
and hree counries haveagreed o finance he pre-easibiliy sudy a a cos oUS$1.8 million, equally sharedamong hem
Sena Line Railway:rehabiliaion and upgrade
Mozambique,Zambia andZimbabwe
Beira corridor 200 2013 – 2015 ender documens andconracor proposals ready
Nacala: line and new coalerminal
Mozambique andMalawi
Nacalacorridor
1.5 2012 – 2015 Deailed engineering sudies
-
8/16/2019 Regional Infrastructure Development Master Plan Executive Summary
34/40
Execuiv Smary32
ProjectBenefiting
Member StatesRegion
Project CostEstimate
($ million)
ExpectedCompletion
YearProject Status
Nacala: por modernisaion andexpansion
Mozambique Nacalacorridor
200 2012 – 2014 Maser plan, final reporand consrucion will besubjec o he conclusion
o an Environmen ImpacAssessmen (EIA)
Mbinga – Mbaba Bay: roadupgrade
anzania Mwaracorridor
53 2013 – 2016 Feasibil iy sudy, deaileddesign repors and enderdocumens
Insiuional projecs: roaduser charging sysems (RUCS),harmonisaion o corridors,sandardised CommercialisedRoad Managemen (CRM)assessmen sudy, esablishregional ranspor compeiionauhoriy, coordinaion and
aciliaion o air ranspor
All SADC MemberSaes
SADC/COMESA/EAC
38 2012 – 2017 Ongoing
Insiuional iniiaives:coninue he commercialisaiono regional airpors,ANS, wihdrawal ogovernmen paricipaionin naional airlines, coninuecommercialisaion, includingland lording o pors
All SADC MemberSaes
SADC/COMESA/EAC
2012 – 2017 Ongoing
Total 16.65 billion
-
8/16/2019 Regional Infrastructure Development Master Plan Executive Summary
35/40
33Execuiv Smary
4. Information and Communication Technologies (ICT) Sector
ProjectBenefiting
Member StatesRegion
Project CostEstimate
($ million)
ExpectedCompletion
YearProject Status
Digial erresrial elevision
(D) migraion suppor oSADC Member Saes
All SADC Member
Saes
SADC 0.77 2012 – 2016 Seing up he SADC D
Migraion Special Desk a heSADC Secrearia o overseeimplemenaion
SADC Region InormaionInrasrucure (SRII) Phase II
All SADC MemberSaes
SADC 125.155 2012 – 2016 Projec almos complee wiha ew missing links remainingon SRII Phase II
Ensuring confidence in, andsecuriy o neworks andservices
All SADC MemberSaes
SADC 0.830 2012 – 2017 Model cyber securiy lawsprepared, now working wihIU impac or Member Saeassisance
Regional/naional inerneexchange poins (IXPs)
All SADC MemberSaes
SADC 0.211 2012 – 2015 Projec implemenaion hascommenced in conjuncionwih Arican Union
Commission (AUC)SADC regional and naionalinegraed broadbandinrasrucure
All SADC MemberSaes
SADC/PIDA 21,000.00 2013 – 2017
Developmen o a sharedsaellie nework o connecremoe research cenres,schools, meeorologysaions, wildlie conservaionposs, border poss, clinics,emergency services and posalbranches
All SADC MemberSaes
SADC 0.94 2013 – 2017
Implemenaion o posal codeaddressing sysems
All SADC MemberSaes
SADC 110.00 2012 – 2016 Projec has commenced insome SADC Member Saes
Exension o naional posalbranch neworks o morelocaions, especially in ruralareas
All SADC MemberSaes
SADC 0.085 2012 – 2016 Projec has commenced insome SADC Member Saes
Improving he use o IC inposal sysems
All SADC MemberSaes
SADC 140.07 2013 – 2016
Regional Global MonioringSysem (GMS) or mail QOSmeasuremen
All SADC MemberSaes
SADC 10.00 2012 – 2014 Projec has commenced insome SADC Member Saes
Esablishing a Regional Cenreo Excellence or IC andposal sysems
All SADC MemberSaes
SADC 1.50 2013 – 2015
Institutional and Regional Harmonisation ICT Policy Projects and InitiativesDevelopmen and review o heenabling policy and regulaoryenvironmen o maximise ICinrasrucure deploymen
All SADC MemberSaes
SADC 1.766 2012 – 2017 SADC has developed andreviewed some policies andguidelines
Developmen o he SADC ICObservaory
All SADC MemberSaes
SADC 0.301 2012 – 2015 erms o Reerence havebeen developed
IC capaciy building andconen (broadcasing anduniversal IC educaionprogramme)
All SADC MemberSaes
SADC 0.784 2013 – 2017
-
8/16/2019 Regional Infrastructure Development Master Plan Executive Summary
36/40
Execuiv Smary34
ProjectBenefiting
Member StatesRegion
Project CostEstimate
($ million)
ExpectedCompletion
YearProject Status
Communiy empowermenprogramme
All SADC MemberSaes
SADC 1.84 2013 – 2017
Regional/naional e-services
and applicaions developmen(e-commerce and e-pos)
All SADC Member
Saes
SADC 6.988 2012 – 2017 Adoped he SADC
e-sraegic Framework
Promoe improvedcollaboraion, inormaion andknowledge sharing beweenresearch cenres
All SADC MemberSaes
SADC 5.135 2013 – 2015
Developmen o ICequipmen manuacuring,sofware and applicaions
All SADC MemberSaes
SADC 0.375 2013 – 2016
Total 21.40 billion
-
8/16/2019 Regional Infrastructure Development Master Plan Executive Summary
37/40
35Execuiv Smary
5. Meteorology Sector
ProjectBenefiting
Member StatesRegion
Project CostEstimate
($ million)
ExpectedCompletion
YearProject Status
AMESD Projec Angola, Boswana,
Namibia,Lesoho, Malawi,Mozambique, SouhArica, Swaziland,anzania, Zimbabweand Zambia
SADC 1.95 May 2013 Ongoing