Regional Criteria Work Group (RCWG) Recommendation for RPIC August 15, 2012 Brian Theaker RCWG...

22
Regional Criteria Work Group (RCWG) Recommendation for RPIC August 15, 2012 Brian Theaker RCWG Chair

Transcript of Regional Criteria Work Group (RCWG) Recommendation for RPIC August 15, 2012 Brian Theaker RCWG...

Page 1: Regional Criteria Work Group (RCWG) Recommendation for RPIC August 15, 2012 Brian Theaker RCWG Chair.

Regional Criteria Work Group (RCWG)Recommendation for RPIC

August 15, 2012

Brian Theaker

RCWG Chair

Page 2: Regional Criteria Work Group (RCWG) Recommendation for RPIC August 15, 2012 Brian Theaker RCWG Chair.

2

• Background

• RCWG Recommendation

• Comments

• Other issues outside RCWG scope

• RPIC vote on recommendation

• Next steps

Agenda

Page 3: Regional Criteria Work Group (RCWG) Recommendation for RPIC August 15, 2012 Brian Theaker RCWG Chair.

3

• RCWG formed in August 2011

• Focus: Regional Criteria (“RegCr”)

• Joint RPIC/GNC concerns

• MembershipoChairs of standing committeesoRPIC and GNC members

Background

Page 4: Regional Criteria Work Group (RCWG) Recommendation for RPIC August 15, 2012 Brian Theaker RCWG Chair.

4

RCWG Membership

• Steve Ashbaker, WECC RPIC*• John Tolo, TEP (OC Chair) GNC**• Dick Ferreira, TANC* Board• Bob Harshbarger, PSE (MIC Chair)• Vicken Kasarjian, SMUD*• Diana Pommen, AESO*• Steve Rueckert, WECC• John Stout, Mariner Consulting (Board Vice-Chair)**• Brian Theaker, NRG Energy, Inc. (RCWG Chair)*• Scott Waples, Avista (PCC Chair)• Tom Botello, SCE (emeritus)

Page 5: Regional Criteria Work Group (RCWG) Recommendation for RPIC August 15, 2012 Brian Theaker RCWG Chair.

5

• RegCr impose mandatory requirements but are not under the CMEP

• Only WECC members are required to adhere to RegCr requirementso Loss of WECC membership most severe sanction

for failing to adhere

• Perception that RegCr were increasingly being used for reliability purposes o Frequency Responsive Reserve

RegCr Concerns

Page 6: Regional Criteria Work Group (RCWG) Recommendation for RPIC August 15, 2012 Brian Theaker RCWG Chair.

6

• Develop recommendations to:o Eliminate RegCr that do not serve reliabilityo Incorporate RegCr requirements to standards,

incl. new as appropriate

• Annual list of applicable RegCr

• Estimate impact of non-adherence to RegCr

• Develop methods of monitoring adherenceoMinimally burdensome

RCWG Charter

Page 7: Regional Criteria Work Group (RCWG) Recommendation for RPIC August 15, 2012 Brian Theaker RCWG Chair.

7

• Documents that impose mandatory requirements that materially affect reliability should be standards

• Documents that impose mandatory requirements that do not materially affect reliability but do promote efficient business should be Regional Business Practices

RCWG Principles

Page 8: Regional Criteria Work Group (RCWG) Recommendation for RPIC August 15, 2012 Brian Theaker RCWG Chair.

8

• RCWG White Paper

• Mark-up of WECC Document Categorization Policy

• Proposed Process for Monitoring Adherence to WECC RBP Requirements

Final RCWG Package Includes

Page 9: Regional Criteria Work Group (RCWG) Recommendation for RPIC August 15, 2012 Brian Theaker RCWG Chair.

9

• Retain eight (9) RegCr that satisfy “Fill-In-The-Blank” requirements as RegCr:o EOP-007-WECC-CRT-1

Blackstart Unit Testingo MOD-[011-013]-WECC-CRT-1

Steady State and Dynamic Datao PRC-[012-014]-WECC-CRT-2

Remedial Action Schemeso PRC-003-WECC-CRT-1

Relay Mis-operation o PRC-006-WECC-CRT-1

Underfrequency Load Shedding

Recommendation

Page 10: Regional Criteria Work Group (RCWG) Recommendation for RPIC August 15, 2012 Brian Theaker RCWG Chair.

10

• Draft SARs to evaluate seven (7) existing RC for promotion to standards:o PRC-001-WECC-CRT-1

(Governor Droop criterion)o PRC-024-WECC-CRT-1

(Low Voltage Ride-Though Criterion)o TPL-[001-004]-WECC-CRT-2

(System Performance Criteria)o VAR-502-WECC-CRT-0

(Power System Stabilizer Design and Performance)

Recommendation (2)

Page 11: Regional Criteria Work Group (RCWG) Recommendation for RPIC August 15, 2012 Brian Theaker RCWG Chair.

11

• Request custodian work group (Telecommunications Work Group) to evaluate one (1) existing Regional Criterion for possible demotion to a guidelineoCOM-001-WECC-CRT-1

Digital Circuits Sychronization

Recommendation (3)

Page 12: Regional Criteria Work Group (RCWG) Recommendation for RPIC August 15, 2012 Brian Theaker RCWG Chair.

12

• Rename sixteen (16) existing “INT” RegCr as “Regional Business Practices”o INT-001, 003, 004, 005, 007, 008, 009, 010,

011, 014, 015, 016, 017, 018, 020, 021oNo fundamental change in the nature of the

requirements they impose oNo desire to derail INT re-write effort underwayo If parties feel INTs are mis-categorized, they

can submit a SAR

Recommendation (4)

Page 13: Regional Criteria Work Group (RCWG) Recommendation for RPIC August 15, 2012 Brian Theaker RCWG Chair.

13

Proposed Disposition of RegCr

Page 14: Regional Criteria Work Group (RCWG) Recommendation for RPIC August 15, 2012 Brian Theaker RCWG Chair.

14

• Approve and implement “Process for Monitoring Adherence to WECC Regional Business Practice Requirements”

Recommendation (5)

Page 15: Regional Criteria Work Group (RCWG) Recommendation for RPIC August 15, 2012 Brian Theaker RCWG Chair.

15

• Staff posts list of applicable RBP annually• 3rd party reporting of alleged non-adherence

WECC staff review allegations of non-adherence Confidentiality maintained If non-adherent, submit plan for adherence Appeals to Board/designated committee WECC posting of confirmed non-adherence

• Still missing: an exemptions/exceptions process

RBP Adherence Process Components

Page 16: Regional Criteria Work Group (RCWG) Recommendation for RPIC August 15, 2012 Brian Theaker RCWG Chair.

16

• Initial recommendation posted May 1

• Comments received June 1o Ten sets of comments receivedoOpposition to annual officer confirmationoDivided on other aspects

• Revised recommendation posted July 10o Six sets of comments received July 25oWith one exception, comments editorial

Member Feedback

Page 17: Regional Criteria Work Group (RCWG) Recommendation for RPIC August 15, 2012 Brian Theaker RCWG Chair.

17

• Support annual confirmation • Indirect impacts of failure to adhere to RBP• Guideline development must follow process set

forth in Bylaws §8.5.6oOutside RCWG scope

• Categorization dispute resolution processo June RPIC meeting – whom? WSC? RPIC?

• Need an exemptions/exceptions processoRCWG agrees – but whom?

Powerex Positions

Page 18: Regional Criteria Work Group (RCWG) Recommendation for RPIC August 15, 2012 Brian Theaker RCWG Chair.

18

• Develop recommendations to:o Eliminate RegCr that do not serve reliabilityo Incorporate RegCr requirements to standards,

incl. new as appropriate

• Annual list of applicable RegCr

• Estimate impact of non-adherence to RegCr

• Methods of monitoring adherenceoMinimally burdensome

RCWG Charter & Recommendation

Page 19: Regional Criteria Work Group (RCWG) Recommendation for RPIC August 15, 2012 Brian Theaker RCWG Chair.

19

• Exceptions/exemptions process

• Document categorization dispute resolution process

Follow-up items:

Page 20: Regional Criteria Work Group (RCWG) Recommendation for RPIC August 15, 2012 Brian Theaker RCWG Chair.

20

• Moved, that the Reliability Policy Issues Committee approve the RCWG recommendation as presented on August 15, 2012

Motion

Page 21: Regional Criteria Work Group (RCWG) Recommendation for RPIC August 15, 2012 Brian Theaker RCWG Chair.

21

• Seek Board approval at next available Board meeting

Next steps

Page 22: Regional Criteria Work Group (RCWG) Recommendation for RPIC August 15, 2012 Brian Theaker RCWG Chair.

Brian Theaker

RCWG Chair

NRG Energy, Inc.

[email protected]

530-295-3305

Questions?