    Regional Connector Transit CorridorAugust 2012 Community Update Meetings

    1

    1st St/Central Av Station Community Meeting May 30, 2013

  • 7/28/2019 Regional Connector PPT

    2/22

    2

    Agenda> Project Overview and Update

    > Presentation on Extended Work Hours

    Request> Community Outreach and Notification

    > Next Steps

    > How to Contact Us

  • 7/28/2019 Regional Connector PPT

    3/22

    Project Overview> $1.366 Billion

    underground Light RailTransit System

    > Connect Metro GoldLine to Metro Blue andExpo Lines

    > 1.9-miles with 3underground stations

    > 90,000 Daily ProjectedTransit Trips

    > 17,700 Daily New

    Transit Trips3

  • 7/28/2019 Regional Connector PPT

    4/22

    4

    Project Update> Request for Proposal issued to prequalified

    Design/Builders

    >Proposals due July, 2013

    > Contract Award and Notice to Proceedissuance end of 2013

    > Design/Build activities begin

  • 7/28/2019 Regional Connector PPT

    5/22

    Project Update

    5

    3rd Party Utility Relocation

    > Excavation and conduit installation by AT&T

    > 1st

    St from Central Av. to E/O Alameda St.> Anticipated to start this summer

    > Anticipated work hours are Monday Friday:

    9am -3:30pm; Saturday: 8am 6pm> Work with community to ensure Nisei Week

    is a successful event (August)

  • 7/28/2019 Regional Connector PPT

    6/22

    Information on Metros Requestfor an Extended Work Hours

    6

  • 7/28/2019 Regional Connector PPT

    7/22

    Summary of Work HoursDaytime Allowable Hours Extended HoursMonday Friday: 7am - 9pm Monday Friday: 9pm - 7am of the

    following day

    Saturday: 8am -6pm Saturday: Before 8am & after 6pm

    No Sunday work All day Sunday

    7

    Peak Traffic Hour: Restricts construction from 6am 9am and from3:30pm 7pm, Monday through Friday.

    Holiday Moratorium: Restricts construction from before Thanksgivingto after New Years Day holidays.

  • 7/28/2019 Regional Connector PPT

    8/22

    Extended Work Hours Request

    8

    > Metro requests extended work hourvariances from City codes

    > Variances allow longer work hours,including nights and on Sundays

    > Continued approval is conditional onperformance

    > All work will be scheduled in advance,with notice to community

  • 7/28/2019 Regional Connector PPT

    9/22

    Extended Work Hours Request

    9

    > Compliance with the Mitigation Monitoringand Reporting Program (MMRP) is required

    > Project Hotline operates 24 hours per dayand 7 days a week

    > Metros team has used these variances onthe successful Eastside Gold Lineconstruction

  • 7/28/2019 Regional Connector PPT

    10/22

    Extended Work Hours Request

    10

    Why is needed

    > Minimize construction impacts to thecommunity

    > Shorten the overall duration of construction

    > Reduce construction impacts to traffic

    > Complete project early 2020

  • 7/28/2019 Regional Connector PPT

    11/22

    1st St/Central Av Station

    11

  • 7/28/2019 Regional Connector PPT

    12/22

    1st St/Central Av Station> Central Av, south

    of 1st St

    > Intersection ofAlameda St andTemple Av

    > 1st St, West andEast of Alameda St

    12

  • 7/28/2019 Regional Connector PPT

    13/22

    Conceptual Construction Sequencing

    13

  • 7/28/2019 Regional Connector PPT

    14/22

    14

    Soldier Pile Installation

  • 7/28/2019 Regional Connector PPT

    15/22

    Deck Installation> Deck support system

    in place during MetroGold LineConstruction

    15

  • 7/28/2019 Regional Connector PPT

    16/22

    Deck Installation> Temporary Deck

    maintainsmobility of trafficwhile

    constructionactivities takeplace below it

    16

  • 7/28/2019 Regional Connector PPT

    17/22

    17

    Excavation below street surface

    Existing utilities and support systems arevisible.

    Construction Overview Cut and Cover

  • 7/28/2019 Regional Connector PPT

    18/22

    18

    Tunneling Equipment

  • 7/28/2019 Regional Connector PPT

    19/22

    Summary

    19

    > Receive support for extended work hours tominimize construction duration

    > Reduction in overall duration and relatedconstruction impacts

    > Deliver project to the community andbusinesses by 2020

  • 7/28/2019 Regional Connector PPT

    20/22

    Next Steps

    20

    > LAPD Commission Staff may contact youabout Metros variance request

    > Questions or Comments can be directed toMetro Construction Relations

    > Letters of Support

  • 7/28/2019 Regional Connector PPT

    21/22

    Community Outreach and Notification

    21

    > Advance look-ahead of activities provided atCommunity Leadership Council Committee(CLCC) and community meetings

    > CLCC presentation on activities in advance ofwork starting

    > Notification to stakeholders one week in

    advance of work starting> Construction updates on Project website,

    Facebook and Twitter

  • 7/28/2019 Regional Connector PPT

    22/22

    22

    How to Contact [email protected]

    Facebook.com/metroregionalconnector

    @metroconnector

    www.Metro.net/regionalconnector

    Project Hotline: 213-922-7277

    https://www.facebook.com/MetroRegionalConnectorhttps://www.facebook.com/MetroRegionalConnectorhttp://twitter.com/metroconnectorhttp://www.metro.net/regionalconnectorhttp://www.metro.net/regionalconnectorhttp://www.metro.net/regionalconnectorhttp://twitter.com/metroconnectorhttp://twitter.com/metroconnectorhttps://www.facebook.com/MetroRegionalConnectorhttps://www.facebook.com/MetroRegionalConnectorhttps://www.facebook.com/MetroRegionalConnectorhttps://www.facebook.com/MetroRegionalConnector