Regional Conference “THROUGH COOPERATION TOWARDS INTEGRATION” Montenegro, 8-9 th October 2007

21
Regional Conference “THROUGH COOPERATION TOWARDS INTEGRATION” Montenegro, 8-9 th October 2007 Working Group II Instrument of Pre Accession and Cross Border Cooperation REPUBLIC OF ALBANIA MINISTRY OF EUROPEAN INTEGRATION

description

REPUBLIC OF ALBANIA MINISTR Y OF EUROPEAN INTEGRATION. Regional Conference “THROUGH COOPERATION TOWARDS INTEGRATION” Montenegro, 8-9 th October 2007. Working Group II Instrument of Pre Accession and Cross Border Cooperation. Content. Organization and respons i bilities - PowerPoint PPT Presentation

Transcript of Regional Conference “THROUGH COOPERATION TOWARDS INTEGRATION” Montenegro, 8-9 th October 2007

Page 1: Regional Conference  “THROUGH COOPERATION TOWARDS INTEGRATION” Montenegro, 8-9 th  October 2007

Regional Conference “THROUGH COOPERATION TOWARDS

INTEGRATION”Montenegro, 8-9th October 2007

Working Group IIInstrument of Pre Accession and Cross Border Cooperation

REPUBLIC OF ALBANIAMINISTRY OF EUROPEAN INTEGRATION

Page 2: Regional Conference  “THROUGH COOPERATION TOWARDS INTEGRATION” Montenegro, 8-9 th  October 2007

Content

• Organization and responsibilities

• Overview of EU funds– Component I – “Institution Building and

Transition Support”– Component II – “Cross Border

Cooperation”

• Challenges…

Page 3: Regional Conference  “THROUGH COOPERATION TOWARDS INTEGRATION” Montenegro, 8-9 th  October 2007

EU Assistance Implementing Structures

• Delegation of the European Commission • Central Managing Authority of the EC Assistance

• Ministry of European Integration • National IPA Coordinator on the Albanian Government’s side

• Department of Donor and Strategy Coordination

• within the Council of Ministers provides support to the process through the IPS

Page 4: Regional Conference  “THROUGH COOPERATION TOWARDS INTEGRATION” Montenegro, 8-9 th  October 2007

IPA Coordinating Structures

Line Ministries and other Government Agencies

Ministry of European Integration

Council of Ministers

Department Strategy and Donor

Coordination

European Union

European Commissi

on

CBC Unit

Member States

IPA Unit

EC Delegatio

n in Albania

Page 5: Regional Conference  “THROUGH COOPERATION TOWARDS INTEGRATION” Montenegro, 8-9 th  October 2007

Ministry of European Integration

• Appointed National IPA Coordinator• Two main Sectors:

• Sector of IPA dealing with Component I• Sector of Regional Cooperation dealing with Component II

• Main Tasks• lead the process of programming EU funds• co-operation with Line Ministries and central institutions to

identify the priorities for funding by IPA Programme and in consultation with the Department of Strategy and Donor Coordination shall submit these priorities for approval to the Strategic Planning Committee

• coordinate, monitor and report the implementation of EU funded projects between the DEC and Line Institutions

Page 6: Regional Conference  “THROUGH COOPERATION TOWARDS INTEGRATION” Montenegro, 8-9 th  October 2007

Department of Donor and Strategy Coordination

• The Department is responsible for implementing the Integrated Planning System (IPS) approved by the Government in November 2005

• The Department main Tasks are:– To improve consultation process with donor community – To align international assistance with national priorities

• The Department coordinates all sources of Foreign Assistance

• In charge of preparing the Strategic Planning Committee agenda

Page 7: Regional Conference  “THROUGH COOPERATION TOWARDS INTEGRATION” Montenegro, 8-9 th  October 2007

European Integration Units

• Establishment of EIU in each Line Ministry was done by CMD no. 179, dated 22.02.2006

• Under direct supervision and responsibility of the Secretary General in each Line Ministry

• Role: Coordination and support in implementing SAA obligations within the Line Ministry, – contact points for the programming phase

• Accommodation of SPO’s upon future appointments

Page 8: Regional Conference  “THROUGH COOPERATION TOWARDS INTEGRATION” Montenegro, 8-9 th  October 2007

Overview of EU Financial Assistance to Albania

• CARDS 2001 – Completed • CARDS 2002 – Completed• CARDS 2003 – Completed• CARDS 2004 – Contracting completed• CARDS 2005 – Implementation has started in 2006,

contracting to be completed Sept.2008

• CARDS 2006 – Approval Procedures have started• IPA 2007 – Signature of Financial Agreement

expected end of 2007• IPA 2008 – Under programming phase

Page 9: Regional Conference  “THROUGH COOPERATION TOWARDS INTEGRATION” Montenegro, 8-9 th  October 2007

Overview of EU Assistance under IPA

Albania for the period 2007 – 2009 benefits form Component I and II

YEARS

COMPONENTS

2007 2008 2009 2007-2009

COMPONENT I Institution

Building and Transition Support

54.3 61.1 70.9 186

COMPONENT II

Cross-Border Cooperation

6.7 9.6 10.3 26.6

TOTAL (in mill Euros)

61.0 70.7 81.1 212.6

Page 10: Regional Conference  “THROUGH COOPERATION TOWARDS INTEGRATION” Montenegro, 8-9 th  October 2007

IPA 2007 projects• Political requirements (16.5 million Euro)

– Support for PAMECA– TA to the CFCU– Implementation of the pre-detention system

• Economic and social requirements (9.5 million Euro)– Contribution to multibeneficiary programs– Support to INSTAT– Support SME policies

• European Standards (28.3 million Euro)– Rehabilitation of water and sewerage system– Customs and Taxation Support

Page 11: Regional Conference  “THROUGH COOPERATION TOWARDS INTEGRATION” Montenegro, 8-9 th  October 2007

Key lessons from IPA 2007 – National Plan for the implementation of the SAA

• Basic document for reporting the accomplishment of the Albanian obligations in the European Integration Process

• Basic reference for programming of IPA assistance

– Financial needs from the National Plan reflected to the MTBP and the annual budget as part of the Gov’t Integrated Planning System

– Overlapping of CARDS project

– Projects under Component of regional development

Page 12: Regional Conference  “THROUGH COOPERATION TOWARDS INTEGRATION” Montenegro, 8-9 th  October 2007

Programming of IPA 2008

IPA '08

Strategic Planning

Committee Approval in principle in the

SPC / Discussion with ECD

Working groups Set up of Internal

working groups / discussion with Line

MinistriesWriting of project fiches

After a final approval of the

potential project ideas,

beneficiaries will write the project

fiches

Submission of project fiches

The deadline to submit IPA project fiches is

beginning of February 2008, IPA Committee

June 2008

Revision of the NPISAA

Identification of priorities for IPA 2008

Discussion with ECD

Current stage

Page 13: Regional Conference  “THROUGH COOPERATION TOWARDS INTEGRATION” Montenegro, 8-9 th  October 2007

CBC Component1. CBC Programmes (bordering countries)

1.1 EU member states– IPA-Adriatic - ~15 mln Euro 2007-2009– Greece-Albania ~ 4 mln Euro 2007-2009

1.2 Western Balkans

– Albania-Montenegro ~ 2,5 Mln Euro 2007-2009 – Macedonia-Albania ~2.7 Mln Euro 2007-2009 – Unilateral programme at the regions bordering Kosovo

2007 – 0.5 Mln Euro ( 2.4 Mln Euro 2007-2009)

Page 14: Regional Conference  “THROUGH COOPERATION TOWARDS INTEGRATION” Montenegro, 8-9 th  October 2007

CBC component (Con’t)Current status:

• Programming Structures of the CBC Programmes have been established

• Preparation of the CBC Programme documents– internal borders: fyRoM-AL, AL-MN, unilateral Programme with Kosova– external borders: GR-AL, Adriatic

• Submission of the CBC Programmes in the European Commission

Future activities:

• Raise the awareness for participation in CBC Programmes (training of local stakeholders, in the framework of the launch of proposal)

• Preparation on building the JTSs of the CBC Programmes

Page 15: Regional Conference  “THROUGH COOPERATION TOWARDS INTEGRATION” Montenegro, 8-9 th  October 2007

CBC Component (Con’t)

2. Transnational Programmes

• Southeast Europe – 0.6 Mln Euro for 2007-2009• Programme submitted – To be approved by the end of

December 2007

• MED 2007 – no participation for 2007, under discussion participation for the coming years

3. Interregional Programmes – No current participation

Page 16: Regional Conference  “THROUGH COOPERATION TOWARDS INTEGRATION” Montenegro, 8-9 th  October 2007

Community Programmes• Lead the internal and external consultation and

coordination process (Line Ministries and Stakeholder)

• Preparation and start of the participation procedures

• Expresion of interest for full participation in 2008 in: - Seventh Framework Programme (FP7)- Competitiveness & Innovation Programme (CIP)- Europe for Citizens- Youth in Action

• Close cooperation with line Ministries in preparatory/information activities

• Support for providing the necessary compatible framework conditions for the management of CPs (strengthening administrative capacities)

Page 17: Regional Conference  “THROUGH COOPERATION TOWARDS INTEGRATION” Montenegro, 8-9 th  October 2007

Challenges ahead

• Enhance capacities to better conduct the programming process and the monitoring of project implementation;

• Better coordination with member states and IFIs;

• Completion of the decentralization process

Page 18: Regional Conference  “THROUGH COOPERATION TOWARDS INTEGRATION” Montenegro, 8-9 th  October 2007

Programming and monitoring of project implementation

• Greater active involvement of the beneficiaries since the programming phase;

• Enhance administrative capacity to manage the projects ;

• Conduct independent assessment of the efficiency of projects that are being implemented as well as effectiveness (objectives achievement)

Page 19: Regional Conference  “THROUGH COOPERATION TOWARDS INTEGRATION” Montenegro, 8-9 th  October 2007

Donor coordination

Need for better coordination of donor assistance:

• improvement of consultation process with donor community through donor meetings and working tables;

• alignment of international assistance with national priorities;

Page 20: Regional Conference  “THROUGH COOPERATION TOWARDS INTEGRATION” Montenegro, 8-9 th  October 2007

Towards decentralization process

• Council of Ministers Decision on the newly established IPA implementation structures:– Appointment of CAO, NAO, PAO – CFCU – Central Financing and Contracting Unit is

established within the Ministry of Finance– SPO – Senior Programme Officer to be appointed

within the European Integration Units

• Close cooperation with the MF and transition from centralized to the DIS: – establishment of effective and efficient management

of the tendering and contracting procedures, and – viable technical and financial reporting system

Page 21: Regional Conference  “THROUGH COOPERATION TOWARDS INTEGRATION” Montenegro, 8-9 th  October 2007

Contact Details

Ministry of European Integration

www.mie.gov.al

• Department of Institutional Support and the Integration Process • Tel 228645/ fax 256267

• E-mail: [email protected] (Head of Department) [email protected] (IPAUnit) [email protected] (IPA Unit) [email protected] (CBC Unit)

[email protected] (CBC Unit)