Region IV Plan Review Training for Local Hazard Mitigation Plans
description
Transcript of Region IV Plan Review Training for Local Hazard Mitigation Plans
![Page 1: Region IV Plan Review Training for Local Hazard Mitigation Plans](https://reader036.fdocuments.in/reader036/viewer/2022062519/5681557e550346895dc347b3/html5/thumbnails/1.jpg)
Region IV Plan Review Training
for Local Hazard Mitigation Plans
Brenda Stirrup, HM Planning SpecialistLarry Breland, HM Planning Analyst
August 2014
![Page 2: Region IV Plan Review Training for Local Hazard Mitigation Plans](https://reader036.fdocuments.in/reader036/viewer/2022062519/5681557e550346895dc347b3/html5/thumbnails/2.jpg)
2
Agenda Purpose of Updating Plan
Review Guide and Tool Local Mitigation Plan Review
Guide Local Mitigation Plan Review
Tool Local Mitigation Plan Review
Procedures
![Page 3: Region IV Plan Review Training for Local Hazard Mitigation Plans](https://reader036.fdocuments.in/reader036/viewer/2022062519/5681557e550346895dc347b3/html5/thumbnails/3.jpg)
3
Update of Plan Review Guide and Tool - 2011
Increase Mitigation Plan focus on risk reduction strategies.
Promote alignment with the Law and regulations.
Improve consistency of plan reviews and minimize subjective interpretation.
Facilitate more positive interaction between FEMA , States, and plan developers by increasing responsiveness to communities.
Simplify and improve efficiency of the plan review process to use less State, local, and FEMA time and resources.
Introduction to the Mitigation Plan Review Process - Purpose
![Page 4: Region IV Plan Review Training for Local Hazard Mitigation Plans](https://reader036.fdocuments.in/reader036/viewer/2022062519/5681557e550346895dc347b3/html5/thumbnails/4.jpg)
4
Introduction to Mitigation Plan
Review Process- Solutions
Plan Review Update Solutions:Developed new Plan Review Guide Developed a Plan Review Tool to replace the Crosswalk
Developed Quality Assurance Measures
Provided web-based plan review training
Developed the Mitigation Planning Handbook
![Page 5: Region IV Plan Review Training for Local Hazard Mitigation Plans](https://reader036.fdocuments.in/reader036/viewer/2022062519/5681557e550346895dc347b3/html5/thumbnails/5.jpg)
5
Local Mitigation Plan Review Guide
Plan Review Guide Sections:
Introduction (purpose, roles and responsibilities)
Plan Review Guiding PrinciplesCompleting the Plan Review Tool
![Page 6: Region IV Plan Review Training for Local Hazard Mitigation Plans](https://reader036.fdocuments.in/reader036/viewer/2022062519/5681557e550346895dc347b3/html5/thumbnails/6.jpg)
6
Local Mitigation Plan Review Guide
Plan Review Guide Sections continued:
Regulation ChecklistPlan Review Procedure (plan review, submittal, approval and adoption)
Appendix A: Local Mitigation Plan Review Tool
![Page 7: Region IV Plan Review Training for Local Hazard Mitigation Plans](https://reader036.fdocuments.in/reader036/viewer/2022062519/5681557e550346895dc347b3/html5/thumbnails/7.jpg)
7
Local Mitigation Plan Review Tool
Highlights of the Plan Review Tool Simplifies review process for States and FEMA Regions and reduces time
Provides user-friendly feedback to community
Highlights positive features of the plan
Offers opportunities for improvement beyond minimum requirements
Enables a more holistic review of the plan and focuses on approving plans if they meet all essential elements
![Page 8: Region IV Plan Review Training for Local Hazard Mitigation Plans](https://reader036.fdocuments.in/reader036/viewer/2022062519/5681557e550346895dc347b3/html5/thumbnails/8.jpg)
8
Local Mitigation Plan Review - Audience and Roles
Target Audience – States and FEMA
State - responsible for initial review and coordination of the plan between the local government and FEMA.
FEMA - responsible for the final review and approval of all Local Mitigation Plans.
![Page 9: Region IV Plan Review Training for Local Hazard Mitigation Plans](https://reader036.fdocuments.in/reader036/viewer/2022062519/5681557e550346895dc347b3/html5/thumbnails/9.jpg)
9
Local Mitigation Plan Review - Guiding Principles
Focus on Mitigation StrategyEmphasis on actions and implementation.
Review for Intent, as well as ComplianceFocus on whether mitigation plan meets the intent of the law and
regulation. Process is as Important as the Plan Itself
Emphasis is on what must be documented in the plan, rather than specify exactly how it must be done.
“This is the Community’s Plan”A performance, rather than a prescriptive approach to the planning requirements. FEMA will recognize the inherent differences that exist among local governments with respect to size, resources, capability, and vulnerability.
Foster RelationshipsFEMA will provide technical assistance that facilitates successful plan development and approval.
![Page 10: Region IV Plan Review Training for Local Hazard Mitigation Plans](https://reader036.fdocuments.in/reader036/viewer/2022062519/5681557e550346895dc347b3/html5/thumbnails/10.jpg)
10
Local Mitigation Plan Review Guide – Regulatory Compliance
The Plan Review Tool Guide: Is FEMA’s official source for defining the requirements
of original and updated Local Mitigation Plans. Represents FEMA’s interpretation of all statutory or
regulatory requirements. The Guide sets forth a standard operating procedure for FEMA to be consistent, fair, and equitable in the implementation of the agency’s authorities.
Includes references to specific language in 44 CFR §201.6 and descriptions of relevant requirements to meet the Mitigation Planning regulations.
Must be referenced when completing the Local Mitigation Plan Review Tool.
![Page 11: Region IV Plan Review Training for Local Hazard Mitigation Plans](https://reader036.fdocuments.in/reader036/viewer/2022062519/5681557e550346895dc347b3/html5/thumbnails/11.jpg)
11
Local Mitigation Plan Review Guide Language Distinction between “shall” Regulation Checklist
includes only the requirements where the regulation uses the words “shall” and “must”
and “should” FEMA strongly
recommends including items related to requirements using the word “should”
![Page 12: Region IV Plan Review Training for Local Hazard Mitigation Plans](https://reader036.fdocuments.in/reader036/viewer/2022062519/5681557e550346895dc347b3/html5/thumbnails/12.jpg)
12
Local Mitigation Plan Review Tool
Walk-through
![Page 13: Region IV Plan Review Training for Local Hazard Mitigation Plans](https://reader036.fdocuments.in/reader036/viewer/2022062519/5681557e550346895dc347b3/html5/thumbnails/13.jpg)
13
Local Mitigation Plan Review Tool
Local Mitigation Plan Review Tool
1.Cover Page
2.Regulation Checklist
3.Plan Assessment
4.Multi-jurisdiction Summary Spreadsheet
![Page 14: Region IV Plan Review Training for Local Hazard Mitigation Plans](https://reader036.fdocuments.in/reader036/viewer/2022062519/5681557e550346895dc347b3/html5/thumbnails/14.jpg)
14
D. Local Mitigation Plan Review Tool: Cover Page
![Page 15: Region IV Plan Review Training for Local Hazard Mitigation Plans](https://reader036.fdocuments.in/reader036/viewer/2022062519/5681557e550346895dc347b3/html5/thumbnails/15.jpg)
15
Local Mitigation Plan Review ToolRegulation Checklist
Must be completed by the State and submitted with the Mitigation Plan to FEMA-R4
State must identify the location of plan content by sub-element
FEMA will determine whether each element is “met” or “not met”
FEMA will provide a clear explanation of the revisions that are required for plan approval for each sub-element that is “not met” using the appropriate numbers (A1, B3, etc.).
![Page 16: Region IV Plan Review Training for Local Hazard Mitigation Plans](https://reader036.fdocuments.in/reader036/viewer/2022062519/5681557e550346895dc347b3/html5/thumbnails/16.jpg)
16
Local Mitigation Plan Review Tool: Planning Process – Element A1
![Page 17: Region IV Plan Review Training for Local Hazard Mitigation Plans](https://reader036.fdocuments.in/reader036/viewer/2022062519/5681557e550346895dc347b3/html5/thumbnails/17.jpg)
17
Local Mitigation Plan Review Tool: Planning Process - Element A2
![Page 18: Region IV Plan Review Training for Local Hazard Mitigation Plans](https://reader036.fdocuments.in/reader036/viewer/2022062519/5681557e550346895dc347b3/html5/thumbnails/18.jpg)
18
Local Mitigation Plan Review Tool: Planning Process -Element A3
![Page 19: Region IV Plan Review Training for Local Hazard Mitigation Plans](https://reader036.fdocuments.in/reader036/viewer/2022062519/5681557e550346895dc347b3/html5/thumbnails/19.jpg)
19
Local Mitigation Plan Review Tool: Planning Process - Element A4
![Page 20: Region IV Plan Review Training for Local Hazard Mitigation Plans](https://reader036.fdocuments.in/reader036/viewer/2022062519/5681557e550346895dc347b3/html5/thumbnails/20.jpg)
20
Local Mitigation Plan Review Tool: Planning Process - Element A5
![Page 21: Region IV Plan Review Training for Local Hazard Mitigation Plans](https://reader036.fdocuments.in/reader036/viewer/2022062519/5681557e550346895dc347b3/html5/thumbnails/21.jpg)
21
Local Mitigation Plan Review Tool: Planning Process - Element A6
![Page 22: Region IV Plan Review Training for Local Hazard Mitigation Plans](https://reader036.fdocuments.in/reader036/viewer/2022062519/5681557e550346895dc347b3/html5/thumbnails/22.jpg)
22
D. Local Mitigation Plan Review Tool: Example
![Page 23: Region IV Plan Review Training for Local Hazard Mitigation Plans](https://reader036.fdocuments.in/reader036/viewer/2022062519/5681557e550346895dc347b3/html5/thumbnails/23.jpg)
23
Local Mitigation Plan Review Tool: Risk Assessment – Element B1
![Page 24: Region IV Plan Review Training for Local Hazard Mitigation Plans](https://reader036.fdocuments.in/reader036/viewer/2022062519/5681557e550346895dc347b3/html5/thumbnails/24.jpg)
24
Local Mitigation Plan Review Tool: Risk Assessment – Element B2
![Page 25: Region IV Plan Review Training for Local Hazard Mitigation Plans](https://reader036.fdocuments.in/reader036/viewer/2022062519/5681557e550346895dc347b3/html5/thumbnails/25.jpg)
25
Local Mitigation Plan Review Tool: Risk Assessment – Element B3
![Page 26: Region IV Plan Review Training for Local Hazard Mitigation Plans](https://reader036.fdocuments.in/reader036/viewer/2022062519/5681557e550346895dc347b3/html5/thumbnails/26.jpg)
26
Local Mitigation Plan Review Tool: Risk Assessment – Element B4
![Page 27: Region IV Plan Review Training for Local Hazard Mitigation Plans](https://reader036.fdocuments.in/reader036/viewer/2022062519/5681557e550346895dc347b3/html5/thumbnails/27.jpg)
27
![Page 28: Region IV Plan Review Training for Local Hazard Mitigation Plans](https://reader036.fdocuments.in/reader036/viewer/2022062519/5681557e550346895dc347b3/html5/thumbnails/28.jpg)
28
Local Mitigation Plan Review Tool: Mitigation Strategy – Element C1
![Page 29: Region IV Plan Review Training for Local Hazard Mitigation Plans](https://reader036.fdocuments.in/reader036/viewer/2022062519/5681557e550346895dc347b3/html5/thumbnails/29.jpg)
29
Local Mitigation Plan Review Tool: Mitigation Strategy – Element C2
![Page 30: Region IV Plan Review Training for Local Hazard Mitigation Plans](https://reader036.fdocuments.in/reader036/viewer/2022062519/5681557e550346895dc347b3/html5/thumbnails/30.jpg)
30
Local Mitigation Plan Review Tool: Mitigation Strategy – Element C3
![Page 31: Region IV Plan Review Training for Local Hazard Mitigation Plans](https://reader036.fdocuments.in/reader036/viewer/2022062519/5681557e550346895dc347b3/html5/thumbnails/31.jpg)
31
Local Mitigation Plan Review Tool: Mitigation Strategy – Element C4
![Page 32: Region IV Plan Review Training for Local Hazard Mitigation Plans](https://reader036.fdocuments.in/reader036/viewer/2022062519/5681557e550346895dc347b3/html5/thumbnails/32.jpg)
32
Local Mitigation Plan Review Tool: Mitigation Strategy – Element C5
![Page 33: Region IV Plan Review Training for Local Hazard Mitigation Plans](https://reader036.fdocuments.in/reader036/viewer/2022062519/5681557e550346895dc347b3/html5/thumbnails/33.jpg)
33
Local Mitigation Plan Review Tool: Mitigation Strategy – Element C6
![Page 34: Region IV Plan Review Training for Local Hazard Mitigation Plans](https://reader036.fdocuments.in/reader036/viewer/2022062519/5681557e550346895dc347b3/html5/thumbnails/34.jpg)
34
C. Local Mitigation Plan Review Tool: Review the Guide
![Page 35: Region IV Plan Review Training for Local Hazard Mitigation Plans](https://reader036.fdocuments.in/reader036/viewer/2022062519/5681557e550346895dc347b3/html5/thumbnails/35.jpg)
35
Local Mitigation Plan Review Tool: Updates Only - Element D1
![Page 36: Region IV Plan Review Training for Local Hazard Mitigation Plans](https://reader036.fdocuments.in/reader036/viewer/2022062519/5681557e550346895dc347b3/html5/thumbnails/36.jpg)
36
Local Mitigation Plan Review Tool: Updates Only - Elements D2& D3
![Page 37: Region IV Plan Review Training for Local Hazard Mitigation Plans](https://reader036.fdocuments.in/reader036/viewer/2022062519/5681557e550346895dc347b3/html5/thumbnails/37.jpg)
37
D. Local Mitigation Plan Review Tool
![Page 38: Region IV Plan Review Training for Local Hazard Mitigation Plans](https://reader036.fdocuments.in/reader036/viewer/2022062519/5681557e550346895dc347b3/html5/thumbnails/38.jpg)
38
Local Mitigation Plan Review Tool: Adoption Requirements
Element E. Plan AdoptionAdoption by the local governing body demonstrates the jurisdiction’s commitment to fulfilling the mitigation goals outlined in the plan.
Adoption legitimizes the plan and authorizes responsible agencies to execute their responsibilities.
![Page 39: Region IV Plan Review Training for Local Hazard Mitigation Plans](https://reader036.fdocuments.in/reader036/viewer/2022062519/5681557e550346895dc347b3/html5/thumbnails/39.jpg)
39
Local Mitigation Plan Review Tool: Adoption – Element E1
![Page 40: Region IV Plan Review Training for Local Hazard Mitigation Plans](https://reader036.fdocuments.in/reader036/viewer/2022062519/5681557e550346895dc347b3/html5/thumbnails/40.jpg)
40
Local Mitigation Plan Review Tool: Adoption – Element E2
![Page 41: Region IV Plan Review Training for Local Hazard Mitigation Plans](https://reader036.fdocuments.in/reader036/viewer/2022062519/5681557e550346895dc347b3/html5/thumbnails/41.jpg)
41
Local Mitigation Plan Review Tool: Plan AssessmentThe Plan Assessment MUST be completed by the FEMA Mitigation Planner
NOT required from the State Offers the local community more thoughtful, focused feedback on the quality and utility of the Plan in a narrative format
Offers an opportunity for the FEMA Mitigation Planner to provide information to the community
![Page 42: Region IV Plan Review Training for Local Hazard Mitigation Plans](https://reader036.fdocuments.in/reader036/viewer/2022062519/5681557e550346895dc347b3/html5/thumbnails/42.jpg)
42
Local Mitigation Plan Review Tool: Plan Assessment Focuses on positive aspects of the plan
Notes where the community is doing a really good job or where there may be areas of improvement
Is a short summary Does not address CFR requirements Does not replace other forms of communication
![Page 43: Region IV Plan Review Training for Local Hazard Mitigation Plans](https://reader036.fdocuments.in/reader036/viewer/2022062519/5681557e550346895dc347b3/html5/thumbnails/43.jpg)
43
Local Mitigation Plan Review Tool: Plan Assessment
Plan Strengths and Opportunities for Improvement • Organized according to plan elements
• May only include Recommended Revisions
• Suggested topics for consideration, in italics, must be deleted
![Page 44: Region IV Plan Review Training for Local Hazard Mitigation Plans](https://reader036.fdocuments.in/reader036/viewer/2022062519/5681557e550346895dc347b3/html5/thumbnails/44.jpg)
44
Local Mitigation Plan Review Tool: Plan AssessmentElement A. Planning Process
Suggested topics for consideration:• How does the Plan go above and beyond minimum requirements
to document the planning process with respect to:• Involvement of stakeholders (elected officials/decision makers,
plan implementers, business owners, academic institutions, utility companies, water/sanitation districts, etc.);
• Involvement of Planning, Emergency Management, Public Works Departments or other planning agencies (i.e., regional planning councils);
• Diverse methods of participation (meetings, surveys, online, etc.); and
• Reflective of an open and inclusive public involvement process.
![Page 45: Region IV Plan Review Training for Local Hazard Mitigation Plans](https://reader036.fdocuments.in/reader036/viewer/2022062519/5681557e550346895dc347b3/html5/thumbnails/45.jpg)
45
Local Mitigation Plan Review Tool: Plan AssessmentElement B: Hazard Identification and Risk Assessment
Suggested topics for consideration:• How does the Plan go above and beyond minimum
requirements to document the Hazard Identification and Risk Assessment with respect to:
• Use of best available data (flood maps, HAZUS, flood studies) to describe significant hazards;
• Communication of risk on people, property, and infrastructure to the public (through tables, charts, maps, photos, etc.);
• Incorporation of techniques and methodologies to estimate dollar losses to vulnerable structures;
• Incorporation of Risk MAP products (i.e., depth grids, Flood Risk Report, Changes Since Last FIRM, Areas of Mitigation Interest, etc.); and
• Identification of any data gaps that can be filled as new data became available.
![Page 46: Region IV Plan Review Training for Local Hazard Mitigation Plans](https://reader036.fdocuments.in/reader036/viewer/2022062519/5681557e550346895dc347b3/html5/thumbnails/46.jpg)
46
Local Mitigation Plan Review Tool: Resources for ImplementingResources for Implementing Your Approved Plan
Provides a place for the FEMA Mitigation Planner to offer information, data sources and general suggestions on the implementation of the plan and specific mitigation actions
Provides a place for other possible sources of assistance including, but not limited to, existing publications, grant funding or training opportunities.
Provides a place for States to add state and local resources, if available.
![Page 47: Region IV Plan Review Training for Local Hazard Mitigation Plans](https://reader036.fdocuments.in/reader036/viewer/2022062519/5681557e550346895dc347b3/html5/thumbnails/47.jpg)
47
Local Mitigation Plan Review Tool: Resources for ImplementingResources for Implementing Your Approved Plan
• Ideas may be offered on moving the mitigation plan forward and continuing the relationship with key mitigation stakeholders by identifying the following.
• What FEMA assistance (funding) programs are available (e.g., HMA) to the jurisdiction to assist with implementing the mitigation actions?
• What other Federal programs (NFIP, CRS, RiskMAP, etc.) may provide assistance for mitigation activities?
• What publications, technical guidance or other resources are available to the jurisdiction relevant to the identified mitigation actions?
• Are there upcoming trainings/workshops (BCA, HMA grants, etc.) to assist the jurisdiction?
• What mitigation actions can be funded by other Federal agencies (e.g., USFS grants, NOAA programs, EPA Smart Growth, HUD sustainability grants, etc.) and/or state and local agencies?
![Page 48: Region IV Plan Review Training for Local Hazard Mitigation Plans](https://reader036.fdocuments.in/reader036/viewer/2022062519/5681557e550346895dc347b3/html5/thumbnails/48.jpg)
48
Local Mitigation Plan Review Tool: Multi-jurisdiction SpreadsheetMulti-jurisdiction Summary Spreadsheet
States will:• List and identify each participating jurisdiction & the jurisdiction type
FEMA Reviewer will:• Summarize “Requirements Met” for each jurisdiction listed for each section of the Plan Review Tool
![Page 49: Region IV Plan Review Training for Local Hazard Mitigation Plans](https://reader036.fdocuments.in/reader036/viewer/2022062519/5681557e550346895dc347b3/html5/thumbnails/49.jpg)
49
Local Mitigation Plan Review Procedures
The next slides will discuss:Communicating the ReviewMitigation Plan SubmittalMitigation Plan ReviewMitigation Plan Approval and Adoption
![Page 50: Region IV Plan Review Training for Local Hazard Mitigation Plans](https://reader036.fdocuments.in/reader036/viewer/2022062519/5681557e550346895dc347b3/html5/thumbnails/50.jpg)
50
Local Mitigation Plan Review Procedures
Communicating the Review Call first to discuss deficiencies before sending NR letters
Mutually agree on elements Efficient process to send to Local Communities
Mitigation Plan Submittal Send to FEMA Region IV Office per Regional Guidelines including submittal letters
![Page 51: Region IV Plan Review Training for Local Hazard Mitigation Plans](https://reader036.fdocuments.in/reader036/viewer/2022062519/5681557e550346895dc347b3/html5/thumbnails/51.jpg)
51
Local Mitigation Plan Review Procedures continued
Mitigation Plan Review FEMA and State will work together 45 days, whenever possible Outcomes (NR, APA, APP)
Mitigation Plan Approval and Adoption
Adoption must occur within one calendar year of FEMA’s APA letter
Multi-jurisdictional plans: first approval date sets the 5 year expiration date for all participants
![Page 52: Region IV Plan Review Training for Local Hazard Mitigation Plans](https://reader036.fdocuments.in/reader036/viewer/2022062519/5681557e550346895dc347b3/html5/thumbnails/52.jpg)
52
In Summary Stronger emphasis on Mitigation Strategy
requirements; Simplified guidance only includes the
regulatory requirements; New Guiding Principles and Intent
statements support regulatory requirements;
Plan Review Tool replaces the existing Crosswalk in a new format that is easier to use; and
Plan Review Assessment communicates implementation of the plan as well as improvements to the plan.