REGION 4 - MOBILITY PRESENTATION
3-7-2018
PROJECTS TO DISCUSS
1. I-84: Swanson Canyon – Arlington (K20274)
• 2019 Construction Work Zone Impacts
2. ORS 366.215 Impacts
• US97: Bend – Spring Creek Hill VSL (K19260)
• I-84: Hood River EB & US97 @ Biggs Jct SB VMS
(K20860)
3. Local Jurisdiction TSP Updates
• City of Sisters
• City of Madras
2
I-84: Swanson Canyon – Arlington (K20274)
Scope - pavement preservation between MP 125-138.
Construction in 2019
MP 125.50 – 132.00 (6.5 miles)
- 3” grind, 5” inlay/overlay
MP 132.00 – 137.78 (5.8 miles)
- Left (“A”) Lane - 5” grind, 8” inlay/overlay
- Right (“B”) Lane – 3” grind, 5” inlay/overlay
Traffic Analysis – single lane conditions remain below
delay thresholds except during Memorial Day and Labor
Day weekends.
3
I-84: Swanson Canyon – Arlington (K20274)
Traffic Control Alternatives
1. Single Lane Closures $500K
– 14.5’ – 19’ horizontal clearance, likely nighttime
2. Temporary Crossover w/ Concrete Barrier $1.8M
– 18’ horizontal clearance, 24-hour restriction
– Exposure while placing barrier (12.5 miles)
3. Temporary Crossover w/ Plastic Drums $700K
– 17.5’ horizontal clearance, 24-hour restriction
– 19’ horizontal clearance at start/end
– Speed Reduction to 45mph
– See attachment “TZ_K20274_ Misc_04.pdf”
4
US97: Bend – Spring Creek Hill VSL (K19260)
Scope - design of weather responsive Variable Speed
Limit system on US97 from Lava Butte (MP 143) to Spring
Creek Hill (MP 244). Project is not funded for construction.
ORS366.215 Impacts – cantilever mounted Variable
Message Signs and Variable Speed Signs will encroach
over the roadway. Current design calls for 18’-0” vertical
clearance.
See following pages
for site locations
5
US97: Bend – Spring Creek Hill VSL (K19260)
Bend – LaPine
Site 1: MP 143.68 Southbound
Site 6: MP 152.75 Northbound
Site 7: MP 153.50 Southbound
Site14: MP 164.17 Northbound
Chemult – Spring Creek Hill
Site 15: MP 204.10 Southbound
Site 22: MP 212.98 Northbound
Site 23: MP 213.29 Southbound
Site 28: MP 227.66 Northbound
Site 29: MP 227.86 Southbound
Site 32: MP 243.22 Northbound
6
US97: Bend – Spring Creek Hill VSL (K19260)
Site 1 – US97 MP 143.68 Southbound
Designed Vertical Clearance: 18’-0”
7
US97: Bend – Spring Creek Hill VSL (K19260)
Site 6 – US97 MP 152.75 Northbound
Designed Vertical Clearance: 18’-0”
8
US97: Bend – Spring Creek Hill VSL (K19260)
Site 7 – US97 MP 153.50 Southbound
Designed Vertical Clearance: 18’-0”
9
US97: Bend – Spring Creek Hill VSL (K19260)
Site 14 – US97 MP 164.17 Northbound
Designed Vertical Clearance: 18’-0”
10
US97: Bend – Spring Creek Hill VSL (K19260)
Site 15 – US97 MP 204.10 Southbound
Designed Vertical Clearance: 18’-0”
11
US97: Bend – Spring Creek Hill VSL (K19260)
Site 22 – US97 MP 212.98 Northbound
Designed Vertical Clearance: 18’-0”
12
US97: Bend – Spring Creek Hill VSL (K19260)
Site 23 – US97 MP 213.29 Southbound
Designed Vertical Clearance: 18’-0”
13
US97: Bend – Spring Creek Hill VSL (K19260)
Site 28 – US97 MP 227.66 Northbound
Designed Vertical Clearance: 18’-0”
14
US97: Bend – Spring Creek Hill VSL (K19260)
Site 29 – US97 MP 227.86 Southbound
Designed Vertical Clearance: 18’-0”
15
US97: Bend – Spring Creek Hill VSL (K19260)
Site 32 – US97 MP 243.22 Northbound
Designed Vertical Clearance: 18’-0”
16
I-84: Hood River EB & US97 @ Biggs Jct SB VMS (K20860)
Scope – Design and installation of two Variable Message
Signs (VMSs); one on I-84 Hood River Eastbound (MP63.04)
and one on US97 @ Biggs Junction Southbound (MP TBD).
ORS366.215 Impacts – cantilever mounted VMSs will
encroach over the roadway. The current design is
proposing 18’-0” to 19’-0” vertical clearance.
17
I-84: Hood River EB & US97 @ Biggs Jct SB VMS (K20860)
I-84 at MP 63.04± Eastbound VMS
18
Located near the Westcliff Dr. Overcrossing Structure
Proposed Vertical Clearance: 18’-0” to 19’-0”
• Centered over the skip line
• Placed behind guardrail
Visual Concept of VMS
I-84: Hood River EB & US97 @ Biggs Jct SB VMS (K20860)
I-84 at MP 63.04± Eastbound VMS: Existing Structures
19
To the East: Exit 63 (MP 63.78)Sign Truss Bridge (#09199A)
Existing Vertical Clearances
• Right Lane = 18’-1”
• Left Lane = 17’-8”
Google Maps August 2016
To the West: Exit 62 (MP 62.05)Bridge Structure #09017
Existing Vertical Clearances
• EB Right Lane = 16’-9”
• EB Left Lane = 16’-0”
• Diamond Interchange
Google Maps August 2016
I-84: Hood River EB & US97 @ Biggs Jct SB VMS (K20860)
US97 at Biggs Jct Southbound VMS
20
Existing NB VMS
• Will be located within MP 0.07 to MP 0.21 on US 97 (Sherman Hwy #042)
• Proposed Vertical Clearance: 18’-0” to 19’-0”• US97: Biggs Jct. - Spanish Hollow & Trout Creek Project (K19075) will continue
extending the southbound acceleration lane ½ mile south of Interchange (2018)
Cantilever VMS located within this area
(similar to I-84 Hood River EB)
I-84: Hood River EB & US97 @ Biggs Jct SB VMS (K20860)
US97 at Biggs Jct Southbound VMS: Existing Structures
21
Google Maps November 2015
Google Maps August 2016
To the North: Biggs Jct Int (MP 0.04)Traffic Signal
Existing Vertical Clearances
• Right Lane = 18’-6”
• Left Lane = 18’-7”
To the South: Wasco Intchg (MP 14.73)Bridge Structure #13548
Existing Vertical Clearances
• Right Lane = 17’-9”
• Left Lane = 18’-1”
• Diamond Interchange – could go “up
and over” ramps
City of Sisters TSP Update
GOAL: Improve highway operations on the east side of the city and
improve the highway alternate route (Barclay and Locust) for all
users, including freight.
PLANNING GOAL TO IMPLEMENTATION:
1. Identify Funding (not there yet)
2. Intersection Traffic Control Study (Alternatives Analysis)
3. Stakeholder Outreach & Design
4. Construction
22
Source: Sisters TSP Refinement (KAI)
City of Sisters TSP Update
NEAR TERM IMPROVEMENT US20 at Locust – Mini Roundabout
Single Lane approaches
Designed so that all loads are accommodated
23
Source: Sisters TSP Refinement (KAI)
CONCEPT ONLY
City of Sisters TSP Update
LONG TERM IMPROVEMENTS
1. Potential Roundabout US20 and Locust
24
Source: Sisters TSP Refinement (KAI)
CONCEPT ONLY CONCEPT ONLY CONCEPT ONLY
City of Sisters TSP Update
2. Potential Roundabout US20 and OR126
25
Source: Sisters TSP Refinement (KAI)
CONCEPT ONLY
City of Madras TSP Update
SOUTH MADRAS CONCEPT AREA:
Three lane highway (US97) without signals or roundabouts. In the
future, lands to the east and west of the highway will compete with
high demand on the highway.
STEPS TO IMPLEMENTATION:
1. Identify Funding (not there yet)
2. Intersection Traffic Control Study (Alternatives Analysis)
3. Stakeholder Outreach & Design
4. Construction
26
City of Madras TSP Update
NEAR TERM IMPROVEMENT ALTERNATIVES FOR CONSIDERATION
Intersection Improvements at primary connections to US97
(Fairgrounds Road and Hall Road)
• ROUNDABOUT – highway volumes likely require multilane
– Mobility benefits (v/c, delay)
– Safety benefits (reduced crashes)
– Aesthetic Benefits
27
City of Madras TSP Update
• JUG-HANDLE
– Restrict left and right turn movements at an intersection
– Two phase (more efficient) signalized intersection
– Turn movements served by “jug-handles”
28
Source: Google Maps
City of Madras TSP Update
• MEDIAN U-TURN
» Restrict left-turns at main intersection
» Two phase (more efficient) signalized intersection
» Provide U-Turn downstream of intersection
29
Source: FHWA Median U-Turn
Information Guide
City of Madras TSP Update
• Restricted Crossing Median U-Turn
– Restrict minor street through volumes
» Served by turning right and then using the downstream u-turn
– Allow major street left-turns
Want to Know More? http://www.madrastsp.com/30