Region 3 SHADY BRIDGE Project consists of replacing 3 bridges with 4 ~ hanging a pedestrian bridge...

26
Region 3 SHADY BRIDGE SHADY BRIDGE Project consists of replacing 3 bridges with 4 ~ hanging a pedestrian Project consists of replacing 3 bridges with 4 ~ hanging a pedestrian bridge under the new SB River bridge and NB and SB off ramp bridge under the new SB River bridge and NB and SB off ramp modifications. modifications.

Transcript of Region 3 SHADY BRIDGE Project consists of replacing 3 bridges with 4 ~ hanging a pedestrian bridge...

Page 1: Region 3 SHADY BRIDGE Project consists of replacing 3 bridges with 4 ~ hanging a pedestrian bridge under the new SB River bridge and NB and SB off ramp.

Region 3

SHADY BRIDGESHADY BRIDGEProject consists of replacing 3 bridges with 4 ~ hanging a Project consists of replacing 3 bridges with 4 ~ hanging a

pedestrian bridge under the new SB River bridge and NB and pedestrian bridge under the new SB River bridge and NB and SB off ramp modifications.SB off ramp modifications.

Page 2: Region 3 SHADY BRIDGE Project consists of replacing 3 bridges with 4 ~ hanging a pedestrian bridge under the new SB River bridge and NB and SB off ramp.

Region 3

Original Project TimelineOriginal Project Timeline

• Project Bid ~ February 2004

• Contract Completion ~ January 31, 2008

• Stem Wall Issues ~ June 2006– Stem Wall Repairs ~ October 2007– Repairs Complete ~ February 2008

Page 3: Region 3 SHADY BRIDGE Project consists of replacing 3 bridges with 4 ~ hanging a pedestrian bridge under the new SB River bridge and NB and SB off ramp.

Region 3

Stem Wall Damage Stem Wall Damage InvestigationInvestigation

• Ground Penetrating Radar

• Impact Echo Hammer

• Impulse Resonance

• Core Drilling

Page 4: Region 3 SHADY BRIDGE Project consists of replacing 3 bridges with 4 ~ hanging a pedestrian bridge under the new SB River bridge and NB and SB off ramp.

Region 3

Ground Penetrating RadarGround Penetrating Radar

Page 5: Region 3 SHADY BRIDGE Project consists of replacing 3 bridges with 4 ~ hanging a pedestrian bridge under the new SB River bridge and NB and SB off ramp.

Region 3

Core DrillingCore Drilling

Page 6: Region 3 SHADY BRIDGE Project consists of replacing 3 bridges with 4 ~ hanging a pedestrian bridge under the new SB River bridge and NB and SB off ramp.

Region 3

Stem Wall Damage PicturesStem Wall Damage Pictures

Page 7: Region 3 SHADY BRIDGE Project consists of replacing 3 bridges with 4 ~ hanging a pedestrian bridge under the new SB River bridge and NB and SB off ramp.

Region 3

Stem Wall Damage PicturesStem Wall Damage Pictures

Page 8: Region 3 SHADY BRIDGE Project consists of replacing 3 bridges with 4 ~ hanging a pedestrian bridge under the new SB River bridge and NB and SB off ramp.

Region 3

Stem Wall Damage PicturesStem Wall Damage Pictures

You can note that the rebar is pushed away from the concrete stem wall.

Page 9: Region 3 SHADY BRIDGE Project consists of replacing 3 bridges with 4 ~ hanging a pedestrian bridge under the new SB River bridge and NB and SB off ramp.

Region 3

Stem Wall Damage PicturesStem Wall Damage Pictures

Page 10: Region 3 SHADY BRIDGE Project consists of replacing 3 bridges with 4 ~ hanging a pedestrian bridge under the new SB River bridge and NB and SB off ramp.

Region 3

Overview of Stem Wall DamageOverview of Stem Wall Damage

Page 11: Region 3 SHADY BRIDGE Project consists of replacing 3 bridges with 4 ~ hanging a pedestrian bridge under the new SB River bridge and NB and SB off ramp.

Region 3

Duct Bundling Allowance –vs- Duct Bundling Allowance –vs- BR130BR130

Page 12: Region 3 SHADY BRIDGE Project consists of replacing 3 bridges with 4 ~ hanging a pedestrian bridge under the new SB River bridge and NB and SB off ramp.

Region 3

Duct Bundling AllowanceDuct Bundling Allowance

Page 13: Region 3 SHADY BRIDGE Project consists of replacing 3 bridges with 4 ~ hanging a pedestrian bridge under the new SB River bridge and NB and SB off ramp.

Region 3

Stem Wall PT Duct Install PicturesStem Wall PT Duct Install Pictures

Page 14: Region 3 SHADY BRIDGE Project consists of replacing 3 bridges with 4 ~ hanging a pedestrian bridge under the new SB River bridge and NB and SB off ramp.

Region 3

Duct and Bundling PicturesDuct and Bundling Pictures

Page 15: Region 3 SHADY BRIDGE Project consists of replacing 3 bridges with 4 ~ hanging a pedestrian bridge under the new SB River bridge and NB and SB off ramp.

Region 3

Duct and Bundling PicturesDuct and Bundling Pictures

Page 16: Region 3 SHADY BRIDGE Project consists of replacing 3 bridges with 4 ~ hanging a pedestrian bridge under the new SB River bridge and NB and SB off ramp.

Region 3

Duct and Bundling PicturesDuct and Bundling Pictures

Page 17: Region 3 SHADY BRIDGE Project consists of replacing 3 bridges with 4 ~ hanging a pedestrian bridge under the new SB River bridge and NB and SB off ramp.

Region 3

Repair DetailsRepair Details

Page 18: Region 3 SHADY BRIDGE Project consists of replacing 3 bridges with 4 ~ hanging a pedestrian bridge under the new SB River bridge and NB and SB off ramp.

Region 3

Another IssueAnother Issue

The bottom of Deck is The bottom of Deck is corrugated!corrugated!

Page 19: Region 3 SHADY BRIDGE Project consists of replacing 3 bridges with 4 ~ hanging a pedestrian bridge under the new SB River bridge and NB and SB off ramp.

Region 3

Bottom of DeckBottom of Deck

Page 20: Region 3 SHADY BRIDGE Project consists of replacing 3 bridges with 4 ~ hanging a pedestrian bridge under the new SB River bridge and NB and SB off ramp.

Region 3

Bottom of DeckBottom of Deck

Page 21: Region 3 SHADY BRIDGE Project consists of replacing 3 bridges with 4 ~ hanging a pedestrian bridge under the new SB River bridge and NB and SB off ramp.

Region 3

Bottom of DeckBottom of Deck

Concrete Dobie Blocks

The bottom of deck buckled between dobies

Page 22: Region 3 SHADY BRIDGE Project consists of replacing 3 bridges with 4 ~ hanging a pedestrian bridge under the new SB River bridge and NB and SB off ramp.

Region 3

Deck Form BoardsDeck Form Boards

Contractor used 11/32” plywood. Requirement is now 5/8” nominal thickness.

Page 23: Region 3 SHADY BRIDGE Project consists of replacing 3 bridges with 4 ~ hanging a pedestrian bridge under the new SB River bridge and NB and SB off ramp.

Region 3

Warpage:Warpage:

Contractor was required to remove this plywood on the remaining spans; 3 and 4.

Page 24: Region 3 SHADY BRIDGE Project consists of replacing 3 bridges with 4 ~ hanging a pedestrian bridge under the new SB River bridge and NB and SB off ramp.

Region 3

Where we are now.Where we are now.

• July 12, 2008 ~ Sent Ross Bros. a letter of Termination for Default.

• July 21, 2008 ~ ODOT received proposals from both the contractor and the surety.

• July 24, 2008 ~ ODOT rejected Ross’ proposal, but agreed to pursue Safeco’s 2nd proposed option.

Per the Standard Specifications, the contractor and their surety have the ability to propose a cure to the project with in 10 days of the notice.

Ross’ proposal kept them as the Prime Contractor. Safeco’s proposal had 2 options; 1) keeping Ross as the prime and 2) Safeco taking over the contract and hiring a completion contractor.

Page 25: Region 3 SHADY BRIDGE Project consists of replacing 3 bridges with 4 ~ hanging a pedestrian bridge under the new SB River bridge and NB and SB off ramp.

Region 3

Where we are now.Where we are now.• September 15, 2008 ~ ODOT signed a

Takeover Agreement with Safeco.

• Highlights of Takeover Agreement– Safeco is now the Prime Contractor;– Safeco is allowed to use Ross Brothers;– Safeco will provide on-sight Project Manager– Safeco will assume Superintendent

responsibilities per the STD Specs 150 section;– Safeco will reimburse ODOT ± $2M for stem wall

repairs and investigation;– Safeco will reimburse ODOT ± $1.1M for

continued CEI costs;– Safeco will reimburse ODOT ± $426K for LD’s;

After 7 weeks of back and forth negotiations, ODOT and Safeco came to agreement.

Page 26: Region 3 SHADY BRIDGE Project consists of replacing 3 bridges with 4 ~ hanging a pedestrian bridge under the new SB River bridge and NB and SB off ramp.

Region 3

Where we are now.Where we are now.• Highlights of Takeover Agreement; (cont)

– Agreement established a new interim and new completion date;

• October 31, 2010 – All work complete except for site restoration, clean up, punch list, pier and falsework removal, planting, etc.

• August 31, 2011 – Final completion – All work must be complete.

• September 29, 2008 ~ Safeco was provided an NTP to proceed with the work under the new agreement.

• October 31, 2008 ~ The NB South Umpqua River Bridge was open to traffic.